Loading...
HomeMy WebLinkAbout26-6402 - City Council - ResolutionRESOLUTION 26-6402 A RESOLUTION OF THE CITY OF FORT WORTH, TEXAS DETERMINING THE COSTS OF CERTAIN PUBLIC IMPROVEMENTS TO BE FINANCED BY THE FORT WORTH PUBLIC IMPROVEMENT DISTRICT NO. 22 (VEALE RANCH); ACCEPTING A PRELIMINARY SERVICE AND ASSESSMENT PLAN, INCLUDING PROPOSED ASSESSMENT ROLLS; DIRECTING THE FILING OF THE PROPOSED ASSESSMENT ROLLS WITH THE CITY SECRETARY TO MAKE AVAILABLE FOR PUBLIC INSPECTION; CALLING A PUBLIC HEARING ON OCTOBER 27, 2026, TO CONSIDER AN ORDINANCE LEVYING ASSESSMENTS ON CERTAIN PROPERTY WITHIN THE DISTRICT; DIRECTING CITY STAFF TO PUBLISH AND MAIL NOTICE OF SAID PUBLIC HEARING; AND RESOLVING OTHER MATTERS INCIDENT AND RELATED THERETO WHEREAS, Chapter 372, Texas Local Government Code (the "Act") authorizes the governing body (the "City Council") of the City of Fort Worth, Texas (the "City"), to create a public improvement district within the corporate limits and extraterritorial jurisdiction of the City; and WHEREAS, on August 8, 2023, the City Council conducted a public hearing to consider a petition received by the City on June 5, 2023 (the "Petition"), requesting the creation of Fort Worth Public Improvement District No. 22 (Veale Ranch) (the "District") to undertake the construction of certain public improvements described in the Petition (the "Authorized Improvements"); and WHEREAS, on August 8, 2023, the City Council adopted Resolution No. 5782-08-2023 authorizing, establishing and creating the District; and WHEREAS, the City Council now desires to levy special assessments on Improvement Area #6 (as defined in the Preliminary SAP (defined below)) of the District for the purposes of financing the costs of certain Authorized Improvements in Improvement Area #6 (the "Improvement Area #6 Improvements"); and WHEREAS, the City Council and the City staff have been presented with a Preliminary Service and Assessment Plan for the District, including the Improvement Area #6 Assessment Roll (the "Proposed Assessment Roll") (the Preliminary Service and Assessment Plan and the Proposed Assessment Roll are referred to collectively as, the "Preliminary SAP"), a copy of which is attached hereto as Exhibit A and is incorporated herein for all purposes; and WHEREAS, the Preliminary SAP sets forth the estimated total costs of the Improvement Area #6 Improvements, and the Proposed Assessment Roll states the proposed assessments to be levied against each parcel of land in Improvement Area #6 benefited by such improvements, as determined by the assessment methodology chosen by the City Council and set forth in the Preliminary SAP; and WHEREAS, the Act requires that the Proposed Assessment Rolls levying the assessments on Improvement Area #6 be filed with the City Secretary of the City (the "City Secretary") and be subject to public inspection; and WHEREAS, the Act requires that a public hearing (the "Assessment Hearing") be called to consider the proposed assessments on benefited property within Improvement Area #6 and requires the City Council to hear and pass on any objections to such proposed assessments at, or on the adjournment of, the Assessment Hearing; and WHEREAS, the Act requires that notice of the Assessment Hearing be published in a newspaper of general circulation in the City, and in a newspaper of general circulation in the part of the City's extraterritorial jurisdiction in which the District is located or in which the proposed improvements are to be undertaken, before the tenth (10th) day before the date of the Assessment Hearing and be mailed to property owners liable for assessment; and WHEREAS, after all objections have been heard and passed on at the Assessment Hearing, the City Council may levy assessments on benefited property within Improvement Area #6 to pay for the Improvement Area #6 Improvements, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT: 1. The recitals set forth above in this Resolution are true and correct and are hereby adopted as findings of the City Council and are incorporated into the body of this Resolution as if fully set forth herein; and 2. The City Council hereby accepts the Preliminary SAP, including the Proposed Assessment Rolls. All capitalized terms not otherwise defined herein shall have the meanings given to such terms in the Preliminary SAP; and 3. The City Council hereby determines that the estimated total cost of the Improvement Area #6 Improvements to be funded through the assessments to be levied on benefitted property in Improvement Area #6 of the District, including financing costs, is approximately $30,380,000; and 4. The City Council's final determination and approval of the costs of the Improvement Area #6 Improvements, or any portion thereof, shall be subject to and contingent upon City Council approval of a final Service and Assessment Plan which will include the final Improvement Area #6 Assessment Roll, after the properly noticed and held Assessment Hearing; and 5. The City Council hereby authorizes and directs the filing of the Preliminary SAP, including the Proposed Assessment Roll, with the City Secretary and the same shall be available for public inspection on the City's website; and 6. The City Council hereby authorizes, and calls, a public hearing (the Assessment Hearing as defined above) to be held on October 27, 2026, at or after 1 p.m. at City Council Chamber, City Hall, 100 Fort Worth Trail, Fort Worth, Texas, at which the City Council shall, among other actions, hear and pass on any objections to the proposed assessments; and, upon the adjournment of the Assessment Hearing, the City Council may consider an ordinance levying the assessments on the benefited property within Improvement Area #6 of the District (which ordinance shall specify the method of payment of the assessments); and 7. The City Council hereby authorizes and directs City staff to publish notice of the Assessment Hearing in substantially the form attached hereto as Exhibit B and incorporated herein for all purposes, in a newspaper of general circulation in the City, and in a newspaper of general circulation in the part of the City's extraterritorial jurisdiction in which the District is located or in which the proposed improvements are to be undertaken, on or before October 16, 2026, as required by Section 372.016(b) of the Act; and 8. When the Proposed Assessment Rolls are filed with the City Secretary, the City Council hereby authorizes and directs City staff, on or before October 16, 2026, to mail to owners of property liable for assessment notice of the Assessment Hearing as required by Section 372.016(c) of the Act; and 9. City staff is authorized and directed to take such other actions as are required (including, but not limited to, providing notice of the public hearing as required by the Texas Open Meetings Act) to place the Assessment Hearing on the agenda for the October 27, 2026 meeting of the City Council; and 10. This resolution shall be effective from and after its passage by the City Council. Adopted this October 13, 2026. ATTEST: By: Jannette S. Goodall, City Secretary as FORr��� 27 0 OOOOOO O 0 pd �v0 °2d o0 .* OO nEapp FORT WORTH PUBLIC IMPROVEMENT DISTRICT NUMBER 22 (VEALE RANCH) CITY OF FORT WORTH, TEXAS FORT WORTH® PRELIMINARY AMENDED SERVICE AND ASSESSMENT PLAN April 28, 2026 As updated for Improvement Area #4 and #5 Bonds on August 11, 2026, as updated for Improvement Area #6 levy on October 13, 2026 PREPARED BY: MUNICAP, INC. PUBLIC FINANCE FORT WORTH PUBLIC IMPROVEMENT DISTRICT NUMBER 22 (VEALE RANCH) PRELIMINARY AMENDED SERVICE AND ASSESSMENT PLAN TABLE OF CONTENTS I. PLAN DESCRIPTION AND DEFINED TERMS...................................................................1 A. INTRODUCTION............................................................................................................................1 B. DEFINITIONS............................................................................................................................... 2 II. PROPERTY INCLUDED IN THE PID............................................................................ 12 A. PROPERTY INCLUDED IN THE PID..............................................................................................12 B. PROPERTY INCLUDED IN IMPROVEMENT AREA #4.....................................................................13 C. PROPERTY INCLUDED IN IMPROVEMENT AREA #5.....................................................................13 D. PROPERTY INCLUDED IN IMPROVEMENT AREA #6.....................................................................13 E. PROPERTY INCLUDED IN FUTURE IMPROVEMENT AREAS..........................................................14 III. DESCRIPTION OF THE AUTHORIZED IMPROVEMENTS .............................................16 16 A. AUTHORIZED IMPROVEMENT OVERVIEW..................................................................................16 B. DESCRIPTIONS AND BUDGETED COSTS OF IMPROVEMENT AREA #4 IMPROVEMENTS ................17 C. DESCRIPTIONS AND BUDGETED COSTS OF IMPROVEMENT AREA #5 IMPROVEMENTS ................19 D. DESCRIPTIONS AND BUDGETED COSTS OF IMPROVEMENT AREA #6 IMPROVEMENTS ................21 E. FUTURE IMPROVEMENT AREAS..................................................................................................23 IV. SERVICE PLAN........................................................................................................ 25 A. PROJECTED SOURCES AND USES OF FUNDS................................................................................25 B. PROJECTED FIVE-YEAR SERVICE PLAN.....................................................................................30 C. PID ASSESSMENT NOTICE..........................................................................................................32 V. ASSESSMENT PLAN................................................................................................... 33 A. INTRODUCTION..........................................................................................................................33 B. SPECIAL BENEFIT.......................................................................................................................35 C. ASSESSMENT METHODOLOGY....................................................................................................37 D. ASSESSMENTS.............................................................................................................................39 E. ADMINISTRATIVE EXPENSES......................................................................................................40 F. ADDITIONAL INTEREST RESERVE...............................................................................................40 G. TIRZ ANNUAL CREDIT..............................................................................................................40 VI. TERMS OF THE ASSESSMENTS................................................................................. 41 A. AMOUNT OF ASSESSMENTS AND ANNUAL INSTALLMENTS FOR PARCELS LOCATED WITHIN IMPROVEMENTAREA #4........................................................................................................... 41 B. AMOUNT OF ASSESSMENTS AND ANNUAL INSTALLMENTS FOR PARCELS LOCATED WITHIN IMPROVEMENTAREA #5........................................................................................................... 41 C. AMOUNT OF ASSESSMENTS AND ANNUAL INSTALLMENTS FOR PARCELS LOCATED WITHIN IMPROVEMENTAREA #6...........................................................................................................42 D. AMOUNT OF ASSESSMENTS AND ANNUAL INSTALLMENTS FOR PARCELS LOCATED WITHIN FUTURE IMPROVEMENT AREAS.................................................................................................42 E. REALLOCATION OF ASSESSMENTS.............................................................................................43 F. MANDATORY PREPAYMENT OF ASSESSMENTS...........................................................................43 G. REDUCTION OF ASSESSMENTS....................................................................................................44 H. PAYMENT OF ASSESSMENTS.......................................................................................................45 I. COLLECTION OF ANNUAL INSTALLMENTS.................................................................................47 VII. THE ASSESSMENT ROLL........................................................................................ 49 A. IMPROVEMENT AREA #4 ASSESSMENT ROLL.............................................................................49 B. IMPROVEMENT AREA #5 ASSESSMENT ROLL.............................................................................50 C. IMPROVEMENT AREA #6 ASSESSMENT ROLL.............................................................................51 D. FUTURE IMPROVEMENT AREAS ASSESSMENT ROLL..................................................................51 E. ANNUAL ASSESSMENT ROLL UPDATES.......................................................................................52 VIII. MISCELLANEOUS PROVISIONS........................................................................... 53 A. ADMINISTRATIVE REVIEW.........................................................................................................53 B. TERMINATION OF ASSESSMENTS................................................................................................53 C. AMENDMENTS............................................................................................................................53 D. COUNTY FILING.........................................................................................................................54 E. ADMINISTRATION AND INTERPRETATION OF PROVISIONS..........................................................54 F. SEVERABILITY............................................................................................................................54 APPENDIX A-1 - PID MAP APPENDIX A-2 - IMPROVEMENT AREA #4 MAP APPENDIX A-3 - IMPROVEMENT AREA #5 MAP APPENDIX A-4 - IMPROVEMENT AREA #6 MAP APPENDIX A-5 - FUTURE IMPROVEMENT AREA APPENDIX B - BUDGETED COSTS OF THE AUTHORIZED IMPROVEMENTS APPENDIX C-1 - IMPROVEMENT AREA #4 LEGAL DESCRIPTION APPENDIX C-2 - IMPROVEMENT AREA #5 LEGAL DESCRIPTION APPENDIX C-3 - IMPROVEMENT AREA #6 LEGAL DESCRIPTION APPENDIX D - DIAGRAMS OF THE AUTHORIZED IMPROVEMENTS APPENDIX E - PID ASSESSMENT NOTICE APPENDIX F - ASSESSMENT PER UNIT, PROJECTED LEVERAGE AND PROJECTED TAX RATE EQUIVALENTS APPENDIX G - IMPROVEMENT AREA #4 ASSESSMENT ROLL APPENDIX H - IMPROVEMENT AREA #5 ASSESSMENT ROLL APPENDIX I - PROPOSED IMPROVEMENT AREA #6 ASSESSMENT ROLL I. PLAN DES GRIP TIONAND DEFINED TERMS A. INTRODUCTION On August 8, 2023, the City Council of the City of Fort Worth, Texas (the "City") passed and approved Resolution No. 5782-08-2023 approving and authorizing the creation of the Fort Worth Public Improvement District No. 22 (Veale Ranch) (the "PID") to finance the costs of certain public improvements for the benefit of certain property in the PID, which was located both within the corporate limits of the City and in the extraterritorial jurisdiction of the City at the time the PID was created. The property within the PID is proposed to be developed in multiple phases, and the PID will finance certain public improvements as the property within the PID is developed. Assessments will be imposed on the property within the PID that receives a special benefit from certain Authorized Improvements. Chapter 372 of the Texas Local Government Code, the "Public Improvement District Assessment Act" (as amended, the "PID Act"), governs the creation and operation of public improvement districts within the State of Texas. This Fort Worth Public Improvement District No. 22 (Veale Ranch) Service and Assessment Plan (the "Service and Assessment Plan") has been prepared in accordance with the PID Act and specifically Sections 372.013, 372.014, 372.015 and 372.016, which address the requirements of a service and assessment plan and the assessment roll. According to Section 372.013 of the PID Act, a service plan "must (1) cover a period of at least five years; (2) define the annual indebtedness and the projected costs for improvements; and (3) include a copy of the notice form required by Section 5.014, Property Code." Additionally, Section 372.013 of the PID Act provides that "[t]he governing body of the municipality or county shall review and update the service plan annually for the purpose of determining the annual budget for improvements." The service plan is described in Section IV of this Service and Assessment Plan. The copy of the notice form required by Section 5.014 of the Texas Property Code, as amended, is attached hereto as Appendix E. Section 372.014 of the PID Act provides that "[a]n assessment plan must be included in the annual service plan." The assessment plan is described in Section V of this Service and Assessment Plan. Section 372.015 of the PID Act provides that "[t]he governing body of the municipality or county shall apportion the cost of an improvement to be assessed against property in an improvement district." The method of assessing the costs of the Authorized Improvements and apportionment of such costs to the property within the PID is included in Section V of this Service and Assessment Plan. Section 372.016 of the PID Act provides that "[a]fter the total cost of an improvement is determined; the governing body of the municipality or county shall prepare a proposed assessment roll. The rolls must state the assessment against each parcel of land in the district, as determined by the method of assessment chosen by the municipality or county under this subchapter." The Improvement Area #4 Assessment Roll, the Improvement Area #5 Assessment Roll, and the Improvement Area #6 Assessment Roll are included as Appendix G, Appendix H, and Appendix MuniCap 1 1 I, respectively, to this Service and Assessment Plan. The Assessments as shown on such Assessment Rolls are based on the method of assessment and apportionment of costs described in Section V of this Service and Assessment Plan. On April 28, 2026, the City Council approved the Improvement Area #4 Reimbursement Agreement and Improvement Area #5 Reimbursement Agreement to finance, refinance, provide or otherwise assist in the acquisition, construction and maintenance of the public improvements provided for the benefit of the property in the PID. The Improvement Area #4 Reimbursement Agreement allocated to the Improvement Area #4 Improvements was $16,630,000 and the Improvement Area #5 Reimbursement Agreement allocated to the Improvement Area #5 Improvements was $6,809,000. On August 11, 2026, the City Council approved the Improvement Area #4 & #5 Bonds to remove the obligation under the Improvement Area #4 Reimbursement Agreement and the Improvement Area #5 Reimbursement Agreement. Improvement Area #4 & #5 Bonds were issued in the amount of $23,018,000. This Service and Assessment Plan is being amended and restated herein to, provide for the levy of Assessments on Improvement Area #6 of the PID. The amended and restated Service and Assessment Plan is herein referred to as the "Service and Assessment Plan". B. DEFINITIONS Capitalized terms used herein shall have the meanings ascribed to them as follows: "Actual Cost(s)" means, with respect to an Authorized Improvement, the demonstrated, reasonable, allocable, and allowable costs of constructing such Authorized Improvement, as specified in a Certificate for Payment that has been reviewed and approved by the City. Actual Costs may include (a) the costs for the design, planning, financing, administration, management, acquisition, installation, construction and/or implementation of such Authorized Improvement, including general contractor and construction management fees, if any, (b) the costs of preparing the construction plans for such Authorized Improvement, (c) the fees paid for obtaining permits, licenses or other governmental approvals for such Authorized Improvement, (d) the costs for external professional costs associated with such Authorized Improvement, such as engineering, geotechnical, surveying, land planning, architectural landscapers, advertising, marketing and research studies, appraisals, legal, accounting and similar professional services, taxes (e) the costs of all labor, bonds and materials, including equipment and fixtures, incurred by contractors, builders and material men in connection with the acquisition, construction or implementation of the Authorized Improvements, (f) all related permitting, zoning and public approval expenses, architectural, engineering, legal, and consulting fees, financing charges, taxes, governmental fees and charges (including inspection fees, City permit fees, plan review fees, material testing fees, water lab fees, development fees, capacity fees and per acre charges), insurance premiums, and miscellaneous expenses, and (g) the fair market value of any Property for which easements, road right-of-way or landscaping facilities has been dedicated to the City as an Authorized Improvement. MuniCap 1 2 Actual Costs include general contractor's fees in an amount up to a percentage equal to the percentage of work completed and accepted by the City or construction management fees in an amount up to five percent of the eligible Actual Costs described in a payment request in a form that has been reviewed and approved by the City. The amounts expended on legal costs, taxes, governmental fees, insurance premiums, permits, financing costs, and appraisals shall be excluded from the base upon which the general contractor and construction management fees are calculated. "Additional Interest Component" means the amount collected by application of the Additional Interest Rate. "Additional Interest Rate" means the 0.50% additional interest rate charged on Assessments pursuant to Section 372.018 of the PID Act. "Additional Interest Reserve" has the meaning set forth in Section V.G of this Service and Assessment Plan. "Administrative Expenses" means the costs associated with, or incident to, the administration, organization, maintenance and operation of the PID, including, but not limited to, the costs of: (i) creating and organizing the PID, including conducting hearings, preparing notices and petitions, and all costs incident thereto, including engineering fees, legal fees and consultant fees, (ii) the annual administrative, organization, maintenance, and operation costs and expenses associated with, or incident and allocable to, the administration, organization, maintenance, and operation of the PID and the Authorized Improvements, (iii) computing, levying, billing and collecting Assessments or the Annual Installments thereof, (iv) maintaining the record of installments of the Assessments and the system of registration and transfer of the Bonds, (v) paying and redeeming the Bonds, (vi) investing or depositing of monies, (vii) complying with the PID Act and other laws applicable to the Bonds, (viii) the Trustee fees and expenses relating to the Bonds, including reasonable fees, (ix) legal counsel, engineers, accountants, financial advisors, investment bankers or other consultants and advisors, and (x) administering the construction of the Authorized Improvements. Administrative Expenses do not include payment of the actual principal of, redemption premium, if any, and interest on the Bonds. Administrative Expenses collected and not expended for actual Administrative Expenses in one year shall be carried forward and applied to reduce Administrative Expenses in subsequent years to avoid the over -collection of amounts to pay Administrative Expenses. "Administrator" means an employee of the City or third -party designee of the City who shall have the responsibilities provided in this the Service and Assessment Plan, a Trust Indenture, or any other agreement or document approved by the City related to the duties and responsibilities of the administration of the PID. The initial Administrator is MuniCap, Inc. "Annual Installment" means, with respect to each Parcel of Assessed Property, each annual payment of: (i) the Assessments including both principal of and interest thereon, as shown on the applicable Assessment Roll attached hereto (or any Annual Service Plan Update, and calculated as provided in Section VI of this Service and Assessment Plan, (ii) the Additional Interest Component described in Section V of this Service and Assessment Plan, and (iii) Administrative Expenses. MuniCap 13 "Annual Service Plan Update" has the meaning set forth in Section IV.A of this Service and Assessment Plan. "Assessed Property" means any property that benefits from the Authorized Improvements within the PID on which Assessments have been imposed as shown in the applicable Assessment Roll, as such Assessment Roll is updated each year by the Annual Service Plan Update. Assessed Property includes all Parcels within the PID other than Non -Benefited Property. "Assessment" means an assessment levied against a Parcel of Assessed Property imposed pursuant to an Assessment Ordinance and the provisions hereof, as shown on the applicable Assessment Roll, subject to reallocation or reduction according to the provisions hereof and the PID Act. An Assessment for a Parcel of Assessed Property consists of the Annual Installments to be collected in all years including the portion of those Annual Installments collected to pay Administrative Expenses and interest (including the Additional Interest Component) on all Assessments. "Assessment Ordinance" means each ordinance adopted by the City Council approving this Service and Assessment Plan (including amendments or supplements to this Service and Assessment Plan) and levying Assessments against Assessed Property, and includes the Improvement Area #4 Assessment Ordinance, the Improvement Area #5 Assessment Ordinance, the Improvement Area #6 Assessment Ordinance, and all Future Improvement Area Assessment Ordinances. "Assessment Revenues" means the revenues actually received by or on behalf of the City from the collection of Assessments. "Assessment Roll" means the Improvement Area #4 Assessment Roll, the Improvement Area #5 Assessment Roll, the Improvement Area #6 Assessment Roll, and all Future Improvement Area Assessment Rolls approved in an amendment or supplement to this Service and Assessment Plan or in an Annual Service Plan Update. "Authorized Improvements" means those public improvements described in Appendix B of this Service and Assessment Plan and Section 372.003 of the PID Act, constructed and installed in accordance with this Service and Assessment Plan, and any future updates and/or amendments. "Bonds" means any bonds issued by the City in one or more series and secured in whole or in part by the Assessment Revenues. "Budgeted Cost(s)" means the amounts budgeted to construct the Authorized Improvements as used in the preparation of this Service and Assessment Plan. "Certification for Payment" means the certificate to be provided by the Developer, or its designee, to substantiate the Actual Costs of one or more Authorized Improvements. "City" means the City of Fort Worth, Texas. MuniCap 1 4 "City Council" means the duly elected governing body of the City. "County" means Tarrant County, Texas or Parker County, Texas. "Delinquent Collection Costs" means the costs related to the foreclosure on a Parcel of Assessed Property and the costs of collection of a delinquent Assessment or any other delinquent amounts due under this Service and Assessment Plan, all in accordance with the PID Act, including penalties and reasonable attorney's fees actually paid, but excluding amounts representing interest and penalty interest. "Developer" means the applicable Original Owner of an Improvement Area and any authorized assignee pursuant to the Development Agreement. "Development Agreement" means that certain "Veale Ranch Development Agreement" by and among the Original Owners and the City, related to the property within the PID, and effective as of March 9, 2023, as amended, supplemented, or assigned from time to time. "Equivalent Units" means, as to any Parcel of Assessed Property, the number of dwelling units by Lot Type expected to be built on such Parcel multiplied by the factors calculated and shown in Appendix F attached hereto. "Future Improvement Area" means an Improvement Area to be defined and developed after Improvement Area #1, #2, and #3, Improvement Area #4, and Improvement Area #5, Improvement Area #6, and within the boundaries of the PID (but which are not subject to development at this time). "Future Improvement Area Assessed Property" means all Parcels of Assessed Property within the Future Improvement Area. "Future Improvement Area Assessment" means an Assessment levied against Future Improvement Area Assessed Property to pay for a portion of the Future Improvement Area Improvements and imposed pursuant to a Future Improvement Area Assessment Ordinance and the provisions herein, as shown on a Future Improvement Area Assessment Roll, subject to reallocation or reduction pursuant to the provisions set forth herein and in the PID Act. "Future Improvement Area Assessment Ordinance" means each ordinance adopted by the City Council that levies a Future Improvement Area Assessment against Future Improvement Area Assessed Property. "Future Improvement Area Assessment Roll" means the Assessment Roll that will be attached to this Service and Assessment Plan in conjunction with the adoption of a Future Improvement Area Assessment Ordinance. "Future Improvement Area Bonds" means bonds issued to fund Future Improvement Area Improvements (or a portion thereof) in a Future Improvement Area that are secured in whole or in MuniCap 1 5 part by Future Improvement Area Assessments. In connection with Future Improvement Area Bonds, Future Improvement Area Assessments related to such Future Improvement Area Bonds, Future Improvement Area Assessments will be levied only on Assessed Property located within the applicable Future Improvement Area to finance Future Improvement Area Improvements which will only benefit such Future Improvement Area. "Future Improvement Area Improvements" means those Authorized Improvements which will confer a special benefit to the related Future Improvement Area. "Future Improvement Area Reimbursement Agreement" means any reimbursement agreement related to the Actual Costs of Future Improvement Area Improvements to be paid from Future Improvement Area Assessments secured by the Future Improvement Area Assessed Property for the Future Improvement Area Improvements under the terms of the Master Reimbursement Agreement. "Homeowners' Association" means a homeowner's association or property owners' association established for the benefit of property owners within the boundaries of the PID. "Homeowners' Association Property" means property within the boundaries of the PID that is owned by or irrevocably offered for dedication to, whether in fee simple or through an exclusive use easement, a Homeowner's Association. "Improvement Area" means one or more Parcels within the PID that will be developed in the same general time period. The Parcels within an Improvement Area or will be assessed in connection with the issuance of Bonds to fund Authorized Improvements (or the portion thereof) designated in an update to this Service and Assessment Plan that specially benefit the Parcels within the Improvement Area. "Improvement Area Reimbursement Agreements" means, collectively, the Improvement Area #4 Reimbursement Agreement, the Improvement Area #5 Reimbursement Agreement, the Improvement Area #6 Reimbursement Agreement, and all Future Improvement Area Reimbursement Agreements. "Improvement Areas #1, #2, and #3" means the Improvement Areas developed as depicted in Appendix A-1 and are not anticipated to have an Assessment imposed upon them. "Improvement Area #4" or "IA #4" means the improvement area to be developed as depicted in Appendix A-2, and as specifically described as the sum of all Parcels shown in Appendix G. Also referred to as Maverick Phase # 1. "Improvement Area #4 and #5 Assessment Ordinance" means Ordinance No. 28474-04-2026 approved and adopted by the City Council on April 28, 2026, which levied the Improvement Area #4 Assessment against the Improvement Area #4 Assessed Property and the Improvement Area #5 Assessment against the Improvement Area #5 Assessed Property, respectively, and approved this Service and Assessment Plan. MuniCap 1 6 "Improvement Area #4 and #5 Bonds" mean those certain City of Fort Worth, Texas, Special Assessment Revenue Bonds, Series 2026 (Fort Worth Public Improvement District No. 22 (Veale Ranch) Improvement Area #4 and #5 Project) that are secured primarily by Improvement Area #4 Assessment Revenues and Improvement Area #5 Assessment Revenues. The term Improvement Area #4 and #5 Bonds may also include any additional bonds issued in the future to construct or acquire the Improvement Area #4 Improvements and Improvement Area #5 Improvements currently being constructed pursuant to the Master Reimbursement Agreement and the Improvement Area #4 Reimbursement Agreement and Improvement Area #5 Reimbursement Agreement and which will also be secured by the Improvement Area #4 Assessment Revenues and Improvement Area #5 Assessment Revenues. "Improvement Area #4 Assessed Property" means all Parcels of Assessed Property within Improvement Area #4 as shown in the Improvement Area #4 Assessment Roll against which an Improvement Area #4 Assessment relating to the Improvement Area #4 Improvements is levied. "Improvement Area #4 Assessment" means an Assessment levied against Improvement Area #4 Assessed Property to pay for a portion of the Improvement Area #4 Improvements and imposed pursuant to the Improvement Area #4 Assessment Ordinance and the provisions herein, as shown on the Improvement Area #4 Assessment Roll, subject to reallocation or reduction pursuant to the provisions set forth herein and in the PID Act. "Improvement Area #4 Assessment Revenues" mean the actual revenues received by or on behalf of the City from the collection of Improvement Area #4 Assessments or the Annual Installments thereof. "Improvement Area #4 Assessment Roll" means the document attached to this Service and Assessment Plan as Appendix G, as updated, modified or amended from time to time in accordance with the procedures set forth herein and in the PID Act, including updates prepared in connection with the issuance of Bonds or in connection with any Annual Service Plan Update. "Improvement Area #4 Developer" means FW Club LP and FW Maverick Development LLC, its successors and assigns. "Improvement Area #4 Improvements" means the Authorized Improvements which only benefit the Improvement Area #4, which are described in Section III.B. "Improvement Area #4 Reimbursement Agreement" means the reimbursement agreement related to the Actual Costs of the Improvement Area #4 Improvements to be paid from Improvement Area #4 Assessments secured by the Improvement Area #4 Assessed Property for the Improvement Area #4 Improvements under the terms of the Master Reimbursement Agreement. "Improvement Area #5" or "IA #5" means the improvement area to be developed as depicted in Appendix A-3, and as specifically described as the sum of all Parcels shown in Appendix H. Also referred to as Ventana Phase #8. MuniCap 1 7 "Improvement Area #5 Assessed Property" means all Parcels of Assessed Property within Improvement Area #5, as shown in the Improvement Area #5 Assessment Roll against which an Improvement Area #5 Assessment relating to the Improvement Area #5 Improvements is levied. "Improvement Area #5 Assessment" means an Assessment levied against Improvement Area #5 Assessed Property to pay for a portion of the Improvement Area #5 Improvements and imposed pursuant to the Improvement Area #5 Assessment Ordinance and the provisions herein, as shown on the Improvement Area #5 Assessment Roll, subject to reallocation or reduction pursuant to the provisions set forth herein and in the PID Act. "Improvement Area #5 Assessment Revenues" mean the actual revenues received by or on behalf of the City from the collection of Improvement Area #5 Assessments levied against Improvement Area #5 Assessed Property, or the Annual Installments thereof. "Improvement Area #5 Assessment Roll" means the document attached to this Service and Assessment Plan as Appendix H, as updated, modified or amended from time to time in accordance with the procedures set forth herein and in the PID Act, including updates prepared in connection with the issuance of Bonds or in connection with any Annual Service Plan Update. "Improvement Area #5 Developer" means PMB Ventana Developer South LLC and PMB SWFW Dev Co Manager LLC, its successors and assigns. "Improvement Area #5 Improvements" means the Authorized Improvements which only benefit the Improvement Area #5, which are described in Section III.C. "Improvement Area #5 Reimbursement Agreement" means the reimbursement agreement related to the Actual Costs of the Improvement Area #5 Improvements to be paid from Improvement Area #5 Assessments secured by the Improvement Area #5 Assessed Property for the Improvement Area #5 Improvements under the terms of the Master Reimbursement Agreement. "Improvement Area #6" or "IA #6" means the improvement area to be developed as depicted in Appendix A-4, and as specifically described as the sum of all Parcels shown in Appendix I. Also referred to as Ventana Phase #9 and Ventana Phase #10. "Improvement Area #6 Assessed Property" means all Parcels of Assessed Property within Improvement Area #6, as shown in the Improvement Area #6 Assessment Roll against which an Improvement Area #6 Assessment relating to the Improvement Area #6 Improvements is levied. "Improvement Area #6 Assessment" means an Assessment levied against Improvement Area #6 Assessed Property to pay for a portion of the Improvement Area #6 Improvements and imposed pursuant to the Improvement Area #6 Assessment Ordinance and the provisions herein, as shown on the Improvement Area #6 Assessment Roll, subject to reallocation or reduction pursuant to the provisions set forth herein and in the PID Act. MuniCap 1 8 "Improvement Area #6 Assessment Revenues" mean the actual revenues received by or on behalf of the City from the collection of Improvement Area #6 Assessments levied against Improvement Area #6 Assessed Property, or the Annual Installments thereof. "Improvement Area #6 Assessment Roll" means the document attached to this Service and Assessment Plan as Appendix I, as updated, modified or amended from time to time in accordance with the procedures set forth herein and in the PID Act, including updates prepared in connection with the issuance of Bonds or in connection with any Annual Service Plan Update. "Improvement Area #6 Developer" means PMB SWFW Dev Co, LLC and PMB SWFW Dev Co Manager LLC, its successors and assigns. "Improvement Area #6 Improvements" means the Authorized Improvements which only benefit the Improvement Area #6, which are described in Section III.D. "Improvement Area #6 Maximum TIRZ Credit Amount" means the TIRZ Annual Credit Amount required to maintain the Target Net Tax Rate Equivalent. "Improvement Area #6 Reimbursement Agreement" means the reimbursement agreement related to the Actual Costs of the Improvement Area #6 Improvements to be paid from Improvement Area #6 Assessments secured by the Improvement Area #6 Assessed Property for the Improvement Area #6 Improvements under the terms of the Master Reimbursement Agreement. "Lot" means a tract of land described as a "lot" in a subdivision plat recorded in the official public records of the applicable County. "Lot Type" means a classification of final building lots with similar characteristics (e.g., commercial, light industrial, multifamily residential, single family residential, etc.), as determined by the Administrator and confirmed by the City Council as shown in Appendix F. In the case of single-family residential lots, the Lot Type shall be further defined by classifying the residential lots by the estimated average home value for each home at the time of assessment levy, considering factors such as density, lot size, proximity to amenities, view premiums, location, and any other factors that may impact the average home value on the lot, as determined by the Administrator and confirmed by the City Council. "Master Reimbursement Agreement" means that certain Veale Ranch Development Master Reimbursement Agreement dated as of December 7, 2023, by and among the City and the Original Owners in which the applicable Developer agrees to fund Actual Costs of certain Authorized Improvements and the City agrees to reimburse the Developer with interest permitted by the PID Act solely from Assessment Revenues and/or the net proceeds of Bonds for a portion of such Actual Costs of the Authorized Improvements funded by the Developer for Authorized Improvements constructed and accepted by the City for the benefit of the Assessed Property. "Non -Benefited Property" means Parcels that accrue no special benefit from the Authorized Improvements, including Homeowners' Association Property, Public Property and easements that MuniCap 1 9 create an exclusive use for a public utility provider to the extent they accrue no special benefit. Property identified as Non -Benefited Property at the time the Assessments (i) are imposed or (ii) are reallocated pursuant to a subdivision of a Parcel, is not assessed. Assessed Property converted to Non -Benefited Property, if the Assessments may not be reallocated pursuant to the provisions herein, remains subject to the Assessments and requires the Assessments to be prepaid as provided for in Section VI.F of this Service and Assessment Plan. "Original Owner(s)" means PB Ventana 1, LLC, a Texas limited liability company; PMB I20 Land LP, a Texas limited partnership; PMB Rolling V South Land, LP, a Texas limited partnership; PMB RVS Dev Co LLC, a Texas limited liability company; PMB SWFW Dev Co LLC, a Texas limited liability company; PMB Team Ranch Devco LLC, a Texas limited liability company; PMB Veale Land Investors 1 LP, a Texas limited partnership; PMB Ventana Developer LLC, a Texas limited liability company; PMB Ventana Developer South LLC, a Texas limited liability company; PMB Ventana SFR LP, a Texas limited partnership; and TRT Land Investors, LLC, a Delaware limited liability company and any affiliate or assignee thereof with respect to the Development Agreement. "Parcel" or "Parcels" means a parcel or parcels within the PID identified by either a tax map identification number assigned by the appraisal district for the applicable County, for real property tax purposes or by lot and block number in a final subdivision plat recorded in the real property records of the County. "PID" has the meaning set forth in Section LA of this Service and Assessment Plan. "PID Act" means Texas Local Government Code Chapter 372, Public Improvement District Assessment Act, Subchapter A, Public Improvement Districts, as amended. "PID Assessment Notice" means the homebuyer disclosure required under section 372.013 of the PID Act and is further described in Section IV.C and attached as Appendix E to this Service and Assessment Plan. "Prepayment Costs" mean interest and expenses to the date of prepayment, plus any additional expenses related to the prepayment, reasonably expected to be incurred by or imposed upon the City as a result of any prepayment of an Assessment. "Public Property" means property within the boundaries of the PID that is owned by or irrevocably offered for dedication to the federal government, the State of Texas, the County, the City, a school district or any other public agency, whether in fee simple or through an exclusive use easement. "Service and Assessment Plan" means this Service and Assessment Plan prepared for the PID pursuant to the PID Act, as the same may be amended or updated from time to time. "Target Net Tax Rate Equivalent" means $0.46 per $100 of taxable value. MuniCap 110 "TIRZ No. 16" means the Tax Increment Reinvestment Zone No. 16, City of Fort Worth, Texas (Veale Ranch TIF). "TIRZ Annual Credit Amount" means, for each Parcel of Assessed Property, the amount of TIRZ Revenues calculated, if applicable, pursuant to Section VI of this Service and Assessment Plan. "TIRZ Ordinance" means an ordinance adopted by the City Council authorizing the use of TIRZ Revenues for project costs under the Tax Increment Financing Act, Texas Tax Code, Chapter 311, as amended, relating to the Authorized Improvements as provided for in the TIRZ Project Plan and Financing Plan (including amendments or supplements thereto). "TIRZ Project Plan and Financing Plan" means the governing document of the TIRZ No. 16. "TIRZ Revenues" mean the portion of the City's and County's ad valorem tax revenue pledged to be paid into the TIRZ Fund pursuant to the TIRZ Ordinance and the TIRZ Project Plan and Financing Plan. "Trustee" means the fiscal agent or trustee as specified in a Trust Indenture, including a substitute fiscal agent or trustee. "Trust Indenture" means an indenture of trust, ordinance or similar document setting forth the terms and other provisions relating to the Bonds, as modified, amended, and/or supplemented from time to time. (remainder of this page is intentionally left blank) MuniCap I11 IL PROPERTYINCLUDED IN THE PID A. PROPERTY INCLUDED IN THE PID The PID is presently located within the corporate limits of the City and the City's extraterritorial jurisdiction. The PID contains approximately 5,200 acres of land. A map of the property within the PID is shown on Appendix A-1 to this Service and Assessment Plan. At completion, the PID is expected to consist of single-family residential units, multi -family residential units and commercial and industrial structures, landscaping, and infrastructure necessary to provide roadways, drainage, and utilities to the PID. The property within the PID is proposed to be developed as shown in Table II -A. Table II -A Proposed Development — PID Proposed Development Quantity Measurement Residential Units Single-family 6,000 Units Multi -family 11,000,000 GSF Commercial Retail Pad 600,000 GSF Retail (Big Box) 900,000 GSF Office 5,000,000 GSF Industrial 12,000,000 GSF Improvement Areas #1, #2 and #3 consists of approximately 464 acres and consists of 273 single family residential units, 188 multi -family residential units, and 1,592,554 square feet of commercial. No Assessments are anticipated to be levied on these Improvement Areas. Table II -B Actual Development — Improvement Area #1, #2 and #3 Proposed Development Quantity Measurement Residential Units Single-family 273 Units Multi -family 206,048 GSF Commercial Industrial 1,592,554 GSF MuniCap I12 B. PROPERTY INCLUDED IN IMPROVEMENT AREA #4 Improvement Area #4 consists of approximately 421.082 acres and is projected to consist of 136 single family residential units, to be developed as Improvement Area #4, as further described in Section III. A map of the property within Improvement Area #4 is shown in Appendix A-2. The property within Improvement Area #4 is proposed to be developed as shown in Table II -C. Table II -C Proposed Development — Improvement Area #4 Proposed Development Total Measurement Single Family - Estate Lots 100 Units Single Family - Cottage Lots 36 Units Total C. PROPERTY INCLUDED IN IMPROVEMENT AREA #5 136 Units Improvement Area #5 consists of approximately 72.059 acres and is projected to consist of 277 single family residential units, to be developed as Improvement Area #5, as further described in Section III. A map of the property within Improvement Area #5 is shown in Appendix A-3. The property within Improvement Area #5 is proposed to be developed as shown in Table II -D. Table II -D Proposed Development — Improvement Area #5 Proposed Development Total Measurement Single Family - 70 Ft 39 Units Single Family - 60 Ft 38 Units Single Family - 50 Ft 163 Units Single Family - 40 Ft 37 Units Total 277 Units D. PROPERTY INCLUDED IN IMPROVEMENT AREA #6 Improvement Area #6 consists of approximately 144.658 acres and is projected to consist of 589 single family residential units, to be developed as Improvement Area #6, as further described in Section III. A map of the property within Improvement Area #6 is shown in Appendix A-4. The property within Improvement Area #6 is proposed to be developed as shown in Table II -E. MuniCap 113 Table II -E Proposed Development — Improvement Area #6 Proposed Development Total Measurement Single Family - 70 Ft 64 Units Single Family - 60 Ft 166 Units Single Family - 50 Ft 115 Units Single Family - 40 Ft 188 Units Single Family —4 Packs 56 Units Total 589 Units E. PROPERTY INCLUDED IN FUTURE IMPROVEMENT AREAS The Future Improvement Areas consist of a total of approximately 4,098 acres and are projected to consist of 4,464 single family residential units, 10,793,952 gross square feet of multi -family, and 16,907,446 gross square feet of commercial. A map of the property within the Future Improvement Areas is shown in Appendix A-1 and Appendix A-5. The property within the Future Improvement Areas is proposed to be developed as shown in Table II -F. Table II -F Proposed Development — Future Improvement Areas Proposed Development Quantity Measurement Residential Units Single-family 4,464 Units Multi -family 10,793,952 GSF Commercial Retail Pad 600,000 GSF Retail (Big Box) 900,000 GSF Office 5,000,000 GSF Industrial 10,407,446 GSF As Future Improvement Areas are developed, Future Improvement Area Bonds may be issued and/or related reimbursements may be required pursuant to the Master Reimbursement Agreement and each respective Future Improvement Area Reimbursement Agreement for each new Improvement Area. In connection with the issuance of each new Future Improvement Area Bond and/or execution of each Future Improvement Area Reimbursement Agreement, this Service and Assessment Plan will be updated to add additional details of each new Improvement Area similar to that Improvement Area #4, Improvement Area #5, and Improvement Area #6 in Section II.B, Section II.C, and Section II.D. A map of the projected property within the Future Improvement Areas is shown in Appendix A-1 and Appendix A-5. The Future Improvement Areas are shown for illustrative purposes only and are subject to adjustment. The current Parcels of Assessed MuniCap 114 Property in the PID are shown on the Assessment Rolls included as Appendix G, Appendix H, and Appendix I. The estimated number of units at the build -out of the PID is based on the land use approvals for the property in the PID, the anticipated subdivision of property in the PID, and the Developer's estimates of the highest and best use of the property within the PID and are subject to adjustment by the Developers. (remainder of this page is intentionally left blank) MuniCap 115 III. DESCRIPTION OF THE AUTHORIZED IMPROVEMENTS A. AUTHORIZED IMPROVEMENT OVERVIEW Pursuant to Chapter 372.003 of the PID Act, Authorized Improvements: (a) If the governing body of a municipality or county finds that it promotes the interests of the municipality or county, the governing body may undertake an improvement project that confers a special benefit on a definable part of the municipality or county or the municipality's extraterritorial jurisdiction. A project may be undertaken in the municipality or county or the municipality's extraterritorial jurisdiction. (b) A public improvement may include: (i) landscaping; (ii) erection of fountains, distinctive lighting, and signs; (iii) acquiring, constructing, improving, widening, narrowing, closing, or rerouting of sidewalks or of streets, any other roadways, or their rights -of way; (iv) construction or improvement of pedestrian malls; (v) acquisition and installation of pieces of art; (vi) acquisition, construction, or improvement of libraries; (vii) acquisition, construction, or improvement of off-street parking facilities; (viii) acquisition, construction, improvement, or rerouting of mass transportation facilities; (ix) acquisition, construction, or improvement of water, wastewater, or drainage facilities or improvements; (x) the establishment or improvement of parks; (xi) projects similar to those listed in Subdivisions (i)-(x); (xii) acquisition, by purchase or otherwise, of real property in connection with an authorized improvement; (xiii) special supplemental services for improvement and promotion of the district, including services relating to advertising, promotion, health and sanitation, water and wastewater, public safety, security, business recruitment, development, recreation, and cultural enhancement; (xiv) payment of expenses incurred in the establishment, administration and operation of the district; and (xv) the development, rehabilitation, or expansion of affordable housing. After analyzing the public improvement projects authorized by the PID Act, the City has determined at this time to undertake only Authorized Improvements listed in Section III.B, Section III.C, and Section III.D, and shown in the opinion of probable costs and on the diagrams included as Appendix B for the benefit of the Assessed Property. Any change to the list of Authorized MuniCap 116 Improvements will require the approval of the City and an update to this Service and Assessment Plan. Tables included in this Section may be rounded to the nearest whole dollar. B. DESCRIPTIONS AND BUDGETED COSTS OF IMPROVEMENT AREA #4 IMPROVEMENTS The descriptions of the Improvement Area #4 Improvements are presented below as provided by the project engineer. The Budgeted Costs of the Improvement Area #4 Improvements are shown in Table III -B. The costs shown in Table III -B are estimates and may be revised in Annual Service Plan Updates, including such other improvements as deemed necessary to further improve the properties within the PID. A description of the Improvement Area #4 Improvements are as follows. Roadway Improvements The road improvement portion of the Improvement Area #4 Improvements consists of the acquisition, construction, improvement, widening, narrowing, closing and re-routing of streets, roadways, bridges and arterials and include, subgrade stabilization (including lime treatment and compaction), concrete, asphalt or other applicable material, curbs, gutters, sidewalks, barrier free ramps, signage, traffic control devices and wayfinding, landscaping and irrigation, re -vegetation of disturbed areas within and for the right of way, retaining walls within and for the right of way, all related earthwork and excavation, and the fair market value of any right-of-way dedication to the City which benefit the Improvement Area #4 Assessed Property. Roadway improvements also include, if necessary, any TxDOT (the "TxDOT") turn lanes or TxDOT signalization at US 377 & Bear Creek Parkway or other locations and the necessary infrastructure, requirements, permitting, and other necessary work related to TxDOT. All roadway projects will be designed and constructed in accordance with City and/or other applicable governmental jurisdiction standards and specifications, including the Fort Worth Master Throughfare Plan (the "Master Throughfare Fare"), and will be owned and operated by the City and/or other applicable governmental jurisdictions. Water Improvements The water improvements portion of the Improvement Area #4 Improvements consists of acquisition, construction, improvement and installation of water and reclaimed water supply lines and related facilities and equipment, which includes waterlines (excluding waterlines 8" or less and serving residential area), valves, vaults, fire hydrants, trench safety, testing, related earthwork and excavation, appurtenances, and the fair market value of any easements granted to the City necessary for the portion of the water distribution system that will service the Improvement Area #4 Assessed Property, including improvements that are off -site. The water improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. (remainder of this page is intentionally left blank) MuniCap 117 Sanitary Sewer Improvements The sanitary sewer improvement portion of the Improvement Area #4 Improvements consists of acquisition, construction, improvement and installation of various sized sanitary sewer pipes (excluding lines 8" or less and serving residential area), service lines, force main(s), lift station(s), and related facilities and equipment which include, manholes, encasements, pumps, trench safety, testing, related earthwork and excavation, appurtenances, and the fair market value of any easements granted to the City necessary to provide sanitary sewer service to Improvement Area #4 Assessed Property, including improvements that are offsite. The sanitary sewer improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. Storm Drainage Improvements The storm drainage improvement portion of the Improvement Area #4 Improvements consists of the acquisition, construction, improvement and installation of stormwater drainage and detention improvements and related facilities and equipment which include, storm pipes (all applicable material), storm boxes, multi -reinforced box culverts, junction boxes, inlets, headwalls, trench safety, testing, related earthwork and excavation and erosion control, appurtenances, and the fair market value of any easements granted to the City necessary to provide adequate drainage to the Improvement Area #4 Assessed Property, including improvements that are offsite. Storm drainage improvements further include, if necessary, any drainage infrastructure within TxDOT turn lanes at US 377 & Bear Creek Parkway or other locations and the necessary infrastructure, requirements, permitting, and other necessary work related to TxDOT. The storm drainage collection system improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. Public Landscaping and Trails The public landscaping and trail improvements of the Improvement Area #4 Improvements consist of the planting and construction of supplemental landscaping such as parks, ponds, lakes, open spaces, entry features and areas, which include, sitting stations, benches, shaded structure(s), hardscape such as walls, statues and monuments, landscaping, plantings, and irrigation, fountains, playgrounds, athletic facilities, pavilions, lighting and paved parking spaces, which benefit the Improvement Area #4 Assessed Property. The landscaping improvements will be designed according to City standards and will be available for public use. Other Soft and Miscellaneous Costs The soft and miscellaneous costs portion of the Improvement Area #4 Improvements consists of all costs related to designing, construction, installing, and financing the Authorized Improvements including engineering and surveying, land planning and design, project and construction management fees, City fees (including inspection fees, IPRC engineering plan review fees, administrative material testing costs, water lab testing fees, permit fees, development fees, capacity fees and per acre charges), material testing, appraisal, legal and issuance costs, contingency, and other related soft and miscellaneous costs. MuniCap 118 Table 111-A Budgeted Costs — Improvement Area #4 Original Improvement Total Improvement Area #4 Budget Area #4 Authorized Improvements Improvements Revisions Improvements) Roadway improvements $3,212,402 $0 $3,212,402 Water improvements $4,792,594 $0 $4,792,594 Sanitary sewer improvements $1,502,756 $0 $1,502,756 Storm drainage improvements $289,181 $0 $289,181 Public landscaping and trails $675,000 $0 $675,000 Other soft and miscellaneous costs $2,927,205 $550,000 $3,477,205 Total Authorized Improvements $13,399,138 $550,000 $13,949,138 'Provided by the Improvement Area #4 Developer. The figures shown in Table III -A may be revised in Annual Service Plan Updates and may be reallocated between line items so long as the total Improvement Area #4 Assessment related to the Improvement Area #4 Improvements does not increase. C. DESCRIPTIONS AND BUDGETED COSTS OF IMPROVEMENT AREA #5 IMPROVEMENTS The descriptions of the Improvement Area #5 Improvements are presented below as provided by the project engineer. The Budgeted Costs of the Improvement Area #5 Improvements are shown in Table III -B. The costs shown in Table III -B are estimates and may be revised in Annual Service Plan Updates, including such other improvements as deemed necessary to further improve the properties within the PID. A description of the Improvement Area #5 Improvements are as follows. Roadway Improvements The road improvement portion of the Improvement Area #5 Improvements consists of the acquisition, construction, improvement, widening, narrowing, closing and re-routing of streets, roadways, bridges and arterials and include, subgrade stabilization (including lime treatment and compaction), concrete, asphalt or other applicable material, curbs, gutters, sidewalks, barrier free ramps, signage, traffic control devices and wayfinding, landscaping and irrigation, re -vegetation of disturbed areas within and for the right of way, retaining walls within and for the right of way, all related earthwork and excavation, and the fair market value of any right-of-way dedication to the City which benefit the Improvement Area #5 Assessed Property. All roadway projects will be designed and constructed in accordance with City standards and specifications, including the Master Throughfare Plan, and will be owned and operated by the City. Water Improvements The water improvements portion of the Improvement Area #5 Improvements consists of acquisition, construction, improvement and installation of water and reclaimed water supply lines, and related facilities and equipment, includes waterlines (excluding water lines under 8" and MuniCap 119 serving residential area), valves, vaults, fire hydrants, trench safety, testing, related earthwork and excavation, appurtenances, and the fair market value of any easements granted to the City necessary for the portion of the water distribution system that will service the Improvement Area #5 Assessed Property, including improvements that are offsite. The water improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. Sanitary Sewer Improvements The sanitary sewer improvement portion of the Improvement Area #5 Improvements consists of acquisition, construction, improvement and installation of various sized sanitary sewer pipes (excluding lines 8" or less and serving residential area), service lines, force main(s), lift station(s), and related facilities and equipment which include, manholes, encasements, pumps, trench safety, testing, related earthwork and excavation, appurtenances, and the fair market value of any easements granted to the City necessary to provide sanitary sewer service to Improvement Area #5 Assessed Property, including improvements that are offsite. The sanitary sewer improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. Storm Drainage Improvements The storm drainage improvement portion of the Improvement Area #5 Improvements consists of the acquisition, construction, improvement and installation of stormwater drainage and detention improvements and related facilities and equipment which include, storm pipes (all applicable material), storm boxes, multi -reinforced box culverts, junction boxes, inlets, headwalls, trench safety, testing, related earthwork and excavation and erosion control, appurtenances, and the fair market value of any easements granted to the City necessary to provide adequate drainage to the Improvement Area #5 Assessed Property, including improvements that are offsite. The storm drainage collection system improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. Public Landscaping and Trails The public landscaping and trail improvements of the Improvement Area #5 Improvements consist of the planting and construction of supplemental landscaping such as parks, ponds, lakes, open spaces, entry features and areas, which include, sitting stations, benches, shaded structure(s), hardscape such as walls, statues and monuments, landscaping, plantings, and irrigation, fountains, playgrounds, athletic facilities, pavilions, lighting and paved parking spaces, which benefit the Improvement Area #5 Assessed Property. The landscaping improvements will be designed according to City standards and will be available for public use. Other Soft and Miscellaneous Costs The soft and miscellaneous costs portion of the Improvement Area #5 Improvements consists of all costs related to designing, construction, installing, and financing the Authorized Improvements including engineering and surveying, land planning and design, project and construction management fees, City fees (including inspection fees, IPRC engineering plan review fees, MuniCap 1 20 administrative material testing costs, water lab testing fees, permit fees, development fees, capacity fees and per acre charges), material testing, appraisal, legal and issuance costs, contingency, and other related soft and miscellaneous costs. Table III -B Budgeted Costs — Improvement Area #5 Original Improvement Total Improvement Area #5 Budget Area #5 Authorized Improvements Improvements Revisions Improvements' Roadway improvements $1,219,985 $0 $1,219,985 Water improvements $468,315 $0 $468,315 Sanitary sewer improvements $1,002,254 $0 $1,002,254 Storm drainage improvements2 $1,519,981 $0 $1,519,981 Public landscaping and trails $147,696 $0 $147,696 Other soft and miscellaneous costs3 $1,071,497 $3 17,780 $1,389,277 Total Authorized Improvements $5,429,728 $317,780 $5,747,508 'Provided by the Improvement Area #5 Developer. The figures shown in Table III -B may be revised in Annual Service Plan Updates and may be reallocated between line items so long as the total Improvement Area #5 Assessment related to the Improvement Area #5 Improvements does not increase. 2Include $210,965 in drainage costs excluding the residential drainage improvement costs and $1,309,286 in drainage costs related to the residential area. 3Include $884,963 in other soft and miscellaneous costs excluding the improvement costs related to the residential drainage and $186,534 other soft and miscellaneous costs related to the residential drainage improvement costs. D. DESCRIPTIONS AND BUDGETED COSTS OF IMPROVEMENT AREA #6 IMPROVEMENTS The descriptions of the Improvement Area #6 Improvements are presented below as provided by the project engineer. The Budgeted Costs of the Improvement Area #6 Improvements are shown in Table III -C. The costs shown in Table III -C are estimates and may be revised in Annual Service Plan Updates, including such other improvements as deemed necessary to further improve the properties within the PID. A description of the Improvement Area #6 Improvements are as follows. Roadway Improvements The road improvement portion of the Improvement Area #6 Improvements consists of the acquisition, construction, improvement, widening, narrowing, closing and re-routing of streets, roadways, bridges and arterials and include, subgrade stabilization (including lime treatment and compaction), concrete, asphalt or other applicable material, curbs, gutters, sidewalks, barrier free ramps, signage, traffic control devices and wayfinding, landscaping and irrigation, re -vegetation of disturbed areas within and for the right of way, retaining walls within and for the right of way, all related earthwork and excavation, and the fair market value of any right-of-way dedication to the City which benefit the Improvement Area #6 Assessed Property. All roadway projects will be designed and constructed in accordance with City standards and specifications, including the Fort MuniCap 121 Worth Master Throughfare Plan (the "Master Throughfare Plan"), and will be owned and operated by the City. Local residential streets, as defined by the Master Throughfare Plan, will not be an Authorized Improvement. Water Improvements The water improvements portion of the Improvement Area #6 Improvements consists of acquisition, construction, improvement and installation of water and reclaimed water supply lines, and related facilities and equipment, includes waterlines (excluding water lines under 8" and serving residential area), valves, vaults, fire hydrants, trench safety, testing, related earthwork and excavation, appurtenances, and the fair market value of any easements granted to the City necessary for the portion of the water distribution system that will service the Improvement Area #6 Assessed Property, including improvements that are offsite. The water improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. Sanitary Sewer Improvements The sanitary sewer improvement portion of the Improvement Area #6 Improvements consists of acquisition, construction, improvement and installation of various sized sanitary sewer pipes (excluding lines 8" or less and serving residential area), service lines, force main(s), lift station(s), and related facilities and equipment which include, manholes, encasements, pumps, trench safety, testing, related earthwork and excavation, appurtenances, and the fair market value of any easements granted to the City necessary to provide sanitary sewer service to Improvement Area #6 Assessed Property, including improvements that are offsite. The sanitary sewer improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. Storm Drainage Improvements The storm drainage improvement portion of the Improvement Area #6 Improvements consists of the acquisition, construction, improvement and installation of stormwater drainage and detention improvements and related facilities and equipment which include, storm pipes (all applicable material), storm boxes, multi -reinforced box culverts, junction boxes, inlets, headwalls, trench safety, testing, related earthwork and excavation and erosion control, appurtenances, and the fair market value of any easements granted to the City necessary to provide adequate drainage to the Improvement Area #6 Assessed Property, including improvements that are offsite. The storm drainage collection system improvements will be designed and constructed in accordance with City standards and specifications and will be owned and operated by the City. Public Landscanina and Trails The public landscaping and trail improvements of the Improvement Area #6 Improvements consist of the planting and construction of supplemental landscaping such as parks, ponds, lakes, open spaces, entry features and areas, which include, walking trails, sitting stations, benches, shaded structure(s), hardscape such as walls, statues and monuments, landscaping, plantings, and MuniCap 122 irrigation, fountains, playgrounds, athletic facilities, pavilions, lighting and paved parking spaces, and the fair market value of any easements granted to the City necessary for Public Landscaping and Trails, which benefit the Improvement Area #6 Assessed Property. The landscaping improvements will be designed according to City standards and will be available for public use. Other Soft and Miscellaneous Costs The soft and miscellaneous costs portion of the Improvement Area #6 Improvements consists of all costs related to designing, construction, installing, and financing the Authorized Improvements including engineering and surveying, land planning and design, project and construction management fees, City fees (including inspection fees, IPRC engineering plan review fees, urban forestry permit fees, administrative material testing costs, water lab testing fees, permit fees, development fees, community facilities agreement fees, capacity fees and per acre charges and any engineering related to City fees), material testing, appraisal, legal and issuance costs, contingency, and other related soft and miscellaneous costs. Table III -C Budgeted Costs — Improvement Area #6 Total Improvement Area #6 Authorized Improvements Improvements' Roadway improvements $3,170,252 Water improvements $5,013,572 Sanitary sewer improvements $1,120,987 Storm drainage improvements $4,435,120 Public landscaping and trails $1,358,713 Other soft and miscellaneous costs Engineering $2,300,566 Easement and Right-of-way Dedication $6,561,302 Other soft and miscellaneous costs $4,555,852 Subtotal Other soft and miscellaneous costs $13,417, 720 Total Authorized Improvements $28,516,364 'Provided by the Improvement Area #6 Developer. The figures shown in Table III -C may be revised in Annual Service Plan Updates and may be reallocated between line items so long as the total Improvement Area #6 Assessment related to the Improvement Area #6 Improvements does not increase. E. FUTURE IMPROVEMENT AREAS As Future Improvement Areas are developed and Future Improvement Area Bonds are issued and/ or related reimbursements are required pursuant to the Master Reimbursement Agreement, each respective Future Improvement Area Reimbursement Agreement and this Service and Assessment Plan will be amended to identify the specific Future Improvement Area Improvements that confer a special benefit to the property inside each Future Improvement Area (e.g., a Table III -D, Table III -E, etc. will be added in a future updates to this Service and Assessment Plan to show the costs MuniCap 123 for the specific Authorized Improvements financed within the specific Future Improvement Area being developed). (remainder of this page is intentionally left blank) MuniCap 124 IV. SERVICE PLAN A. PROJECTED SOURCES AND USES OF FUNDS The PID Act requires the service plan to cover a period of at least five years. The service plan is required to define the annual projected costs and indebtedness for the Authorized Improvements undertaken within the PID during the five-year period. The Improvement Area #4 Improvements were completed and accepted by the City in the third quarter of 2026. The Improvement Area #5 Improvements were completed and accepted by the City in the third quarter of 2026. The Improvement Area #6 Improvements will be completed and accepted by the City in the fourth quarter of 2026. The costs for Improvement Area #4 Improvements and the expenses allocable to Improvement Area #4 incurred in the establishment, administration, and operation of the PID are $16,281,345, as shown in Table IV -C. The service plan shall be reviewed and updated at least annually for the purpose of determining the annual budget for Administrative Expenses, updating the estimated Authorized Improvement costs, and updating the Improvement Area #4 Assessment Roll. Any update to this Service and Assessment Plan is herein referred to as an "Annual Service Plan Update." The costs for Improvement Area #5 Improvements and the expenses allocable to Improvement Area #5 incurred in the establishment, administration, and operation of the PID are $6,773,487 as shown in Table IV -C. The service plan shall be reviewed and updated at least annually for the purpose of determining the annual budget for Administrative Expenses, updating the estimated Authorized Improvement costs, and updating the Improvement Area #5 Assessment Roll. Any update to this Service and Assessment Plan is herein referred to as an "Annual Service Plan Update." The costs for Improvement Area #6 Improvements and the expenses allocable to Improvement Area #6 incurred in the establishment, administration, and operation of the PID are $34,086,186 as shown in Table IV -D. The service plan shall be reviewed and updated at least annually for the purpose of determining the annual budget for Administrative Expenses, updating the estimated Authorized Improvement costs, and updating the Improvement Area #6 Assessment Roll. Any update to this Service and Assessment Plan is herein referred to as an "Annual Service Plan Update." As Future Improvement Areas are developed and Future Improvement Area Bonds are issued and/or additional reimbursements are required pursuant to the Master Reimbursement Agreement and each Future Improvement Area Reimbursement Agreement with respect thereto, this Service and Assessment Plan will be updated (e.g., Table IV -H, Table IV -I, etc. will be updated in a future update to this Service and Assessment Plan to include Improvement Area #7, etc.). MuniCap 125 Improvement Area #4 The obligation under the Improvement Area #4 Reimbursement Agreement was created in 2026, as shown in Table IV -A. Amounts in the tables included in this section may be rounded to the nearest whole dollar. Table IV -A Projected Sources and Uses — Improvement Area #4 Projects Sources of Funds Total Assessment Amount $16,630,000 Total Sources $16,630,000 Uses of Funds Improvement Area #4 Improvements': Roadway improvements $3,212,402 Water improvements $4,792,594 Sanitary sewer improvements $1,502,756 Storm drainage improvements $289,181 Public landscaping and trails $675,000 Other soft and miscellaneous costs $2,927,205 Subtotal Improvement Area #4 Project Costs $13,399,137 Bond Issuance Costs: Cost of Issuance $998,500 Reserve Fund $1,222,712 Administrative expenses $95,000 Capitalized Interest $415,750 Underwriter's Discount $498,900 Subtotal Bond Issuance Costs $3,230,862 Total Uses $16,630,000 'See Table III -B for details (remainder of this page is intentionally left blank) MuniCap 126 Improvement Area #5 The obligation under the Improvement Area #5 Reimbursement Agreement was created in 2026, as shown in Table IV -B. Table IV -B Projected Sources and Uses — Improvement Area #5 Projects Sources of Funds Total Par Amount $6,809,000 Total Sources $6,809,000 Uses of Funds Improvement Area #5 Improvements': Roadway improvements Water improvements $1,219,985 $468,315 Sanitary sewer improvements $1,002,254 Storm drainage improvements $1,519,981 Public landscaping and trails $147,696 Other soft and miscellaneous costs $1,071,497 Subtotal Improvement Area #5 Improvement Costs $5,429,728 Bond Issuance Costs: Cost of Issuance $409,149 Reserve Fund $500,628 Administrative expenses $95,000 Capitalized Interest $170,225 Underwriter's Discount $204,270 Subtotal Bond Issuance Costs $1,379,272 Total Uses $6,809,000 'See Table III -B for details Improvement Area #4 and #5 Bonds were issued in 2026 to remove the obligation under the Improvement Area #4 Reimbursement Agreement and Improvement Area #5 Reimbursement Agreement. Table IV -C shows the combined costs for the Improvement Area #4 and #5 Bonds. (remainder of this page is intentionally left blank) MuniCap 127 Table IV -C Projected Sources and Uses — Improvement Area #4 and #5 Bonds Sources of Funds Par Amount Premium Other Funding Source Total Sources Improvement Area #4 Portion of the Improvement Area #4 and #5 Bonds $16,255,000 $26,345 $0 $16,281,345 Improvement Area #4 Portion of the Improvement Area #4 and #5 Bonds Total $6,763,000 $23,018,000 $10,487 $36,832 $0 $0 $6,773,487 $23,054,832 Uses of Funds Improvement Area #4 Improvements': Roadway improvements $3,212,402 $0 $3,212,402 Water improvements $4,792,594 $0 $4,792,594 Sanitary sewer improvements $1,502,756 $0 $1,502,756 Storm drainage improvements $289,181 $0 $289,181 Public landscaping and trails $675,000 $0 $675,000 Other soft and miscellaneous costs $3,477,205 $0 $3,477,205 Subtotal Improvement Area #4 Improvement Costs $13,949,138 $0 $13,949,138 Improvement Area #5 Improvements2: Roadway improvements $0 $1,219,985 $1,219,985 Water improvements $0 $468,315 $468,315 Sanitary sewer improvements $0 $1,002,254 $1,002,254 Storm drainage improvements $0 $1,519,981 $1,519,981 Public landscaping and trails $0 $147,696 $147,696 Other soft and miscellaneous costs $0 $1,389,277 $1,389,277 Subtotal Improvement Area #5 Improvement Costs $0 $5, 747,508 $5, 747,508 Bond Issuance Costs: Cost of Issuance $583,114 $242,783 $825,897 Reserve Fund $1,166,443 $485,306 $1,651,749 Administrative expenses $95,000 $95,000 $190,000 Underwriter's Discount $487,650 $202,890 $690,540 Subtotal Bond Issuance Costs $2,332,207 $1, 025,979 $3,358,186 Total Uses $16,281,345 $6,773,487 $23,054,832 'See Table III -A for details. 'See Table III -B for details. (remainder of this page is intentionally left blank) MuniCap 128 Improvement Area #6 The obligation under the Improvement Area #6 Reimbursement Agreement will be created in 2026, as shown in Table IV -D. Table IV -D Projected Sources and Uses — Improvement Area #6 Projects Sources of Funds Total Assessment Amount $30,380,000 Other Funding Sources $3,706,186 Total Sources $34,086,186 Uses of Funds Improvement Area #6 Improvements': Roadway improvements $3,170,252 Water improvements $5,013,572 Sanitary sewer improvements $1,120,987 Storm drainage improvements $4,435,120 Public landscaping and trails $1,358,713 Other soft and miscellaneous costs Engineering $2,300,566 Easement and Right-of-way Dedication $6,561,302 Other soft and miscellaneous costs $4,555,852 Subtotal Other soft and miscellaneous costs $13,417, 720 Subtotal Improvement Area #6 Improvement Costs $28,516,364 Estimated Bond Issuance Costs2: Cost of Issuance Reserve Fund Administrative expenses Underwriter's Discount $1,823,083 $2,724,339 $111,000 $911,400 Estimated Subtotal Bond Issuance Costs $5,569,822 Total Uses $34,086,186 'See Table 111-C for details. 2Bond issuance costs are estimated and included as bonds are anticipated in first quarter of 2027. It is anticipated that Improvement Area #6 Bonds will be issued in first quarter of 2027 to remove the obligation created under the Improvement Area #6 Reimbursement Agreement. (remainder of this page is intentionally left blank) MuniCap 129 B. PROJECTED FIVE-YEAR SERVICE PLAN Improvement Area #4 The annual projected costs and annual projected indebtedness for Improvement Area #4 is shown in Table IV -E. The annual projected costs and indebtedness is subject to revision and each shall be updated in the Annual Service Plan Update to reflect any changes in the costs or indebtedness expected for each year. Table IV -E Annual Projected Costs and Annual Projected Indebtedness — Improvement Area #4 Annual Annual Other Projected Projected Projected Funding Annual Year Cost Indebtedness Sources Installments' 2026 $16,255,000 $16,255,000 $0 $0 2027 $0 $0 $0 $1,331,811 2028 $0 $0 $0 $1,331,795 2029 $0 $0 $0 $1,331,556 2030 $0 $0 $0 $1,331,777 2031 $0 $0 $0 $1,331,409 2032 $0 $0 $0 $1,331,450 2033 $0 $0 $0 $1,330,850 Total $16,255,000 $16,255,000 $0 $9,320,648 'Administrative Expenses in year 2026 were funded with Bond proceeds. The annual projected costs shown in Table IV -E are the annual expenditures relating to the Improvement Area #4 Improvements shown in Table III -A and the costs associated with setting up the PID, including the issuance costs and reserves as shown in Table IV -C. The difference between the total projected costs and the total projected indebtedness, if any, is the amount contributed by the Improvement Area #4 Developer. Improvement Area #5 The annual projected costs and annual projected indebtedness for Improvement Area #5 is shown in Table IV -F. The annual projected costs and indebtedness is subject to revision and each shall be updated in the Annual Service Plan Update to reflect any changes in the costs or indebtedness expected for each year. (remainder of this page is intentionally left blank) MuniCap 130 Table IV -F Annual Projected Costs and Annual Projected Indebtedness — Improvement Area #5 Annual Other Projected Annual Projected Funding Annual Year Projected Cost Indebtedness Sources Installments) 2026 $6,763,000 $6,763,000 $0 $0 2027 $0 $0 $0 $622,150 2028 $0 $0 $0 $621,878 2029 $0 $0 $0 $621,621 2030 $0 $0 $0 $622,192 2031 $0 $0 $0 $621,541 2032 $0 $0 $0 $621,720 2033 $0 $0 $0 $621,678 Total $6,763,000 $6,763,000 $0 $4,352,780 'Administrative Expenses in year 2026 were funded with Bond proceeds. The annual projected costs shown in Table IV -F are the annual expenditures relating to the Improvement Area #5 Improvements shown in Table III -B and the costs associated with setting up the PID, including the issuance costs and reserves as shown in Table IV -C. The difference between the total projected costs and the total projected indebtedness, if any, is the amount contributed by the Improvement Area #5 Developer. Improvement Area #6 The annual projected costs and annual projected indebtedness for Improvement Area #6 is shown in Table IV -G. The annual projected costs and indebtedness is subject to revision and each shall be updated in the Annual Service Plan Update to reflect any changes in the costs or indebtedness expected for each year. Table IV -G Annual Projected Costs and Annual Projected Indebtedness — Improvement Area #6 Annual Other Projected Annual Projected Funding Annual Year Projected Cost Indebtedness Sources Installments 2026 $34,086,186 $30,380,000 $3,706,186 $0 2027 $0 $0 $0 $0 2028 $0 $0 $0 $2,835,339 2029 $0 $0 $0 $2,836,867 2030 $0 $0 $0 $2,837,350 2031 $0 $0 $0 $2,837,879 2032 $0 $0 $0 $2,839,454 2033 $0 $0 $0 $2,827,077 Total $34,086,186 $30,380,000 $3,706,186 $17,013,967 MuniCap 131 The annual projected costs shown in Table IV -G are the annual expenditures relating to the Improvement Area #6 Improvements shown in Table III -C and the costs associated with setting up the PID, including the issuance costs and reserves as shown in Table IV -D. The difference between the total projected costs and the total projected indebtedness, if any, is the amount contributed by the Improvement Area #6 Developer. As Future Improvement Areas are developed, in association with issuing Future Improvement Area Bonds and/ or execution of a Future Improvement Area Reimbursement Agreement for each Future Improvement Area, a table will be added to identify the Authorized Improvements to be financed by each new series of the Future Improvement Area Bonds and/ or Future Improvement Area Reimbursement Agreements and the projected indebtedness resulting from each additional series of the Future Improvement Area Bonds and/ or Future Improvement Area Reimbursement Agreements. C. PID ASSESSMENT NOTICE The PID Act requires that this Service and Assessment Plan and each Annual Service Plan Update include a copy of the notice form required by Section 5.014 of the Texas Property Code. The "PID Assessment Notice" is attached hereto as Appendix E and may be updated in an Annual Service Plan Update. (remainder of this page is intentionally left blank) MuniCap 132 V. ASSESSMENT PLAN A. INTRODUCTION The PID Act requires the City Council to apportion the costs of the Authorized Improvements on the basis of special benefits conferred upon the property because of the Authorized Improvements. The PID Act provides that the costs of the Authorized Improvements may be assessed: (i) equally per front foot or square foot; (ii) according to the value of the property as determined by the governing body, with or without regard to improvements on the property; or (iii) in any other manner that results in imposing equal shares of the cost on property similarly benefited. The PID Act further provides that the governing body may establish by ordinance or order reasonable classifications and formulas for the apportionment of the cost between the municipality and the area to be assessed and the methods of assessing the special benefits for various classes of improvements. The proposed bond issuance program entails a series of bond financings that are intended to finance the public infrastructure required for the development. This financing will necessarily be undertaken in phases to coincide with the private investment and development of the Authorized Improvements. Following the execution of the Improvement Area #4 Reimbursement Agreement and the Improvement Area #5 Reimbursement Agreement in 2026, and the Improvement Area #4 and #5 Bonds issued in 2026, the execution of the Improvement Area #6 Reimbursement Agreement in 2026, subsequent financings may be issued over the subsequent fifty (50) years from the date of the first Assessment levy, as the Future Improvement Areas of the development are gradually constructed. The purpose of this gradual issuance of bonds in phases is to mirror the actual development of the Authorized Improvements. The levy of Assessments and issuance of Bonds are most prudently and efficiently utilized when directly coinciding with construction of public infrastructure needed for private development that is to occur once the infrastructure is completed; it is most effective to issue the Bonds when the infrastructure is needed, not before. Furthermore, there is no economic advantage, and several disadvantages, to issuing debt and encumbering property within the PID prior to the need for the Authorized Improvements. For purposes of this Service and Assessment Plan, the City Council has determined that the costs of the Improvement Area #4 Improvements, Improvement Area #5 Improvements, and Improvement Area #6 Improvements shall be allocated as described below: 1. The costs of the Improvement Area #4 Improvements that only benefit Improvement Area #4 shall be allocated on the basis of Equivalent Units calculated using the estimated average home price of each Lot Type at the time the Improvement Area #4 Assessments are levied, and that such method of allocation will result in the imposition of equal shares of the costs of the Improvement Area #4 Improvements to Parcels of Improvement Area #4 Assessed Property similarly benefited. 2. The costs of the Improvement Area #5 Improvements that only benefit Improvement Area #5 shall be allocated on the basis of Equivalent Units calculated using the estimated average home MuniCap 133 price of each Lot Type at the time the Improvement Area #5 Assessments are levied, and that such method of allocation will result in the imposition of equal shares of the costs of the Improvement Area #5 Improvements to Parcels of Improvement Area #5 Assessed Property similarly benefited. 3. The costs of the Improvement Area #6 Improvements that only benefit Improvement Area #6 shall be allocated on the basis of Equivalent Units calculated using the estimated average home price of each Lot Type at the time the Improvement Area #6 Assessments are levied, and that such method of allocation will result in the imposition of equal shares of the costs of the Improvement Area #6 Improvements to Parcels of Improvement Area #6 Assessed Property similarly benefited. At this time, it is impossible to determine with absolute certainty the amount of special benefit each Parcel within Future Improvement Areas will receive from the direct Authorized Improvements that will benefit each individual Improvement Area and that are to be financed with Future Improvement Area Bonds. Therefore, Parcels will only be assessed for the special benefits conferred upon the Parcel at this time because of the Improvement Area #4 Improvements, the Improvement Area #5 Improvements, and the Improvement Area #6 Improvements, as applicable. In connection with the issuance of Future Improvement Area Bonds and/ or additional obligations created pursuant to the Master Reimbursement Agreement and each respective Future Improvement Area Reimbursement Agreement, this Service and Assessment Plan will be updated to reflect the special benefit each Parcel of Assessed Property within a Future Improvement Areas receives from the specific Authorized Improvements funded with those Future Improvement Area Bonds issued and/ or Future Improvement Area Reimbursement Agreements executed with respect to that Future Improvement Areas. Prior to assessing Parcels located within Future Improvement Areas in connection with issuance of Future Improvement Area Bonds and/ or execution of Future Improvement Area Reimbursement Agreements, each owner of the Parcels to be assessed must acknowledge that the Authorized Improvements to be financed confer a special benefit on their Parcel and must consent to the imposition of the Assessments to pay for the Actual Costs of such Authorized Improvements. This section of this Service and Assessment Plan currently (i) describes the special benefit received by each Parcel of Assessed Property within the PID as a result of the Improvement Area #4 Improvements, Improvement Area #5 Improvements, and Improvement Area #6 Improvements, as applicable, (ii) provides the basis and justification for the determination that this special benefit exceeds the amount of the Improvement Area #4 Assessments, the Improvement Area #5 Assessments, the Improvement Area #6 Assessments levied on the Improvement Area #4 Assessed Property, Improvement Area #5 Assessed Property, Improvement Area #6 Assessed Property, as applicable, and (iii) establishes the methodologies by which the City Council allocates and reallocates the special benefit of the Improvement Area #4 Improvements, Improvement Area #5 Improvements, Improvement Area #6 Improvements, as applicable, to Parcels of Improvement Area #4 Assessed Property, Improvement Area #5 Assessed Property, and Improvement Area #6 Assessed Property, as applicable, in a manner that results in equal shares of the Actual Costs of such improvements being apportioned to Parcels similarly benefited. The determination by the City Council of the assessment methodologies set MuniCap 134 forth below is the result of the discretionary exercise by the City Council of its legislative authority and governmental powers and is conclusive and binding on the Improvement Area #4 Developer, the Improvement Area #5 Developer, the Improvement Area #6 Developer, and all future owners and developers of the Improvement Area #4 Assessed Property, the Improvement Area #5 Assessed Property, and the Improvement Area #6 Assessment Property. As Future Improvement Areas are developed in connection with the issuance of Future Improvement Area Bonds and/or additional reimbursements are required pursuant to the Master Reimbursement Agreement, each respective Future Improvement Area Reimbursement Agreement, this Service and Assessment Plan will be updated based on the City's determination of the assessment methodology for each Future Improvement Areas. B. SPECIAL BENEFIT Assessed Property must receive a direct and special benefit from the Authorized Improvements, and this benefit must be equal to or greater than the amount of the Assessments. The Authorized Improvements (more particularly described in line -item format in Appendix B to this Service and Assessment Plan) and the costs of issuance and payment of costs incurred in the establishment of the PID shown in Table IV -C and Table IV -D are authorized by the PID Act. These Authorized Improvements are provided specifically for the benefit of the Assessed Property. At or prior to the time the City Council approved the Improvement Area #4 Assessment Ordinance, the Improvement Area #5 Assessment Ordinance, and Improvement Area #6 Assessment Ordinance, respectively, each owner of the Improvement Area #4 Assessed Property, Improvement Area #5 Assessed Property, and Improvement Area #6 Assessed Property, has acknowledged that the Improvement Area #4 Improvements, the Improvement Area #5 Improvements, and the Improvement Area #6 Improvements, respectively, confer a special benefit on the Improvement Area #4 Assessed Property, the Improvement Area #5 Assessed Property, and the Improvement Area #6 Assessed Property, respectively, and has consented to the imposition of the Improvement Area #4 Assessments, the Improvement Area #5 Assessments, and the Improvement Area #6 Assessments, as the case may be, to pay for the Actual Costs associated therewith. In making such acknowledgements and consents, each of the owners was acting in its interest in consenting to the apportionment and levying of the Improvement Area #4 Assessments, the Improvement Area #5 Assessments, and the Improvement Area #6 Assessments, respectively, because the special benefit conferred upon the Improvement Area #4 Assessed Property, the Improvement Area #5 Assessed Property, and the Improvement Area #6 Assessed Property, respectively, by the Improvement Area #4 Improvements, Improvement Area #5 Improvements, and Improvement Area #6 Improvements, respectively, exceeds the amount of the Improvement Area #4 Assessments, the Improvement Area #5 Assessment, and the Improvement Area #6 Assessment, as applicable. The Authorized Improvements provide a special benefit to the Assessed Property as a result of the close proximity of these improvements to the Assessed Property and the specific purpose of these improvements of providing infrastructure for the Assessed Property. In other words, the Assessed Property could not be used in the manner proposed without the construction of the MuniCap I3 Authorized Improvements. The Authorized Improvements are being provided specifically to meet the needs of the Assessed Property as required for the proposed use of the property. The Assessments are being levied to provide the Authorized Improvements that are required for the highest and best use of the Assessed Property (i.e., the use of the property that is most valuable, including any costs associated with that use). Highest and best use can be defined as "the reasonably probable and legal use of property, which is physically possible, appropriately supported, financially feasible, and that results in the highest value." (Dictionary of Real Estate Appraisal, Third Edition.) The Authorized Improvements are expected to be required for the proposed use of the Assessed Property to be physically possible, appropriately supported, financially feasible, and maximally productive. The Improvement Area #4 Developer, Improvement Area #5 Developer, and Improvement Area #6 Developer have evaluated the potential use of the property and have determined that the highest and best use of the property is the use intended and the legal use for the property as described in Section II of this Service and Assessment Plan. The use of the Assessed Property as described herein will require the construction of the Authorized Improvements. The special assessments will repay financing that is on advantageous terms, as the Bonds issued, if any, to finance the Authorized Improvements will pay interest that is exempt from federal income tax. As a result, all other terms being equal (e.g., maturity, fixed vs. variable rate, credit quality), the tax-exempt bonds will have a lower interest rate than debt that is not tax-exempt. The Bonds also have a longer term than other available financings and may either be repaid or assumed by a buyer at the buyer's option. As a result of these advantageous terms, the financing provided by the PID is the most beneficial means of financing the Authorized Improvements. At or prior to the time the City Council approved the Improvement Area #4 Assessment Ordinance, the Improvement Area #5 Assessment Ordinance, and the Improvement Area #6 Assessment Ordinance, respectively, each owner of the Assessed Property will ratify, confirm, accept, agree to and approve: (i) the determinations and findings by the City Council as to the special benefits described in this Service and Assessment Plan, the Improvement Area #4 Assessment Ordinance, the Improvement Area #5 Assessment Ordinance, and the Improvement Area #6 Assessment Ordinance; (ii) the Service and Assessment Plan, the Improvement Area #4 Assessment Ordinance, the Improvement Area #5 Assessment Ordinance, and the Improvement Area #6 Assessment Ordinance, and (iii) the levying of Assessments on the Assessed Property. Use of the Assessed Property as described in this Service and Assessment Plan and as authorized by the PID Act requires that Authorized Improvements be acquired, constructed, installed, and/or improved. Funding the Actual Costs of the Authorized Improvements through the PID has been determined by the City Council to be the most beneficial means of doing so. As a result, the Authorized Improvements result in a special benefit to the Assessed Property, and this special benefit exceeds the amount of the Assessment. This conclusion is based on and supported by the evidence, information, and testimony provided to the City Council. In summary, the Authorized Improvements result in a special benefit to the Assessed Property for the following reasons: MuniCap 136 1. The Authorized Improvements are being provided specifically for the use of the Assessed Property, are necessary for the proposed best use of the property and provide a special benefit to the Assessed Property as a result; 2. The Improvement Area #4 Developer, Improvement Area #5 Developer, and Improvement Area #6 Developer have consented to the imposition of the Improvement Area #4 Assessments, the Improvement Area #5 Assessments, and the Improvement Area #6 Assessments, respectively, for the purpose of providing the Improvement Area #4 Improvements, the Improvement Area #5 Improvements, and the Improvement Area #6 Improvements, and the Improvement Area #4 Developer, Improvement Area #5 Developer, and Improvement Area #6 Developer are acting in their interest by consenting to this imposition; 3. The Authorized Improvements are required for the highest and best use of the Assessed Property; 4. The highest and best use of the Assessed Property is the use of the Assessed Property that is most valuable (including any costs associated with the use of the Assessed Property); 5. Financing of the costs of the Authorized Improvement through the PID is determined to be the most beneficial means of providing for the Authorized Improvements; and 6. As a result, the special benefits to the Assessed Property from the Authorized Improvements will be equal to or greater than the Assessments. C. ASSESSMENT METHODOLOGY The costs of the Authorized Improvements may be assessed by the City Council against the Assessed Property so long as the special benefit conferred upon the Assessed Property by the Authorized Improvements equals or exceeds the amount of the Assessments. The costs of the Authorized Improvements may be assessed using any methodology that results in the imposition of equal shares of the Actual Costs on Assessed Property similarly benefited. 1. Assessment Methodology for Improvement Area #4 Improvements For purpose of this Service and Assessment Plan, the City Council determined that the Actual Costs of the Improvement Area #4 Improvements shall be allocated to the Improvement Area #4 Assessed Property by spreading the entire Improvement Area #4 Assessment across the Parcels of Improvement Area #4 Assessed Property based on the estimated number of Equivalent Units anticipated to be developed on such Parcel. Based on the estimates of the costs of the Improvement Area #4 Improvements, as set forth in Table III -A, the City Council determined that the benefit to Improvement Area #4 Assessed Property of the Improvement Area #4 Improvements was at least equal to the Improvement Area #4 Assessments levied on the Improvement Area #4 Assessed Property. MuniCap 137 Upon subsequent divisions of any Parcel of Improvement Area #4 Assessed Property, the Improvement Area #4 Assessment applicable to it will then be apportioned pro rata based on the estimated Equivalent Units of each newly created Parcel of Improvement Area #4 Assessed Property. For residential lots, when final residential building sites are platted, Improvement Area #4 Assessments will be apportioned proportionately among each Parcel of Improvement Area #4 Assessed Property based on the ratio of the estimated Equivalent Units at the time residential lots are platted to the total estimated Equivalent Units for lots in the platted Parcel of Improvement Area #4 Assessed Property, as determined by the Administrator and confirmed by the City Council. The Improvement Area #4 Assessment and Annual Installments for each Parcel of Improvement Area #4 Assessed Property is shown on the Improvement Area #4 Assessment Roll, attached as Appendix G, and no Improvement Area #4 Assessment shall be changed except as authorized by this Service and Assessment Plan or the PID Act. 2. Assessment Methodology for Improvement Area #5 Improvements For purpose of this Service and Assessment Plan, the City Council has determined that the Actual Costs of the Improvement Area #5 Improvements shall be allocated to the Improvement Area #5 Assessed Property by spreading the entire Improvement Area #5 Assessment across the Parcels of Improvement Area #5 Assessed Property based on the estimated number of Equivalent Units anticipated to be developed on each Parcel of Improvement Area #5 Assessed Property. Based on the estimates of the costs of the Improvement Area #5 Improvements, as set forth in Table III -B, the City Council has determined that the benefit to Improvement Area #5 Assessed Property of the Improvement Area #5 Improvements is at least equal to the Improvement Area #5 Assessments levied on the Improvement Area #5 Assessed Property. Upon subsequent divisions of any Parcel of Improvement Area #5 Assessed Property, the Improvement Area #5 Assessment applicable to it will then be apportioned pro rata based on the estimated Equivalent Units of each newly created Parcel of Improvement Area #5 Assessed Property. For residential lots, when final residential building sites are platted, Improvement Area #5 Assessments will be apportioned proportionately among each Parcel of Improvement Area #5 Assessed Property based on the ratio of the estimated Equivalent Units at the time residential lots are platted to the total estimated Equivalent Units for lots in the platted Parcel of Improvement Area #5 Assessed Property, as determined by the Administrator and confirmed by the City Council. The Improvement Area #5 Assessment and Annual Installments for each Parcel of Improvement Area #5 Assessed Property is shown on the Improvement Area #5 Assessment Roll, attached as Appendix H, and no Improvement Area #5 Assessment shall be changed except as authorized by this Service and Assessment Plan or the PID Act. (remainder of this page is intentionally left blank) MuniCap 138 3. Assessment Methodology for Improvement Area #6 Improvements For purpose of this Service and Assessment Plan, the City Council has determined that the Actual Costs of the Improvement Area #6 Improvements shall be allocated to the Improvement Area #6 Assessed Property by spreading the entire Improvement Area #6 Assessment across the Parcels of Improvement Area #6 Assessed Property based on the estimated number of Equivalent Units anticipated to be developed on each Parcel of Improvement Area #6 Assessed Property. Based on the estimates of the costs of the Improvement Area #6 Improvements, as set forth in Table III -C, the City Council has determined that the benefit to Improvement Area #6 Assessed Property of the Improvement Area #6 Improvements is at least equal to the Improvement Area #6 Assessments levied on the Improvement Area #6 Assessed Property. Upon subsequent divisions of any Parcel of Improvement Area #6 Assessed Property, the Improvement Area #6 Assessment applicable to it will then be apportioned pro rata based on the estimated Equivalent Units of each newly created Parcel of Improvement Area #6 Assessed Property. For residential lots, when final residential building sites are platted, Improvement Area #6 Assessments will be apportioned proportionately among each Parcel of Improvement Area #6 Assessed Property based on the ratio of the estimated Equivalent Units at the time residential lots are platted to the total estimated Equivalent Units for lots in the platted Parcel of Improvement Area #6 Assessed Property, as determined by the Administrator and confirmed by the City Council. The Improvement Area #6 Assessment and Annual Installments for each Parcel of Improvement Area #6 Assessed Property is shown on the Improvement Area #6 Assessment Roll, attached as Appendix I, and no Improvement Area #6 Assessment shall be changed except as authorized by this Service and Assessment Plan or the PID Act. 4. Assessment Methodology for Future Improvement Areas When any given Future Improvement Area is developed, and Future Improvement Area Bonds for that Future Improvement Areas are to be issued and/ or a Future Improvement Area Reimbursement Agreement is executed, this Service and Assessment Plan will be amended to determine the assessment methodology that results in the imposition of equal shares of the Actual Costs on Assessed Property similarly benefited within that Future Improvement Area. D. ASSESSMENTS The Improvement Area #4 Assessments were levied in 2026 on each Parcel or lot of Improvement Area #4 Assessed Property according to the Improvement Area #4 Assessment Roll, attached hereto as Appendix G. The Annual Installments for Improvement Area #4 portion of the Improvement Area #4 and #5 Bonds will be collected on the dates and in the amounts shown on the Improvement Area #4 Assessment Roll, subject to revisions made during an Annual Service Plan Update. (remainder of this page is intentionally left blank) MuniCap I3 The Improvement Area #5 Assessments were levied on each Parcel or lot of Improvement Area #5 Assessed Property according to the Improvement Area #5 Assessment Roll, attached hereto as Appendix H. The Annual Installments for Improvement Area #5 portion of the Improvement Area #4 and #5 Bonds will be collected on the dates and in the amounts shown on the Improvement Area #5 Assessment Roll, subject to revisions made during an Annual Service Plan Update. The Improvement Area #6 Assessments will be levied on each Parcel or lot of Improvement Area #6 Assessed Property according to the Improvement Area #6 Assessment Roll, attached hereto as Appendix I. The Annual Installments for the Improvement Area #6 Reimbursement Agreement will be collected on the dates and in the amounts shown on the Improvement Area #6 Assessment Roll, subject to revisions made during an Annual Service Plan Update. See Appendix F for Improvement Area #4 Assessments, Improvement Area #5 Assessments, Improvement Area #6 Assessments per unit, leverage, and estimated tax rate equivalent calculation details. E. ADMINISTRATIVE EXPENSES The cost of administering the PID and collecting the Annual Installments shall be paid for on a pro rata basis by each Parcel of Assessed Property based on the amount of Assessment levied against such Parcel. The Administrative Expenses shall be collected as part of and in the same manner as Annual Installments in the amounts shown on each Assessment Roll, which may be revised based on Actual Costs incurred in Annual Service Plan Updates. F. ADDITIONAL INTEREST RESERVE Pursuant to the PID Act, the interest rate for Assessments may exceed the actual interest rate per annum paid on the related Bonds, by the Additional Interest Rate. The Additional Interest Component of the Annual Installments is allocated to fund a reserve to be used for paying Prepayment Costs and to offset Delinquent Collection Costs. The Additional Interest Reserve shall be funded until it reaches 5.50% of the outstanding Bonds unless otherwise stipulated in the applicable Trust Indenture. Once the Additional Interest Reserve is funded in full, the City may allocate the Additional Interest Component of the Annual Installments as provided in the applicable Trust Indenture. G. TIRZ ANNUAL CREDIT Pursuant to the TIRZ Ordinance, the City has agreed to use TIRZ Revenues in an amount equal to 65% of the City's ad valorem tax revenues collected on the tax increment from each Parcel of Assessed Property within the TIRZ No. 16 to offset a portion of the Assessments levied on each such Parcel, if applicable. The Annual Installment for each Parcel of Assessed Property shall be calculated by taking into consideration any TIRZ Annual Credit Amount applicable to such Parcel then on deposit in the TIRZ No. 16 tax increment fund. The TIRZ Annual Credit Amount applicable to each Parcel of Assessed Property shall be calculated, if applicable, as described under Section VI of this Service and Assessment Plan. MuniCap 140 VI. TERMS OF THE ASSESSMENTS A. AMOUNT OF ASSESSMENTS AND ANNUAL INSTALLMENTS FOR PARCELS LOCATED WITHIN IMPROVEMENT AREA #4 The Improvement Area #4 Assessment and Annual Installments thereof for each Improvement Area #4 Assessed Property is shown on the Improvement Area #4 Assessment Roll, attached as Appendix G, and no Improvement Area #4 Assessment shall be changed except as authorized by this Service and Assessment Plan and the PID Act. The Annual Installments from the Improvement Area #4 Assessed Property shall be collected in an amount sufficient (i) to pay principal and interest on the Improvement Area #4 portion of the Improvement Area #4 and #5 Bonds, (ii) the Additional Interest Component, as applicable, and (iii) Administrative Expenses. The Annual Installment for each Parcel of Improvement Area #4 Assessed Property shall be determined by taking into consideration the TIRZ Annual Credit Amount applicable to such Parcel then on deposit in the TIRZ No. 16 tax increment fund, if applicable. The TIRZ Annual Credit Amount shall be determined separately for each Parcel of Improvement Area #4 Assessed Property and such TIRZ Annual Credit Amount shall be applied on a Parcel -by -Parcel basis, if applicable. As described in Section V.G., the TIRZ Revenues attributable to each Parcel of Improvement Area #4 Assessed Property collected in any given year shall be used to determine such Parcel's TIRZ Annual Credit Amount in the following year (i.e., TIRZ Revenues collected in 2026 shall be used to calculate the TIRZ Annual Credit Amount applicable to Annual Installments to be collected in 2027). The number of units to be used for the calculation of the TIRZ Annual Credit Amount, if applicable, shall be determined by the Administrator based on the information available to the Administrator at the time of such calculations. B. AMOUNT OF ASSESSMENTS AND ANNUAL INSTALLMENTS FOR PARCELS LOCATED WITHIN IMPROVEMENT AREA #5 The Improvement Area #5 Assessment and Annual Installments for each Improvement Area #5 Assessed Property is shown on the Improvement Area #5 Assessment Roll, attached as Appendix H, and no Improvement Area #5 Assessment shall be changed except as authorized by this Service and Assessment Plan and the PID Act. The Annual Installments from the Improvement Area #5 Assessed Property shall be collected in an amount sufficient (i) to pay principal and interest on the Improvement Area #5 portion of the Improvement Area #4 and #5 Bonds, (ii) the Additional Interest Component, as applicable, and (iii) Administrative Expenses. The Annual Installment for each Parcel of Improvement Area #5 Assessed Property shall be determined by taking into consideration the TIRZ Annual Credit Amount applicable to such Parcel then on deposit in the TIRZ No. 16 tax increment fund, if applicable. The TIRZ Annual Credit Amount shall be determined separately for each Parcel of Improvement Area #5 Assessed Property and such TIRZ Annual Credit Amount shall be applied on a Parcel -by -Parcel basis, if applicable. As described in Section V.G., the TIRZ Revenues attributable to each Parcel of Improvement Area #5 Assessed Property collected in any given year MuniCap 141 shall be used to determine such Parcel's TIRZ Annual Credit Amount for such Parcel in the following year (i.e., TIRZ Revenues collected in 2026 shall be used to calculate the TIRZ Annual Credit Amount applicable to Annual Installments to be collected in 2027). The number of units to be used for the calculation of the TIRZ Annual Credit Amount, if applicable, shall be determined by the Administrator based on the information available to the Administrator at the time of such calculations. C. AMOUNT OF ASSESSMENTS AND ANNUAL INSTALLMENTS FOR PARCELS LOCATED WITHIN IMPROVEMENT AREA #6 The Improvement Area #6 Assessment and Annual Installments for each Improvement Area #6 Assessed Property is shown on the Improvement Area #6 Assessment Roll, attached as Appendix I, and no Improvement Area #6 Assessment shall be changed except as authorized by this Service and Assessment Plan and the PID Act. The Annual Installments from the Improvement Area #6 Assessed Property shall be collected in an amount sufficient (i) to pay principal and interest on the Improvement Area #6 Reimbursement Agreement, (ii) the Additional Interest Component, as applicable, and (iii) Administrative Expenses. The Annual Installment for each Parcel shall be calculated by taking into consideration any lawfully available funds to the PID, capitalized interest and TIRZ Annual Credit Amount applicable to the Parcel. The TIRZ Annual Credit Amount shall be applied on a Parcel -by -Parcel basis. As described in Section V.G, the TIRZ Revenues attributable to each Parcel of the Assessed Property collected in any given year shall be used to calculate each Parcel's TIRZ Annual Credit Amount for such Parcel in the following year (i.e., TIRZ Revenues collected in tax year 2027 shall be used to calculate the TIRZ Annual Credit Amount applicable to Annual Installments to be collected in tax year 2028) on a Parcel -by -Parcel basis. TIRZ Annual Credit Amounts shall be calculated only for Parcels that are subject to Assessments in the PID. The estimated number of units to be used for calculation of the TIRZ Annual Credit Amount, if applicable, shall be determined by the Administrator based on the information available to the Administrator at the time of such calculations. As described above, the Annual Installment for an Improvement Area #6 Assessed Property shall receive a TIRZ Annual Credit Amount equal to the TIRZ Revenue generated that results in the Target Net Tax Rate Equivalent for such Parcel, but in no event shall the TIRZ Annual Credit Amount for a Parcel in Improvement Area #6 exceed the Improvement Area #6 Maximum TIRZ Credit Amount for such Parcel, the amount sufficient to result in a net PID Annual Installment tax rate equivalent [(Annual Installment - TIRZ Annual Credit Amount) - assessed value] of $0.4600 per $100 of assessed value unless otherwise approved by the City. D. AMOUNT OF ASSESSMENTS AND ANNUAL INSTALLMENTS FOR PARCELS LOCATED WITHIN FUTURE IMPROVEMENT AREAS As Future Improvement Areas are developed, this Service and Assessment Plan will be amended to determine the Future Improvement Area Assessment and Annual Installments for each Future Improvement Area Assessed Property (e.g., an Appendix will be added as the Assessment Roll for Improvement Area #7, etc.). The Future Improvement Area Assessments shall not exceed the benefit received by the Future Improvement Area Assessed Property. MuniCap 142 E. REALLOCATION OF ASSESSMENTS 1. Subdivision Upon the subdivision of any Parcel, the Assessment for the Parcel prior to the subdivision shall be reallocated among the new subdivided Parcels according to the following formula: A=Bx(C-D) Where the terms have the following meanings: A = the Assessment for each new subdivided Parcel B = the Assessment for the Parcel prior to subdivision C = the estimated number of Equivalent Units to be built on each new subdivided Parcel D = the sum of the estimated number of Equivalent Units to be built on all of the new subdivided Parcels The calculation of the estimated number of Equivalent Units to be built on a Parcel shall be performed by the Administrator based on the information available regarding the use of the Parcel, and such calculation shall be approved by the City Council in the immediately following Annual Service Plan Update. The calculation as confirmed by the City Council shall be conclusive and binding. The number of Equivalent Units to be built on a Parcel may be estimated by net land area and reasonable density ratios. The sum of the Assessments for all newly subdivided Parcels shall not exceed equal the Assessment for the Parcel prior to subdivision. The calculation shall be made separately for each newly subdivided Parcel. The reallocation of an Assessment for a Parcel that is a homestead under Texas law may not exceed the Assessment prior to the reallocation and to the extent the reallocation would exceed such amount, it shall be prepaid by such amount by the party requesting the subdivision of the Parcels. Any reallocation pursuant to this section shall be reflected in an Annual Service Plan Update approved by the City Council. 2. Consolidation Upon the consolidation of two or more Parcels, the Assessment for the consolidated Parcel shall be the sum of the Assessments for the Parcels prior to consolidation. The reallocation of an Assessment for a Parcel that is a homestead under Texas law may not exceed the Assessment prior to the reallocation and to the extent the reallocation would exceed such amount, it shall be prepaid by such amount by the party requesting the consolidation of the Parcels. Any reallocation pursuant to this section shall be reflected in an Annual Service Plan Update approved by the City Council. The reallocation as confirmed by the City Council shall be conclusive and binding. F. MANDATORY PREPAYMENT OF ASSESSMENTS 1. If a Parcel subject to Assessments is transferred to a party that is exempt from the payment of the Assessment under applicable law, or if an owner causes a Parcel subject to Assessments to become Non -Benefited Property, the owner of such Parcel shall pay to the City the full MuniCap 143 amount of the principal portion of the Assessment on such Parcel, plus all Prepayment Costs, prior to or concurrently with any such conveyance or act, and no such conveyance shall be effective until the City receives such payment. 2. The payments required above shall be treated the same as any Assessment that is due and owing under the PID Act, each Assessment Ordinance, and this Service and Assessment Plan, including the same lien priority, penalties, procedures, and foreclosure specified by the PID Act. G. REDUCTION OF ASSESSMENTS 1. If after all Authorized Improvements to be funded with a series of Bonds and/or Improvement Area Reimbursement Agreement have been completed and Actual Costs for such Authorized Improvements are less than the Actual Costs or Budgeted Costs of the Authorized Improvements used to calculate the Assessments securing such series of Bonds and/or related Improvement Area Reimbursement Agreement, resulting in excess proceeds being available, and such excess proceeds may be used for any purpose authorized by a Trust Indenture and/or may be used to reduce the obligations under an Improvement Area Reimbursement Agreement as provided in the Improvement Area Reimbursement Agreement, then the Assessment securing such series of Bonds and/or related Improvement Area Reimbursement Agreement for each Parcel of Assessed Property shall be reduced by the City Council pro rata such that the sum of the resulting reduced Assessments for all Assessed Properties equals the actual reduced Actual Costs. The Assessments shall not be reduced to an amount less than the related outstanding series of Bonds (including by application of the Additional Interest Rate)and/or amounts due under a related Improvement Area Reimbursement Agreement. If all of the Authorized Improvements are not completed, the City may reduce the Assessments in another method if it determines such method would better reflect the benefit received by the Parcels from the Authorized Improvements completed. 2. If all the Authorized Improvements are not undertaken, resulting in excess Bonds proceeds being available and/or a need to reduce the obligations under an Improvement Area Reimbursement Agreement, and such excess proceeds may be used for any purpose authorized by a Trust Indenture and/or may be used to reduce the obligations under an Improvement Area Reimbursement Agreement, as provided in the Improvement Area Reimbursement Agreement, as the case may be, then the Assessments and Annual Installments for each Parcel shall be appropriately reduced by the City Council to reflect only the amounts required to repay the Bonds and/ or repay obligations under an Improvement Area Reimbursement Agreement, including interest on the Bonds (including by application of the Additional Interest Rate) and/ or interest due under an Improvement Area Reimbursement Agreement and Administrative Expenses. The City Council may reduce the Assessments and the Annual Installments for each Parcel (i) in an amount that represents the Authorized Improvements provided for each Parcel or (ii) by an equal percentage calculated based on number of units, if determined by the City Council to be the most fair and practical means of reducing the Assessments for each Parcel, such that the sum of the resulting reduced Assessments equals the amount required to repay the Bonds and/ or repay the obligations under an Improvement Area Reimbursement Agreement, including interest thereon and MuniCap 144 Administrative Expenses. The principal portion of the Assessment for each Parcel shall be reduced pro rata to the reduction in the Assessments for each Parcel such that the sum of the resulting reduced principal portion of the Bonds and/or obligations under an Improvement Area Reimbursement Agreement is equal to the outstanding principal amount of the Bonds and/or an Improvement Area Reimbursement Agreement. H. PAYMENT OF ASSESSMENTS 1. Payment in Part or Full (a) The Assessment for any Parcel may be paid in full at any time. Such payment shall include all Prepayment Costs. If prepayment in full will result in redemption of Bonds, the payment amount shall be reduced by the amount, if any, of interest through the date of redemption of Bonds and reserve funds applied to the redemption under the Trust Indenture, net of any other costs applicable to the redemption of Bonds. (b) If an Annual Installment has been billed prior to payment in full of an Assessment, the Annual Installment shall be due and payable and shall be credited against the payment -in - full amount. (c) Upon payment in full of the Assessment and all Prepayment Costs, the City shall deposit the payment in accordance with the Trust Indenture; whereupon the Assessment shall be reduced to zero, and the owner's obligation to pay the Assessment and Annual Installments thereof shall automatically terminate. (d) At the option of the owner of the Assessed Property, the Assessment on any Parcel plus Prepayment Costs may be paid in part, in an amount sufficient to allow for a convenient redemption of Bonds as determined by the Administrator. Upon the payment of such amounts for a Parcel, the Assessment for the Parcel shall be reduced, the Assessment Roll shall be updated to reflect such partial payment, the obligation to pay the Annual Installment for such Parcel shall be reduced to the extent the partial payment is made, and the term of the Assessment shall not be reduced. 2. Payment in Annual Installments The PID Act provides that an Assessment for a Parcel may be paid in full at any time. If not paid in full, the PID Act authorizes the Assessment to be paid in installments and additionally allows the City to collect interest (including the Additional Interest Rate), Administrative Expenses and other authorized charges in installments. An Assessment for a Parcel that is not paid in full will be collected in Annual Installments each year in the amounts shown on the Assessment Rolls, as updated as provided for herein, which include interest, Administrative Expenses, and payments required for the Additional Interest Reserve if and when Bonds are issued. Payment of the Annual Installments shall commence with tax bills mailed after the initial levy of Assessments. (remainder of this page is intentionally left blank) MuniCap 145 Improvement Area #4 and #5 Bonds Each Assessment for the Improvement Area #4 Assessed Property and Improvement Area #5 Assessed Property related to the Improvement Area #4 and #5 Bonds shall be paid with interest of no more than the actual interest rate paid on the Improvement Area #4 and #5 Bonds. Interest on the Improvement Area #4 and #5 Bonds is based on an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 11 through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056) and Additional Interest at the rate of 0.5% for the Additional Interest Reserve. Furthermore, the Annual Installments related to the Improvement Area #4 and #5 Bonds may not exceed the amounts shown on the Improvement Area #4 Assessment Roll and Improvement Area #5 Assessment Roll. The Improvement Area #4 Assessment Roll and the Improvement Area #5 Assessment Roll are shown as Appendix G and Appendix H, respectively. Improvement Area #6 Each Assessment for the Improvement Area #6 Assessed Property for the Improvement Area #6 Improvements shall be paid with interest of no more than the actual interest rate paid on the obligation under the Reimbursement Agreement related to the Improvement Area #6 Improvements. Interest on the obligation under the Reimbursement Agreement related to the Improvement Area #6 Improvements shall be paid based on an estimated interest rate of 8.91% per annum for years 1 through 5 and 7.33% per annum following the fifth Annual Installment. The interest on the obligation under the Reimbursement Agreement related to the Improvement Area #6 Improvements shall be paid at a rate not to exceed five hundred basis points (5.00%) above the highest average index rate for tax-exempt bond reported in a daily or weekly bond index approved by the City and reported in the month prior to the establishment of the Assessments securing such portion of the obligation due under the Reimbursement Agreement and continuing for a period of five years from such date. Such rate shall then adjust and shall not exceed two hundred basis points (2.00%) above the bond index rate described above and shall continue until the Assessments are paid in full. The index approved by the City is the Bond Buyer Index for which the highest average rate during the previous thirty days prior to the levy of Assessments against the Improvement Area #6 Assessed Property was 5.33%. The City has determined that the obligation under the Reimbursement Agreement related to the Improvement Area #6 Improvements shall bear interest at the estimated interest rate of 8.91% per annum for years 1 through 5 and 7.33% per annum following the fifth Annual Installment, which rates are equal to or less than the initial maximum allowable rate of estimated interest of 8.91% for years 1 through 5 and equal to the maximum allowable rate of interest following the fifth Annual Installment, which would be 7.33%. Furthermore, the Annual Installments of the Assessments levied against Improvement Area #6 Assessed Property may not exceed the amounts shown on the Improvement Area #6 Assessment Roll. The Improvement Area #6 Assessment Roll is shown as Appendix I. Reduction ofAssessments The Annual Installments shall be reduced to equal the respective Actual Costs of repaying the Improvement Area #4 and #5 Bonds and the Improvement Area #6 Reimbursement Agreement, as applicable, and actual Administrative Expenses (as provided for in the definition of such term), taking into consideration any other available funds for these costs, such as interest income on account balances. MuniCap 146 The City reserves and shall have the right and option to refund the Improvement Area #4 and #5 Bonds, and/or issue additional Bonds in accordance with Section 372.027 of the PID Act. In the event of such refunding, the Administrator shall recalculate the Annual Installments, and if necessary, may adjust, or decrease, the amount of the Annual Installments so that total Annual Installments of Assessments will be produced in annual amounts that are required to pay the refunding bonds when due and payable as required by and established in the ordinance authorizing and/or the indenture securing the refunding bonds, and such refunding bonds shall constitute Improvement Area #4 and #5 Bonds, as the case may be, for purposes of this Service and Assessment Plan. I. COLLECTION OF ANNUAL INSTALLMENTS No less frequently than annually, the Administrator shall prepare, and the City Council shall consider and approve, an Annual Service Plan Update to allow for the billing and collection of Annual Installments. Each Annual Service Plan Update shall include updated Assessment Rolls and a calculation of the Annual Installment for each Parcel. Administrative Expenses shall be allocated among Parcels in proportion to the amount of the Annual Installments for the Parcels. Each Annual Installment shall be reduced by any credits applied under the applicable Trust Indenture, such as capitalized interest, interest earnings on any account balances, and any other funds available to the Trustee for such purpose, including any existing deposits for the Additional Interest Reserve and any applicable TIRZ Annual Credit Amounts. Annual Installments shall be collected by the City in the same manner and at the same time as ad valorem taxes and shall be subject to the same penalties, procedures, and foreclosure sale in case of delinquencies as are provided for ad valorem taxes of the City. The City Council may provide for other means of collecting the Annual Installments to the extent permitted under the PID Act. The Assessments shall have lien priority as specified in the PID Act. Each Annual Installment, including the interest on the unpaid amount of an Assessment, shall be calculated as of September 1 and updated annually. Each Annual Installment together with interest thereon shall be delinquent if not paid prior to February 1 of the following year. The collection of the first Annual Installment for a Parcel of Improvement Area #4 Assessed Property shall commence upon September 1, 2026. The collection of the first Annual Installment for a Parcel of Improvement Area #5 Assessed Property shall commence upon September 1, 2026. The collection of the first Annual Installment for a Parcel of Improvement Area #6 Assessed Property shall commence upon the earlier of: (i) with tax bills sent the first October after execution of the Improvement Area #6 Reimbursement Agreement, or (ii) September 1, 2027. Any sale of Assessed Property for nonpayment of the Annual Installments shall be subject to the lien established for the remaining unpaid Annual Installments against such Assessed Property and such Assessed Property may again be sold at a judicial foreclosure sale if the purchaser thereof MuniCap 147 fails to make timely payment of the non -delinquent Annual Installments against such Assessed Property as they become due and payable. (remainder of this page is intentionally left blank) MuniCap 148 VIL THE ASSESSMENT ROLL A. IMPROVEMENT AREA #4 ASSESSMENT ROLL The City Council has evaluated each Parcel in Improvement Area #4 (based on numerous factors such as the applicable zoning for the developable area, the use of proposed Homeowners' Association Property, the Public Property, the types of Authorized Improvements, and other development factors deemed relevant by the City Council) to determine which Parcels constitute Improvement Area #4 Assessed Property. The Improvement Area #4 Assessed Property was assessed for the special benefits conferred upon such property resulting from the Improvement Area #4 Improvements. Table VII -A summarizes the $16,255,00 (excluding bond premium) in special benefit from the Improvement Area #4 Improvements, including a portion of the costs of the PID formation and applicable Improvement Area #4 Bond issuance costs. The Improvement Area #4 Assessment is $16,255,000, which is less than the benefit received by the Improvement Area #4 Assessed Property. Accordingly, the total Improvement Area #4 Assessment to be applied to all the Improvement Area #4 Assessed Property is $16,255,000, plus interest and annual Administrative Expenses. The Improvement Area #4 Assessment for each Improvement Area #4 Assessed Property is calculated based on the allocation methodologies described in Section V.D. The Improvement Area #4 Assessment Roll is attached hereto as Appendix G. Table VII -A Improvement Area #4 Special Benefit Summary Special Benefit Total Improvement Area #4 Improvements Bond Issuance Costs: Cost of Issuance Reserve Fund Administrative expenses Underwriters Discount Subtotal Bond Issuance Costs Premium Total Special Benefit Special Benefit: Total Special Benefit Assessment Excess Benefit 'See Table 111A for details. Total Cost $13,949,138 $583,114 $1,166,443 $95,000 $487,650 $2,332,207 ($26,345) $16,255,000 $16,255,000 $16,255,000 $0 MuniCap 149 B. IMPROVEMENT AREA #5 ASSESSMENT ROLL The City Council has evaluated each Parcel in Improvement Area #5 (based on numerous factors such as the applicable zoning for the developable area, the use of proposed Homeowners' Association Property, the Public Property, the types of Authorized Improvements, and other development factors deemed relevant by the City Council) to determine which Parcels constitute Improvement Area #5 Assessed Property. The Improvement Area #5 Assessed Property is being assessed for the special benefits conferred upon such property resulting from the Improvement Area #5 Improvements. Table VII -B summarizes the $6,763,000 (excluding bond premium) in special benefit from the Improvement Area #5 Improvements, including a portion of the costs of the PID formation and applicable Improvement Area #5 Bond issuance costs. The Improvement Area #5 Assessment amount is $6,763,000, which is less than the benefit received by the Improvement Area #5 Assessed Property. Accordingly, the total Improvement Area #5 Assessment to be applied to all the Improvement Area #5 Assessed Property is $6,763,000, plus interest and annual Administrative Expenses. The Improvement Area #5 Assessment for each Improvement Area #5 Assessed Property is calculated based on the allocation methodologies described in Section V.D. The Improvement Area #5 Assessment Roll is attached hereto as Appendix H. Table VII -B Improvement Area #5 Special Benefit Summary Special Benefit Total Cost Total Improvement Area #5 Improvements' $5,747,508 Bond Issuance Costs: Cost of Issuance $242,783 Reserve Fund $485,306 Administrative expenses $95,000 Underwriter's Discount $202,890 Subtotal Bond Issuance Costs $1, 025,979 Premium ($10,487) Total Special Benefit $6,763,000 Special Benefit: Total Special Benefit $6,763,000 Assessment $6,763,000 Excess Benefit $0 'See Table III -B for details. (remainder of this page is intentionally left blank) MuniCap 150 C. IMPROVEMENT AREA #6 ASSESSMENT ROLL The City Council has evaluated each Parcel in Improvement Area #6 (based on numerous factors such as the applicable zoning for the developable area, the use of proposed Homeowners' Association Property, the Public Property, the types of Authorized Improvements, and other development factors deemed relevant by the City Council) to determine which Parcels constitute Improvement Area #6 Assessed Property. The Improvement Area #5 Assessed Property is being assessed for the special benefits conferred upon such property resulting from the Improvement Area #6 Improvements. Table VII -C summarizes the $34,086,186 in special benefit from the Improvement Area #6 Improvements, including the costs of the PID formation and applicable issuance costs. The Improvement Area #6 Assessment amount is $30,380,000, which is less than the benefit received by the Improvement Area #6 Assessed Property. Accordingly, the total Improvement Area #6 Assessment to be applied to all the Improvement Area #6 Assessed Property is $30,380,000, plus interest and annual Administrative Expenses. The Improvement Area #6 Assessment for each Improvement Area #6 Assessed Property is calculated based on the allocation methodologies described in Section V.D. The Improvement Area #6 Assessment Roll is attached hereto as Appendix I. Table VII -C Improvement Area #6 Special Benefit Summary Special Benefit Total Cost Total Improvement Area #6 Improvements' $28,516,364 Estimated Bond Issuance Costs: Cost of Issuance $1,823,083 Reserve Fund $2,724,339 Administrative expenses $111,000 Underwriter's Discount $911,400 Subtotal Estimated Bond Issuance Costs $5,569,822 Total Special Benefit $34,086,186 Special Benefit: Total Special Benefit $34,086,186 Assessment $30,380,000 Excess Benefit $3,706,186 'See Table III -C for details. D. FUTURE IMPROVEMENT AREAS ASSESSMENT ROLL As Future Improvement Areas are developed, this Service and Assessment Plan will be amended to determine the Future Improvement Area Assessment for each Parcel or lot located within such Future Improvement Areas (e.g., an appendix will be added for each Future Improvement Area Assessment Roll). MuniCap 151 E. ANNUAL ASSESSMENT ROLL UPDATES The Administrator shall prepare, and shall submit to the City Council for approval, annual updates to the Assessment Roll in conjunction with the Annual Service Plan Update to reflect the following matters, together with any other changes helpful to the Administrator or the City and permitted by the PID Act: (i) the identification of each Parcel (ii) the Assessment for each Parcel of Assessed Property, including any adjustments authorized by this Service and Assessment Plan or the PID Act; (iii) the Annual Installment for the Assessed Property for the year (if the Assessment is payable in installments); and (iv) payments of the Assessment, if any, as provided by Section VI.F of this Service and Assessment Plan. This Service and Assessment Plan reflects the actual interest under the Improvement Area #6 Reimbursement Agreement, and which the Annual Installments shall be paid, any reduction in the Improvement Area #6 Assessments, and any revisions in the Budgeted Costs to be funded by the Improvement Area #6 Reimbursement Agreement and Improvement Area #6 Developer funds. (remainder of this page is intentionally left blank) MuniCap 152 VIII. MISCELLANEOUS PRO VISIONS A. ADMINISTRATIVE REVIEW The City may elect to designate a third party to serve as Administrator. The City shall notify the Developer in writing at least thirty (30) days in advance before appointing a third -party Administrator. To the extent consistent with the PID Act, an owner of an Assessed Property claiming that a calculation error has been made in an Assessment Roll, including the calculation of the Annual Installment, shall send a written notice describing the error to the City not later than thirty (30) days after the date any amount which is alleged to be incorrect is due prior to seeking any other remedy. The Administrator shall promptly review the notice, and if necessary, meet with the Assessed Property owner, consider written and oral evidence regarding the alleged error and decide whether, in fact, such a calculation error occurred. If the Administrator determines that a calculation error has been made and the applicable Assessment Roll should be modified or changed in favor of the Assessed Property owner, such change or modification shall be presented to the City Council for approval to the extent permitted by the PID Act. A cash refund may not be made for any amount previously paid by the Assessed Property owner (except for the final year during which the Annual Installment shall be collected or if it is determined there are sufficient funds to meet the expenses of the PID for the current year), but an adjustment may be made in the amount of the Annual Installment to be paid in the following year. The decision of the Administrator regarding a calculation error relating to an Assessment Roll may be appealed to the City Council. Any amendments made to an Assessment Roll pursuant to calculation errors shall be made pursuant to the PID Act. The decision of the Administrator, or if such decision is appealed to the City Council, the decision of the City Council, shall be conclusive as long as there is a reasonable basis for such determination. This procedure shall be exclusive and its exhaustion by any property owner shall be a condition precedent to any other appeal or legal action by such owner. B. TERMINATION OF ASSESSMENTS Each Assessment shall be extinguished on the date the Assessment is paid in full, including unpaid Annual Installments and Delinquent Collection Costs, if any. After the extinguishment of an Assessment and the collection of any delinquent Annual Installments and Delinquent Collection Costs, the City shall provide the owner of the affected Parcel a recordable "Notice of the PID Assessment Termination." C. AMENDMENTS Amendments to this Service and Assessment Plan can be made as permitted or required by the PID Act and under Texas law. MuniCap I3 The City Council reserves the right to the extent permitted by the PID Act to amend this Service and Assessment Plan without notice under the PID Act and without notice to property owners of Parcels of Assessed Property: (i) to correct mistakes and clerical errors; (ii) to clarify ambiguities; and (iii) to provide procedures for the collection and enforcement of Assessments, Prepayment Costs, collection costs, and other charges imposed by this Service and Assessment Plan. D. COUNTY FILING Within seven days of its approval by the City Council, the City shall (i) file and record this Service and Assessment Plan in the real property records of the County and (ii) post a copy of this Service and Assessment Plan on the City's internet web site. In addition, the City shall similarly file each Annual Service Plan Update approved by the City Council, with each such filing to occur within seven days of the date each respective Annual Service Plan Update is approved. All such documents shall be filed and recorded in their entirety. E. ADMINISTRATION AND INTERPRETATION OF PROVISIONS The City Council shall administer the PID, this Service and Assessment Plan, and all Annual Service Plan Updates consistent with the PID Act and shall make all interpretations and determinations related to the application of this Service and Assessment Plan unless stated otherwise herein or in the Trust Indenture, such determination shall be conclusive. F. SEVERABILITY If any provision, section, subsection, sentence, clause or phrase of this Service and Assessment Plan or the application of same to an Assessed Property or any person or set of circumstances is for any reason held to be unconstitutional, void or invalid, the validity of the remaining portions of this Service and Assessment Plan or the application to other persons or sets of circumstances shall not be affected thereby, it being the intent of the City Council in adopting this Service and Assessment Plan that no part hereof or provision or regulation contained herein shall become inoperative or fail by reason of any unconstitutionality, voidness or invalidity of any other part hereof, and all provisions of this Service and Assessment Plan are declared to be severable for that purpose. If any provision of this Service and Assessment Plan is determined by a court to be unenforceable, the unenforceable provision shall be deleted from this Service and Assessment Plan and the unenforceable provision shall, to the extent possible, be rewritten to be enforceable and to give effect to the intent of the City. (remainder of this page is intentionally left blank) MuniCap 154 APPENDIX A-1 PID MAP .r, Veale Ranch PID - Boundary Map c:wfl __ 1 ' f VEALE RANCH lll�� VEALE RANCH MASTER PLAN TIY rr, ...�� _' .W.MI�IYMN(OY.I'IY. APPENDIX A-2 IMPROVEMENT AREA #4 MAP LJ L?3\ r 1 ; 14\ hj 1i L.. r proveae� 4. / bra 04 VEALE RANCH •, , V` - --•- ® ' __" MAS1UPMH APPENDIX A-3 IMPROVEMENT AREA #5 MAP .----.----..-'.-..- •__•7I.-..-.. Sri. .__ A I I.- • I\,.) __ __ I r • 3 " �,; fth VEALE RANCH 6 APPENDIX A-4 IMPROVEMENT AREA #6 MAP LJ 7 VEALE RANCH MASTER PLAN _-..... --_- ..«....,.., ..,.w..wm rout .... APPENDIX A-5 FUTURE IMPROVEMENT AREA MAP VEALE RANCH MASTER PLA(J I1 � APPENDIX B BUDGETED COSTS OF AUTHORIZED IMPROVEMENTS ''.3' i Roadway Improvements Item Description Unit Quantity Unit Price Total Item Cost I Furnish/Install Electric Service Pedestal (Traffic Signal) EA 1.00 $15,500.00 $15,500.00 12" Conduit PVC SCH 80(T) IF 51.0C $38.00 $1,938.001 13" Conduit PVC SCH 80(T) IF 152.00 $40.00 $6,080.001 13" Conduit PVC SCH 80 (B) LF 132.00 $88.00 $11,616.00 14" Conduit PVC SCH 80 (T) LF 12.00 $44.00 $528.00) 14" Conduit PVC SCH 80 (B) LF 442.00 $92.00 $40,664.00 Furnish/Install 3 -Sect Signal Head EA 13.00 $2,850.00 $37,050.00 Furnish/Install 5 -Sect Signal Head EA 1.00 $4,950.00 $4,950.001 Furnish/Install Ped Singal Head Assembly EA 2.0C $2,000.00 $4,000.00 lAudible Pedestrian Pushbutton Station EA 2.00 $6,500.00 $13,000.00 Furnish/Install BBU System EXT Mounted EA 1.00 $11,500.00 $11,500.00 Furnish/Install Hybrid Detection System EA 5.0C $13,000.00 $65,000.00 Furnish/Install Model 711 Preemption LF 3.0C $4,000.00 $12,000.00 Furnish/Install Preemption Cable EA 822.00 $5.00 $4,110.00 Furnish/Install PTZ Camera EA 1.00 $11,500.00 $11,500.00 Furnish/Install Communication Modem LF 1.0C $5,500.00 $5,500.00) Furnish/Install CATS Ethernet Cable LF 1,600.0C $5.00 $8,000.00 )5/C 14AWG Multi -Conductor Cable LF 20.00 $5.00 $100.00) 17/C 14 AWG Multi -Conductor Cable LF 705.00 $6.00 $4,230.00 )10/C 14 AWG Multi -Conductor Cable LF 218.00 $7.00 $1,526.00 120/C 14AWG Multi -Conductor Cable LF 1,155.00 $11.00 $12,705.00 13/C 14AWG Multi -Conductor Cable LF 228.00 $5.00 $1,140.00 NO 6 Insulated Electric Condr LF 36.00 $5.00 $180.00) )NO 10 Insulated Electric Condr LF 1,888.00 $3.00 $5,664.00 1NO6 Bare Electric Condr SLD LF 18.00 $5.00 $90.00) NO 8 Bare Electric Condor SLD LF 771.00 $4.00 $3,084.00 Furnish/Install Ground Box Type D, w/Apron EA 8.00 $4,000.00 $32,000.00 Furnish/Install10'-20' Ped Pole Assembly LF 1.00 $4,500.00 $4,500.00 Furnish/Install Type 41 Signal Pole EA 2.0C $15,500.00 $31,000.00 Furnish/Install Type 43 Signal Pole EA 1.00 $19,000.00 $19,000.00 Furnish/Install Type 45 Signal Pole EA 2.0C $19,500.00 $39,000.00 Furnish/Install Mast Arm 16-36' EA 2.0C $10,000.00 $20,000.00 Furnish/Install Mast Arm 40'- 48' EA 1.00 $11,000.00 $11,000.00 Furnish/Install Mast Arm 52-60' EA 2.0C $14,000.00 $28,000.00 ITS 1 Signal Foundation EA 1.00 $6,500.00 $6,500.001 ITS 3 Signal Foundation EA 2.00 $8,000.00 $16,000.00 ITS 4 Signal Foundation EA 1.00 $8,500.00 $8,500.00) ITS 5 Signal Foundation EA 2.00 $9,000.00 $18,000.00 ISignal Cabinet Foundation - 352i & BBU EA 1.00 $7,800.00 $7,800.00) )Furnish/Install ATC Signal Controller EA 1.00 $6,800.00 $6,800.00) 1 Furnish/Install 352i Controller Cabinet Assembly EA 1.00 $32,000.00 $32,000.00 Furnish/Install LED Lighting Fixture (137 Watt ATB2 Cobra Head) EA 5.00 $1,100.00 $5,500.00) Furnish/Install Alum Sign Mast Arm Mount EA 16.00 $1,000.00 $16,000.00 Furnish/Install Alum Sign Ground Mount City Std. EA 6.00 $1,000.00 $6,000.00) )IN SM RD SUP&AM TYI0BWG(I)SA(P) EA 6.00 $500.00 $3,000.00 Remove Existing Wire Fence LF 188.00 $6.00 $1,128.00 Post & Cable Fence (Remove) LF 80.00 $10.00 $800.00) Concrete Sidewalks (5") SY 15.00 $62.00 $930.00) ) Plane Asphalt Concrete Pavement (1") SY 1,515.00 $32.00 $48,480.00 )FL 85 (CMP In Place)(TY A GR 1-2)(10") SY 1,515.00 $115.00 $174,225.00 Lime Treatment (Subgrade)(6") SY 2,075.0C $9.00 $18,675.00 Concrete Pavement (COST REINF - CRCP)(8") SY 560.00 $102.00 $57,120.00 ITS 21 Comb Island Ramp EA 1.00 $4,000.00 $4,000.00 ITS 1 Perpendicular Curb Ramp EA 2.00 $4,500.00 $9,000.00 )Plane Asphalt Concrete Pavement (1") (Change Order 1) SY (1,515.00) $32.00 ($48,480.00)) )TS -B Asphalt Pavement (S") (Change Order 1) SY 1,933.00 $54.00 $104,382.00 )TV -C Asphalt Pavement (3") (Change Order 1) SY 1,886.0[ $48.00 $90,528.00 Clearing & Grubbing - TxDOT Driveway AC 1.4_1 $2,500.00 $3,625.00 )Cut-TxDOT Driveway CV 249.0[ $8.00 $1,992.00 Fill -TxDOT Driveway CV 1,572.00 $12.00 $18,864.00 (Traffic Control - TxDOT Driveway LS 1.0C $25,000.00 $25,000.00 Subtotal - Roadway Improvements $1,102,524.1 Ater Improve Item Description Unit Quantity Unit Price Total Item Cost Unclassified Excavation - Utility >8" Corridor CV 2,040.00 $4.75 $9,690.00) Trench Safety LF 11,363.00 $2.00 $22,726.00 ) 12" PVC Water Pipe LF 1,088.00 $112.00 $121,856.00 ) 12" DIP Water LF 83.00 $142.00 $11,786.00 ) 16" PVC Water Pipe LF 2,646.00 $162.00 $428,652.00 ) 16" DIP Water LF 680.00 $222.00 $150,960.00 ) 24" PVC Water Pipe LF 5,717.00 $242.00 $1,383,514.00 ) 24" DIP Water LF 222.00 $282.00 $62,604.00 ) Fire Hydrant (Assembly) EA 1.00 $8,500.00 $8,500.00 ) 1" Water Service EA 13.00 $1,450.00 $18,850.00 ) 12" Gate Valve EA 6.00 $4,500.00 $27,000.00 ) 16" Gate Valve & Vault EA 2.00 $28,500.00 $57,000.00 ) 24" Gate Valve & Vault EA 9.00 $62,500.00 $562,500.00 ) Ductile Iron Water Fittings w/ Restraint TON 15.02 $16,500.00 $247,797.00 ) 6" Blow Off Valve EA 1.00 $14,500.00 $14,500.00 ) 8" Blow Off Valve EA 1.00 $18,500.00 $18,500.00 ) 2" Combination Air Valve Assembly for Water EA 1.00 $12,500.00 $12,500.00 ) 4" Combination Air Valve Assembly for Water EA 1.00 $30,500.00 $30,500.00 ) 20" Casing By Open Cut LF 508.00 $320.00 $162,560.00 ) 24" Casing By Open Cut LF 407.00 $380.00 $154,660.00 ) 42" Casing By Open Cut LF 529.00 $720.00 $380,880.00 ) Connection to Existing 24" Water Main EA 1.00 $9,500.00 $9,500.00 Erosion Control Matting SV 127.00 $12.00 $1,524.00 12" DIP Water, CSS Backfill LF 427.00 $162.00 $69,174.00 24" DIP Water, CSS Backfill LF 500.00 $312.00 $156,000.00 Concrete Riprap 5V 1,041.00 $82.00 $85,362.00 Utility Markers LS 1.00 $2,500.00 $2,500.00 Water Testing (Excluding Geotech) LF 12,903.00 $2.00 $25,806.00 124" Ring Connection EA 1.00 $105,000.00 $105,000.00 18" PVC Water Pipe (Change Order 1) LF 23.00 $56.00 $1,288.00 18" DIP Water (Change Order 1) LF 20.00 $66.00 $1,320.00 112" PVC Water Pipe (Change Order 1) LF (7.00) $112.00 ($784.00) 112" DIP Water (Change Order 1) LF 7.00 $142.00 $994.00 124" PVC Water Pipe (Change Order 1) LF (15.00) $242.00 ($3,630.00) 24" Gate Valve & Vault (Change Order 1) EA (2.00) $62,500.00 ($125,000.00) I Ductile iron Water Fittings w/ Restraint (Change Order 1) TON (0.90) $16,500.00 ($14,850.00) 18" Water Lowering (Change Order 1) EA 1.00 $5,500.00 $5,500.00 20" Casing By Open Cut (Change Order 1) LF 20.00 $320.00 $6,400.00 24" Casing By Open Cut (Change Order 1) LF (209.00) $380.00 ($79,420.00) 12" DIP Water, CSS Backfill (Change Order 1) LF 20.00 $162.00 $3,240.00 112" Water Pipe, CSS Backfill (Change Order 1) LF (20.00) $132.00 ($2,640.00) Ring Connection (Change Order 1) EA (1.00( $105,000.00 ($105,000.00)1 124" Subtotal- Water Improvements $4,020,129.00 Sewer Improvements Item Description Unit Quantity Unit Price Total Item Cost Post -CCTV Inspection LF 1,911.00 $6.00 $11,466.00 Manhole Vacuum Testing EA 11.00 $500.00 $5,500.00 Trench Safety LF 1,911.00 $4.00 $7,644.00 Trench Water Stops EA 7.00 $750.00 $5,250.00 15" PVC Sewer Pipe SDR-26 LF 345.00 $326.00 $112,470.00 15" DIP Sewer Pipe LF 246.00 $396.00 $97,416.00 18" Epoxy Coated Ductile Iron Sewer Pipe LF 226.00 $425.00 $96,050.00 30" Fiberglass Reinforced Sewer Pipe LF 1,343.00 $426.00 $572,118.00 24" Casing By Open Cut LF 289.00 $420.00 $121,380.00 36" Casing By Open Cut LF 226.00 $620.00 $140,120.00 48" Casing By Open Cut LF 30.00 $820.00 $24,600.00 15" Sewer Pipe, CSS Backfill LF 20.00 $346.00 $6,920.00 18" DIP Sewer, CSS Backfill LF 141.00 $456.00 $64,296.00 30" Fiberglass Sewer Pipe, CSS Backfill LF 20.00 $466.00 $9,320.00 4' Manhole EA 3.00 $8,000.00 $24,000.00 4' Drop Manhole EA 2.00 $9,000.00 $18,000.00 5' Manhole EA 7.00 $10,000.00 $70,000.00 Concrete Collar for Manhole EA 11.00 $1,000.00 $11,000.00 Remove 4' Sewer Manhole EA 1.00 $3,500.00 $3,500.00 WAGER 3000 Manhole Scrubber EA 1.00 $18,500.00 $18,500.00 4' Extra Depth Manhole VF 60.90 $275.00 $16,747.50 5' Extra Depth Manhole VF 70.00 $325.00 $22,750.00 Epoxy Manhole Liner VF 197.60 $485.00 $95,836.00 Concrete Riprap Sy 252.00 $82.00 $20,664.00 Post -CCTV Inspection (Change Order 1) LF 378.00 $6.00 $2,268.00 Manhole Vacuum Testing (Change Order 1) EA 4.00 $500.00 $2,000.00 Trench Safety (Change Order 1) LF 378.00 $4.00 $1,512.00 Trench Water Stops (Change Order 1) EA (3.00) $750.00 ($2,250.00) 112" Sanitary Sewer Pipe (Change Order 1) LF 2.00 $276.00 $552.00 115" Sanitary Sewer Pipe (Change Order 1) LF 24.00 $326.00 $7,824.00 120" Casing by Open Cut (Change Order 1) LF (5.00) $320.00 ($1,600.00) 124" Casing by Open Cut (Change Order 1) LF (159.00) $420.00 ($66,780.00) 136" Casing by Open Cut (Change Order 1) LF (8.00) $620.00 ($4,960.00) 118" DIP Sanitary Sewer, CSS Backfill (Change Order 1) LF (141.00) $456.00 ($64,296.00) 14' Manhole (Change Order 1) EA 1.00 $8,000.00 $8,000.00 14' Drop Manhole (Change Order 1) EA 3.00 $9,000.00 $27,000.00 15' Manhole (Change Order 1) EA (2.00) $10,000.00 ($20,000.00) 14' Extra Depth Manhole (Change Order 1) VF (53.00) $275.00 ($14,575.00) Concrete Collar for Manhole (Change Order 1) EA 4.00 $1,000.00 $4,000.00 Concrete Rip Rap (Change Order 1) If (10.00) $82.00 ($820.00) 115" DIP Sanitary Sewer (Change Order 1) LF (46.00) $396.00 ($18,216.00) 118" Epoxy Coated D.I. Sanitary Sewer Pipe (Change Order 1) LF (226.00) $425.00 ($96,050.00) 118" Epoxy Coated D.I. Sanitary Sewer Pipe, CSS Backfill (Change Order 1) LF 359.00 $456.00 $163,704.00 15' Drop Manhole (Change Order 1) EA 1.00 $11,000.00 $11,000.00 Deep Trench Deduct (Change Order 1) LS (1.00) $140,550.00 ($140,550.00)1 Subtotal - Sewer Improvements 1 $1,373,310.50 Storm Drainage Improvements Item Description I Unit I Quantity I Unit Price I Total Item Cast RC Pipe (CL III)(24") TXDOT Drivewav LF 113.00 $115.00 $12,995.00 112" Rip Rap (Stone Common)(Grout) CV 23.00 $435.00 $10,005.00 124" Headwall (PSET-SP) EA 2.00 $4,500.00 $9,000.00 124" Headwall (CH -FW-0) EA 1.00 $4,500.00 $4,500.00 (Remove SIR (Headwall) EA 1.00 $1,500.00 $1,500.00 124" RCP CL III (Change Order 1) LF (113.00) $115.00 ($12,995.00) (Headwall (PSET-SP) 24" (Change Order 1) EA (1.00{ $4,500.00 ($4,500.00) (Headwall (CH-FW-0) 24" (Change Order 1) EA (1.00) $4,500.00 ($4,500.00) 14X2 RCB (Change Order 1) LF 127.00 $240.00 $30,480.00 402 Headwall (Change Order 1) EA 2.00 $6,500.00 $13,000.00 Subtotal - Storm Drainage Improvements $59,485.00 +I Other Soft and Miscellaneous Costs Item Description Unit Quantity Unit Price Total Item Cost Engineering, Surveying, Staking LS 1 $1,537,500 $1,537,5001 Construction Materials Testing LS 1 $15,000 $15,000 1ErosionControl &SWPPP LS 1 $15,000 $15,000 City of Fort Worth Fees LS 1 $361,702 $361,702 Bonding Fees (Maintenance, Payment, Performance, Development) LS 1 $166,933 $166,933 Easement and Right -of -Way Dedication LS 1 $325,000 $325,000 Construction Management % 5% $6,555,449 $327,772 Subtotal - Other Soft and Miscellaneous Costs $2,748,907.12 oadway Improvements Item Description Unit Quantity Unit Price Total Item Cost )Unclassified Excavation - Public ROW CV 48,270.00 $4.75 $229,282.50) Hydrated Lime (3681ST) TN 232.00 $275.00 $63,800.00 1 8" Lime Treatment (3681ST) SY 12,860.00 $5.00 $64,300.00 ) 10" Conc Pvmt SY 12,040.00 $108.00 $1,300,320.00 ) Barrier Free Ramp, Type P-1 EA 4.00 $2,400.00 $9,600.00 1 Topsoil CV 786.00 $28.00 $22,008.00 1 Seeding, Hydromulch SY 7,070.00 $2.00 $14,140.00 ) 1 4" Conc Sidewalk SF 36,690.00 $4.25 $155,932.50 ) Construct Std Pvmt Header LF 85.00 $30.00 $2,550.00 1 Pedestrian Hand Rail LF 100.00 $140.00 $14,000.00 1 Construct Barricade EA 2.00 $800.00 $1,600.001 4" (White) Dashed Stripe w/ Raised Pavement Markers LF 3,579.00 $3.00 $10,737.00 1 8" (White) Solid Stripe w/ Raised Pavement Markers LF 657.00 $4.00 $2,628.00) Lane Legend (Arrow) EA 11.00 $500.00 $5,500.00) Lane Legend (Only) EA 11.00 $500.00 $5,500.00) 12" (White) 3'-9' Dotted Lane Drop Line LF 344.00 $10.00 $3,440.001 6" (White) Solid Stripe w/ 18" (White) Solid Stripes (In Ceveron Pattern) SF 1,065.00 $4.00 $4,260.00) Furnish/Install Alum Sign Ground Mount City Std. - Stop w/ Street Name Blades (R1-1) EA 1.00 $1,000.00 $1,000.00) Furnish/Install Alum Sign Ground Mount City Std. - Speed Limit (R2-1) EA 3.00 $500.00 $1,500.001 Furnish/Install Alum Sign Ground Mount City Std. - Left Turn Only (R3 -5L) EA 2.00 $500.00 $1,000.00) Furnish/Install Alum Sign Ground Mount City Std. - Stop Here For Pedestrians (R1 -5b) EA 1.00 $500.00 $500.00 1 Furnish/Install Alum Sign Ground Mount City Std. - Left, Left, Right Only (R3-BLLR) EA 4.00 $500.00 $2,000.00) Furnish/Install Alum Sign Ground Mount City Std. - Right Lane Must Turn Right (R3 -7R) EA 2.00 $500.00 $1,000.00) Furnish/Install Elec Sery Pedestal EA 1.00 $10,500.00 $10,500.00) 2" Condt PVC SCH 80 (T) LF 2,992.00 $15.00 $44,880.00) Rdwy Ilium Foundation TV 3,5,6, and 8 EA 16.00 $1,800.00 $28,800.00) Rdwy Ilium TV 18 Pole EA 16.00 $3,400.00 $54,400.00) Install Type 33A Arm EA 22.00 $600.00 $13,200.00) Type 82 Luminaire EA 22.00 $750.00 $16,500.00) Electric Overhead Line Burying Allowance LS 1.00 $25,000.00 $25,000.00 Subtotal - Roadway Improvements $2,109,878.00 Water improve Item Description Unit Quantity Unit Price Total Item Cost Il Trench Safety LF 2,147.00 $2.00 $4,294.00) 12" PVC Water Pipe LF 2,071.00 $112.00 $231,952.001 12" DIP Water LF 36.00 $142.00 $5,112.001 12" Gate Valve EA 8.00 $4,500.00 $38,000.00) Ductile Iron Water Fittings w/ Restraint TON 2.47 $9,500.00 $23,484.00) 2" Combination Air Valve Assembly for Water EA 1.00 $14,500.00 $14,500.00) 20" Casing By Open Cut LF 20.00 $320.00 $6,400.00) 12" Water Pipe, CSS Backfill LF 40.00 $132.00 $5,280.00) Water Testing (Excluding Geotech) LF 2,147.00 $1.00 $2,147.00 Subtotal - Water Improvements $329,169.00 !Sewer Improvements' Item Description Subtotal - Sewer Improvements !Storm Drainage Improvements Item Description Trench Safety Post -CCTV Inspection 21" RCP, Class III 24" RCP, Class III 27" RCP, Class III 6x3 Box Culvert 4' Storm Junction Box 10' Recessed Inlet 15' Recessed Inlet 12" Rock Riprap (2)-6'x3' PW-1 4:1 Sloped End Wingwall Subtotal - Storm Drainage Improvements Unit Quantity Unit Price Total Item Cost $0.00 Unit Quantity Unit Price Total Item Cost LF 544.00 $2.00 $1,088.001 LF 544.00 $2.00 $1,088.001 LF 119.00 $75.00 $8,925.001 LF 183.00 $85.00 $15,555.001 LF 8.00 $105.00 $840.001 LF 234.00 $450.00 $105,300.00) EA 2.00 $5,500.00 $11,000.00) EA 2.00 $5,000.00 $10,000.00) EA 2.00 $6,000.00 $12,000.00) 5Y 192.00 $125.00 $24,000.00) EA 2.00 $19,950.00 $39,900.00 $229,696.00 +I Public Landscaping, Trails and Parks )Item Description Unit Quantity Unit Price Total Item Cost Public Landscape, Irrigation & Hardscape Allowance LS 1.00 $675,000.00 $675,000.00 Subtotal - Public Landscaping, Trails and Parks $675,000.00 Cher Soft and Miscel Item Description Unit Quantity Unit Price Total Item Cost )Construction Materials Testing LS 1 $120,449 $120,4491 Erosion Control &SWPPP LS 1 $10,000 $10,000) Easement and Right -of -Way Dedication LS 1 $345,000 $345,000) Construction Management % St) $3,343,743 $167,187 Subtotal - Other Soft and Miscellaneous Costs $642,636.15 Water Improvements Item Description Unit Quantity Unit Price Total Item Cost Mobilization LS 1.00 $7,500.00 $7,500.001 Remove 12" Water Line LF 110.00 $40.00 $4,400.00 Remove 16" Water Line LF 30.00 $60.00 $1,800.00 14"-12"Water Abandonment Plug 6" EA 2.00 $1,500.00 $3,000.00 ISalvage Fire Hydrant EA 3.00 $1,000.00 $3,000.00 112" PVC Water Pipe (Restrained Joints) LF 580.00 $142.00 $82,360.00 116" DIP Water LF 10.00 $322.00 $3,220.00 116" PVC C900 Water Pipe (Restrained Joints) LF 126.00 $262.00 $33,012.00 14' Wide Asphalt Pvmt Repair, Residential LF 599.00 $48.00 $28,752.00 I5' Wide Asphalt Pvmt Repair, Residential LF 136.00 $60.00 $8,160.00 Asphalt Pvmt Repair Beyond Defined Width, Arterial ST 155.00 $108.00 $16,740.00 130" Casing By Open Cut LF 102.00 $420.00 $42,840.00 IFire Hydrant EA 3.00 $6,500.00 $19,500.00 112" Gate Valve EA 4.00 $6,000.00 $24,000.00 I1" Water Service, Meter Reconnection EA 3.00 $2,500.00 $7,500.00 I1" Bored Water Service EA 5.00 $3,500.00 $17,500.00 IConnection to Existing 16" Water Main EA 3.00 $10,500.00 $31,500.00 Connection to Existing 4"-12" Water Main 8" EA 2.00 $3,500.00 $7,000.00 IConnection to Existing 4"-12" Water Main 6" EA 1.00 $2,500.00 $2,500.00 116" Gate Valve with Vault EA 1.00 $26,500.00 $26,500.00 116" x 12" Tapping Sleeve & Valve EA 1.00 $24,500.00 $24,500.00 (Ductile Iron Water Fittings TONS 4.00 $9,500.00 $38,000.00 ITraffic Control LS 1.00 $6,500.00 $6,500.00 Waterline Sterilization and Pressure Testing LF 716.00 $4.00 $2,864.00 ITrench Safety LF 716.00 $2.00 $1,432.00 Right of Way Clearing, Restoration, and Seeding of Disturbed Areas LF 716.00 $10.00 $7,160.00 Comply with TPDES Construction General Permit TXR 150000 LS 1.00 $3,500.00 $3,500.00 (Mobilization (Change Order 1) LS 0.50 $7,500.00 $3,750.00 Remove 12" Water Line (Change Order 1) LF (110.00( $40.00 ($4,400.00) Remove 16" Water Line (Change Order 1) LF (30.00( $60.00 ($1,800.00) ISainage Fire Hydrant (Change Order 1) EA (1.00) $1,000.00 ($1,000.00) 112" WTR Pipe (PVC Restrained) (Change Order 1) LF 412.00 $142.00 $58,504.00 116" DIP Water (Change Order 1) LF (10.00) $322.00 ($3,220.00) 116" PVC C900 Water Pipe (Restrained Joints) (Change Order 1) LF (126.00) $262.00 ($33,012.00) 130" Casing by Open Cut (Change Order 1) LF (102.00) $420.00 ($42,840.00) (Fire Hydrant (Change Order 1) EA (1.00) $6,500.00 ($6,500.00) 112" Gate Valve (Change Order 1) EA 1.00 $6,000.00 $6,000.00 Connection to Existing 16" Water Main (Change Order 1) EA (2.00) $10,500.00 ($21,000.00) 116" Gate Valve with Vault (Change Order 1) EA (1.00) $26,500.00 ($26,500.00) (Ductile Iron Water Fittings (Change Order 1) TON (1.30) $9,500.00 ($12,302.50) ITraffic Control (Change Order 1) LS 0.50 $6,500.00 $3,250.00 Waterline Sterilization and Pressure Testing (Change Order 1) LF 296.00 $4.00 $1,184.00 ITrench Safety (Change Order 1) LF 296.00 $2.00 $592.00 Right of Way Clearing, Restoration, and Seeding of Disturbed Areas (Change Order 1) LF 296.00 $10.00 $2,960.00 Comply with TPDES Construction General Permit (Change Order 1) LS 0.50 $3,500.00 $1,750.00 IConc Collar for Valves (Change Order 1) EA 2.00 $2,000.00 $4,000.00 112" DIP PIPE (Change Order 1) LF 20.00 $162.00 $3,240.00 IConn to Ex 16" WTR Main (Change Order 1) EA 1.00 $10,000.00 $10,000.00 14' W Asphalt Pvmt Repair, Resid (12" WTR) LF 435.00 $40.00 $17,400.00 16" x 12" Tapping Sleeve & Valve EA 1.00 $28,500.00 $28,500.00 Subtotal - Water Improvements $443,295.50 Sewer Improvements Item Description Unit Quantity Unit Price Total Item Cost RMV 655 Line (Change Order 1) LF 94.00 $50.00 $4,700.00 1 RMV 4" SS MH (Change Order 1) EA 1.00 $3,500.00 $3,500.00 IMH Vacuum Testing (Change Order 1) EA 2.00 $250.00 $500.00 Post CCTV Inspection (Change Order 1) LF 94.00 $10.00 $940.00 Bypass Pumping (Change Order 1) LS 1.00 $15,000.00 $15,000.00 ITrench Safety (Change Order 1) LF 94.00 $10.00 $940.00 IConc Collar For MHS (Change Order 1) EA 2.00 $2,000.00 $4,000.00 116" Casing by Open Cut (Change Order 1) LF 94.00 $420.00 $39,480.00 18" DIP 55 Pipe (W/ Protecto 401) (Change Order 1) LF 94.00 $186.00 $17,484.00 1 1Epoxy MH Liner (Change Order 1) CF 6.44 $435.00 $2,801.40 14' MH - W/ CSS Encase 1' Around (Change Order 1) EA 2.00 $7,800.00 $15,600.00 1 ITraffin Control (TXDOT ROW) (Change Order 1) LS 1.00 $9,500.00 $9,500.00 IROW Clear, Restore, & SEED DIST AREA (Change Order 1) LF 110.00 $20.00 $2,200.00 I5' W ASPHLT PVMT REPAIR, RESID (8" SS - 16" Encase) (Change Order 1; LF 110.00 $72.00 $7,920.00 PVMT REPAIR BYND DEF WIDTH, ART (Change Order 1) ST 61.00 $80.00 $4,880.00 �ASPHLT Subtotal - Sewer Improvements $129,445.40 +I Storm Drainage Improvements Item Description I Unit I Quantity I Unit Price I Total Item Cost Subtotal -Storm Drainage Improvements $0.00 Public Landscaping, Trails and Parks Item Description Subtotal - Public Landscaping, Trails and Parks Other Soft and Miscellaneous Costs Item Description Engineering, Surveying, Staking Construction Materials Testing Erosion Control & SWPPP City of Fort Worth Fees Construction Management Subtotal - Other Soft and Miscellaneous Costs Unit I Quantity I Unit Price I Total Item Cost $0.00 Unit Quantity Unit Price Total Item Cost LS 1 $18,890.31 $18,890.31 LS 1 $5,780.00 $5,780.00 1 LS 1 $2,500.00 $2,500.00 LS 1 $29,854.47 $29,854.47 1 % 5% $572,741 $28,6371 $85,661.83 +I (1UTHORIZED IMPROVEMENTS Roadway Improvements $1,102,524 Water Improvements $4,020,129 Sewer Improvements $1,373,311 Storm Drainage Improvements $59,485 Public Landscaping, Trails and Parks $0 Other Soft and Miscellaneous Costs $2,748,907 Subtotal -AUTHORIZED IMPROVEMENTS $9,304,356 Roadway Improvements $2,109,878 Water Improvements $329,169 Sewer Improvements $0 Storm Drainage Improvements $229,696 Public Landscaping, Trails and Parks $675,000 Other Soft and Miscellaneous Costs $642,636 Subtotal - BEAR CREEK IMPROVEMENTS $3,986,379 Roadway Improvements $0 Water Improvements $443,296 Sewer Improvements $129,445 Storm Drainage Improvements $0 Public Landscaping, Trails and Parks $0 Other Soft and Miscellaneous Costs $85,662 Subtotal - KENWOOD LONGVUE IMPROVEMENTS $658,403 TOTAL - IMPROVEMENT AREA 84 Roadway Improvements $3,212,402 Water Improvements $4,792,594 Sewer Improvements $1,502,756 Storm Drainage Improvements $289,181 Public Landscaping, Trails and Parks $675,000 Other Soft and Miscellaneous Costs $3,477,205 February 26, 2026 469.621.0710 TBPELS F-1386 TBPELS 10110501 www.LJA.com 6060 North Central Expressway, Suite 400, Dallas, Texas 75206 Re: Engineer's Report Maverick Phase 1 Fort Worth, Texas Maverick is a proposed single-family development anticipated to include approximately 500 residential lots in Fort Worth, Texas. Phase 1 is comprised of 136 residential lots, and is currently under construction. The proposed authorized infrastructure improvements associated with Phase 1 of the development are shown in the attached exhibits. A quantity takeoff and associated construction cost summary has been prepared based on executed contractor bids, and construction costs associated with authorized improvements have been quantified. Authorized Improvements are categorized as any public utility infrastructure (public drainage and public water and sanitary sewer lines greater than 8" in diameter) serving Maverick Phase 1 and commercial, improvements associated with Bear Creek Parkway (a City of Fort Worth MTP arterial roadway), a new signalized intersection at Bear Creek Parkway and Highway 377, a TxDOT driveway, deceleration lane and related improvements, and improvements associated with Kenwood Longvue (an off site water project required to provide adequate water capacity to serve Maverick Phase 1). All Authorized Improvements are necessary in order to provide utilities and access to Maverick Phase 1 residential lots. OF .� !�1\L11�971��C�P► k_ 126873 J ` k TONAL Er+" 02.26.2026 S \NTX-LAND\0002\NT840\700 COMMUNICATIONS\720 Memo\Maverick Phase 1 Letter 26FEB19.docx Storm Drainage Improvements Item Description Unit Quantity Unit Price Total Item Cost Post -CCTV Inspection of Storm Dra in LF 574.00 $4.00 $2,296.00 ITrench Safety LF 574.00 $2.00 $1,148.00 121" RCP, Class III LF 226.00 $85.00 $19,210.00 124" RCP, Class III LF 348.00 $95.00 $33,060.00 110' Curb Inlet EA 5.00 $4,600.00 $23,000.00 115' Curb Inlet EA 7.00 $5,600.00 $39,200.00 Convert 4'X4' Drop Inlet into 4' Square Manhole EA 2.00 $6,500.00 $13,000.00 Remove 4'X4' Drop Inlet EA 3.00 $2,500.00 $7,500.00 Inlet Protection EA 12.00 $250.00 $3,000.00 Post -CCTV Inspection of Storm Drain LF 4,274.00 $4.00 $17,096.00 ITrench Safety LF 4,274.00 $2.00 $8,548.00 121" RCP, Class III LF 509.00 $75.00 $38,175.00 124" RCP, Class III LF 1,151.00 $85.00 $97,835.00 127" RCP, Class III LF 287.00 $105.00 $30,135.00 130" RCP, Class III LF 333.00 $115.00 $38,295.00 136" RCP, Class III LF 993.00 $160.00 $158,880.00 142" RCP, Class III LF 299.00 $200.00 $59,800.00 148" RCP, Class III LF 15.00 $235.00 $3,525.00 154" RCP, Class III LF 349.00 $285.00 $99,465.00 14' Storm Junction Box EA 6.00 $7,500.00 $45,000.00 1 15' Storm Junction Box EA 5.00 $7,928.57 $39,642.85 14' Stacked Manhole EA 2.00 $15,000.00 $30,000.00 16' Storm Junction Box EA 2.00 $10,500.00 $21,000.00 110' Curb Inlet EA 23.00 $4,000.00 $92,000.00 115' Curb Inlet EA 5.00 $5,000.00 $25,000.00 Dual 3x3 MBC LF 338.00 $560.00 $189,280.00 12-10" X 6' Junction Box EA 1.00 $28,500.00 $28,500.00 112-10" X 10'-6" Junction Box EA 1.00 $50,500.00 $50,500.00 124" 4:1 Sloped End HW EA 1.00 $3,500.00 $3,500.00 130" 4:1 Sloped End HW EA 1.00 $4,500.00 $4,500.00 Dual 3'x3' 4:1 Sloped End HW EA 1.00 $18,500.00 $18,500.00 136" 4:1 Sloped End HW EA 1.00 $6,500.00 $6,500.00 142" 4:1 Sloped End HW EA 1.00 $8,500.00 $8,500.00 112" Large Stone Type "A" Dry Rip Rap SY 283.00 $165.00 $46,695.00 Subtotal - Storm Drainage Improvements $1,309,285.85 1{ Other Soft and Miscellaneous Costs Item Description Unit Quantity Unit Price Total Item Cost Easement and Right -of -Way Dedication LS 1.00 $55,605.31 $55,605.31 Construction Management Fee % 5% $1,309,285.85 $65,464.29 Contingency % 5% $1,364,891.16 $68,244.56 Subtotal - Storm Drainage Improvements $189,314.16 Water Improvements Item Description Unit Quantity Unit Price Total Item Cost 112" Waterline Lowering EA 1.00 $6,500.00 $6,500.00 ITrench Safety LF 2,130.00 $2.00 $4,260.00 Ductile Iron Water Fittings w/ Restraint TON 3.77 $10,500.00 $39,585.00 112" Water Pipe LF 1,315.00 $102.00 $134,130.00 112" DIP Water LF 73.00 $112.00 $8,176.00 112" DIP Water, CLSM Backfill LF 64.00 $142.00 $9,088.00 116" Water Pipe LF 577.00 $122.00 $70,394.00 116" DIP Water LF 41.00 $182.00 $7,462.00 116" DIP Water, CLSM Backfill LF 60.00 $212.00 $12,720.00 1 Fire Hydrant EA 2.00 $7,500.00 $15,000.00 112" Gate Valve EA 6.00 $4,500.00 $27,000.00 116" Gate Valve w/ Vault EA 3.00 $28,500.00 $85,500.00 12" Combination Air Valve Assembly for Water EA 1.00 $14,500.00 $14,500.00 Connection to Existing 4"-12" Water Main EA 1.00 $1,000.00 $1,000.00 11" Irrigation Service EA 2.00 $1,500.00 $3,000.00 116" Waterline Lowering EA 4.00 $7,500.00 $30,000.00 Subtotal - Water Improvements $468,315.00 Sewer Improvement Item Description Unit Quantity Unit Price Total Item Cost Post -CCTV Inspection LF 1,961.00 $4.00 $7,844.00 Final MH-CCTV Inspection EA 12.00 $400.00 $4,800.00 Manhole Vacuum Testing EA 12.00 $200.00 $2,400.00 ITrench Safety LF 1,961.00 $2.00 $3,922.00 Concrete Collar for Manhole EA 5.00 $1,500.00 $7,500.00 ITrench Water Stops EA 7.00 $350.00 $2,450.00 130" Casing By Open Cut LF 20.00 $380.00 $7,600.00 116" Sewer Carrier Pipe LF 20.00 $258.00 $5,160.00 115" Sewer Pipe LF 1,771.00 $178.00 $315,238.00 115" Sewer Pipe, CSS Backfill LF 150.00 $208.00 $31,200.00 116" DIP Sewer LF 20.00 $258.00 $5,160.00 Epoxy Manhole Liner VF 142.00 $485.00 $68,870.00 14' Manhole EA 8.00 $4,800.00 $38,400.00 14'Extra Depth Manhole VF 70.00 $225.00 $15,750.00 14' Manhole W/ Hydraulic Slide EA 4.00 $6,800.00 $27,200.00 Connect to Existing 15" Sewer Stub EA 1.00 $5,500.00 $5,500.00 I End and Plug 15" PVC EA 1.00 $2,000.00 $2,000.00 (Subtotal - Sewer Improvements $550,994.00 Other Soft and Miscellaneous Costs Item Description Unit Quantity Unit Price Total Item Cost Preliminary Plat Application Fee LS 1.00 $1,767.21 $1,767.21 ISWFMA-25-0031 Application Fee LS 1.00 $714.37 $714.37 Final Plat Application Fee LS 1.00 $3,375.83 $3,375.83 IIPRC Review Fee LS 1.00 $15,895.80 $15,895.80 IPRC Inspection Fees LS 1.00 $58,882.74 $58,882.74 Engineering/Surveying LS 1.00 $300,469.32 $300,469.32 Final Geotechinical Report & Testing LS 1.00 $26,894.27 $26,894.27 Construction Management % 5% $1,019,309.00 $50,965.45 IContingency % 5% $1,427,308.54 $71,365.43 Subtotal - Other Soft and Miscellaneous Costs $530,330.42 Item Description Unit Quantity Unit Price Total Item Cost Clearing & Grubbing ACRE 2.40 $725.00 $1,740.001 Unclassified Excavation CY 12,649.00 $3.20 $40,476.801 Erosion Control LS 1.00 $3,196.95 $3,196.95 Retaining Walls LS 1.00 $321,261.00 $321,261.001 Hydrated Lime (32 Ibs/sy for Residential & 42 Ibs/sy for Orchard Way) TON 156.70 $275.00 $43,092.501 16" Lime Treatment SY 177.00 $4.00 $708.001 I8" Lime Treatment SY 7,326.00 $5.00 $36,630.001 16" Conc Pvmt SY 176.00 $62.00 $10,912.001 14" Conc Sidewalk SF 17,490.00 $4.25 $74,332.501 Barrier Free Ramp, Type P-1 EA 8.00 $2,400.00 $19,200.001 ITopsoil CY 322.00 $28.00 $9,016.001 Block Sod Placement SY 1,934.00 $8.00 $15,472.001 17.5" Conc Pvmt SY 6,950.00 $78.00 $542,100.001 Construct Type Ill Barricade EA 1.00 $800.00 $800.001 IConstruct Std. Pvmt Header LF 37.00 $25.00 $925.001 Remove Barricade and Connect to Existing Pavement Header EA 1.00 $1,000.00 $1,000.001 12" CONDT PVC SCH 80 (T) LF 1,714.00 $15.00 $25,710.001 1Install Type 33B Arm EA 9.00 $600.00 $5,400.001 Furnish/Install 120-240 Volt Single Phase Metered Pedestal EA 1.00 $10,500.00 $10,500.001 Rdwy Ilium Assembly TY 8,11,D-25, and D-30 EA 9.00 $2,500.00 $22,500.001 I R2 EA 9.00 $750.00 $6,750.001 Rdwy Ilium Foundation TY 1,2, and 4 EA 9.00 $1,200.00 $10,800.001 NO 2 Insulated Elec Condr LF 1,714.00 $8.00 $13,712.001 IType B Ground Box W/ Apron EA 5.00 $750.00 $3,750.001 Subtotal - Roadway Improvements $1,219,984.75 Storm Drainage Improvements I Item Description Unit Quantity Unit Price Total Item Cost I Post -CCTV Inspection of Storm Drain LF 1,108.00 $4.00 $4,432.00 ITrench Safety LF 1,108.00 $2.00 $2,216.00 121" RCP, Class III LF 215.00 $75.00 $16,125.00 124" RCP, Class III LF 174.00 $85.00 $14,790.00 130" RCP, Class III LF 67.00 $115.00 $7,705.00 136" RCP, Class III LF 652.00 $160.00 $104,320.00 14' Storm Junction Box EA 1.00 $5,500.00 $5,500.00 15' Storm Junction Box EA 2.00 $7,928.57 $15,857.14 110' Curb Inlet EA 6.00 $4,000.00 $24,000.00 14' X 4' Drop Inlet EA 3.00 $4,500.00 $13,500.00 1 Inlet Protection EA 9.00 $250.00 $2,250.00 Subtotal - Storm Drainage Improvements $210,695.14 Public Landscaping, Trails and Parks Item Description Unit Quantity Unit Price Total Item Cost Sod SF 81,194.40 $0.70 $56,836.08 Fine Grade SF 81,194.40 $0.05 $4,059.72 Trees EA 64.00 $700.00 $44,800.00 Permits and Inspetion, Design EA 1.00 $7,000.00 $7,000.00 Irrigation LS 1.00 $35,000.00 $35,000.00 Subtotal - Public Landscaping, Trails and Parks $147,695.80 1Other Soft Costs and Miscellaneous Items IIfem Description Unit Quantity Unit Price Total Item Cost Easement and Right -of -Way Dedication LS 1.00 $300,000.00 $300,000.00 Construction Management % 5% $1,578,375.69 $78,918.78 Contingency % 5% $1,878,375.69 $93,918.78 Subtotal- Other Soft and Miscellaneous Costs $472,837.57 r ewer Improvements Item Description Unit Quantity Unit Price Total Item Cost Piping and Valve Submittals LS 1.00 $10,000.00 $10,000.00 Mobilization LS 1.00 $10,000.00 $10,000.00 IBonds LS 1.00 $15,000.00 $15,000.00 Valve Procurement LS 1.00 $10,000.00 $10,000.00 Discharge Piping Installation LS 1.00 $18,891.00 $18,891.00 Lift Station and Vault Piping and Valve Installation LS 1.00 $20,000.00 $20,000.00 Pump Submittals LS 1.00 $10,000.00 $10,000.00 Pump Procurement LS 1.00 $41,107.00 $41,107.00 lAir Release Valve and Piping Installation LS 1.00 $10,000.00 $10,000.00 ISwing Check Valve Installation LS 1.00 $15,000.00 $15,000.00 Riser Discharge Piping Installation LS 1.00 $15,000.00 $15,000.00 Gate Valve Installation LS 1.00 $15,000.00 $15,000.00 Pump 2 Propeller Installation LS 1.00 $16,532.00 $16,532.00 Pump 3 Propeller Installation LS 1.00 $16,532.00 $16,532.00 Completion of All Electrical Submittals LS 1.00 $20,000.00 $20,000.00 Electrical and Controls Installation LS 1.00 $79,368.00 $79,368.00 Bypass Pump Submittal LS 1.00 $10,000.00 $10,000.00 Bypass Pump Mobilization LS 1.00 $15,000.00 $15,000.00 Bypass Installation LS 1.00 $25,000.00 $25,000.00 Bypass Pump Schedule Days Days 12.00 $4,080.83 $48,969.96 Bypass Pump Monitoring Days 12.00 $2,488.34 $29,860.08 Subtotal - Sewer Improvements $451,260.04 Other Soft Costs and Miscellaneous Items Item Description Unit Quantity Unit Price Total Item Cost IIPRC Application Fee LS 1.00 $1,000.00 $1,000.00 ICFAAppliction Fee LS 1.00 $2,508.75 $2,508.75 IPRC Inspection Fees LS 1.00 $75,937.50 $75,937.50 Engineeering/Surveying LS 1.00 $65,000.00 $65,000.00 Construction Management % 5% $451,260.04 $22,563.00 Contingency % 5% $595,706.29 $29,786.00 Subtotal - Sewer Improvements $196,795.25 Storm Drainage Improvements $1,309,286 Other Soft and Miscellaneous Costs $189,314 Subtotal - RESIDENTIAL IMPROVEMENTS $1,498,600 Water Improvements $468,315 Sewer Improvements $550,994 Other Soft and Miscellaneous Costs $530,330 Subtotal - AUTHORIZED IMPROVEMENTS $1,549,639 ORCHARD WAY Roadway Improvements $1,219,985 Storm Drainage Improvements $210,695 Public Landscaping, Trails and Parks $147,696 Other Soft and Miscellaneous Costs $472,838 Subtotal - ORCHARD WAY $1,578,376 LIFT STATION PHASE 2 UPGRADES Sewer Improvements $451,260 Other Soft and Miscellaneous Costs $196,795 Subtotal - LIFT STATION PHASE 2 UPGRADES $648,055 TOTAL - IMPROVEMENT AREA #5 Roadway Improvements $1,219,985 Water Improvements $468,315 Sewer Improvements $1,002,254 Storm Drainage Improvements $1,519,981 Public Landscaping, Trails and Parks $147,696 Other Soft and Miscellaneous Costs $1,389,277 February 26, 2026 469.621.0710 TBPELS F-1386 TBPELS 10110501 www.LJA.com 6060 North Central Expressway, Suite 400, Dallas, Texas 75206 Re: Engineer's Report Ventana Phase 8 Fort Worth, Texas Ventana Phase 8 is a proposed single-family development comprised of approximately 277 residential lots in Fort Worth, Texas. Phase 8A is comprised of 95 residential lots, and is currently under construction. Phase 8B is comprised of 182 residential lots, and is also currently under construction. The proposed authorized infrastructure improvements associated with Phase 8 of the development are shown in the attached exhibits. A quantity takeoff and associated construction cost summary has been prepared based on executed contractor bids, and construction costs associated with authorized improvements have been quantified. Authorized Improvements are categorized as any public utility infrastructure (public drainage, water and sanitary sewer lines greater than 8" in diameter) serving Ventana Phase 8, improvements associated with Orchard Way (a 60' wide right-of-way Collector Road), and improvements associated with the Ventana Lift Station Phase 2 Upgrades (a lift station upgrade project needed to provide adequate sewer capacity to serve Ventana Phase 8). All Authorized Improvements are necessary in order to provide utilities and access to Ventana Phase 8 residential lots. ��Pt6 OFrFrl� O...* ..::.....................:. JAMIE SHELTON 126873 oNAL . M 02.26.2026 S \NTX-LAND\0002\NT840\700 COMMUNICATIONS\720 Memo\Ventana Phase 8 Letter 26FEB19.doex WATER IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost (Trench Safety LF 320 $2.00 640.00 Ductile Iron Water Fittings w/ Restraint TON 1.57 $11,500.00 $18,055.00 112" Water Pipe LF 208.00 $100.00 $20,800.00 112" Water Pipe, CLSM Backfill LF 40.00 $130.00 $5,200.00 112" DIP Water LF 32.00 $110.00 $3,520.00 112" DIP Water, CLSM Backfill LF 40.00 $140.00 $5,600.00 Fire Hydrant EA 1.00 $7,500.00 $7,500.00 Connection to Existing 4"-12" Water Main EA 2.00 $1,000.00 $2,000.00 112" Gate Valve EA 2 $4,500.00 $9,000.00 I8"x12" Cut In Tee (Change Order #2) EA 1.00 $3,500.00 $3,500.00 ITrench Safety LF 291.00 $2.00 $582.00 120" Casing By Open Cut LF 14.00 $320.00 $4,480.00 Ductile Iron Water Fittings w/ Restraint TON 0.55 $11,500.00 $6,325.00 112" DIP Water Pipe LF 254.00 $100.00 $25,400.00 112" Water Pipe, CLSM Backfill LF 20.00 $130.00 $2,600.00 112" DIP Water LF 3.00 $110.00 $330.00 112" DIP Water, CLSM Backfill LF 14.00 $140.00 $1,960.00 Fire Hydrant EA 1.00 $7,500.00 $7,500.00 Connection to Existing 4"-12" Water Main EA 2.00 $1,000.00 $2,000.00 112" Gate Valve EA 2.00 $4,500.00 $9,000.00 11.5" Irrigation Service EA 2.00 $2,500.00 $5,000.00 Subtotal - Water Improvements 140,992.00 SEWER IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost Post -CCTV Inspection LF 139.00 $4.00 $556.00 Final MH-CCTV Inspection EA 1.00 $400.00 $400.00 Manhole Vacuum Testing EA 1.00 $200.00 $200.00 ITrench Safety LF 139.00 $2.00 $278.00 ITrench Water Stops EA 1.00 $350.00 $350.00 115" Sewer Pipe LF 139.00 $164.00 $22,796.00 1 Epoxy Manhole Liner VF 17.10 $485.00 $8,293.50 14' Drop Manhole EA 1.00 $6,000.00 $6,000.00 14' Extra Depth Manhole VF 11.10 $225.00 $2,497.50 (Connect to Existing 15" Sewer Stub EA 1.00 $2,500.00 $2,500.00 'Subtotal - Sewer Improvements $43,871.00 STORM DRAINAGE IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost ( Post -CCTV Inspection of Storm Drain LF 6,017.00 $4.00 $24,068.00 ITrench Safety LF 6,017.00 $2.00 $12,034.00 121" RCP, Class III LF 453.00 $73.00 $33,069.00 124" RCP, Class III LF 2,354.00 $83.00 $195,382.00 127" RCP, Class III LF 119.00 $103.00 $12,257.00 142" RCP, Class III LF 1,219.00 $198.00 $241,362.00 148" RCP, Class III LF 1,278.00 $233.00 $297,774.00 (6X6 Box Culvert LF 344.00 $548.00 $188,512.00 (8X5 Box Culvert LF 250.00 $618.00 $154,500.00 )4' Storm Junction Box EA 10.00 $7,500.00 $75,000.00 )S' Storm Junction Box EA 2.00 $8,500.00 $17,000.00 16' Storm Junction Box EA 7.00 $9,500.00 $66,500.00 14' Manhole Cover EA 1.00 $5,500.00 $5,500.00 )10' Curb Inlet EA 11.00 $4,000.00 $44,000.00 )15' Curb Inlet EA 18.00 $5,000.00 $90,000.00 120' Curb Inlet EA 3.00 $6,000.00 $18,000.00 (4'X4' Drop Inlet EA 1.00 $4,500.00 $4,500.00 )10' X 4' Junction Box EA 1.00 $26,500.00 $26,500.00 )12' X 4' Junction Box EA 1.00 $28,500.00 $28,500.00 124" 4:1 Sloped End HW EA 2.00 $4,500.00 $9,000.00 16" X 4" SW -0 Wingwall EA 1.00 $9,500.00 $9,500.00 16" X 6" SW -0 Wingwall EA 2.00 $10,500.00 $21,000.00 ) RCB to RCP Connection EA 1.00 $1,500.00 $1,500.00 112" Large Stone Type "A" Dry Rip Rap SY 211.00 $165.00 $34,815.00 ( Remove 24" CH-PW-0 4:1 HW EA 1.00 $2,500.00 $2,500.00 Remove 42" CH-PW-0 4:1 HW EA 1.00 $3,500.00 $3,500.00 ( Remove 42" SW -0 Wingwall EA 1.00 $3,500.00 $3,500.00 (Connect to Existing Storm Line EA 2.00 $2,500.00 $5,000.00 (Inlet Protection EA 33.00 $250.00 $8,250.00 ( Post -CCTV Inspection of Storm Drain (Change Order #2) LF 296.00 $4.00 $1,184.00 ITrench Safety (Change Order #2) LF 296.00 $2.00 $592.00 121" RCP, Class III (Change Order #2) LF 13.00 $73.00 $949.00 124" RCP, Class III (Change Order #2) LF 123.00 $83.00 $10,209.00 142" RCP, Class III (Change Order #2) LF 65.00 $198.00 $12,870.00 (6X6 Box Culvert (Change Order #2) LF (18.00) $548.00 ($9,864.00) )4' Storm Junction Box (Change Order#2) EA 1.00 $7,500.00 $7,500.00 )5' Storm Junction Box (Change Order#2) EA 1.00 $8,500.00 $8,500.00 (6'x6' SW -0 Wingwall (Change Order#2) EA (1.00) $9,500.00 ($9,500.00) 112" Large Stone Type "A" Dry Rip Rap (Change Order #2) SY 399.00 $165.00 $65,835.00 136" RCP, Class III (Change Order #2) LF 62.00 $133.00 $8,246.00 ( Modified 15' Curb Inlet (Pond Outfall) (Change Order #2) EA 1.00 $6,500.00 $6,500.00 Modified 20' Curb Inlet (Pond Outfall) (Change Order #2) EA 1.00 $7,500.00 $7,500.00 (Concrete Weir & Drop Structure (Change Order#2) EA 4.00 $42,500.00 $170,000.00 112" Large Stone Type "A" Grouted Rip Rap (Change Order #2) SY 131.00 $225.00 $29,475.00 ) Post -CCTV Inspection of Storm Drain LF 7,842.00 $4.00 $31,368.00 ITrench Safety LF 7,842.00 $2.00 $15,684.00 121" RCP, Class III LF 1,058.00 $73.00 $77,234.00 124" RCP, Class III LF 2,383.00 $83.00 $197,789.00 127" RCP, Class III LF 709.00 $103.00 $73,027.00 130" RCP, Class III LF 368.00 $113.00 $41,584.00 133" RCP, Class III LF 442.00 $117.17 $51,789.14 136" RCP, Class III LF 2,313.00 $158.00 $365,454.00 148" RCP, Class III LF 93.00 $233.00 $21,669.00 (4'x2' Box Culvert LF 340.00 $268.00 $91,120.00 6'x5' Box Culvert LF 136.00 $448.00 $60,928.00 )4' Storm Junction Box EA 21.00 $7,500.00 $157,500.00 )5' Storm Junction Box EA 2.00 $8,500.00 $17,000.00 16' Storm Junction Box EA 1.00 $9,500.00 $9,500.00 )7' Storm Junction Box EA 1.00 $9,500.00 $9,500.00 )10' Curb Inlet EA 23.00 $4,000.00 $92,000.00 )15' Curb Inlet EA 32.00 $5,000.00 $160,000.00 (13'x6' Junction Box EA 1.00 $30,500.00 $30,500.00 13'x8' Junction Box EA 1.00 $34,500.00 $34,500.00 148" 4:1 Sloped End HW EA 1.00 $8,500.00 $8,500.00 112" Large Stone Type "A" Dry Rip Rap SY 250.00 $165.00 $41,250.00 )Remove 5'x5' Drop Inlet EA 4.00 $2,500.00 $10,000.00 (Connect to Existing Storm Line EA 1.00 $2,501.86 $2,501.86 )Inlet Protection EA 55.00 $250.00 $13,750.00 112" Large Stone Type "A" Dry Rip Rap (Change Order #2) SY 72.00 $165.00 $11,880.00 Subtotal - Storm Drainage Improvements $3,569,047.00 PUBLIC LANDSCAPING, TRAILS & PARKS Item Description Unit Quantity Unit Price Total Item Cost ( Public Trails LS 1.00 $175,012.40 $175,012.40 Subtotal - Public Landscaping, Trails & Parks $175,012.40 OTHER SOFT AND MISCELLANEOUS COSTS Item Description Unit Quantity Unit Price Total Item Cost Engineering, Surveying, Staking LS 1.00 $596,565.62 $596,565.62 Construction Materials Testing LS 1.00 I $51,003.56 $51,003.56 Erosion Control & SWPPP LS 1.00 $20,000.00 $20,000.00 City of Fort Worth Fees LS 1.00 $427,315.58 $427,315.58 Easement and Right -of -Way Dedication LS 1.00 $3,543,959.70 $3,543,959.70 Construction Management % 5 $196,446.12 $196,446.12 Contingency % 10% $856,776.69 $856,776.69 Subtotal - Other Soft and Miscellaneous Costs $5,692,067.28 WATER IMPROVEMENTS Item Description ITrench Safety 142" Casing By Open Cut 124" Water Carrier Pipe I Ductile Iron Fittings w/ Restraint 18" PVC Water Pipe 116" Water Pipe 124" Water Pipe 124" Water Pipe. CLSM Backfill 124" DIP Water 124" DIP Water, CLSM Backfill (Connection to Existing 24" Water Main Connection to Existing 36" Water Main Connection to Existing 4"-12" Water Main 14" Combination Air Valve Assembly for Water 18" Gate Valve 116" Gate Valve w/ Vault 124" Gate Valve W/ Vault 18" Blow Off Valve 'Subtotal - Water Improvements Unit Quantity Unit Price Total Item Cost LF 8,123.0 $2.00 $16,246.00 LF 206.0 $720.00 $148,320.00 LF 206.0 $280.00 $57,680.00 TON 19.6 $24,000.00 $470,280.00 LF 76.0 $54.00 $4,104.00 LF 89.0 $130.00 $11,570.00 LF 7,642.0 $222.00 $1,696,524.00 LF 80.0 $252.00 $20,160.00 LF 46.0 $280.00 $12,880.00 LF 60.0 $310.00 $18,600.00 EA 1.0 $11,500.00 $11,500.00 EA 1.0 $35,000.00 $35,000.00 EA 1.0 $1,000.00 $1,000.00 EA 3.0 $34,500.00 $103,500.00 EA 1.0 $2,500.00 $2,500.00 EA 2.0 $28,500.00 $57,000.00 EA 10.0 $58,500.00 $585,000.00 EA 4.0 $18,500.00 $74,000.00 3,325,864.00 OTHER SOFT AND MISCELLANEOUS COSTS Item Description Unit Quantity Unit Price Total Item Cost (Engineering, Surveying, Staking LS 1.00 $249,000.00 $249,000.00 (Construction Materials Testing LS 1.00 $88,331.00 $88,331.00 ( Erosion Control & SWPPP LS 1.00 $18,277.15 $18,277.15 (City of Fort Worth Fees LS 1.00 $71,241.93 $71,241.93 Bonding Fees (Maintenance, Payment, Performance, Development) LS 1.00 $49,888.00 $49,888.00 ( Easement and Right -of -Way Dedication LS 1.00 $1,530,916.20 $1,530,916.20 (Construction Management % 593 $166,293.20 $166,293.20 (Contingency % 10% $533,351.83 $533,351.83 Subtotal - Other Soft and Miscellaneous Costs $2,707,299.31 ROADWAY IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost (Hydrated Lime (30 lbs/sy) TON 3.80 $285.00 $1,083.00 (Hydrated Lime (36 ibs/sy) TON 145.50 $285.00 $41,467.50 16" Lime Treatment SY 255.00 $4.00 $1,020.00 18" Lime Treatment SY 8,082.00 $5.00 $40,410.00 16" Conc Pvmt SY 247.00 $52.00 $12,844.00 14" Conc Sidewalk SF 19,752.00 $4.25 $83,946.00 ( Barrier Free Ramp, Type R-1 EA 8.00 $2,200.00 $17,600.00 Barrier Free Ramp, Type P-1 EA 2.00 $2,400.00 $4,800.00 (Topsoil CV 349.67 $28.00 $9,790.76 ( Block Sod Placement SY 2,098.00 $8.00 $16,784.00 ( Furnish/Install Alum Sign Ground Mount City Std. - Stop WI Street Name Blades (R1-1) EA 5.00 $550.00 $2,750.00 17.5" Conc Pvmt SY 7,669.00 $64.00 $490,816.00 (Construct Type Ill Barricade EA 6.00 $800.00 $4,800.00 (Construct Std. Pvmt Header LF 198.00 $30.00 $5,940.00 ( Remove Barricade and Connect to Existing Pavement Header EA 1.00 $1,000.00 $1,000.00 Removal of uninstalled Construct Type Ill Barricade (Change Order #2) EA (6.00) $800.00 ($4,800.00) 12" CONDT PVC SCH 80 (T) LF 1,854.00 $15.00 $27,810.00 ( Install Type 33B Arm EA 10.00 $600.00 $6,000.00 ( Rdwy Ilium Foundation TY 1,2, and 4 EA 10.00 $1,200.00 $12,000.00 ( Rdwy Ilium Foundation TY 11 Pole EA 10.00 $2,500.00 $25,000.00 IType R2 Luminaire EA 10.00 $750.00 $7,500.00 ( NO 6 Insulated Elec Condr (Change Order#1) LF 1,854.00 $6.00 $11,124.00 (Furnish/Install 120-240 Volt Single Phase Metered Pedestal (Change Order#1) EA 1.00 $10,500.00 $10,500.00 CLEAR & GRUB AC 2.90 $750.00 $2,175.00 (UNCLAIMED EXCAVATION CV 13,072.00 $3.20 $41,830.40 ( Retaining Walls within Public Right -of -Way LS 1.00 $311,567.00 $311,567.00 Subtotal - Roadway Improvements $1,185,757.66 WATER IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost (Trench Safety LF 2,060.00 $2.00 $4,120.00 142" Casing By Open Cut LF 50.00 $720.00 $36,000.00 124" Water Carrier Pipe LF 50.00 $520.00 $26,000.00 Ductile Iron Water Fittings w/ Restraint TON 7.97 $18,500.00 $147,445.00 18" Water Pipe LF 402.00 $54.00 $21,708.00 18" DIP Water Pipe. CLSM Backfill LF 19.00 $84.00 $1,596.00 112" Water Pipe LF 91.00 $100.00 $9,100.00 112" DIP Water LF 9.00 $130.00 $1,170.00 112" DIP Water, CLSM Backfill LF 20.00 $160.00 $3,200.00 116" Water Pipe LF 44.00 $130.00 $5,720.00 116" Water Pipe LF 15.00 $160.00 $2,400.00 116" DIP Water, CLSM Backfill LF 16.00 $190.00 $3,040.00 124" Water Pipe LF 1,185.00 $240.00 $284,400.00 124" Water Pipe, CLSM Backfill LF 40.00 $270.00 $10,800.00 124" DIP Water LF 129.00 $280.00 $36,120.00 124" DIP Water, CLSM Backfill LF 40.00 $310.00 $12,400.00 (Connection to Existing 4"-12" Water Main EA 1.00 $1,000.00 $1,000.00 18" Gate Valve EA 2.00 $2,500.00 $5,000.00 112" Gate Vavle EA 5.00 $5,500.00 $27,500.00 116" Gate Valve W/ Vault EA 2.00 $28,500.00 $57,000.00 124" Gate Vavle w/ Vault EA 3.00 $58,500.00 $175,500.00 18" Blow Off Valve EA 1.00 $18,500.00 $18,500.00 112" Ring Connection Assembly Includes All Fittings and Lead Pipe EA 1.00 $18,500.00 $18,500.00 116" Ring Connection Assembly Includes All Fittings and Lead Pipe EA 1.00 $42,500.00 $42,500.00 14" Water Service EA 1.00 $38,500.00 $38,500.00 (Removal of uninstalled 4" Water Service (Change Order#2) EA (1.00) $38,500.00 ($38,500.00) Subtotal - Water Improvements $950,719.00 STORM DRAINAGE IMPROVEMENTS Item Description Post -CCTV Inspection of Storm Drain ITrench Safety 121" RCP, Class III 124" RCP, Class III 136" RCP, Class III 142" RCP, Class III 148" RCP, Class III 6'x5' Box Culvert 14' Storm Junction Box 15' Storm Junction Box 142" Parallel Headwall, 1 Pipe 110' Curb Inlet 14'x4' Drop Inlet 15' Drop Inlet 6'x5' SW -0 Wingwall I RCB to TCP Connection 112" Large Stone Type "A" Dry Rip Rap Concrete Weir & Drop Structure Inlet Protection Removal of uninstalled Post -CCTV Inspection of Storm Drain (Change Order #2) Removal of uninstalled Trench Safety (Change Order #2) Removal of uninstalled 21" RCP, Class III (Change Order #2) Removal of uninstalled 36" RCP, Class III (Change Order #2) Removal of uninstalled 48" RCP, Class III (Change Order #2) Removal of uninstalled 5' Drop Inlet (Change Order #2) Removal of uninstalled Inlet Protection (Change Order#2) Removal of uninstalled RipRap (Change Order#2) Removal of uninstalled Concrete Weird & Drop Structure (Change Order#2) Subtotal - Storm Drainage Improvements PUBLIC LANDSCAPING, TRAILS & PARKS Item Description Landscape & Hardscape within the Public Right -of -Way 'Subtotal - Public Landscaping, Trails & Parks Unit Quantity Unit Price Total Item Cost LF 1,203.00 $4.00 $4,812.00 LF 1,203.00 $2.00 $2,406.00 LF 757.00 $73.00 $55,261.00 LF 157.00 $83.00 $13,031.00 LF 64.00 $118.00 $7,552.00 LF 74.00 $168.00 $12,432.00 LF 21.00 $198.00 $4,158.00 LF 130.00 $448.00 $58,240.00 EA 2.00 $7,500.00 $15,000.00 EA 1.00 $8,500.00 $8,500.00 EA 1.00 $6,500.00 $6,500.00 EA 8.00 $4,000.00 $32,000.00 EA 1.00 $4,500.00 $4,500.00 EA 4.00 $6,500.00 $26,000.00 EA 1.00 $10,000.00 $10,000.00 EA 2.00 $1,500.00 $3,000.00 SY 3,401.00 $145.00 $493,145.00 EA 8.00 $22,425.00 $179,400.00 EA 13.00 $250.00 $3,250.00 LF (71.00) $4.00 ($284.00) LF (71.00) $2.00 ($142.00) LF (37.00) $73.00 ($2,701.00) LF (13.00) $118.00 ($1,534.00) LF (21.00) $198.00 ($4,158.00) EA (4.00) $6,500.00 ($26,000.00) EA (4.00) $250.00 ($1,000.00) SY (3,025.00) $145.00 ($438,625.00) EA (7.00) $22,425.00 ($156,975.00) $307,768.00 Unit Quantity Unit Price Total Item Cost LS 1.00 $467,268.95 $467,268.95 $467,268.95 OTHER SOFT AND MISCELLANEOUS COSTS Item Description Unit Quantity Unit Price Total Item Cost Engineering, Surveying, Staking LS 1.00 $495,000.00 $495,000.00 Construction Materials Testing LS 1.00 $30,900.00 $30,900.00 Erosion Control & SWPPP LS 1.00 $15,000.00 $15,000.00 City of Fort Worth Fees LS 1.00 $128,659.76 $128,659.76 Bonding Fees (Maintenance, Payment, Performance, Development) LS 1.00 $43,401.00 $43,401.00 Easement and Right -of -Way Dedication LS 1.00 $511,614.00 $511,614.00 Construction Management % 5% $145,575.68 $145,575.68 Contingency % 10% $413,608.84 $413,608.84 Il Subtotal - Other Soft and Miscellaneous Costs $1,783,759.28 ROADWAY IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost Hydrated Lime (30 lbs/sy) TON 6.47 $285.00 $1,843.95 Hydrated Lime (36 Ibs/sy) TON 82.02 $285.00 $23,375.70 16" Lime Treatment SY 429.23 $4.00 $1,716.92 18" Lime Treatment SY 4,556.00 $5.00 $22,780.00 16" Conc Pvmt SY 416.34 $52.00 $21,649.68 14" Conc Sidewalk SF 10,769.00 $4.25 $45,768.25 Barrier Free Ramp, Type R-1 EA 8.00 $2,200.00 $17,600.00 Barrier Free Ramp, Type P-1 EA 2.00 $2,400.00 $4,800.00 ITopsoil CY 195.00 $28.00 $5,460.00 Block Sod Placement SY 1,168.00 $8.00 $9,344.00 Furnish/Install Alum Sign Ground Mount City Std. - Stop w/ Street Name Blades (R1-1) EA 5.00 $550.00 $2,750.00 17.5" Conc Pvmt SY 4,323.00 $64.00 $276,672.00 Construct Type Ill Barricade EA 5.00 $800.00 $4,000.00 (Construct Std. Pvmt Header LF 145.00 $30.00 $4,350.00 Remove Barricade and Connect to Existing Pavement Header EA 1.00 $1,000.00 $1,000.00 Removal of uninstalled Construct Type III Barricade (Change Order#2) EA (4.00) $800.00 ($3,200.00) Removal of uninstalled Remove Barricade and Connect to Existing Pavement Header (Change 0rder#2) EA (1.00) $1,000.00 ($1,000.00) 12" CONDT PVC SCH 80 (T) LF 953.00 $15.00 $14,295.00 Install Type 33B Arm EA 6.00 $600.00 $3,600.00 Rdwy Ilium Foundation TY 1,2, and 4 EA 6.00 $1,200.00 $7,200.00 Rdwy Ilium Foundation TY 11 Pole EA 6.00 $2,500.00 $15,000.00 IType R2 Luminaire EA 6.00 $750.00 $4,500.00 NO 6 Insulated Elec Condr (Change Order#1) LF 997.00 $6.00 $5,982.00 CLEAR&GRUB AC 1.60 $750.00 $1,200.00 UNCLAIMED EXCAVATION CY 17,081.00 $3.20 $54,659.20 ( 'Subtotal - Roadway Improvements $545,346.70 WATER IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost (Trench Safety LF 1,173.00 $2.00 $2,346.00 124" Casing By Open Cut LF 33.00 $380.00 $12,540.00 130" Casing By Open Cut LF 20.00 $480.00 $9,600.00 112" Water Carrier Pipe LF 33.00 $132.00 $4,356.00 116" Water Carrier Pipe LF 20.00 $162.00 $3,240.00 ) Ductile Iron Water Fittings w/ Restraint TON 2.23 $18,500.00 $41,162.50 18" Water Pipe LF 25.00 $54.00 $1,350.00 112" Water Pipe LF 93.00 $100.00 $9,300.00 112" DIP Water LF 38.00 $130.00 $4,940.00 116" Water Pipe LF 870.00 $130.00 $113,100.00 116" Water Pipe, CLSM Backfill LF 40.00 $160.00 $6,400.00 116" DIP Water LF 34.00 $160.00 $5,440.00 116" DIP Water, CLSM Backfill LF 20.00 $190.00 $3,800.00 (Connection to Existing 16" Water Main EA 1.00 $1,000.00 $1,000.00 18" Gate Valve EA 1.00 $2,500.00 $2,500.00 112" Gate Valve EA 3.00 $5,500.00 $16,500.00 )16" Gate Valve W/ Vault EA 3.00 $28,500.00 $85,500.00 Subtotal - Water Improvements $323,074.50 SEWER IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost (Concrete Riprap SY 64.00 $175.00 $11,200.00 (Post -CCTV Inspection LF 4,045.00 $4.00 $16,180.00 ( Final MH-CCTV Inspection EA 21.00 $400.00 $8,400.00 ( Manhole Vacuum Testing EA 21.00 $200.00 $4,200.00 ITrench Safety LF 4,045.00 $2.00 $8,090.00 (Concrete Collar for Manhole EA 9.00 $1,000.00 $9,000.00 ITrench Water Stops EA 15.00 $350.00 $5,250.00 130" Casing By Open Cut LF 93.00 $520.00 $48,360.00 116" Sewer Carrier Pipe LF 93.00 $326.00 $30,318.00 14" Sewer Service EA 20.00 $900.00 $18,000.00 18" Sewer Pipe LF 60.00 $72.00 $4,320.00 18" Sewer Pipe, CSS Backfill LF 80.00 $92.00 $7,360.00 115" Sewer Pipe LF 3,635.00 $162.00 $588,870.00 115" Sewer Pipe, CSS Backfill LF 120.00 $192.00 $23,040.00 116" DIP Sewer LF 37.00 $244.00 $9,028.00 116" DIP Sewer, CSS Backfill LF 20.00 $274.00 $5,480.00 ( Epoxy Manhole Liner VF 277.00 $485.00 $134,345.00 14' Manhole EA 16.00 $5,000.00 $80,000.00 )4' Drop Manhole EA 1.00 $6,000.00 $6,000.00 14' Extra Depth Manhole VF 151.00 $225.00 $33,975.00 )4' Manhole w/ Hydraulic Slide EA 4.00 $5,800.00 $23,200.00 (Connect to Existing 15" Sewer Stub EA 1.00 $2,500.00 $2,500.00 Subtotal - Sewer Improvements $1,077,116.00 STORM DRAINAGE IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost Post -CCTV Inspection of Storm Drain LF 765.00 $4.00 $3,060.00 ITrench Safety LF 765.00 $2.00 $1,530.00 121" RCP, Class III LF 117.00 $73.00 $8,541.00 124" RCP, Class III LF 85.00 $83.00 $7,055.00 127" RCP, Class III LF 76.00 $103.00 $7,828.00 142" RCP, Class III LF 487.00 $168.00 $81,816.00 )4' Storm Junction Box EA 1.00 $7,500.00 $7,500.00 )5' Storm Junction Box EA 2.00 $8,500.00 $17,000.00 124" Parallel Headwall, 1 pipe EA 1.00 $4,500.00 $4,500.00 142" Parallel Headwall, 1 pipe EA 1.00 $6,500.00 $6,500.00 )15' Curb Inlet EA 4.00 $5,000.00 $20,000.00 (4'x4' Drop Inlet EA 1.00 $4,500.00 $4,500.00 112" Large Stone Type "A" Dry Rip Rap SY 1,209.00 $145.00 $175,305.00 ( Remove 42" CH-PW-0 EA 1.00 $2,000.00 $2,000.00 (Connect to Existing Storm Line EA 1.00 $2,500.00 $2,500.00 (Inlet Protection EA 5.00 $250.00 $1,250.00 (Removal of uninstalled 24" Headwall (Change Order#2) EA (1.00) $4,500.00 ($4,500.00) Removal of uninstalled 42" Headwall (Change Order#2) EA (1.00) $6,500.00 ($6,500.00) (Removal of uninstalled Riprap (Change Order#2) SY (1,209.00) $145.00 ($175,305.00) (Removal of uninstalled Removed 42" CH-PW-0 (Change Order #2) EA (1.00) $2,000.00 ($2,000.00) Subtotal - Storm Drainage Improvements $162,580.00 PUBLIC LANDSCAPING, TRAILS & PARKS Item Description Unit Quantity Unit Price Total Item Cost ( Landscape & Hardscape within the Public Right -of -Way LS 1.00 $215,345.58 $215,345.58 Subtotal - Public Landscaping, Trails & Parks $215,345.58 OTHER SOFT AND MISCELLANEOUS COSTS Item Description Unit Quantity Unit Price Total Item Cost Engineering, Surveying, Staking LS 1.00 $499,000.00 $499,000.00 Construction Materials Testing LS 1.00 $23,565.19 $23,565.19 Erosion Control & SWPPP LS 1.00 $15,000.00 $15,000.00 City of Fort Worth Fees LS 1.00 $131,086.15 $131,086.15 Bonding Fees (Maintenance, Payment, Performance, Development) LS 1.00 $43,807.00 $43,807.00 Easement and Right -of -Way Dedication LS 1.00 $292,662.00 $292,662.00 Construction Management % 5% $116,173.14 $116,173.14 Contingency % 10% $303,921.88 $303,921.88 Subtotal - Other Soft and Miscellaneous Costs $1,425,215.36 ROADWAY IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost ( Hydrated Lime (30 Ibs/sy) TON 4.80 $285.00 1,368.00 ( Hydrated Lime (36 Ibs/sy) TON 169.00 $285.00 48,165.00 16" Lime Treatment SY 319.00 $4.00 1,276.00 18" Lime Treatment SY 9,381.00 $5.00 46,905.00 16" Conc Pvmt SY 312.00 $52.00 16,224.00 110" Conc Pvmt SY 7,059.00 $90.00 635,310.00 14" Conc Sidewalk SF 25,327.00 $4.25 107,639.75 Barrier Free Ramp, Type P-1 EA 6.00 $2,400.00 14,400.00 ( Preformed Thermoplastic Contrast Markings - 24" Crosswalk LF 101.00 $20.00 2,020.00 ( Preformed Thermoplastic Contrast Markings - 24" Stop Bars LF 48.00 $16.00 768.00 ITopsoil CY 335.00 $28.00 9,380.00 ( Block Sod Placement SY 2,008.00 $8.00 16,064.00 ( Furnish/Install Alum Sign Ground Mount City Std. - Stop w/Street Name Blades (R1-1) EA 3.00 $550.00 1,650.00 ( Furnish/Install Alum Sign Ground Mount City Std. - Speed Limit (R2-1) EA 1.00 $550.00 550.00 17.5" Conc Pvmt SY 1,727.00 $64.00 110,528.00 Construct Type III Barricade EA 4.00 $800.00 3,200.00 (Construct Std. Pvmt Header LF 125.00 $30.00 3,750.00 ( Remove Barricade and Connect to Exisiting Pavement Header EA 1.00 $1,000.00 1,000.00 16" Double Yellow Line Marking w/ RPMS LF 2,267.00 $4.00 9,068.00 1Hyrdated Lime (30 Ibs/sy) (Change Order #1) TON (0.80) $285.00 (228.00) 16" Lime Treatment (Change Order #1) SY (35.00) $4.00 (140.00) 16" Conc Pvmt (Change Order #1) SY (36.00) $52.00 (1,872.00) ( Performed Thermoplastic Contrast Markings -24" Crosswalk (Change Order #1) LF (12.00) $20.00 (240.00) Performed Thermoplastic Contrast Markings - 24" Stop Bars (Change Order#1) LF (5.00) $16.00 (80.00) ITopsoil (Change Order#1) CY 9.00 $28.00 252.00 ( Block Sod Placement (Change Order #1) IV 57.00 $8.00 456.00 (Construct Std. Pvmt Header (Change Order#1) LF -11 $30.00 (330.00) (Conduct Type Ill Barricade (Change Order#3) EA 1 $800.00 800.00 110" Unreinforced Concrete (Change Order#3) SY 104 $92.00 9,568.00 (Removal of uninstalled Construct Type III Barricade (Change Order#4) EA -4 $800.00 (3,200.00) ( Removal of uninstalled Remove Barricade and Connect to Exisiting Pavement Header (Change Order#4) EA -1 $1,000.00 (1,000.00) 12" CONDT PVC SCH 80 (T) LF 2757 $15.00 41,355.00 ( Install Type 33A Arm EA 26 $600.00 15,600.00 ( Install Type 33B Arm EA 2 $600.00 1,200.00 ( Rdwy Ilium Foundation TY 1,2, and 4 EA 2 $1,200.00 2,400.00 ( Rdway Ilium Foundation TY 3,5,6, and 8 EA 13 $1,800.00 23,400.00 Rdwy Ilium Assembly TY 11 Pole EA 2 $2,500.00 5,000.00 ( Rdwy Ilium TY 18 Pole EA 13 $3,400.00 44,200.00 IType R2 Luminaire EA 28 $750.00 21,000.00 ( NO 6 Insulated Elec Condr (Change Order#1) LF 2757 $6.00 16,542.00 (CLEAR&GRUB AC 7.20 $750.00 5,400.00 (UNCLAIMED EXCAVATION CV 40,734.00 $3.20 130,348.80 ( Retaining Walls within Public Right -of -Way LS 1.00 $99,450.00 99,450.00 Subtotal - Roadway Improvements 1,439,147.55 WATER IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost 142" Casing By Open Cut LF 20.00 $720.00 14,400.00 (Trench Safety LF 459.00 $2.00 918.00 124" Water Carrier Pipe LF 20.00 $520.00 10,400.00 ) Ductile Iron Water Fittings w/ Restraint TON 1.90 $18,500.00 35,150.00 124" Water Pipe LF 433.00 $240.00 103,920.00 124" DIP Water LF 6.00 $280.00 1,680.00 (Connection to Existing 24" Water Main EA 1.00 $9,500.00 9,500.00 14" Combination Air Valve Assembly to Water EA 1.00 $30,500.00 30,500.00 124" Gate Valve w/ Valve EA 1.00 $58,500.00 58,500.00 18" Water Pipe (Change Order #2) LF 101.00 $54.00 5,454.00 18" Gate Valve (Change Order #2) EA 1.00 $2,500.00 2,500.00 Subtotal - Water Improvements 272,922.00 STORM DRAINAGE IMPROVEMENTS Item Description Post -CCTV Inspection of Storm Drain ITrench Safety 121" RCP, Class III 124" RCP, Class III 130" RCP, Class III 136" RCP, Class III 142" RCP, Class III 14' Storm Junction Box 15' Storm Junction Box 110' Recessed Inlet 14'x4' Drop Inlet 142" CH-PW-0 4:1 Headwall 112" Large Stone Type "A" Dry Rip Rap Concrete Weir & Drop Structure Inlet Protection Removal of uninstalled Rip Rap (Change Order #4) Removal of Uninstalled Concrete Weir and Drop Structure (Change Order#4) Removal of uninstalled Headwall (Change Order#4) Subtotal - Storm Drainage Improvements Unit Quantity Unit Price Total Item Cost LF 2,440.00 $4.00 9,760.00 LF 2,440.00 $2.00 4,880.00 LF 388.00 $73.00 28,324.00 LF 631.00 $83.00 52,373.00 LF 366.00 $113.00 41,358.00 LF 784.00 $118.00 92,512.00 LF 271.00 $168.00 45,528.00 EA 6.00 $7,500.00 45,000.00 EA 2.00 $8,500.00 17,000.00 EA 5.00 $5,000.00 25,000.00 EA 5.00 $4,500.00 22,500.00 EA 1.00 $6,500.00 6,500.00 SY 932.00 $145.00 135,140.00 EA 4.00 $22,425.00 89,700.00 EA 10.00 $250.00 2,500.00 SY (870.00) $145.00 (126,150.00) EA (4.00) $22,425.00 (89,700.00) EA (1.00) $6,500.00 (6,500.00) 395,725.00 PUBLIC LANDSCAPING, TRAILS&PARKS Item Description Unit Quantity Unit Price Total Item Cost Landscape & Hardscape within the Public Right -of -Way LS 1.00 $501,086.27 501,086.27 Subtotal - Public Landscaping, Trails & Parks $501,086.27 OTHER SOFT AND MISCELLANEOUS COSTS ■ Item Description Engineering, Surveying, Staking Construction Materials Testing Erosion Control & SWPPP City of Fort Worth Fees Bonding Fees (Maintenance, Payment, Performance, Development) Easement and Right -of -Way Dedication Construction Management (Contingency 'Subtotal - Other Soft and Miscellaneous Costs Unit Quantity Unit Price Total Item Cost LS 1.00 $461,000.00 $461,000.00 LS 1.00 $29,431.00 $29,431.00 LS 1.00 $15,000.00 $15,000.00 LS 1.00 $67,555.17 $67,555.17 LS 1.00 $33,997.00 $33,997.00 LS 1.00 $682,150.50 $682,150.50 % 5% $130,444.04 $130,444.04 % 10% $389,801.45 $389,801.45 $1,809,379.16 IN -TRACT Water Improvements $140,992 Sewer Improvements $43,871 Storm Drainage Improvements $3,569,047 Public Landscaping, Trails & Parks $175,012 Other Soft and Miscellaneous Costs $5,692,067 Subtotal - IN -TRACT $9,620,990 24" WATERLINE Water Improvements $3,325,864 Other Soft and Miscellaneous Costs $2,707,299 Subtotal - 24" WATERLINE $6,033,163 VENTANA P` Roadway Improvements $1,185,758 Water Improvements $950,719 Storm Drainage Improvements $307,768 Public Landscaping, Trails & Parks $467,269 Other Soft and Miscellaneous Costs $1,783,759 Subtotal - VENTANA PARKWAY $4,695,273 ORCHARD WAY Roadway Improvements $545,347 Water Improvements $323,075 Sewer Improvements $1,077,116 Storm Drainage Improvements $162,580 Public Landscaping, Trails & Parks $215,346 Other Soft and Miscellaneous Costs $1,425,215 Subtotal - ORCHARD WAY $3,748,678 MARKUM RANCH ROAD Roadway Improvements $1,439,148 Water Improvements $272,922 Storm Drainage Improvements $395,725 Public Landscaping, Trails & Parks $501,086 Other Soft and Miscellaneous Costs $1,809,379 Subtotal - MARKUM RANCH ROAD $4,418,260 TOTAL - IMPROVEMENT AREA #6 Roadway Improvements $3,170,252 Water Improvements $5,013,572 Sewer Improvements $1,120,987 Storm Drainage Improvements $4,435,120 Public Landscaping, Trails and Parks $1,358,713 Other Soft and Miscellaneous Costs $13,417,720 ROADWAY IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost CLEAR & GRUB AC 46.30 $750.00 $34,725.00 UNCLAIMED EXCAVATION CY 144,847.00 $3.20 $463,510.40 ROUGH LOT GRADING LOT 169.00 $250.00 $42,250.00 FINAL LOT GRADING LOT 169.00 $250.00 $42,250.00 M.C. (40x80' PAD) - 4' DEEP LOT 36.00 $1,300.00 $46,800.00 M.C. (40x80' PAD) - 6' DEEP LOT 4.00 $1,960.00 $7,840.00 M.C. (40x80' PAD) - 8' DEEP LOT 8.00 $2,610.00 $20,880.00 M.C. (40x80' PAD) - 10' DEEP LOT 4.00 $3,260.00 $13,040.00 M.C. (60x80' PAD) - 4' DEEP LOT 20.00 $1,960.00 $39,200.00 M.C. (60x80' PAD) - 6' DEEP LOT 3.00 $2,940.00 $8,820.00 M.C. (60x80' PAD) - 8' DEEP LOT 1.00 $3,910.00 $3,910.00 M.C. (60x80' PAD) - 10' DEEP LOT 4.00 $4,880.00 $19,520.00 M.C. POLY) 6 TO 8 MIL THICKNESS) LOT 18.00 $300.00 $5,400.00 CLEAR & GRUB AC 5.30 $750.00 $3,975.00 UNCLAIMED EXCAVATION CY 21,957.00 $3.20 $70,262.40 ROUGH LOT GRADING LOT 56.00 $250.00 $14,000.00 FINAL LOT GRADING LOT 56.00 $250.00 $14,000.00 M.C. (40x44' PAD) - 4' DEEP LOT 9.00 $715.00 $6,435.00 M.C. (40x44' PAD) - 6' DEEP LOT 1.00 $1,075.00 $1,075.00 M.C. (44x50' PAD) - 4' DEEP LOT 9.00 $900.00 $8,100.00 M.C. (44x50' PAD) - 8' DEEP LOT 1.00 $1,790.00 $1,790.00 M.C. (40'x80' PAD) -4' DEEP LOT 3.00 $1,300.00 $3,900.00 M.C. (40x80' PAD) - 6' DEEP LOT 19.00 $1,960.00 $37,240.00 M.C. (40x80' PAD) - 8' DEEP LOT (8.00) $2,610.00 ($20,880.00) M.C. (40x80' PAD) - 10' DEEP LOT (3.00) $3,260.00 ($9,780.00) M.C. (40x80' PAD) - 12' DEEP LOT 16.00 $3,900.00 $62,400.00 M.C. (60'x80' PAD) -4' DEEP LOT (2.00) $1,960.00 ($3,920.00) M.C. (60'x80' PAD) - 6' DEEP LOT 17.00 $2,940.00 $49,980.00 M.C. (60'x80' PAD) -8' DEEP LOT (1.00) $3,910.00 ($3,910.00) M.C. (60'x80' PAD) - 12' DEEP LOT 4.00 $5,880.00 $23,520.00 M.C. POLY (6 TO 8 MIL THICKNESS) LOT (18.00) $300.00 ($5,400.00) CLEAR & GRUB AC 36.40 $750.00 $27,300.00 UNCLAIMED EXCAVATION CY 257,229.00 $3.20 $823,132.80 ROUGH LOT GRADING LOT 194.00 $250.00 $48,500.00 FINAL LOT GRADING LOT 194.00 $250.00 $48,500.00 BLOCK 14 GRADE CHANGES - EXCAVATION LOT 18.00 $250.00 $4,500.00 BLOCK 16 LOT SETBACK - EXCAVATION LOT 14.00 $250.00 $3,500.00 BLOCK 16 LOT SETBACK - EXCAVATION LOT (6.00) $250.00 ($1,500.00) CLEAR & GRUB AC 29.30 $750.00 $21,975.00 UNCLAIMED EXCAVATION CY 123,335.00 $3.20 $394,672.00 ROUGH LOT GRADING LOT 142.00 $250.00 $35,500.00 FINAL LOT GRADING LOT 142.00 $250.00 $35,500.00 M.C. POLY (6 TO 8 MIL THICKNESS) LOT 5.00 $300.00 $1,500.00 CLEAR & GRUB AC 16.90 $750.00 $12,675.00 UNCLAIMED EXCAVATION CY 42,211.00 $3.20 $135,075.20 CLEAR & GRUB LOT 29.00 $250.00 $7,250.00 UNCLAIMED EXCAVATION LOT 29.00 $250.00 $7,250.00 CLEAR & GRUB LOT 12.00 $300.00 $3,600.00 Retaining Walls LS 1.00 $2,455,895.00 $2,455,895.00 Hydrated Lime (3016s/sy) TON 510.61 $285.00 $145,523.85 (6" Lime Treatment SY 34,037.00 $4.00 $136,148.00 (6" Conc Pvmt SY 31,895.00 $52.00 $1,658,540.00 (4" Conc Sidewalk SF 19,401.00 $4.25 $82,454.25 Barrier Free Ramp, Type R-1 EA 16.00 $2,200.00 $35,200.00 Barrier Free Ramp, Type P-1 EA 14.00 $2,400.00 $33,600.00 (Topsoil CY 476.00 $28.00 $13,328.00 Block Sod Treatment SY 2,858.00 $8.00 $22,864.00 Furnish/Install Alum Sign Ground Mount City Std. - Stop w/ Street Name Blades (R-1) EA 15.00 $550.00 $8,250.00 Street Name Blade Pair EA 2.00 $250.00 $500.00 Street Sign Pole EA 2.00 $300.00 $600.00 Construct Type III Barricade EA 3.00 $800.00 $2,400.00 Construct Std. Pvmt Header LF 87.00 $30.00 $2,610.00 Remove Barricade and Connect to Existing Pavement Header EA 6.00 $1,000.00 $6,000.00 Hydrated Lime (30lbs/sy) (Change Order#2) TON 2.19 $285.00 $624.15 (6" Lime Treatment (Change Order #2) SY 151.00 $4.00 $604.00 (6" Conc Pvmt (Change Order #2) SY 186.00 $52.00 $9,672.00 (4" Conc Sidewalk (Change Order #2) SF (5,514.00) $4.25 ($23,434.50) Topsoil (Change Order #2) CY (206.00) $28.00 ($5,768.00) Block Sod Treatment (Change Order #2) SY (1,236.00) $8.00 ($9,888.00) (2" CONDT PVC SCH 80 (T) LF 2,302.00 $15.00 $34,530.00 NO 6 Insulated Elec Condr LF 2,302.00 $6.00 $13,812.00 Install Type 33B Arm EA 40.00 $600.00 $24,000.00 Rdwy Ilium Foundation TY 1,2, and 4 EA 40.00 $1,200.00 $48,000.00 Rdwy Ilium Assembly TY 11 Pole EA 40.00 $2,500.00 $100,000.00 Type R2 Luminaire EA 38.00 $750.00 $28,500.00 IType R4 Luminaire EA 2.00 $950.00 $1,900.00 14" Flexible Base, Type A, GR-1 SY 6,829.00 $16.00 $109,264.00 Hydrated Lime (30 Ibs/sy) TON 708.00 $285.00 $201,780.00 Hydrated Lime (36 Ibs/sy) TON 9.00 $285.00 $2,565.00 16" Lime Treatment SY 47,138.00 $4.00 $188,552.00 I8" Lime Treatment SY 621.00 $5.00 $3,105.00 16" Conc Pvmt SY 50,122.00 $52.00 $2,606,344.00 14" Conc Sidewalk SF 9,306.00 $4.25 $39,550.50 Barrier Free Ramp, Type R-1 EA 12.00 $2,200.00 $26,400.00 1 Barrier Free Ramp, Type P-1 EA 34.00 $2,400.00 $81,600.00 ITopsoil CR 208.00 $28.00 $5,824.00 Block Sod Placement SY 1,240.00 $8.00 $9,920.00 Furnish/Install Alum Sign Ground Mount Cuty Std. - Stop Sign w/ Stree Name Blades (R1-1) EA 23.00 $550.00 $12,650.00 17.5" Conc Pvmt SY 595.00 $64.00 $38,080.00 ( Street Name Blade Pair EA 6.00 $250.00 $1,500.00 Street Sign Pole EA 6.00 $300.00 $1,800.00 Connect to Existing Pavement Header EA 4.00 $1,000.00 $4,000.00 Construct Type Ill Barricade EA 1.00 $800.00 $800.00 Construct Std. Pvmt Header LF 29.00 $30.00 $870.00 14" Conc Sidewalk (Change Order #2) SF (3,324.00) $4.25 ($14,127.00) Topsoil (Change Order #2) CR (80.00) $28.00 ($2,240.00) Block Sod Placement (Change Order #2) SY (480.00) $8.00 ($3,840.00) 12" CONDT PVC SCH 80 (T) LF 4,362.00 $15.00 $65,430.00 NO 6 Insulated Elec Condr LF 4,362.00 $6.00 $26,172.00 Install Type 338 Arm EA 64.00 $600.00 $38,400.00 Rdwy Ilium Foundation TY 1,2, and 4 EA 64.00 $1,200.00 $76,800.00 Rdway Ilium Assembly TY 11 Pole EA 64.00 $2,500.00 $160,000.00 (Type R2 Luminaire EA 58.00 $750.00 $43,500.00 Type R4 Luminaire EA 6.00 $950.00 $5,700.00 Subtotal - Roadway Improvements $11,166,727.05 WATER IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost Trench Safety LF 11,379.00 $2.00 $22,758.00 120' Casing by Open Cut LF 88.00 $320.00 $28,160.00 (8" Water Carrier Pipe LF 88.00 $66.00 $5,808.00 Ductile Iron Water Fittings w/ Restraint TON 9.07 $11,500.00 $104,305.00 (6" Water Pipe LF 1,978.00 $50.00 $98,900.00 (6" Water Pipe, CLSM Backfill LF 52.00 $80.00 $4,160.00 (8" Water Pipe LF 8,709.00 $54.00 $470,286.00 8" DIP Water, CLSM Backfill LF 552.00 $84.00 $46,368.00 Fire Hydrant EA 19.00 $7,500.00 $142,500.00 Connection to Existing 4"-12" Water Main EA 2.00 $1,000.00 $2,000.00 (1" Water Service EA 228.00 $1,200.00 $273,600.00 (6" Gate Valve EA 14.00 $2,000.00 $28,000.00 (8" Gate Valve EA 40.00 $2,500.00 $100,000.00 1" Irrigation Service EA 3.00 $1,500.00 $4,500.00 1.5" Irrigation Service EA 3.00 $2,178.00 $6,534.00 (2" Irrigation Service EA 1.00 $3,500.50 $3,500.50 Trench Safety (Change Order#2) LF (567.00) $2.00 ($1,134.00) Ductile Iron Water Fittings w/ Restraint (Change Order #2) TON 0.71 $11,500.00 $8,165.00 (6" Water Pipe (Change Order #2) LF (1,978.00) $50.00 ($98,900.00) (6" Water Pipe, CLSM Backfill (Change Order #2) LF (52.00) $80.00 ($4,160.00) 18"Water Pipe (Change Order #2) LF 378.00 $54.00 $20,412.00 8" DIP Water, CLSM Backfill (Change Order #2) LF 52.00 $84.00 $4,368.00 Fire Hydrant (Change Order #2) EA 9.00 $7,500.00 $67,500.00 (6" Gate Valve (Change Order #2) EA (14.00) $2,000.00 ($28,000.00) 8" Gate Valve (Change Order #2) EA 14.00 $2,500.00 $35,000.00 1" Irrigation Service (Change Order #2) EA (3.00) $1,500.00 ($4,500.00) 1.5" Irrigation Service (Change Order #2) EA 2.00 $2,178.00 $4,356.00 (4"Water Pipe (Change Order#2) LF 1,155.00 $48.00 $55,440.00 (8" Waterline Lowering (Change Order#2) EA 3.00 $8,500.00 $25,500.00 (8"x8" Cut In Tee (Change Order#2) EA 13.00 $2,500.00 $32,500.00 Trench Safety LF 13,740.00 $2.00 $27,480.00 (20" Casing By Open Cut LF 11.00 $320.00 $3,520.00 (8" Water Carrier Pipe LF 25.00 $66.00 $1,650.00 Ductile Iron Water Fittings w/ Restraint TON 11.63 $11,500.00 $133,745.00 (8" Water Pipe LF 13,000.00 $54.00 $702,000.00 8" DIP Water, CLSM Backfill LF 715.00 $84.00 $60,060.00 Fire Hydrant EA 29.00 $7,500.00 $217,500.00 Connection to Existing 4"-12" Water Main EA 1.00 $1,000.00 $1,000.00 I8" Gate Valve EA 52.00 $2,500.00 $130,000.00 (1" Water Service EA 365.00 $1,200.00 $438,000.00 1" IrrigationService EA 5.00 $1,500.00 $7,500.00 1.5" Irrigation Service EA 1.00 $2,500.00 $2,500.00 Subtotal - Water Improvements $3,182,881.50 SEWER IMPROVEMENTS Item Description Unit Quantity Unit Price Total Item Cost Post -CCTV Inspection LF 11,361.00 $4.00 $45,444.00 Final MH-CCTV Inspection EA 69.00 $400.00 $27,600.00 Manhole Vacuum Testing EA 69.00 $200.00 $13,800.00 Trench Safety LF 11,361.00 $2.00 $22,722.00 120" Casing by Open Cut LF 120.00 $380.00 $45,600.00 Trench Water Stops EA 42.00 $350.00 $14,700.00 18" Sewer Carrier Pipe LF 120.00 $104.00 $12,480.00 14" Sewer Service EA 266.00 $900.00 $239,400.00 I8" Sewer Pipe LF 10,517.00 $70.00 $736,190.00 8" Sewer Pipe, CSS Backfill LF 690.00 $90.00 $62,100.00 I8" DIP Sewer Pipe LF 34.00 $102.00 $3,468.00 Epoxy Manhole Liner WF 304.00 $485.00 $147,440.00 14' Manhole EA 66.00 $5,000.00 $330,000.00 (4' Drop Manhole EA 2.00 $6,000.00 $12,000.00 14' Manhole W/ Hydraulic Slide EA 1.00 $6,800.00 $6,800.00 14' Extra Depth Manhole VF 265.00 $225.00 $59,625.00 I Connection to Existing 8" Sewer Stub EA 7.00 $1,500.00 $10,500.00 16" Sewer Pipe (Change Order #1) LF 34.00 $118.00 $4,012.00 Post -CCTV Inspection LF 13,798.00 $4.00 $55,192.00 Final MH-CCTV Inspection EA 61.00 $400.00 $24,400.00 Manhole Vacuum Testing EA 61.00 $200.00 $12,200.00 ITrench Safety LF 13,798.00 $2.00 $27,596.00 (Trench Water Stops EA 45.00 $350.00 $15,750.00 (20" Casing By Open Cut LF 60.00 $380.00 $22,800.00 18" Sewer Carrier Pipe LF 60.00 $104.00 $6,240.00 14" Sewer Service EA 365.00 $900.00 $328,500.00 I8" Sewer Pipe LF 12,660.00 $70.00 $886,200.00 8" Sewer Pipe, CSS Backfill LF 1,030.00 $90.00 $92,700.00 I8" DIP Sewer Pipe LF 48.00 $102.00 $4,896.00 Epoxy Manhole Liner VF 230.40 $485.00 $111,744.00 14' Manhole EA 56.00 $5,000.00 $280,000.00 14' Drop Manhole EA 4.00 $6,000.00 $24,000.00 (4' Extra Depth Manhole VF 248.90 $225.00 $56,002.50 (4' Shallow Manhole EA 1.00 $5,500.00 $5,500.00 Connect to Existing 8" Sewer Stub EA 1.00 $1,500.00 $1,500.00 Subtotal - Sewer Improvements 3,749,101.50 OTHER SOFT AND MISCELLANEOUS COSTS Item Description Unit Quantity Unit Price Total Item Cost Engineering, Surveying, Staking LS 1.00 $374,784.38 $374,784.38 Construction Materials Testing LS 1.00 $439,711.44 $439,711.44 Erosion Control & SWPPP LS 1.00 $232,302.69 $232,302.69 City of Fort Worth Fees LS 1.00 $387,100.46 $387,100.46 Construction Management % 5% $904,935.50 $904,935.50 (Contingency % 10% $1,953,260.90 $1,953,260.90 Subtotal - Other Soft and Miscellaneous Costs $4,292,095.37 IN -TRACT Roadway Improvements $11,166,727 Water Improvements $3,182,882 Sewer Improvements 3,749,101.5 Other Soft and Miscellaneous Costs $4,292,095 Subtotal - IN -TRACT $22,390,805 TOTAL - IMPROVEMENT AREA #6 Roadway Improvements $11,166,727 Water Improvements $3,182,882 Sewer Improvements 3,749,101.5 Other Soft and Miscellaneous Costs $4,292,095 • • t :t August 27, 2026 469.621.0710 TBPELS F-1386 TBPELS 10110501 www.LJA.com 6060 North Central Expressway, Suite 400, Dallas, Texas 75206 Re: Engineer's Report Ventana West Phase 1 Fort Worth, Texas Ventana West is a proposed single-family development anticipated to include approximately 873 residential lots in Fort Worth, Texas. Phase 1A is comprised of 224 residential lots, and is currently under construction. Phase 1 B is comprised of 365 residential lots, and is currently under construction. The proposed authorized infrastructure improvements associated with Phase 1 of the development are shown in the attached exhibits. A quantity takeoff and associated construction cost summary has been prepared based on executed contractor bids, and construction costs associated with authorized improvements have been quantified. Authorized Improvements are categorized as any public utility infrastructure (public drainage and public water and sanitary sewer lines greater than 8" in diameter) serving Ventana West Phase 1, Ventana Parkway and Orchard Way (collector roadways providing points of connection to Ventana West), along with Markum Ranch Road (half of a City of Fort Worth MTP arterial roadway), and an offsite 24" waterline providing water capacity to Ventana West. All Authorized Improvements are necessary in order to provide utilities and access to Maverick Phase 1 residential lots. S \NTX-LAND\0171\NT840\700 COMMUNICATIONS\720 Memo\Ventana West\Ventana West Phase I Letter 26AUG27.docx APPENDIX C-1 IMPROVEMENT AREA #4 LEGAL DESCRIPTION EXHIBIT C-1 421.082 ACRES BEING A 421.082 -ACRE TRACT OF LAND SITUATED IN THE D. T. FINLEY SURVEY, ABSTRACT NO. 1901, THEODORE FINLEY SURVEY, ABSTRACT NO. 1878, T. F. RODGERS SURVEY, ABSTRACT NO. 1357, ELIZABETH LANGSTON SURVEY, ABSTRACT NO. 988, T & N.O. RR CO. SURVEY, ABSTRACT NO. 1565, AND BEING A PORTION OF THAT TRACT OF LAND DESCRIBED TO FW CLUB LP BY DEED RECORDED IN COUNTY CLERK FILE NO. D224085431 AND A PORTION OF THAT TRACT OF LAND DESCRIBED TO PMB ROLLING V SOUTH LAND LP BY DEED RECORDED IN COUNTY CLERK FILE NO. D223038385 OF THE OFFICIAL PUBLIC RECORDS OF TARRANT COUNTY, TEXAS, AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 5/8 -INCH CAPPED IRON ROD STAMPED "LJA SURVEYING" SET (HEREINAFTER REFERRED TO AS "SET IRON ROD") ON THE NORTHWESTERN RIGHT-OF-WAY LINE OF BENBROOK BOULEVARD / US HIGHWAY 377 SOUTH (A VARIABLE WIDTH RIGHT-OF-WAY), FROM WHICH A 1 -INCH IRON ROD FOUND FOR THE EASTERNMOST CORNER OF LOT 10, BLOCK 35 OF BELLA FLORA PHASE 10, AN ADDITION TO TARRANT COUNTY, TEXAS AS SHOWN BY PLAT RECORDED IN COUNTY CLERK FILE NO. D221350274 OF SAID OFFICIAL PUBLIC RECORDS BEARS SOUTH 47°57'57" WEST, A DISTANCE OF 719.57 FEET; THENCE OVER AND ACROSS SAID PMB ROLLING V SOUTH LAND LP TRACT, THE FOLLOWING COURSES AND DISTANCES: NORTH 02°35'06" EAST, A DISTANCE OF 14.05 FEET TO A SET IRON ROD; NORTH 42°47'44" WEST, A DISTANCE OF 44.89 FEET TO A SET IRON ROD FOR THE BEGINNING OF A CURVE TO THE RIGHT HAVING A RADIUS OF 817.00 FEET, AND A CHORD THAT BEARS NORTH 37°51'06" WEST, 140.82 FEET; WITH SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 09°53'16", AN ARC -DISTANCE OF 140.99 FEET TO A SET IRON ROD; NORTH 32°54'28" WEST, A DISTANCE OF 100.32 FEET TO A SET IRON ROD FOR THE BEGINNING OF A CURVE TO THE LEFT, HAVING A RADIUS OF 707.00 FEET, AND A CHORD THAT BEARS NORTH 65°59'02" WEST, 771.70 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 66°09'10", AN ARC -DISTANCE OF 816.29 FEET TO A SET IRON ROD ON THE SOUTH LINE OF SAID FW CLUB LP TRACT; THENCE SOUTH 47°59'24" WEST, WITH SAID SOUTH LINE, A DISTANCE OF 650.35 FEET TO A SET IRON ROD; THENCE OVER AND ACROSS SAID FW CLUB LP TRACT THE FOLLOWING COURSES AND DISTANCES: NORTH 48°30'20" WEST, A DISTANCE OF 224.30 FEET TO A SET IRON ROD AT THE BEGINNING OF A NON -TANGENT CURVE TO THE RIGHT HAVING A RADIUS OF 173.00 FEET AND A CHORD THAT BEARS SOUTH 70°56'47" WEST, 112.95 FEET; WITH SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 38°06'26", AN ARC -DISTANCE OF 115.06 FEET TO A SET IRON ROD; WEST, A DISTANCE OF 365.34 FEET TO A SET IRON ROD; NORTH 35°40'44" WEST, A DISTANCE OF 2,234.12 FEET TO A SET IRON ROD; EXHIBIT C-1 421.082 ACRES NORTH 81°00'15" WEST, A DISTANCE OF 1,573.98 FEET TO A SET IRON ROD; NORTH 76°19'21" WEST, A DISTANCE OF 107.04 FEET TO A SET IRON ROD; NORTH 49°27'05" WEST, A DISTANCE OF 40.36 FEET TO A SET IRON ROD FOR THE BEGINNING OF A NON -TANGENT CURVE TO THE RIGHT, HAVING A RADIUS OF 618.00 FEET, AND A CHORD THAT BEARS NORTH 43°57'09" EAST, 73.39 FEET; WITH SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 06°48'29", AN ARC -DISTANCE OF 73.43 FEET TO A SET IRON ROD FOR THE BEGINNING OF A REVERSE CURVE TO THE LEFT, HAVING A RADIUS OF 792.00 FEET, AND A CHORD THAT BEARS NORTH 42°25'22" EAST, 136.23 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 09°52'04", AN ARC -DISTANCE OF 136.40 FEET TO A SET IRON ROD FOR THE BEGINNING OF A REVERSE CURVE TO THE RIGHT, HAVING A RADIUS OF 672.90 FEET, AND A CHORD THAT BEARS NORTH 39°46'51" EAST, 16.36 FEET; WITH SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 01°23'34", AN ARC -DISTANCE OF 16.36 FEET TO A SET IRON ROD FOR THE BEGINNING OF A COMPOUND CURVE TO THE RIGHT, HAVING A RADIUS OF 475.59 FEET, AND A CHORD THAT BEARS NORTH 44°08'41" EAST, 165.75 FEET; WITH SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 20°04'16", AN ARC -DISTANCE OF 166.60 FEET TO A SET IRON ROD; SOUTH 15°22'58" EAST, A DISTANCE OF 135.83 FEET TO A SET IRON ROD; NORTH 74°37'02" EAST, A DISTANCE OF 630.00 FEET TO A SET IRON ROD; SOUTH 86°23'54" EAST, A DISTANCE OF 115.70 FEET TO A SET IRON ROD; SOUTH 79°37'25" EAST, A DISTANCE OF 184.75 FEET TO A SET IRON ROD; NORTH 50°4959" EAST, A DISTANCE OF 184.81 FEET TO A SET IRON ROD; NORTH 13°20'55" WEST, A DISTANCE OF 170.00 FEET TO A SET IRON ROD; NORTH 63°31'55" EAST, A DISTANCE OF 541.02 FEET TO A SET IRON ROD; NORTH 45°52'19" EAST, A DISTANCE OF 221.60 FEET TO A SET IRON ROD; SOUTH 50°22'10" EAST, A DISTANCE OF 150.00 FEET TO A SET IRON ROD; NORTH 42°43'19" EAST, A DISTANCE OF 425.62 FEET TO A SET IRON ROD; NORTH 39°37'50" EAST, A DISTANCE OF 85.00 FEET TO A SET IRON ROD; NORTH 34°23'51" EAST, A DISTANCE OF 274.70 FEET TO A SET IRON ROD; NORTH 81°12'46" EAST, A DISTANCE OF 406.70 FEET TO A SET IRON ROD; EXHIBIT C-1 421.082 ACRES THENCE NORTH 00°32'23" WEST, PASSING A SET IRON ROD FOR REENTRANT CORNER ON THE NORTHERLY LINE OF SAID FW CLUB LP TRACT AT 184.60 FEET AND CONTINUING WITH SAID NORTHERLY LINE A TOTAL DISTANCE OF 907.40 FEET TO A SET IRON ROD; THENCE CONTINUING WITH THE NORTHERLY LINE OF SAID FW CLUB LP TRACT THE FOLLOWING COURSES AND DISTANCES: NORTH 89°27'34" EAST, A DISTANCE OF 444.62 FEET TO A SET IRON ROD; SOUTH 24°54'16" EAST, A DISTANCE OF 164.11 FEET TO A SET IRON ROD; SOUTH 07°0506" EAST, A DISTANCE OF 246.75 FEET TO A SET IRON ROD; EAST, A DISTANCE OF 628.83 FEET TO A SET IRON ROD; NORTH 60°2429" EAST, A DISTANCE OF 780.16 FEET TO A SET IRON ROD; NORTH 32°45'42" WEST, A DISTANCE OF 102.90 FEET TO A SET IRON ROD; NORTH 14°56'25" EAST, A DISTANCE OF 122.85 FEET TO A SET IRON ROD; NORTH 46°56'31" EAST, A DISTANCE OF 1,061.55 FEET TO A SET IRON ROD; NORTH 89°38'01" EAST, A DISTANCE OF 1,065.53 FEET TO A SET IRON ROD FOR THE NORTHEAST CORNER OF SAID FW CLUB LP TRACT; THENCE WITH THE EASTERLY AND SOUTHERLY LINES OF SAID FW CLUB LP TRACTTHE FOLLOWING COURSES AND DISTANCES: SOUTH 00°22'06" EAST, A DISTANCE OF 187.48 FEET TO A SET IRON ROD; NORTH 89°38'01" EAST, A DISTANCE OF 19.77 FEET TO A SET IRON ROD; SOUTH 00°2206" EAST, A DISTANCE OF 3,480.72 FEET TO A SET IRON ROD FOR THE EAST COMMON CORNER OF SAME TRACT AND A TRACT OF LAND DESCRIBED TO PMB ROLLING V SOUTH LAND LP BY DEED RECORDED IN COUNTY CLERK FILE NO. D223038386 OF SAID OFFICIAL PUBLIC RECORDS; SOUTH 89°57'02" WEST, A DISTANCE OF 1,016.95 FEET TO A SET IRON ROD; SOUTH 47°12'16" WEST, A DISTANCE OF 1,105.20 FEET TO A SET IRON ROD FOR THE BEGINNING OF A CURVE TO THE LEFT, HAVING A RADIUS OF 1,750.00 FEET, AND A CHORD THAT BEARS SOUTH 34°23'46" WEST, 775.92 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 25°37'01, AN ARC -DISTANCE OF 782.43 FEET TO A SET IRON ROD FOR THE BEGINNING OF A NON -TANGENT CURVE TO THE RIGHT, HAVING A RADIUS OF 817.00 FEET, AND A CHORD THAT BEARS SOUTH 55°00'01" EAST, 614.55 FEET; THENCE OVER AND ACROSS SAID PMB ROLLING V SOUTH LAND LP TRACT AS DESCRIBED BY DEED RECORDED IN COUNTY CLERK FILE NO. D223038385 THE FOLLOWING COURSES AND DISTANCES: EXHIBIT C-1 421.082 ACRES WITH SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 44°11'06", AN ARC -DISTANCE OF 630.05 FEET TO A SET IRON ROD; SOUTH 32°54'28" EAST, A DISTANCE OF 100.32 FEET TO A SET IRON ROD; TO THE BEGINNING OF A CURVE TO THE LEFT, HAVING A RADIUS OF 707.00 FEET, AND A CHORD THAT BEARS SOUTH 37°51'06" EAST, 121.86 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 09°53'16", AN ARC -DISTANCE OF 122.01 FEET TO A SET IRON ROD; SOUTH 42°47'44" EAST, A DISTANCE OF 46.35 FEET TO A SET IRON ROD; SOUTH 87°24'54" EAST, A DISTANCE OF 14.24 FEET TO A SET IRON ROD ON THE NORTHWESTERN RIGHT-OF-WAY LINE OF SAID BENBROOK BOULEVARD; THENCE SOUTH 47°57'57" WEST, WITH SAID NORTHWESTERN RIGHT-OF-WAY LINE, A DISTANCE OF 130.01 FEET TO THE POINT OF BEGINNING AND CONTAINING A CALCULATED AREA OF 421.082 ACRES (18,342,393 SQ. FEET) OF LAND. PRELIMINARY, THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE AND SHALL NOT BE USED, VIEWED OR RELIED UPON AS A FINAL SURVEY DOCUMENT. Aaron C. Brown, R.P.L.S. September 16, 2025 Registered Professional Land Surveyor Texas Registration No. 6702 LJA Surveying, Inc. 3017 West 7t" Street, Suite 300 Fort Worth, Texas 76107 817-288-1900 TBPELS Firm No. 10194382 APPENDIX C-2 IMPROVEMENT AREA #5 LEGAL DESCRIPTION EXHIBIT "A" 72.059 -ACRE TRACT BEING A 72.059 -ACRE TRACT OF LAND SITUATED IN THE T. F. ROGERS SURVEY, ABSTRACT NO. 1357 AND THE WILLIAM ATKINS SURVEY, ABSTRACT NO. 1961, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF THOSE TRACTS OF LAND DESCRIBED TO PMB VENTANA DEVELOPER SOUTH LLC BY DEED RECORDED IN COUNTY CLERK FILE NOS. D221026481 (HEREINAFTER REFERRED TO AS "PMB VENTANA TRACT 1") AND D224176443 (HEREINAFTER REFERRED TO AS "PMB VENTANA TRACT 2"), OFFICIAL PUBLIC RECORDS OF TARRANT COUNTY, TEXAS, AND BEING ALL OF THAT TRACT OF LAND DESCRIBED TO PHDFW-VENTANA 36 LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D224169598 OF SAID OFFICIAL PUBLIC RECORDS AND BEING ALL OF THAT TRACT OF LAND DESCRIBED TO AMERICAN LEGEND LOT HOLDINGS LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D224123917 OF SAID OFFICIAL PUBLIC RECORDS AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 5/8 -INCH CAPPED IRON ROD STAMPED "JACOBS" FOUND FOR THE WEST COMMON CORNER OF SAID PMB VENTANA TRACT 1 AND A TRACT OF LAND DESCRIBED TO FW CLUB LP BY DEED RECORDED IN COUNTY CLERK FILE NO. D224085431 OF SAID OFFICIAL PUBLIC RECORDS; THENCE NORTH 00°3229" WEST, WITH THE WEST LINE OF SAID PMB VENTANA TRACT 1, A DISTANCE OF 1074.43 FEET TO A 5/8 -INCH CAPPED IRON ROD STAMPED "LJA SURVEYING" SET (HEREINAFTER REFERRED TO AS "IRON ROD SET") FOR THE SOUTHEAST CORNER OF SAID PMB VENTANA TRACT 2; THENCE NORTH 29°01'22" WEST, WITH THE SOUTHWESTERLY LINE OF SAID PMB VENTANA TRACT 2, A DISTANCE OF 310.00 FEET TO AN IRON ROD SET; THENCE OVER AND ACROSS SAID PMB VENTANA TRACT 2, THE FOLLOWING COURSES AND DISTANCES: NORTH 60°5838" EAST, A DISTANCE OF 60.00 FEET TO AN IRON ROD SET; NORTH 29°01'22" WEST, A DISTANCE OF 125.00 FEET TO AN IRON ROD SET; NORTH 60°58'38" EAST, A DISTANCE OF 176.00 FEET TO AN IRON ROD SET ON THE WEST LINE OF SAID PMB VENTANA TRACT 1; THENCE NORTH 00°32'29" WEST, WITH SAID WEST LINE, A DISTANCE OF 341.31 FEET TO A 5/8 -INCH CAPPED IRON ROD STAMPED "JACOBS" FOUND FOR THE SOUTHWEST CORNER OF LOT 18, BLOCK 26, VENTANA, PHASE 5A, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AS SHOWN BY PLAT RECORDED IN COUNTY CLERK FILE NO. D221277917, PLAT RECORDS OF TARRANT COUNTY, TEXAS; THENCE NORTH 60°58'38" EAST, WITH THE NORTHERLY LINE OF SAID PMB VENTANA TRACT 1, A DISTANCE OF 604.61 FEET TO A 5/8 -INCH CAPPED IRON ROD STAMPED "LJA SURVEYING" FOUND (HEREINAFTER REFERRED TO AS "CAPPED IRON ROD FOUND" ON THE SOUTHWEST RIGHT-OF-WAY LINE OF EMBARGO ROAD (A 50 -FOOT WIDE RIGHT-OF-WAY), SAME BEING THE NORTHWEST CORNER OF VENTANA, PHASE 6A-1, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AS SHOWN BY PLAT RECORDED IN COUNTY CLERK FILE NO. D222166626 OF SAID PLAT RECORDS; THENCE WITH SAID SOUTHWEST RIGHT-OF-WAY LINE, THE FOLLOWING COURSES AND DISTANCES: SOUTH 29°01'22" EAST, A DISTANCE OF 535.00 FEET TO A CAPPED IRON ROD FOUND; S:\NTX-LAND\0002\200 SURVEY\230 Legal Descriptions\0002EX136 VENTANA 8.docx Page 1 of 4 EXHIBIT "A" 72.059 -ACRE TRACT SOUTH 15°58'38" WEST, A DISTANCE OF 14.14 FEET TO A CAPPED IRON ROD FOUND; SOUTH 29°01'22" EAST, A DISTANCE OF 50.00 FEET TO A CAPPED IRON ROD FOUND; SOUTH 74°01'22" EAST, A DISTANCE OF 14.14 FEET TO A CAPPED IRON ROD FOUND; SOUTH 29°01'22" EAST, A DISTANCE OF 230.00 FEET TO A CAPPED IRON ROD FOUND; SOUTH 15°58'38" WEST, A DISTANCE OF 14.14 FEET TO A CAPPED IRON ROD FOUND; SOUTH 29°01'22" EAST, A DISTANCE OF 50.00 FEET TO A CAPPED IRON ROD FOUND; SOUTH 74°01'22" EAST, A DISTANCE OF 14.14 FEET TO A CAPPED IRON ROD FOUND; SOUTH 29°01'22" EAST, A DISTANCE OF 1.92 FEET TO A CAPPED IRON ROD FOUND FOR THE BEGINNING OF A CURVE TO THE LEFT HAVING A RADIUS OF 1525.00 FEET AND A CHORD THAT BEARS SOUTH 33°10'56" EAST, 221.22 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 8°19'08", AN ARC -DISTANCE OF 221.42 FEET TO A CAPPED IRON ROD FOUND; SOUTH 37°20'30" EAST, A DISTANCE OF 40.91 FEET TO A CAPPED IRON ROD FOUND; SOUTH 07°09'49" WEST, A DISTANCE OF 14.26 FEET TO A CAPPED IRON ROD FOUND; SOUTH 37°20'30" EAST, A DISTANCE OF 50.01 FEET TO A CAPPED IRON ROD FOUND; SOUTH 82°50'11" EAST, A DISTANCE OF 14.02 FEET TO A CAPPED IRON ROD FOUND; SOUTH 37°20'30" EAST, A DISTANCE OF 168.42 FEET TO A CAPPED IRON ROD FOUND; SOUTH 10°07'50" WEST, A DISTANCE OF 13.52 FEET TO A CAPPED IRON ROD FOUND; SOUTH 31°57'59" EAST, A DISTANCE OF 60.00 FEET TO A CAPPED IRON ROD FOUND; NORTH 57°48'39" EAST, A DISTANCE OF 5.64 FEET TO A CAPPED IRON ROD FOUND; SOUTH 80°04'28" EAST, A DISTANCE OF 14.69 FEET TO A CAPPED IRON ROD FOUND FOR THE WEST COMMON CORNER OF SAID VENTANA PHASE 6A-1 ADDITION AND VENTANA, PHASE 6B, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AS SHOWN BY PLAT RECORDED IN COUNTY CLERK FILE NO. D224076545 OF SAID PLAT RECORDS; THENCE WITH THE SOUTHWESTERLY LINE OF SAID VENTANA PHASE 6B, THE FOLLOWING COURSES AND DISTANCES: SOUTH 37°20'30" EAST, A DISTANCE OF 110.29 FEET TO A CAPPED IRON ROD FOUND; SOUTH 09°34'50" WEST, A DISTANCE OF 13.66 FEET TO A CAPPED IRON ROD FOUND; SOUTH 33°09'44" EAST, A DISTANCE OF 50.00 FEET TO A CAPPED IRON ROD FOUND FOR THE SOUTHWEST CORNER OF SAID VENTANA PHASE 6B ADDITION ON THE NORTH LINE OF SAID AMERICAN LEGEND LOT HOLDINGS LLC TRACT; S:\NTX-LAND\0002\200 SURVEY\230 Legal Descriptions\0002EX136 VENTANA 8.docx Page 2 of 4 EXHIBIT "A" 72.059 -ACRE TRACT THENCE WITH THE NORTHWESTERLY LINE OF SAID AMERICAN LEGEND LOT HOLDINGS LLC TRACT, THE FOLLOWING COURSES AND DISTANCES: NORTH 56°43'20" EAST, A DISTANCE OF 3.65 FEET TO A CAPPED IRON ROD FOUND; SOUTH 80°3133" EAST, A DISTANCE OF 14.58 FEET TO A CAPPED IRON ROD FOUND; NORTH 54°23'23" EAST, A DISTANCE OF 50.02 FEET TO A CAPPED IRON ROD FOUND; NORTH 07°34'26" EAST, A DISTANCE OF 14.16 FEET TO A CAPPED IRON ROD FOUND FOR THE BEGINNING OF A NON -TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 905.00 FEET AND A CHORD THAT BEARS NORTH 50°0334" EAST, 66.76 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 4°13'38", AN ARC -DISTANCE OF 66.77 FEET TO A CAPPED IRON ROD FOUND; NORTH 47°56'45" EAST, A DISTANCE OF 33.43 FEET TO A CAPPED IRON ROD FOUND FOR THE NORTHEAST CORNER OF SAID AMERICAN LEGEND LOT HOLDINGS LLC TRACT, SAME BEING A REENTRANT CORNER OF SAID VENTANA PHASE 6B ADDITION; THENCE WITH THE SOUTHWESTERLY LINE OF SAID VENTANA PHASE 6B, THE FOLLOWING COURSES AND DISTANCES: SOUTH 37°20'30" EAST, A DISTANCE OF 565.64 FEET TO A CAPPED IRON ROD FOUND; NORTH 52°39'30" EAST, A DISTANCE OF 105.00 FEET TO A CAPPED IRON ROD FOUND; SOUTH 37°20'30" EAST, A DISTANCE OF 153.02 FEET TO A CAPPED IRON ROD FOUND FOR THE SOUTHWEST CORNER OF SAID VENTANA PHASE 6B ADDITION ON THE NORTHWESTERLY LINE OF SAID FW CLUB LP TRACT; THENCE WITH SAID NORTHWESTERLY LINE, THE FOLLOWING COURSES AND DISTANCES: SOUTH 46°56'31" WEST, A DISTANCE OF 287.44 FEET TO A 5/8 -INCH CAPPED IRON ROD STAMPED "JACOBS" FOUND; SOUTH 14°56'25" WEST, A DISTANCE OF 122.85 FEET TO A 5/8 -INCH CAPPED IRON ROD STAMPED "JACOBS" FOUND; SOUTH 32°45'42" EAST, A DISTANCE OF 102.90 FEET TO AN IRON ROD SET; SOUTH 60°24'29" WEST, A DISTANCE OF 780.16 FEET TO AN IRON ROD SET; WEST, A DISTANCE OF 628.83 FEET TO AN IRON ROD SET; NORTH 07°05'06" WEST, A DISTANCE OF 246.75 FEET TO AN IRON ROD SET; NORTH 24°54'16" WEST, A DISTANCE OF 164.11 FEET TO AN IRON ROD SET; S:\NTX-LAND\0002\200 SURVEY\230 Legal Descriptions\0002EX136 VENTANA 8.docx Page 3 of 4 EXHIBIT "A" 72.059 -ACRE TRACT SOUTH 89°27'34" WEST, A DISTANCE OF 444.34 FEET TO THE POINT OF BEGINNING AND CONTAINING A CALCULATED AREA OF 72.059 ACRES (3,138,884 SQ. FEET) OF LAND. PRELIMINARY, THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE AND SHALL NOT BE USED, VIEWED OR RELIED UPON AS A FINAL SURVEY DOCUMENT. Aaron C. Brown, R.P.L.S. September 17, 2025 Registered Professional Land Surveyor Texas Registration No. 6702 LJA Surveying, Inc. 3017 West 7th Street, Suite 300 Fort Worth, Texas 76107 817-288-1900 TBPELS Firm No. 10194382 S:\NTX-LAND\0002\200 SURVEY\230 Legal Descriptions\0002EX136 VENTANA 8.docx Page 4 of 4 APPENDIX C-3 IMPROVEMENT AREA #6 LEGAL DESCRIPTION METES & BOUNDS DESCRIPTION BEING A 144.658 -ACRE TRACT OF LAND SITUATED IN THE S.A. & M.G. SURVEY, ABSTRACT NOS. 1903 AND 1479 AND THE WILLIAM ATKINS SURVEY, ABSTRACT NO. 1961, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF THAT TRACT OF LAND DESCRIBED TO PMB SWFW DEV CO LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D224176444, OFFICIAL PUBLIC RECORDS OF TARRANT COUNTY, TEXAS, AND BEING ALSO A PORTION OF THAT TRACT OF LAND DESCRIBED TO PMB VEALE LAND INVESTORS 1 LP BY DEED RECORDED IN COUNTY CLERK FILE NO. D224176442 OF SAID OFFICIAL PUBLIC RECORDS, AND BEING ALSO ALL OF THAT TRACT OF LAND DESCRIBED TO HIGHLAND HOMES - DALLAS LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D224194263 (HEREINAFTER REFERRED TO AS "HIGHLAND HOMES TRACT 1") OF SAID OFFICIAL PUBLIC RECORDS, AND BEING ALSO A PORTION OF THAT TRACT OF LAND DESCRIBED TO HIGHLAND HOMES - DALLAS LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D225197854 (HEREINAFTER REFERRED TO AS "HIGHLAND HOMES TRACT 2") OF SAID OFFICIAL PUBLIC RECORDS, AND BEING ALSO ALL OF THAT TRACT OF LAND DESCRIBED TO CND -PO 1 VENTANA LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D224191530 OF SAID OFFICIAL PUBLIC RECORDS, AND BEING ALSO ALL OF THAT TRACT OF LAND DESCRIBED TO KL LB BUY 5 LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D224187768 OF SAID OFFICIAL PUBLIC RECORDS, AND BEING ALSO ALL OF THAT TRACT OF LAND DESCRIBED TO VENTANA-FORT WORTH LP BY DEED RECORDED IN COUNTY CLERK FILE NO. D224187760 OF SAID OFFICIAL PUBLIC RECORDS, AND BEING ALSO A PORTION OF THAT TRACT OF LAND DESCRIBED TO PMB VENTANA DEVELOPER SOUTH LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D224176443 OF SAID OFFICIAL PUBLIC RECORDS, AND BEING ALSO A PORTION OF THAT TRACT OF LAND DESCRIBED TO TRT LAND INVESTORS LLC BY DEED RECORDED IN COUNTY CLERK FILE NO. D221245221 OF SAID OFFICIAL PUBLIC RECORDS, AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 5/8 -INCH CAPPED IRON ROD STAMPED "LJA SURVEYING" FOUND (HEREINAFTER REFERRED TO AS A "CAPPED IRON ROD FOUND") FOR THE NORTHEAST CORNER OF SAID VENTANA- FORT WORTH LP TRACT, FROM WHICH A 1 -INCH IRON ROD FOUND FOR THE NORTHWEST CORNER OF VENTANA 3B, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS AS SHOWN BY PLAT RECORDED IN COUNTY CLERK FILE NO. D221278153, PLAT RECORDS, TARRANT COUNTY, TEXAS, BEARS NORTH 00°3223" WEST, A DISTANCE OF 1,174.03 FEET; THENCE SOUTH 00°3223" EAST, PASSING A CAPPED IRON ROD FOUND FOR THE EAST COMMON CORNER OF SAID VENTANA-FORT WORTH LP TRACT AND SAID KL LB BUY 5 LLC TRACT AT 817.96 FEET AND CONTINUING WITH THE EAST LINE OF SAME TRACT, PASSING A CAPPED IRON ROD FOUND FOR THE SOUTHEAST CORNER OF SAID KL LB BUY 5 LLC TRACT AT 1,875.33 FEET AND CONTINUING WITH THE EASTERLY LINE OF SAID PMB VEALE LAND INVESTORS 1 LP TRACT FOR A TOTAL DISTANCE IN ALL OF 1,935.33 FEET TO A CAPPED IRON ROD FOUND FOR THE NORTHEAST CORNER OF SAID HIGHLAND HOMES TRACT 2; THENCE SOUTH 89°27'37" WEST, WITH THE NORTHERLY LINE OF SAID HIGHLAND HOMES TRACT 2, A DISTANCE OF 382.00 FEET TO A CAPPED IRON ROD FOUND FOR THE NORTHERNMOST COMMON CORNER OF SAID HIGHLAND HOMES TRACT 2 AND HIGHLAND HOMES TRACT 1; THENCE SOUTH 44°27'37" WEST, WITH THE COMMON LINE OF SAID HIGHLAND HOMES TRACT 1 AND HIGHLAND HOMES TRACT 2, A DISTANCE OF 14.14 FEET TO A CAPPED IRON ROD FOUND; THENCE SOUTH 00°32'23" EAST, CONTINUING WITH SAID COMMON LINE, A DISTANCE OF 120.00 FEET; THENCE OVER AND ACROSS SAID HIGHLAND HOMES TRACT 2, THE FOLLOWING COURSES AND DISTANCES: SOUTH 45°32'23" EAST, A DISTANCE OF 14.14 FEET; S:\NTX-LAND\0171 \200SURVEY\230 Legal Descriptions\01 71 VENTANA WEST OVERALL.docx Page 1 of 4 METES & BOUNDS DESCRIPTION NORTH 89°27'37" EAST, A DISTANCE OF 8.50 FEET; SOUTH 00°3226" EAST, A DISTANCE OF 50.00 FEET; SOUTH 89°27'37" WEST, A DISTANCE OF 8.50 FEET; SOUTH 44°27'37" WEST, A DISTANCE OF 14.14 FEET TO A POINT ON SAID COMMON LINE; THENCE SOUTH 00°3223" EAST, WITH SAID COMMON LINE, A DISTANCE OF 800.00 FEET TO A CAPPED IRON ROD FOUND; THENCE SOUTH 45°32'23" EAST, CONTINUING WITH SAID COMMON LINE, A DISTANCE OF 14.14 FEET TO A CAPPED IRON ROD FOUND; THENCE OVER AND ACROSS SAID HIGHLAND HOMES TRACT 2, THE FOLLOWING COURSES AND DISTANCES: NORTH 89°27'37" EAST, A DISTANCE OF 8.46 FEET; SOUTH 00°44'03" EAST, A DISTANCE OF 50.00 FEET; SOUTH 89°27'37" WEST, A DISTANCE OF 8.63 FEET TO A CAPPED IRON ROD FOUND FOR THE EASTERNMOST SOUTHEAST CORNER OF SAID HIGHLAND HOMES TRACT 1; SOUTH 44°09'09" WEST, A DISTANCE OF 14.07 FEET TO THE BEGINNING OF A NON -TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 415.00 FEET AND A CHORD THAT BEARS SOUTH 15°25'59" EAST, 195.02 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 27°10'45", AN ARC -DISTANCE OF 196.86 FEET; SOUTH 29°01'22" EAST, PASSING THE SOUTHEAST LINE OF SAID HIGHLAND HOMES TRACT 2, SAME BEING THE NORTHWEST LINE OF SAID PMB VENTANA DEVELOPER SOUTH LLC TRACT AT 92.75 FEET AND CONTINUING OVER AND ACROSS SAID PMB VENTANA DEVELOPER SOUTH LLC TRACT FOR A TOTAL DISTANCE IN ALL OF 517.75 FEET; THENCE SOUTH 60°58'38" WEST, CONTINUING OVER AND ACROSS SAID PMB VENTANA DEVELOPER SOUTH LLC TRACT, A DISTANCE OF 60.00 FEET TO THE SOUTHWESTERLY LINE OF SAME TRACT; THENCE NORTH 29°01'22" WEST, WITH SAID SOUTHWESTERLY LINE, PASSING THE NORTHWEST CORNER OF SAID PMB VENTANA DEVELOPER SOUTH LLC TRACT AT 425.00 FEET AND CONTINUING OVER AND ACROSS SAID HIGHLAND HOMES 2 TRACT FOR A TOTAL DISTANCE IN ALL OF 517.75 FEET TO THE BEGINNING OF A CURVE TO THE RIGHT HAVING A RADIUS OF 475.00 FEET AND A CHORD THAT BEARS NORTH 15°21'03" WEST, 224.54 FEET; THENCE CONTINUING OVER ACROSS SAID HIGHLAND HOMES TRACT 2 AND WITH SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 27°20'38", AN ARC -DISTANCE OF 226.69 FEET; THENCE NORTH 45°48'31" WEST, CONTINUING OVER AND ACROSS SAID HIGHLAND HOMES TRACT 2, A DISTANCE OF 14.21 FEET TO THE NORTH LINE OF SAME TRACT, SAME BEING THE SOUTHERLY LINE OF SAID HIGHLAND HOMES TRACT 1; THENCE WITH THE BOUNDS OF SAID HIGHLAND HOMES TRACT 1, THE FOLLOWING COURSES AND DISTANCES: SOUTH 89°27'37" WEST, A DISTANCE OF 915.00 FEET TO A CAPPED IRON ROD FOUND; SOUTH 45°32'23" EAST, A DISTANCE OF 14.14 FEET TO A CAPPED IRON ROD FOUND; S:\NTX-LAND\0171 \200SURVEY\230 Legal Descriptions\01 71 VENTANA WEST OVERALL.docx Page 2 of 4 METES & BOUNDS DESCRIPTION SOUTH 00°3223" EAST, A DISTANCE OF 15.04 FEET TO A CAPPED IRON ROD FOUND FOR A CURVE TO THE LEFT HAVING A RADIUS OF 690.00 FEET AND A CHORD THAT BEARS SOUTH 04°26'15" EAST, 93.81 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 7°47'44", AN ARC -DISTANCE OF 93.88 FEET TO A CAPPED IRON ROD FOUND; SOUTH 81°39'54" WEST, A DISTANCE OF 165.11 FEET TO A CAPPED IRON ROD FOUND; SOUTH 78°00'05" WEST, A DISTANCE OF 181.60 FEET TO A CAPPED IRON ROD FOUND; SOUTH 11°5955" EAST, A DISTANCE OF 5.00 FEET TO A CAPPED IRON ROD FOUND; SOUTH 78°00'05" WEST, A DISTANCE OF 639.70 FEET TO A CAPPED IRON ROD FOUND; NORTH 74°37'40" WEST, A DISTANCE OF 64.26 FEET TO A CAPPED IRON ROD FOUND; NORTH 66°38'16" WEST, A DISTANCE OF 70.32 FEET TO A CAPPED IRON ROD FOUND; NORTH 35°20'03" WEST, A DISTANCE OF 112.26 FEET TO A CAPPED IRON ROD FOUND; NORTH 11°59'55" WEST, A DISTANCE OF 319.43 FEET TO A CAPPED IRON ROD FOUND; NORTH 10°06'12" WEST, A DISTANCE OF 78.07 FEET TO A CAPPED IRON ROD FOUND; NORTH 05°24'41" WEST, A DISTANCE OF 79.09 FEET TO A CAPPED IRON ROD FOUND; NORTH 00°39'54" WEST, A DISTANCE OF 79.09 FEET TO A CAPPED IRON ROD FOUND; NORTH 04°04'53" EAST, A DISTANCE OF 79.09 FEET TO A CAPPED IRON ROD FOUND; NORTH 08°49'40" EAST, A DISTANCE OF 79.09 FEET TO A CAPPED IRON ROD FOUND; NORTH 13°34'27" EAST, A DISTANCE OF 79.09 FEET TO A CAPPED IRON ROD FOUND; NORTH 18°19'15" EAST, A DISTANCE OF 217.15 FEET TO A CAPPED IRON ROD FOUND FOR THE BEGINNING OF A NON -TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 3755.00 AND A CHORD THAT BEARS NORTH 39°03'29" EAST, 50.27 FEET; WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 0°46'01", AN ARC -DISTANCE OF 50.27 FEET; THENCE NORTH 51°36'37" WEST, DEPARTING THE WESTERLY LINE OF SAID HIGHLAND HOMES TRACT 1, OVER AND ACROSS SAID PMB SWFW DEV CO LLC TRACT, PASSING THE WESTERLY LINE OF SAME TRACT AT 54.12 FEET AND CONTINUING OVER AND ACROSS SAID PMB VEALE LAND INVESTORS 1 LP TRACT FOR A TOTAL DISTANCE IN ALL OF 54.97 FEET TO THE BEGINNING OF A NON -TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 3700.59 FEET AND A CHORD THAT BEARS NORTH 24°57'40" EAST, 1754.66 FEET; THENCE OVER AND ACROSS SAID PMB VEALE LAND INVESTORS 1 LP TRACT AND WITH SAID CURVE TO THE LEFT, PASSING THE EASTERLY LINE OF SAID PMB SWFW DEV CO LLC TRACT AT 184.04 FEET AND CONTINUING OVER AND ACROSS SAME TRACT FOR A TOTAL ARC -DISTANCE IN ALL OF 1771.53 FEET; THENCE NORTH 11°14'46" EAST, CONTINUING OVER AND ACROSS SAID PMB SWFW DEV CO LLC TRACT, A DISTANCE OF 434.46 FEET TO THE BEGINNING OF A CURVE TO THE RIGHT HAVING A RADIUS OF 2000.00 FEET AND A CHORD THAT BEARS NORTH 12°14'58" EAST, 70.04 FEET; THENCE CONTINUING OVER AND ACROSS SAID PMB SWFW DEV CO LLC TRACT AND WITH SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 2°00'24", PASSING THE NORTHERLY LINE OF SAME S:\NTX-LAND\0171 \200SURVEY\230 Legal Descriptions\01 71 VENTANA WEST OVERALL.docx Page 3 of 4 METES & BOUNDS DESCRIPTION TRACT AT 43.97 FEET AND CONTINUING OVER AND ACROSS SAID TRT LAND INVESTORS LLC TRACT FOR A TOTAL ARC -DISTANCE IN ALL OF 70.04 FEET; THENCE SOUTH 77°02'02" EAST, CONTINUING OVER AND ACROSS SAID TRT LAND INVESTORS LLC TRACT, A DISTANCE OF 55.00 FEET TO THE BEGINNING OF A NON -TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 1945.00 FEET AND A CHORD THAT BEARS SOUTH 13°06'48" WEST, 10.00 FEET; THENCE CONTINUING OVER AND ACROSS SAID TRT LAND INVESTORS LLC TRACT AND WITH SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 0°17'40", AN ARC -DISTANCE OF 10.00 FEET TO A CAPPED IRON ROD FOUND FOR THE NORTHWEST CORNER OF SAID VENTANA-FORT WORTH LP TRACT; THENCE NORTH 89°27'37" EAST, WITH THE NORTHERLY LINE OF SAID VENTANA-FORT WORTH LP TRACT, A DISTANCE OF 1575.35 FEET TO THE POINT OF BEGINNING AND CONTAINING A CALCULATED AREA OF 144.658 ACRES (6,301,287 SQ. FEET) OF LAND. PRELIMINARY, THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE AND SHALL NOT BE USED OR VIEWED OR RELIED UPON AS A FINAL SURVEY DOCUMENT. S:\NTX-LAND\0171 \200SURVEY\230 Legal Descriptions\01 71 VENTANA WEST OVERALL.docx Page 4 of 4 APPENDIX D DIAGRAMS OF THE AUTHORIZED IMPROVEMENTS Improvement Area #4 0 150 300 J CONNECT TO - EXISTING 16" • WATERLINE (X-09278) C- 80w\E CONNECT TO EXISTING 16' WATERLINE (X-09278) 1 2" WATER; INF o ; O 3 w' Y i •----------- - - MAYW000 ST I I I CONNECT TO CONNECT TO EXISTING 8" EXISTING 6" WATERLINE WATERLINE (X-10725) (X-10362) LEGEND PID ELK;IBLE WATER LINE EXISTING WATER I ICE ------------ IPRCU-0DOI r I CPNI03:M 11 16 WATERLINE CONNECT TO EXISTING 16" WATERLINE (X-091 18) W Z 9 PID EXHIBIT WATER IMPROVEMENTS KEN WOOD AVE & LONGVUE AVE b 6060 North Central Expressway Phone 469.6210710 Sule 400 Dallas. Texas 75206 FRN - F-1386 Improvement Area #5 E H FlD INFRASTRUCTURE Improvement Area #6 4. — I.c— — Ivt ..waa..b J016T. W MT�IO.u6S: •D I.' MIP Y.c IMUEC CL .fl SON)C.. M WMOwQ: r // FBUER'E EBIff ®-���sYS IICw v[P LL�n MATCHUNEfrnriiiJT� W -� APPENDIX E PID ASSESSMENT NOTICE AFTER RECORDING RETURN TO: 11 NOTICE OF OBLIGATION TO PAY IMPROVEMENT DISTRICT ASSESSMENT TO CITY OF FORT WORTH, TEXAS CONCERNING THE FOLLOWING PROPERTY STREET ADDRESS OF PROPERTY LOT TYPE PRINCIPAL ASSESSMENT: $ As the purchaser of the real property described above, you are obligated to pay assessments to the City of Fort Worth, Texas (the "City"), for the costs of a portion of a public improvement or services project (the "Authorized Improvements") undertaken for the benefit of the property within Fort Worth Public Improvement District No. 22 (Veale Ranch) (the "District") created under Subchapter A, Chapter 372, Local Government Code. AN ASSESSMENT HAS BEEN LEVIED AGAINST YOUR PROPERTY FOR THE AUTHORIZED IMPROVEMENTS, WHICH MAY BE PAID IN FULL AT ANY TIME. IF THE ASSESSMENT IS NOT PAID IN FULL, IT WILL BE DUE AND PAYABLE IN ANNUAL INSTALLMENTS THAT WILL VARY FROM YEAR TO YEAR DEPENDING ON THE AMOUNT OF INTEREST PAID, COLLECTION COSTS, ADMINISTRATIVE COSTS, AND DELINQUENCY COSTS. The exact amount of the assessment may be obtained from the City. The exact amount of each annual installment will be approved each year by the City Council in the annual service plan update for the district. More information about the assessments, including the amounts and due dates, may be obtained from the City. Your failure to pay any assessment or any annual installment may result in penalties and interest being added to what you owe or in a lien on and the foreclosure of your property. ' To be included in separate copy of the notice required by Section 5.0143, Tex. Prop. Code, to be executed at the closing of the purchase and sale and to be recorded in the deed records of Tarrant County, Texas or Parker County, Texas. [The undersigned purchaser acknowledges receipt of this notice before the effective date of a binding contract for the purchase of the real property at the address described above. DATE: DATE: SIGNATURE OF SIGNATURE OF PURCHASER PURCHASER The undersigned seller acknowledges providing this notice to the potential purchaser before the effective date of a binding contract for the purchase of the real property at the address described above. DATE: SIGNATURE OF SELLER DATE: SIGNATURE OF SELLER]2 2 To be included in copy of the notice required by Section 5.014, Tex. Prop. Code, to be executed by seller in accordance with Section 5.014(a-1), Tex. Prop. Code. Signature Page to Initial Notice of Obligation to Pay Improvement District Assessment [The undersigned purchaser acknowledges receipt of this notice before the effective date of a binding contract for the purchase of the real property at the address described above. The undersigned purchaser acknowledged the receipt of this notice including the current information required by Section 5.0143, Texas Property Code, as amended. DATE: DATE: SIGNATURE OF SIGNATURE OF PURCHASER PURCHASER STATE OF TEXAS § COUNTY OF § The foregoing instrument was acknowledged before me by and , known to me to be the person(s) whose name(s) is/are subscribed to the foregoing instrument and acknowledged to me that he or she executed the same for the purposes therein expressed. Given under my hand and seal of office on this , 20_. Notary Public, State of Texas]3 s To be included in separate copy of the notice required by Section 5.0143, Tex. Prop. Code, to be executed at the closing of the purchase and sale and to be recorded in the deed records of Tarrant County, Texas or Parker County, Texas. Purchaser Signature Page to Final Notice with Current Information of Obligation to Pay Improvement District Assessment The undersigned seller acknowledges providing a separate copy of the notice required by Section 5.014 of the Texas Property Code including the current information required by Section 5.0143, Texas Property Code, as amended, at the closing of the purchase of the real property at the address above. DATE: SIGNATURE OF SELLER STATE OF TEXAS § COUNTY OF § DATE: SIGNATURE OF SELLER The foregoing instrument was acknowledged before me by and , known to me to be the person(s) whose name(s) is/are subscribed to the foregoing instrument and acknowledged to me that he or she executed the same for the purposes therein expressed. Given under my hand and seal of office on this , 20_. Notary Public, State of Texas]4 4 To be included in separate copy of the notice required by Section 5.0143, Tex. Prop. Code, to be executed at the closing of the purchase and sale and to be recorded in the deed records of Tarrant County, Texas or Parker County, Texas. Seller Signature Page to Final Notice with Current Information of Obligation to Pay Improvement District Assessment APPENDIX F ASSESSMENT PER UNIT, PROJECTED LEVERAGE AND PROJECTED TAX RATE EQUIVALENTS Appendix F For purposes of calculating and allocating the Assessments, the Assessed Property has been classified in one of seven Lot Types. "Lot Type 1" means lots identified as such on the Assessment Roll, being lots typically considered estate lots. "Lot Type 2" means lots identified as such on the Assessment Roll, being lots typically considered cottage lots. "Lot Type 3" means lots identified as such on the Assessment Roll. being lots typically with a Lot width of approximately 70 feet. "Lot Type 4" means lots identified as such on the Assessment Roll, being lots typically with a Lot width of approximately 60 feet. "Lot Type 5" means lots identified as such on the Assessment Roll, being lots typically with a Lot width of approximately 50 feet. "Lot Type 6" means lots identified as such on the Assessment Roll, being lots typically with a Lot width of approximately 40 feet. "Lot Type 7" means lots identified as such on the Assessment Roll, being lots typically with a Lot considered as a 4 -pack. A) Proposed Residential Development Table F -A-1 shows the proposed total units to be developed within the PID. Table F -A-1 Proposed Development within the PID Proposed Development Quantity Measurement Residential Units Single-family 6,000 Units Multi -family 11,000,000 GSF Commercial Retail Pad 600,000 GSF Retail (Big Box) 900,000 GSF Office 5,000,000 GSF Industrial 12,000,000 GSF Table F -A-2 shows the actual units developed within Improvement Areas #1, #2, and #3. Table F -A-2 Actual Development — Improvement Area #1, #2, and #3 Proposed Development Quantity Measurement Residential Units Single-family 273 Units Multi -family 206,048 GSF Commercial Industrial 1,592,554 GSF Table F -A-3 shows the proposed residential units within Improvement Area #4. Table F -A-3 Proposed Development — Improvement Area #4 Lot Type Proposed Development Lot Type 1 (Estate Lots) 100 Units Lot Type 2 (Cottage Lots) 36 Units Total 136 Units Table F -A-4 shows the proposed residential Lot Types within Improvement Area #5. Table F -A-4 Proposed Development — Improvement Area #5 Lot Type Proposed Development Lot Type 3 (70 Ft) 39 Units Lot Type 4 (60 Ft) 38 Units Lot Type 5 (50 Ft) 163 Units Lot Type 6 (40 Ft) 37 Units Total 277 Units Table F -A-5 shows the proposed residential Lot Types within Improvement Area #6. Table F -A-5 Proposed Development — Improvement Area #6 Lot Type Proposed Development Lot Type 3 (70 Ft) 64 Units Lot Type 4 (60 Ft) 166 Units Lot Type 5 (50 Ft) 115 Units Lot Type 6 (40 Ft) 188 Units Lot Type 7 (4 -pack) 56 Units Total 589 Units Table F -A-6 shows the proposed units within the Future Improvement Areas. Table F -A-6 Proposed Development — Future Improvement Areas Proposed Development Quantity Measurement Residential Units Single-family 4,464 Units Multi -family 10,793,952 GSF Commercial Retail Pad 600,000 GSF Retail (Big Box) 900,000 GSF Office 5,000,000 GSF Industrial 10,407,446 GSF B) Calculation of Equivalent Units As explained under Section V.D, for the purposes of this Service and Assessment Plan, the City Council has determined that the Actual Costs of the Improvement Area #4 Improvements and Improvement Area #5 Improvements financed with the Improvement Area #4 and #5 Bonds, and the Improvement Area #6 Improvements to be financed under the Improvement Area #6 Reimbursement Agreement shall be allocated to the Improvement Area #4 Assessed Property, the Improvement Area #5 Assessed Property, and the Improvement Area #6 Assessed Property, respectively, by spreading the entire Improvement Area #4 Assessment, Improvement Area #5 Assessment, and Improvement Area #6 Assessment across the Parcels of Improvement Area #4 Assessed Property, Improvement Area #5 Assessed Property, and Improvement Area #6 Assessed Property, respectively, based on the estimated Equivalent Units. For the purposes of this Service and Assessment Plan, the City Council has determined that the Improvement Area #4 Assessments, the Improvement Area #5 Assessments, and the Improvement Area #6 Assessments shall be allocated to the Improvement Area #4 Assessed Property, Improvement Area #5 Assessed Property, and Improvement Area #6 Assessed Property on the basis of the average home value of each Lot Type, and that such method of allocation will result in the imposition of equal shares of the Improvement Area #4 Assessments, the Improvement Area #5 Assessments, and the Improvement Area #6 Assessments on Parcels of Improvement Area #4 Assessed Property, the Improvement Area #5 Assessed Property, and the Improvement Area #6 Assessed Property, respectively, similarly benefited. In determining the average home value of each Lot Type, the City Council has taken into consideration (i) the Lot Types (i.e., 70 Ft, 60 Ft, etc.); (ii) current and projected home prices; (iii) the costs of the Authorized Improvements, and (iv) the ability of different property types to utilize and benefit from the Authorized Improvements. Improvement Area #4 Having taken into consideration the matters described above; the City Council has determined that allocating the Improvement Area #4 Assessments among Parcels of Improvement Area #4 Assessed Property based on average home value is best accomplished by creating classifications of benefited Parcels based on the "Lot Types" defined above. These classifications from Lot Type 1 (Estate Lots) which represents the highest value to Lot Type 2 (Cottage Lots) representing the lowest value for residential lots are set forth in Table F -B-1. Improvement Area #4 Assessments are allocated to each Lot Type on the basis of the average home value for each class of lot. This is accomplished by giving each Lot Type an Equivalent Unit factor. Equivalent Units are the ratio of the average value of lots within each lot class, setting the Equivalent Unit factor for Lot Type 1 (Estate Lot) to 1.0. Table F -B-1 Equivalent Unit Factors - Improvement Area #4 Lot Type Lot Type 1 (Estate Lot) Lot Type 2 (Cottage Lot) Improvement Area #5 Estimated Average Unit Equivalent Unit Value Factor $4,250,000 1.00 Per dwelling unit $3,250,000 0.76 Per dwelling unit Having taken into consideration the matters described above; the City Council has determined that allocating the Improvement Area #5 Assessments among Parcels of Improvement Area #5 Assessed Property based on average home value is best accomplished by creating classifications of benefited Parcels based on the "Lot Types" defined above. These classifications from Lot Type 3 (70 Ft Lot) representing the highest value to Lot Type 6 (40 Ft Lot) representing the lowest value for residential lots are set forth in Table F -B-2. Improvement Area #5 Assessments are allocated to each Lot Type on the basis of the average home value for each class of lot. This is accomplished by giving each Lot Type an Equivalent Unit factor. Equivalent Units are the ratio of the average value of lots within each lot class, setting the Equivalent Unit factor for Lot Type 3 (70 Ft Lots) to 1.0. Table F -B-2 Equivalent Unit Factors — Improvement Area #5 Estimated Average Unit Lot Type Value Equivalent Unit Factor Lot Type 3 (70 Ft Lot) $580,000 1.00 Per dwelling unit Lot Type 4 (60 Ft Lot) $530,000 0.91 Per dwelling unit Lot Type 5 (50 Ft Lot) $480,000 0.83 Per dwelling unit Lot Type 6 (40 Ft Lot) $430,000 0.74 Per dwelling unit Improvement Area #6 Having taken into consideration the matters described above; the City Council has determined that allocating the Improvement Area #6 Assessments among Parcels of Improvement Area #6 Assessed Property based on average home value is best accomplished by creating classifications of benefited Parcels based on the "Lot Types" defined above. These classifications from Lot Type 3 (70 Ft Lot) representing the highest value to Lot Type 6 (40 Ft Lot) representing the lowest value for residential lots are set forth in Table F -B-3. Improvement Area #6 Assessments are allocated to each Lot Type on the basis of the average home value for each class of lot. This is accomplished by giving each Lot Type an Equivalent Unit factor. Equivalent Units are the ratio of the average value of lots within each lot class, setting the Equivalent Unit factor for Lot Type 3 (70 Ft Lots) to 1.0. Table F -B-3 Equivalent Unit Factors — Improvement Area #6 Estimated Average Unit Lot Type Value Equivalent Unit Factor Lot Type 3 (70 Ft Lot) $580,000 1.00 Per dwelling unit Lot Type 4 (60 Ft Lot) $530,000 0.91 Per dwelling unit Lot Type 5 (50 Ft Lot) $480,000 0.83 Per dwelling unit Lot Type 6 (40 Ft Lot) $430,000 0.74 Per dwelling unit Lot Type 7 (4 -pack Lot) $480,000 0.83 Per dwelling unit C) Original Allocation of Assessments to Lots within Improvement Area #4 The total estimated Equivalent Units for Improvement Area #4 Assessed Property are shown in Table F -C-1 as calculated based on the Equivalent Unit factors shown in Table F -B-1, estimated Lot Types and number of units estimated to be built within Improvement Area #4. Table F -C-1 Estimated Equivalent Units - Improvement Area #4 Total Planned Equivalent Equivalent Lot Type No. of units Unit Factor Units Lot Type 1 (Estate Lots) 100 1.00 100.00 Lot Type 2 (Cottage Lots) 36 0.76 27.36 Total 136 127.36 As shown in Section IV of this Service and Assessment Plan, the total amount of the original obligation under the Improvement Area #4 Reimbursement Agreement, which represents the total Improvement Area #4 Assessment to be allocated on all Parcels of Improvement Area #4 Assessed Property, is $16,630,000. As shown in Table F -C-1, there are a total of 127.36 estimated Equivalent Units in Improvement Area #4, resulting in an original Assessment per Equivalent Unit of $130,574.75. The original Improvement Area #4 Assessment per dwelling unit is calculated as the product of (i) $130,574.75 multiplied by (ii) the applicable Equivalent Unit value for each Lot Type. For example, the original Improvement Area #4 Assessment for a Lot Type 1 (Estate Lot) dwelling unit is $130,574.75 (i.e. $130,574.75 x 1.00). The original Improvement Area #4 Assessment for a Lot Type 2 (Cottage Lot) dwelling unit is $99,236.81 (i.e. $130,574.75 x 0.76), Table F -C-2 sets forth the original Assessment per dwelling unit for each Lot Type in Improvement Area #4. Table F -C-2 Assessment Per Unit — Improvement Area #4 - Original Assessment Planned per Equivalent No. of Equivalent Unit Total Type Units Unit Factor Assessment per Unit Assessments Lot Type 1 (Estate Lots) 100 $130,574.75 1.00 $130,574.75 Per dwelling unit $13,057,475 Lot Type 2 (Cottage Lots) 36 $130,574.75 0.76 $99,236.81 Per dwelling unit $3,572,525 Total 136 $16,630,000 The original projected leverage calculated based on the estimated land values, finished lot values and home values for each unit in Improvement Area #4 is shown in Table F -C-3. Table F -C-3 Projected Leverage — Improvement Area #4 - Original Planned Estimated Projected Leverage Leverage No. of Finished Lot Home Value Assessment (Lot (Home Description Units Value per unit per unit per Unit Value) Value) Lot Type 1 (Estate Lots) 100 $1,500,000 $4,250,000 $130,574.75 11.49 32.55 Lot Type 2 (Cottage Lots) 36 $1,000,000 $3,250,000 $99,236.81 10.08 32.75 The original projected tax rate equivalent per unit calculated based on the estimated finished lot values and home values for each unit in Improvement Area #4 is shown in Table F -C-4. Table F -C-4 Estimated Tax Rate Equivalent per unit — Improvement Area #4 - Original Projected Projected Tax Rate Tax Rate Planned Estimated Home Average Annual Equivalent Equivalent No. of Finished Lot Value per Installment per (per $100 (per $100 Description Units Value per unit unit unit Lot Value) Home Value) Lot Type 1 (Estate Lots) 100 $1,500,000 $4,250,000 $12,225.75 $0.8150 $0.2877 Lot Type 2 (Cottage Lots) 36 $1,000,000 $3,250,000 $9,304.88 $0.9305 $0.2863 D) Undated Allocation of Assessments to Lots within Improvement Area #4 As shown in Section IV of this Service and Assessment Plan, the Improvement Area #4 portion of the Improvement Area #4 and #5 Bonds, which represents the total updated Improvement Area #4 Assessment to be allocated on all Parcels of Improvement Area #4 Assessed Property, is $16,255,000. As shown in Table F -C-1, there are a total of 127.36 estimated Equivalent Units in Improvement Area #4, resulting in an updated Assessment per Equivalent Unit of $127,630.34. The updated Improvement Area #4 Assessment per dwelling unit is calculated as the product of (i) $127,630.34 multiplied by (ii) the applicable Equivalent Unit value for each Lot Type. For example, the updated Improvement Area #4 Assessment for a Lot Type 1 (Estate Lot) dwelling unit is $127,630.34 (i.e. $127,630.34 x 1.00). The updated Improvement Area #4 Assessment for a Lot Type 2 (Cottage Lot) dwelling unit is $96,999.06 (i.e. $127,630.34 x 0.76), Table F -D-1 sets forth the updated Assessment per dwelling unit for each Lot Type in Improvement Area #4. Table F -D-1 Assessment Per Unit — Improvement Area #4 - Updated Assessment Planned per Equivalent No. of Equivalent Unit Total Type Units Unit Factor Assessment per Unit Assessments Lot Type 1 (Estate Lots) 100 $127,630.34 1.00 $127,630.34 Per dwelling unit $12,763,034 Lot Type 2 (Cottage Lots) 36 $127,630.34 0.76 $96,999.06 Per dwelling unit $3,491,966 Total 136 $16,255,000 The updated projected leverage calculated based on the estimated land values, finished lot values and home values for each unit in Improvement Area #4 is shown in Table F -D-2. Table F -D-2 Projected Leverage — Improvement Area #4 - Updated Planned Estimated Projected Leverage Leverage No. of Finished Lot Home Value Assessment (Lot (Home Description Units Value per unit per unit per Unit Value) Value) Lot Type 1 (Estate Lots) 100 $1,500,000 $4,250,000 $127,630.34 11.75 33.30 Lot Type 2 (Cottage Lots) 36 $1,000,000 $3,250,000 $96,999.06 10.31 33.51 The updated projected tax rate equivalent per unit calculated based on the estimated finished lot values and home values for each unit in Improvement Area #4 is shown in Table F -D-3. Table F -D-3 Estimated Tax Rate Equivalent per unit — Improvement Area #4 - Updated Projected Projected Tax Rate Tax Rate Planned Estimated Home Average Annual Equivalent Equivalent No. of Finished Lot Value per Installment per (per $100 (per $100 Description Units Value per unit unit unit Lot Value) Home Value) Lot Type 1 (Estate Lots) 100 $1,500,000 $4,250,000 $10,453.60 $0.6969 $0.2460 Lot Type 2 (Cottage Lots) 36 $1,000,000 $3,250,000 $7,944.74 $0.7945 $0.2445 The updated Improvement Area #4 Assessment and Annual Installments for each Parcel of Improvement Area #4 Assessed Property is shown on the Improvement Area #4 Assessment Roll, attached as Appendix G, and no Improvement Area #4 Assessment shall be changed except as authorized by this Service and Assessment Plan and the PID Act. E) Original Allocation of Assessments to Lots within Improvement Area #5 The total estimated Equivalent Units for Improvement Area #5 Assessed Property are shown in Table F -E-1 as calculated based on the Equivalent Unit factors shown in Table F -B-2, estimated Lot Types and number of units estimated to be built within Improvement Area #5. Table F -E-1 Estimated Equivalent Units - Improvement Area #5 Total Planned Equivalent Equivalent Lot Type No. of units Unit Factor Units Lot Type 3 (70 Ft Lot) 39 1.00 39.00 Lot Type 4 (60 Ft Lot) 38 0.91 34.58 Lot Type 5 (50 Ft Lot) 163 0.83 135.29 Lot Type 6 (40 Ft Lot) 37 0.74 27.38 Total 277 236.25 As shown in Section IV of this Service and Assessment Plan, the total amount of the obligation under the Improvement Area #5 Reimbursement Agreement, which represents the total original Improvement Area #5 Assessment to be allocated on all Parcels of Improvement Area #5 Assessed Property, is $6,809,000. As shown in Table F -E-1, there are a total of 236.25 estimated Equivalent Units in Improvement Area #5, resulting in an original Improvement Area #5 Assessment per Equivalent Unit of $28,821.16. The original Improvement Area #5 Assessment per dwelling unit is calculated as the product of (i) $28,821.16 multiplied by (ii) the applicable Equivalent Unit value for each Lot Type. For example, the original Improvement Area #5 Assessment for a Lot Type 3 (70 Ft Lot) dwelling unit is $28,821.16 (i.e. $28,821.16 x 1.00). The original Improvement Area #5 Assessment for a Lot Type 4 (60 Ft Lot) dwelling unit is $26,227.26 (i.e. $28,821.16 x 0.91), and so on. Table F -E-2 sets forth the projected original Improvement Area #5 Assessment per dwelling unit for each Lot Type in Improvement Area #5. Table F -E-2 Assessment Per Unit — Improvement Area #5 - Original Assessment Planned per Equivalent No. of Equivalent Unit Total Type Units Unit Factor Assessment per Unit Assessments Lot Type 3 (70 Ft Lot) 39 $28,821.16 1.00 $28,821.16 Per dwelling unit $1,124,025 Lot Type 4 (60 Ft Lot) 38 $28,821.16 0.91 $26,227.26 Per dwelling unit $996,636 Lot Type 5 (50 Ft Lot) 163 $28,821.16 0.83 $23,921.57 Per dwelling unit $3,899,215 Lot Type 6 (40 Ft Lot) 37 $28,821.16 0.74 $21,327.66 Per dwelling unit $789,123 Total 277 $6,809,000 The original projected leverage calculated based on the estimated land values, finished lot values and home values for each unit in Improvement Area #5 is shown in Table F -E-3. Table F -E-3 Projected Leverage — Improvement Area #5 — Original Planned Estimated Projected Leverage Leverage No. of Finished Lot Home Value Assessment (Lot (Home Description Units Value per unit per unit per Unit Value) Value) Lot Type 3 (70 Ft Lot) 39 $169,000 $580,000 $28,821.16 5.86 20.12 Lot Type 4 (60 Ft Lot) 38 $148,000 $530,000 $26,227.26 5.64 20.21 Lot Type 5 (50 Ft Lot) 163 $126,000 $480,000 $23,921.57 5.27 20.07 Lot Type 6 (40 Ft Lot) 37 $105,000 $430,000 $21,327.66 4.92 20.16 The original projected tax rate equivalent per unit calculated based on the estimated finished lot values and home values for each unit in Improvement Area #5 is shown in Table F -E-4. Table F -E-4 Estimated Tax Rate Equivalent per unit — Improvement Area #5 — Original Projected Projected Tax Rate Tax Rate Planned Estimated Home Average Annual Equivalent Equivalent No. of Finished Lot Value per Installment per (per $100 (per $100 Description Units Value per unit unit unit Lot Value) Home Value) Lot Type 3 (70 Ft Lot) 39 $169,000 $580,000 $2,966.53 $1.7553 $0.5115 Lot Type 4 (60 Ft Lot) 38 $148,000 $530,000 $2,699.54 $1.8240 $0.5093 Lot Type 5 (50 Ft Lot) 163 $126,000 $480,000 $2,462.22 $1.9541 $0.5130 Lot Type 6 (40 Ft Lot) 37 $105,000 $430,000 $2,195.23 $2.0907 $0.5105 The original Improvement Area #5 Assessment and Annual Installments for each Parcel of Improvement Area #5 Assessed Property is shown on the Improvement Area #5 Assessment Roll, attached as Appendix H, and no Improvement Area #5 Assessment shall be changed except as authorized by this Service and Assessment Plan and the PID Act. F) Undated Allocation of Assessments to Lots within Improvement Area #5 As shown in Section IV of this Service and Assessment Plan, the Improvement Area #5 portion of the Improvement Area #4 and #5 Bonds, which represents the total updated Improvement Area #5 Assessment to be allocated on all Parcels of Improvement Area #5 Assessed Property, is $6,763,000. As shown in Table F -E-1, there are a total of 236.25 estimated Equivalent Units in Improvement Area #5, resulting in an updated Improvement Area #5 Assessment per Equivalent Unit of $ $28,626.46. The updated Improvement Area #5 Assessment per dwelling unit is calculated as the product of (i) $28,626.46 multiplied by (ii) the applicable Equivalent Unit value for each Lot Type. For example, the updated Improvement Area #5 Assessment for a Lot Type 3 (70 Ft Lot) dwelling unit is $28,626.46 (i.e. $28,626.46 x 1.00). The updated Improvement Area #5 Assessment for a Lot Type 4 (60 Ft Lot) dwelling unit is $26,050.07 (i.e. $28,626.46 x 0.91), and so on. Table F -F-1 sets forth the updated Improvement Area #5 Assessment per dwelling unit for each Lot Type in Improvement Area #5 Table F -F-1 Assessment Per Unit — Improvement Area #5 — Updated Assessment Planned per Equivalent No. of Equivalent Unit Total Type Units Unit Factor Assessment per Unit Assessments Lot Type 3 (70 Ft Lot) 39 $28,626.46 1.00 $28,626.46 Per dwelling unit $1,116,432 Lot Type 4 (60 Ft Lot) 38 $28,626.46 0.91 $26,050.07 Per dwelling unit $989,903 Lot Type 5 (50 Ft Lot) 163 $28,626.46 0.83 $23,759.96 Per dwelling unit $3,872,873 Lot Type 6 (40 Ft Lot) 37 $28,626.46 0.74 $21,183.58 Per dwelling unit $783,792 Total 277 $6,763,000 The updated projected leverage calculated based on the estimated land values, finished lot values and home values for each unit in Improvement Area #5 is shown in Table F -F-2. Table F -F-2 Projected Leverage — Improvement Area #5 - Updated Planned Estimated Projected Leverage Leverage No. of Finished Lot Home Value Assessment (Lot (Home Description Units Value per unit per unit per Unit Value) Value) Lot Type 3 (70 Ft Lot) 39 $169,000 $580,000 $28,626.46 5.90 20.26 Lot Type 4 (60 Ft Lot) 38 $148,000 $530,000 $26,050.07 5.68 20.35 Lot Type 5 (50 Ft Lot) 163 $126,000 $480,000 $23,759.96 5.30 20.20 Lot Type 6 (40 Ft Lot) 37 $105,000 $430,000 $21,183.58 4.96 20.30 The updated projected tax rate equivalent per unit calculated based on the estimated finished lot values and home values for each unit in Improvement Area #5 is shown in Table F -F-3. Table F -F-3 Estimated Tax Rate Equivalent per unit — Improvement Area #5 - Updated Projected Projected Tax Rate Tax Rate Planned Estimated Home Average Annual Equivalent Equivalent No. of Finished Lot Value per Installment per (per $100 (per $100 Description Units Value per unit unit unit Lot Value) Home Value) Lot Type 3 (70 Ft Lot) 39 $169,000 $580,000 $2,632.64 $1.5578 $0.4539 Lot Type 4 (60 Ft Lot) 38 $148,000 $530,000 $2,395.70 $1.6187 $0.4520 Lot Type 5 (50 Ft Lot) 163 $126,000 $480,000 $2,185.09 $1.7342 $0.4552 Lot Type 6 (40 Ft Lot) 37 $105,000 $430,000 $1,948.15 $1.8554 $0.4531 The updated Improvement Area #5 Assessment and Annual Installments for each Parcel of Improvement Area #5 Assessed Property is shown on the Improvement Area #5 Assessment Roll, attached as Appendix H, and no Improvement Area #5 Assessment shall be changed except as authorized by this Service and Assessment Plan and the PID Act. G) Allocation of Assessments to Lots within Improvement Area #6 The total estimated Equivalent Units for Improvement Area #6 Assessed Property are shown in Table F -G-1 as calculated based on the Equivalent Unit factors shown in Table F -B-3, estimated Lot Types and number of units estimated to be built within Improvement Area #6. Table F -G-1 Estimated Equivalent Units - Improvement Area #6 Total Planned Equivalent Equivalent Lot Type No. of units Unit Factor Units Lot Type 3 (70 Ft Lot) 64 1.00 64.00 Lot Type 4 (60 Ft Lot) 166 0.91 151.06 Lot Type 5 (50 Ft Lot) 115 0.83 95.45 Lot Type 6 (40 Ft Lot) 188 0.74 139.12 Lot Type 7 (4 -pack Lot) 56 0.83 46.48 Total 589 496.11 As shown in Section IV of this Service and Assessment Plan, the total amount of the obligation under the Improvement Area #6 Reimbursement Agreement, which represents the total original Improvement Area #6 Assessment to be allocated on all Parcels of Improvement Area #6 Assessed Property, is $30,380,000. As shown in Table F -G-1, there are a total of 496.11 estimated Equivalent Units in Improvement Area #6, resulting in an original Improvement Area #6 Assessment per Equivalent Unit of $61,236.42. The original Improvement Area #6 Assessment per dwelling unit is calculated as the product of (i) $61,236.42 multiplied by (ii) the applicable Equivalent Unit value for each Lot Type. For example, the original Improvement Area #6 Assessment for a Lot Type 3 (70 Ft Lot) dwelling unit is $61,236.42 (i.e. $61,236.42 x 1.00). The Improvement Area #6 Assessment for a Lot Type 4 (60 Ft Lot) dwelling unit is $55,725.14 (i.e. $61,236.42 x 0.91), and so on. Table F -G-2 sets forth the projected original Improvement Area #6 Assessment per dwelling unit for each Lot Type in Improvement Area #6. Table F -G-2 Assessment Per Unit — Improvement Area #6 Assessment Planned per Equivalent No. of Equivalent Unit Total Type Units Unit Factor Assessment per Unit Assessments Lot Type 3 (70 Ft Lot) 64 $61,236.42 1.00 $61,236.42 Per dwelling unit $3,919,131 Lot Type 4 (60 Ft Lot) 166 $61,236.42 0.91 $55,725.14 Per dwelling unit $9,250,374 Lot Type 5 (50 Ft Lot) 115 $61,236.42 0.83 $50,826.23 Per dwelling unit $5,845,016 Lot Type 6 (40 Ft Lot) 188 $61,236.42 0.74 $45,314.95 Per dwelling unit $8,519,211 Lot Type 7 (4 -pack Lot) 56 $61,236.42 0.83 $50,826.23 Per dwelling unit $2,846,269 Total 589 $30,380,000 The projected leverage calculated based on the estimated land values, finished lot values and home values for each unit in Improvement Area #6 is shown in Table F -G-3. Table F -G-3 Projected Leverage — Improvement Area #6 Planned Estimated Projected Leverage Leverage No. of Finished Lot Home Value Assessment (Lot (Home Description Units Value per unit per unit per Unit Value) Value) Lot Type 3 (70 Ft Lot) 64 $169,000 $580,000 $61,236.42 2.76 9.47 Lot Type 4 (60 Ft Lot) 166 $148,000 $530,000 $55,725.14 2.66 9.51 Lot Type 5 (50 Ft Lot) 115 $126,000 $480,000 $50,826.23 2.48 9.44 Lot Type 6 (40 Ft Lot) 188 $105,000 $430,000 $45,314.95 2.32 9.49 Lot Type 7 (4 -pack Lot) 56 $126,000 $480,000 $50,826.23 2.48 9.44 The projected tax rate equivalent per unit calculated based on the estimated finished lot values and home values for each unit in Improvement Area #6 is shown in Table F -G-4. Table F -G-4 Estimated Tax Rate Equivalent per unit — Improvement Area #6 Projected Projected Tax Rate Tax Rate Planned Estimated Home Average Annual Equivalent Equivalent No. of Finished Lot Value per Installment per (per $100 (per $100 Description Units Value per unit unit unit Lot Value) Home Value)' Lot Type 3 (70 Ft Lot) 64 $169,000 $580,000 $5,692.48 $3.3683 $0.9815 Lot Type 4 (60 Ft Lot) 166 $148,000 $530,000 $5,180.15 $3.5001 $0.9774 Lot Type 5 (50 Ft Lot) 115 $126,000 $480,000 $4,724.76 $3.7498 $0.9843 Lot Type 6 (40 Ft Lot) 188 $105,000 $430,000 $4,212.43 $4.0118 $0.9796 Lot Type 7 (4 -pack Lot) 56 $126,000 $480,000 $4,724.76 $3.7498 $0.9843 'Does not include annual reduction from TIRZ Annual Credit Amount to achieve the Target Net Tax Rate Equivalent of $0.46. The Improvement Area #6 Assessment and Annual Installments for each Parcel of Improvement Area #6 Assessed Property is shown on the Improvement Area #6 Assessment Roll, attached as Appendix I, and no Improvement Area #6 Assessment shall be changed except as authorized by this Service and Assessment Plan and the PID Act. APPENDIX G IMPROVEMENT AREA #4 ASSESSMENT ROLL Appendix G-1 Improvement Area #4 Assessment Roll Parcels Assessment Total Equivalent Units Additional See Appendix G-4 $16,255,000 127.36 Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment 2027 $264,000 $893,568 $95,000 $79,243 $1,331,811 2028 $251,000 $903,940 $96,900 $79,955 $1,331,795 2029 $262,000 $892,018 $98,838 $78,700 $1,331,556 2030 $274,000 $879,573 $100,815 $77,390 $1,331,777 2031 $286,000 $866,558 $102,831 $76,020 $1,331,409 2032 $299,000 $852,973 $104,888 $74,590 $1,331,450 2033 $312,000 $838,770 $106,985 $73,095 $1,330,850 2034 $327,000 $823,950 $109,125 $71,535 $1,331,610 2035 $342,000 $808,418 $111,308 $69,900 $1,331,625 2036 $357,000 $792,173 $113,534 $68,190 $1,330,896 2037 $374,000 $775,215 $115,804 $66,405 $1,331,424 2038 $394,000 $754,458 $118,121 $64,535 $1,331,114 2039 $416,000 $732,591 $120,483 $62,565 $1,331,639 2040 $438,000 $709,503 $122,893 $60,485 $1,330,881 2041 $462,000 $685,194 $125,350 $58,295 $1,330,839 2042 $488,000 $659,553 $127,857 $55,985 $1,331,395 2043 $515,000 $632,469 $130,415 $53,545 $1,331,429 2044 $543,000 $603,887 $133,023 $50,970 $1,330,879 2045 $574,000 $573,750 $135,683 $48,255 $1,331,688 2046 $606,000 $541,893 $138,397 $45,385 $1,331,675 2047 $640,000 $508,260 $141,165 $42,355 $1,331,780 2048 $678,000 $469,860 $143,988 $39,155 $1,331,003 2049 $720,000 $429,180 $146,868 $35,765 $1,331,813 2050 $763,000 $385,980 $149,805 $32,165 $1,330,950 2051 $810,000 $340,200 $152,802 $28,350 $1,331,352 2052 $860,000 $291,600 $155,858 $24,300 $1,331,758 2053 $912,000 $240,000 $158,975 $20,000 $1,330,975 2054 $968,000 $185,280 $162,154 $15,440 $1,330,874 2055 $1,028,000 $127,200 $165,397 $10,600 $1,331,197 2056 $1,092,000 $65,520 $168,705 $5,460 $1,331,685 Total $16,255,000 $18,263,531 $3,853,968 $1,568,633 $39,941,131 'The interest is calculated using an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 11 through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. Appendix G-2 Improvement Area #4 Assessment Roll by Lot Type Parcel Lot Type 1 (Estate Lot) Assessment $127,630.34 Equivalent Units Additional 1.00 Administrative Interest Total Annual Year Principal Interest' Expenses Component Installment 2027 $2,073 $7,016 $746 $622 $10,457 2028 $1,971 $7,098 $761 $628 $10,457 2029 $2,057 $7,004 $776 $618 $10,455 2030 $2,151 $6,906 $792 $608 $10,457 2031 $2,246 $6,804 $807 $597 $10,454 2032 $2,348 $6,697 $824 $586 $10,454 2033 $2,450 $6,586 $840 $574 $10,450 2034 $2,568 $6,469 $857 $562 $10,455 2035 $2,685 $6,347 $874 $549 $10,456 2036 $2,803 $6,220 $891 $535 $10,450 2037 $2,937 $6,087 $909 $521 $10,454 2038 $3,094 $5,924 $927 $507 $10,452 2039 $3,266 $5,752 $946 $491 $10,456 2040 $3,439 $5,571 $965 $475 $10,450 2041 $3,628 $5,380 $984 $458 $10,449 2042 $3,832 $5,179 $1,004 $440 $10,454 2043 $4,044 $4,966 $1,024 $420 $10,454 2044 $4,264 $4,742 $1,044 $400 $10,450 2045 $4,507 $4,505 $1,065 $379 $10,456 2046 $4,758 $4,255 $1,087 $356 $10,456 2047 $5,025 $3,991 $1,108 $333 $10,457 2048 $5,323 $3,689 $1,131 $307 $10,451 2049 $5,653 $3,370 $1,153 $281 $10,457 2050 $5,991 $3,031 $1,176 $253 $10,450 2051 $6,360 $2,671 $1,200 $223 $10,453 2052 $6,753 $2,290 $1,224 $191 $10,457 2053 $7,161 $1,884 $1,248 $157 $10,450 2054 $7,601 $1,455 $1,273 $121 $10,450 2055 $8,072 $999 $1,299 $83 $10,452 2056 $8,574 $514 $1,325 $43 $10,456 Total $127,630 $143,401 $30,260 $12,317 $313,608 'The interest is calculated using an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 1 ] through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. Appendix G-3 Improvement Area #4 Assessment Roll by Lot Type Parcel Lot Type 2 (Cottage Lot) Assessment $96,999.06 Equivalent Units Additional 0.76 Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment 2027 $1,575 $5,332 $567 $473 $7,947 2028 $1,498 $5,394 $578 $477 $7,947 2029 $1,563 $5,323 $590 $470 $7,946 2030 $1,635 $5,249 $602 $462 $7,947 2031 $1,707 $5,171 $614 $454 $7,945 2032 $1,784 $5,090 $626 $445 $7,945 2033 $1,862 $5,005 $638 $436 $7,942 2034 $1,951 $4,917 $651 $427 $7,946 2035 $2,041 $4,824 $664 $417 $7,946 2036 $2,130 $4,727 $677 $407 $7,942 2037 $2,232 $4,626 $691 $396 $7,945 2038 $2,351 $4,502 $705 $385 $7,943 2039 $2,482 $4,372 $719 $373 $7,946 2040 $2,614 $4,234 $733 $361 $7,942 2041 $2,757 $4,089 $748 $348 $7,942 2042 $2,912 $3,936 $763 $334 $7,945 2043 $3,073 $3,774 $778 $320 $7,945 2044 $3,240 $3,604 $794 $304 $7,942 2045 $3,425 $3,424 $810 $288 $7,947 2046 $3,616 $3,234 $826 $271 $7,947 2047 $3,819 $3,033 $842 $253 $7,947 2048 $4,046 $2,804 $859 $234 $7,943 2049 $4,296 $2,561 $876 $213 $7,947 2050 $4,553 $2,303 $894 $192 $7,942 2051 $4,834 $2,030 $912 $169 $7,945 2052 $5,132 $1,740 $930 $145 $7,947 2053 $5,442 $1,432 $949 $119 $7,942 2054 $5,776 $1,106 $968 $92 $7,942 2055 $6,134 $759 $987 $63 $7,944 2056 $6,516 $391 $1,007 $33 $7,947 Total $96,999 $108,985 $22,998 $9,361 $238,342 'The interest is calculated using an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 11 through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. Appendix G4 Improvement Area #4 Assessment Roll Summary Equivalent Outstanding Administrative Additional Annual Parcel ID Block # Lot # Lot Type Units Assessment Principal Interest Expense Interest Installment 43201159 1 Various 3 Total Lots 2.52 $321,628 $5,224 $17,681 $1,880 $1,568 $26,352 43201281 2 13 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201272 2 12 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201264 2 11 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201256 2 10 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201248 2 9 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201230 2 8 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201221 2 7 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201213 2 6 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201205 2 5 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201191 2 4 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201183 2 3 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201175 2 2 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201167 2 1 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201141 1 120 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201132 1 119 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201124 1 118 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201116 1 117 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201108 1 116 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201094 1 115 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201086 1 114 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201078 1 113 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201060 1 112 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201051 1 111 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201043 1 110 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201035 1 109 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201027 1 108 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201019 1 107 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43201001 1 106 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200993 1 105 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200985 1 104 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200977 1 103 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200969 1 102 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200951 1 101 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200942 1 100 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200934 1 99 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200926 1 98 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200918 1 97 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200900 1 96 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200896 1 95 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200888 1 94 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200870 1 93 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200861 1 92 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200853 1 91 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200845 1 90 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200837 1 89 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200829 1 88 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200811 1 87 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200802 1 86 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200799 1 85 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200781 1 84 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200772 1 83 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200764 1 82 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200756 1 81 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200748 1 80 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200730 1 79 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200721 1 78 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200713 1 77 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200705 1 76 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200691 1 75 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200683 1 74 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200675 1 73 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200667 1 72 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200659 1 71 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200641 1 70 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200632 1 69 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200624 1 68 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200616 1 67 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200608 1 66 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200594 1 65 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200586 1 64 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200578 1 63 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 Appendix G-4 Improvement Area #4 Assessment Roll Summary Equivalent Outstanding Administrative Additional Annual Parcel ID Block # Lot # Lot Type Units Assessment Principal Interest Expense Interest Installment 43200560 1 62 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200551 1 61 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200543 1 60 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200535 1 59 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200527 1 58 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200519 1 57 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200501 1 56 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200497 1 55 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200489 1 54 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200471 1 53 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200462 1 52 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200454 1 51 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200446 1 50 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200438 1 49 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200420 1 48 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200411 1 47 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200403 1 46 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200390 1 45 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200381 1 44 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200373 1 43 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200365 1 42 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200357 1 41 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200349 1 40 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200331 1 39 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200322 1 38 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200314 1 37 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200306 1 36 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200292 1 35 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200284 1 34 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200276 1 33 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200268 1 32 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200250 1 31 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200241 1 30 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200233 1 29 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200225 1 28 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200217 1 27 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200209 1 26 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200195 1 25 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200187 1 24 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200179 1 23 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200161 1 22 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200152 1 21 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200144 1 20 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200136 1 19 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200128 1 18 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200110 1 17 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200101 1 16 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200098 1 15 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200080 1 14 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200071 1 13 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200063 1 12 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200055 1 11 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200047 1 10 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200039 1 9 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200021 1 8 Estate Lot 1.00 $127,630 $2,073 $7,016 $746 $622 $10,457 43200012 1 7 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43200004 1 6 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43199995 1 5 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43199987 1 4 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43199979 1 3 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43199961 1 2 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 43199952 1 1 Cottage Lot 0.76 $96,999 $1,575 $5,332 $567 $473 $7,947 Total 127.36 $16,255,000 $264,000 $893,568 $95,000 $79,243 $1,331,811 APPENDIX H IMPROVEMENT AREA #5 ASSESSMENT ROLL Appendix H-1 Improvement Area #5 Assessment Roll Parcels Assessment Total Equivalent Units Additional See Appendix H-6 $6,763,000 236.25 Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment 2027 $124,000 $370,181 $95,000 $32,970 $622,150 2028 $118,000 $373,783 $96,900 $33,195 $621,878 2029 $122,000 $368,178 $98,838 $32,605 $621,621 2030 $127,000 $362,383 $100,815 $31,995 $622,192 2031 $131,000 $356,350 $102,831 $31,360 $621,541 2032 $136,000 $350,128 $104,888 $30,705 $621,720 2033 $141,000 $343,668 $106,985 $30,025 $621,678 2034 $147,000 $336,970 $109,125 $29,320 $622,415 2035 $152,000 $329,988 $111,308 $28,585 $621,880 2036 $158,000 $322,768 $113,534 $27,825 $622,126 2037 $164,000 $315,263 $115,804 $27,035 $622,102 2038 $171,000 $306,161 $118,121 $26,215 $621,496 2039 $179,000 $296,670 $120,483 $25,360 $621,513 2040 $188,000 $286,736 $122,893 $24,465 $622,093 2041 $197,000 $276,302 $125,350 $23,525 $622,177 2042 $206,000 $265,368 $127,857 $22,540 $621,765 2043 $216,000 $253,935 $130,415 $21,510 $621,860 2044 $227,000 $241,947 $133,023 $20,430 $622,400 2045 $238,000 $229,349 $135,683 $19,295 $622,327 2046 $249,000 $216,140 $138,397 $18,105 $621,642 2047 $262,000 $202,320 $141,165 $16,860 $622,345 2048 $276,000 $186,600 $143,988 $15,550 $622,138 2049 $291,000 $170,040 $146,868 $14,170 $622,078 2050 $307,000 $152,580 $149,805 $12,715 $622,100 2051 $324,000 $134,160 $152,802 $11,180 $622,142 2052 $342,000 $114,720 $155,858 $9,560 $622,138 2053 $361,000 $94,200 $158,975 $7,850 $622,025 2054 $381,000 $72,540 $162,154 $6,045 $621,739 2055 $403,000 $49,680 $165,397 $4,140 $622,217 2056 $425,000 $25,500 $168,705 $2,125 $621,330 Total $6,763,000 $7,404,601 $3,853,968 $637,260 $18,658,828 'The interest is calculated using an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 11 through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. Appendix H-2 Improvement Area #5 Assessment Roll by Lot Type Parcel Lot Type 3 (70 Ft Lot) Assessment $28,626.46 Equivalent Units 1.00 Additional Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment 2027 $525 $1,567 $402 I $140 $2,633 2028 $499 $1,582 $410 $141 $2,632 2029 $516 $1,558 $418 $138 $2,631 2030 $538 $1,534 $427 $135 $2,634 2031 $554 $1,508 $435 $133 $2,631 2032 $576 $1,482 $444 $130 $2,632 2033 $597 $1,455 $453 $127 $2,631 2034 $622 $1,426 $462 $124 $2,635 2035 $643 $1,397 $471 $121 $2,632 2036 $669 $1,366 $481 $118 $2,633 2037 $694 $1,334 $490 $114 $2,633 2038 $724 $1,296 $500 $111 $2,631 2039 $758 $1,256 $510 $107 $2,631 2040 $796 $1,214 $520 $104 $2,633 2041 $834 $1,170 $531 $100 $2,634 2042 $872 $1,123 $541 $95 $2,632 2043 $914 $1,075 $552 $91 $2,632 2044 $961 $1,024 $563 $86 $2,634 2045 $1,007 $971 $574 $82 $2,634 2046 $1,054 $915 $586 $77 $2,631 2047 $1,109 $856 $598 $71 $2,634 2048 $1,168 $790 $609 $66 $2,633 2049 $1,232 $720 $622 $60 $2,633 2050 $1,299 $646 $634 $54 $2,633 2051 $1,371 $568 $647 $47 $2,633 2052 $1,448 $486 $660 $40 $2,633 2053 $1,528 $399 $673 $33 $2,633 2054 $1,613 $307 $686 $26 $2,632 2055 $1,706 $210 $700 $18 $2,634 2056 $1,799 $108 $714 $9 $2,630 Total $28,626 $31,342 $16,313 $2,697 $78,979 'The interest is calculated using an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 11 through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. Appendix H-3 Improvement Area #5 Assessment Roll by Lot Type Lot Type Lot Type 4 (60 Ft Lot) Assessment $26,0.50.07 Equivalent Units 0.91 Additional Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment 2027 $478 $1,426 $366 $127 $2,396 2028 $455 $1,440 $373 $128 $2,395 2029 $470 $1,418 $381 $126 $2,394 2030 $489 $1,396 $388 $123 $2,397 2031 $505 $1,373 $396 $121 $2,394 2032 $524 $1,349 $404 $118 $2,395 2033 $543 $1,324 $412 $116 $2,395 2034 $566 $1,298 $420 $113 $2,397 2035 $585 $1,271 $429 $110 $2,395 2036 $609 $1,243 $437 $107 $2,396 2037 $632 $1,214 $446 $104 $2,396 2038 $659 $1,179 $455 $101 $2,394 2039 $689 $1,143 $464 $98 $2,394 2040 $724 $1,104 $473 $94 $2,396 2041 $759 $1,064 $483 $91 $2,397 2042 $793 $1,022 $492 $87 $2,395 2043 $832 $978 $502 $83 $2,395 2044 $874 $932 $512 $79 $2,397 2045 $917 $883 $523 $74 $2,397 2046 $959 $833 $533 $70 $2,394 2047 $1,009 $779 $544 $65 $2,397 2048 $1,063 $719 $555 $60 $2,396 2049 $1,121 $655 $566 $55 $2,396 2050 $1,183 $588 $577 $49 $2,396 2051 $1,248 $517 $589 $43 $2,396 2052 $1,317 $442 $600 $37 $2,396 2053 $1,391 $363 $612 $30 $2,396 2054 $1,468 $279 $625 $23 $2,395 2055 $1,552 $191 $637 $16 $2,397 2056 $1,637 $98 $650 $8 $2,393 Total $26,050 $28,521 $14,845 $2,455 $71,871 'The interest is calculated using an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 11 through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. Appendix H-4 Improvement Area #5 Assessment Roll by Lot Type Lot Type Lot Type 5 (50 Ft Lot) Assessment $23,759.96 Equivalent Units 0.83 Additional Total Administrative Interest Annual Year Principal Interests Expenses Component Installment 2027 $436 $1,301 • $334 $116 $2,186 2028 $415 $1,313 $340 $117 $2,185 2029 $429 $1,293 $347 $115 $2,184 2030 $446 $1,273 $354 $112 $2,186 2031 $460 $1,252 $361 $110 $2,184 2032 $478 $1,230 $368 $108 $2,184 2033 $495 $1,207 $376 $105 $2,184 2034 $516 $1,184 $383 $103 $2,187 2035 $534 $1,159 $391 $100 $2,185 2036 $555 $1,134 $399 $98 $2,186 2037 $576 $1,108 $407 $95 $2,186 2038 $601 $1,076 $415 $92 $2,183 2039 $629 $1,042 $423 $89 $2,184 2040 $660 $1,007 $432 $86 $2,186 2041 $692 $971 $440 $83 $2,186 2042 $724 $932 $449 $79 $2,184 2043 $759 $892 $458 $76 $2,185 2044 $798 $850 $467 $72 $2,187 2045 $836 $806 $477 $68 $2,186 2046 $875 $759 $486 $64 $2,184 2047 $920 $711 $496 $59 $2,186 2048 $970 $656 $506 $55 $2,186 2049 $1,022 $597 $516 $50 $2,186 2050 $1,079 $536 $526 $45 $2,186 2051 $1,138 $471 $537 $39 $2,186 2052 $1,202 $403 $548 $34 $2,186 2053 $1,268 $331 $559 $28 $2,185 2054 $1,339 $255 $570 $21 $2,184 2055 $1,416 $175 $581 $15 $2,186 2056 $1,493 $90 $593 $7 $2,183 Total $23,760 $26,014 $13,540 $2,239 $65,553 'The interest is calculated using an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 11 through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. Appendix H-5 Improvement Area #5 Assessment Roll by Lot Type Lot Type Lot Type 6 (40 Ft Lot) Assessment $21,183.58 Equivalent Units 0.74 Additional Administrative Interest Total Annual Year Principal Interest' Ex enses2 Component Installment 2027 $388 $1,160 $298 I $103 $1,949 2028 $370 $1,171 $304 $104 $1,948 2029 $382 $1,153 $310 $102 $1,947 2030 $398 $1,135 $316 $100 $1,949 2031 $410 $1,116 $322 $98 $1,947 2032 $426 $1,097 $329 $96 $1,947 2033 $442 $1,076 $335 $94 $1,947 2034 $460 $1,055 $342 $92 $1,950 2035 $476 $1,034 $349 $90 $1,948 2036 $495 $1,011 $356 $87 $1,949 2037 $514 $987 $363 $85 $1,949 2038 $536 $959 $370 $82 $1,947 2039 $561 $929 $377 $79 $1,947 2040 $589 $898 $385 $77 $1,949 2041 $617 $865 $393 $74 $1,949 2042 $645 $831 $400 $71 $1,948 2043 $677 $795 $408 $67 $1,948 2044 $711 $758 $417 $64 $1,950 2045 $745 $718 $425 $60 $1,949 2046 $780 $677 $433 $57 $1,947 2047 $821 $634 $442 $53 $1,949 2048 $865 $584 $451 $49 $1,949 2049 $911 $533 $460 $44 $1,949 2050 $962 $478 $469 $40 $1,949 2051 $1,015 $420 $479 $35 $1,949 2052 $1,071 $359 $488 $30 $1,949 2053 $1,131 $295 $498 $25 $1,948 2054 $1,193 $227 $508 $19 $1,947 2055 $1,262 $156 $518 $13 $1,949 2056 $1,331 $80 $528 $7 $1,946 Total $21,184 $23,193 $12,072 $1,996 $58,445 'The interest is calculated using an interest rate of 4.75% in years 1 through 10 (2027-2036), 5.55% in years 11 through 20 (2037-2046), and 6.00% in years 21 through 30 (2047-2056). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. Appendix H-6 Improvement Area #5 Assessment Roll Summary Outstanding Administrative Additional Annual Parcel ID Total Lot Count Equivalent Units Assessment Principal Interest Expense Interest Installment 43124120 120 108.25 $3,098,814 $56,817 $169,617 $43,529 $15,107 $285,070 43218817 6 6.00 $171,759 $3,149 $9,401 $2,413 $837 $15,801 43124138 37 27.38 $783,792 $14,371 $42,902 $11,010 $3,821 $72,104 43188179 2 1.66 $47,520 $871 $2,601 $668 $232 $4,372 42724447 112 92.96 $2,661,115 $48,792 $145,659 $37,381 $12,973 $244,805 Total 277 236.25 $6,763,000 $124,000 $370,181 $95,000 $32,970 $622,150 APPENDIX I PROPOSED IMPROVEMENT AREA #6 ASSESSMENT ROLL Appendix I-1 Proposed Improvement Area #6 Assessment Roll Parcels See Appendix 1-7 Assessment $30,380,000 Total Equivalent Units 496.11 Additional Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment3 2028 $19,000 $2,705,339 $111,000 $0 $2,835,339 2029 $20,000 $2,703,647 $113,220 $0 $2,836,867 2030 $20,000 $2,701,866 $115,484 $0 $2,837,350 2031 $20,000 $2,700,085 $117,794 $0 $2,837,879 2032 $21,000 $2,698,304 $120,150 $0 $2,839,454 2033 $485,000 $2,219,524 $122,553 $0 $2,827,077 2034 $517,000 $2,183,974 $125,004 $0 $2,825,978 2035 $552,000 $2,146,077 $127,504 $0 $2,825,582 2036 $589,000 $2,105,616 $130,054 $0 $2,824,670 2037 $629,000 $2,062,442 $132,655 $0 $2,824,097 2038 $671,000 $2,016,336 $135,308 $0 $2,822,645 2039 $717,000 $1,967,152 $138,015 $0 $2,822,167 2040 $766,000 $1,914,596 $140,775 $0 $2,821,371 2041 $819,000 $1,858,448 $143,590 $0 $2,821,039 2042 $876,000 $1,798,416 $146,462 $0 $2,820,878 2043 $937,000 $1,734,205 $149,391 $0 $2,820,596 2044 $1,002,000 $1,665,523 $152,379 $0 $2,819,902 2045 $1,072,000 $1,592,076 $155,427 $0 $2,819,503 2046 $1,147,000 $1,513,498 $158,535 $0 $2,819,034 2047 $1,228,000 $1,429,423 $161,706 $0 $2,819,129 2048 $1,315,000 $1,339,411 $164,940 $0 $2,819,351 2049 $1,408,000 $1,243,021 $168,239 $0 $2,819,260 2050 $1,508,000 $1,139,815 $171,604 $0 $2,819,419 2051 $1,615,000 $1,029,279 $175,036 $0 $2,819,314 2052 $1,730,000 $910,899 $178,537 $0 $2,819,436 2053 $1,854,000 $784,090 $182,107 $0 $2,820,197 2054 $1,986,000 $648,192 $185,749 $0 $2,819,941 2055 $2,129,000 $502,618 $189,464 $0 $2,821,082 2056 $2,281,000 $346,562 $193,254 $0 $2,820,816 2057 $2,447,000 $179,365 $197,119 $0 $2,823,484 Total $30,380,000 $49,839,800 $4,503,057 $0 $84,722,857 'The interest is calculated using an estimated interest rate of 8.91% for years 1 through 5 (2028-2032) and 7.33% for years 6 through 30 (2033-2057). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. 3The Annual Installments shown do not include any TIRZ Annual Credit Amount. Appendix I-2 Proposed Improvement Area #6 Assessment Roll by Lot Type Lot Type Lot Type 3 (70 Ft Lot) Assessment $61,236.42 Equivalent Units 1.00 Additional Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment3 2028 $38 $5,453 $224 $0 $5,715 2029 $40 $5,450 $228 $0 $5,718 2030 $40 $5,446 $233 $0 $5,719 2031 $40 $5,443 $237 $0 $5,720 2032 $42 $5,439 $242 $0 $5,723 2033 $978 $4,474 $247 $0 $5,698 2034 $1,042 $4,402 $252 $0 $5,696 2035 $1,113 $4,326 $257 $0 $5,695 2036 $1,187 $4,244 $262 $0 $5,694 2037 $1,268 $4,157 $267 $0 $5,692 2038 $1,353 $4,064 $273 $0 $5,690 2039 $1,445 $3,965 $278 $0 $5,689 2040 $1,544 $3,859 $284 $0 $5,687 2041 $1,651 $3,746 $289 $0 $5,686 2042 $1,766 $3,625 $295 $0 $5,686 2043 $1,889 $3,496 $301 $0 $5,685 2044 $2,020 $3,357 $307 $0 $5,684 2045 $2,161 $3,209 $313 $0 $5,683 2046 $2,312 $3,051 $320 $0 $5,682 2047 $2,475 $2,881 $326 $0 $5,682 2048 $2,651 $2,700 $332 $0 $5,683 2049 $2,838 $2,506 $339 $0 $5,683 2050 $3,040 $2,298 $346 $0 $5,683 2051 $3,255 $2,075 $353 $0 $5,683 2052 $3,487 $1,836 $360 $0 $5,683 2053 $3,737 $1,580 $367 $0 $5,685 2054 $4,003 $1,307 $374 $0 $5,684 2055 $4,291 $1,013 $382 $0 $5,686 2056 $4,598 $699 $390 $0 $5,686 2057 $4,932 $362 $397 $0 $5,691 Total $61,236 $100,461 $9,077 $0 $170,774 'The interest is calculated using an estimated interest rate of 8.91% for years 1 through 5 (2028-2032) and 7.33% for years 6 through 30 (2033-2057). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. 3The Annual Installments shown do not include any TIRZ Annual Credit Amount. Appendix 1-3 Improvement Area #6 Assessment Roll by Lot Type Lot Type Lot Type 4 (60 Ft Lot) Assessment $55,725.14 Equivalent Units 0.91 Additional Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment3 2028 $35 $4,962 $204 $0 $5,201 2029 $37 $4,959 $208 $0 $5,204 2030 $37 $4,956 $212 $0 $5,204 2031 $37 $4,953 $216 $0 $5,205 2032 $39 $4,949 $220 $0 $5,208 2033 $890 $4,071 $225 $0 $5,186 2034 $948 $4,006 $229 $0 $5,184 2035 $1,013 $3,936 $234 $0 $5,183 2036 $1,080 $3,862 $239 $0 $5,181 2037 $1,154 $3,783 $243 $0 $5,180 2038 $1,231 $3,699 $248 $0 $5,177 2039 $1,315 $3,608 $253 $0 $5,177 2040 $1,405 $3,512 $258 $0 $5,175 2041 $1,502 $3,409 $263 $0 $5,175 2042 $1,607 $3,299 $269 $0 $5,174 2043 $1,719 $3,181 $274 $0 $5,174 2044 $1,838 $3,055 $280 $0 $5,172 2045 $1,966 $2,920 $285 $0 $5,172 2046 $2,104 $2,776 $291 $0 $5,171 2047 $2,252 $2,622 $297 $0 $5,171 2048 $2,412 $2,457 $303 $0 $5,171 2049 $2,583 $2,280 $309 $0 $5,171 2050 $2,766 $2,091 $315 $0 $5,172 2051 $2,962 $1,888 $321 $0 $5,171 2052 $3,173 $1,671 $327 $0 $5,172 2053 $3,401 $1,438 $334 $0 $5,173 2054 $3,643 $1,189 $341 $0 $5,173 2055 $3,905 $922 $348 $0 $5,175 2056 $4,184 $636 $354 $0 $5,174 2057 $4,488 $329 $362 $0 $5,179 Total $55,725 $91,420 $8,260 $0 $155,405 'The interest is calculated using an estimated interest rate of 8.91% for years 1 through 5 (2028-2032) and 7.33% for years 6 through 30 (2033-2057). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. 3The Annual Installments shown do not include any TIRZ Annual Credit Amount. Appendix I-4 Improvement Area #6 Assessment Roll by Lot Type Lot Type Lot Type 5 (50 Ft Lot) Assessment $50,826.23 Equivalent Units 0.83 Additional Total Administrative Interest Annual Year Principal Interest' Expenses2 Component Installment3 2028 $32 $4,526 $186 $0 $4,744 2029 $33 $4,523 $189 $0 $4,746 2030 $33 $4,520 $193 $0 $4,747 2031 $33 $4,517 $197 $0 $4,748 2032 $35 $4,514 $201 $0 $4,750 2033 $811 $3,713 $205 $0 $4,730 2034 $865 $3,654 $209 $0 $4,728 2035 $924 $3,590 $213 $0 $4,727 2036 $985 $3,523 $218 $0 $4,726 2037 $1,052 $3,450 $222 $0 $4,725 2038 $1,123 $3,373 $226 $0 $4,722 2039 $1,200 $3,291 $231 $0 $4,722 2040 $1,282 $3,203 $236 $0 $4,720 2041 $1,370 $3,109 $240 $0 $4,720 2042 $1,466 $3,009 $245 $0 $4,719 2043 $1,568 $2,901 $250 $0 $4,719 2044 $1,676 $2,786 $255 $0 $4,718 2045 $1,793 $2,664 $260 $0 $4,717 2046 $1,919 $2,532 $265 $0 $4,716 2047 $2,054 $2,391 $271 $0 $4,716 2048 $2,200 $2,241 $276 $0 $4,717 2049 $2,356 $2,080 $281 $0 $4,717 2050 $2,523 $1,907 $287 $0 $4,717 2051 $2,702 $1,722 $293 $0 $4,717 2052 $2,894 $1,524 $299 $0 $4,717 2053 $3,102 $1,312 $305 $0 $4,718 2054 $3,323 $1,084 $311 $0 $4,718 2055 $3,562 $841 $317 $0 $4,720 2056 $3,816 $580 $323 $0 $4,719 2057 $4,094 $300 $330 $0 $4,724 Total $50,826 $83,383 $7,534 $0 $141,743 'The interest is calculated using an estimated interest rate of 8.91% for years 1 through 5 (2028-2032) and 7.33% for years 6 through 30 (2033-2057). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. 3The Annual Installments shown do not include any TIRZ Annual Credit Amount. Appendix I-5 Improvement Area #6 Assessment Roll by Lot Type Lot Type Lot Type 6 (40 Ft Lot) Assessment $45,314.9.5 Equivalent Units 0.74 Additional Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment3 2028 $28 $4,035 $166 $0 $4,229 2029 $30 $4,033 $169 $0 $4,231 2030 $30 $4,030 $172 $0 $4,232 2031 $30 $4,027 $176 $0 $4,233 2032 $31 $4,025 $179 $0 $4,235 2033 $723 $3,311 $183 $0 $4,217 2034 $771 $3,258 $186 $0 $4,215 2035 $823 $3,201 $190 $0 $4,215 2036 $879 $3,141 $194 $0 $4,213 2037 $938 $3,076 $198 $0 $4,212 2038 $1,001 $3,008 $202 $0 $4,210 2039 $1,069 $2,934 $206 $0 $4,210 2040 $1,143 $2,856 $210 $0 $4,208 2041 $1,222 $2,772 $214 $0 $4,208 2042 $1,307 $2,683 $218 $0 $4,208 2043 $1,398 $2,587 $223 $0 $4,207 2044 $1,495 $2,484 $227 $0 $4,206 2045 $1,599 $2,375 $232 $0 $4,206 2046 $1,711 $2,258 $236 $0 $4,205 2047 $1,832 $2,132 $241 $0 $4,205 2048 $1,961 $1,998 $246 $0 $4,205 2049 $2,100 $1,854 $251 $0 $4,205 2050 $2,249 $1,700 $256 $0 $4,205 2051 $2,409 $1,535 $261 $0 $4,205 2052 $2,580 $1,359 $266 $0 $4,205 2053 $2,765 $1,170 $272 $0 $4,207 2054 $2,962 $967 $277 $0 $4,206 2055 $3,176 $750 $283 $0 $4,208 2056 $3,402 $517 $288 $0 $4,208 2057 $3,650 $268 $294 $0 $4,212 Total $45,315 $74,341 $6,717 $0 $126,373 'The interest is calculated using an estimated interest rate of 8.91% for years 1 through 5 (2028-2032) and 7.33% for years 6 through 30 (2033-2057). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. 3The Annual Installments shown do not include any TIRZ Annual Credit Amount. Appendix I-6 Improvement Area #6 Assessment Roll by Lot Type Lot Type Lot Type 7 (4 -pack Lot) Assessment $50,826.23 Equivalent Units 0.83 Additional Administrative Interest Total Annual Year Principal Interest' Expenses2 Component Installment3 2028 $32 $4,526 $186 $0 $4,744 2029 $33 $4,523 $189 $0 $4,746 2030 $33 $4,520 $193 $0 $4,747 2031 $33 $4,517 $197 $0 $4,748 2032 $35 $4,514 $201 $0 $4,750 2033 $811 $3,713 $205 $0 $4,730 2034 $865 $3,654 $209 $0 $4,728 2035 $924 $3,590 $213 $0 $4,727 2036 $985 $3,523 $218 $0 $4,726 2037 $1,052 $3,450 $222 $0 $4,725 2038 $1,123 $3,373 $226 $0 $4,722 2039 $1,200 $3,291 $231 $0 $4,722 2040 $1,282 $3,203 $236 $0 $4,720 2041 $1,370 $3,109 $240 $0 $4,720 2042 $1,466 $3,009 $245 $0 $4,719 2043 $1,568 $2,901 $250 $0 $4,719 2044 $1,676 $2,786 $255 $0 $4,718 2045 $1,793 $2,664 $260 $0 $4,717 2046 $1,919 $2,532 $265 $0 $4,716 2047 $2,054 $2,391 $271 $0 $4,716 2048 $2,200 $2,241 $276 $0 $4,717 2049 $2,356 $2,080 $281 $0 $4,717 2050 $2,523 $1,907 $287 $0 $4,717 2051 $2,702 $1,722 $293 $0 $4,717 2052 $2,894 $1,524 $299 $0 $4,717 2053 $3,102 $1,312 $305 $0 $4,718 2054 $3,323 $1,084 $311 $0 $4,718 2055 $3,562 $841 $317 $0 $4,720 2056 $3,816 $580 $323 $0 $4,719 2057 $4,094 $300 $330 $0 $4,724 Total $50,826 $83,383 $7,534 $0 $141,743 'The interest is calculated using an estimated interest rate of 8.91% for years 1 through 5 (2028-2032) and 7.33% for years 6 through 30 (2033-2057). 2Administrative Expenses are estimated and will be updated each year in the Annual Service Plan Updates. Assumes a 2% increase per year. 3The Annual Installments shown do not include any TIRZ Annual Credit Amount. Appendix I-7 Improvement Area #6 Assessment Roll Summary Outstanding Parcel ID Total Lot Count Equivalent Units Assessment 43215583 153 137.19 $8,401,024 73215575 56 46.48 $2,846,269 43223624 44 37.11 $2,272,484 43209893 336 275.33 $16,860,223 Total 589 496.11 $30,380,000 EXHIBIT B NOTICE OF PUBLIC HEARING CITY OF FORT WORTH, TEXAS NOTICE OF PUBLIC HEARING TO CONSIDER THE LEVY OF ASSESSMENTS AGAINST PROPERTY WITHIN IMPROVEMENT AREA #6 OF FORT WORTH PUBLIC IMPROVEMENT DISTRICT NO.22 (VEALE RANCH) Pursuant to Chapter 372, Texas Local Government Code (the "Act"), notice is hereby given that the City Council of the City of Fort Worth, Texas (the "Cy") will hold a public hearing (the "Public Hearing") to consider the levy of assessments against property within Improvement Area #6 of the Fort Worth Public Improvement District No. 22 (Veale Ranch) (the "District") to pay for certain improvements therein. Date, Time and Place of Public Hearing. The Public Hearing will take place on October 27, 2026, at or after 1:00 p.m., at the City Council Chamber, City Hall, 100 Fort Worth Trail, Fort Worth, Texas. General Nature of the Improvements. The general nature of the proposed public improvements, including the improvements to be reimbursed through the levy of special assessments in the District, includes: (i) acquisition, construction, and improvement of water, wastewater, and drainage facilities and improvements; (ii) acquiring, constructing, improving, widening, narrowing, closing, and rerouting of sidewalks and of streets, any other roadways, and their rights -of -way; (iii) landscaping; (iv) the establishment and improvement of parks; (v) acquisition, construction, and improvement of off-street parking; (vi) erection of fountains, distinctive lighting, and signs; (vii) construction and improvement of pedestrian malls; (viii) acquisition and installation of pieces of art; (ix) acquisition, construction and improvement of libraries; (x) acquisition, construction, improvement, and rerouting of mass transportation facilities; (xi) projects similar to those listed in (i)-(x); (xii) acquisition, by purchase or otherwise, of real property in connection with an improvement; (xiii) special supplemental services for improvement and promotion of the District, including services relating to advertising, promotion, health and sanitation, water and wastewater, public safety, security, business recruitment, development, recreation, and cultural enhancement; (xiv) payment of expenses incurred in the establishment, administration, and operation of the District, including the costs of financing the authorized improvements, and (xv) the development, rehabilitation and expansion of affordable housing. Notwithstanding anything to the contrary, the following will not be considered as authorized improvements: (a) water lines and sanitary sewer lines having a diameter of 8" or less located in and serving a for sale or rent single-family home, cottage home, and/or townhome residential subdivision; (b) oversizing of water and sanitary sewer lines in and serving residential areas without City approval; and (c) local residential streets, as defined by the Fort Worth Master Thoroughfare Plan. The property within the District is expected to be developed in multiple phases (each phase being an "Improvement Area"). Improvements that will benefit and serve only property within Improvement Area #6 to be installed and constructed in the current phase of improvements, and special assessments will be levied within Improvement Area #6 to fund such improvements. For each subsequent phase within the District, special assessments will be levied within the future Improvement Areas to pay the costs of public improvement projects that confer a special benefit on the property within such Improvement Areas. Cost of the Improvements. The estimated total cost of the public improvements in Improvement Area #6 to be funded through the special assessments levied therein, including financing costs, is $30,380,000. Proposed Assessment Rolls. The proposed assessment rolls providing for the costs of said improvements to be assessed, levied, and apportioned against the benefited property within Improvement Area #6, and the real and true owner or owners thereof, are on file and are available for public inspection during regular business hours at the office of the City Secretary at City Hall, 100 Fort Worth Trail, Fort Worth, Texas. Boundaries of the District. The boundaries of the District encompass approximately 5,200 acres, and the District is generally located northwest of US 377 south of Aledo Road both in the corporate limits and the extraterritorial jurisdiction of the City. The boundaries of the District, including the boundaries of Improvement Area #6, are more particularly described by a metes and bounds description available at the Fort Worth City Hall and available for public inspection. Obiections Considered. All written or oral objections will be considered at the Public Hearing.