HomeMy WebLinkAbout025688 - Construction-Related - Contract - Hillwood Development Corporation. � . � ,
� _"
FOT OTH �
� V� R
COMMUNIT�I I�GREEMENT ���� �E�RE`�A►�1( �
�(�NTRACT NQ, -�.,) I�
�
�—'[ taTi�
STREET, STORM DRAIN, STREET LIGHT AND STREET NAME SIGN
�, � � IMPROVEMENTS
For
Shiver Road and Trace Ridge Parkway
A. The Developer agrees to install or to cause to have installed, the street, storm
drainage, street lighting, street name sign and other community facilities
improvements shown as "current improvements" on the attached Exhibits B, B-1, C.
B. The Developer agrees to comply with all city accepted practices, ordinances,
regulations, as well as provisions of the City Charter, the City Subdivision
Ordinance, City Design Standards and the current Policy for Installation of
Community Facilities in the design, contracting and installation of required "current
improvements".
C. The Developer agrees to comply with the General Requirements contained herein
(Attachment A).
D. As shown on the attached "Summary of Cost", the Developer agrees to fund his
share of "current improvements" and to pay the City for his share of the cost of
street, storm drainage, street lighting, street name sign and other community
facilities shown as "future improvements" on the attached Exhibits B, B-1, C.
Payment is due at the time this agreement is executed by the City and the
Developer.
E. The estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection is
estimated to be $275,799.
In accordance with the City's current Policy for Installation of Community Facilities
as shown in the Cost Summary on page 3,
The Developer shall contribute Dollars $115,000 of the total amount.
The City shall contribute Dollars $160,799 of the total amount.
F. Developer agrees to provide, at his expense, all necessary rights of way and
easements required to construct current and future improvements provided for in this
agreement. .
. 4����1(������ 'P4��1`"J'�
� b� ��"�����
rtia ����7�'� n � �',y�,,,
�..�-
TR.ANSPORTATION AND PUBLIC WORKS DEPART'MfENT
THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, TEXAS 76102
(81 � 871-7800 * Fnx (81 � 871-8092
� Printed on reeycled paper
�
�
Shiver Road and Trace Ridge Parkway
G. Developer agrees to relieve the City of any respon�ibilities for any inadequacies in
the preliminary plans, specifications and cost estimates supplied for the purpose of
this contract.
H. Developer also agrees to install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. Developer agrees that no street construction or storm drainage will begin prior to
City Council approval of this Community Facilities agreement. (Article 104.100,
Ordinance 7234).
J. Developer agrees that no lot shall be occupied until improvements required herein
have been constructed (Article 104.100, Ordinance 7234).
K. Developer agrees to complete the improvements covered by this agreement within
90 calendar days after having been instructed to do so, in writing, by the Director of
Transportation and Public works. It is understood that the developer will initiate the
construction of all improvements to conform with his own schedule, except for those
improvements which the Transportation and Public Works Director deems necessary
for the proper and orderly development of the area. In the event Developer fails to
carry out any such instructions within the 90-day period, the Developer gives the City
the right to design and award a contract, and inspect the improvements in question,
and agrees to pay to the City prior to the award of the contract, the amount of the
low bid.
L. City participation in "current improvements" shall not exceed 125% of cost shown in
Summary of Cost.
w.
u�l������ °'��� �'���J °��
��� ��`�������
�, �!� �'`��, �• . ,
� •
• •
ltem
A. Construction
1. Streets
2. Storm Drainage
3. Street Lights
Shiver Road and Trace Ridge Parkway
Summary of Cost
4. Traffic Control Devices
5. Street Name Signs
B. Engineering Design
� 6%�
C. Construction Engineering
(@ 7 1 /2 %) and
Management by DOE
D. TPW Administration
�_p� 1 %)
Estimated Estimated
Developer for Park for
Current Cost Current Cost
Improvements Improvements
$60,940 $60,663
$34,472 $9,989
$17,600 $-0-
$-0- $-0-
$80 $-0-
$-0- $4,239
$1,908 $5,299
$-0-
TOTALS $115,000
Estimated
City Cost
$-0-
$66,397
$-0-
$-0-
$-0-
$3,984
$10,228
Total Cost
$121,603
$110,858
$17,600
$-0-
$80
$8,223
$17,435
$-0- $-0- $-0-
$80,190 $80,609 $275,799
NOTES:
1. Forty-two (42) feet and wider street include sidewalk cost.
2. Construction items (1-4) cost includes 10% contingencies for Developer and City.
3. Developer's column for Item C represents two percent (2%) costs for construction
inspection and materials testing.
4. City not preparing plans and specifications.
5. Parks Department participation for streets adjacent to City Park is $80,190.
6. The total estimated construction cost for Shiver Road is �210,876, and total storm drain is $134,728.
7. Stone Manor road (FP99059) contribution is $79,308, and $20,075 for storm drain. City contribution for
storm drain was $3,795 and for this CFA is $5,893.
8. Trace Ridge road (FP98006) contribution is $28,463 with no storm drain cost.
CFA CODE 99047
Prepared LRC
Checked
3
Date: December 23, 1999
_.:�1'1����� °'"�F� ����� ���
� 1��r ���'� `' � ' °��
�o ViJ�J�Cr�� Y��
�
E. STREET LIGHTS:
l. STREET LIGHT COST ESTIMATE
INTERSECTIONS
MID-BLOCK RESIDENTIRL
CHANGE OF DIRECTION RESIDENTIAL
MID-BLOCK COLLECTOR
MID-BLOCK ARTERIAL
MID-BLOCK ARTERIAL MEDIAN
RELOCATE EXISTING LIGHT
SHIVER ROAD
Fort Worth, Texas
QUANTITY UNIT COST
2 EA $ 2,000
0 EA $ 2,000
0 EA $ 2,000
0 EA $ 2,000
6 EA $ 2,000
0 EA $ 2,500
TOTAL COST
$ 4,000
$ --0--
$ --0--
$ --0--
$ 12,000
$ --0--
0 EA $ 1500 $ --0--
Subtotal $16,000.00
City's Cost $ ---0---
Developer's Subtotal $16,000.00
10% Contingencies $ 1,600.00
Project Total $ 17,600.00
Adjacer.t Developer's Cost $ --0--
Developer's Cost $ 17,600.00
September 14, 1999
'�������'��:� �����'JG'' G
�b� r���� �������
�. 4���'�1�, ����,
�
2. STREET LIGHTS WORK DESCRIPTION:
1. Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the streetlight Engineer.
2. Streetlights on arterial streets shall be installed with underground
conduit and conductors.
3. The Developer shall provide for the installation of a 11/-inch
scnedule 40 PVC conduit at a depth not less than 30 inches and at
least 18-inch behind the curb, "clear from all other utilities".
4. The Developer shall provide for the installation of a 11/-inch
schedule 40 PVC conduit between streetlights proposed for
installation and the power source to become operational.
5. A 3-inch schedule 80 PVC conduit is required when crossing streets
at a depth not less than 30 inches, unless indicated otherwise on
the plans concrete pull boxes shall be provided at the crossing
points.
6. Luminaire ballast shall be rated for multitap operation and each
luminaire shall have it's own photocell.
'�'��0�0�� �'���G?L�
��O�11 c����G� ° G�ti�
I�o t��uG'��lo ��o ,
�
�
IV
STREET NAME SIGNS
1. The Developer agrees to pay for the street name sign
installations required by this development to the extent of
580.00 per intersection. This unit cost will be re��ised annually
by the Department of Transportation and Public Tr;orks to reflect
prevailing costs of materials and labor.
2. This develooment creates the follo�rring one (1) intersection at a
cost to the Developer of $80.00:
Shiver Road and Trace Ridge Parkway
3. The Developer may either deposit cash funds with the City equal
to the above amount at the time of Community Facilities Agreement
approval or wait until the street nama signs are to be installed.
If the Developer elects to wait, the cost of street name signs
will be at the rate prevailing when the Developer deposits funds
with the City.
4. The City will install the street name signs upon tinal approval
of the street construction. The street name sig:-�s will remain
the property of, and will be m.aintained by, tn? City.
SHIVER ROAD AND TRACE RIDGE
Fort Worth, Texas
IV-1
September 15, 1999
���D�UG��s� ����lJ�prlJ
��� ����� f�����
�� �����, �'`'t�.
�
, ..._ �
SHRIV�I?
FORT W4�RTH
�
'`- 6'2�� �
`-��_--�
G'� A'P � V I�I E
c7
�
r7
ARL I NG�fON
C] F W
AIRPORT
�
LO CATI � N MAP
SHRIVER ROAD
����C��� ,_,,_;,
p �ii Carte� Burgess
,� j' y �l��y/�'al_ f� ,�' r s ce„r.we� �.w �ro. E�a�...��a..�,tn,r.�,�..
�r 1:39 "' I �w«.r.r a..a It.4�.d S.n�e.
���V � ���{�'�a�5��'�li_ s3 � �uHasr�nRGE55, INC.
� � � �a. ,
fOl[t wC[fM. TA 76107 - Tl3�1
� o ���',���' �j�'yy�y� PROJECT N0. 99t2580i0
N'P �l00�99125E�CIv�SNRLCfA.0GH
�
4''QRI7P 1N�ET�
�27�
24" ,
4" DROP I �!L'EF ��-34"�
1 1 !
_ I
� ���i� �
�����
�
�
� .
��[}�.r�FR.yE�} �+p!
S�RVV4. S�AC. 1
.�
T'R,.�CE RIDGE 7.4RFCR'AY'
SUNSE'C 'Ii�.tCE DRI'r'E
t
p •
a
� 2�2Q' C. I.
24" �
� I T I i]I�AL �� � q��
ANh1EL I'cAT I JN `�
�R�1P STRUCTURE � -
�
2-S �" X8"' MBC---i
avaR� n�r.� �
LEGEND
ROP. STORM DRAIN LINE
ROP, I NLET
ROP. MANHOLE
ROP. HEADWALL
XIST. STORM DRAIN LINE
IMITS OF PROJECT
;M•tr \Jo0�9912�H�CIV�SHR�CfA.DGN
�
�
r
_ _ _ _ _� _ _ _ _
H
SCAL E� t " = 300'
sTo �nn � �,i N
EXHIBIT 'A'
SHRIVER ROAD
� �i �iql'fE�' BYI'9e55
r�-.�iC-i' ,�Ii�( � +d�.,�� �r�,'ItiIj� fl, :d���,�r!I Cee.«„eien�+nu,�a��o«o«w na �It� S.n:e..
�'✓ 'J � � J V �!f'�.:'a U�: L� �+� ��'_:' !. _
CARTER 3 BURGESS,INC.
� I�Ij� � ��' �+4i r�'� E +� a aeeo rutN mter
�':-` U � II C�N:.a �: U� �� 7 forr wo�m, u�eio- - rtsi
i�l�u ' �`�L'U�P �l'�G^�u�o PROJECT N0. 991258010
SCA�E� 1" = 300'
— TRACE RIDOE P,aRICWAY
� �` .
_ r'v' � -
�� i
f,
�'
�f`
�Y•
jJ.
`'.
F1J'IZJRE
SCHOOL Sii'E
PROPOSED .
R I GHT TURN ;;-
LANE ��
�� r
.;•
� /, y
� ��
CG �
CC /
N '✓ �
� �
J�
!`' .
� H �
��
��s
�p
/ � .
�� .
J '
!!`
f f�
� .
/ '
1.
��r .
=,�
NOR1H BF1+.CH STREET ' �
�r�
�f
' LEGEND
�P. 41' B-B ROADWAY/60' ROW I��������
'ROP. 41' B-B ROADWAY/60' ROW k;.��
�A I TS OF PROJECT
N•a �Joo�e5i2se�tiv�sHrt�tF�.oCn
SUNSET TRACE DR7VE
STREETS
EXHIBIT 'B'
SHRIVER ROAD
'�r� Carte� Burgess
(� � I',I f_� fk'� 'L-i :�� �� i� Co�w,MoM. in Monn��a, l.qin.«aa.,tieAn.cn,�.,
i �. r.,l_ ti� 1 �:, cd.�a„ n.e.,owT.�„ a.,e e.+�.a s.�.,.�..
.<aG��.:���� �_ ';.:�,:��.',,
CARTER S BURGE55, INC.
f��� �� � ParL5 UrU �� �h� roa wa . n� w� _ ru+
� ;�', � j�r�i�1 ���p PR0JECi N0. 99i258010
.. �lvJ „......,..15Y�,� � � J
�
F1J?tVitE
SCHt7OL SITE
lY()R7�k{ $�Cfi .�r 1`RF'.��
LEGEND
PROP. SINGLE STREET LIGHT
EXIST. SINGLE STREET LIGHT
(ON STEEL POLE WITH STREET
AND STOP SIGNS ATTACHED)
PROP. STREET SIGN
EXIST. STREET SIGN
LIMITS OF PROJECT
GH•p \)oD\99t2�d�CIV�SMR�CFA,0CN
,� Tk 4CE itff]GE PARKW'AY
� " .
C�
�
i
�
.
a
�. .
SCiNS�[' `TRAC� AR,IV£
�
SCALE� 1" = 300'
STREET LIGHTS
EXHIBIT 'C'
SHRIVER ROAD
,'����c���'y�. �,�;� --���';.', �i � Carter Burgess
��.�»,�. �� �a��,ro. �;�..��o..��.�.�.
- pc�1 r (� �� r ca,,.uwid, w.00.,.,«» a�e R.�e..e s.�.:�..
�,�� i,� ��' ���5�� 5���1u' c�.xhR a euR�ess, iHc.
- � �� �„��
-' ��'rt 11�'� � � roRr woRn,, rx �ao� _ rts.
�'''l•� � ��m PR0JECT N0. 991259010
�
�
ADDENDUM
The following constitutes an Addendum to be read and construed with and as a part of that
certain Community Facilities Agreement, heretofore entered into by and between the developer
Hillwood Development Corporation Fred J. Balda Vice President and the City of Fort Worth, a
municipal corporation in Tarrant County, Texas dated . and designated
as Contract No. . in the office of the City Secretary of the City of Fort
Worth, Texas.
(1)
The developers and the City hereby agree as follows:
A. The developer has agreed to sell to the public one parcel of land
approximately 50.17 acres in size out of the Eli Shiver Survey
Abstract 1455 and the J.W. Haynes Survey Abstract 783 being a
portion of Tract 14 for the purpose of a community park as so
designated by the City Council, City of Fort Worth, the said parcel of
land being the delineated area shown on the attached Exhibit "B",
Streets, which is hereby incorporated herein by reference for
identifying the land to be acquired as Community Park. The deeding
of said park to the City shall occur per the terms and conditions of the
Contract of Sale between the City of Fort Worth and Hillwood/2500
Ltd.
B. Developer agrees to have or to cause to have the said above described
area, which is so with plans and specifications as approved by the City
Parks and Community Services Department. Developer agrees to
provide a minimum of six (6") inches of topsoil over areas of cut or fill
resulting from CFA construction within the designated park areas or
road right of way adjoining the Community Park. The topsoil shall be
relatively free of rock and other debris.
C. Developer agrees to seed said areas of cut or fill with suitable grass as
determined by the City Parks and Community Services Department.
D. Developer agrees to have or to cause to have suitable clean-up of the
Community Park site as determined by the City Parks and Community
Services Department prior to reimbursement for construction costs of
for Shiver Road. This would include, but not be limited to, removal
of trash and construction debris deposited on the said park areas.
F.�.\Rendle Harwood Files\old da�a\My llocumenis\CFAs\Shiver RoaA CFA Addendum.dnc
�U�'��� U�'.�� �:'���� or�
� �� ���`� G?�; G�`�
�� � �1R. �j'�^��
li' I� J�9 W :°�y'y�
i �� 1�
�
�
F. The Developer will, upon completion of Shiver Road, provide the
Parks and Community Services Department with final construction
drawings of the road and drainage improvements.
G. The City Parks and Community Services Department's participation
in this contract is dependent on transfer of ownership of Far North
Community Park. The development and maintenance of this property
is subject to the terms and conditions of the contract for sale for Far
North Community Park and City Council approval and funding of the
project and maintenance costs.
Recommended:
chard Zavala, Director
arks and Community Services Department
G�'JianAle Huwood Filcs�old Aata\My DocumeNs�CFAc\Shiver Roxd CFA Addendum.doc
�y��fd'�'��U�:� U�:ly'-�:�����:L'��
�C��' ���,��'�.�,�`�
� �s:�;�i� �.
„ �
�
�
PAVING FACILITiES ATTRIBUTABLE
TO PARK DEVELOPMENT
A. One half of linear foot charges of park paving and sidewalk constn.iction,
including design, engineering, administration and inspection
contingencies attributable to the Parks and Community Services
Department at an estimated cost of $68.853
B. The City's share of park paving and sidewalk construction costs of the
proposed park will be due and payable to the developer upon:
1. Completion of park paving and sidewalk construction; and
2. Delivery of related construction documents to the Parks and Community
Services Department; and
3. Completion of the close of sale and transfer of ownership of the
Community Park property to the City.
Whichever event occurs last.
Recommended,
'� -- — -
` �
!
Richard Zavala, Director
;� Parks and Community Services Department
E\Ramlle Harwood Files\old data\My Documenls�CFAs\Shivcr Road CFA Addendwn.doc
=� ^_ "I �,�` �'
�;V,�;t��'�dl�!�- b`_'{�LL�UIG
(��;1,'T1�� lr�l`�"U�SIClUW U
�, u l�1 C� v u
' �� ����:��, �. �,
�
�
STORM DRAINAGE FACILITIES ATTRIBUTABLE
TO PARK DEVELOPMENT
A. One half of linear foot and installation charges for storm drainage
facilities, including design engineering and inspection, and contingencies
attributable to the Parks and Community Services Department at an
estimated cost of $ 11,337.
B. The City's share of storm drainage costs to the proposed park will be
due and payable to the developer upon:
Completion of the all infrastructure improvements related to the park
property as a result of the Shiver Road construction; and
2. Delivery of the required construction documents, related to
infrastructure improvements on or adjacent to the park property, to the
Parks and Community Services Department.
Whichever event occurs last.
Recommended,
Richard Zavala, Director
Parks and Community Services Department
f-�Randle Harwood Files�oid d:+ta�My Documents\CFAs�Sluver Road CFA Addendum doc
'{„'i� rll" � "'i � �I _ u�,l—�'��
+,. � ., :�_�- �Z�.l�_�_�L��,'sU
�^ � ,,,' r �� �e1 �eJ h
.�u�G ��� ��'U�:�W
�0 4J�l.I��'�.I: �� � �L+ �
�
�
ATTACHMENT A
GENERAL REQUIREMENTS
A. It is agreed and understood by the parties hereto that the developer shall
employ a civil engineer, licensed to practice in the State of Texas, for the
design and preparation of plans and specifications for the construction of all
current improvements covered by this contract, subject to Paragraph B.
B. For any project estimated to cost less than S 10,000 or for any project
designed to serve a single lot or tract, the developer may at his option request
the City to provide the design engineering, and if such request is granted, the
developer shall pay to the City an amount equal to 10 percent of the final
construction cost of such project for such engineering services.
C. In the event the developer employs his own engineer to prepare plans and
specifications for any or all current improvements, the pians and specifications
so prepared shall be subject to approval by the department having jurisdiction.
One (1) reproducible set of plans with 1 5 prints and 35 specifications for each
facility shall be furnished the department having jurisdiction. It is agreed and
understood that in the event of any disagreement on the plans and
specifications, the decision of the Transportation/Public Works Department
Director, and/or Water Department Director will be final.
D. It is further agreed and understood by the parties hereto that upon acceptance
by the City, title to all facilities and improvements mentioned hereinabove shall
be vested at all times in the City of Fort Worth, and developer hereby
relinquishes any right, title, or interest in and to said facilities or any part
hereof.
E. It is further agreed that the decision of the City to not collect funds for "future
improvements" required in previous CFA agreements does not constitute an
obligation on the part of the City to construct such "future improvements" at
its expense.
A-1
'�J���C�aQ� �f�C�C���
�� �������
'�� ��'�, �.
� �� ,
� ��
F. Work hereunder shall be completed within two f2) years from date here�f, and
it is understood that any obligation on the part of the City to make any refunds
with respect to water and/or sanitary sewer facilities or street, storm drain,
street light and street name sign shall cease upon the expiration of two (2)
years from date hereof, except for refunds due from "front foot charges" on
water and sanitary sewer mains, which refunds may continue to be made for a
period of ten (10) years commencing on the date that approach mains are
accepted by the Director. If less than 70% of the eligible collections due to
the developer has been collected, the Developer may request in writing an
extension of up to an additional 10 years for collection of front charges. �f the
construction under the Community Facilities Contract shall have started within
the two-year period, the life of the Community Facilities Contract shall be
extended for an additional one-year period. Community Facility Contracts not
completed within the time periods stated above will require renewal of the
contract with all updated agreements being in compliance with the policies in
effect at the time of such renewal. Developers must recognize that City funds
may not be available to pay all or a portion of the normal City share for
renewal contracts. It must be understood by all parties to the Community
Facilities Contract that any of the facilities or requirements included in the
contract that are to be performed by the developer, but not performed by the
developer within the time periods stated above, may be completed by the City
at the developer's expense. The City of Fort Worth shall not be obligated to
make any refunds due to the developer on any facilities constructed under this
agreement until all provisions of the agreement are fulfilled.
G. PERFORMANCE AND PAYMENT GUARANTEES
1. For Street, Storm Drain. Street Liaht and Street Name Siqn
Improvements to be Constructed bv the Developer or Citv on Behalf of
the Developer:
Performance and Payment bonds or cash deposits acceptable to the City
are required to be furnished by the developer for the installation of
streets, storm drains, street lights, and street name signs, on a non-
assessment basis, and must be furnished to the City prior to execution
A-2
�������� 4'k� ��C���
�C�`�° ���� ���1�
,�: �.��,���:°��o��
.�'. ���� ; �
of this contract. The performance and payment bonds shall be in the
amount of one hundred percent (100%) of the developer's estimated
share of the cost of the streets, storm drains, street lights, and street
name signs. If the deposit is in the form of cash, the deposit shall be in
the amount of one hundred twenty five percent (125%) of the
developer's estimated cost of the streets, storm drains, street lights,
street name ssgns, and change orders (during the course of the project).
2. For Future Improvement:
Performance and payment bonds or cash deposits, acceptable to the
City are required to be furnished by the developer for one hundred
percent (100°�0) of the developer's estimated cost resulting from the
paving, drainage, lighting and name signage of border streets on an
assessment paving basis. (Reference Section VI, Item 3, Development
Procedures Manual.) Said performance and payment bonds or cash
deposits must be furnished to the City prior to execution of this
contract.
Where the City lets the contract, performance and payment bonds shall
be deposited, in the amount of one hundred percent (100%) of the
estimated cost of construction as stated in the construction contract, is
required prior to issuance of a work order by the City.
3. For Water and Sanitary Sewer Facilities:
Performance and payment bonds, or cash deposits, acceptable to the
City are required to be furnished by the developer for the installation of
water and sanitary sewer facilities.
a. Where the developer lets the construction contract for water and
sanitary sewer facilities, performance and payment bonds shall be
deposited, in the amount of one hundred percent (100%) of the
estimated cost of construction, cash deposited shall be in the
amount of one hundred twenty-five percent (125%), as stated in
the construction contract, is required to be furnished simultaneous
with execution of the construction contract.
A-3
�,��,, �����,
�����J'U'U'�:��� ��.�L�Lv�f��
'���`' ���'�����ti�
[�� �,�������, �L�?n
b. Where the City lets the contract, performance and payment bonds
shall be deposited, in the amount of one hundred percent (100%)
of the estimated cost of construction as stated in the construction
contract, is required prior to issuance of a work order by the City.
4. Tvpes of Guarantees:
a. Performance and Pavment Bonds: Are required for the
construction of streets, storm drains, street lights, and street
name signs, the following terms and conditions shall apply:
(1) The bonds will be standard performance and payment bonds
provided by a licensed surety company on forms furnished
by that surety company.
(2) The bonds will be subject to the review and approval by the
City Attomey.
(3) The performance bond shall be payable to the City and shall
guarantee performance of the street, storm drain, street
light, and street name sign construction contemplated under
this contract.
(4) The Payment Bond shall guarantee payment for all labor,
materials and equipment furnished in connection with the
street, storm drain, street light, and street name sign
construction contemplated under this contract.
(5) In order for a surety company to be acceptable, the name of
the surety shall be included on the current U.S. Treasury list
of acceptable sureties, and the amount of bond written by
any one acceptable company shall not exceed the amount
shown on the Treasury list for that company.
b. Cash Deposits: A cash deposit shall be acceptable with
verification that an attempt to secure a bond has been denied,
A-4
i�j�=i,;i^=1 a:" =,;;;�:�^,,i�l
���UJ.��I��'s �.L,'�UU��
l`:�� L"'��r�iPSIZ^1tl11��
�i vV C: l"��1f U' {�.�r
•
•
such deposit shall be made in the Treasury of the City of Fort
Worth. The City of Fort Worth will not pay interest on any such
cash deposit.
(1) At such time that the contract is bid for projects other than
assessment projects, the cash deposit shall be adjusted to
one hundred twenty five percent (125%) of the actual bid
price. No contract shall be awarded and no work order shall
be issued until such adjustment is made.
(2) When a cash deposit is made, the additional twenty-five
percent (25%) beyond the one hundred percent {100%1 of
the estimated developer's share represents additional funds
for change orders during the course of the project. This
twenty five percent (25%) shall be considered the
developer's change order fund.
(3) If the developer makes a cash deposit with the City, the
developer may make timely withdrawals from the cash
funds in order to pay the contractor and/or subcontractor
based on amount of construction work completed as
approved and verified by the City Engineer or authorized
representative. For projects whose actual total contract
cost is 5400,000 or greater, such release of security shall
equal the percentage of work completed for that period
multiplied by ninety-five percent (95%). This percentage
shall be applied to the actual current total contract cost to
determine the amount that may be reduced upon request of
developer. For projects whose actuai totaf contract cost is
less than 5400,000, such release of security shall equal the
percentage of work completed for that period multiplied by
ninety percent (90%). This percentage shall then be applied
to the actual current total contract cost to determine the
amount of security that may be reduced upon request of
developer. The remaining security, five percent (5%) for
projects of $400,000 or greater and ten percent (10%) for
A-5
�� ��� GGI�� ��C u �'D
���� ���; G��G��
U Uo UUn�'Il�'�_'�1111g �L74��
'
'
projects less than 5400,000 together with the remaining
funds from the Developer's Change Order Fund, if any, will
be released to the developer after the project has been
accepted by the City. Partial release of funds shall be limited
to once per month. There shall be no partial release of funds
for projects of less than S25,000. Proof that the developer
has paid the contractor shall be required for partial releases.
5. Purpose, Term and Renewal of Guarantees:
a. Performance and payment bonds, and cash deposits furnished
hereunder shall be for the purposes of guaranteeing satisfactory
compliance by the developer with all requirements, terms and
conditions of this agreement, including, but not limited to, the
satisfactory completion of the improvements prescribed herein,
and the making of payments to any person, firm, corporation or
other entity with whom the developer has a direct contractual
relationship for the performance of work hereunder.
b. Developer shall keep said performance and payment bonds, and/or
cash deposits in full force and effect until such time as developer
has fully complied with the terms and conditions of this
agreement, and failure to keep same in force and effect shall
constitute a default and breach of this agreement.
H. The City shall assume its share of the cost of the improvements covered by
this agreement along with the engineering fee only if funds are available for
such participation. In the event that no funds are available for City
participation, the developer shall award the contract and deposit with the City
a performance and payment bonds or cash for 100 percent of the estimated
total construction cost of the improvements [plus ten percent (10%) for
engineering and miscellaneous costs if the City prepares the plans].
I. On all facilities included in this agreement for which the developer awards its
own construction contract, the developer agrees to follow the following
procedures:
ULr���'�:�il�!:5 �•..lu��:V�:��I
� D�' ����: G?�G?�
�, ��������; ��� ,
•
'
1. If the City participates in the cost of the facilities, the construction
contract must be advertised, bid and awarded in accordance with State
statutes prescribing the requirements for the letting of contracts for the
construction of public work. This includes advertising in a local
newspaper at least twice in one or more newspapers of general
circulation in the county or counties in which the �vork is to be
performed. The second publication must be on or before the tenth
(10th) day before the first date bids may be submitted. The bids must
be opened by an officer or employee of the City at or in an office of the
City.
2. To employ a construction contractor, who is approved by the Director of
the Department having jurisdiction over the facility to be so constructed,
said contractor to meet City's requirements for being insured, licensed
and bonded to do work in public right of way.
3. To require the contractor to furnish to the City payment, performance
and maintenance bonds in the names of the City and the developer for
one hundred percent (100%) of the contract price of the facility, said
bonds to be furnished before work is commence. Developer furthe�
shall require the contractor to provide public liability insurance in the
amounts required by the City's specifications covering that particular
work.
4. To give 48 hours notice to the department having jurisdiction of intent
to commence construction of the facility so that City inspection
personnel will be available; and to require the contractor to allow the
construction to be subject to inspection at any and all times by City
inspection forces, and not to install any paving, sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and
gives his consent to proceed, and to make such laboratory tests of
materials being used as may be required by the City.
5. To secure approval by the Director of the Department having jurisdiction
A-7
u�l�0� 0�� �'��� °'D
CO�U ���GG�G��h�
�� 11VUC'��UUp ��o
of any and all partial and final payments to the contractor. Said
approval shall be subject to and in accordance with requirements of this
agreement, and is not to constitute approval of the quantities of which
payment is based.
6. To delay connections of buildings to service lines of sewer and water
mains constructed under this contract until said sewer and water mains
and service lines have been completed to the satisfaction of the Water
Department.
7. It is expressly understood by and between the developer and the City of
Fort Worth, that in the event the deveioper elects to award one single
construction contract for storm drainage and pavement, said contract
shall be separated in the bidding and City participation, if any, shall be
limited to the lowest possible combination of bids as if each of the
above were awarded as separate contracts.
J. Anything to the contrary herein notwithstanding, for and in consideration of
the promises and the covenants herein made by the City, the developer
covenants and agrees as follows:
1. The developer shall make separate elections with regard to water and/or
sanitary sewer facilities, storm drainage, street improvements and street
lights as to whether the work prescribed herein shall be performed
by the City, or by its contractor, or by the developer, through its
contractor. Each separate election shall be made in writing and
delivered to City no later than six (6) months prior to the expiration of
this agreement. In the event any of such separate elections has not
been made and delivered to City by such date, it shall be conclusively
presumed that the developer has elected that such work be performed
by the City in accordance with all of the terms of this agreement, and in
particular Paragraph V-F hereof.
2. Irrespective of any such election and whether the work is to be
performed by the City, or by its contractor or by the developer through
its contractor, the developer covenants and agrees to deliver to the City
A-8 �_ . _ ,
'�Y��vc�u�� P�k5'�� ��� .
� U� ����G?�G��
�� _�. ���C�ti �, ���
a performance and payment guarantee in accordance with the provisions
of Paragraph V-F of this agreement.
3. In addition to the guarantee required in the preceding paragraph, in the
event developer elects that the work be performed by the City, or by the
City's contractor, or such election is presumed as provided above, the
developer covenants and agrees to pay to the City the developer's share
of the estimated construction costs. The amount of such estimated
payment shall be computed as set out in Sections « 5» hereof, based
upon the lowest responsive bid for such work, as determined by City, or
upon a cost estimated to be performed by City forces prepared by the
City, as appropriate, and shall be subject to adjustment to actual costs
upon final completion of the subject work. Such estimated payment
shall be made promptly upon demand by City, it being understood that
such payment will be made after the receipt of bids for work, but in
every case prior to the award of any construction contract, unless
otherwise specifically set out herein.
4. Developer further covenants and agrees to, and by these presents does
hereby fully indemnify, hold harmless and defend the City, its officers,
agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted,
brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with,
this agreement or the construction of the improvements or facilities
described herein, whether or not caused, in whole or in part, bv the
nealiaence of officers, aaents, or emplovees of the Citv. In addition the
developer covenants to indemnify, hold harmless and defend the City,
its officers, agents and employees from and against all claims, suits, or
causes or action or any nature whatsoever brought for, or on account of
any injuries or damages to persons or property, including death,
resulting from any failure to properly safeguard the work or an account
of any act, intentional or otherwise, neglect or misconduct of the
developer, its contractors, subcontractors, agents or employees,
whether or not caused, in whole or in part, bv the neQliqence of
officers, aaents, or emplovees of the Citv.
l�-9
����V h4 J�fiW� iSGI��L�7�i'LJ
��� �",��'^�•����?�
M,/�rM�{� ��y/+ `7rI �n` r1I] �r�1M1V'
Y YV Y� -/III�I���JV`U� W��..1U�C
� •
5. Developer covenants and agrees that it discriminates against no
individual involving employment as prohibited by the terms of Ordinance
No. 7278 (as amended by Ordinance No. 74001, an ordinance prohibiting
discrimination in employment practice because of race, creed, color,
religion, national origin (except for illegal aliens), sex or age, unless sex or
age is a bonafide occupational qualification, subcontractor or
employment agency, either furnishing or referring applicants to such
developer, nor any agent of developer is discriminating against any
individual involving employment as prohibited by the terms of such
Ordinance No. 7278 (as amended by Ordinance No. 7400).
K. Venue of any action brought hereunder shall be in Fort Worth, Tarrant County,
Texas.
L. The City's Policy for the Installation of Community Facilities, as adopted by the
City Council on September 1992, is hereby incorporated herein by reference,
and Developer covenants and agrees to comply with said Policy as a condition
of this contract and as a condition to the platting of the subject property.
M. The following descriptions of work apply, as appropriate, to the areas included
in the Community Facilities Agreement:
1. STREETS
Streets as shown in Exhibit B will be in accordance �vith plans and
specifications prepared by the Owner's engineer and approved by the
Director of Engineering.
2. STORM DRAINAGE
Storm drain as shown in Exhibit B— 1 wili be in accordance with plans and
specifications prepared by the Owner's engineer and approved by the
Director of Engineering.
A-10
; J � � 6��� 9'�i� U'L�����
���� ��C���G�C���
��, `w�':a�����o �[�o
'
,
3. STREET LIGHTING
a. The Developer shall provide for the installation of streetlights by the City
forces at the approximate locations shown in Exhibit C, immediately
after final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation and
Public Works Department.
b. Streetlights on residential and / or collector streets can be installed using
overhead or underground conductors with the approval of the streetlight
Engineer.
c. Streetlights on arterial streets shall be installed with underground conduit
and conductors.
d. The Developer shall provide for the installation of a 1'/4 inch schedule 40
PVC conduit at the depth not less than 30 inches and at least 18 inch
behind the curb, "clear from all other utilities".
e. The Developer shall provide for the installation of a 1'/4 inch schedule 40
PVC conduit between streetlights proposed for installation and the power
source to become operational.
f. A 3 inch schedule 80 PVC conduit is required when crossing streets at
depth not less than 30 inches, unless indicated otherwise on the plans.
Concrete pull boxes shall be provided at the crossing points.
g. Luminaire ballast shall be rated for multitap ope�ation and each luminaire
shall have it's own photocell.
4. TRAFFIC CONTROL DEVICES
a. The Developer agrees to pay for the street name sign installations required
by this development to the extent of $80.00 per inspection. This unit cost
will be revised annually by the Department of Transportation and Public
Works to reflect prevailing costs of materials and labor.
b. This development creates the following number intersections at a total cost
as shown to the Developer.
c. The Developer may either deposit cash funds with the City equal to the
following amount at the time of Community Facilities Agreement approval
or wait until the street name signs are to be installed. If the Developer
elects to wait, the cost of street name signs will be at the rate
prevailing when the Developer deposits funds with the City.
A-11
;;�i°��u�vu��':�h w��J��
�)
G �� I�'Wr C-�r��'� �i �
���u 4�7yr^��!�-CIl'�p lIIS//�:a
�
�
d. The City will instail the street name signs upon final approval of the street
construction. The street name signs will remain the property of, and will be
maintained by, the City.
5. OTHER WORKS
In the event that other works is required it will be included as specific
requirements to Community Facilities Agreement.
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said
Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this
the l'���i day of �'���✓'r,���L , '�`-`���'l�
���1�� � � �`�i�� 1 � �� �
LEGALITY:
�r� �
Gary J. Steinberger
Assistant City Attorney
+
AZ'f EST:
�� . ��� .���.�
Gloria Pear on 3��7-0�
� __, .
City Secretary
RECOMMENDED:
Hugo Malanga, P.E. �S�� lf ������'
Director, Transportation
and Public Works
,,
,�`
CITY OF FOR�i WmF�TH, TEXAS
��� � ��
�
BY: u ��
Mike Groomer
Assistant City Manager
D ELOPER: �n. �r� ("'__�___".� r-hE��c.vd �r�o'�e��,1�
� � �u, .�r..� W�,� � -r�� a �rn r ���' ����+�?�.4���
� y� J-h l l wu�d ,rle v�- �uP"+t�4 � C 6�-
B: l� r V�-~ ���+�..� n��`ci��,� u'� i i��
� Fr��l B�Ida,r President
�� � A-12 � � ��cS (D �
Contract Authorization
:� - r .� -� r�°C�
,:,,����4�� �:�����
�: a� ���:�:�r[�� �'
; ,� {��,�.��
� ����'� �I1� �
Y �..J�Y' yiLJC�IA
City of For�t Worth, Texas
�1►�1'�A�►ar And Cauncil C,aminun�cAt�on
DATE REFERENCE NUMBER LOG NAME I PAGE
2/15/00 C-17862 20SCHOOL � 2 of 2
SUBJECT COMMUNITY FACILITIES AGREEMENT WITH HILLWOOD DEVELOPMENT
CORPORATION FOR THE INSTALLATION OF COMMUNITY FACILITIES FOR
IMPROVEMENTS TO SHIVER ROAD AND TRACE RIDGE PARKWAY
ESTIMATED COSTS:
Proiect Cost Developer
Street Improvements
Construction $60,940.00
Design Engineering -0-
Engineerrng and Administration 1,219.00*
Storm Drain Improvements
Construction 34,472.00
Design Engineering -0-
Engineering and Administration 689.00*
Street Lights
Street Name Signs
TOTAL PROJECT COST:
*2% Construction Inspection
17,600.00
80.00
$115,OQ0.00
FISCAL INFORMATION/CERTIFICATION:
Park TPW
$60,663.00
3,640.00
4,550.00
$9,989.00
599.00
749.00
-0-
-0-
-0-
-0-
$66,397.00
3,984.00
10,228.00
-0-
Total
$121,603.00
3,640.00
5,769.00
11 Q,858.00
4,583.00
11, 666.00
17,600.00
-0- -0- 80.00
$80,190.00 $80,609.00 $275,799.00
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of
the Street Improvements Fund and the Parks and Community Services Fund.
MG:}
t•.
Submitted for City Ma�ager's
Office by:
Mike.Groomer 6140
Originating Department Nead:
Hugo Malanga
Additional Information Contact
Hugo Malanga
FUND I ACCOUNT I
(to)
7801 � (from)
C115 541200
C115 531200
� C115 511010
7S01 I C181 541200
CENTER I AMOUNT
020115136292 $66,397.00
020115095292 $ 3,984.00
020115095216 $10,228.00 �
080181046120 �80,190.00 I
C(TY SECRETARY
AP�'ROVt�
CITY C�UNC�I�
r- R j 5 ZOt?IO
�,>,w. l :�..�..-�r
i;itq Sec:vheiy of t21a
City oi 'r'ort Worih, tazns
City of Fort Worth, Texas
�lr��a�a� And Caunc�l C,a�»mun�cAt�on
DATE REFEftENCE NUMBER LOG NAME PAGE
2/15/00 C-17862 20SCHOOL 1 of 2
SUBJECT COMMUNITY F�CILITIES AGREEMENT WITH HILLWOOD DEVELU�'IVIENT
CORPORATION FOR THE INSTALLATION OF COMMUNITY FACILITfES FOR
IMPROVEMENTS TO SHIVER ROAD AND TRACE RIDGE PARKWAY
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a Community Facilities
Agreement with Hillwood Development Corporation for the installation of community facilities for
improvements to Shrver Road from North Beach Street to Trace Ridge Parkway.
DISCUSSION:
Hillwood Development Corporation has executed a proposed contract for community facilities to serve
the future school site for the Keller Elementary School. The site is located immediately north of Shiver
Road between Trace Ridge Parkway and North Beach Street (see attachment). The improvements to
Shiver Road need to be completed before the new elementary school is opened August 1, 2000.
These improvements will provide 40 feet of pavement within a 60-foot right-of-way from Trace Ridge
Parkway to North Beach Street. In addition, a right turn lane wEll be provided on Shiver Road at the
south entrance ta Keller Elementary School. Trace Ridge Parkway will be constructed to 20 feet of
pavement on the west half of the right-of-way from Shiver Road no�th to the east entrance of Keller
Elementary Schoal.
In addition to Hillwood Development Corporation, two other developers are also contributing to the
improvements to Shiver Road. Stone Manor Addition (FP99059), located south of Shiver Road, is
contributing $99,384.80, and Trace Ridge Addition Phase II (FP98006), located south of Shiver Road,
is contributing $28,463.50. The Parks and Community Services Department (PACSD) has property
located north of Shiver Road and is contributing $80,190.00. The Keller Independent School District
(KISD) is contributing $31,930.00. Hillwood Development Corporation is contributing a share squal to
that of the KISD along the frontage of Shiver Road. The attached map shows all of the entities
contributing to the Shiver Road improvement.
The Community Facilities Agreement is in compliance with standard City policy. The project is located
in COUNCIL DISTRICT 4.
' ..
1yy�.;
INTER-OFFICE CORRESPONDENCE
ciry of Forr Worrf:
Transportatio�i/Public �Vorks Departrnent
Marcla l, 2000
TO: Gary Steinberger
Assistant City Attorney
FROM: Raquel Velasquez, Development Project Coord. �JV
SUBJECT: COMMUNITY FACILITIES CONTRACT FOR SHIVER ROAD AND
TRACE RIDGE PARKWAY
In accordance with M&C C-17862, approved on February 15, 2000, please
process the 3 copies of the CFA to the City Manager and City Secretary for
execution. After execution and assignment of contract number, the City
Secretary shall retain one copy and return the remaining copses to this office for
fu�ther processing. I've included a copy of the approved M&C. Developer paid
cash for their share of the project.
Please call Raquel Velasquez at 7905 when ready for pickup.
Thank you,
cc: file