HomeMy WebLinkAboutContract 41159-A1 CITY SECRETARY _
AMENDMENT NO. 1 CONTRACT NO° 11 5�i P�
(No M&C Needed)
STATE OF TEXAS S
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Freese and
Nichols, Inc. , (Engineer) made and entered into City Secretary
Contract No. 41159, (the Contract) which was executed by the City
Manager on the twenty-ninth day of November 2010; and
WHEREAS, the Contract involves engineering services for the
following project:
Brennan Avenue Drainage Improvements Project, Project No. 01602
WHEREAS, it has become necessary to execute Amendment No. 1
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated August 4, 2011, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $43,560.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $103, 617.00.
�ppRD
R
pFF CREt
City of Fort Worth,Texas y S p'Ry
Amendment to Engineering Agreement CST •�H� n
PMO Official Release Date 10.01 2010 WpR
Page 1 of 2
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the 4 4-1- day of (OC!V60c ,r 2011, in Fort
Worth, Tarrant County, Texas.
ATTEST: l
O�o o I'
dk�Oo ' C
o
Marty Hendrix o o Z d
City Secretary -r 00
A000000000 Icy
ww. uria�b b-.Ty 'Zr
APPROVAL RECOMMENDED: APPROVED:
W
Douglas 0. Wiersig, P.E.0 Director, Fernando Costa
Department of Transportation and Assistant City Manager
Public Work
Freese and Nichols, Inc.
ENGINEER
By: 44P
Name: Kell illard, P.E.
Associate
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
APPROVED AS TO FORM AND LEGALITY:
Q C—AP-
Assistant City Attorney
City of Fort Worth,Texas
CIR
Amendment to Engineering Agreement PMO Official Release Date:6.18.2010 Page 2 of 2
FREESE Practical results
Innovative approaches
ZOutstanding service
4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7491 www.freese.com
August 26, 2011
Vibhuti Pandey, Ph.D., P.E., CFM
Project Manager
Stormwater-Gordon SWIFT Building
900 Monroe Street, Suite 500
Fort Worth, TX 76102
Re: Brennan Avenue Drainage Improvements Project(Project No.01602)—Amendment No. 1
Dear Mr. Pandey:
Additional services have been requested for the Brennan Avenue Drainage Improvements Project
(Project No. 01602, DOE No. 5689). The additional scope of work in the sub-watershed adjacent to our
current contracted study area includes:
1. Hydraulic modeling and analysis of the existing storm drain system along Cold Springs Road from
Watauga Road south to outfall at Northside Drive,
2. Hydraulic modeling and analysis of the existing storm drain system located within the City
maintenance facility along Brennan Avenue,
3. Revised proposed drainage improvement alternatives analyses for Cold Springs Road and the
City maintenance facility,
4. Additional hydrologic and hydraulic modeling and proposed drainage improvements alternatives
analysis for the adjacent Northside Drive sump area east of Cold Springs Road beneath the
existing railroad bridge; and
5. Field surveying of the Cold Springs Road storm drain system, the police maintenance facility
system and drainage features for the Northside Drive sump area.
Attached Figure 1 shows the proposed additional study area and existing storm drain systems to be
analyzed. The total for the proposed services is $43,560 including additional engineering services, field
survey and administration fees. This brings the total contract amount to $103,617. Please contact me
directly at 817-735-7460 if you require additional information. Thank you for your attention to this
matter.
Sincerely,
Scott Berman, P.E., CFM, CPESC
Project Manager
Attachments[Project Number]T:/File Path
„
r �
� r
b
p � 4, a, tom'.8,� i e4` � 1 �'� a III4'��. „���. ���•� "�l
r
i
r c
e �
a n v
i t��i ' �`rn ,,d t�l arr >��r !�� yV�,^<<�,����+�rn �” '`✓ 1n �/i, � !� u, �'` � � � �� � i %� ;) I
a
r
aY" f
� �u✓r a G'n�w ^
s ^
a,