Loading...
HomeMy WebLinkAbout025675 - Construction-Related - Contract - Stocker Enterprises, Inc.EXECUTED COPY SPECIFICATIONS AND C{� SECRETARY CITY SECRETARY � '�j (� �h� CONTRACT NO. CONTRACT DOCUMENTS FOR Sanitary Sewer Meter Stations Serving the City of Saginaw SEWER PROJECT NO.: PS46-070460250030 DOE NO. 2404 KENNETH L. BAR.R BOB TERRELL MAYOR CITY MANAGER LEE C. BR.ADLEY JR., P.E., DIRECTOR FORT WORTH WATER DEPARTMENT PREPARED BY WATER DEPARTMENT , -. ���g��1�� ������� ��' �����?C��`� �, �G'�� �. , City of Fo�t Worth, Texas ��A�or And Counc�il Cv�n�»un�cAt�on DATE REFERENCE NUMBER LOG NAME PAGE 1/25/00 **C-17831 60SAG 1 of 2 SUBJECT AWARD OF CONTRACT TO STOCKER ENTERPRISES, INC. FOR CONSTRUCTION OF SANITARY SEWER METER STATIONS IN THE CITY OF SAGINAW, TEXAS RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Stocker Enterprises, Inc. in the amount of $180,695 for construction of sanitary sewer meter stations to serve the City of Sagsnaw. DISCUSSION: Relocation of the existing Saginaw wastewater meter located south of Longhorn Drive is necessary due to development in Fort Worth upstream of the existing meter. Two meter stations are required to replace the existing meter in order to measure flow on two separate mains from Saginaw. The constructson of two separate meter stations will allow for more accurate measurement of flows from Saginaw, and allow Fort Worth development to connect to the main downstream of the proposed meters. This pro}ect is {ocated south of Longhorn Road in COUNCIL DISTRICT 7, Mapsco 47D, 48A and 34L, respectively. This project was advertised for bid September 30 and October 7, 1999. On October 28, 1999, the following bids were received: BIDDER AMOUNT Stocker Enterprises, Inc. $180,695 Linder-Stahl Construction Company, Inc. 215,570 B&H Utilities 226,842 Architectural Utilities 245,795 Stocker Enterprises, Inc. is in compliance with the City's MNVBE Ordinance by committing to 17% M/V1/BE participation. The City's goal on this project is 16%. In addition to the contract cost, $9,035 is required for contingencies, and $18,070 is required for staff project overview. The wholesale customer contract provides that meter replacements are funded through the wholesale rate schedule. City of FoYt Worth, Texas �1�A�a�r And C,aunc�l Con��»un�cAt�on DATE REFERENCE NUMBER LOG NAME PAGE 1/25/00 **C-17831 60SAG 2 of 2 SUBJECT AWARD OF CONTRACT TO STOCKER ENTERPRISES, INC. FOR CONSTRUCTION OF SANITARY SEWER METER STATIONS IN THE CITY OF SAGINAW, TEXAS FISCAL INFORMATION/CERTiFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Sewer Fund. MG:j Submitted for City Manager's Office by: Mike Groomer Originating Department Head: Dale Fisseler Additional Information Contact: Dalc Fisseler FUND � aCCOUNT � CENTER j A�1OUNT (to) 6140 � 8207 � (from) I PS46 I 820i � 541200 070460250040 $180,695.00 � � I � I CITY SECRETARY AP�ROVED CITY COUNCfL ,qt� 25 2000 � . r. � �. �/ �/I N i Clty Secretary of i4e Cit� nf Fort Wor h Tax=•= TABLE OF CONTEI�TTS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Part A-Notice to Bidders Special Instructions to Bidders Part B-Proposal Minority and Women Business Enterprises Specifications Part C-General Conditions Part D-Special Conditions Section E-Specifications Part F-Certificate of Insurance Contractor Compliance With Worker's Compensation Law Performance Bond Payment Bond Maintenance Bond Part G-Contract � � L' . � � � � �� � PART A NO?ICE TD BIDDERS SPECIAL INSTRUCTIONS TO BIDDERS � � NOTICE TO BIDD�RS � Sealed proposals for the following: SANITARY SEWER METER STATIONS SERVING THE CITY OF SAGINAW SEWER PROJECT NO.: PS46-07046025Q030 DOE NO. 2404 � Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 P.M., Thursday, October 28, 1999, and then � publicly opened and read aloud at 2:00 P.M. Plans, Specifications and Coniract Documents for this project may be obtained at the office of ihe Department of Engineering, Municipal Office Building, 1000 Throcl:morton Street, Fort Worth, Texas. � One set of documents �vill be provided to prospective bidders for a deposit of $20.00; _ such deposit will be refunded if the document is retumed in good condition within 10 days after bids are opened. Additional sets may be purchased on a non-refundable basis ` for twenty dollars ($20.00) per set. w•. Bid security is required in accordance with the Special Insiructions to Bidders. �� The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of forty-nine (49) days from � the date ihe M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM andlor ihe GOOD FAITH EFFORT FORM ("Documentation") as appropriate is received by the City. The award of contract, if made, will be within forty-nine (49) days after ihis � documentation is received, but in no case will ihe award be made until the responsibility � of the bidder to whom it is proposed to award the contract has been verified. Bidders are responsible for obtaining all addenda to tlie contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817) 871-7910. In accord with City of Fort Worth Ordinance No. 11923, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. You may obtain a copy of the Ordinance from the Office of the City Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included within these bid documents must be completed and submitted with your bid. Failure to submit the completed AFFIDAVIT STATEMENT shall render your bid non-responsive. The bidder shall submit ihe MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT � � � � � � �� � � � � � � � PORM ("Documentation") as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (�) City btisiness days after the bid openinb date. The bidder shall obtain a receipt from il�e appropriate employee of the managin� department to whom delivery was made. Such receipt shall be evidenr_e that the Documentation was received by ihe City. Failure to comply shall render your bid non- responsive. . For additional information, contact John Kasavich @ S71-8480. BOB TER.RELL CITY MANAGER Advertising Dates: September 30, 1999 October 7, 1999 GLORIA PEARSON CITY SECRETARY Water Department Lee C. Bradley Jr., Director By � �G�.��"� Engineering Manager � � � �� � �� � SPECIAL IVS`['Rl►CTIO�IS "1'0 I3[DUERS l) PREC)�i-ALlF1CATIUV IZEpU1RL'�IEN'fS: All coniractor5 submiriin� bids are required to be prequalified by the Fort Worth Water Department prior to submittin� bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis ofthe contractor. It is the bidder's responsibility to submit the follo���ing documentation: a current financial statement, an acceptable e�perience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to ihe date of the opening of bids. a} The financial statement reyuired shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing a�ency and shall have been so prepared as to reflect the �nancial status to the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received_ � c) The Director of the Water Department shall be the sole judge as to the �acceptability for financial qualification to bid on any Fort Worth Water � Department project. � ", � � d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. � Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify sl�all not be a waiver of any necessary prequalification. �„ 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less than five (5%) percent of the largest possible total of the Uid submitted must accoirpany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents :� within ten (1 U) days aitc:r the contract has been a�ti�arded. "I'o be an acceptabie surety c�n the bond, (1) the name of the surety shail l}e included on the current U.S. Treasury List, or (2) th� surety musi have capital and surplus equal to ten times the limit of the bond. `The surety must be licensed to do business in the state of Teaas. The amount of the bond shall not exceed the amo�mt sho�vn on the treasury list or one-tenth ( li ] 0) the total capital and surplus. 3. BONDS: A perforn�ance bond, a payment bond, and a maintenance bond each for one hundred (100%) percent ofthe contract price will be required, Reference C 3-3.7. 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents must be paid on this project. 5. A1�BIGLIITY: In ihe case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. QIDDCR LICENSC: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDEI�T BIDDERS: Pursuant to Article 601g, "I'exas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder" means a bidder whose principal place of business is not in this � state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. � This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in �order for the bid to meet specifications. The failure of a nonresident contractor to do .- so wi11 automatically disqualify that bidder. � �' � � 8. PAYMENT: If the bid amount is $25,000.00 or less, the contract amount shall be paid within foriy-�ve (45} calendar days after completion and acceptance by the City. 9. AGE: ln accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the ' bases o1�a bana t�ide occupational c�ualification, retir�ment plan or statutory req u i rement. Contractor furiher covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specity, in solicitations or advertisements for employees to work on this contract, a maximum a�e limit Tor such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify � and hold City harmless against any claims or alle�ations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age � discrimination in the performance of this a�reement. �10. DISABILITY: In accordance with the provisions of the Americans With Disabilities a Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services � to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Cantractor warrants it will fully comply with ADA's provisions and any other applicable federal, state and local laws conc�rning disability and will �,,, defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arisin�; out of Contractor's and/or its � subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. R"" 11. R'[INORITY AND WOMEN BUSINESS ENTERPRISES: In accard with City of Fort Worth Ordinance No. 11923, the City of fort Worth has goals for the participation of minoriry business enterprises and women business enterprises in City � contracts. A copy of the Ordinance can be obtained from the Office of the City � Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included within these bid documents must be completed and �submitted with the bid. Failure to submit the completed AFF[DAVIT STATEMENT � shall render your bid non-responsive. The bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVCR FORM and/or the �GOOD FAITH EFFORT FOIZM ("Documentation") as appropriate. The � Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a � receipt from the appropriate employee of the managinb department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. � 12. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise � � � (ML3E) on the contract and a�ment th�reof� Contractor lurther a�recs to ennit an P } ., P Y audit and,'or examination of am• bool:s, records or tiles in its possession that ��-ill � subst;�ntiate the actual ��ork perfonred hv an MBE 1nd;'or V4�'I3E. 'I�he m�s�epresentation of facts (other than a ne�;ligent misrepresentation) and/ur � commission of fraud by the Contractor will be �rounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such m�srepresentation facts (other than a negligent misrepresentation) and!or commission of fraud will result in the Contractor � being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3} years. Revised 9/24/97 � E� C� Q 0. J d � O a O � � � � � � � � �' ji7� � r � � � � � � � � � � ' � PART B - PROPOSAL � This proposal must not be removed from this book of Contract Documents. TO: Bob Terrell City Manager r'"' Fort Worth, Texas � �" � � � Fort Worth, Texas PROPOSAL FOR: The furnishing of all materials, except materials specified to be f'urnished by the City, equipment and labor for the installation of 2 sanitary sewer metering stations and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: PROJECT NAME: Sanitary Sewer Meter Stations Serving the City of Saginaw Sewer Project No. PS46-070460250030 Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the City Engineering Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: B-1 , �� PART B - PROPOSAL This proposai must not be removed from this book of Contract Documents. �� TO: Bob Terrell City Manager � Fort Worth, Texas � � � � Fort Worth, Texas PROPOSAL FOR: The furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of 2 sanitary sewer metering stations and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: PROJECT NAME: Sanitary Sewer Meter Stations Serving the City of Saginaw Sewer Project No. PS46-070460250030 Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, f'urnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in ihe Plans and Contract Documents and subject to the inspection and approval of the Director of the City Engineering Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: � B-1 UNIT I: SEWER (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 2. 3. � 4 30 L.S. Sanitary sewer meters, telemetry, electrical power, 2" Sch 40 and Sch 80 conduit; Per � �Q L�p Sum: �-- r�►2-w (��� � ��c�� �'��C�� Dollars and r— c��— Cents EA. Standard 4-Foot Diameter Manhole to 6 feet depth with water tight manhole cover, D-10; Per Each: �c� r s �a-.�'� � ► �,.a � �.+ r+� tl2 � Dollars and d — Cents L.F. Additional Depth over 6 feet of Standard 4-Foot Diameter Manhole; Per �L.inear Foot: �a :-� � � 11 �� Dollars � And -- � -� Cents � s� ,-. � ��� � 1���� � ��ea � �� � �� � : �. 2 5. 25 r ,r �, 7. 4 8. 15 EA. 5-Foot x 5-Foot Square Manhole to 6 feet depth; Include aluminum ladder, Bilco �� Access Door J-4AL and Bilco �'� �'� Ladder Up Safety Post (Part E) $ / ��,,��t $ � ��'C�G� or approved equals; Per Each: � -� ... � . � v r � I L �ce.Urjr1�'I.i+-� �- � �, C� ,cr.���v���.:�17 Dollars and - G � Cents L.F. Additional Depth over 6 feet of 5-Foot x 5-Foot Square Manhole; Pez, Linear Foot•} ��, r � �-t_�,'�,�7��1';�!J j ��� �-�� Dollars � � $ ��'L� $ . ;�`��C''y� and . �� � Cents EA. Watertight Manhole Inserts D-31; Per Each: - r c.�,.,, .,,�. V� ''; � �y �-, C +�1 �. ,� ,� �, . Dollars 1 $ �`� $ � � � and �� U -- Cents EA. Concrete Collar for Manhole, Per Fi . 121; Per Each: � �. , `— ci,.+..�t � ��'.-v� �v` f��l'..'�'' � C � � 4�;� -}-- � � -� `:� •� f �- Dollars � $ `�" i'�-k $ ' � �..�1 and — '�` - Cents L.F. 8-inch SDR 26 PVC pipe; Per Linear Foot: �-"_._ � r'-, �1..�! (' C���'�_.- Dollazs " �- �'' � �� and •-- � _ � ��,� � � t�_.-�'�� Cents , : 1 � E 10 80 40 11. 105 12. 1 13. 50 14. 20 L.F. 10-inch SDR 26 PVC pipe; Per Linear Foot: � --, �`, k � r.-�s. �� � . -�� G�-' � Dollars � ` �- r . and — (� -�- $ �� $ � �'C�'�`, Cents L.�. 10-inch Ductile Iron Pipe Class 51, for drainage; Per Linear Faoi: °"� � ^ ��'� c_.=,,;�, , ,-r _, �-`� .,�- : �`�. _ ��C' Dollazs � $ ��� $ ��'�-�� and - � .� � Cents L.F. 12-inch SDR 26 PVC pipe; Per Linear Foot: „,�` - - -, I r� � I t� R`'F a� f[.��---- �� l��' L 1�. Dollars � � - � and — �-�� $. �� $ �'t����� Cents L.S. P.V.C. Fittings, including _ reducers; Per Lump Sum: ,� �"(�� — \. ��. � .�, -_� ����,��� �� J r �.: Dollars _ � � �d --- � -- $ ��� �;��7:� $ � ��r��� Cents C.Y. Crushed limestone for misc. placement, D-8; Per Cubic Yard: � � ��.. ��` �� Dollars $ ( �� $ �j �� and �- '� � Cents C.Y. Class 'B' Concrete (2500#) D-17; Per Cubic Yard: � � � �i�� e.� ✓1 r �O ` Dollazs $ � � � $ �j� � and " � � Cents B-4 15. 10 16. 200 17. 2 18. 200 19. 6 C.Y. Class'E' Concrete (1500#) D-17; Per Cubic Yard: ����� � �,v Dollars $ � � $ ,�'� � and : C7 � � Cenis L.F. Trench Safety System, D-9; Per Linear Foot: �� � � ��� � � � Dollars � � $ z a o� v and '� � — Cents EA. Hydromatic SP40-A 1 Sump Pump or approved �qual; Per� Each: �� �� �� ' ' '� � � '�r� � � dE`� Q c� Dollars and -� � � Cents L.F. Post-Construction Television Inspection of Sanitary Sewer Lines, D-25; Per Linear Foot: �� �� � �� �� � � Dollars and � O -- Cents EA. Vacuum tests for manholes; Per ea �i�1 � n� � �l� r.� Op �, Dollars � ��� arid y $ � �� $ Cents I�•". ?0. 2 21. 270 2?. S0 23. 1 EA. Pre-cast equipment building and �fl.G,slab; Per Each: � �t�L '�s� �° oc� J �� � Dollars � $� $ / � �O�,,. and � Cents S.'k'. 5-i�ch �I.Nf .A.�C. Par�ement; Per � - Sq�ua Yard: '� � � *�� , � �� r��� � �/G� �oilars $ � and � �' � �' Cents C.Y. 6-inch Compacted Flex Base Material; Per Cubic Yard: �� �� �� � � � �� Dollars � $ $ and �--- � '-� Cents L.S. Grading and leveling around equipment building; Per Lump �� ���� � � �� $f� �� $ Dollars and —� � � Cents TOTAL AMOUNT BID E� � � � 1 �'�� v � B-6 PART B - PROPOSAL (Cont.) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithfitl performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Wortli, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. �` The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated ` January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Coniract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of � any labor organization, subcontractors, or employment agency in either furnishing or refei-ring employee applicants to the undersigned are not discriminated against as � prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. , 7400. � � The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 45 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal � place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. � � �� Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. The principal place of business of our company or our parent company or majority owner is in the State of Texas. � I: I(we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: � � �y Addendum No. 1(Initials) A_��`� ..aendum No. 3(Initials) Addendum No. 2(Initials) �� Addendum No. 4(Initials) � Respectfully submitted, �� n �) Toc ��.* �y r�,/'. :`�'�! .• y I �"�I�'.---,._ r, Title �, �.�1 Y .�- = -�, � Address I o S I ��-�vn�.c�.c.t, d�-- � � .� � l��- � � • '? � � 31 Telephone: g I �- 3�� - b�# �t� (Seal) Date: f �} ' �,�i �'�' � Cit�y of Fort Worth Minority and Women �3usiness Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the tfltal dollar vaiue of the contract is $25,000 or more, the MJWBE goal is applicable. If the total dollar value of the contract is less than $25,000, the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. M/WBE PROJECT GOALS f The City's MBE/WBE goa( on this project is �Gp % of the base bid value of the contract. COMPLIANCE TO BID SPEClFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's MJWBE Ordinance by either of the fo(lowing: 1. Meet or exceed the above stated MNVBE goat, or; 2. Good Faith Effort documentation, or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. M/WBE Utilization Form: 2. Prime Contractor Waiver Form: 3. Good Faith Eifort Form: received by 5:00 p.m., five (5) City business days after the bid opening date, exciusive of the bid opening date. received by 5:00 p.m., fve (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. �FAILURE TO COMPLY WITN THE CITY'S MNVBE ORDINANCE, WILL RESULT IN THE BID BEING � CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. Any questtons, ptease contact the M/WBE Oftice at (817) 871-6104. Rev. 6/2/98 city of Fort wortn Minority and Women Business Enterprise Specifications PRIME COMPANY NAME �ROJECT NAME ( CITI''S �1/1�'BE PROJECT COAL: MBE/WBE UTILIZATION $ID DATE PROJECT NUMBER _ � �l/��"NE PERCENTAGE ACHIEVED: ATTACHMENT 1A Page 1 of 2 �aiture to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being constdered non-responsive to bid specifications. � The undersigned bidder agrees to enter into a formal agreement with the MSE and/or WBE firms for work listed in this scf�edule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing r�isrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered ; ��on-responsive to specifications. Company �a�n�� CoraWct Nsme, I Add�ress, and Telep'�one �?o. � r __ . _ w.�.._ �..�.___.- ------- F..____.. ______.- - - -- Ce+rtltiod 3pocihr @11 �Coo�tracting Scop�e of W�Vo�k �•p Spoc�fy All 'P�a�os t4 bp [)ol9ar Amaynt Suppliad(`) ,�, 3 � �� �-_ __ __.._._ ___... . __ ._.�- ---- -- ._- _ ___--- - - --.- � _ _ ��.. ..�.�_.. _� . . . .. _ M _ . � .. � M/WBEs must be Iocated In the 9(nine) county marketptace or currently doing business in ihe marketplace at the time of bid. � ') Specify aU areas in which MWBE's are to be utilized and/or items to be supplied: � ') A complete listing of items to be supptied is reguired fn order to recelve credit toward the MIWBE goal. "') Identify each Tier levet. ' Tier: Means ttie leve! of subcontracting below the prime contractor/consultant, i.e., a direct payment from the prime contractor to a subcontractor is considered 1" tier, a payment by a subconiractor to its supplier is considered 2"° tier. THIS FORM MUST BE RECEIVED BY THE MANAGlNG DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID OPENING, EXC�USIVE OF THE BID OPENING DATE Rev. 6!Zl98 Pages 1 and 2 of Attachment 1A must be received by the Managing Department ATTACHMENT 9A Page 2 of 2 Ci�ty of Fort Worth Minorrty and Women Busrness Enterprise Specifications MBE/WBE UTILiZATION � Cornp�ny Nam�, Contact �fa�e, Ca�tf�ed - Specify All �anQracGinr� Specil�r AQ Items to be Add��s, and T�lep�►os�e No. .. Scope o('Work ('� Supptied(•� ,r.. � �- � � $� �� � �-.---__.__.____. . _ __ _ ._. � �- � .._.- .- � -_-----_ _ p.._ , . .e...._........_.__. � _ .__ � Doll�r Amount � 1"he bidder further agrees to provide, directty to the City upon request, compiete and accuraEe information regarding actual work perforrned by all subcontractors, incl�ding MSE{s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to attow an audit and/or examination of any books, records and files held by their company that nrill substantiate the actual work performed by ihe MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts wili be grounds for terminating the :onfract or debarment from City work for a period of not less than three (3) years and for 'tnrtiating action under Federal, 3tate or Local taws concerning fafse sfaternents. Any faiture to comply with this ordinance and creates a material breach of contract may resuit tn a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than or+e (1) year. A�L MBEs and WBEs MUST BE CERTfFIED BY THE CITY BEFORE CONTRAGT AWARD authorized Signature Title Company Name �ddress ;tty/State/Zip Code Printed Signature Contact Name and Title {if differentj Telephone Number (sj Fax Number Date THIS FORM MUST BE RECEIVED BY THE MANAGlNG DEPARTM�NT 8Y 5:Q0 p.m., FJVE {5) CIiY BUSINESS DAYS AFTER BiD OPENING, EXCIUSIVE OF THE BID OPENING DATE Pages 1 and 2 of Attachmenf 1A must be received by the Managing Department Rev. 6/2/98 ATTACHMENT1B Page 1 of 1 City of Fort Worth Minority and Women Business Enterprise Specifications Prime Contractor Waiver Prime Company Name Bid Opening Date Project Name Project Number If both answers to this form are YES, do not comptete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is onfy applicable if both answers are yes. Failure to cornplete this form in its entirety and be received by the Manaqinq Department on or before 5:00 p.m., five (51 Citv business days after bid openinq, exclusive of the bid opening date, will result in the bid being considered non-�esponsive to bid specifications. Wil[ you perform this entire contract without subcontractors? Yes No lf yes, please provide a detaited explanation that proves based on the size and scope of this project, this is your normal business practice and provide an operational profile of your business. Will you perform this eniire contract without suppliers? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provsde an inventory profrle of your business. . The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actuai work performed by all subcontractors, including MBE(s) andlor WBE(s) on this contract, the payment therefore and any proposed changes to the origina! MBE{s) andlor WBE (s) arrangements submitted with this bid. The bidder also agrees to a14ow an audit and/or examination of any books, records and files held by their company that will substantiate the actuat work perforrned by the M8E(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentionat and/or knowing misrepresentation of Eacts wit! be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Loca! laws concerning fatse statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determinatson of an irresponsible offeror and barred from participating in City work for a period of time not tess than one (1) year. Authorized Signature Title Company Name Address Printed Signature Contact Name (if different) Contact Telephone Number (s) Fax Number Rev, 6!2/98 ATTACHMENT 1C Rage 1 of 3 City of Fort Worth Minority and Women Business Enterprise GOOD FAITH EFFORT Prime Company Name Project Name Bid Qate Project Number If you have failed to secure MlWSE participation and you have subcontracting and/or supplier opportunities or if � your M/WBE participation is less than the City's project goal, you must complete this form. If the bidder's method of compliance with the M/WBE goaf is based upon demanstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentiona! and/or knowing misrepresentation the facts or intentiona! discrimination by the bidder. Failure to complete this form, in its entsrety with supporting documentation, and received by the Managing Department on or before 5:Q0 p.m. �ve (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting andlor supplier opportunity 1DO NOT LIST NAMES OF FIRMS) which will be used in the completion of this project, regardless of whether it is to be provided by a MIWBE or non- MNVBE. (Use additional sheets, if necessary) List of: Subcontractinq Opportunities List of: Supplier Opportunities Rev. 6I2/98 ATTACHMENT 1C Page 2 of 3 2.) Did you obtain a current list of M/WBE firms from the City's MIWBE Office? The list is considered in compliance, if it is not more than 3 manths o!d from the date of bid opening. Yes No Date of �isting 3.) Did you solicit bids from M/WBE firms, within the subcontracting andlor supplier areas previously tisted, at least ten calendar days prtor to bid opening by mail, exclusive of the day the bids are opened? Yes lf yes, attach MIWBE mail listing to include name of firm anct address and a dated No copy of letter mailed. 4.) Did you solicit bids from MIWBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by tefephone, exclusive of the day the bids are opened? Yes If yes, attach list to include name of M/WBE fsrm, ep rson contacted, No phone number and date and time of contact. NOTE: A facsimite may be used to compty with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and documentation faxed. NOTE: !f a SIC list of M/WBE is ten or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If a sic list of MIWBE is more than ten, the bidder must contact at least two-thirds of the list but not less than ten to be in comptiance with questions 3 and 4. 5.) Dtd you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the MIVVBEs? Yes No 6.) If M/WBE bids were received and rejected, you must: (1) List the M/WBE firms and the reason(s) for rejection (i.e., quotation not commercially reasonable, qualifications, etc.) and (2) Attach a�davit and/or documentation to support the reason(s) listed below (i.e., letters, memos, bids, telephone calls, meetings, etc.) (Ptease use addrifonat sheets, if necessary, and attach.) Company Name ielephone Contact Person Scope of Work Reason for Rejection Rev. 6/2l96 ATTACHMENT 1C Page 3 of 3 ADDIT{ONAL INFORMATION: Please provide additional information you fee! will further explain your good and hanest efforts to obtain M/WBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actuat work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that wr11 substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from Crty work for a period of not less than three (3) years and for initiating action under Federaf, State or Locai laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from partrcipating in City work for a perrod of time not less than one (1) year. The undersigned certifes that the information provided and the M/WBE(s) lis#ed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and the reasons for not using them wilt be verified by the City's M/VI/BE Office. Authorized Signature Title Company Name Address City/State2ip Printed Signature Contact Name and Trtle (if different) Telephone Number(s) Fax Number Date Rev. 6/2/98 � �1'V I LV a/J I lal 1�' JL I 1� /^iVl\111 Y'YllllLlf VLI i 1IIl1 IIV. LlA� uI1 U1VJ I � UJ � Cr� of Fort Worth D��"i 0 F Mrnority and Women usiness Enter�r��� ��tif'�Fa�i�lns ATTACHMEIYT 'iA Page 1 of 2 MBEIWBE UTlLIZA,T�I��� � P�l/ 1 3� � �{ ���� � r � � �� fc�1 ��' � �i �R�M C�C?MPAi�[Y NitNTE �y ,f • �/ 1� � 81D DATE �� IJI� � �� �" d T RCm.i�C7 N E � Nrt6-JECT NUMBER � � � ./�-� / r"i.�' r'�--�� ,l�'��C� - �'�r'— - I � � CIT�"S Ailw6£ pROJECT GQ.aL: ��r � I�tn� BE PERCE�TAGE ACHIEVED: �� I t '�ailure to complete this form, in its entirety with supporting documentaiion, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, wifl result in the bid 1 eing considered non-responsive to bid specifications. he undersigned bidder agrees to entet into a formal agreement with the MB� and/or WBE firms for work listed in this hedule, conditioned upon executiost of a contract with the City of Fort Worth. 7he intentional and/or knowing � isrepresentation of facts is grounds for consideration of disquatification and will. result in the bid being coosidered ,.s on-responstve Lo specifications. � Company Name, Contact Name, CE:rtified Address, and Telephone No. a V p0 � 4 Zj X � � Z r.� �.�'��_� ,r � � _ . � ��., � a ��� ,�`' o�, , ��. i k � ��� ... � �, f �,� � +�' �� . , ,� c�.� � � 47�f�� � � � �� ����� �.v bre� . `nl. � !o a.a-� �, t'", t q4o, 5�.5-bs�� 1 [ ; t r� Trcrf-�.'� c'c� �o , � ����� � a f��-v� s-c- . �T._ G'V�, raG-�-Y ..�� .'7 G 1 c�� ' �C�(2_'� ��}��-5�..'� _ _ ___ Specffy 1�11 Gontractina Scope of Work (`) ��. Spec'rfy � Items to be Su�plied(*) � �r��� �� � � � Doltar Amount ,� r uy� 0. m y � @o f,����`' : . �� ,�- : � ��ooU ; +, � � . �� �� p 1 '!! iNM/BEs musf be Iocated In the 8(nine) county marketplace or currently doing business in tho marketplace at the Ume of b?d_ �) SFecify a11 aroas '+n which MWBE's are to be utilized and/or items to be supplied: - A complete listing of items to be supplied is requ"rred In Ortler to recefve credit toward the NUWBE goal_ ' I{") Identify each Tier level. ' Tier: Means the leve! ot subconVaCting below ihe prime coniraCtorlconsulcant, i.e., a di�ect payment � from tt�e prime contrdCtp[ to a subcontrdCtor is ton&idered 1" Uer, a payment by a subcontraci4r to fts supplier is conside�ed 2n° tier. , � TH1S FORM MUST BE REC�IVED BY TFtE MANAGING D�PARTMENT BY 5:00 p.m., FNE (5) C1TY BUSINESS DAYS AFTER BID �� OPENfNG, EXCLUSIVE OF THE B1D OPENlNG DATE Rev. 6!?J98 Pages 1 and 2 of Attachment 1A must be received by the Managing Department r u�l—�y—yy rrcl 1b��� h I. WUK I H WH I tK U�.F' I h H1S NU. tS 1 1 ti f l tS 1 y� r. u� ■__J n L c�yt of Fort wortn Minority and Women Business Enterprise Specifications MBENVBE UTILIZATION Cort�pany Name, ContaGt Name, Certified Address, and Telephone No. ,. U n p � �i z �� ��C r�r .�, �+s�:. .'.� - � - �� �. ����' _C�!' �_ � �,,, '�sr��-r�+�,.�7�._ `��� t 5 ki�-`�'�5-�4�� Specify l,�Contracting Specify � Items to be Scope of Work (`) Supplied(') ; � cna �- �� �G ✓'� - �� .� ATTACHMENi 1A `` Page 2 ot 2 �:' .:� �.K DollarAmount '� :� I �w � .,� rs� ti:�_ ��� l �;�� � _ �.--..�— - ' - ��� ° � � _... � ..w..�p :,� ,� s ---- __ _ 'n� ---____._..�._.. . ._.�..,.._.. ��� � ... .. _.. . ...V..r i _.. _— � ';' � .,:, , ; I � he bidder further agrees to provide, direCtly to the City upon request, complete and acCurate informaiion TegaCditlg .'� � actual work performed by all subcontractors, including MBE(s) andlor WBE(s) arrangemertts submitted with this btd. r� ��he bidder a[so agrees to allow an audit anBlor examination of any books, records and files held by their company that ��-= � ill substantiate the actuat work performed by the MBE(s) andlor WBE(s) on ihis contract, by an authorized officer or `! empfoyee of ihe C�ty. Any intentional andlor knowing misrepresentation of facts will be grounds For terminating the :�; � ontract or debarment from City work for a per"sod of not less than three (3) years and for initiating action under Federal, �.� � 4 ��tate or Locat laws concerning fa(se statements. Any failure to comply with this ordinance and creates a maferial _���: ? areach of contract may resutt in a determination of an irresponsibie offeror and barred from participating in City work '=::� � ""' �`or a period of time n s than one (1) year. ''` � Es and WBEs MIiST BE CERTIFfED BY TH� C B��`�RE ONi1�'AC� AwAR� .°.�: � �r � ,I� ,� ,�'r :�-7�' ' ' uthorized �gnature � Printed Signature •�� � � ��. �i,� . �� . �"� Title �--. Contact Name and Title �if differenty ;';` � � � � �� � Y �- ��i� �� � 3c� 2� ���� . R. �:ompany Name � / �Tetephone Number (5) :` � � �� il� ��' L�J _ _ �� ���; �: I D � � � _ �� � �n� n �' , � r... �lddress ' , /� -� Fax Number ,:; � �,���rr � �•� �i1��.1� �,,� — ; � iry/State/Zip Code I Date � ���i� � S� �: � '- } � ,', � ,. ;�. � THIS FORM MUST BE REC�IV£D BY THE MANAGING �EPARTMENT BY 5:00 p.m_, FfVE (5) CITY BUSINE5S DAYS AFT�R BID �' . OPENING, EXCLUSlVE OF TNE BID 0PENING DATE Rev 6J2198 ' ` '� � Pages 1 and 2 of Attachmeni 1A must be received by the Managing Departmeni � � P:e RT C GGNERAL CONDITIUNS l� �. � C1-1 C1-l.l C1-1.2 C1-1.3 C1-1.4 C1-1.5 C1-1.6 C1-1.7 C1-1.8 C1-1.9 C1-1.10 C1-1.11 C1-1.12 C1-1.13 C1-1.14 C1-1.15 C1-1.16 C1-1.17 C1-1.18 C1-1.19 C1-1.20 C1-1.21 C1-1.22 C1-1.23 C1-1.24 C1-1.25 C1-1.26 C1-1.27 C1-1.28 C1-1.29 C1-1.30 C1-1.31 C1-1.32 PART C - GENERAL TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS DEFINITIQNS Definition of Terms Contract Documents Notice to Bidders Proposal Bidder General Conditions Special Conditions Specifications Bond Contract Plans City City Council Mayor City Manager City Attorney Director of Public Works Director, City Water Department Engineer Contractor Sureties The Work or Project Working Day Calendar Day Legal Holiday Abbreviations Change Order Paved Streets and Alleys Unpaved Streets and Alleys City Streets Roadway Gravel Street C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2.2 Interpretation of Quantities C2-2.3 Examination of Contract Documents and Site C2-2.4 Submitting of Proposal C2-2.5 Rejection of Proposals C2-2.6 Bid Security CONDITIONS Cl-1 C1-1 Cl-1 C1-1 Cl-1 C1-1 C1-1 Cl-1 C1-1 C1-1 Cl-1 Cl-1 Cl-1 Cl-1 Cl-1 C1-1 C1-1 C1-1 Cl-1 C1-1 Cl-1 Cl-1 Cl-1 Cl-1 C1-1 Cl-1 Cl-1 Cl-1 Cl-1 C1-1 Cl-1 Cl-1 (1) (1) (2) (2) (2) (2) (2) (2) (2) (3) (3) (3) (3) (3) (3) (3) (4) (4) (4) (4) (4) (4) (4) (4) (4) (S> (6) (6) (6) (6) (6) (6) C2-2 (1) C2-2 (1) C2-2 (2) C2-2 (3) C2-2 (3) C2-2 (3) (1) C2-2.? Delivery of Proposal C2-2.8 Withdrawing Proposals C2-2.9 Telegraphic Modification of Proposals C2-2.10 Public Opening of Proposal C2-2.11 Irregular Proposals C2-2.12 Disqualification of Bidders C3-3 C3-3.1 C3-3.2 C3-3.3 C3-3.4 C3-3.5 C3-3.6 C3-3.7 C3-3. 8 C3-3.9 C3-3.10 C3-3.11 C3-3.12 C3-3.13 C3-3.14 C3-3.15 C4-4 C4-4.1 C4-4.2 C4-4.3 C4-4.4 C4-4.5 C4-4.6 C4-4.7 C5-5 C5-5.1 C5-5.2 C5-5.3 C5-5.4 C5-5.5 C5-5.6 CS-5.7 CS-5.8 CS-5.9 C5-5.10 C5-5.11 C5-5.12 CS-5.13 CS-5.14 C5-5.15 CS-5.16 C5-5.17 C5-5.18 AWARD AND EXECUTION OF DOCUMENTS Consideration of Proposals Minority Business Enterpise Women-Owned Business Enterprise compliance Equal Employment Provisions Withdrawal of Proposals Award of Contract Return of Proposal Securities Bonds Execution of Contract Failure to Execute Contract Beginning Work Insurance Contractor's Obligations Weekly Payroll Contractor's Contract Administration Venue SCOPE OF WORK Intent of Contract Documents Special Provisions Increased or Decreased Quantities Alteration of Contract Documents Extra Work Schedule of Operations Progress Schedules for Water and Sewer Plant Facilities CONTROL OF WORK AND MATERIALS Authority of Engineer Conformity with Plans Coordination of Contract Documents Cooperation of Contractor Emergency and/or Rectification Work Field Office Construction Stakes Authority and Duties of Inspectors Inspection Removal of Defective and Unauthorized Substitute Materials or Equipment Samples and Tests of Materials Storage of Materials Existing Structures and Utilities Interruption of Service Mutual Responsibility of Contractors Cleanup Final Inspection C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (5) C3-3 (1) C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 (1) (1) (2) (2) (2) (2) (4) (4) (4) (4) (7) (7) (7) (8) C4-4 (1> C4-4 (1> C4-4 (1) C4-4 (2> C4-4 (2) C4-4 (3) C4-4 (4) C5-S C5-5 CS-5 C5-S C5-5 C5-S CS-S CS-5 CS-5 Work CS-S C5-5 C5-5 CS-5 CS-S C5-S CS-5 CS-5 CS-5 (1> (1) (2) (2) (3) (3) t3) (4) (5) (5) (5> (6) (6) (7) (7) (8) (8) (9) , �� � �� �� !� (2) � r [� � C6-6 C6-6.1 C6-6.2 C6-6.3 C6-6.4 C6-6.5 C6-6.6 C6-6.7 r' C6-6. 8 C6-6.9 C6-6.10 C6-6.11 �. C6-6.12 C6-6.13 �J C6-6. 14 C6-6.15 f C6-6.16 C6-6.17 �- C6-6. 18 � C6-6.19 C6-6.20 C6-6.21 C7-7 C7-7.1 C7-7.2 C7-7.3 C7-7.4 C7-7.5 C7-7.6 C7-7.7 C7-7.8 C7-7.9 C7-7.10 C7-7.11 C7-7.12 C7-7.13 C7-7.14 C7-7.15 C7-7.16 c�-�.1� C8-8 C8-8.1 C8-8.2 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY Laws to be Observed Permits and Licenses Patented Devices, Materials and Processes Sanitary Provisions Public Safety and Convenience Privileges of Contractor in Streets, Alleys, and Right-of-Way Railway Crossings Barricades, Warnings and Watchmen Use of Explosives, Drop Weight, etc. Work Within Easements Independent Contractor Contractor's Responsibility for Damage Claims Contractor's Claim for�Damages Adjustment of Relocation of Public Utilities, etc. Temporary Sewer Drain Connections Arrangement and Charges of Water Furnished by City Use of a Section of Portion of the Work Contractor's Responsibility for Work No Waiver of Legal Rights Personal Liability of Public Officials State Sales Tax PROSECUTION AND PROGRESS Subletting Assignment of Contract Prosecution of the Work Limitations of Operations Character of Workman and Equipment Work Schedule Time of Commencement and Completion Extension of time of Completion Delays Time of Completion Suspension by Court Order Temporary Suspension Termination of Contract due to National Emergency Suspension of Abandonment of the Work and Annulment of Contract Fulfillment of Contract Termination for Convenience of the Onwer Safety Methods and Practices MEASUREMENT AND PAYMENT Measurement of Quantities Unit Prices C6-6 (1) C6-6 (1) C6-6 (1) C6-6 (2) C6-6 (2) C6-6 (3) C6-6 (4) C6-6 (4) C6-6 (S) C6-6 (6) C6-6 (8) C6-6 (8) C6-6 (10) C6-6 (10) C6-6 (10) C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 (1> (1> (1) (2> t2) (3) (4) (4) (4) (5) (6) (6) C7-7 (7) C7-7 (7) C7-7 (9) c�—� cio> C7-7 (13) C8-8 (1) C8-8 (1) (3) C8-8.3 C8-8.4 C8-8.5 C8-8.6 C8-8.7 C8-8.8 C8-8.9 C8-8.10 C8-8.11 C8-8.12 C8-8.13 a Lump Sum Scope of Payment Partial Estimates and Retainage Withholding Payment Final Acceptance Final Payment Adquacy of Design General Guaranty Subsidiary Work Miscellaneous Placement of Material Record Documents C8-8 (1) C8-8 (1) C8-8 (2) C8-8 (3) C8-8 (3) C8-8 (3) C8-8 (4) C8-8 (4) C8-8 (5) C8-8 (5) C8-8 (S) � � ir � � i ' �� 1 , � y (4) � � PART C - GENERAL CONDITIONS Cl-1 DEFINITIONS SECTION Cl-1 DEFINITIONS C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are used, the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance of the contract. These are contained in the General Contract Documents and the Special Contract Documents. a, GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern al1 Water Department Projects and include the following items: � � F .. PART A- NOTICE TO BIDDERS (Sample) PART B - PROPOSAL (Sample) PART C - GENERAL CONDITIONS (CITY) (Developer) PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT (Sample) (Sample) White Wh�te Canary Yellow Brown Green E1-White E2-Golden Rod E2A-White Blue White White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A- NOTICE TO BIDDERS above PART B - PRQA()�21T. (Rirll PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H- PLANS (Usually bound separately) (Advertisement) Same as Cl-1 (1) ' � C1-1.3 N0TICE T0 BIDDERS: All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1,4 PR0P0SAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the 0wner. C1-1.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents, constitutes a bidder. C1-1.6 GENERAL C0NDITI0NS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions, the latter shall take precedence and shall govern. C1-1.7 SPECIAL C0NDITI0NS: Special conditions are the y specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1.8 SPECIFICATI0NS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements, statutes, etc., such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1.9 B0ND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and � �I �' � � � Cl-1 t2) � � � � faithful performance of the contract and include the Following: � a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3.7) c. Maintenance Bond (see paragraph C3-3.7) � d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) _ C1-1.10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual � understanding of the two contracting parties about the project to be completed under the Contract Documents, ',,., C1-l.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail � the location, dimension and position of the various elements ' of the project, including such profiles, typical �" cross-sections, layout diagrams, working drawings, preliminary � drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing �.• changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from ather parts of the '' Contract Documents, but they are a part of the Contract ,, Documents just as though they were bound therein. � C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and chartered under the Texas State ' Statutes, acting by and through its governing body or its City � Manger, each of which is required by charter to perform specific duties. Responsibility for final enforcement of � Contracts involving the City of Fort Worth is by Charter - vested in the City Manager. The terms City and Owner are ' synonymous. � C1-1,13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. ' C1-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. � C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. Cl-1 (3) � �i i �" , C1-1.17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1.18 DTRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth, Texas, or his duly authorized representative, assistant, or agents. C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. C1-1.2� CONTRACTOR: The person, persons, partnership, company, firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor. The ` sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1.22 THE WORK OR PROJECT: The completed work contemplated • in and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. C1-1.23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7) hours between 7:00 a.m, and 6:00 p.m., with exceptions as permitted in paragraph C7-7.6. C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. C1-1.25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: � � � Cl-1 (4) �• � r �� l. 2. 3. 4. 5. 6. 7. 8. 9. New Year's Day January 1 M. L. King, Jr. Birthday Third Monday in January Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November Thanksgiving Friday Fourth Friday in November Christmas Day December 25 Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is � declared by the City Council, falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those � employees working on working day operations. Employees working calendar day operations will consider the calendar holiday as the holiday. � � � � C1-1.26 ABBREVIATI0NS: Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials RSCE - American Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works $ � Percentum Association R - Radius ASA - American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute 0.D. - Outside Diameter Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY � Square Yard Max. - Maximum L.F. - Linear Foot D.I. - Ductile Iron Cl-1 (5) ■ C1-1.27 CHANGE ORDER: A"Change Order" is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature w�ich may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25$ of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following.types of wearing surfaces applied over the natural unimproved surface: 1. 2. 3. 4. S. Any type of asphaltic concrete with or without separate base material. Any type of asphalt surface treatment, not including an oiled surface, with or without separate base material. Brick, with or without separate base material. Concrete, with or without separate base material. Any combination of the above. C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys." C1-1.30 CITY STREETS: A city street is defined as that area between the right-of-way lines as the street is dedicated. Cl-I.31 ROADWAY: parallel lines two (4') feet back of exists. The roadway is defined as the area between (2') feet back of the curb lines or four the average edge of pavement where no curb C1-1.32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. �, � � � � ' C1-1 (6) a� SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with ,_, proposal.form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon � which bid prices are requested. The Proposal form will state the Bidder's general understanding of the project to be `" completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal � contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior � to the hour for openinq of bids. � The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so � prepared as to reflect the current financial status. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new � statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10$> percent of the estimated project cost will be {� required. `" For an experience record to be considered to be acceptable for ' a given project, it must reflect the experience of the firm � seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been on projects +' completed not more than five (S) years prior to the date on ,' which are to be received. The Director of the Water � department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water � Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal C2-2(1) W � � forms or other parts of the Contract Documents will be � considered as approximate only and will be used for the Qurpose of comparing bids on a uniform basis. Payment will be � made to the Contractor for only the actual quantities of work � performed or materials furnished in strict accordance with the � Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or � decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. � C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with � the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which '�' the owner will supply after promulgation of th? formal � contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just � as though such addenda were actually written into the original Contract Documents. ++� Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents, to visi,t the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an ' intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2(2) � � � Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist, f C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shalZ submit his , Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices, written in ink in both words and numerals, for which he " proposes to do the work contemplated or furnishe the materials required, All such prices shall be written legibly. In case � of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. r« � �� � � � � If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given, and the proposal must be signed by a member of the firm, association, or partnership, or by a person duly autharized. If a proposal is submitted by a company or corporation, the company or corporate name and business address �nust be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called far, conditional or uncalled for alternate bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalance value of any items. Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a"Proposal Security" of the character and in the amount indicated in the "Notice to Bidders" and the "Proposal." The Bid Security is required by the Owner as �evidence of good faith on the part of the Bidder, and by way ,� of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish � the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid }_ security of all other bidders may be returned promptly after � the canvass of bids. � �. C2-2(3) —. �► �� , C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder �nust have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a pr000sal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders." Al1 proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as being "Irregular" if they show any omissions, alterations of form, additions, or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However, the � � � �r� �� � �; � C2-2(4) � 4 � L� � Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an r" irregularity which cannot be waived. C2-2.12 DISQUALIFZCATION OF BIDDERS: Bidders may be . disqualified and their proposals not considered for any of, but not limited to, the following reason: t�.. . a. Reasons for believing that collusion exists among ~� bidders. , b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work �" contemplated. c. The bidder being interested in any litigation � against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. ti�• d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an �_ unsatisfactory manner. f. Lack of competency as revealed by the financial � statement, experience record, equipment schedule, �... and such inquiries as the Owner may see fit to make. g. Uncompleted work which, in the judgment of the ,. Owner, will prevent or hinder the prompt completion of additional work if awarded. ''_'- h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the j� f ol lowing : r � l. Financial Statement showing the financial �� condition of the bidder as specified in Part "A" - Special Instructions. � 2. A current experience record showing especially { the projects of a nature similar to the one under consideration, which have been � successfully completed by the Bidder. 3. An equipment schedule showing the equipment ' the bidder has available for use on the ., project. .. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated �' herein, shall be set aside and not opened. _. � i �2_2�5� � � PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: ` C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the �basis of the quoted prices, the quantities shown in the ,� proposal, and the application of such formulas or other methods of bringing items to a common basis as may be ,� established in the Contract Documents. `� The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum � items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new progosals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. � w � � C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE; Contractor agrees to provide to Owner, upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by Owner, to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that wiZl substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements; further, any such misrepresentatian may be grounds for disqualification of Contractor at Owner's discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. � C3-3 (1) � �' The Contractor shall post the required notice to that effect on the project site, and, at his request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer, C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within forty-five (45) days after the date on which the proposals were opened. C3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time, not to exceed forty-five (45) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids, the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award. Al1 other proposal securities, usually those of the three lowest bidders, will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3.7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND: A good and sufficient performance bond in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against darnage by reason of negligence of the Contractor, or improper execution of the work or the use of inferior materials. This performance C3-3 (2) � � � � � �� �� � �d 1 � � � bond shall guarantee the payment for all labor, materials, equipment, supplies, and services used in the construction of the work, and shall remain � in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. i.� r � C, r � � b. MAINTENANCE BOND: A good an maintenance bond, in the amount of 100 percent of the amount of the evidenced by the proposal tabulation guaranteeing the prompt, full performance of the general guaranty forth in paragraph C8-8.10. d sufficient not less than contract, as or otherwise, and faithful which is set c. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, f ull and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959, effective April 27, 1959, and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until all payments as above stipulated are made. d, OTHER BONDS: Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner. In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 (3) new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties, as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the contract., the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the City Secretary, approved as to form and legality by the City Attorney, and executed for the Owner by ezther the Mayor or City Manager. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten (10) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee's failure to execute said bonds and contract within ten (10) days, the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. - The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3.10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do s� by the Owner. Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order", it is agreed that the Surety Company will, within ten (10) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3.11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents, and such insurance has been approved by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub-contractors' �! �� �� � � C3-3 (4) � � - certificate of insurance for approval. The prime contractor shall indicate on the certificate of insurance included in the �' documents for execution whether or not his insurance covers sub-contractors. It is the intention of the Owner that the �insurance coverage required herein shall include the coverage � of all sub-contractors. � a. COMPENSATION INSURANCE: The Contractor shall maintain, during the life of this contract, Workers' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. �� In case any class of employees engaged in hazardous work on the project under this contract is not �� protected under the Workers' Compensation Statute, � the Contractor shall provide adequate employer's general liability insurance for the protection of such of his employees not so protected. w. � b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during rthe life of this contract Contractor's ` Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an r amount not less than $500,000 covering each . occurrence on account of bodily injury, including death, and in an amount not less than $500,000 � covering each occurrence on account of property , damage with $2,000,000 umbrella policy coverage. • c. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the � above-mentioned policies, and in the amount as set forth for public liability and property damage, the „ following insurance: { l. Contingent Liability (covers General Contractor's Liability for acts of sub-contractors). 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation (if excavations are to be performed adaacent to same>. 4. Damage to underground utilities for $500,000. C3-3 (S) � . E� 6. Builder's risk (where above-ground structures are involved). Contractual Liability (covers all indemnification requirements of Contract>. d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain, during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not Iess than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 on account of one accident, and automobile property damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub-contractors, respectively, against damage claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, an3 also against any of the following soecial hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner. (Sample attached.) All insurance requirements made upon the Contractor shall apply to the sub-contractor, should the Prime Contractor's insurance not cover the sub-contractor's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance and bonding companies with whom the Contractor's insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the � � � C3-3 (6) � � � � � � L. � �' �, � , � � � � �. City of Fort Worth, Tarrant County, Texas. Each such agent shall be a duly qualified, one upon whom service of process may be had, and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged, may have against the Contractor, insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth-Dallas area. The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. C3-3.12 CONTRACTOR'S OBLIGATIONS: Under the Contract, the Contractor shall pay for all materials, labor and services when due. C3-3.13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner's representative within seven (7) days after the close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of'the Contract. Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor. C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person, persons, partnership, company, firm, association, corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth-Dallas metropolitan area. The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent) with full authority to transact all business actions required in the performance of the Contract. This local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other r• �w C3-3 (7) � � �� matter associated such as maintaining adequate and appropriate insurance or security coverage for the project. Such local authority for administration of the work under the Contract sha11 be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor's principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor's assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, all appropriately signed and sealed, as applicable, by the Contractor's responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents. The intent of these requirements is that all matters associated with the Contractor's administration, whether it be oriented in furthering the work, or other, be g overned direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion, may demand that such local representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of working time will be for periods in which work stoppages are in effect for this reason. �� �I C3-3.15 VENUE: Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. � � � � � LJ � C3-3 (8) � � � � PART C - GENERAL C0NDITI0NS C4-4 SC0PE 0F W0RK I� SECTI0N C4-4 SC0PE 0F W0RK � C4-4.1 INTENT 0F C0NTRACT D0CUMENTS: It is the definite +-- intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish, all in full compliance with the � requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as � provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in � these Contract Documents, furnish all labor, tools, materials, machinery, equipment, special services, and incidentals necessary to the prosecution and completion of the project. � C4-4.2 SPECIAL PR0VISI0NS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract � Documents be anticipated, or should there be any additional �- proposed work which is not covered by these Contract Documents, then "Special Provisions" covering all such work � will be prepared by the Owner previous to the time of :.., receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. Al1 such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. �C4-4.3 INCREASED 0R DECREASED QUANTITIES: The Owner reserves � the right to alter the quantities of the work to be perf ormed `�• or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the r work as altered, increased or decreased at the unit prices. �. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. �� When such changes increase or decrease the original quantity � of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the r contract shall upon written request to the other party be � entitled to a revised consideration upon that portion of the � work above or below the 25 percent of the original quantity stated in the proposal� such revised consideration to be � determined by special agreement or as hereinafter provided for ,. "Extra Work." No allowance will be made for any changes in anticipated profits nor shall such changes be considered as C4-4 (1) � �� waiving or invalidating any conditions or provisions of the � Contract Documents. Variations in quantities of sanitary sewer pipes in depth � categories, shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. �, C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract � Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially � alter the original Contract Documents or change the general � nature of the project as a whole. Such changes shall not be considere3 as waiving or invalidating any condition or provision of the Contract Documents. �' C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided, however, that before any extra work is begun a"Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Unit bid price previously approved. b. An agreed lump sum. c. The actual reasonable cost of (1) labor, (2) rental � of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates; (3) materials � entering permanently into the project, and (4) actual cost of insurance, bonds, and social security as determined by the Owner, plus a fixed � fee to be agreed upon but not to exceed 10$ of the � actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor f or rental of equipment owned by him and � used for the extra work. The fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general � and all other expense not included in (1), (2), (3), and (4> above. The Contractor shall keep accurate cost records on the form and in the method I�� "�' C4-4 (2 > ,�� ! � � � � �, �. L� � � � r �. . suggested by the Owner and shall give the Owner access to all accounts, bills, vouchers, and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner. In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work, prior to beginning such work. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method (Item C). Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within f ive ( 5) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepar2 for permanent record a corrected set of plans showing the actual installation. � r The compensation agreed upon for 'extra work' whether or not � iniitiated by a'change order' shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are �, known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, .� ripple or impact cost, or any other effect on changed or ; unchanged work as a result or the change or extra work. 4 f � f 4- C4-4.6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner's approval thereof, a"Schedule of Operations," showing by a straight line method the date of commencing and finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There C4-4 (3) � �' shall be presented also a composite graph showing the � anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted � vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. � C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten (10) days prior to submission of first monthly progress payment, the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities (including procurement of materials, plans, and equipment) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. � � Prior to the final drafting of the detailed construction � schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding � of the contract requirements. � The following guidelines shall be adhered to in preparing the construction schedule: �, IW" a. Milestone dates and final project completion , dates shall be developed to conform to time ' constraints, sequencing requirements and f` completion time. Wi b. The construction process shall be divided into �'. activities with time durations of approximately � fourteen (14) days and construction values not to exceed $50,000. Fabrication, delivery and ,,., submittal activities are exceptions to this � guideline. ,� C4-4 (4) !� [� � � c. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. �� e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. . The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts, the construction � schedule shall indicate the following procurements, construction and preacceptance activities and events in their logical sequence for equipment and materials. Preparation and transmittal of submittals. Submittal review periods. 3. Shop fabrication and delivery. 4. Erection or installation. 5. 6. 7. 8. Transmittal of manufacturer's operation and maintenance instructions. Installed equipment and materials testing. Owner's operator instruction (if applicable). Final inspection. C4-4 (5) �� 1 � 9. Operational testing. 10. Final inspection. If, in the opinion of the Owner, work accomplished falls behind that scheduled, the Contractor shall take such � action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion � of the work within the contract time. If the Owner finds the proposed plan not acceptable, he may require the Contractor to increase the work force, the construction � plant and equipment, the number of work shifts or the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. �; � , � � C4-4 (6) � L� � � � L.. � � �J fi t PART C - GENERAL C5-S CONTROL OF MATERIALS SECTION CS-5 CONTROL OF WORK AND MATERIALS CONDITIONS WORK AND CS-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished, work performed, rate of progress of the work, overall sequence of the construction,' interpretation of the Contract Documents, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible for Contractor's means, methods, techniques, sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the contract documents. He shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, �aithin a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. C5-5.2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines, grades, cross-sections, finish, and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents. Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. � CS-S (1) CS-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up of several sections, which, taken together, are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern over specifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparent error or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents. In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer. In the event of a conflict in the drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5.4 COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of the Contract Documents and sha11 have available on the site of the project at all times one set of such Contract Documents. The Contract shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer, his inspector, and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent, English-speaking superintendent and an assistant who are fully authorized to act as the Contractor's agent on the work. Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives. Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor's agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to � �� r �' � � *� � � W �5�5 [27 � i� i�� � adequately provide for the safety or convenience of the '' traveling public or the owners of property across which the project extends or the safety of property contiguous to the '� project routing. The Contractor shall provide all facilities to enable the � Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. � � C te CS-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative, shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition. Such a response shall occur day or night, whether the project is scheduled on a calendar-day or on a working-day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies, omissions, or corrections necessary to conform with the requirements of the project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall then deduct an amount equal to the entire costs for such remedial action, plus 25$, from any funds due the Contractor on the project. �.. CS-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the r- Engineer, if specifically called for. The field office shall �� be not less than 10 by 14 feet in floor area, substantially constructed, well heated, air conditioned, lighted, and �, weather-proof, so that documents will not be damaged by the elements. � r C5-5.7 CONSTRUCTION STAKES: The City, through its Engineer, will furnish the Contractor with all lines, grades, and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents, and lines, grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. CS-5 (3) � `' These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings as may be established for the Contractor's use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost of replacing such stakes or marks plus 25$ will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. CS-5.8 AUTH0RITY AND DUTIES OF CITY INSPECT0RS: City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed, to report any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents, and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the work, the City Inspector will have authority to reject materials or equipment to suspend work until the question at issue can be referred to and be decided by the Engineer. The City Inspector will not, however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents, nor to approve or accept any portion or section of the work, nor to issue any instructions contrary to the requirements of the Contract Documents. He will in no case act as superintendent or foreman or perform any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties. The Contractor shall regard and obey the directions and instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents, provided, however, should the Contractor object to any orders or instructions of the City Inspector, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy. C5-5 (4) �S � � � LJ � � � C5-5.9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements f of the Contract Documents. If the Engineer so requests, the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be . directed. After examination, the Contractor shall restore said portions of the work to the standard required by the `" Contract Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but � should be work so exposed or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the � Contractor's expense. No work shall be done or materials used without suitable supervision or inspection. �_ � � T � � � � � � � CS-5.10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, materials, or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own ex.pense. Work done beyond the lines and grades given or as shown on the plans, except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor. Failure to require the removal of any defective or unauthori.zed work shall not constitute acceptance of such works. CS-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: If the Specifications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the preconstruction conference, make written application to ENGINEER for approval of such substitute certifying in writing that the proposed substitute will perform adequately the functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing the same function as that specified; and identifying all variations of the proposed C� CS-S (S) � substitute from that specified and indicating available � maintenance service. No substitute shall be ordered or installed without the written approval of Engineer who will be the judge of the equality and may require Contractor to � furnish such other data about the proposed substitute as he considers pertinent. No substitute shall be ordered or installed without such performance guarantee and bonds as � Owner may require which shall be furnished at Contractor's ir� expense.� Contractor shall indemnify and hold harmless Owner and Engineer and anyone directly or indirectly employed by � either of them from and against the claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. �ti C5-5.12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion "� of the Engineer, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests wi11 � be made at the expense of and paid for direct to the testing agency by the Owner unless otherwise specifically provided. The failure of the Owner to make any tests of materials shall � be in no way relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of � materials, unless otherwise specified, will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the � Engineer may require for collecting and forwarding samples and shall not, without specific written permission of the Engineer, use the materials represented by the samples until � tests have been made and the materials approved for use. The . Contractor will furnish adequate samples without charge to the Owner. _ In case of concrete, the aggregates, design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contactor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete, using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be ma3e prior to the use of the new materials. CS-5.13 STORAGE OF MATERIALS: All materials which are to be used in the construction operation shall be stored so as to �" insure the preservation of the quality and fitness of the work. �, When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the , �` �' C5-5 (6) , � ' �� ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. � CS-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities � are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be "- considered as the nonexistence of, or a definite location of, existing underground utilities. The location of many gas mains, water mains, conduits, sewer lines and service lines for all utilities, etc., is unknown to the Owner, and the Owner assumes no responsibility for failure to show any or all � such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing the � pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision for which is not made in the Contract �„ Documents, in which case the provision in these Contract Documents for Extra Work shall apply. � It shall be the Contractors responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such � local adjustments as necessary in the construction process to provide adequate clearances. The Contractor shall take all necessary precautions in order to protect all existing �� utilities, structures and service lines. Verification of �, existing utilities, structures and service lines shall include _ notification of all utility companies at least forty eight (48) hours in advance of construction including exploratory �, excavation if necessary. All verification of existing utilities and their adjustment shall be considered as _, subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: j� a. Normal Prosecution: In the normal prosectuion of �L work where the interruption of service is necessary, the Contractor, at least 24 hours in advance, shall be required to: � 1. Notify the Water De artment's Distribution P Division as to location, time, and schedule of � service interruption. � C5-5 (7) 2. Notify each customer personall} responsible personnel as to time and of the interruption of their service, through schedule or 3. In the event that personal notification of a 3 customer cannot be made, a prepared tag form shall be attached to the customer's entrance door knob. The tag shall be durable in composition, and in large bold type shall say: "NOTICE" Due to Utility Improvement in your neighborhood, your (water) (sewer) service will be inter- rupted on between the hours of and . This inconvenience will be as short as possible. Thank you, Contractor Address Phone b. Emerqency: In the event that an unforeseen service interruption occurs, notice shall be as above,but immediate. � C5-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through acts or neglect on the part of the Contractor, any other Contractor or any sub-contractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or sub-contractor by agreement or arbitration. If such other Contractor or sub-contractor shall assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify the Contractor, who shall indemnify and save harmless the Owner against any such claim. C5-5.17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site during the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the the satisfaction of the Engineer. Twenty-fours fours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the Engineer, if the Contractor fails to correct the CS-5 (8) � � � unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, and the costs of such direct action, plus 25$ of such costs, � shall be deducted from monies due or to become due to the Contractor. �' Upon the completion of the project as a whole as covered by , these Contract Documents, and before final acceptance and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials, temporary structures, and debris of every kind. He "�' shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and �� waste materials removed from the site of the work shall be .r disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials f� installed by him and shall deliver over such materials and �, equipment in a bright, clean, polished and new appearing condition. No extra compensation will be made to the �.-. Contractor for any clean-up required on the project. ' CS-5.18 FINAL INSPECTION: Whenever the work provided for in , and contemplated under the Contract Documents has been satisfactorily completed and final cleanup performed, the Engineer will notify the proper officials of the Owner and request that the Final inspection be made. Such inspection will be made within 10 days after such notification. After such final inspection, if the work and materials and equipment � are found satisfactory, the Contractor will be notified in .. writing of the acceptance of the same after the proper resolution has been passed by the City Council. No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final � i.nspection of the work. �� �� i� � 1!+ CS-5 (9) � � � :... PART C - GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY � C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal and State Laws and City ordinances and regulations which in any way affect the conduct of the work or his operations, and shall observe and comply with a1Z orders, laws, ordinances and regulations which exist .... or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his � Sureties shall indemnify and save harmless the City and all of �. . its officers, agents, and employees against any and all claims �,_ or liability arising from or based on the violation of any such law, ordinance, regulation, or order, whether it be by � himself or his employees. rT C6-6.2 PERMITS AND LICENSES: The Contractor shall procure all � permits and licenses, pay all charges, costs and fees, and give all notices necessary and incident to the due and lawful �� prosecution of the work. C6-6.3 PATENTED DEVICES{ MATERIALS AND PROCESSES: If the Contractor is required or desires to use any design, device, material, or process covered by letter, patent, or copyright, - he shall provide for such use by suitable legal agreement with the patentee or owner of such patent, letter, or copyrighted design. It is mutually agreed and understood that without exception the contract prices shall include all royalties or cost arising from patents, trade-marks, and copy rights in any way involved in the work. The Contractor and his sureties shall indemnify and save harmless the Owner from any and all " claims for infringement by reason of the use of any such patented design, device, material or process, or any trade-mark or copy right in connection with the work agreed to be performed under these Contract Documents, and shall indemnify the Owner for any cost, expense, or damage which it ' may be obliged to pay by reason of such infringement at any , time during the prosecution of the work or after completion of the work, provided, however, that the Owner will assume the responsibility to defend any and all suits brought for the infringement of any patent claimed to be infringed upon by the design, type of construction or material or equipment __ specified in the Contract Documents furnished the Contractor by the Owner, and to hold the Contractor harmless on account of such suits. � r C6-6 (1> C6-6.4 SANITARY PROVISIONS: The Contractor shall establish and enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as wi11 tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance about the work on any property either public or private, and such regulations as are required by Law shall be put into immediate force and effect by the Contractor. The necessary sanitary conveniences for use of laborers on the work, properly secluded from public observation, shall be constructed and maintained by the Contractor and their use shall be strictly enforced by the Contractor. All such facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance. Al1 sanitary laws and regulations of the State of Texas and the City shall be strictly complied with. C6-6.5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used, and the work shall at all times be so conducted, as to cause no greater obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The Contractor is required to maintain at all times all phases of his work in such a manner as not to impair the safety or convenience of the public, including, but not limited to, safe and convenient ingress and egress to property contiguous to the work area. The Contractor shall make adequate provisions to render reasonable ingress and egress for normal vehicular traffic, except during actual trenching or pipe installation operations, at all driveway crossings. Such provisions may include bridging, placement of crushed stone or gravel or such other means of providing proper ingress and egress for the property served by the driveway as the Engineer may approve as appropriate. Such other means may include the diversion of driveway traffic, with specific approval by the Engineer. If diversion of traffic is approved by L•he Engineer at any location, the Contractor shall make arrangements satisfactory to the Engineer at any location, the Contractor shall make arrangements satisfactory to the Engineer for the diversion of traffic, and shall, at his own expense, provide all materials and perform all work necessary for the construction and maintenance of roadways and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer. The materials excavated and the construction materials such as pipe used in the construction of the work shall be placed so as not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes, police call boxes, water valves, ��—� cz� � �� � � � � r � � � gas valves, or manholes in the vicinity. The Owner reserves the right to remedy any neglect on the part o£ the Contractor as regards to public convenience and safety which may come to � its attention, after twenty-four hours notice in writing to the Contractor, save in cases of emergency when it shall have the right to remedy any neglect without notice, and in either case, the cost of such work done or materials furnished by the Owner or by ths City shall be deducted from monies due or to � become due to the Contractor. The Contractor, after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer, and Police Department, when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible, � and, when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire apparatus. The Contractor shall promptly notify the Fire � Department Headquarters when a11 such obstructed streets, alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary � bridges or make other arrangements for crossing over ditches or streams, his responsibility for accidents in connection � with such crossings shall include the roadway approaches as well as the structures of such crossings. �� �� r �- r � The Contractor shall at all times conduct his operation and the use of construction machinery so as not to damage or destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damage may be done, the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in settlement of such claims. The Contractor shall file with the Engineer a written statement showing all such claims adjusted. C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT-OF-WAY: For the performance of the contract, the Contractor will be permitted to use and occupy such portions of the public streets and alleys, or other public places or other rights-of-way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the Engineer. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. Excavated and waste materials shall be piled or stacked in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be �' C6-6 (3) carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Owner may, for all purposes required by the contract, enter upon the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoining work. Any additional grounds desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6.7 RAILWAY CROSSINGS: When the work encroaches upon any right-of-way of any railway, the City will secure the necessary easement for the work. Where the railway tracks are to be crossed, the Contractor shall observe all the regulations and instructions of the railway company as to the methods of performing the work and take all precautions for safety of property and the public. Negotiations with the railway companies for permits shall be done by and through the City. The Contractor shall give the City notice not less than five days prior to the time of his intentions to begin work on that portion of the project which is related to the railway properties. The Contractor will not be given extra or additional compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: Where the work is carried on in or adjacent to any street, alley, or public place, the Contractor shall at his own expense furnish, erect, and maintain such barricades, fences, lights and danger signals, shall provide such.watchmen, and shall take all such other precautionary measures for the protection of persons or property and of the work as are necessary. Barricades and fences shall be painted in a color that will be visible at night. From sunset to sunrise the Contractor shall furnish and maintain at least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to keep pedestrians away from, and vehicles from being driven on or into, any work under construction or being maintained. The Contractor shall f urnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work and prevent accident or damage. All installations and procedures shall be consistent with the provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d Veron's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. C6-6 (4> � � � The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign Cmust be removed to permit required construction, the Contractor shall contact the Transportation and Public Works department, Traffic Services . Division (phone number � 871-81O0), to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the re.quirements of the above � referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in � place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be re-installed, the Contractor shall again � contact the Traffic Services Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. � The Contractor will be held responsible for all damage to the � work or the public due to failure of barricades, signs, �• fences, lights, or watchmen to protect them. Whenever � evidence is found of such damage to the work the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor's own expense. The � Contractor's responsibility for the maintenance of barricades, �: signs, fences and lights, and for providing watchmen shall not cease until the project shall have been completed and accepted r by the Owner. No compensation, except as specifically provided in these r Contract Documents, will be paid to the Contractor for the work and materials involved in the constructing, providing, � and maintaining of barricades, signs, fences, and lights or for salaries of watchmen, for the subsequent removal and ` disposal of such barricades, signs, or for any other incidentals necessary for the proper protection, safety, and convenience of the public during the contract period, as this work is considered to be subsidiary to the several items for , which unit or lump sum prices are requested in the Proposal. ._ C6-6.9 USE OF LXPLOSIVES, DROP WEIGHT, ETC.: Should the Contractor elect to use explosives, drop weight, etc., in the � prosecution of the work, the utmost care shall be exercised at all times so as not to endanger life or property. The Contractor shall notify the proper representative of any public service corporation, any company, individual, or utility, and the Owner, not less than twenty-four hours in C6-6 (S) �� � advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special Contract Documents, or the use of explosives is requested, the Contractor shall submit notice to the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of explosives. All claims arising out of the use of explosives shall be investigatea and a written report made by the Contractoz's insurers to the Engineer within ten (10) days after receipt of written notice of the claim to the Contractor from either the City or the claimant. The City shall proceed to give notice to the Contractor of any such claim. The use of explosives may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. Whenever explosives are stored or kept, they shall be stored in a safe and secure manner and all storage places shall be plainly marked "DANGEROUS EXPLOSIVES" and shall be under the care of a competent watchman at all times. Al1 vehicles in which explosives are being transported shall be plainly marked as mentioned above and shall, insofar as possible, not use heavy traffic routes. C6-6.10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will provide such right-of-way or easement privileges as the City may deem necessary for the prosecution of the work. Any additional rights-of-way or work area considered necessary by the Contractor shall be provided by him at his own expense. Such additional rights-of-way or work area shall be acquired for the benefit of the City. The City shall be notified in writing as to the rights so acquired before work begins in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and until the specified 'approval of the property owner has been secured in writing by the Contractor and a copy furnished to the Engineer. Unless specifically provided otherwise, the Contractor shall clear all rights-of-way or easements of obstructions which must be removed to make possible proper prosecution of the work as a part of the project construction operations. The Contractor shall be responsible for the preservation of and shall use C6-6 (6) �i ) ':J �� } �t � every precaution to prevent damage to all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences, and to all other public or private property along adjacent to the work. The Contractor shall notify the proper representatives of owners or occupants of public or private lands or interest in lands which might be affected by the work. Such notice shall be made at least 48 hours in advance of the beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the work, or at any time due to defective work, material, or equipment. � t. � When and where any direct or indirect or injury is done to public or private property on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non-execution thereof on the part of the Contractor, he shall restore or have restored at his own cost and expense such property to a condition at least equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise replacing and restoring as may be directed by the Owner, or he shall make good such damages or injury in a manner acceptable to the owner of the property and the Engineer. � Al1 fences encountered and removed during construction of this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be � crossed, the Contractor shall set cross braced posts on �. either side of permanent easement before the f ence is cut. Should additional fence cuts be necessary, the Contractor ,' shall provide cross braced posts at point of the proposed „ cut in additi.on to the cross braced posts provided at the permanent easements limits, before the fence is cut. Temporary fencing shall be erected in place of th '� removed whenever the work is not in progress and site is vacated overnight, and/or at all times t r livestock from entering the construction area. The �- fence removal, temporary closures and replacement subsidiary to the various items bid in the ; f encing when the � prevent cost for shall be project C6-6 (7) � proposal. Therefore, no separate payment sl�all be allowed for any service associated with this work. In case of failure on the part of the Contractor to restore � such property to make good such damage or injury, the Owner may, upon 48 hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition � results, proceed to repair, rebuild, or otherwise restore such rraE property'as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or � to become due to the Contractor under this Contract. ;,.� C6-6.11 INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that Contractor shall perform all work and services hereunder as an independent contractor, and not as an officer, agent, servant or employee of the Owner. Contractor shall have exclusive control of and the exclusive right to control the details of all the work and services performed hereunder, and all persons performing same, and shall be solely responsible for the acts and omissions of its officers, agents, servants, employees, contractors, subcontractors, licensees and invitees. The doctrine of respondeat superior shall not apply as between Owner and Contractor, its officers, agents, employees, contractors and subcontractors, and nothing herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor. C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to, and does hereby indemnify, hold harmless and defend Owner, its officers, agents, „ servants, and employees from and against any an all claims or suits for property damage or loss and/or personal injury, including death, to any and all persons, of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees, contractors, subcontractors, licensees or invitees, whether or not caused, in whole or in part, by alleged negligence on the part of officers, agents, servants, employees, contractors, subcontractors, licensees and invitees of the Owner; and said Contractor does hereby covenant and agree to assume all liability and responsibility of Owner, its officers agents, servants and employees for property damage or loss, and/or personal injuries, including death, to any and all persons of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents employees, contractors, subcontractors, licensees and invitees, whether or not caused, � C6-6 (8) f 1 u � L� in whole or in part, by alleged negligence of officers, agents, servants, employees, contractors, subcontractors, licensees or invitees of the Owner. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries,loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from, in whole or in part, any and all alleged acts or omissions of officers, agents, servants, employees, contractors, subcontractors, licenses, or invitees of the Owner. In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Water Depar.tment for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. If the claim concerned remains unsettled as of the expiration � of the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final payment to be in an amount equal to the total � dollar amount then due less the dollar value of any written � claims pending against the Contractor arising out of the performance of such work, and such semi-final payment may then �' be recommended by the Director. . r The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory to the Director that: 1. The claim has been settled and a release has been obtained from the claimant involved, or 2. Good faith efforts have been made to settle such outstanding claims, and such good faith efforts have failed. `� If condition (1) above is met at any time within the six month period, the Director shall recommend that the final payment to � the Contractor be made. If condition (2) above is met at any �. time within the six month period, the Director may recommend that the final payment to the Contractor be made. At the � C6-6 (9) �' �� �II p expiration of the six month period the Director may recommend that final payment be made if all other work has been performed and all other bbligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept � bids on other Water Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of �' work performed under a City contract. C6-6.13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor � claim compensation for any alleged damage by reason of the acts or omissions of the Owner, he shall within three days I� after the actual sustaining of such alleged damage, make a written statement to the Engineer, setting out in detail the nature of the alleged damage, and on or before the 25th day of the month succeeding that in which any such damage is claimed � to have been sustained, the Contractor shall file with the � Engineer an itemized statement of the details and amount of such alleged damage and, upon request, shall give the Engineer � access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements � shall be filed as hereinabove required, the Contractor's claim for compensation shall be waived, and he shall not be entitled to payment on account of such damages. _ C6-6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES, ETC.: �' In case it is necessary to change, move, or alter in any manner the property of a public utility or others, the said � property shall not be moved or interfered with until orders � i thereupon have been issued by the Engineer. The right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making � such changes or repairs to their property that may be necessary by the performance of this contract. � C6-6.15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing J� sewer lines have to be taken up or removed, the Contractor shall, at his own expense and cost, provide and maintain � temporary outlets and connections for all private or public � drains and sewers. The Contractor shall also take care of all sewage and drainage which will be received from these drains and sewers, and for this purpose he shall provide and �� maintain, at his own cost and expense, adequate pumping � facilities and temporary outlets or diversions. The Contractor, at his own cost and expense, shall construct � such troughs, pipes, or other structures necessary, and be , prepared at all times to dispose of drainage and sewage � 1 C6-6 (10) ' � � received from these temporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and r maintained under the Contract, except when specified or ordered to be abandoned by the Engineer. All water, sewage, � and other waste shall be disposed of in a satisfactory manner . so that no nuisance is created and so that the work under construction will be adequately protected. � C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE j� CITY: When the Contractor desires to use City water in jr connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water �- Department for so doing. ' City water furnished to the Contractor shall be delivered to ._ the Contractor from a connection on an existing City main. Al1 piping required beyond the point of delivery shall be �- installed by the Contractor at his own expense. � � � The Contractor's responsibility in the use of all existing fire hydrant and/or valves is detailed in Section E2-1.2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. When meters are used to measure the water, the charges, if any, for water wiZl be at the regular established rates. When meters are not used, the charges, if any, will be as prescribed by the City Ordinance, or where no ordinance applies, payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. C6-6.17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in the opinion of the Engineer, any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer, and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents. Al1 necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, equipment, or to deficient operations on the part of the Contractor, shall be performed by the Contractor at his own expense. C6-6.18 CONTRACTOR'S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as provided for in these Contract Documents, the work shall be under the charge and care of the Contractor, and he shall take every necessary precaution to prevent injury or damage to the work or any part C6-6 (11) . thereof by action of the elements or from any cause wratsoever, whether arising from the execution or nonexecution of the work. The Contractor sha11 rebuild, repair, restore, and make good at his own expense a11 injuries or damage to any portion of the work occasioned by any of the hereinabove causes. C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or any possession taken by the City shall not operate as a waiver of any provision of the Contract Documents. Any waiver of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. The Owner reserves the right to correct any error that may be discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents. C6-6.20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no liability upon the authorized representatives of the Owner, either personally or otherwise as they are agents and representatives of the City. C6-6.21 STATE SALES TAX: On a contract awarded by the City of Fort Worth, an organization which qualifies for exemption pursuant the provisions of Article 20.04 (H> of the Texas Limited Sales, excise, and Use Tax Act, the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued by the Contractor in �ieu of the tax shall be subject to an3 shall comply with the provisions of State Comptroller's Ruling .011, and any other applicable State Comptroller rulings pertaining to the Texas Limited Sales, Excise, and Use Tax Act. On a contract awarded by a developer for the construction of a publicly-owned improvement in a street right-of-way or other easement which has been dedicated to the public and the City of Fort Worth, an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (H) of the Texas limited Sales, Excise, and Use Tax Act, the Contractor can probably be exempted in the same manner stated above. � � C6-6 (12) � Limited Sale, Excise and Use Tax permits and information can be obtained from: � Comptroller of Public Accounts Sale Tax Division �' Capitol Station Austin, TX � � , , , ' LI � `JI � 1 1 ^ C6-6 (13) �� PART C - GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS SECTION C7-7 PROSECUTION AND PROGRESS: � C7-7.1 SUBLETTING: The Contractor shall perform with his own . organization, and with the assistance of workman under his immediate superintendance, work of a value of not less than fifty (50$) percent of the value embraced in the contract. If the Contractor sublets any part of the work to be done under " these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed under '�� these Contract Documents. All transactions of the Engineer will be with the Contractor. Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements as to character and competency. The Owner will not recognize any -� subcontractor on the work. The Contractor shall at all times, __ when the work is in operation, be represented either in person or by a superintendent or other designated representatives. C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, br otherwise dispose of the contract �' or his right, title, or interest therein or any part thereof, � to any person or persons, partnership, company, firm, or� A1 corporation, or does by bankruptcy, voluntary or involuntary, , or by assignment under the insolvency laws of any state, attempt to dispose of the contract may, at the option of the - Owner be revoked and annulled, unless the Sureties shall � successfully complete said contract, and in the event of any such revocation or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the � Owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual damages. ;,,� C7-7.3 PROSECUTION OF THE WORK: Prior to beginning any construction operation, the Contractor shall submit to the Engineer in five or mare copies, if requested by the Engineer, � a progress schedule preferably in chart or diagram f orm, or a brief outlining in detail and step by step the manner of � C7-7 (1) � , prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials, and labor as is necessary to insure its completion within the time limit. The sequence requested of all construction operations shall be at all times as specified in the Special Contract Documents. Any deviation from scuh sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with any deviation until he has received written approval from the Engineer. Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7-7.8 "Extension of Time of Completion" of this Agreement, and a progress schedule shall not constitute a change in the contract time. C7-7.4 LIMITATIONS OF OPERATIONS: The working operations shall at all times be conducted by the Contractor so as to create a minimum amount of inconvenience to the public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations-in a portion of a street or public way greater than is necessary f or the proper execution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional section or street. � C7-7.5 CHARACTER OF WORKMEN AND EQUIPMENT: Local labor shall be used by the Contractor is available. The Contractor may bring in from outside the City of Fort Worth his key men and his superintendent. All other workmen, including equipment operators, may be imported only after the local supply is exhausted. The Contractor shall employ only such superintendents, foremen, and workmen who are careful, competent, and fully qualified to perform the duties or tasks assigned to them, and the Engineer may demand and secure the summary dismissal of any person or persons employed by the Contractor in or about or on the work who, in the opinion of the Owner, shall misconduct himself or be found to be incompetent, disrespectful, intemperate, dishonest, or C7-7 (2) � �� � , L�J � otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or carry out the directions of the Owner, and �- such person or persons shall not be employed again thereon L without written consent of the Engineer. All workmen shall have sufficient skill, ability, and � experience to properly perform the work assigned to them and '�- operate any equipment necessary to properly carry out the performance of the assigned duties. r� �. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress. All equipment, tools, and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory, safe and efficient working condition. Equipment on any portion of the work shall be such that no injury to the work, workmen or adjacent property will result from its use. C7-7.6 WORK SCHEDULE: Elapse3 working days shall starting with the first day of work completed as � C1-1.23 "WORKING DAY" or the date stipulated in ORDER" for beginning work, whichever comes first. � ,. be computed defined in the "WORK Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays, providing that the following requirements are met: a. A request to work on a specific Saturday, Sunday or Legal Holiday must be made to the Engineer no later than the proceeding Thursday. b. Any work to be done on the project on such a r specific Saturday, Sunday or Legal Holiday must be, •� in the opinion of the Engineer, essential to the timely completion of the project. , The Engineer's decision shall be final in response to such a request for approval to work on a specific Saturday, Sunday or � Legal Aoliday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific � Saturday, Sunday or Legal Holiday. r r t� r Calendar Days shall be defined in C1-1.24 and the Contractor may work as he so desires. C7-7 (3) C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the time specified in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. The Contractor shall maintain a rate of progress such as will insure that the whole work will be performed and the premises cleaned up in accordance with the Contract Documents and within the time established in such documents and such extension of time as may be properly authorized by the Owner. C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request for an extension of time of completion shall be considered only when the request for such extension is submitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval . In adjusting the contract time for completion of work, consideration will be given to unforseeable causes beyond the control of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy, acts of the Owner, fire, flood, tornadoes, epidemics, quarantine restrictions, strikes, freight embargoes, or delays o£ sub-contractors due to such causes. When the date of completion is based on a calendar day bid, a request for extension of time because of inclement weather will not be considered. A request for extension of time due to inability to obtain supplies and materials will be considered only when a review of the Contractor's purchase order dates and other pertinent data as requested by the Engineer indicates that the Contractor has made a bonafide attempt to secure delivery on schedule. This shall include efforts to obtain the supplies and materials from alternate sources in case the first source cannot make delivery. If satisfactory execution and completion of the contract should require work and rnaterials in greater amounts or quantities than those set forth in the approved Contract Documents, then the contract time may be increased by Change Order. C7-7.9 DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if � '+ � C7-7 (4) 1 � � any, which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him �- found correct shall be approved and referred by him to the �,. Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay � is caused by specific orders given by the Engineers to stop 4 work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for �. carrying on the work, then such delay will entitle the 4 Contractor to an equivalent extension of time, his application �-�- for which shall, however, be subject to the approval of the City Council; and no such extension of time shall release the � Contractor or the surety on his performance bond from all his �_ obligations hereunder which shall remain in full force until the discharge of the contract. ; C7-7.10 TIME OF COMPLETION: The time of completion is an `�` essential element of the contract. Each bidder shall indicate in the appropriate place on the last page of the Proposal the � number of working days or calendar days that he will require 4_ to fully complete this contract or the time of completion will be specified by the City in the Proposal section of the �' contract documents. The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon. The amount of time so stated by the successful bidder or the City will become the time of completion specified in the Contract Documents. For each calendar day that any work shall remain uncompleted after thz time specified in the Contract Documents, or the increased time granted by the Owner, or as automatically increased by additional work or materials ordered after the contract is signed, the sum per day given in the following schedule, unless otherwise specified in other parts of the Contract Documents, will be deducted from monies due the Contractor, not as a penalty, but as liquidated damages suffered by the Owner. AMOUNT OF CONTRACT Less than $ 5,000 $ 5,001 to $ 15,000 $ 15,001 to $ 25,000 $ 25,001 to $ 50,000 $ 50,001 to $ 100,000 $ 100,001 to $ 500,000 C7-7 (5) inclusive $ inclusive $ inclusive $ inclusive $ inclusive $ inclusive $ 35.00 45.00 63.00 105.00 154.00 210.00 $ 500,001 to $1,000,000 inclusive $ 315.00 $1,000,001 to $2,000,000 inclusive $ 420.00 $2,000,001 and over $ 630.00 The parties hereto understand and agree th< City caused by the Contractor's delay in con hereunder in the time specified by the Cc would be incapable or very difficult of accc and that-the "Amount of Liquidated Damages out above, is a reasonable f orecast of just the City for harm caused by any delay. .t any harm to the pleting the work ntract Documents rate estimation, Per Day", as set compensation due C7-7.11 SUSPENSION BY COURT ORDER: The Contractor shall suspend operations on such part or parts of the work ordered by any court, and will not be entitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the event the work is suspended by a Court Order. Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. C7-7.12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work opera�ion wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the Owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract, for any reason, the Owner will make no extra payment for stand-by time of construction equipment and/or construction crews. � If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary.• Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of the Contractor as set forth in Paragraph C7-7.8 EXTENSION OF THE TIME OF COMPLETION, and should it be determined by mutual consent of the Contractor and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time, then the Contractor may be reimbursed f or the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the Engineer �� F;� , C7-7 (6) , � � � � L � L � � r that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowea. No reimbursement shall be allowed if the equipment is moved to another construction project for the City of Fort Worth. The Contractor shall not suspend work without written notice from the-Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. C7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because of National Emergency, so declared by the President of the United States or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor, materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months, the Contractor sha11 within seven days notify the City in writing, giving a detailed statement of the efforts which have been made and listing all necessary items of labor, materials, and equipment not obtainabl,e. If, after investigations, the Owner finds that such conditions existing and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contract, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials and equipment within thirty days, the Contractor may request the Owner to terminate the contract and the Owner may comply with the request, and the termination shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of the agreed settlement, which shall include, but not be limited to, the payment for all work executed but no anticipated profits on work which has not been performed. C7-7.14 SUSPENSIOtv OR ABANDONMENT OF THE WORR AND ANNULMENT OF CONTRACT: The work operations on alI or any portion or section of the work under Contract shall be suspended immediately on written order of the Engineer or the Contract may be declared cancelled by the City Council for any good and sufficient cause. The following, by way of example, but not of limitation, may be considered grounds for suspension or cancellation: a. Failure of the Contractor to commence work operations within the time specified in the Work Order issued by the Owner. r C7-7 (7) b. Substantial evidence that progress of the work operations by Contractor is insufficient to complete the work within the specified time. c. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. � e. Substantial evidence that the Contractor has abandoned the work. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requirements of the Contract Documents or to comply with any orders given by the Engineer or Owner provided for in these Contract Documents. g. Failure of the Contractor promptly to make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed in writing by the Engineer or the Owner. h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud on the City in the construction of work under contract. i. A substantial indication that the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of any creditor or for any other purpose. � k. If the Contractor shall for any cause whatsoever not carry on the working operation in an acceptable manner. If the Contractor commences legal action against the Owner. A copy of the suspension order or action of the City Council shall be served on the Contractor's Sureties. When work is suspended for any cause or causes, or when the contract is cancelled, the Contractor shall discontinue the work or such part thereof as the Owner shall designate, whereupon the Sureties may, at their option, assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue, and may perform the same or may, with the written , �r � � � � y� �� C7-7 (8) L�' � � consent of the Owner, sublet t}ze work or that portion of the work as taken over, provided however, that the Sureties sha11 exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon � the Contractor and upon the Sureties or their authorized agents. The Sureties, in such event shall assume the Contractor's place in all respects, and shall be paid by the Owner for all work performed by them in accordance with the � terms of,the Contract Documents. Al1 monies remaining due the Contractor at the tirne of this default shall thereupon become due and payable to the Sureties as the work progresses, � subject to a11 of the terms of the Contract Documents. C.v In case the Sureties do not, within the hereinabove specified � time, exercise their right and option to assume the contract responsibilities, or that portion thereof which the Owner has ordered by the Contractor to discontinue, then the Owner �hall � have the power to complete, by contract or otherwise, as it may determine, the work herein described or such part thereof as it may deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and � use any materials, plants, tools, equipment, supplies, and � property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, � equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials, tools, equipment, �' and all expenses incidental thereto. The expense so charged ' shall be deducted by the Owner from such monies as may be due � or may become due at any time thereafter to the Contractor � under and by virtue of the Contract or any part thereof. The Owner shall not be required to obtain the lowest bid for the �' work completing the contract, but the expense to be deducted -, - shall be the actual cost of the owner of such work. ... In case such expenses shall exceed the amount which would have been payable under the Contract if the same had been completed �- by the Contractor, then the Contractor and his Sureties shall �, pay the amount of such excess to . the City on notice from the Owner of the excess due. When any particular part of the work is being carried on by the Owner by contract or otherwise r under the pravisions of this section, the Contractor shall �- continue the remainder of the work in conformity with the terms of the Contract Documents and in such a manner as to not hinder or interfere with performance of the work by the Owner. ~ C7-7.15 FULFILLMENT OF CONTRACT: The Contract will be considered as having been fulfilled, save as provided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Contract Documents have C7-7 (9) � � . been finished Engineer, and the Owner. and completed, the final inspection made by the the final acceptance and final payment made by C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: A. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner in whole, or from time to time in part, in accordance with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner. Any such termination shall be effected by mailing a notice of termination to the Contractor specifying the extent to which performance of work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail by the Owner. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. B. CONTRACTOR ACTION: After receipt of a notice of termination, and except as otherwise directed by the Engineer, the Contractor shaZl: l. Stop work under the contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the work under the contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the perf ormance of work terminated by the notice of termination; 4. transfer title to the manner, at the if any, directed by c�—� cio� the Owner and deliver in times, and to the extent, the Engineer: � � �� �� 9 �� � � � � � � � � � �.. � � � �. �. L� � a. the fabricated or unfabricated parts, work in process, completed work, supplies and other material produced as a part of, or acquired in connection with the performance of, the work terminated by the notice of termination; and b, the completed, or partially completed plans, drawings, information and other property which, if the contract had been completed, would have been required to be furnished to the Owner. complete performance of such part of the work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the Engineer may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the Owner has or may acquire the rest. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the Engineer a list, certified as to quantity and guality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by the Engineer. Not later than 15 days thereafter, the Owner shall accept title to such items provided, that the list submitted shall be subject to verification by the Engineer upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. C. TERMINATION CLAIM: Within 60 days after notice of termination, the Contractor shall submit his termination claim to the Engineer in the form and with the certification prescribed by the Engineer. Unless one or more extensions in writing are granted by the Owner upon request of the Contractor, made in writing within such 60-day period or authorized extension thereof, any and all such claims shall be conclusively deemed waived. � C7-7 (11) �. AMOUNTS: Subject to the provisions of Item C7-7.16(C), the Contractor and Owner may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the total contract price as reduced by - the amount of payments otherwise made and as further reduced by the contract price of work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount_ No amount shall be due for lost or anticipated profits. Nothing in C7-7.16(E} hereafter, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragranh. E. FAILURE TO AGREE: In the event of the failure of the Contractor and the Owner to agree as provided in C7-7.16 (D) upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this section the Owner shall deterrnine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. �. DEDUCTIONS: In arriving at the amount due the contractor under this section, there shall be deducted (a) all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract; (b) any claim which the Owner may have against the Contractor in connection with thxs contract; and (c) the agreed price for, or the proceeds of sale of, any materials, supplies or other things kept by the Contractor or sold, pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner. G. ADJUSTMENT: If the termination hereunder be partial, prior to the settlement of the terminated portion of this contract, the Contractor may file with the Engineer a request in writing for an �� J '' C7-7 (12) L� L� � L C' C' 1 � equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by the notice of termination), such equitable adjustment as may be agreed upon shall be made in such price or prices; nothing contained herein, however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter th� rights which the Owner may have for termination of this contract under C7-7.14 hereof entitled "Suspension of Abandonment of the work and Amendment of Contract" or any other right which Owner may have for default or breach of contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with�the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal, state, and local laws, ordinances, and regulations so as to protect person and property from injury, including death, or damage in connection with the work. � C7-7 (13) ' � � PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT � SECTION C8-8 MEASUREMENT AND PAYMENT C8-8.1 MEASUREMENT OF QUANTITIES: The determination of � quantities of work performed by the Contractor and authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer, based � on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents, numbers, and weights of the materials and � items installed. � C8-8.2 UNIT PRICES: When in the Proposal a"Unit Price" is set forth, the said "Unit Price" shall include the f urnishing by the Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the � construction of and the completion in a manner acceptable to i�. the Engineer of all work to be done under these Contract Documents. � The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures, �. cleanup, finished, overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other causes, `- delays, profits, injuries, damages claims, taxes, and all other items not specifically mentioned that may be required to � fully construct each item of the work complete in place and in a satisfactory condition for operation. � C8-8.3 LUMP SUM: When in the Proposal a"Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for the Contractor to furnish all labor, tools, materials, �. machinery, equipment, appurtenances, and all subsidary work necessary for the construction and completion of all the work � to provide a complete and functional item as detailed in the Special Contract Documents and/or Plans. C8-8.4 SCOPE OF PAYMENT: The Contractor shall receive and accept the compensation, as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution of the work at any time C8-8 (1) u � � before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completeing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and prooer expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfection, or damage shall have been discovered on or before the final inspection and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Between the lst and Sth day of each month the Contractor shall submit to the Engineer a statement showing an estimate of the value of the work done during the previous month, or estimate period under the Contract Documents. Not later than the lOth day of the month the Engineer shall verify such estimate, and if it is found to be acceptable and the value of work performed since the last partial payment was made exceeds one hundred dollars ($100.00) in amount, 90$ of such estimated sum will be paid to the Contractor if the total contract amount is less than $400,000, or 95$ of such estimated sum will be paid to the Contractor if the total contract amount is $400,000 or greater within twenty-five (25? days after the regular estimate period. The City will have the option of preparing estimates on forms furnished by the City. The partial estimate may include acceptable nonperishable materials delivered to the work which are to be incorporated into the work as a permanent part thereof, but which at the the time of the estimate have not been installed. (such payment will be allowed on a basis of 85$ of the net invoice value thereof.) The Contractor shall furnish the Engineer such information as he may request to aid C8-8 (2) � ,' � '� � i � t� � him as a guide in the verification or the preparation of partial estimates. It is understood that the partial estimate from month to month will be approximate only, and all partial monthly estimates and payment will be subject to correction in the estimate rendered following the discovery of an error in any previous estimate,and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City reserves the right to withhold the paymeht of any 1" monthly estimate if the contractor fails to perform the work r,,,, strictly in accordance with the specifications or provisions of this contract. � C8-8.6 WITHHOLDING PAYMENT; Payment on any estimate or `' estimates may be held in abeyance if the performance of the construction operations is not in accordance with the � requirements of the Contract Documents. L. C8-8.7 FINAL ACCEPTANCE: Whenever the improvements provided � for by the Contract Documents shall have been completed and all requirements of the Contract Documents shall have been fulfilled on the part of the Contractor, the Contractor shall notif y the Engineer in writing that the improvements are ready � for the final inspection. The Engineer shalZ notify the appropriate officials of the Owner, will within a reasonable time make such final inspection, and if the work is � satisfactory, in an acceptable condition, and has been completed in accordance with the terms of the Contract - Documents and all approved modifications thereof, the Engineer e will initiate the processing of the final estimate and F recommend final acceptance of the project and final payment �. therefor as outlined in C8-8.8 below. �. , C8-8.8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. Al1 prior � subject to payment. 4 A � estimates upon which payment has been made are necessary corrections or revisions in the final C8-8 (3) �j � The amount of the final estimate, less previous payments and any sum that have been deducted or retained under the provisions of the Contract Documents, will be paid to the Contractor within 60 days after final acceptance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the Owner satisfactory evidence of payment as f ollows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit, as furnished by the City, certifying that all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under Contract Documents or any act or neglect of said City relating to or connected with the Contract. The making of the final payment by the Owner shall not relieve � the Contractor of any guarantees or other requirements of the �, Contract Documents which specifically continue thereafter. C8-8.9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent Engineers and designers to prepare the Contract Documents and all modifications of the anproved Contract Documents. It is, therefore, agreed that the Owner shall be responsible for the adequacy of its"own design features, sufficiency of the Contract Documents, the safety of the structure, and the practicability of the operations of the completed project, provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof, and additions and alterations thereto approved in writing by the Owner. The burden of proof of such compliance shall be upon the Contractor to show that he has complied with the said requirements of the Contract Documents, approved modifications thereof, and all approved additions and alterations thereto. C8-8.10 GENERAL GUARANTY: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and r � C8-8 (4) � � ' �` pay for any damage to other work resulting therefi�om which �Y� shall appear within a period of one year from the date of final acceptance of the work unless a longer period is specified andshall furnish a good and sufficient maintenance � bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general �� guaranty as above outline. The Owner will give notice of ', observe3 defects with reasonable promptness. � . C8-8.11 SUBSIDIARY WORK: Any and all work specifically �� governed by documentary requirements for the project, such as �-- conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific item for bid has been provided for in the Proposal, �, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for ,. each bid item. Surface restoration, rock excavation and �. cleanup are general items of work which fall in the category of subsidiary work. C8-8.12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be .. allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These r� materials shall be used only when directed by the Engineer, _� depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of ,r material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in " accordance with the General Contract Documents regardless of the actual amount used for the project. : CS-8.13 RECORD DOCUMENTS: Contractor shall keep on record a - copy of all specifications, plans, addenda, modifications, -- shop drawings and samples at the site, in good order and annotated to show all changes made during the construction process. These shall be delivered to Engineer upon completion . of the work. � i 1 �8-8 �S� L �'�1R� A SPLCIAL CONDITIONS ITEM D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-& D-9 D-10 D-ll D-12 D-13 D-14 U-15 D-16 D-l7 D-18 D-19 D-20 D-21 D-22 D-23 D-24 D-25 D-26 D-27 D-28 D-29 D-30 D-31 D-32 PART D - SPECi�L CONDITIONS "I'AI31_I� OF C'ONT[;N'I�S 1�AI3LE Of CONTF:NTS General Project Desi�;�lation Right To Audit Project Si�,*ns Wage Rates Existing Utilities Substitutions Crushed Limestone Backfill Trench Safety System Sanitary Sewer Manholes Minority/Women Business Enterprise Compliance Connection of Existing Mains Easements and Permits Site Preparation Submission of Bids Bid Quantities Concrete and Accessaries Interpretation and Preparation of Proposal Bonds (City Let Projects) Disposal of Spoil/Fill Material Workers' Compensation lnsurance Operating and Maintenance Manuals Trench Excavation, Backfiil and Compaction Shop Drawings Post-Construction Television Inspection of Sanitar_y Sewers Explanation of Bid Ttems Cost Breakdo��vn Samples and Quality Controi Testing Protection of Trees, Plants, and Soil Partial Estimates and Retainage Manhole Inserts Contractor's Responsibility for Damage Claims PART D - SPECIAL CONDITIONS D-1 General: Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and Specifications, effective July 1, 1978, with the Iatest revisions are made a part of the Contract Documents for this project. The Plans, Special Conditions and Provisions Documents, and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturer's name, number or identification included therein as specifying, refening or implying product control, performance, quality, or other shall be binding upon the Contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shal! generally, but not necessarily, follow the guidelines listed below: l. Plans 2. Contract Documents 3. General Contract Documents and Specifications The following Special Conditions shall be applicable to this project and shall govern over any conflicts with the General Contract Documents under the provisions stated above. D-2 Proiect Desi�nation: Consiruction under these Special Documents shall be performed under the Fort Worth Water Department Project Designations: Sewer Project Number: PS46-070460250030 D.O.E. Number: 2404 D-3 Ri�ht To Audit: RIGHT TO AUDIT: Part C- General Conditions, Section C8-8 MEASUREMENT AND PAYMENT, Page C8-8 (5), add the following: "C8-8.14 RIGHT TO AUDIT: (a) Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give contractor reasonable advance notice of intended audits. !� D-1 , � .» �� D-3 Right To Audit (Continued): (b) Contractor further agrees to include in a11 its subcontracts hereunder a provision to the � effect that the subcontractor agrees that the City shall, until the expiration of three {3) years af'ter final payment under the subcontract, have access to and tlle rigllt to examsne • and photocopy any directly pertinent books, docuinents, papers and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. City shall give subcontractor reasonable advance �" notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse the Contractor for the cost of copies as follows: 1. 50 copies and under - 10 cents per page 2. More than 50 copies - 85 cents for the first page plus fifteen cenis for each page thereafter. D-4 Proiect Si�ns: Project Signs are required at all locations which will be under construction for more than thirty (30) calendar days as indicated in Part B Proposal. Project_Signs shall be in accordance with Figure 30 (dated 8-28-89) of the General Contract Documents. The signs may be mounted on skids or on posts. The exact Iocations and methods of mounting shall be approved by the engineer. Any and all costs for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cast of the project and no additional compensation will be allowed. � D-5 Wa�e Rates: The labor classifications and minimum wage rates set forth herein have been ,. predetermined by the City Council of the City of Fort Worth, Texas, in accordance with I statutory requirements, as being the prevailing classifications and rates that shali govem 'e- on all work performed by the Contractor or any sub-contractor on the site of the project covered by these Contract Documents. In no event sl�all less than the following rates of � wages be paid. (Attached). � � � �_ D-6 Existin� Utilities: The plans show the locations of all known surface and subsurface structures. However, the Owner assumes no responsibility for failure to show any or aIl of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be considered sufficient basis for claims for additional compensation for e�:tra work or for increasing the pay quantities in any maiu-►er �vhatsoever. - D-2 �� � D-6 Ezistina Utilitics (Continued�: The Contractor shall be responsible for verifying the locations of and protecting all � existing utilities, service lines, or other property crossed or exposed by his consiruction operations. Contractor shall make all necessary provisions for the support, protection, relocation, and or temporary relocation of all utility poles, gas lines, telephone '" cables, utitity services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and or temporary � relocation of such facilities shall be included in the cost bid per lineai• foot of pipe � insta(led. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged, the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediateiy notify the Owner of the damaged utility or service line. He sliall cooperate with the owners of all utilities to locate existing underground facilities and notify the Engineer at once of any conflicts in grades and � alignment. r- In case it is necessary to change or move the proPerty of any owner of a public utility, such property shalt not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs, of their property that may be made necessary by performance of this contract. D-7 Substitutions: " The specifcations for materials set out the minimum standard of quality which the City r„ believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material which has been specified. Where the term "or equal," or "or approved eaual" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished it will be approvable, as the particular trade name R was used for the purpose of establishing a standard of quality acceptable to the City. If a ,. product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the proposed substitute is procured by the Contractor. Where the term ; "or equal," or "or approved equal" is not used in the specifications, this does not .� necessarily exclude alternative items or material or equipment which rnay accomplish the intended purpose. However, the Contractor shall liave the full responsibility of proving , that the proposed substitution 'ts, in fact, equal, and the Engineer, as the representative of - the City, shall be the sole judge of the acceptability of substitut�ans. The provisions of ... this sub-section as related to "Substitutions" shall be applicable to all sections of these specifications. .-- � D-3 J � D-8 Crushed Limestone Backfill: � Where specified on the plans or directed by the Engineer, crushed limestone shall be used �- for trench backfill on this project. The material shall conform to Transportation and : Public Works Standard Specifications for Street and Storm Drain Construction Division 2 � Item 208.2 Materials and Division 2 Item 208.3 Materials Sources. Trench backfill and -- compactioil s11all meet the requirements of E2-2 Excavation and Backfill of the General Contract Documents and Specifications. � Payment for crushed limestone backfill in place shall be made at the unit price bid in the �, Proposal multiplied by the quantity of material used measured in accordance with E2- 2.16 Measurement of Backfill Materials of the General Contract Documents and +� Specifications. �- D-9 Trench Safetv Svstem: l. GENER.AL: This specification covers the trench safety requirements for all trench excavations in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and all other , appurtenances. "' 2. STANDARDS: The latest version of the U.S. Department of Labor, Occupational . Safety and Health Admznistration Standards, 29 CFR Part 1926, Subpart P-Excavations, are hereby made a part of this specification and shall be the minimum governing '' requirements for trench safety. 3. DEFINITIONS: A. TRENCHES: A trench is referred to as a narrow excavation made below the surface of the ground in which ihe depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15) feet. If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to ihe side of the excavation to fifteen (15) feet or less at the bottom of the excavation, the excavation is also considered to be a trench. B. BENCHING SYSTEM: Benching means excavating the sides of a trench to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. C. SLOPING SYSTEM: Sloping means excavating to form sides of a trench that are inclined away from the excavation. D. SHIELD SYSTEM: Shields used in trenches are generally referred to as "trench boxes" or "trench shields." Shield means a structure that is able to withstsnd the forces imposed on it by a cave-in and protect workers witllin the structure. Shields can be permanent structures or can be designed to be portable and move along as the work progresses. Shields can be eitl�er premanufactured or job-built in accordance with OSHA standards. D-4 �. �� � D-9 Trench Safetv Svstem (Continued): E. SHORING SYSTEM: Shoring means a structure such as a metal hydraulic, � mechanical or timber system that supports the sides of a trench and which is designed to prevent cave-ins. Shoring systems are generally comprised of crossbraces, vertical rails (upriglrts), ]lorizontal rails (�vales) and/or sheeting. 4. MEASUREMENT: Trench depth is the vertical measurement from the top of the existing ground to the bottom of the pipe or structures. The quantity of irench safety systems shall be based on the linear foot amount of trench depth greater than five (5) .� feet. '" 5. PAYMENT: Separate payrnent will be made only when trench excavations exceed a depth of five (5) feet and shail be full cornpensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench safety systems. D-10 Sanitary Sewer Manholes: �— The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, ancUor as described in these Special Contract Docucnents ~ in addition to those located in the fiefd and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract Documents and Specifications, unless amended or superseded by requirements of � this Special Condition. l. Concrete Collars: Concrete collars when indicated on the plans will be required as per Fig. 121. 2. Watertight Manhole Inserts: Watertight gasketed manhole inserts shall be installed in sanitary sewer manholes when indicated on the plans. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations. � � 3. Lift-Holes: All lift holes shall be plugged with a precast concrete plug. The lift hole shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be seated on the inside of the manhole with quick setting cement grout. � �. � 4. Final Rim Elevations: A. ManhoIe rims in parkways, lawns, alleys, and other improved lands shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the surrounding ground. Backfill shall pro��ide a uniform slope from the top of manhole casting for not less than three (3) feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regraded near the manhole. . , � D-5 � � D-10 Sanitary Se�ver Manholes (Continued): B. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation �' shown on the drawings or minimum of 6 inches above grade. 5. Manhole Covers: All lids shall have pick slots in lieu of pick holes. Manhole frames �` and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots. Covers shall set flush with the rim of the frame and shall have no larger than 1/8- inch gap between the frame and cover. Bearing surfaces shall be machine finished. Locking manhole lids and franles will be restricted to locations within the 100 year flood ,.. plain and areas specifically designated on the plans. Certainteed Duciile Iron Manhole Lids and Frames are acceptable for use where Locking lids are specified. � . 6. Shallow Manholes: Shallow manhole construction will be used when manhole depth is four (4) feet or less. All shallow manholes shall be built in accordance �vith Fig. 106 or �" per Fig. 103 but with a flat slab top (no cones sections will be allowed}. All shallow manholes shall have a 24" x 40" cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIG. 105 WILL NOT BE ALLOWED. �- 7. Manhole Steps: No Manhole steps are to be installed on any Sanitary Sewer Manhole. � 8. Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy paint, Koppers "Bitumastic Super Service Black", Tnemec, "46-450 Heavy Tnemecol", or equal to a minimum of 14 mils dry film thickness. 9. Manhole Joint Sealing A. General: All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Worth Water Department, excluding only the joints using a trapped type preformed O-ring rubber gasket shall require bitumastic joint sealants as per r attached Figure M. r � � B. Materials: This sealant shall be preformed and trowelable bitumastic as manufactured by Kent-Seal, Ram-Nek, E-Z Stick or equal. The joint sealer shail be supplied in either extruded rope-form of suitable cross-sectional area or flat-tape form and shall be sized as reconunended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The joint sealer shall remain totally flexible without slu-inking, hardening, or oxidizing regardless of the ]ength of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of the product as a preformed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years. ... D-6 � � D-10 Sanit�ry Se�ver Manholes (Continued): C. Installation of Joint Sealant: Each grade adjustment ring and manhole frame shall be � sealed with the above specified materials. Ali surfaces to be in contact with the joint sealant sllall be thoroughly clean of dirt, sand, mud or other foreign matter. A primer shall be apptied to all surfaces prior to installing the joint sealant in accordance with the * recommendations by the manufacturer. The protective wrapper shall remain on the joint sealant until immediately prior to placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shal( be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on bitumastic joint sealer. Frames �., and grade rings shall rest on two (2) rows (inside and outside) of bitumastic joint sealer. ' 10: Sealing and/or Adjusting Existing Manholes: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping t}ie sides of the trercch nearly vertical. A. Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block, or materials other than precast concrete shall be replaced with precast concrete rings, ar where necessary and approved by the Engineer, a precast flattop section. Precast concrete rings, or precast concrete flattop section will be the only adjustments allo��ed. B. In brick or block manholes replace the upper portion of the manhole to a point 24 inches below the frame. If the walls or cone section below this level are structurally unsound, notif'y the Engineer prior to replacement of the grade rings and manhole frame. Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. r C. Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris. Coat exposed manhole surfaces with an approved bonding agent followed with an application of a quick setting hydraulic cement to provide a smooth working surface. `" D. If ihe inside diameter of the manhole is too large to safely support new adjustment �. rings or frame, a flattop section shall be installed. ` E. Joint surfaces between the frame, adjustment rings, and cone section shall be free of ,. dirt, stones, debris, and voids to ensure a watertight seal. Place a flexible gasket joint material in two concentric rings along the inside and outside edge of each joint, or use trowelable material in lieu of preforir►ed gasket material. Position the butt joint for each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not specificaliy accepted by the Engineer may be used to obtain final `� surface elevation of the manhole frame. � D-7 G � � � D-10 Sanitary Se�ver Manholes (Continued): F. In paved areas or future paved areas, castings sliall be installed by usi�ig a straight edge � not less than ten (10) feet long so tliat the top of casting will conform to the slope and finish elevation of the paved surface. The top of t}ie casting shall be 1/8 inch below tiie finished elevation. Allowances for the compression of the joint material shall be made to +� assure a proper final grade elevation. G. All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy paint, Koppers "Bitumastic Super Service Black", Tnemec, "46-450 Heavy Tnemecol", �, or equal to a minimum of 14 mils dry film thickness.. " 11. Measurement and Payment: A. The price bid for new/replacement marihole instaliations shall inclade alf labor, equipment, and materials necessary for canstruction of the manhole including but not limited to joint sealing, lift hole sealing and exterior surface coating. B. The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment, and materials necessary for adjusting and/or sealing the manhole including �. but not limited to joint sealing, lifthole sealing and exterior surface coating. .� C. Payment for concrete collars and watertight manhole inserts, if required, will be made separately, based on the appropriate bid items. � � D-11 Minoritv/Women Business Enternrise Comnliance: Reference Part C(General Conditions), Section C3-3.2 Entitled "MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTER.PRISE r COMPLIANCE" shall be deleted in its entirety and replaced with ihe following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a ` Woman Business Enterprise (WBE) on the contract and payment iherefore. Contractor � furtlier agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. '� The misrepresentation of facts (other than a negligent misrepresentation) and/or the � commission of fraud by the Contractor wilI be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of ' time of not less than three (3) years. � �. D-8 r � [� � D-12 Connection of ExistinE Mains: The Contractor shall determine the exact location, elevation, configuration and angulation � of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said wor� sllall be r• considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting down an existing main, the Contractor shall notify Mr. James Anderson, � Manager, Construction Services, Phone 871-7813, at least 48-hours prior to the required shut down time. The Contractor's attention is directed to Paragraph CS-5.15 � INTERRUPTION OF SERVICE, Page CS-5(5), PART C- GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTR.ACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both r" personally and in writing as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shall be included in the linear foot ,.� price bid for the appropriate pipe size. '� D-13 Easements and Permits: Easements and permits, both temporary and permanent, have been secured for this project at this time and rnade a part t�lereto. Any easements and/or permits, both temporary and permanent, that have not been obtained by the time of publication shall be secured before construction starts. No work is to be done in areas requiring easements and/or permits unti! the necessary easements are obtained. The Contractor's attention is directed to the easement description and permit requirements, as contained herein, along with any - special conditions that may have been imposed on these easements and perniits. � Where the pipetine crosses privately owned property, the easements and construction areas are shown on the plans. The easements shall be cleaned up after use and restored to their original conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission '�- from the property owners irivolved for the use of additional property required. No �. additional payment will be allo�ved for this item. ` D-14 Srte Pre�aration: r The Contractor shall clear rights-of-way or easements of obstruction which must be removed to make possible proper prosecution of the work as a part of this project construction operations. The contractor's attention is directed to paragraph C6-6.10 work within easements, page C6-6(4), part C- General Conditions of the Water Department General Contract Document and General Specifications. _ Clearing and restoration shall be considered as incidental to construction and all costs incurred will be considered to be included in the Linear Foot price of the pipe. D-9 � � � D-15 Submission of Bids: This document is desioned as two separate contract documents and proposals and shall � not be construed as being a package. The Proposal Sections are desi�ned as two separate proposals and are arranged to allow the Contractor to submit a bid on each individual praposal. The total low bid of each proposal is the apparent successfi�l bidder. If the f►�* Contractor only submits a bid on one proposal and is the lowest proposed price total, the Contractor will be the apparent successful bidder for this individual proposal. Unit I consists of the water and/or sewer line replacements. �� Unit II consists of the street and/or storm drain improvements. r- D-16 Brd Ouantities : Bid quantities of the various items in the Proposal are for bid comparison only and inay �,,, not reflect the actual quantities (See General Conditions C2-2.2 anc3 C4-4.3). Moreover, there is to be no limit on the variations between the estimated quantities shown and actual � quantities performed. �"' D-17 Concrete and Accessories: l. SCOPE: The requirements of this Section shall govern for all materials used and for the storage, handling, measuring, proportioning, and mixing or cambining such materials in producing concrete for special manholes and incidental pier construction. � All other conerete construction shall be governed by the General Contract Document � Specifications. All materials shall be in accordance with requirements of ACI 301, unless � amended or superseded by requirements of following articles or generaI notes on the � Plans. Concrete shall be composed of normal Portland cement or high early strength cement, coarse aggregate, fine aggregate, and water proportioned and mixed as hereinafter provided in these specifications. «.- When not specifically shown on the plans or stated in the Special Contract Documents, all concrete shall be 3000 pss Type II, unless othen�vise directed by the Engineer. "Central Plant", or "Transit Mixed" concrete may be permitted, but only with Engineer's approval. 2. TESTING AGENCY: All testing shall be done by an approved testing laboratory selected and paid by the Contractor. Three (3 )cylinder samples should be performed at `" each 20-yard interval o concrete that is placed. � D-l� V � � D-17 Concrete and Accessories (Continued�: �. CEMENT' (ACI 301 2.1): Only one brand of cement shall be used in any one structure, � except by vvritten permission of the Engineer. When such permission is granted and more than one brand is used in one structure, the resulting concrete shall be uniform in color. Portland cement shall meet ihe requirements of ASTM C150, Type II with a maximum of �% tricalcuim aluminate for exposure to sewage. All cement shall be sampled and tested in accordance with ASTM C 183, C 184, C 187, C 188, C 190, and C 191, "Sampling and Testing Portland Cement". � 4. WATER (ACI 301 2.3): The water used in all concrete shall be free from objectionable ^ quantities of silt, organic matter, alkali, salts, and other impurities. 5. COARSE t1GGREGATE (ACI 30I 2.4): Coarse aggregate shall consist of gravel or crushed stone t��eeting the requirements of ASTM C33. When tested by ASTM C 131 procedures, coarse aggregate shall have a percentage of wear of not more than forty (40). Coarse aggregate for Class F concrete shall have a minimum of fifty (50%) percent calcium carbonate equivalent. M� ,r. 6. FINE AGGREGATE (ACI 301 2.4): fiine aggregate shall consist of natural sand, manufactured sand, or a combination thereof conforming to ASTM C-33. When tested in accordance with ASTM 40, "Test of Organic Impurities in Sands for � Concrete", the fine aggregate shall not show a color darker than the standard color. When the fine aggregate, to be used on the job, is mixed with High Early Strength �, Portland Cement in the proportion of one to three, the average tensile strength of not less than tluee standard mortar briquets shall be equal to or greater than the tensile strengtli of .- Ottawa sand mortar briquets of the same consistency when tested at tlie age of three days. 7. ADMIXTURES (ACI 301 2.2): A. General: Unless specified, no admixtures may be used without specific approval of the Engineer. Admixtures containing more than 1% � chloride ions may not be used. � B. Air Entraining Agent: Conform to ASTM C260. Add air entraining agent as indicated in ACI 301, Table 3.4.1. C. Water Reducing Admixtures: Conform to ASTM C494, Type A; Euclid Chemical Co. Eucon WR-75, Master Builders Pozzolith 200N, Protex PDA or approved equal. (At Contractor's option, water reducing admixture may be used to reduce cement content and improve workability.) Use according to manufacturer's reconvr►endations. � D. High Range Water Reducing Admixture (Super Plasticizer): Conform to ASTM C494, �' Type F or Type G; Euclid Chemical Co. Euco n37, Sike Chemical Corp. Sikament or approved equal. �.. � D-11 � � D-17 Concrete and Accessories (Continued�: 8. STORAGE OF CEMENT (ACI 301 2.5): Unless otherwise provided, all cement shall " be stored in well ventilated weatherproof buildings which wrll protect the cement from dampness. The floor supporting the cement shali clear the ground a sufficient distance to prevent the absorption of moisture by the cement. Provisions for storage shall be ample in capacity, and the shipments shall be segregated in sucI� a manner as to provide easy access for identification and inspection of each shipment. The Engineer may permit small quantities of cement to be stored in the open for a short w� period of time, (maximum 48 hours) if a raised storage platfornl and adequate waterproof covering are provided. No cement shall be used which has become lumped, caked or r hardened. 9. STORAGE OF AGGREGATES(ACI 301 2.5): The handlin� and storage of aggregate to be used in making concrete shall be such as to prevent the admixture of foreign materials. If the aggregates are stored on the ground, the site of the stock piles shal( be grubbed, cleared of all weeds, grass and other vegetation, and leveled off sa that the entire area will be properly drained. The bottom layer of aggregate shall noi be disturbed `- or used. «� When the contract requires the use of two (2) or more sizes of aggregates, the different sizes shall be stored in such a matuier as to prevent intermixing. Materials in stock piles shall be handled and placed in such a manner that segregation of '"' materials within the pile will be avoided, and each pile shall be built up in horizontal f,, layers of not more than three (3) feet in depth. `"' 10. CONSTRUCTION JOINT BONDING (ACI 301 6.1.4.1): Polyvinyl acetate type r.. bonding compound. Euclid Chemical Co. Euco Weld, Larsen Welacrete or approved equal. Omit 6.1.4.2 and b.1.4.3 11. ACCESSORIES FOR FORMS (ACI 301, Chapter 4): A. Cone Ties: 11/16" diameter, �,. 1" depth, plastrc cone and neoprene waterstop ring with suitable snap tie. B. Chamfer Strips: 3/4" 45 degree }ob cut wood. I2. STRUCTURAL REPAIR MATERIALS (ACI 301 9.4): With prior approval of the Engineer as to methods and procedures, make structural repairs with Euclid Chemical Co. Euco Epoxy 456, 400, 463 or Sika Chemical Corp. Culma Dur Mortar, Sikadur Hi-Mod L.V. ,or Sikadur Hi-Mod or approved equal. 13. MIXING OF CONCRETE: A. Central Mixing Plant: A central mixing plant will be allowed provided the method of mixing and handling has first been approved by the Engineer, and concrete produced is in conformity with the specification requirements. Concrete: D-12 � � � D-17 Concrete and Accessories (Continued): 1. Hauling Time: Discharge all concrete transmitted in a truck mixer, agitaTor or otlier � iransportation device within 1-1/2 hours af'ter the mixing water lias been added. ?. Extra Water: Deliver concrete to the job in exact quantities required by the design mix. �- Should extra water be required before depositing the concrete, the Engineer shali have sole authority to authorize the addition of water. Any additional water added to the mix after leaving the batch plant shall be indicated on the iruck ticket and signed by the person responsible. Wl�ere extra water is added to the concrete it shall be mixed �„ tl�oroughly for 40 revolutions of the drum or 3-1/2 minutes at mixing speed, whichever is greater. B. Transit Mixing: When transit mixing is used, the transit mixer shalt be of an approved revolving drum or revolving blade type so constructed as to produce a thoroughly mixed concrete with a uniform distribution of the materials throughout the mass and shall be equipped with a discharge mecl�anism which will insure the discharging of the mixed concrete without segregation. ... The mixer drum shall be water-tight wllen closed and shall be equipped with a locking device which will automatically prevent the discharging of the mixer prior to receiving `� tl�e required number of revolutions. The entire quantity of mixing water shall be accurately measured and controlled. Each batch shall be mixed to the consistency as described herein. Any additional mixing shall be done at a slow speed specified by the manufacturer for agitation and shall be continuous until the batch is discharged. ° 14. CONSTRUCTION JOINTS: Construction joints shall be placed as shown on the r pians unless otherwise specifically authorized by the Engineer. All construction joint shall be made on horizontal and vertical planes and formed with mortises or keys made in the concrete unless shown otherwise on the pians. A. Construction Joint Bonding (ACI 302 6.1.4.1) Polyvinyl Acetate type bonding "" compound. Euclid Chemical Co., Euco Weld, Larsen Welacrete or approved equal and �. applied as recommended. Omit 6.1.4.1 and 6.1.4.3. "-� I5. FORMS: �. A. FORMWORK (ACI 301, CHAPTER 4) 1. Earth Cuts (ACI 30I 4.1.3): Shall not be used as forn�s for vertical surfaces unless approved by the Engineer. 2. Chamfer Strips (ACI 301 42.4): Install 45 degrees chamfer strips at exposed outside corners. B. FORM REMOVAL (ACI 301 4.5)i. Form Rernoval: Remove formwork supporting `� weight of concrete only after notifying Engineer and in a manner to insure safety of the .- structure. Under normal conditions. Formwork may be removed when concrete is at least 14 days old and has reached 90 percent of specified strength. When temperature is below 45 degrees F leave formwork in place an additional period of the equaling time structure D-13 r � V � D-17 Concrete and Accessories (Continuedl: was exposed to lower temperature. No live load permitted on new construction after form "� removal until concrete is at least ?8 days old and has reaclled full specified strength. 2. Form Facing Material Removal: Form facing material which is removable without disturbing shores may be removed when concrete is at least 7 days old. Facing may be removed earlier if specifically approved by the Engineer and acceptable curing compound is applied to all surfaces immediately after form removal. •- G RESHORING (ACI 301 4.6) Reshoring permitted only after prior review by Engineer. 'r D. FORM REUSE Clean all fornl material suitable for reuse before erection. No forn� material will be acceptable for reuse if, in ihe opinion of the Engineer it will not produce a finished surface required by these Specifications or called for on the drawings. 16. PLACING CONCRETE (ACI 301): On ��ertical forniwork, use approved bar chairs or spacer as requrred to maintain proper concrete cover and bar position. -• 17. REPAIR OF SURFACE DEFECTS (ACI 309 9.1): Allow Engineer to inspect r- concrete surfaces immediately upon removal of forms. Modify or replace concrete not conforming to required lines, detail and elevations. Repair or replace concrete not properiy placed resulting in excessive honeycombing and other defects. Do not patch, repair or replace exposed architectural finished concrete except upon_express directions � of Engineer. Patching of tie holes and defects is required. .. 18. FORMED SURFACE FINISHED (ACI 301 10.4): Formed surface finished per ACI 301 10.4. 19. CURING (ACI 301 12.1): A. Impervious Coating: Applied specified curing cotnpounds immediately after final finishing of slabs. Apply in quantities recocnmended by the manufacturer. B. Wet Covering: Curing shall be continued for at least four curing days after the ` concrete is placed. r- 20. MISCELLANEOUS FINISH REQUIREMENTS: All other concrete finish work not indicated on the plans shall be provided herein, even though not specifically mentioned, as follows: 1. Finishing Exposed Surfaces: All tie wires shall be cut below surface then pointed over. All iinperfections such as fins shall be removed ai�d local surface depressions pointed over. D-l4 � � D-17 Concrete and Accessories (Continuedl: 21. PAYMENT FOR CONCRETE: The concrete quantities for the various structures will �, be paid for at tlie lump sum for the construction of tlie special ma«ilole and piers. Price will be full compensation for furnishing, hauling, and mixing all concrete materials; placing, curing and finishing all concrete; all grouting and pointing; cost of concrete mix � design e�:cept as provided in Special Contract Documents; furnishing and placing metal flashing strips; and for aIl forms and formwork, labor, tools, equipment, and incidentals necessary to complete the work. � D-18 Intcrr�retation and Prenaration of Pro�osal: �'- Part C- Generai Conditions, Section C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL, Page C2-2 (4) exchange paragraphs C2-2.7, C2-2.8 and C2-2.9 with the following: C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by iis proper Bid Security, to the Purchasing Manager or his representative at ihe official location and stated time set forth in the "Notice to Bidders." ,... It is the Bidder's sole responsibility to deliver the proposat at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The *" Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to tI�e Purchasing Manager, City of Fort Worth Purcliasing Division, P.O. Box 17027, Fort � Worth, Texas 76102. r" C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing �-• Manager cannot be withdrawn prior to the tiine set for opening proposals. A request for non-consideration of a proposal must be made in «�riting, addressed to the City Manager, � and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. ... .-- C2-2.9 TELEGR.APHIC MODIFICATION OF PROPOSALS: Any bidder may modify hjs proposal by tetegraphic communication at any time prior to the time set for opening proposals, provided such telegraplzic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such te(egraphic communication over the signature of the bidder was mailed prior to the proposal openin� time. If such confirmation is not received within forty-eight (48) liours after the proposal opening time, no further consideration will be given to the proposal. � � D-15 �. � � � D-19 Iionds (Citv Let Proiectsl: Reference Part C, General Conditions, dated November 1, 1987; (City let projects) make the following revisions: � 1. Pg. C3-3(3); the paragraph after paragraph C3-3.7d--Other Bonds should be revised r- to read: No surety will be accepted by the O«�ner which are at the time in default or delinquent on any bonds or which are interested in any litigation against ihe Owner. All bonds shall be made on the fornis fumished by the Owner and the surety shall be acceptable to the Owner. In order for a surety to be acceptable to the City, (1) the name ` of the surety shall be included on the current U.S. Treasury List of Acceptable Sureties [Circular 870], or (2) the surety must have capital and surplus equal to ten times the +� amount of the bond. The surety must be licensed to business in the state of Texas. The ,,� amount of the bond shall not exceed the amount shown on the Treasury list or one-tenth (1/10) of the total capital and surplus. If reinsurance is requrred, the company writing the �'� reinsurance must be authorized, accredited, or trusted to do business in Texas. 2. Pg. C3-3(5) Paragraph C3-3.11 INSURANCE delete subparagraph a. COMPENSATION INSURANCE. � 3. Pg. C3-3(6), Paragraph C3-3.11 INSURANCE delete subparagraph g. LOCAL � AGENT FOR INSURANCE AND BONDING. D-20 Dis�osal of Spoil/Fill Material: - Prior to the disposing of any spoil/fill material, the contractor shall advise the Director of the Department of Engineering, acting as the City of Fort Worth's Flood Plain �� Administrator ("Administrator"), of the location of all sites where the contractor intends -� to dispose of such material. Contractor shall not dispose of such maierial until the � proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance No. 11517). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a flood plain without a pe�nit. A flood plain permit can be issued upon approval of necessary engineering studies. No fill permit is required if disposal sites are not in a L flood plain. Approval of the contractors disposal sites shall be evidenced by a letter _ signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any eYpenses associated M with obtaining the fill permit, including any necessary engineering studies, shall be at . contractors' expense. In the event ihat the contractor disposes of spoil/fill material at a site without a fill permit or a letter from ihe Administrator approving the disposal site, upon notification by the Director of the Department of Engineering, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance ��vith the Ordinances of the City and this section. � ' � D-16 � � � D-21 �'Vorkers' Comnensation Insurance: A: Contractor's Worker's Compensation Insurance. Contractor agrees to provide to the � Owner (City) a certificate showing that it has obtained a policy of workers compensation insurance covering each of its employees employed on the project in compliance with state law. No Notice to Proceed will be issued until the Contractor has complied with �'" this section. B: Subcontractor's Worker's Compensation Insurance. Contractor agrees to require each and every subcontractor who will perform work on the project to provide to it a i„ certif cate from such subcontractor stating that the subcontractor has a policy of workers compensation insurance covering each employee employed on the project. Contractor � will not permit any subcontractor to perform work on the project until such certificate has been acquired. Contractor shall provide a copy of all such certificate to the Owner (City). R'" C. Workers Compensation Insurance Coverage 1. Definitions: �... Certificate of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the Texas Workers' Compensation ''� Commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC- 84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. � Duration of the Project. Includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and r accepted by the ��' City. r� ... r- Persons providing services on the project ("subcontractor" in section 406.096)- includes ail persons or entities performing all or part of the services the contractor has undertaken to perforni on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 2. The contractor shall provide coverage, based on proper reporting of classification `" codes a�1d payroll amounts and filing of any coverage agreements, which meets the . statutory requirements of Texas Labor Code, Section 401.011(44) for all ernployees of the contractor providing services of the project, for the duration of the project. � � � D-17 ?" D-21 Workers' Comnensation Insurance (Continued�: 3. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded ihe contract. 4. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the City showing that coverage has been extended. � 5. The coniractor shall obtain from each person providing services on a project, and provide to the City: �'^ �.. (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage s�iowing �� coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the .,. current certificate of coverage ends during ihe duration of the project. '� 6. The contractor shall retain all required certificates of coverage for the duration of the ,. project and for one year thereafter. " 7. The contractor shall notify the City in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the proj ect. 8. The contractor shall post on each project site a notice, in the text, form and manner w prescribed by the Texas Worker's Compensation Commission, informing all persons - providing services on the project that they are required to be covered, and stating how a � person may verify coverage and report lack of coverage. '�� 9. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: r - (a) provide coverage, based on proper reporting on the classification codes and � payroil amounts and filing of any coverage agreements, which meets the statutory requirements of Texas labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (b) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of tl�e person providing services on the project, for the duration of the project; � D-1 8 � J � D-21 Workers' Com�ensation Insurance (Continuedl: (c) provide the contractor, prior to the end of the coverage period, a new � certificate of coverage showing extension of coverage, if the coverage period sliown on the current certificate of coverage ends during the duration of the project; (d) obtain from each other person with whom it contracts, and provide to the contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certifcates of coverage on file for the duration of the project and for one year thereafter. v (fl notify the City in ��vriting by certified mail or personal delivery, within ten "w (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and �+ (g) contractually require each person with whom it contracts, to perform as required by paragraphs (a) -(g), with the certificates of coverage to be provided to �' the person for whom they are providing services. � 10. By signing this contract or providing or causing to be provided a certificate of � coverage, the contractor is representing to the City that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and ihat ail coverage agreements `` will be filed with the appropriate insurance carrier or, in the case of a self-insured, with r. the Texas Worker's Compensation Commission's Division of Self-Insurance Regulation. " Providing false or misleading information may subject the contractor to administrative "" penalties, criminal penalties, civil penalties or other civil actions. .R 11. The contractor's failure to coFnply with any of these provisions is a breach of contract by the contractor which entitles the City to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the City. " D. Posting of Required Worker's Compensation Coverage. The contractor shall post a . notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisf`y other posting D-19 \r � � D-21 �'Vorkers' Comnensation Insurance (Continued): requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's � Compensation Commission rules. This notice must be printed with a title in at least 30 �, point bold type and text in at least 19 point normal type, and shall be in both Englisll and Spanish and any other language common to the worker population. The text for the *-� notices shall be the following text, witlzout any additional words or changes: REQUIRED WORKER'S COMPENSATION COVERAGE �, "The law requires that each person working on this site or providing services related to this construction project must be covered by worker's compensation insurance. This j' includes persons providing, hauling, or delivering equipment or materials, or providing �,_ labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee". � "Call the Texas Worker's Compensation Commission at 512-440-37�9 to receive information on the Iegal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage. r D-22 O�erating and Maintenance Manuals: A. The Contractor shall provide five copies of complete "O & M Manuals." All information should be bound in five separate loose-leaf binders and delivered to the Owner at least two weeks prior to final inspection of the project. B. For each product, equipment, or system the following data shall be provided (unless deemed inappropriate by the Engineer): � 1. A general description of the equipment or system listing the major components, �,, intended service, and other general data. 2. Technical data including nameplate data, design parameters, ratings, capacity, performance data, operation curves, characteristics and the like. Clearly distinguish between information which does and does not apply. r. 3. List of warnings and cautions to be observed during installation, operation, and maintenance. �,. p, 4. Fully detailed installation and operating instructions including special tools required, aiigzunent instructions, start-up and shut-down sequences. 5. Maintenance, service, and repair instructions including maintenance and service schedules, materiais and methods for performing routine, special, a�id arulual service. � � 6. Troubleshooting guide and check list indicating common failures, test methods and procedures for determining component fault or failure. D-20 �.. D-22 Onerating and Maintenance Manuals (Continuedl: 7. Spare parts list indicatrng part and order number witli name and address of supplier. Include current prices of replacement parts and supplies. 8. Typewritten test reports including material and system tests performed. Including date of test, testing party, witnesses and record of test conditions and results in test reports. 9. Diagrams to include controls, wiring, installation or operation of the equipment or system. 10. Copies of all "REVIEWED" shop drawings. 1 I. Copies of all manufacturer supplied warranties and guarantees. - C. The contractor should submit two preliminary copies of the operation and maintenance manuals to ihe Engineer at least six weeks prior to final project inspection for review. One copy of the documents will be returned to the Contractor marked "APPROVED" or "REVISE AND RESUBMIT." If it is marked APPROVED, the contractor only needs to �_, provide four additional copies. If it is marked "REVISE AND RESUBMIT," repeat the "O & M Manual" submittal in accordance with this item. r. �~ D-23 Trench Excavation, Backfill and Comnaction: " Trench excavation and backf 11 under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O. W, shall be in accordance with Sections E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract Documents and Specifications except as specified herein. 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and ` Backfill, if the stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loadings of the pipe wiIl be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedral measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights-of-way, � permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special Condition of this � document. � 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type "C' backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that '� the P.I. of the excavated material is less than 8. Such evidence shall be a test report from , an independent testing laboratory and must include representative samples of soiis in all involved areas, with a map showing the location and deptli of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, D-21 .i � D-23 Trench Excavatson, Backfill and Com�action (Continuedl: tlle Engineer may waive the test report requirement. See E1-2.3, Type "C" or "D" � Backfill, and E2-2.11 Trench Backfill for additional requirements. Wlien Type "C" back- fill materia! is not suitable, at the direction of the Engineer, Type "B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall �^ be in accordance with Figure A. Sand material specified in Figure A shall be obtained from an approved source and sl�all consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: � Size Sieve % Retained — #4 0-5 # 16 0-20 #50 0-50 # 100 60-95 #200 90-100 (P.I. = 8 or less) .. 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 "` Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S.T.M. D698) by means of tamping only. � Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by jetting, mechanical tamping, or a combination of � methods. Backfil! material to be mechanically tamped must be within +-4% of its +� optimum moisture content. The top two (2) feet of sewer line trenches and the top eighteen (18) inches of water line may be rolled in with heavy equipment tires, provided `� it is placed in lifts appropriate to the material being used and the operation can be performed without dan�age to the installed pipe. The City, at its own expense, will perform trench compaction tests per A.S.T.M. `'� standards on all trench backfill. Any retesting required as a result of failure to compact �, the backfill material to meet the standards will be at the expense of the Contractor and will be billed at the commercia] rates as determined by the City. These soil density tests �'� shall be perfornied at two (2) foot vertical intervals beginning at a level two (2) feet F� above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of tre�ch backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be � tested or providing trench safety system for tests conducted by the City. _ 4. MEASUREMENT AND PAYMENT: All material, including any and all Type "B" backfill, and labor costs of excavation aizd backfill will be included in the price bid per linear foot of water and sewer pipe. 3 � � D-22 � � D-24 Shon Dr�win�s: 1. Submit seven (7) co�ies of sl�op drawings, layouts, manufacturer's data and material 'r' scliedules as may be required by the Engineer for his revie�v. Submittals may be checked by and stamped with the approval of the Contractor and adentified as the Engineer may require. Such review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents. Indicated actions by the Engineer, which may result from his review, shall not constitute concurrence with any deviation from the plans and specifications unless such deviations are specifically identified by the method described ,�• below, and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted data. Processed shop drawing submittals are not change "" orders. The purpose of submittals by the Contractor is to demonstrate that the Contractor understands the design coilcept, and that he demonstrates l�is understanding by indicating which equipment and materials he intends to furnish and install, and by detailing the f fabrication and installation methods he intends to use. If deviations, discrepancies or �+ conflicts between submittals and the design drawings and/or specifications are discovered, either prior to or after submittals are processed, the design drawings and � specifications shall govern. The Contractor shall be responsible for dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of constriction, coordination of his work with that of other trades and satisfactory `4 performance his work. The Contractor shall check and verify all measurements and - review submittals prior to being submitted, and sign or initial a statement included ���ith the submittal, which signifies compliance tivith plans and specifications and dimensions suitable for the application. Any deviation from the specified criteria shall be expressly `" stated in writing in the submittal. Three (3) copies of the approved submittals shall be retained by the Contractor until completion of the project and presented to the City in � bound form. *„ 2. Shop drawings shall be submitted for tI�e following items prior to installation: List the required submittals here Additional shop drawing requirements are described in some of the material �' specifications. � 3. Address for Submittals - The submittals shall he addressed to the Chief Design Engineer: John Kasavich (ph. 871-8480) City of Fort Worth Water Department 1000 Throckmorton Fort Wortl�, TX 76102 D-23 � � �.. D-25 Post-Construction Television Insnection of Sanrtary Se�vers: A. General: This special condition covers the furnishtng of all necessary materials and '� equipment to perform post-construction television inspection of ail sanitary sewer lines installed under this contract. Tliis television inspection is considered as a part of the final inspection. A satisfactory inspection is required before the project is considered complete. B. Material: -�- 1. VHS format video cassette recording equipment and tapes are required for video taping. The television camera used for the inspection shall be specifically designed � and constructed for such inspection and shall provide a color picture. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe acceptable to the Engineer. The camera shall be operative in ] 00 percent humidity conditions and shall have a minimum of 600 Izne resolution. 2. Recording equipment shall be equipped with data recorder capable of the following: � a. Date and tirne �, b. Footage c. Project name, contract number, contractor, and inspection firm d. Location, main/lateral number, and station number C. Execution: � 1. The Contractor shall obtain ihe services of a qualified independent company to perform the television inspection. � 2. The Contractor shall provide traffic control during inspection operations to maintain public traffic and safety of all personnel. 3. The Contractor shall clean all construction debris, sand, and gravel from the sewer to be inspected. r� 4. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of inspection equipment. Any damage done during inspection shall be repaired by the Contractor. There shall be no additional payment ₹�or these repairs. r,; 5. Internal Television Inspection � a. The inspection shall be done one sewer section at a time. The section being inspected sl-►all be isolated from the remainder of the sewer in a manner approved - by the Engineer. Any defects found shall be repaired by the Contractor and then re-inspected. There shall be no additional compensation allowed for sucli repair or re-inspection. D-24 � [�� �, D-2� Post-Construction Telcvision Ins�ection of Sanitary Se�vers (Continued): b. The camera shall be moved through the line in either direction at a uniformly '- slow rate, stopping at a[1 defects to allow adequate evaluation by the Engineer. In addition, the camera shall be stopped at each service connection. c. Cost for excavation to retrieve inspectioii equipment shall be the responsibility of the Contractor. The City shall not be Iiable for any costs relative to retrieving inspection equipment from the sewer system. w d. Sanitary sewer mains must be laced with enough water to fill all low points. The television inspection must be done immediately following the lacing of the '� main with no water flow. Sanitary sewage may be used to propel the camera if the main is live. However, flow may be restricted in a manner approved by the Engineer when necessary to provide a clear image of the sewer being inspected. e. Telephones, portable radios, CB, walkie talkies, or other electronic means of communication must be set up where voice or manual communication is not feasible. � �- 6. Viewing a. The television inspection company shall provide facilities for the purpose of viewing the monitor while the inspection is in progress. b. The Engineer shall witness the television inspection. 7. Record Logs r_ a. The video tape of each sewer segment shall note on the tape the project name and numher, tlie main or lateral number, the beginning manhole station, the ending manhole station, the time and date of inspection. Footage for camera location in the sewer line shaIl be displayed continuously during the inspection. "" b. The original unaltered cassette video tapes will be reviewed by the Engineer � for focus, lighting, clarity of view, and technical qualzty. The inspection company shall maintain sharp focus, proper lighting, and clear, distortion-free viewing ` during the camera operations. Failure to maintain these conditions can result in r rejection of the video tape by the Engineer. Any sewer line whose video tape is ; not acceptable to the Engineer shall be retelevised at no expense to the City. •* c. Defects shall be described and quantified on the video tapes by the company � doing the inspection. Measurement for location of defects in sewer mains shall be y at the ground level by means of a metering device. Marking on cable or the like .- which requires interpolation for depth of manhole will not be allowed. Measurement meters shall be accurate to 02 feet. Measurements shall be taken from the center of the manhole and displayed on the video tape. D-25 v � � D-2S Post-Construction Television Tnsnection of Sanitar-v Sewers (Continuedl: d. A typewritten report shall be provided with the video tape. Each rwl sheet r' shal] identify the segment being televised, and the location of each service or _ � defect with its appropriate clock position. r'"' e. Upon completion of the project, the Contractor shall provide to the City the video tapes of each section of sewer line televised. D. Measurement and Payment <,.. Payment for internal television inspection shall be paid at the contract price per linear "� foot of sewer pipe televised. Length shall be measured in place along the centerline of the pipe for each sewer segment. The contract price shall include all costs associated with internal television inspection, vie�ving, record logs, and cassette video tapes. D-26 Exnlanation of Bid Items: TI�e total scope of work for this job has been separated into several bid items as shown in -. the Proposal. All materials and workmanship necessary to furnish a complete and funetional job, whether shown, included or implied in the eonstruction plans and/or � specifications, shall be supplied in this contract. The Contractor shall include the cost for all miscelianeous and subsidiary work not specifically mentioned in the Proposal in the various bid prices. D-27 Cost Breakdown: In order to establish a basis upon which partial payments to the Contractor may be authorized, immediately after execution of the contract the Contractor shaIl furnish a �. detailed cost breakdown of his contract price arranged and itemized to meet the approval of the Engineer. D-28 Samnles and Oualitv Control Testin�: ` a. The Contractor shall furnish, at his own expense, certifications by a private laboratory � for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The Contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. b. Tests of the design concrete mix shall be made by the Contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and �� mortar wliich are to be used later in the concrete. The Contractor shall provide a �- certified copy of the test results to the City. � (' �.., D-26 r � � D-28 Samnles and Oualitv Control Testina (Continued): c. Quality co�itro! testin; of in-place material on this project will be performed by the ^' City at its own expense. Any retesting required as a result of failure of t11e material to meet project specifications will be at tl�e expense of the Contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the Contractor of his responsibility to furnish materials and equipment conforming to the requiretnents of the contract. d. Not less than 24 hours notice shall be provided to the City by the Contractor for y... operations requiring testing. The Contractor shall provide access and trench safety systecn (if required} for the site to be tested, and any work effort involved is deemed to be "� included in the unit price for the item being tested. e. The Contractor sliall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. �-� D-29 Protection of Trees, Plants, and Soil: All property along and adjacent to the Contractor's operations including lawns, yards, r� shrubs, trees, etc. shall be preserved or restored, after completion of the work, to a condition equal to or better than existed prior to the start of work. By ordinance, the Contractor must obtain a permit from the City Forester before any '~ work (trimming, removal, or root pruning) can be done on trees or shrubs growing on r public property including street Rights-of-Ways and designated alleys. This permit can be obtained by calling the Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the `" Contraclor by the City. .• To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall he immediately sealed using a commercial pruning paint. This is the only instance when pruning paint is recommended. � No separate payment will be made for any of the work involved for this item and all costs �.: incurred wiIl be considered a subsidiary cost of the project. D-27 � � � D-30 Partial Estimates and Retaina�e: Reference Part C(General Condztions), Section C8-8.5 Entitled "PARTIAL ESTIMATES AND RETAINAGE" shall be deleted in its entirety and replaced with the following: Partzal pay estimates shall be submitted by the Contractor or prepared by the City on the Sth day and 20th day of each month that the work is in progress. The estimate shall be processed by the City on the lOth day and 25th day respectively. EstiFnates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may inciude acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net invoice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten percent (10%). For contracts of $400,000 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by Cit to make the required payments to subcontractors will authorize future payments from the Contractor until compliance wit "' accomplished. � y. Contractor's failure the City to withhold h this paragraph is It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Payment of any partial pay estimate shall not be an admission on the part of the Owner of the amount of work done or of its quality or sufficiency or as an acceptance of the work done; nor shall same release the Contractor of any of its responsibilities under the Contract Documents. `` The City reserves the right to withhold the payment of any partial estimate if the ,.... Contractor fails to perform the work in strict accordance with the specifications or other provisions of this Contract. D-28 � D-31 Manhole Inserts: At the direction of the Engineer, the Contractor shall provide a�vatertipht insert. The manhole insert shall fit in the manhole between the manhole lid and the manhole lid frame and shall provide a water ti�ht barrier which will prevent water from infiltrating into the manl�ole. Manhole inserts shall be manufactured by Knutson Enterprises, Noflow-Inflow, or approved equals. Payment shall be made at the unit price bid in the proposal and shall be fuil compensation for all labor, material, equipment, and incidentals necessary to complete the work. D-32 Contractor's Responsibility for Dama�e Claims: Section C6-6.12 of the General Conditions shall be deleted in its entirety and replaced with the following: C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole ne�ligence. In addition, Contractor . covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out . of, or alleged to arise out of, the work and services to be performed hereunder by the Coniractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such in,jury, dama�e or death is caused, in �vhole or in part, by the negli�ence or alle�ed ne�li�ence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner's officers, servants and employees and any damage, loss or • destruction to property of the Owner arising from ihe performance of any of the terms and conditions of this Contract, whether or not any such in,jury or dama�e is caused in shole or in part by the ne�li�ence of Owuer, its off5cers, servants or r employecs. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shali not be made until . Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a re[ease from the claimant involved, or (b) provides Owner with a ` letter from Contractor's liability insurance carrier that the claim has been refened to the insurance carrier. The Director may, if he deems it appropriate, refitse to accept bids on other City of �.. Fort Worth public work from a Contractor against whom a claim for damages is outstanding as result of work performed under City Contract. � � � D-29 � � 1999 BUILDING & CONSTRUCTION T12ADES STANDARD WAGE RA.TE FOR TARRANT COUNTY r � � � CLASSIFACTION AIlZ CONDITIONII�G MECI�NTC AIIt CONDITIONZNG MECHANIC HELPER ACOUSTIC CEILING TNSTALLER ACOUSTIC CEII,ING INSTALLER HELPER BRICKLAYERISTONE MASON BRICKLAYER/STONE MAS�N HELPER CARPENTER CARPENTER HELPER CONCRETE FII�IISHER CONCRETE FIl�IISHER HELPER COI�ICRETE FORM BUILDER CONCRETE FORM BUII.DER HELPER DRYWALL TAPER DRYWALL TAPER HELPER ELECTRICIAN JOURNEYMAN ELECTRICIAN HELPER ELECTRONIC TECHNTCIAN ELECTRONIC TECHNICIAN HELPER FLOOR LAYER (CARPET) FLOOR LAYER (RESILIENT) FLOOR LAYER HELPER GLAZIER GLAZIER HELPER INSULATOR TNSULATOR HELPER LABORER COMMON LABORER SKILLED LATHER LATHER HELPER METAL BUILDING ASSEMBLLR METAL BUILDING ASSEMBLER HELPER PAINTER PAINTER HELPER HOURLY �tATE $15.96 8.81 13.82 9.79 15.25 9.86 13.00 9.34 12.00 9.44 11.59 _ 8.87 11.87 $.25 16.29 10.20 12.86 12.67 13.58 14.48 8.56 13.66 9.26 15.89 9.46 7.82 9.66 15_80 11.75 13.34 7.85 11.93 8.30 � 1 1999 BUILDING & CONSTRUCTION TRADES STANDARD WAGE RATE FOR TARRANT COUNTY � � CLASSIFACTION PIPEFITTER PIPEFITTER HELPER PLASTERER PLASTERER HELPER PLUMBER PLUMBER HELPER REINFORCING STEEL SETTER REINFORCING STEEL HELPER ROOFER ROOFER HELPER SHEET METAL WORKER SHEET METAL WORKER HELPER SHEETROCK HANGER SHEETROCK HANGER HELPER SPRINKLER SYSTEM INSTALLER SPRINKLER SYSTEM INSTALLER HELPER STEEL WORKER STRUCTUR.AL STEEL WORKER STRUCTURAL HELPER WELDER WELDER HELPER HEAVY EQUIPMENT OPERATORS EQUIPMENT OPERATORS CONCRETE PUMP OPERATORS CRANE, CLAMSHELL, BACKHOE, DERRICK, D'L1NE SHO �. FORKLIFT OPERATOR FOUNDATION DRILL OPERATOR FRONT END LOADER OPERATOR TRUCK DRIVER HOURLY RATE $14.35 10.93 15.29 8.63 1626 9.59 11.88 9.18 13.17 7.82 15.87 9.29 12.70 9.71 16.95 7.81 14.66 7.91 14.87 9.67 14.66 15.50 13.05 10.54 11.66 11.60 9.80 2 � � st:c_r�c�� �: si�i�c��.ic�;1'llOT.l� (.lanuai� I, 197�{) L All materials, cor�structron mcthc,ds and �rc�cedur�s used in this ��ri���ct �lz«11 cc�nfom� to Sections El, C2, and E2t1 of thc l�orl VVurth Water Uc��artmc:nt C�cn�rai �'antract Documents and General Specifications, to�ether with any additional materiai �- sp�cification(s}, constructions(s} or later revision(s). (See re� isic�ns listed on this shcet j Sections El, E2, and E2A of the l�ort Worth Waier Uepartm�nt General Contract � Documents and General Specifications are hereby made a part of this contract documen? by reference for all purposes, the same as if copies verbatim here�n, and such Sections are filed and kept in the office ofthe Cit_y Secretary of the City of 1=ort Worth as an olticial � record of the Cit} of Fort Worth. �. E1 M�1TERlAL SPEC{FICnTlONS � � i� �. E2 CONSTRUC�I�ION SPL=:CIF'CATIO��S E2A CiENE�RAL DESIGN DI�TAl1..S Re��isians as af Ai.�ril 20, 1981, follo���: � �"' E1-2.4 I�ackfill: (Correct minimum compaction r�,quirement to 95��o f'roctor density and f cor�ect P.I. values as follo���s:) C. ACICI1ti0I11I h3Cl�fl�I TLC�UIC:,IT1CTliS 1'�-hen appro��ed for use in streets: � l. Type `I3' [3acki�ill �� (c) Ma�imum plastic index (PI) shall b� 8 r, 2. `fypc 'C' I3ackf'ill i (a) Material meeting requi�ements and havin� a PI af 8 or ` Iess shall b� considered as suitable for compaction by F jetting. (b) Material meeting requirements and havin� a Fl of 9_or mot-e shall be considered for use onl�� ���ith mechanical ► compaction. �� E2-2.11 Trench C3ackfill: (Correct Minimum comp�iction rcyuirement wherever it �- appears in this section to 95°'01'roctor density except for paragraph a.1. where the "95°ro modiiied Proctor density" shall remain unchan�ed.) � ' i � N `' � � �r � REMOVABL£ KEY , W PENCH 1A•f6]Smm) RE OiAMONO Pu PUTE COVER � 1� � �� �� � iY Single Leaf, Channel Frame Steel or Aluminum .� ��- 1/t'(6JJnmj CNANNEL fRAME (FORMED STEEL OA f7(TRUDEO ALUMINUM) 1 u>._,�.=a .. �_� � '�� �LONTiNU0U5 ,43�, ANCHOF FUNGE ! / FOROEO �Y BHAS511iNGE5 A ��f STNNLESS �� STEEL PINS O � Aift • .,� � �pw� e '� SIZE (WIOTH) ` 1 F•11T�3Bmml�� DRn�IJ COUPL�tJG WELDEO UNOER FfUME FOR PIPE CONNECTION TO DRV WELL OR OISPOSAL SYSTEM � STANDARD SIZES AND WEIGHTS fEN1'[i10W�CNMNEL p,,,�-� w�mn: Hn. f%fT Mi0 +.V�w+ CN/.NNEI riWEwiw�.r[� ,...�- Type Lenpth Material Ih(kp) �' �� � �� � - � J-1 2'0' x 2'0' Steel 175 (80) ,o„�„o �- � �_�A� (6�0mm x 61omm� A�um. 60 (28) I � /f �� �`— � J-2 2•6• x 2'6' Steel 235 (107) ��""`•,.�"'c�rvecp'"'�° �_�� (762mm:762mm) Alum. 75(35) „�, J-3 3'0' x 2'6' Steel 270 (123) � (914mm x J62mm) J-3AL Alum. 85 (39) �,rr�4ru.rC �.owcn ""�� �� �'� 3'0' x 3'0' Steel 300 (136) ,� ��A� (91<mm c 91amm) I p�um. 100 (46) .� �- -v�:.v. �;�° ME°�*� r; � (Special sizes are available) wa ��I �[ •TU! d4EtdOM 1•Ia �1 W ILIWNIUMfMYE .,T�..+�,..,�,� wElDEO wDEn FiinuE FON E C J�iECTON T� Dav MlELL ON o�5aO.v.l 6YITFJ1 51ZE nNOTwJ _ .�_�:-;.�' �, � D �� Double Leaf, Channel Frame � Steel or Aluminum � SPECIFICATIONS: Typ�JjJ0 Access door shall be Type� size � X 3 as manufac- tured hy The Bilco Company. Door leai shall be t/4' (6.35mm) steel (or aluminum] dia- �, mond pattem plate to withstand a live load of 300 Ib/f12 (1464 kq/M2) with a maxi- mum defiedion of 1/150th of the span. Channel trame shall be 1/4'. ti �' :� (6.35mm) steel (or aluminumJ with an anchor flange around the �= � perimeter and have a minimum cross-section area of 7-1/2 in2 �� -�; i (4839mmz) to allow tor adequate water drainage. Door shall be equipped � with heavy torqed brass hinges having 3/8' (9.53mm) minimum diameter stainless steel pins and pivot so that the cover does not prolrude into the chan- nel frame. Compression spring operalors enclosed in telescopic tubes shall be � provided for smooth, easy and controlled door operation throughout the entire arc of ` openinp and closinq. Operation shall not be aflected by temperature. The door shail ` a�tomaticaily lock in the vertical position by means ol a heavy steel hold•open arm with release handle. A Type 316 stainless steei snap lock with a gasketed cover plug and �vable turn handle shall be provided. A 1-1/2' (38mm) drainage couplinp shall be ,..ted in the front ripht corner ot the channel Irame. Hardware shall De zinc ptated and chromate sealed' and all fasteners shall be Type 316 stainless steel. Factory linish shall be prime coat of red oxi0e applied to steel doors and lrames. [for atuminum, substitute: 'Mill-tinish with bituminous coating applied to e�Rerior oi the irame'] Installation shall be � in accordance wRh manufacturer's instructions. Manufacturer shall quarantee aqainst � defects in material or workmanship ior a period ol live years. ' For hiphly corrosive conditions, when so s ecilied, Type J and JD are availa�te witA Type 316 stainless steel hardware throughout. �See Floor, Vault, and Sidewalk Ooor 0ptions]. •THIS DIMENSION 1'(25Amm� ON ALUMINUM FRAME � Types J and JD Wldlh I Type LenqlA Ma1eA�1 J•5 3'6'x 3'6' Steel J-5AL ����mm x 1067mm) Alum. J0-2 I 4'0' z 4'0' Steel JD-2AL I(1219mm x 1219mm) p�um. J0-3 4'0' x 6'0' Steel JD•3AL I(t219mm z 1B29mm) I Alum. ��� 5'0' x 5'0' Steel JD-4AL I (�524mmz1524mm) I Alurtt. Type J and JD can be remlorced for H-20 Wheel Loading. See page 20. w�. I16 (kq) 390 (177) � 146 (67) 455 (207) I 160 (73) 62Q (282) 225 (102) 645 (293) � 235 (1071 � r ti I�L �. � � PM �f�v � J"V �1 L Q� � I � I � I �1 I �- I� ��*��- SAFETY POST ,�� -- H �: PULL-UP �oc�P `�'---�--�.. �� ---._ � : fl'wt5TF3�C710h[5 �' I� -- � � �� � K BALAMCING � 5PR�NG 1 � � '� z O � z w t- x w _� � 5�- I 3/�3" � LQCK UP'" BRACIfEi �R4Ni f � VI W � , � �. ' i\ � � � � � d ; � : � �� p� , � �`_��� � � + II � �J� �_ � ENLARGED VIEW WITH SAFETY POST UP ANO LOCKED � _ PATENT PENDING Specifications: Install on fixed ladde�(s) below hatch cover(s) Modei 1 Bilco LadderUP safety post Oevice shall be manufactu�ed oi high strength steel with te(escoping tubular section that locks automatically when fully extended. Upward and downward movement shall be controlled by a stainless steel spring balancing mechanism. Finish shall be black enamel. (Important: If installation is to be in corrosive atmosphere, specity Model 2 hot dip � galvanized with special alloy spring.) Unit shall be completely assembled with fasteners for securing to the ladder rungs in accordance with the manuiacturers instructions. � CLAMP BRACKET MAY BE REVERSED ��"`'�-, TO ACCOMMODATE RUNG SIZES Of 3/4�� � � w` � !� TO I 3/4�� WITH STANDARD 2� 80LTS +� - FURNISHE�. LARGER RUNGS WILL S i�' I I I REQUIRE �ONGER BOLTS 1� " �" I i 2 1/4. �a��! . I � � 2 3/4' - f �� 2 I/4•• �� I ° ' FROM TOP � I I OF RUNG � LADDER � f RUNG � �r�''�� �I ! L� ; I � ---•- � -,-! ff � {' _h�� I f 9 �._...� �--- � � ;- + STAINLES5 STFFL ��,� I � I� I�' I MOUNTING � � � �°i I � � �� I �-- • '��L �I ;= BOLTS 3/6-16 z 2 '--, �� � � � II � �� I � � I 7/8 z .I19 SQ. TUBING HIGH STRENGTH STEEL 0 V IEYV �� �/z"x.��3 SQ. TU81NG HIGH STRENGTH STEEL ADJUSTABLt MOUNTING CHANNEL� VINYL LIFT HANOLE �... � �---- � � FR0NT VIEW I ADJUSTABLE ' I � I MOUNTING I � I FIT5 I I LADpERS 9 � WITH RUNG � � SPACING UP I I TO A80UT � I 14 CENTER TO CENTER � I � I �+� � I � I � I �. I ' � _J �_ _ � � � .�� � _ � F "'I A1 '-RELEASE � �� � ' . ROD � �� ' I , �� , � �� ; �� �' 4i ����-`�--1 � i i ; ii i� � , � SIDE VIEW Manu(actured by... _ Q �.� •�•- •- The Bilco Company, P.O. Box 1203, New Haven, CT 06505 � �� J n r� � E"� �"� �"'� �"'� r"''� �'"! � t'� f'� f-�.1 �."'� �t W -� ..�,.- � _ , .._ �-. '�.�• _—��. _ _ M�1 I ��M� M1 ��� C �C� M�P �K SO l�C�� L�6 S-��i D�•i�O�i�{L� �110tM FMO f0 M�0 Mit� TO *�► 11I� � Ld1f� IfiyWRI FIN`4 l�f CRFi� � � j ►+�ryk�M lu���{[ ! �-f �[l�111,# - fIK 0�1 l,Mf C�'X'f I ry'rir���,ra r��c• �y . w ' p a - `x s�+r a!su�s � � try q�"[ �iN rar M�A�*�/a+NAT!r 'j���a�bG��f��1R1#' � � I i R₹�►. rLrlrK rf�rrt►t wwsa il1{1�•�[ 41[i"i �1 �tio �..f�e �p r�r il( ��� �x,i� � It+saf�[0 � � �a�r (iSMiM i'VK Tx�irty�s:: tTt� r�YR f+rCllrf � - * � . .= • �S� �� — � � � ;� s� ' ♦ � F� �� — � �o � 1 a �.. i4tIK T7 b���R. � I _. E .�......� fi[I�If�O�l4 I�r���[i t.. I. i1�111M � 11 �� - ' ` #^ - —•—._ . '�f {�yl a� i'1� EBCM '/A�T zECTfOH B•E� 8� s � (ur�i 4T Ai C-t M l�[Y a .s�+ R[Y11[0 10/01/tT ,I.A.M./W.R.M. MC7T£� 17f�°TH �" 0`� 3HAf L BE SNOM'N DN SP@RM ORAI�4' PLA+v o+*o" PRL71�'IC+E SNfETS Nol lo Sto/i �.�, � •7IaN} FI 1'ILM �b MGOn(0 [yiM [Mi ••� #. /f 3� �FM l Y � " � � r�M [ � ���! �r H' 1., � � ; o � �a �.k4 aT N' 6��fuE! I�41 �Ml�Gt ��tl d� � � � � � !,{ I I I P a � iM 1 � �fA11 �1 i�l� 4i111 i DUf Y�M 1�i4 � �� 4M6 F1 � ; IM#KR fitK :: . __--,�a �.�;_.��� - � -_ r __ - � - � � � ��_ -a��_ _! _ __ .,. "'"�1I� ' ��y��� �----�._ 'f �iNl re 1'faE�s •�s ���-��+',�� ��i�'powl.til ar �-�ltt `� 9�GTfCaH A-14 �'•� :;,°'����ee.� �■ i i'•a' •a�t. ��wt �*r[�n a � � ^ ' ■�A�4.[ �1i /A-0+i�ll[6 P C� +LNr . AAbi �l! 'iiif. ��'1 .'yr'y� ' ��!'� � � � TYPfCA4� CO#� I , aET�r� PL�'��I V1EW ` ' L �..�I' � ., '� � �" Z �%t+ �X��T.�al , -� � r -� � STANDARD 5� SQUARE MANHOLE CITY of FORT WORTH, TEXAS -CONSTRUCTION STANDARD i Dl1Awu+0 H0. 5-SD E ', � OAtE�. ,JAn. 1969 �tt���tt� ��f�. �i1f 8-�f4 REBARS TYP. USE 3000� C�ASS A CONCRETE. � s rREE T ��r� � a.o� . � ,���, � _ � F ,-..,,. - �, � . . �, ,� � ----. ` . "`�. • � 3 "� T YP . � � i . .1 � ' + . �`'� � � . # f i / 6 �, .�.. � 1 � F �� � , J � - � % � � � � . f. ,� � ,� � �.�� � � �/ ����� � .,� ` -�.� �, /- �. � �. '�, ♦ �, � � __�__� �: � / ' A . � �. � - . ,�•. � , � �.t' . CONC. CO�LAR � HEIGHT VARIES� � �/4' CHAMFER TYP � ' .,, '.� � � '�t P�NT. PYNT. ` �. � � � 4 GROUND .;'� �' � � � 2.' 2T, ��, �,. a ti��'\��• ` - �' �� ;I.IIi=.�![ i'� �IIEh`�ili � � .'�"�� t �, r � \ G'RADE RIfWG _ ' �. ,� ` �. , � C.(SE ! C.tSE 2 :±� . i � 6' MIN. • - RAM NECK ' ' 3" MINIMUM CASE ! • ' FiEIGHT VARIES COL L.4R SHAL L EXTENO TO TO.A OF 2.' 27 CONCRETE tREBAR REO.J SECTION A CASE 2 �� COLLAR SH.4LL EXTENO 3' BECOA' BOT TON OF L O!+'EST GRADE RING (REBAR REO. J FIGURE 121� • CONCRETE MANHOLE COLLAR D E T A I L E 1-20, 21 MATERIAL E2-20,21 CONSTRUCTION 5/18/90 3f05/93 NO�1'ICI�: I h� fullo���in� blanl< spac�s in the Certificat� ot� Insurance, I'erformance, Payment and Maintenance [3onds; and Contract are not to be �illed in by the Ridder at thc time of submitting his!her proposal. Thc;se forn�s are included hcrein to familianze the [3idder ���ith such forms w�hich the successful f3idder Will be required to execute. � ���. � ��. «'��,��� C'I:•_R"l'IT_I_('r�Tl? OF_ I_�I�l!R!�V.('_L' TO ('I�l l` Of� f�Oitl� \\'OR'� I I, I�fi���S [)atc __ -- -- Vr�l1[i O! f'ROJEC"T _. S�,�itar}' �c��cr_�.1e;er Static�nti Ser�_in�� the_('it� c�t�Sa��ii;1�� _ PROJE('T VU1��1131=R -_. ---PS�16-U704GQ?�00;0___.. �i'HiS IS TO CEK"fIFY THAl' (l�.inu and /�J�Irc;s .�f In:urul) is, at the date of this certi�icate. Insured by this Company �aith respect to the business operations hereinafter described, for the type of insurance and in accordance �vith the pro� isions of the standard policies used by this Company, and fiirlher hereinafter described. Gxceptions to standard policy noted on reverse side hereof Tl'PE OP WSURANCE � Policy i�o Cfiective Expires Limits of Liability � Worker s Compensation Comprehensive General Liabilit}� Insurance (Public Liability) � Blasting Collapse of Buildinbs or stn�ctures adjacent to excavations Dama�e to Underground Utilities I Builder's Risk Comprehensive Automobile Liabiliry Contractual Liability � Other Bodily Injury: Ea.Occurrence: � Prope.lv Damabe: Ea Occurrence: S Ea Occurrence: $ _ _ _ __ � ra Occurrence � Ea �ccuirence $____- _-_ Qodily lnjury: La Person S Fa Occurrence: $ Propei�ty Dama�e: Ea Occurrence $ I3odily In,jury: Ea Occ�irrence � Prop�rty Dama�e: Ea Occurrence � Locations covered: Description of operations covered The above policies either in the body thereof or by appropriate endorsement provide that the}� may not be changed or canceled by the insurer in less than five (S) days aRer the insured has received ���riticn notice of such chan�,e/or cancellation. Vti�here applicable local laws or re'ulations require more than five (S) days actual natice of chan�e or cancellation to be assured, the above policies contain stich special requirements, either in the body thereof or hy� appropriate endorsement thereto attached. A�encv Fort ��orth A�ent �^ _ _ _.._ . ------- _. ----- --- - -- nddress Title _ _ _ _ ___�______ � � C'c )N'I lZ,1Cf Of� �'C)1�1P[ 1,1NC'I- 1�'1"l l I ��'C)I�ZK3=J:'SCOf��11'1-�:NSn�i�l(>N i_�1\�,' Pursuant to Article 830b-323 of Vernon's Annotated Civil Statutes, Contractor certities that it provides ���orker's compensation insurance coverage for all of�it's employ�ees empioyed on Cityo uf Fort Worth Project Number PS46-07046025U030 STATE OF TLXAS COUNTY OF TARRANT � � � -�•�c�#-.�, �,, �-t�ti�o`v`�"'�'o r � • C'C�1�T�f�C��C R --- - �i'' `�/� ������ `�� ��.�.��',�f�c,� � Title --- .---------- ------ — �,;�-i7-,���o 6EFORC ME, the undersi�ned authorit}�, on ihis day personally appeared � '��,� i c� � t �� 1��e_r , knawn to me to be the person whose name is subscribed to the foreboinb instrument, and ackno�vled�ed to me that he/she exccuted the same as the act and deed of S�c k e.� �',,�.}� ��� ; 5�� (�� � for the purposes �4 and consideration therein expressed and in the capacity t�ierein stated. � , G1VEN UNDER MY I-IAND AND SEAL OF OFFIC� this ��� �� day of ��,.�_�� ����-t��- �--.�- :�oo ,�, -- � �� � � �o���°��,� DENISE KINCAID � �- ' 4O4 NOTARY PUBLIC � ' STATE OF TEXAS � � Jf,�E���� My Comm. Exp. 10-20-2003 � � '_ '. _ _ _ _ _ x r� ` � � � I -� C-- l=L,� �� `?� �.'`.." `r` ` Notary I'ublic in and for the State of "l�exas � PERFORMANCE BOND Bond No. KO-5953467 TFIE STATE OF TEXAS COUNTY OF TARRANT KNOW ALL MEN BY THESE PRESENTS: That we (1) STOCKER ENTERPRISES. INC. a(2) CORPORATION of TEXAS, hereinafter call Principal, and (3)INDEMNITY INSURANCE COMPANY OF NORTB AMERICA a corporation organized and e�dsting under the laws of the State and fiilly authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under the laws of ihe State of Texas, hereinafter called Owner, in the penal sum of: ONE HUNDRED EIGHTY-ONE THOUSAND SIX HUNDRED PiIP1ETY-FNE AND NO/CENTS... ($181.695.00) Dollars in lawfiil money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made. we hereby bind ourselves, our heirs, eaecutors, administrators and successors, jointly and severally, firmly by these presents. TI� CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the a copy of which is hereto attached and made a part hereof, for the construction of: SANITARY SEWER METER STATIONS SERVING THE CITY OF SAGINAW Designated as Project No. (s) PS46-070460250030 copy of which contract is hereby attached, refened to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being hereinafter refened to as the "work". � �� 1 1 � NOW TE�REFORE, if the Principal shall well, wly, and faithfully perform the work in accordance with the plans, specifications, and contract documents during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harrnless the Owner &om all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and eapense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full forcc and effect. PROVIDED FURTI�R, that if any legal action filed upon this bond, venue shall lie in Tarrant County, State of Texas. L F1 1 � � AND PROVIDED FURTE�R, that thc said Surety, for value received, hereby stipulates and agrees that no change, e�rtension of time, alteralian or addition to the terms of the contract or to the work to bc performed thereunder or the specifications accompanying the same shall in any wise afl'ect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addiUon to the tenns of the contract or to the work or to the specificalions. IN WITNESS WHEREOF, this instrument is executed in 5 counterparts each one of which shall be deemed an original, this the I�� of �,`� �] L1 �— • , �G'�� . �� ATTEST: ,, , _ _ -�'�:=.� STOCKER ENTERPRISES, INC. �. (Principal) Sccrctary (SEAL) ��� �� J����� � k� �/VVikness �s to Fr�nci i ] , f '� � C �,�� � �'LEl-k�'.; '-�< M1� �� , �}; l,�.�.L�-- ; �-x f L � " � A�dress �1'f'Y'EST: � �.-�' �' i� / �!/ �" � y - - (S Secre ' (SEAL) � �, � � l f����i��'-�'P :�` � ,�'�' W,rt'n�'`ss as to Srurety � �� 811 L�r. Suite 310_ F'or# 'VWorth Te�s 7G1C�2 (Address) ' � ������ � BZ"': '�r' �'" Y" a Titl�: �' _'\,i�,�.L�C�•� �:�� 1051 KENNEDY LANE FORT WORTH, TEXAS 76131 (Address) Iodemnitv Insurance Com�anv of North America � ��� � 4 BY: � '�,J� .. ! �-� � � J ' 1 , A � � {A �rn�ey-" act)� " Martin A. Prisant 8ll Lamar. Suite 310. Fort Worth Texas 76102 (Address) NOTE: Date of Bond must not be prior to date oP Contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as case mav be (3) Correct name of Surety (4) If contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact.. � F2 1 PAYIv�NT BOND L� � TI-� STATE OF TEXAS § COUNTY OF TARRANT § Bond No. KO-5953467 KNOW ALL Iv�N BY THESE PRESENTS: That we (1) STOCKER ENTERPRISES, INC. a (2) CORPORATION of TEXAS, hereinafter call Principal, and (3) INDEMNITY INSURANCE COMPANY OF NORTH AMERICA, a corporation organized and existing under the laws of the State and fully authorized to transact business in ihe State of Texas, as Surery, are held and firnily bound unto the City of Fort Worth, a municipal corporaUon organized and e�cisting under the laws of the State of Texas, hereinafter called Owner, and unto all person, firms, and corporations who may furnish materials, for or perform labor upon the building or improvements hereinafter referred to in the penal sum of : ONE HUNDRED EIGHTY-ONE THOUSAND SIX HUNDRED NINETY-FIVE AND NO/100... ($181,695.00) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be madc, we hereby bind owselves, our heirs, cxecutors, adminisirators and successors, jointly and severally, firmly to ihese presents. �• T'I� CONDTTION OF THIS OBLIGATION is such that Whereas, ihe Principal entered into a certain contract with the City of Fort Worth, the Owner, dated ihe day of A.D. , , a copy of �" which is hereto attached and made a part thereof, for the construction of:: � �. SANITARY SEWER METER STATIONS SERVING THE CITY OF SAGINAW Project No. (s)PS46-070460250030, a copy of which is hereto attached, refened to and made a part hereof as fiilly and to the same extent as if copied at length herein, such project and construction being hereinafter refened to as ihe "work". �. � NOW 'I'F�REFORE, the condition of this obligation is such that, if the Principal shall promptly make � payment to all claimants as defined in Article 5160, Revised Civ'rl Statutes of Texas, supplying labor and materials in the prosecution of ihe work provided for in said Contract, then ihis obligation shall be null and void, otherwise it _ shall remain in full force and effcct. �_ C ' i� F10 � �,, TI� BOND IS MADE AND ENTERED into solely for ihe protcction of all claimanis supplying labor and material in the prosecution of the work provided for in said Coniract, as claimants are defined in said Article 5160, and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of the Revised Civil Statutes. PROVIDED FURTE�R, that if any legal action be filed upon this bond, venue shall lie in Tarrant `` County, State of Te�as, that the said Surety, for value received, hereby stipulates and agrees that no change. extension of time, alteration of addition to the terms of the contract or to thc work to be performed thereunder or � the specification s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, estension of time, alteration or addition to the terms of the contract or to the work to ihe specifications. L L PROVIDED FURTI�R, that no final setdement between ihe Owner and the Convactor shall abridge the right of any beneficiary hereunder whose claim may be unsati�ed. IN WITNESS WI-�EREOF, this instrument is executed in 5counterparts each one of which shall be deemed an original, this the �'� day of '�I r�'� - A.D., 20 D D . � ATiE,ST; �/�� . `,, � � � � „ STOCK ENT$ �RISES, INC. �- . . :.� BY: � ti�-'�`- �+, }►.I� (4) _ '� 1 � TiUe: I�� ; ,� �? :�: % ,��1'_.'L�.� (Principal) Secreta►y (SEAL) , r �F `, Y�x .. �1W� 1 � a �pC ����� ��' . (,' � � Wi�tness as to Principal �(;\5 i ��---� 1l. �� c� � �lrl � « � 1U51 KENNEDY LANE FORT WORTA, TEXAS 76131 (Address) Indemoity Insurance Companv of North America T� 4 �-, BY: i�l, 1 1 1 A s"1l�b � ��-� ��:�,-'�, �,�'r � � � I �_ � �r� 1,,�+' � (Attora 'n-fa�5} ' Martin A. Prisant Address � ST: r � � ,� �� �. -����� _ ,� � �Surety) Secretary � ,_ r �. ' �I (SEAL) G _ _ � � � ,��'� ►�i+'imess ta S�ty , 81I I.arnar. Sui�e 31U. For� Wv�h. Texas 7filU2 (Address) 811 Lamar, Suite 310, Fort Worth, Texas 76102 (Address) NOTE: Date of Bond must not be prior to date of contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as case may be (3) Correct name of Surety (4) If contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Attorney in Fact. C � MAINTENANCE BOND No. KO-5953467 TI-� STATE OF TEXAS § COUNTY OF TARRANT § � KNOW ALL N�N BY THESE PRESENTS: That (1) STOCKER ENTERPRISES, INC. as Principal, acting herein by and ihrough (2) DAVID STOCKER its duly authorized PRESIDENT and (3) INDEMNITY INSiJRANCE COMPANY OF NORTH AMERICA a corporation organized under the laws of the State of Pennsylvania, as surety, do hereby acknowledge themselves to be held and bound to pay unto ihe City � of Fort Worth, A Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at Fort Worth, in Tarrant County, Texas the sum of r ONE I3UNDRED EIGHTY-ONE TAOUSAND SIX 13UNDRED NINETY-FIVE NO/100... (S]81.695.00) in lawful money of ihe United States, for ihe payment of which sum well and truly be made unto —' said City of Fort Worth and its successors, said Coniractor and surety do hereby bind themselves, their heirs, , executors, administrators, assigns and succcssors, joindy and severally. This obligation is conditioned, however; that, �. WHEREAS, ihe Principal has entered into a certain contract with the City of Fori Worth dated , 1999, the performance of ihe following described public work and the consiruction of the following described public improvements: SANITARY SEWER METER STATIONS SERVING THE CITY OF SAGINAW of same being referred to herein and in said contract as the Work and being designated as Project No. (s) PS46- 0'70460250030and sa.id coniract, including all of the specifications, conditions and written instruments referred to therein as contract documents being hereby incorporated herein by reference for all purposes and made a part hereof, the same as if set out verbatim herein; and , � WHEREAS, in said Contract, Contractor binds itself to use such materials and to so conswct the work �_ that it will remain in good repair and condition for and during the period One (1) Year after the date of the final acceptance of the work by the City; and WI-�REAS, said Contractor binds itself to maintain said work in good repair and condiUon for said term of Oue (1) Year; and, WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time �' within said period, if in the opinion of ihe Director of the Water Department of the City of Fort Worth, it be necessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefor to repair or reconstruci said �vork as herein provided. FS �. � NOW TT�REFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconsiruct said work in accordance with all ihe terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise this 13ond shall be and remain in full force and effect, and said City shall have and recover Gom the said Contractor and its surety damages in the premises prescribed by said Contract. This obligation shall be continuing one and successive recovenes may be had hereon for successive breaches until ihe full amount hereof is ext►austed. WI-�,REAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas; and, IN WITNF,SS WFiF:R�:OF, this instrument is executed in 5 counterparis, each one of which shall be deemed an onginal, dated � �� _� ( ��� — , �� ��� . ATTEST: �'�- - -•- . _,_�� {FrinciPal) Secrct�.ry (Seal) STOCKER ENTERPRISES, INC. PRINCIPA�L�4) ,�� { ,���� BY: l I�7n�C� �,�1 f � Title: � �- �.�sZ.�!���' & L`�` � ' � : , '`��1 L�.� �'� (,(;r.1 �C� c�— `�Vitness as to Principal �1 E�VINITY INSURANCE COMPANY OF NORTH AMERICA I CS I �tivti� t�-� � � ��.�4�� � �;� �.���-�_tN� � -:� �� f :1� s�� ,� . (Address) BY: �.A�� ` - .�:�rt ! � � � 1051 KENNEDY LANE FORT WORTB, TEXAS 76131 (Address) A"ZTEST; ,v/ [Attnrn�in-f� (�) ` Martin A. Prisant ,�✓�'� 811 Lamar. suite 310, Fort Worth Texas 76102 /�f�����/ � . r-1 (Address) - `r � ,1 u�Surety) �ecr�eta'r�v �� �`� NOT'E: Date of Bond must not be prior to /�� datc of Contract u- {SEAI-) t � /. _-� � 1 � � � J fG��z�,�z�--= ' , " Witness as to Surcty 811 , Suite 310. Fort Worth Texas 76102 (1) Correc.K Name of Conlra��[or (2) A Corporation, a partnership or an Individual, as case may be (3) Correct name of Surery (4) If Coniractor is Partnership all Partners should execule Bond (5) A irue copy of Power of Attomey shall t� attached to Bond by Attomey-in-Fact. F6 r_ � Power of . Attorney F.- C INDENINITY INSURANCE COMPANY OF NORTH AMERICA Bon� No.: K0-5953467 � CIGNA �: -�:�. Know all men by these presents: That INDEMIVITY INSURANCE COMPANY OF NORTH AMERICA , a corporation of the Commonwealth of � Pennsylvania , having its principal office in the Cii}• 01 Philadelphis Pennsylvani: , pursuant to the following Resolution, adopted by ihe Boazd orDirectors of th� said Company on Ueczmber 5, 19R3, to wit: "RESOLVED, That pursuant to Paticles 3 I8 and SJ of the By-Laws, the kllrnvmg Rules shall govem fhe exzcttlien fnt the Cnmpany of Mnds, wdzrtakings, recognilances, contracts and nther wtitinqs in the na�ue thetenf (1) Tl�al the Presidenl any Senicrt Vice Presidrnt, any Vice President, arKl Assrstant Vice Res�denG ot any Attomey-in-Facf, may execute !er and nn txhalf o(the Ceimpany any and all bondv, imderfakings, reco�urences, m c�ntractc and other wrilings m the na��re Nereo(, the same te be attested when necrssary by the Coryotale SecteGtry, ot ��y Ass�Rant Corporate Secretary, and the saal of the Cempany afTuced thereto. and that fhe President, any Seruor Vice President, any Vice previrlent or any Assistant Vice President mey appnmt anA avthonze any other U�licer (electeA nr appomted) of the Compeny, ant Attorrteys-In-Fact to so execute er attest tn the execuhon u(all such wntin� on behalf ef Ihe Crnnpany and lo a(Fir Ihe seal olthe Comyany thereto (2) My mch wn[ing executed m attordance with these Rules shall be as binding upen the Company m any ca� as thnuqh siRneA Ay the President anA attes[eA to by the Corpaate Secretary. (3) The signahue oCthe F'resident, et a Senicx Vice Presi�nt, or a Vice PttsideM, or an AsvisGn[ Vice President and the seal oCthe Crnnpany may Az afl�ixed by f'acsimile on any power of attomey Rrantnd pivvi�vit ro this Resc lution, and the sigruNre of a ceRifying OQcer and the seal of the Company may be aflixeA Ay Facsvnile te any certificafe ot any such pnwer, and any such power or cettificate Aeatinq such (acsimile si�rahve and seal shall be vnfid and binding on the Company. ''. (4) Such other Officers n( the Company, and Attnmeys�ImFact shall have authonty to certify or verity copies of this Resolutioq �he Hy-Laws nf the Company, and any attidavit or tacord nf the Cnmpazry neceszuy to ihe d�schu�e of their didies. (5) The passaRz of t}tis ResoLrtion dnes not revnke arry earlicr au�hority granleA by Resolutinru of lhe Beazd ef Duectcrcs adopted on lune 9; 1953, May 28, 1975, and �facch 23, 1977." �r � does hereby nominate, �onsc����e and aPPo��t MARTIN A. PRISANT of the City of Miami. State of Florida , each individually if there be more than one ' I named, its true and lawful atiomey-in-fact, to make, executz, seal and deliver on its behalt; and as its act and deed xny and all bonds, undertakings, ,,,, recognizances, conVacts and other writings in lhe nature thereof in penalties not exceedinE Five Hundred Thousand Dolla�s ($500,000 and the execution o� r_ such writings in pursuance of these presenis shall be as binding upon said Company, as fully and amply as if they had been duly executed and ackowlcdged s by the regulady elected officers of the Company at its princip:tl ot�ice. '7 O � a �� � � � v^i` ' � W � � � � � . � � 'I " U � �' � p � � � '-J� �' � � �, (�� = ` p � + _. �,�aio : , � � _ � �� 1 � �4.. �� �� . � •'c � � � (� � � � � � U 1 _ �' � j O '— Z U tl '� '�- 1 � 1 � IN VVITNESS WHEREOF, the said W illiam Jungrei� , Vice-President, has hereunto subscrihed his name and �xed the corporate seal of the said INDEMNITY INSURANCE CON1PANl' OF NORTH ANIERICA this l4th day ol Jul} 1994 . INllEMNITY INSURANCE COMPANY OF NORTH AMERICA. William .iungreis , Vice President COMMONWEALTH OF PENNSYLVANIA COUNTY OF PHILADELPHIA ss. On "Ii�is 14th day of July , A.D. 1999 , beY'ore me, a Notary Public of the Commonwealth of Pennsylvania in and for ihe Counly of Philadelphia came , William Jungreis , Vice-President of the INDEMNITY INSL'ItANCE COMPANY OF NORTti AMERICA to me personally known to be the individual and officer who executed thz preceding instrument, and he acknowleJged lhat he execuled the saune, and that the seal affixed to the preceding instrument is the corporale seal of said Company; that the said eorporate seal and his signature were duly �xed by ihe authority and direction of the said corporation, anc�+ that Resulution, adopled by the Board of Directurs of said Company, rofzrred to in the preceding instrument, is now in foroe. 1N TESTIMONY WHEREOF, I have her2unto set my hand and af6xed my ofiicial seal al che City of Philadelphia the day and year firsl above writ[en � NOTARIAL SEAL DEBRA M. MARANO, Notary Public Clry of Phlladelphla, Phlla. County My Commission Expires Dec 20,1999 Notary Y�nr� �� I, the undersigned Secretary of INDEMNITY INSURANCE COAIPANY OF NORTH AMERICA , do hereby certify that the originel POWER OF ATTORNEY, of which the foregoing is a substantially true and correct copy, is in fult forca and eftect. In witness whereof, I have hereunto subscribed my name as Secretauy, and �xed the corporate seal of the Corporation, this 1 � Jay of Februar�T 2000 . 1+�'� f�Y. Debra H. Paziora , Secr THIS POW ER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPT[ON DATE AFTE: July 14, 2001 . NOT VALID UNLESS PRINTED ON TEAL BACKGROUND ��, �, BS-38449d 1 �� � � � L.� � l— PART G - CONTRACT THE STATE OF TEXAS � COUNTY OF TARRANT y� TH1S CONTRACT, made and entered into �� �►�` � cz r's-r ��' ��'aC7` f r by and between the City of Fort Worth, a home-rule municipal corporation located in Tarrant County, Texas, acting throu�h its City Manager thereunto duly authorized so to do, Party of tl�e First Part, hereinafter termed "OWNER", and ��I"o�' �1�-+E-1'' � �'t%cr r rr s�S �-�- r c. . of the City of �-- O r i W O r�+l—�.. , County of �a- r" ✓ c7 .� 7� and State of �� Y Gt .� , Party of the Second Part, hereinafter termed "CONTRACTOR". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second Part (Contractor) hereby agrees with the said Party of the First Part (Owner) to commence and complete certain improvements described as follows: Sanitary Sewer Meter Stations Serving the City of Saginaw Sewer Project No. PS-070460?�0030 and all extra ���ork connected therewith, under the terms as stated in dle Contract Documents, and at his (their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, bonds, insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirements of the Contract Documents, which include all maps, plats, blueprints and other drawings and printed or written e�planatory matter thereof, and the specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been identified by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's Written Proposal and the other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contract Documents and General Specifications, all of �vhich are made a part hereof and collectively evidence and constitute the entire contract. The Contractor hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been �iven to him, and to substantially complete same within tl�e time stated in the proposal. G-1 �.;;!�U��a�U�i�s �r���l�U��J I 1`,� l4� ��� �Gs� �: � �C���I �' , �--.. . � L�. The Owner agrees to pay the Contractor in cunent funds for the performance of the contract in accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the Contract Documents and all approved modifications therefor, and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in quadruplicate the year and the day first above written. ATTEST: � � ,�r � � i � � � '� �`-,.yt'�' �-': , a 'J .� ��i.c�..�7� Gloria Pearson�ty Secretary �-,�p r� � (SEAL) WITNESSES: ' �N�,+�G�--(.��.P� . w (�5[ �� �,- �. .' � '3� • u5��--� f �-�c. . � � [ 3 I City of Fort V�'or . Party of the First �� � By: /� � �ob .�rell, Ci7 as YC�w��er) C, ' �'� � �`� �c�ntraCt Au horization � - ��-�� Da�e CONTRACTOR: Party of the Second Part � � �� �. :�r � � Approved for the Fort Worth City Water Department: ,� � _ , ,f � � -�_ �' �:� G ��" � "�—'�-_ � Dale A. Fisse�r, �.E., Director I� Approved as to Form and Legality: � � �7avid �~�$tt, City Aft rney � I � i� ����0� 0��.� �'��GG�� G-2 �� � !� ����� G�C��� �o ����C��i, �.