HomeMy WebLinkAbout024775 - Construction-Related - Contract - Wendy Lopez and Associates, Inc.� CITY SECRETAI�Y � �r��7 CONTRACT NO. ���. L �J CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING SERVICES � This AGREEMENT is between the City of Fort Worth (the "CITY"), and Wendy Lopez & Associates, Inc., (the "ENGINEER"), for a PROJECT generally described as: Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3), Part 3. Article I Scope of Services A. The Scope of Services is set forth in Attachment A. Article II Compensation A. The ENGINEER's compensation is set forth in Attachment B. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) i2) (3) The Engineer shall provide the City sufficient documentation to reasonably substantiate the invoices. Monthly invoices will be issued by the ENGINEER for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving seven (7) days' written notice to CITY, suspend services under this AGREEMENT until paid in full, including interest. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. - � - ������� ��� r�'��t '��f� ��� Y �J��e y �e}�� �o �l4'JG,"��� ��. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar senrices at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurFace investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be fumished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/exe�ution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the o�iginal drawings of all plans in ink on reproducible plastic film sheets, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. -2- E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction cont�actors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all const�uction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on- site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If, for any reason, the ENGINEER should make an on-site observation(s), on the basis of such on-site observations, if any, the ENGINEER shall endeavor to keep the C1TY informed of any deviation from the Contract Documents coming to the actual notice of ENGINEER regarding the PROJECT. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such ce�tification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and maricet conditions; time or qualify of performance by third parties; quality, type, management, -3- or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority and Woman Business Enterprise (MNVBE) participation In accord with City of Fort Worth Ordinance No. 11923, as amended by Ordinance 13471, the City has goals for the participation of minority business enterprises and woman business enterprises in City contracts. Engineer acknowledges the M/WBE goal established for this contract and its commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be -4- in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3)hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photo copy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. ENGINEER's Insurance (1) Insurance coverage and limits: ENGINEER shall provide to the City certificate(s) of insurance documenting policies of the following coverage at minimum limits which are to be in effect prior to commencement of work on the PROJECT: Commercial General Liability $1,000,000 each occurrence $1,000,000 aggregate Automobile Liability $1,000,000 each accident (or reasonably equivalent limits of coverage if written on a split limits basis). Coverage shall be on any vehicle used in the course of the PROJECT. Worker's Compensation Coverage A: statutory limits Coverage B: $100,000 each accident $500,000 disease - policy limit $100,000 disease - each employee Professional Liability $1,000,000 each claim/annual aggregate (2) Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. �.'� (a) Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. (b) Certificate(s) of insurance shall document that insurance coverages specified according to items section K.(1) and K.(2) of this agreement are provided under applicable policies documented thereon. (c) Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. (d) A minimum of thirty (30) days notice of cancellation, non-renewal or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. (e) Insurers for all policies must be authorized to do business in the state of Texas or be otherwise approved by the CITY; and, such insurers shall be acceptable to the CITY in terms of their financial st�ength and solvency. (fl Deductible limits, or self insured retentions, affecting insurance required herein may be acceptable to the CITY at its sole discretion; and, in lieu of traditional insurance, any alternative coverage maintained through insurance pools or risk retention groups must be also approved. Dedicated financial resou�ces or letters of credit may also be acceptable to the City. (g) Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. (h) The City shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion, the ENGINEER may be required to provide proof of insurance premium payments. (I) The Commercial General Liability insurance policy shall have no exclusions by endorsements unless such are approved by the CITY. (j) The Professional Liability insurance policy, if written on a claims made basis shall be maintained by the ENGINEER for a minimum two (2) year period subsequent to the term of the respective PROJECT contract with the CITY unless such coverage is provided -6- the ENGINEER on an occurrence basis. (k) The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. It is understood that insurance cost is an allowable component of ENGINEER's overhead. (I) All insurance required in section K., except for the Professional Liability insurance policy, shall be written on an occurrence basis in order to be approved by the CITY. (m) Subconsultants to the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When insurance coverage is maintained by subconsultants, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. Notwithstanding anything to the contrary contained herein, in the event a subconsultanYs insurance coverage is canceled or terminated, such cancellation or termination shall not constitute a breach by ENGINEER of the Agreement. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest which develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the ENGINEER will, if requested, assist the CITY in obtaining the services of a qualified subcontractor to manage the �emediation activities of the PROJECT. O. Permitting Authorities - Design Changes '�, If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER -7- should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City-Furnished Data The CITY will make available to the ENGINEER all technical data in the CITY's possession �elating to the ENGINEER's services on the PROJECT. The ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Properiy The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services and will provide labor and safety equipment as required by the ENGINEER for such access. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, o� federal authorities; and land, easements, rights-of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, audator, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule in Attachment D. E. Prompt Notice : The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Haza�dous Substances and Indemnification (1) To the maximum extent permitted by law, the CITY will indemnify and release ENGINEER and its officers, employees, and subcontractors from all claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation expenses arising out of or relating to the presence, discharge, release, or escape of hazardous substances, contaminants, or asbestos on or from the PROJECT. Nothing contained herein shall be construed to require the CITY to levy, assess or collect any tax to fund this indemnification. (2) The indemnification and release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER'S negligence or if such hazardous substance, contaminant or asbestos is brought onto the PROJECT by ENGINEER. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractors negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement. (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. Q'� CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. � Litigation Assistance The Scope of Services does not include costs of the requested assistance to support, prepare, document, litigation undertaken or defended by the CITY. In the services of the ENGINEER, this AGREEMENT shall agreement will be negotiated between the parties. Changes ENGINEER for required or bring, defend, or assist in event CITY requests such be amended or a separate The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article Vl General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. A B. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The final designs, drawings, specifications and documents shall be owned by the CITY. -10- C. D. E. Force Majeure The ENGINEER by acts of God, the ENGINEER. Termination is not responsible for damages or delay in performance caused trikes, lockouts, accidents, or other events beyond the control of (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with five (5) days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b) Out-of-pocket expenses microfilm, electronic data seroices; for purchasing storage containers, files, and other data storage supplies or c) The time requirements for the ENGINEER'S personnel to document the work underway at the time the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination seroices. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or intem,ipt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECTs schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. -11- F. Indemnification (1) The ENGINEER agrees to indemnify and defend the CITY from any loss, cost, or expense claimed by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of the ENGINEER, its employees, officers, and subcontractors in connection with the PROJECT. (2) If the negligence or willful misconduct of both the ENGINEER and the CITY (or a person identified above for whom each is liable) is a cause of such damage or injury, the loss, cost, or expense shall be shared between the ENGINEER and the CITY in proportion to their relative degrees of negligence or willful misconduct as determined pursuant to T.C.P. & R. Code, section 33.011(4) (Vernon Supplement 1996). G. Assignment Neither party will assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties means the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. I. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be TaRant County, Texas. J. Alternate Dispute Resolution (1) All claims, disputes, and other matters in question between the CITY and ENGINEER arising out of, or in connection with this Agreement or the PROJECT, or any breach of any obligation or duty of CITY or ENGINEER hereunder, will be submitted to mediation. If inediation is unsuccessful, the claim, dispute or other matter in question shall be submitted to arbitration if both pa�ties acting reasonably agree that the amount of the dispute is likely to be less than $50,000, exclusive of attorney's fees, costs and expenses. Arbitration shall be in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association or other applicable rules of the Association then in effect. Any award rendered by the arbitrators less , than $50,000, exclusive of attomey's fees, costs and expenses, will be final, judgment may be entered thereon in any court having jurisdict�on, and -12- will not be subject to appeal or modification except to the extent permitted by Sections 10 and 11 of the Federal Arbitration Act (9 U.S.C. Sections 10 and 11). (2) Any award greater than $50,000, exclusive of attorney's fees, costs and expenses, may be litigated by either party on a de novo basis. The award shall become final ninety (90) days from the date same is issued. If litigation is filed by either party within said ninety (90) day period, the award shall become null and void and shaA not be used by either party for any purpose in the litigation. K. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be constnaed as if such invalid, illegal, or unenforceable provision had never been contained herein. A�ticles V.F., VI.B., VI.D., VI.H., VI.I., and VI.J. shall survive termination of this AGREEMENT for any cause. L. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and �egulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. -13- Article VII Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A- Scope of Services Attachment B - Compensation Attachment C- Amendments to Standard Agreement for Engineering Services AT�E�T: c2, ,�.�d1'�'' G�o�ia Pearson _ �ity Seeretary APPROVED AS TO FORM AND LEGALITY ��� �Issistan�'8ity Attomey MAIN21 PT3 -14- CITY OF FORT WORTH « By; hllike ��o�mer Assistant City Manager APPROVED -����,.� � �����. A. Douglas Rademaker, P.E. Director, Engineering Department WENDY LOPEZ & ASSOCIATES, INC. ENGINEER By: � / "� � r� = ' - �'�`�� : Wendy L�apez� E'.�' '�� President � -" /� �/�.�S � _ Contract Authorization ��y��' � `�� ---- Date ATTACHMENT "A" General Scope of Services "Scope of Services set forth herein can only be modified by additions, clarifrcations, and/or deJefions set forth in the supplemental Scope of Services. In cases of conflict between the Supplemental Scope of Services and the General Scope of Services, the Supplemental Scope of Services shall have precedence over the General Scope of Services. " GENERAL 1) Preliminary Conference with City The Engineer shall attend preliminary conferences with authorized representatives of the City regarding the scope of project so that the plans and specifications which are to be developed hereunder by the Engineer will result in providing facilities which are economical in design and conform to the City's requirements and budgetary constraints. 2) Coordination with Outside Agencies/Public Entities The Engineer shall coordinate with officials of other outside agencies as may be necessary for the design of the proposed street, and storm drain and/or water and wastewater facilities/improvements. It shall be the Engineer's duty hereunder to secure necessary information from such outside agencies, to meet their requirements. 3) Geotechnicallnvestigations The Engineer shall advise the City of test borings, and other subsurface investigations that may be needed. In the event it is determined necessary to make borings or excavate test holes or pits, the Engineer shall in coordination with the City and the City's geotechnical engineering consultant, draw up specifications for such testing program. The cost of the borings or excavations shall be paid fo� by the City. 4) Agreements and Permits The Engineer shall complete all forms/applications to allow the City of Fort Worth to obtain any and all agreements and/or permits normally required for a project of this size and type. The Engineer will be responsible for negotiating and coordinating to obtain approval of the agency issuing the agreement and/or permits and will make any revisions necessary to bring the plans into compliance with the requirements of said agency, including but not limited to highways, railroads, water authorities, Corps of Engineers and other utilities. 5) Design Changes Relating to Permitting Authorities If permitting authorities require design changes, the Engineer shall revise the plans and specifications as required at the Engineers own cost and expense, unless such changes are required due to changes in the design of the facilities made by the permitting authority. If such changes are required, the Engineer shall notify the City and an amendment to the contract shall be made if the Engineer incurs additional cost. If there are unavoidable -1- delays, a mutually agreeable and reasonable time extension shall be negotiated. 6) Plan Submittal Copies of the original plans shall be provided on reproducible mylar or approved plastic film sheets, or as otherwise approved by the Department of Engineering and shall become the property of the City. City may use such drawings in any manner it desires; provided, however that the Engineer shall not be liable for the use of such drawings for any project other than the project described herein; and further provided, that the Engineer shall not be liable for the consequences of any changes that are made to the drawings or changes that are made in the implementation of the drawings without the written approval of the Engineer. PHASE 1 7) Right-of-Way, Easement and Land Acquisition Needs The Engineer shall determine the rights-of-way, easement needs for the construction of the project. Engineer shall determine ownership of such land and furnish the City with the necessary right-of-way sketches, prepare necessary easement descriptions for acquiring the rights-of-way and/or easements for the construction of this project. Sketches and easement descriptions are to be presented in form suitable for direct use by the Department of Engineering in obtaining rights-of-way, easements, permits and licensing agreements. All materials shall be furnished on the appropriate City forms in a minimum of four (4) copies each. 8) Design Survey The Engineer shall provide necessary field survey for use in the preparation of Plans and Specifications. The Engineer shall furnish the City certified copies of the field data. 9) Utility Coordination The Engineer shall coordinate with all utilities, including utilities owned by the City, as to any proposed utility liens or adjustment to existing utility lines within the project limits. The info�mation obtained shall be shown on the conceptual plans. The Engineer shall show on the preliminary and final plans the location of the proposed utility lines, existing utility lines, based on the information provided by the utility, and any adjustments and/or relocation of the existing lines within the project limits. The Engineer shall also evaluate the phasing of the water, wastewater, street and drainage work, and shall submit such evaluation in writing to the City as part of this phase of the project. -2' 10) Conceptual Plans The Engineer shall furnish four (4) copies of the Phase 1 concept engineering plans which include layouts, preliminary right-of-way needs and preliminary estimates of probable construction costs for the Engineer's recommended p{an. For all submittals, the Engineer shall submit plans and documents for streeUstorm drain and water/wastewater facilities. The Engineer shall receive written approval of the Phase 1 Plans from the City's project manager before proceeding with Phase 2. PHASE 2 11) Design Data The Engineer shall provide design data, reports, cross-sections, profiles, drainage calculations, and preliminary estimates of probable construction cost. 12) Preliminary Construction Plans and Technical Specifications The Engineer shall submit twenty (20) copies of Phase 2 preliminary construction plans and five (5) copies of the preliminary technical specifications for review by the City and for submission to utility companies and other agencies for the purposes of coordinating work with existing and proposed utilities. The preliminary construction plans shall indicate location of existing/proposed utilities and storm drain lines. The Engineer shall receive written approval of the Phase 2 plans from the City's p�oject manager before proceeding with Phase 3. PHASE 3 13) Final Construction Plans The Engineer shall furnish five (5) copies of the final construction plans and contract specifications for review by the City. 14) Detailed Cost Estimate The Engineer shall furnish four (4) copies of detailed estimates of probable construction costs for the authorized construction project, which shall include summaries of bid items and quantities. 15) Plans and Specification Approval The Engineer shall furnish an original cover mylar for the signatures of authorized City o�cials. The Contract Documents shall comply with applicable local, state and federal laws and with applicable rules and regulations promulgated by local, state and national boards, bureaus and agencies. The Engineer shall receive written approval of the Phase 3 plans from the City's project manager before proceeding with Phase 4. -3- PHASE 4 16) Final Approved Construction Plans The Engineer shall furnish 45 bound copies of Phase 4 final approved construction plans and contract specifications. The approved plans and contract specifications shall be used as authorized by the City for use in obtaining bids, awarding contracts, and constructing the project. 17) Bidding Assistance The Engineer shall issue addenda as appropriate to interpret, clarify, or expand the bidding documents, and assist the owner in determining the qualifications and acceptability of prospective constructors, subcontractors, and suppliers. When substitutson prior to the award of contracts is allowed by the bidding documents, the Engineer will advise the owner as to the acceptability of altemate materials and equipment proposed by the prospective constructors. 18) Recommendation of Award The Engineer shall assist in the tabulation and review of all bids received for the constn,iction of the project and shall make a recommendation of award to the City. 19) Prebid Conference The Engineer shall attend the prebid conference and the bid opening, prepare bid tabulation sheets and provide assistance to the owner in evaluating bids or proposals and in assembling and awarding contracts for construction, materials, equipment, and services. PHASE 5 20) Preconstruction Conference The Engineer shall attend the preconstn�ction conference. 21) Construction Survey The Engineer shall be available to the City on matters concerning the layout of the project during its construction and will set control points in the field to allow City survey crews to stake the project. The setting of line and grade stakes and route inspection of construction will be pe�formed by the City. 22) Site Visits The Engineer shall visit the project site at appropriate intervals as construction proceeds to observe and report on the progress and the quality of the executed work. -4- 23) Shop Drawing Review The Engineer shall review shop and erection drawings submitted by the contractor for compliance with design concepts. The Engineer shall review laboratory, shop, and mill test reports on materials and equipment. 24) Instructions to Contractor The Engineer shall provide necessary interpretations and clarifications of contract documents, review change orders and make recommendations as to the acceptability of the work, at the request of the City. 25) Differing Site Conditions The Engineer shall prepare sketches required to resolve problems due to actual field conditions encountered. 26) Record Drawings The Engineer shall prepare record drawings from information submitted by the contractor. -5- EXHIBIT "A-1" SUPPLEMENTAL SCOPE OF SERVICES (SUPPLEMENT TO ATTACHMENT "A") Main 21 Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group 7, Contract 3),Part 3 Project No. PS46-07046�0460310 D.O.E. No. 2488 PHASE I- DESIGN SERVICES PIPELINE REHABILITATION: The following is a clarification of the tasks that the ENGINEER will perform under Attachment "A". Work under this Exhibit includes replacement/rehabilitation of approximately 4,200 linear feet of small-diameter sanitary sewers in Main 21 Drainage Area. All or parts of the following laterals are included: L1700, L4847, L778, L780, L781, L786, L798, L808, L808A, and L836. Upon receipt of Notice-to-Proceed, the ENGINEER will perform the following tasks: PART A - CONCEPTUAL DESIGN Initial Data Collection a. P�e-Design Coordination Meetings Attend and document meetings, as required, to discuss and coordinate various aspects of the project. For purposes of establishing a level of effort, two (2) meetings are anticipated. These include the following: One (1) pre-design kick-off ineeting, (including the CITY's Water Department, Department of Engineering and other departments that are impacted by the project). One (1) review meeting at completion of the CITY's review of the Design Summary Report. b. Research of Rehab History The ENGINEER will conduct a cursory review of completed sanitary sewer replacement and rehabilitation work in the Main 21 Drainage Area. This will include discussions with various CITY departments, and coordination with local consultants engaged in past and current sanitary sewer improvement projects. Interviews will also be conducted with staff in the Field Operations Division. The research data will be compiled and mapped to avoid potential duplication of work proposed under this contract. c. Coordination with Other Agencies The ENGINEER will consult with the CITY's Water and Engineering Departments and other CITY departments, public utilities, private utilities and railroads to gather Supplemental Scope of Services EA1-1 IC�Proposals1P99008.001Proposal�Exhibit A-1 information on underground utilities and other facilities that have an impact or influence on the project. This includes limits of private property that may be impacted in the construction of the project. 2. Design Summary Report (shall be submitted to CITY twenty-two (22) working days after Notice-to-Proceed Letter is rssued) Based on information contained in the ENGINEER's Report of the Sanitary Sewer Evaluation Survey of the Main 21 Drainage Area, the ENGINEER shall prepare a brief letter report including location maps of all line replacements and submit to the CITY. Four (4) copies of the design summary report shall be submitted. 3. Monthly Progress Meetings The ENGINEER shall host, attend and participate in monthly progress meetings as requested by the CITY. The ENGINEER shall submit a project schedule after the design coniract is fully executed. The schedule shall be updated and submitted to ihe CITY along with monthly progress reports as required under Attachment "B" of the contract. PART B- CONSTRUCTION PLANS AND SPECIFICATIONS Preliminary Design a. Surveys The ENGINEER will conduct horizontal and vertrcal control surveys of pipeline rehabilitation and sanitary sewer improvement locations. This represents approximately 4,200 linear feet of sanitary sewers. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, and other features relevant to the final plan sheets. Plan and Profile Sheets Pipelines scheduled for point repairs, rehabilitation, and replacement will be located on the base sheets p�epared from sunrey information gathered under 6.1.a. Conflicts shall be resolved where pipelines are to be rehabilitated on the same line segment. Base sheets shall reference affected or adjacent streets. Legal descriptions (lot number, block number and addition name) along with property ownership shall be provided on the plan review. Where open-cut construction is anticipated, below and above ground utilities will be located and shown on the base sheets. All plan sheets shall be D-size and in AutoCAD� format. Vertical scale fo� pipeline rehabilitation sites shall be 1" = 4'. Horizontal scale shall be 1" - 20'. All design shall be in conformance with Fort Worth Water Depa�tment policy and procedure for processing water and sewer design. ENGINEER shall review the CITY's master sewer plan and submit a summary of findings pertaining to the proposed project. Supplemental Scope of Services EA1-2 K:1Proposals1P99008.001Proposal\Exhibit A-t c. d e Standard and Special Details The ENGINEER will prepare standard and special detail sheets for pipeline rehabilitation that are not already included in the D-Section of the specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, wateriine relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. Right-of-Way Research/Preparation The ENGINEER shall conduct preliminary resea�ch for availability of existing easements where open-cut construction or relocation of existing alignments is probable. Temporary and permanent easements will be approximated based on available information. Legal descriptions and plot maps will be prepared on 8.5" x 14" standard sheets for all necessary temporary and permanent easements required for relief sewer construction. Descriptions shall be prepared in standard format as directed by the DOE. Temporary and permanent easements shall be delineated on plan sheets. Legal desc�iptions shall be submitted to CITY for review and final acquisition. Right-of-entry agreements shall also be prepared if needed. A total of four (4) permanent easements, four (4) temporary construction easements and ten (10) right-of-entry agreements are included. The CITY will s�cure easements and right- of-entry agreements as necessary. Utility Locations The ENGINEER will consult with the CITY's Water Department, Department of Engineering, and other CITY departments, public utilities, private utilities, and government agencies to determine the approximate location of above and underground utilities, and other facilities that have an impact or influence on the project. The ENGINEER forwarding to all project. shall deliver preliminary construction plans to the CITY for utility companies, which have facilities within the limits of the Reconnecting Wastewater Service Lines The ENGINEER shall make provisionsforreconnecting allwastewaterservice lines which connect direct(y to any main being replaced, including replacement of existing service lines within CITY right-of-way or utility easement. When the existing alignment of any sanitary sewe� main or lateral is changed, provisions will be made in the plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. Supplemental Scope of Services EA1-3 K1ProposalsW99008.00Wroposal�E�ibit A-1 g. New Manhole Constn.iction Locations Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractors responsibility to coordinate utility location, sewer line location, etc. for manhole construction. A total of six (6) new manholes is anticipated. h. Preliminary Submittal to CITY (shall be submitted to CITY sixty-five (65) days after approval of Part A, Section 2). The ENGINEER shall deliver four (4) sets of preliminary plans and specifications to CITY for �eview. It is proposed that the construction under this Phase will be prepared as one (1) project for construction purposes. Generally, plan sheets shall be organized as follows: • Cover Sheet - Project title and sheet index • Project Location Map - Index of plan and profile sheets • Plan and Profile Sheets - All pipeline rehabilitation sites (separate sets) • Standard Construction Details • Special Details The ENGINEER will prepare a preliminary opinion of probable construction costs for the construction project and submit it to the CITY as paR of the preliminary plan submittal. Review Meetings with CITY Meet with CITY to discuss their review comments for the construction contract. Coordinate and participate in coordination activities with ENGINEER's design team and CITY. Two review meetings are included. The CITY shall direct the ENGINEER in writing to proceed with Part 6.2 - Final Design for Final Review. Public Meetings After the preliminary plans have been reviewed and approved by the CITY, ENGINEER shall prepare invitation letter and attend public meeting(s) to help explain the proposed project to residents within the Drain�ge Area. The CITY shall mail the invitation letter to the affected residents. 2. Final Design for Final Review Final construction documents (shall be submitted to CITY twenty-one (21) days after approval of Part B, Section 1). Following CITY approval of the recommended improvements, the ENGINEER shall provide final plans and project manual to CITY (each sheet shall be stamped, dated, and signed by the ENGINEER) and submit four (4) sets of plans and Supplemental Scope of Services EAt-4 K1Proposals�P99008.001Proposal�Exhibit A-1 construction contract documents within 10 days of CITY's final approval. Plan sets shall be used for Part C activities. The ENGINEER shall also provide utility companies, which have facilities within the limits of the project, with final construction plans of the project. ENGtNEER's Opinion of Probable Construction Cost The ENGINEER shall prepa�e a final opinion of probable construction cost upon the submission of plans which follows the items listed in the Final Design within the project manual. PART C - PRE-CONSTRUCTION ASSISTANCE Administration a. Deliver Bid Documents The ENGINEER will make available for bidding, upon request by the CITY, up to forty-five (45) sets of the "final" approved and dated plans and project documents for each construction project to the CITY (per advertised contract) for distribution to potential bidders. The ENGINEER will p�ovide four (4) bound sets of all rights- of-entry and easements to the CITY for bidding purposes. b. Bidding Assistance The ENGINEER shall assist the CITY during the bidding phase including preparation and delivery of addenda (to prospective bidders), pre-qualification, responses to questions submitted to the DOE by plan holders and pre-bid conference. The ENGINEER shall assist in reviewing the bids for completeness and accuracy. The ENGINEER shall attend the project bid opening(s) and develop bid tabulations and submit a recommendation of contract award along with four (4) copies of the bid tabulation. c. Assistance During Const�uction The ENGINEER shall assist the CITY in conducting a pre-construction conference for the project. The ENGINEER shall document minutes of ihe meeting and submit them to the CITY. The ENGINEER shall also consult with and advise the CITY on design and/or construction changes, if necessary. The ENGINEER shall attend the substantial completion and final inspection forthis phase, review the post-construction television inspection video tapes, and prepare a brief final report for the completed project as to compliance with the ENGIN EER's design. Supplemental Scope of Services EAt-5 K:1Proposals�P99008.00�ProposallExhibit A-1 ATTACHMENT "B" COMPENSATION AND SCHEDULE Main 21 Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Compensation A. Payment for services will be computed on the basis of Salary Costs times a multiplier of to determine the payment due for services. The multiplier is a factor which compensates the Engineer for fringe benefits, overhead and profit. B. Payments shall also include Direct Non-Labor Expenses which, in general, include expenses for supplies, transportation, equipment, travel, communication, subsistence and lodging away from home, and similar incidentals. The Direct Non-Labor expenses shall be reimbursable at actual invoice cost plus 10%, except for living and travel expenses when away from the office on business connected with the Project. All travel outside of the Dallas/Fort Worth Metropolitan Area to be made, which are reimbursable at actual invoice cost, by the Engineer in connection with the Project must first be approved in writing by the City Engineer. C D Subcontractor cost shall be reimbursed at the actual cost plus 10%. Payment for expenses, costs and services as described in Attachment "A" shall not exceed $69,632.77. E. Partial payment shall be made monthly upon receipt of an invoice from the Engineer, p�epared from the books and records of the Engineer, outlining the amount of hours worked by each employee, the employee's name and classification, and the employee's salary rate along with itemized charges for any subcontract and reproduction work performed during the period cove�ed by said invoice. Each invoice is to be verifed as to its accuracy and compliance with the terms of this contract by an officer of the Engineer. Payment according to statements will be subject to certification by the Director of Engineering or his duly authorized representative that such work has been performed. II. Schedule Exhibit A-1 (Supplemental Scope of Services) shall be completed 100 calendar days after the "Notice-to-Proceed" letter is issued. Compensation and Schedule AB-1 K:�Proposals1P99008.00�ProposalWttachment B EXHIBIT B-1 (SUPPLEMENT TO ATTACHMENT B) METHOD OF PAYMENT Main 21 Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group 7, Contract 3) Pa�t 3 Project No. PS46-070460460310 D.O.E. No. 2488 The ENGINEER shall be paid monthly on the basis of statements prepared from the books and records of the account of the ENGINEER. The aggregate of such monthly partial payment shall not exceed the following: Until satisfactory completion of Exhibit A-1, Part A, Section 2, hereunder, a sum not to exceed 30 percent of the maximum fee. Until satisfactory completion of Exhibit A-1, Part B, Section 1 hereunder, a sum not to exceed 70 percent of the maximum fee, less previous payments. Until satisfactory completion of Exhibit A-1, Part B, Section 2, hereunder, a sum not to exceed 95 percent of the maximum fee, less previous payments. Balance of earnings to be due and payable after delivery of the bid tabulation for the project. An officer of the ENGINEER shall verify the accuracy of each invoice submitted which shall comply with the terms of the agreement. Proqress Report A. The ENGINEER shall submit to the designated representative of the Director of the Department of Engineering monthly progress reports covering all phases of design by the 15�" of every month in the fo�mat required by the CITY. B. If the ENGINEER determines in the course of making design drawings and specifications that the preliminary opinion of construction cost estimate of $535,753.90 (as estimated in Exhibit "B-5") will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the CIN's Director of the Department of Engineering and, if so instructed by Director of the Engineering Department shall suspend all work hereunder. Method of Payment EB1-1 K1ProposalsW99008.00\Proposal\Exhibit B-1 EXHIBIT B-2 (SUPPLEMENT TO ATTACHMENT B) HOURLY RATE SCHEDULE Main 21 Dralnage Area Sanitary Sewer Rehabilitation & Improvements (Group 7, Contract 3)� Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Employee Classification Principal Project Manager ! Planner RPLS Project Engineer Senior Designer / CAD Operator Designer / CAD Operator Survey Technician Clerical Survey Crew Two-Man Crew Three-Man Crew Reimbursables Mileage Direct Labor Rafe/Hour Range $42.31 Na $33.65 $28.85 - $33.82 $31.25 $28.85 - $32.31 $20.00 $23.08 - $24.25 $19.28 $19.23 - $23.08 $15.59 $15.38 - $17.86 $11.86 $8.00 - $15.50 $11.00 Na $80.00 $105.00 Cost plus 10% $0.32 per mile NOTES: 1) Multiplier of 3.08 will be used for all direct labor rates, except survey crews. Crew rates are fully burdened. 2) Reproduction work will be at current commercial rates. 3) SubconVactors will be paid for at actual invoice cost plus ten percent (10°�). n/a Na HouAy Rale Schedule E82-1 K:�Proposals�P99008.00�ProposalslExhibit &2 Wendy Lopez & Associates, Inc. engineering • environmental • surveying • construcfion services EXHIBIT B�3A (Supplement to Attachment B) DESIGN FEE COST SUMMARY Main 21 Drainage Area Sanitary Sewer Rehabilitation &� Improvements (Group T, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 February 23, 1999 Mr. Tony Sholola, P.E. Depa�tment of Engineering City of Fort Wo�th 1000 Throckmorton Street Fort Worth, TX 76102-6311 Re: Main 21 Drainage Area Sanitary Sewer Rehabilitation and Improvements (Group 7, Conirad 3), Part 6, Sewer Projed No. PS46-070460460310, D.O.E. No. 2488 Dear Mr. Sholola: We appreciate the oppo�tunity to present this proposal and fee schedule for your consideration. Attached please find constn.idion cost estimates, project schedule and exhibits depicting the scope of worlc. We propose to complete the proposed worlc in accordance wrth the following fee schedule: Opinion of Probable Construdion Costs: Sanitary Sewer Line � . Lateral 1700 Lateral 4847 Lateral 778 Lateral 780 Lateral 781 Lateral 786 Lateral 798 Lateral 808 Lateral 808A Lateral 836 Opinion of Probable Construdion Cost Total : Basic Engineering Design Seniices TSPE CuNe 8.50% x 0.85 x$535,753.90 Ooinion of Construction Cost $ 83,062.10 35,183.50 20,344.50 55,171.05 47,451.80 70,983.00 39,860.15 38,204.10 30,529.40 114.964.30 $ 535,753.90 �," Assigned to MBE Subconsultant for surveying and design services Basic Services EB3A-1 $ 38,708.22 $ 38,708.22 3800 Sandshell Drive • Suite 175 • Fort Worth, Texas 76137 •(817) 232-0244 • FAX (817) 232-4638 Mr. Tony Sholola City of FoR Worth Page Two February 23, 1999 Special Services Design Surveys Easement Preparation (4 @ $350 each) Temporary Construdion Easement (4 cLD $75 each) Temporary Right of Entry (10 �$50 each) Monthly Meetings and Status Reports (6 months) TxDOT and Railroad Coorciination 10°/a for MMIBE Subcontrador Subtotal Constn.idion SeNices Pre-Construdion Post Construdion Subtotal Reprodudions 2 Sets of Conceptual Plans (City Review) 14 Sets of Preliminary Plans and 5 Sets of Specifications (Util. Clear.) 2 Sets of Constn�dion Plans and Specifications (City Review) 45 Sets of Final Construction Plans and Specifications 10% for MMIBE Subcontrador Subtotal TOTAL NOT-TO-EXCEED $ 13,100.00 1,400.00 300.00 500.00 4,839.84 3,000.00 1,192.11 $ 24,331.95 $ 2,128.88 1,518.72 $ 3,647.60 $ 40.00 350.00 120.00 2,100.00 335.00 $ 2,945.00 $ 69,632.7T We will be using A.NA., Inc. for surveying and design seryices and Arlington Blueline, Inc. for printing constn�dion plans and specifications. AccorcJing to our estimate, this will result in over 20% of the contrad that will be perfonned by approved MMBE firms which will exceed the target of 17%. If you have any questions or require additional infoitnation, please give me a call. Sincerely, WENDY LOPEZ & ASSOCIATES, INC. Paul R. Holmes, P.E. Manager, Fort Worth Office PRH:ss EB3A-2 r EXHIBIT B-3 (Supplment to Attachment B) DESIGN FEE COST SUMMARY Main 21 Drainage Area Sanitary Sewer Rehabilitation 8� Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Phase I-Design Services II-Pre-Construction Total Scope of Services Pipe Rehabilitation (Parts A and B) Assistance (Part C) Fee $65,985.17 $3.647.60 $69,632.77 Proposed M/V1/BE Subconsultants Services A.�l.A. Consultants, L.L.C. Topographic Field Survey and Design Arlington Blueline Reprographics E63-1 M/WBE $14,270.00 0.00 $14,27Q.00 Fees $11,660.00 $2.610.00 $14,270.00 % 21.63% 0.00% 20.49% % 16.74% 3.75% 20.49% EXHIBIT B-36 (SUPPLEMENT TO EXHIBIT B-3A) MONTHLY MEETING ENGINEERING SERVICES ESTIMATED HOURS Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Project: Main 21 (Group 7, Contract 3) Part 3 Phase 1: Desiqn Services - Rehabilitation/Replacement Sewers WORK TASK DESCRIPTION MONTHLY MEETINGS A. Prepare Reports (6 Months � 3 Hrs./Month) B. Attend Meetings (6 Months � 3 Hrs./Month) Total HOURLY RATE WORK Estimated Manhours rroJect rro�ecc Total Cost Principal Manager Engineer Estimate ($) 18 18 $2,974.32 18 $1,865.52 $4,8�9.84 EB3B-1 � EXHIBIT B-3C (SUPPLEMENT TO EXHIBIT B-3A) CONSTRUCTION PHASE ENGINEERING SERVICES ESTIMATED HOURS Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 � Project: Main 21 (Group 7, Contract 3) Part 3 Phase 1: Desiqn Services - Rehabilitation/Replacement Sewers WORK TASK DESCRIPTION CONSTRUCTION PHASE ENGINEERING SERVICES A. Pre-Construction 1. Bid Opening & Review Bids for Accuracy 2. Compile Bid-Tabulation 3. Pre-Construction Meeting SUBTOTAL B. Post Construction 1. Final Field Inspection 2. Prepare Report on Final Inspection Findings SUBTOTAL TOTAL CONSTR. PHASE ENGINEERING SERVICES � � HOURLY RATE WORK Estimated Manhours Total Cost rro�ect Nro�ecc Estimate Principal Manager Engineer Clerical �$� 2 2 4 8 6 8 8 4 $700.08 2 $767.84 $660.96 $2,128.88 $829.12 2 $689.60 $1,518.72 $3,647.60 E63C-1 EXHIBIT B-4 (SUPPIEMENT TO ATTACHMENT B) Main 21 Drainage Area Sanitary Sewer Rehabilitation b Improvements (Group 7, Contract 3) Part 3 Project No. PS46-0T0460460310 D.O.E. No. 2488 Task No. Task Description BASIC SERVICES MANAGEPROJECT 1 Supervise Staff & Subconsuttants 2 Meet with FW Project Manager 3 Conduct Intemal QA/QC Meetings Subtotal Hours Subtotal Cost DESIGN SERVICES � Data Collection a Meet with Franchise Utility Companies b Sfte Vsits c Research City Records S�btotal Hours Subtotal Cost 2 Base Mapping a Draft Existing Topography & Improvements b FW Benchmarks c Annotate Addresses, Lot, & Block Numbers d Draft Ewsting Easements and Building Lines e Annotate Street Names and Right-of-Way W idths f Develop Project Border Street Subtotal Hours Subtotal Cost 3 Preparation of Plans and Specifications a Design Sanitary Sewer Alignment b Prepare Cover Sheet c Prepare Project Location Maps d Prepare General Layout Maps and Notes e Prepare Sanitary Sewer Plan Streets f Prepare Specifications Subtotal Hours Subtotal Cost 4 Opinion of Construction Cost a Quantity Take-Off b Prepare Engineers Opinion oi Construction Costs Subrotal Hours Subtotal Cost Principal Proj. Man. Proj. Eng. RPLS Field Party CAD Tech Clerical Total $130.31 3103.64 $61.60 $96.25 $105.00 $48.02 $33.88 3 1 18 2 8 5 4 3 7 29 5 $912.17 $3,005.56 $308.00 2 4 7 9 2 3 0 11 16 $0.00 $1,140.04 3985.60 6 6 1 2 2 t 2 1 0 8 13 30.00 3829.12 3800.80 1 12 53 3 12 1 3 8 3 20 4 16 40 2 6 20 8 43 153 $1,042.48 $4,456.52 39,424.80 4 20 1 4 24 1 8 44 $130.31 $829.12 52,710.40 0 ao.00 0 $0.00 0 ao.00 0 30.00 0 0 0 0 $0.00 $0.00 $0.00 $4,225.73 0 0 0 0 $0.00 30.00 30.00 $2,125.64 80 3 26 8 8 8 2 0 133 2 0 so.00 ss,sas.ss $s�.�s as,osa.sa 32 12 20 32 70 6 0 166 6 0 E0.00 37,971.32 3203.28 $23,098.40 6 0 0 0 6 0 $0.00 30.00 �0.00 a203.28 $3,873.11 EB41 Task No. Task Description EXHIBIT B� �SUPPLEMENT TO ATTACHMENT B) Main 21 Drainage Area Sanitary Sewer Rehabilitation 8 Improveme�ts (Group 7, Contract 3) Part S Project No. PS46-0T0460460310 D.O.E. No. 2488 Principal Proj. Man. Proj. Eng. RPLS Field Party CAD Tech Clerical $130.31 $103.64 $61.60 $96.25 �105.00 $48.02 333.88 PRECONSTRUCTION SERVICES 1 Bidding Phase a Bid Opening and Review Bids for Accuracy b Complete Bid Tabulation c Pre-Construction Meeting Subtotal Hours Subtotal Cost SUBTOTAL BASIC SERVICES SPECIAL SERVICES � Design Surveying a Establish Horizontal control b Locate Topographic Features c Sanftary Sewer Manhole Flowline and Rim Elevations d Locate Underground Utilities as Required e Establish Vertical Datum Based on FW Benchmarks f Locate Right-of-Way Monumentation & Property Lines g Prepare Permanent Easements h Prepare Temporary Construction Easements i Prepare Right-of-Entries Subtotal Hours Subtotal Cost 2 Monthly Meetings (6 Mos.) Subtotal Hours Subtotal Cost 3 TxDOT and Railroad Coordination Subtotal Hours Subtotal Cost REIMBURSABLE EXPENSES � Reprographics TOTAL COST OF ENGINEERING SERVICES 2 8 2 8 4 4 0 8 20 30.00 5829.12 $1,232.00 0 30.00 Total $ 2 0 0 2 0 30.00 b0.00 $67.76 52,128.88 E43,536.10 2 14 6 4 36 36 2 8 8 • 2 12 8 2 10 4 4 10 8 4 4 2 2 0 0 0 24 90 74 $0.00 30.00 $0.00 �2,310.00 $9,450.00 33,553.48 36 18 0 0 $0.00 $15,313.48 0 36 18 0 0 0 0 0 50.00 53,731.04 a1,108.80 $0.00 50.00 30.00 $0.00 E4,839.84 8 20 18 2 0 8 20 0 0 18 2 0 $0.00 $829.12 $1,232.00 30.00 b0.00 5864.36 a67.76 $2,993.24 52,945.00 S69,627.66 EB42 EXHIBIT B� (SUPPLEMENT TO ATTACHMENT B) SUMMARY PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage A�ea Sanitary Sewer Rehabilitation 8� Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Sanitary Sewer Line Lateral 1700 Lateral 4847 Lateral 778 Lateral 780 Lateral 781 Lateral 786 Lateral 798 Lateral 808 Lateral 808A Lateral 836 Oqinion of Construction Cost OPINION OF PROBABLE CONSTRUCTION COST TOTAL: $83,062.10 $35,183.50 $20,344.50 $55,171.05 $47,451.80 $70,983.00 $39,860.15 $38,204.10 $30,529.40 $114,964.30 �535,753.90 � E65-1 EXHIBIT B-5 (SUPPLEMENT TO ATTACHMENT B) PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewe� Rehabilitation 8� Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Lateral Number 1700 �tem 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Quantity 500 56 3 2 58 406 3 556 10 1 5 5 250 Unit Desc�iption of Item LF 8" PVC San. Swr. 0-6' LF 8" PVC San. Swr. (over 6') EA Std. 4'-0" M.H. w/insert LF Extra Depth for M.H. EA Drop M.H. w/insert LF E�ra Depth for drop M.H. EA Remove exist. M.H. LF Replace 6" other than by open cut EA 4" San. Swr. Service Tap LF 4" San. Swr. Service Line EA Vacuum Test M.H. LF Post Const. TV Inspection LF Perm. Pavement Repair LS Sodding/Hydromulch CY Misc. Concrete CY Crushed Limestone LF Trench Safety ti Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 $1,600.00 $125.00 $2,100.00 $175.00 $1,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $500.00 $75.00 $20.00 $2.00 Item Total $25,000.00 $3,192.00I $4,800.00I $0.00 j $0.00 $0.00 $2,000.00 $0.00 $23,200.00 $,4,2,0.�0� $450.00I $834.00 $350.00 $500.00 $375.00 $100.00 $500.00 $75,511.00 $7,551.10 $83,062.10� E65-2 EXHIBIT B� (SUPPLEMENT TO ATTACHMENT B) PRELIM(NARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewer Rehabilitation 8� Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Lateral Number 4847 Item � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Quantity 120 60 1 1 8 1 6 150 2 180 190 1 5 5 60 Unit LF LF EA LF EA LF EA LF EA LF EA LF LF LS CY CY LF Description of Item 8" PVC San. Swr. 0-6' 8" PVC San. Swr. (over 6') Std. 4'-0" M.H. w/insert Extra Depth for M.H. Drop M.H. w/insert Extra Depth for drop M.H. Remove exist. M.H. Replace 6" other than by open cut 4" San. Swr. Service Tap 4" San. Swr. Service Line Vacuum Test M.H. Post Const. TV Inspection Perm. Pavement Repair Sodding/Hydromulch Misc. Concrete Crushed Limestone Trench Safety Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 $1,600.00 $125.00 $2,100.00 $175.00 $2,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $75.00 $20.00 $2.00 Item Total $6,000.00 $3,420.00 $1,600.00 $0.00 $2,100.00 $1,400.00 $2,000.00 $0.00 $2,400.00 $5,250.00 $300.00 $270.00 $6,650.00 $0.00 $375.00 $100.00 $120.00 $31,985.00 $3,198.50 $35,183.50 E65-3 EXHIBIT B-5 (SUPPLEMENT TO ATTACHMENT B) PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group 7, Contract 3) Part 3 Project No. PS46-0T0460460310 D.O.E. No. 2488 Lateral Number 778 (Under Building May be Private) Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Quantity 1 1 230 4 1 230 Unit LF LF EA LF EA LF EA LF EA LF EA LF LF LS CY CY LF Description of Item 8" PVC San. Swr. 0-6' 8" PVC San. Sw�. (over 6') Std. 4'-0" M.H. w/insert E�ra Depth for M.H. Drop M.H. w/insert Extra Depth for drop M.H. Remove exist. M.H. Replace 6" other than by open cut 4" San. Swr. Service Tap 4" San. Swr. Service Line Vacuum Test M.H. Post Const. TV lnspection Perm. Pavement Repair Sodding/Hydromulch Misc. Concrete Crushed Limestone Trench Safety Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 $1,600.00 $125.00 $2,100.00 $175.00 $1,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $75.00 $20.00 $2.00 Item Total � $0.00 $0.00 $1,600.00 $0.00 � $0.00I $0.00 $1,000.00 $13,800.00 $1,600.00 $0.00 $150.00 $345.00 � $0.00 I $o.00� $0.o0j $0.00 � $0.00� $18,495.00 $1,849.50� I $20, 344.50I E65-4 EXHIBIT B� (SUPPLEMENT TO ATTACHMENT B) PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Lateral Number 780 � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Quantity 607 2 2 16 112 2 607 60 1 5 5 Unit Description of Item LF 8" PVC San. Swr. 0-6' LF 8" PVC San. Swr. (over 6') EA Std. 4'-0" M.H. w/insert LF Extra Depth for M.H. EA Drop M.H. w/insert LF Extra Depth for drop M.H. EA Remove exist. M.H. LF Replace 6" other than by open cut EA 4" San. Swr. Service Tap LF 4" San. Sw�. Service Line EA Vacuum Test M.H. LF Post Const. TV Inspection LF Perm. Pavement Repair LS Sodding/Hydromulch CY Misc. Concrete CY Crushed Limestone LF Trench Safety Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 $1,600.00 $125.00 $2,100.00 $175.00 $1,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $500.00 $75.00 $20.00 $2.00 Item Total $30,350.00 $0.00 $3,200.00 $0.00 $0.00 $0.00 $2,000.00 $0.00 $6,400.00 $3,920.00 $300.00 $910.50 $2,100.00 $500.00 $375.00 $100.00 $0.00 $50,155.50 $5,015.55 $55,171.05 i � EXHIBIT B-5 (SUPPLEMENT TO ATTACHMENT B) PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewer Rehabilitation 8 Improvements (Group 7, Cont�act 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Lateral Number 781 1 2 3 4 5 6 7 8 9 10 t1 12 13 14 15 16 17 Quantity 382 20 3 1 4 3 14 98 4 402 30 1 5 5 20 Unit Description of item LF 8" PVC San. Swr. 0-6' LF 8" PVC San. Swr. (over 6') EA Std. 4'-0" M.H. w/insert LF Extra Depth for M.H. EA Drop M.H. w/insert LF Extra Depth for drop M.H. EA Remove exist. M.H. LF Replace 6" other than by open cut EA 4" San. Swr. Service Tap LF 4" San. Swr. Service Line EA Vacuum Test M.H. LF Post Const. TV Inspection LF Perm. Pavement Repair LS Sodding/Hydromulch CY Misc. Concrete CY Crushed Limestone LF Trench Safety Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 $1,600.00 $125.00 $2,100.00 $175.00 $1,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $500.00 $75.00 $20.00 $2.00 Item Total $19,100.00 $1,140.00 $4,800.00 $0.00 $2,100.00 $700.00 $3,000.00 $0.00 $5,600.00 $3,430.00 $600.00 $603.00 $1,050.00 $500.00 $375.00 $100.00 $40.00 1 $43,138.00I � $4,313.80 $47,451.80 E65-6 EXHIBIT B-5 (SUPPLEMENT TO ATTACHMENT B) PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewer Rehabilitation 8� Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Lateral Number 786 (Possible Abandonment) Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Quantity 440 90 2 2 10 2 8 60 4 530 540 5 5 90 Unit Description of Item LF 8" PVC San. Swr. 0-6' LF 8" PVC San. Swr. (over 6') EA Std. 4'-0" M.H, w/insert LF E�ctra Depth for M.H. EA Drop M.H. w/insert LF Extra Depth for drop M.H. EA Remove exist. M.H. LF Replace 6" other than by open cut EA 4" San. Swr. Service Tap LF 4" San. Swr. Service Line EA Vacuum Test M.H. LF Post Const. TV Inspection LF Perm. Pavement Repair LS Sodding/Hydromulch CY Misc. Concrete CY Crushed Limestone LF Trench Safety Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 $1,600.00 $125.00 $2,100.00 $175.00 $1,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $75.00 $20.00 $2.00 Item Total $22,000.00 $5,130.00I $3,200.00 j $0.00 $4,200.00 �1,750.00 $2,000.00I $0.00 I $3,200.00 $2,100.00I $600.00 $795.00 $18,900.00 $0.00 $375.00 $100.00 $180.00 $64,530.00 $6,453.00 $70,983.00 EB5-7 EXHIBIT B-5 (SUPPLEMENT TO ATTACHMENT B) PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewer Rehabilitation 8� Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 � Item Quantity 1 361 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2 2 16 112 2 361 10 1 5 5 Unit LF LF EA LF EA LF EA LF EA LF EA LF LF LS CY CY LF Lateral Number 798 Description of Item 8" PVC San. Swr. 0-6' 8" PVC San. Swr. (over 6') Std. 4'-0" M.H. w/insert Extra Depth for M.H. Drop M.H. w/insert E�ra Depth for drop M.H. Remove exist. M.H. Replace 6" other than by open cut 4" San. Swr. Service Tap 4" San. Swr. Service Line Vacuum Test M.H. Post Const. TV Inspection Perm. Pavement Repair Sodding/Hydromulch Misc. Concrete C�ushed Limestone Trench Safety Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 $1,600.00 $125.00 $2,100.00 $175.00 $1,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $1,000.00 $75.00 $20.00 $2.00 Item Total $18,050.00 $0.00 $3,200.00 $0.00 $0.00 $0.00 $2,000.00 $0.00 $6,400.00 $3,920.00 $300.00 $541.50 $350.00 $�,000.00 $375.00 $100.00 $0.00 $36,236.50 $3,623.65 $39,860.15 EB5-8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 EXHIBIT B-5 (SUPPLEMENT TO ATTACHMENT B) PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Lateral Number 808A Quantity Unit Description of Item Unit Cost 180 LF 8" PVC San. Swr. 0-6' $50.00 32 LF 8" PVC San. Swr. (over 6') $57.00 2 EA Std. 4'-0" M.H. w/inse�t $1,600.00 LF Extra Depth for M.H. $125.00 1 EA Drop M.H. w/insert $2,100.00 4 LF E�ra Depth for drop M.H. $175.00 2 EA Remove exist. M.H. $1,000.00 LF Replace 6" other than by open cut $60.00 10 EA 4" San. Swr. Service Tap $400.00 70 LF 4" San. Swr. Service Line $35.00 2 EA Vacuum Test M.H. • $150.00 212 LF Post Const. TV Inspection $1.50 232 LF Perm. Pavement Repair $35.00 LS Sodding/Hydromulch 5 CY Misc. Concrete $75.00 5 CY Crushed Limestone $20.00 122 LF Trench Safety $2.00 Subtotal 10% Contingency Total Estimated Construction Cost Item Total $9,000.00 $1,824.00 $3,200.00 $0.00 $2,100.00 $700.00 $2,000.00 $0.00 $4,000.00 $2,450.00 $300.00 $318.00 $8,120.00 $0.00 $375.00 $100.00 $244.00 $34,731.00 $3,473.10 $38,204.10 EBS-9 EXHIBIT B-5 (SUPPLEMENT TO ATTACHMENT B) � PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTIUN COST Main 21 Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group T, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Lateral Number 808 I Item I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Quantity 286 1 10 70 2 286 20 1 5 5 200 Unit LF LF EA LF EA LF EA LF EA LF EA LF LF LS CY CY LF Description of Item 8" PVC San. Swr. 0-6' 8" PVC San. Swr. (over 6') Std. 4'-0" M.H. w/insert Extra Depth for M.H. Drop M.H. w/insert Extra Depth for drop M.H. Remove exist. M.H. Replace 6" other than by open cut 4" San. Swr. Service Tap 4" San. Swr. Service Line Vacuum Test M.H. Post Const. TV Inspection Perm. Pavement Repair Sodding/Hydromulch Misc. Concrete Crushed Limestone Trench Safety Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 �$1,600.00 $125.00 $2,100.00 $175.00 $1,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $500.00 $75.00 $20.00 $2.00 Item Toial $14,300.00 $0.00 $3,200.00I $0.00 $0.00 $0.00 $1,000.00� $0.00 I $4,000.00 j $2,450.00 $300.00 $429.00 $700.00 $500.00 $375.00 $100.00 $400.00 $27,754.00 $2,775.40 � $30,529.40I EB5-10 EXHIBIT B-5 (SUPPLEMENT TO ATTACHMENT B) PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST Main 21 Drainage Area Sanitary Sewer Rehabilitation 8� Improvements (Group 7, Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 Lateral Number 836 Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Quantity 292 500 2 2 13 3 22 200 4 792 800 1 10 10 600 Unit LF LF EA � LF EA LF EA LF EA LF EA LF LF LS CY CY LF Description of Item 8" PVC San. Swr. 0-6' 8" PVC San. Swr. (over 6') Std. 4'-0" M.H, w/insert E�ra Depth for M.H. Drop M.H. w/inse�t Extra Depth for drop M.H. Remove exist. M.H. Replace 6" other than by open cut 4" San. Swr. Service Tap 4" San. Swr. Service Line Vacuum Test M.H. Post Const. TV Inspection Perm. Pavement Repair Sodding/Hydromulch Misc. Concrete Crushed Limestone Trench Safety Subtotal 10% Contingency Total Estimated Construction Cost Unit Cost $50.00 $57.00 $1,600.00 $125.00 $2,100.00 $175.00 $1,000.00 $60.00 $400.00 $35.00 $150.00 $1.50 $35.00 $1,000.00 $75.00 $20.00 $2.00 Item Total � $14,600.00 $28,500.00 $3,200.00 $0.00 $4,200.00 $2,275.00 $3,000.00 $0.00 $8,800.00 $7,000.00 $600.00 $1,188.00 $28,000.00 $1,000.00 $750.00 $200.00 $1,200.00 $104,513.00I $10,451.30 $114,964.30 E65-11 ATTACHMENT "C" AMENDMENTS TO STANDARD CONTRACT AND GENERAL SCOPE OF SERVICES Main 21 Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group 7, Contract 3) Part 3 Project No. PS46-0T0460460310 D.O.E. No. 2488 No amendments cited. C-1 ATTACHMENT D1 PROJECT TABLE OF TARGET DATES Main 21 Drainage Area Sanitary Sewer Rehabilitation 8 Improvements (Group 7� Contract 3) Part 3 Project No. PS46-070460460310 D.O.E. No. 2488 TASK DESCRIPTION Notice to Proceed Conceptual Design Review Conceptual Design (City) P�eliminary Design Review Preliminary Design (City) Easement Preparation City Obtain Easements Final Design Review Final Design (City) Prepare for Advertisement Advertise Award Contract Construdion Final Inspection & Acceptance START 3/1 /99 3/1/99 3/16/99 4/6/99 4/25/99 4/11 /99 5/21991 5/16/99 � 6/8/99I 6/27/99I 7/18/99) 8/8/99I 10/5/99I 1 /4/00 I PROJECTED FINISH N/A 3/15/99 4/5/99 4/25/99 5/15/99 5/1 /99 7/26/99 6/7/99 6/26/99I 7/17/99I 8/8/99 � 10/4/99I 1 /3/00 � 2/1 /00 � D1-1 DURATION START 10d 15d 15d 15d 15d 60d 15d1 15d� 15d1 15d1 40d1 90d 30d ACTUAL FINISH DURATION b0C Aq�cl AYrrpM M RM��n C1rrW �. P E Wf AqeN No z�ee 10 I T��A Mr+w -- I�rYn t DE31GN }1� dry� j �.r..eA:..a � 1 Aar � c...�o.w�---- ��a,y. � ce�eo....wca ---- tsaysl S e`r"`^^ OwP 90 a r. I 6 E..•wrww.ar�a �a e.r.l 7 Cw Oer.Eww.�n ` 60 mrs I 1i wtr�lwo 40f �p..�a I M Af1n I � ( a..�....o..v�u....ac., I pmY'I u I oe..�r... o.ot �o..�,.... I ea e.r+ I � � r.. D.�r.r. a so«+ I JO d.7+ I �o �..a.rQ.--tic.. I �oa+r:l ! 11 I 4wa. Prvse..+a n..e r.a I 15 m�� I 1� I 40 L AWARD i 61 Aqs I � 1 S I .a.wr r Cr�ase. I 21 my� l �s .......�...c..c....a I somnl n coMsrRuc� I+is s.Y. I u c.,..e.�u. I t�oa.n� t� o...�.n.�a....m..�. I sanl w.�er �ep.i a �..od.�.. H�d��o. � EpA ReMG- (ddq 7. CMnel J). P�A] PM 1A v�1 R wY�ra. P E(E17) 7]2-0141 �.7��7�sooi S,N ik11�11 Mon L/NY Mm 17HKY Mon 11/VO Mon Y1IVG �.,� v�no ww »tso w�eam�vo ww�n��ee T�u u 15NB Tue )l7 ]R9 Men SItd9Y I Tue !fl/D9 Tut UE/DO I Mon lR199 I FN 7/D9G � Wad 7/26189 ru. �ii yva I � enioc wW 7/1NDY I Tw 1 W 191D9 � ernw I n+o� ai yee r�. aiuva I u�o„ iai �ns t�,. iai7no I ►w� �u�n9 Tw 11?/H Wed 1rtW0 n,. �iruo w�a iv�se n,� ��n�uo I ww �aeAa rn, �mna I Fe �mroo Thu 1rI71001 FA 71tU00 Mon 7177100 I FA 7R1100 ------- --- AITACHMENT'D-2' ---- -- --- M�In 21 Dr�lnaye Are• Sanitary Sewer Syzlem Rehahllltation S Improvements (Croup 7, Conlrsd J), Part 3 Sewer ProJect No. P546-070460460310, D.O.E. N�. 24B8 1��Ouwne. 7�.nO...ne� ].a0aiw�e� ����M•� tafOuwnln J�n � FM I Mv I Aor I Mir A Ju� I Jyt � !We 0 Sie I Ocl � Nw � 0.c I Jan � feb { 'M!r I' � . Yt � � � sni uu . +ru �n� SJ50 � N �rY in � ��e � tns � e+x ' iR.1 10H! � : .... . ....__ . . . ;._. . ... .... .. _ .._ ... .. ..... . . . ...... . :. _ . fC#�iWl: . .. �. w� � �a�� +au � � xn ,. . . _._ _.. . . . .... . _ .. . _.._.. . .. . . 711Y N9 efrt vae __ _. ., . _,._ .... F .: I e raw •-�---- ,� nd.a w c.n,�i r.0 4. ��� �� `� sW� .. .. .. .. .. .. .. .. .. .. ah��ai T..� k\ 4 l\\`� I s.m.�.�y re�.e up rw.� r. Q en«n.i t..►. S,�2,'§�:�,`!f�'.�;�rS��� v.oy.�.. rtw.e w r,.w � I lilli iId��oVI:ili2i�leEl�'ir4ili�.� �'°�'� up �rau�... Aq.a su�rn•ry .y ,�;i raya r er i tnd O�wne� Jrtl G�w�1 Aw f ►b�r I JMrr I JJ � venu ATTACHMENT E LOCATION MAPS CITY OF FORT WORTH ENGINEERING Main 21 Drainage Area Sanitary Sewer Rehabilitation 8� Improvements (Group 7, Contract 3) Part 3 P�oject No. PS46-070460460310 D.O.E. No. 2488 TITLE DESCRIPTION EXHIBIT E-1 . . . . . . . . . . . . . . . . . OVERALL DRAWING EXHIBIT E-1-1 . . . . . . . . . . . . . . . . . LATERAL 1700 EXHIBIT E-1-2 . . . . . . . . . . . . . . . . LATERAL 4847 & LATERAL 836 EXHIBIT E-1-3 . . . . . . . . . . . . . . . . LATERAL 778 EXHIBIT E-1-4 . . . . . . . . . . . . . . . . LATERAL 780 EXHIBIT E-1-5 . . . . . . . . . . . . . . . . LATERAL 781 EXMIBIT E-1-fi . . . . . . . . . . . . . . . . LATERAL 786 EXHIBIT E-1-7 . . . . . . . . . . . . . . . . . tATERAL 798 EXHIBIT E-1-8 . . . . . . . . . . . . . . . . LATERAL 808 EXHIBIT E-1-� . . . . . . . . . . . . . . . . LATERAL 808A PAGE ............... EE1 E-1 � C1 TY OF FORT 1MaR�H, r�c►�s EXH � B IT E � ,c�� o �oo ��ac� ,�c "`�r'�°'�` ,'�„�� ,�AIN 21 f� L�raina�� Ar��. �.,a'2i�.��$„� SCAtE IN FEET +LVI MOiI'�t� 7�[lw[ � R 1!I �,„�.�.. SAN!I'fAR1G SEWER SYSTI�M REMABILITAiI N' AN[� I'6�PR0WEI�ENTe fG�i�3UP 7, (�OIVTRACT3)� PART 3 � 1VE��! �Q TC N yl,� �� � �� i i�w i ai.i e�tif.ursc'�eR! . � +.� 1 . i I `I�i�i i I 6"�rL I� � � � � � � � � „� �9'i�3AN1a;-� l(3 I I i5T. I s• � h`• n, � I � 4� y STj, .� �,,!�� I_e, '�'w '� I �I � � � I l � � v� •. IIRM� I ! �,,�' � , � d \�Y.: I I � ' �i I E S`rCB15,��6� � � � L�-�TT9 _ � - � i�.[�� w 4 � � � j i 2 �I � . i � I � I I � , �` C - !'u/ 5 2�E C3• � 5 r+e � �_� �'1 A,y � � ' i - � ���. I p �'` I �..__— S� . -�� '�V y� � _1�+16� �y�.�x g�'w�� l. I ! I �� � � i �. � ���odi� I �v�l i ���'s� ,Q � � —��T-� s.zxe �+�+� a.a� s�MC �•4 6'YC I �I oi I r� � �" � a,;t� 17 � - z I , , � , z �v -.i - i �`�- I. I I � i �6 � � � ��,� G3 � m .a� �" � ae�ltol I L 7f5t4 �4. � ! 6. � 3 � I 8 I _ � !- � � I � � �� h' ��� �; ` 7 . .ti � ,_ f- � I I I l. 94 �-�,, f � vc �. a.bi_ �-- ' � g�. � �. � "� � � �" f I fI � � s•or� I y,kg _ � _ ._ ' , � C � I! I I ��, �T�i I� I f�•� I I . I � 4' � 8RP�4Y � i — � c���� � _ ,� � e, MdR��r) sa <_ �3� f � e•�� r � 9.. � t � I � s. i I' � � !� N�„ '4-- — !, , � ; � I � � I� � I � ; I �r , � , � I-- n� ' �f - T95 �` . ; � �� I � � ,xrt'�I � .� I ;! �7N9� -7 5 � �► '9a �- 9 �� ' - _ — �,v�aer.�� I `x'G' �,�, � �6•s"',66s � �I'�y 5"�C, �a j" ' ,� — �� i �. �. � ' , i I �1. Ai I1.� T E 2� E � �� � �- Uw92f IYFT I IM ��'�� � I�` IJ� �` I 7 Mfi � � 5T � 2 �� 72•T! _,, , �2+V2E +�'i - --- � � 6•f r�� � I•'25£ � � � � .� � � -1 . � . � I _ i � I � I �. � � I ' � � • - {� ���. I . . I ��. � j I � � � � I i $.lRY�t�L� 1 � 5T. !�� ;L •' T.�t�� ( � I. , I ��� ���7T9b1 �-74 I L', 521' ik*4o[ r-� r i r _ �i `t9 sttE �� s�w4; 3� � � I �� ��� � '�" I ; r o h 2s•i .- :..wRyr � � i � � � i i i I�� i �,_� �� i i r� , - -� ��f'I�' . �'' �.-�z9"�! � � � � � I I '+� ' � �� I � i !" -- 2s•o,.� �.�aa �__.._ . � � � ;_� I � ' � .r..�� ��. �— � .� , �,.s�4 � . . :,----�f - I �aQo�� r �-- _ �� �.� ��� i ' ' � � ; I � ' i f ! I � � � 5� • ��.��M-,�e,�� z�.�� :'.� 4e � ! � � , ""� �•�s s•sse G -17�e �•e3 j �� a wp6 e ' � � � �P G 1�60 u«uu J, _D� 7 ._. . _ �,�— 6. ��`�"--I �,�] � } 35 8• _ _ c I �p � � ' �;-�� , ; 1 � . , , I ^ 33 � � � � — — �--�� � � �. . . • I _ �'� _ __ -- � � ' R I l� -32?R ; ~ — -- m ��� � ! � , _ � __ _ _ - — - " - , ��`j; 3 Sfl 8 � _ � , � I ( � � ,. : .- . -- -- � i + � f� � '!( I ! � I i I I I I �h{ E.I I lld � f►� �� E � J= r— —� r- _ " '� o � , , . � - - �. � I I ! � ' ! I ' , I I � �� i � '� ` . � .7I �I I r.i �,4 �,��, —r -� '��,P - � �'� `��* $ . - .. - � � li �I,31 I ,,I � , : __ — _ _ — - i I �1.�3:' � i ' I ' � �• !� 3,i?3I+ i ' I L ,3c'�• f�- _ ___ ; -'^' _ , _ _ .;� � __� - ; � � � `� � �� 9«�a � i frsC� �{ � r m � " � '- . �zc•r� , � �us �.. - , ���4 � I I i � �+I�' ,��I I �€���.aoa � `�_:� -- -__ —_ _.-_ �— —_ __� �1 � � I � : i . I � I t , I � f _ � �T _ - __ O_T _r_rt� � i I � ' 1 i � � a�rF� i N ' i ; :t — _�i �.. . _ 4 _ JEF EI S0l�h�� '— - —_— ��� --- y ��� � i � � � ; � � � � � s-95 24 �3�_ �, . :is-�a� � V � ' ' s , �� � � � .r��'� I ,i ; � ! �� — ��� � 5�1I � � I I �t I-T�t ' � � : � �.,a - _ - ___ _� �— -- - _ _ _-m - � , � � r-rr s � �I � � 16•0� u•.v� �Yi �2 �I . �86 � 16 4P � - ! �d,'�6 �� x� � �._.. _ ._ __. � .__. ,�a,� . .___ . .. �� " _ � - w �, � - � ..._ — � — — — - I � I ��i ! ' � ' I II 4 I ! � � ! I .I � � I �. � � I �, � � i ! I � � �ki � -- TI Z — — _ _� —_ __ -�' �� � a _ w i i �k F_ _ �. i � � ,�, . � 3 . . � � — .�� � �/ ql' � _ � ` � ' ___ .... . _ �' � . . __— . . _—_ _ � ; � I I � � .' � � � I I I I J 7 ,: � __h . ' _ — _ . — .. � _eya � .r-- . 2 \ ' � _— � � � �. I� I L y �{I+y � � I _... _ . � ' � �L—���� � . I I JI-T�/ I I � _7! i I i. � I ' f — 7 I ! I _�' .��; , � rt �' �p.... �.. _� �� � �'__ '_ _ 3 ..�_ e I � �t I Vd•l i � ' I I � I�•iwr� i�ra: I ��e33 I I i I�'� I I � ' `'-��� �6°�JC� �.�! ..� ...., ,.,� Ida . _- —�' --u. ` _ '�I1v`"�i g�-� I - '3 — � � r t .'.. � — - I�apaoa 'Pc�q�e T�' CQ�LINC1 L�1 STRI C�e I�Ic. 8, I�i. RJIL�I i�oCLOUu '�"� ������ �$, CI TY OF FORT WORTH. TEXA5 EXH I B IT E= �-1 MAIN 2�R Draina�e Area SANITARY S�WER SYSTEM REHABILITATIDN AND IMPROVEMENTS (GROUP T, CONTRACT3l� PART 3 LA � 1� �R � � ,,� � '.~--a c� - �_ J 'j � v�• � ' — M��,� �I �:1 � l�'�" W � 4 �� � � ' v � I + _ ,�1 f fV ��+�� � W (,,x� � �()1 _ p . � ����^ � � � � � # � '�"� � � � I i� �� �� U7 # V �� � � — � � 4 AV�. � . o � ' �, �, i _ , . D R. r� f`.� � � 7,?1�1 � 4+�0E + -v - -� � I � I� I' i' ;'' I -� � �' n� i i, i � I , I '�;�`. , � �y i � j i : �! ? I�+_i � � � ._ h ,Ili�-�'f7'��2 I , � ifl�� ��.il ' - ; �'" - , �; , , �-+ � _ �, L 786 � o � � I ! � ! s; I I ' � � � � ! .� �'� � :' � i i�-- _ a� �i �- ��: � �,� �c� s�t��H I � � � ,I. � , , � ; ; � I �, � . � �, - ,�� i I + c � � . ;R � I ;� ,� _ : _ �I ( � I� � � �+�� ENT ; ; . �w — � ;,���.a��.�l ll �„ � �. L �C"' ti � W I � I � I I I � I. � � j I � i � ' I . - II � ��14'1 �; [� IU �+] I I � � � l � . � � I � I. # �' — �l � � + IIrJ`.���i'� 7 i ! ; � ( I � . _ fv a�, �'' 4 ,,, � � , �i - � _ ,/ I��y� , If � i I , � � ' I � i I � � � ' I� � '�" � I . �� , . I � - � � I i I �k ' I I I I ��_ `� ��� � � � +$ � � � � _! � � � �1,� � � � � I � � � � � � � I � � ' � + -�-- �' �_--- -- _ _\� j � � ' � t;, � I � �' - -p �— I � `'� j � I � � I �� � � � j � I �' � � I + �__ - � � �— -- --- .� � �. \, �� J� �a a�J I I ' , i � � , , �! L� . , � , � � � O i i ; , I ; �� li � � � �- _. + � , ,�_ .. � ' � � « • , , : � , Q � � m �' � ~-�---- ----� �..__ �i�+!)�� ► �! �� � �`�'���II� I��i,� I; , , �-_ r,, �! ��"'� --� ( I ( I I 1 �� � I i i � z�' y � I ! I I I I +� {_�i 1 � I�r� -�r -� I i I � I � I W �( I I � � I � ...�� �1' � I�, � I `G1 � h � i , — � ( � i , � I ��! i +� I �,�, rn , I i � � I ! + ! I � !- a� I���� I �f*��� � � � -- �" j �r s ,` i�.� I �r �� � '���`I�f, �Gt�J� � �` 4 j ' I � ' � � I�i� I I � '�����f 'r�n I � —iJ��i4 , � ' � ���� ���� I � I � , � ' ' ; ; f I � ' � I ' � � : � � � � : I , i 'i I 1 � ! � r i i I � + � � F 4 + 3 5 � � wFlvnr covd a.�ssoan� rNc 50 0 100 200 �..,,..o - .,.v,,..o . �,«,o. ,...,� um tvlNW t#nt - 4n1 VS I I� tll I]III MWP�, 1[iU h111 ( � �'n:"'��f SCALE IN FEET W�A �st�c��4�, CI TY OF FORT WORTH. TEXAS EXH I B IT E-1-2 MAIN 21R Draina e Area � SANITARY SEWER SYSTEM REHABILITATI�N AND IMPROVEMENTS � (GROUP 7� CONTRACT3l� PART 3 � � �.. �Is7�=� ��";R 4 ,¢ li�T ../%aii i n rn �1 1 � �'_"_""����Jl��r�1V � �SJ � � I � ��� :�J I �. (J. �N''�� ✓�� � � � � � ��� � ��+��7 lf �'�� � �• �'�� � � �i � � � + �— . E . I I I + � '� � � 1 1 ,� �l��L `y �� — ��� IV � , ' � - m � -_ -p-�-- � --- -- �, `,�,� I �p 3�. �,• V�, f;l -+- _ � ' j � Cn D �^ :;.. 7C '�.� � ' � � 4. �t --,} � �s I c� � �'v ' i ; i __ _-_ �] � � + � , _ i r .� _ L -� 76 o � - � --- ; r ' - - -� r _------ --� L -1 ! �.'.3 ^ �. ,;, ._� � � � _ ' _ � , ' 'C� � _ � _ -` � _ g • , 4 - � Q E (� �' i`- ; _ 1 `.`� .s . C27 ' ' — _--- -- _ _ _ -- C I � �.1 _ I � �� W :;� �� I --. � �. sJ �� � i � I I � x � - � � � i _ .--- - f� ! `' �- . Pn ; L —_8.�6 4 � � ���.� � s� ' 1 � 4R4' � - r'�F,�. � � '� ��BE ' � � 7+9�� " 4*3� � I6+0 C" 1�8�3E . ; I w _ ,.. — � ' �� � � �, - } Q -sT" — � � + . : j -�: - — , � cp �`' ; ' i + � � � � , � ... �i � I � ' �3 i — - -- ITl ., � �� (,Ti C] ----- � � � '-�. _ �- � .— _.__ _ '�., -� cn rn , ° � �Tt - __ ----- ---- � � � i � �pn � �+ �`� � _ . _ � i I..—`�' __ �f I � r i I � ___ _� , j ��� *'' cs� t�. f— rr� _ _ _ _ _ , � _ I — — 'v I�� � i -- - _. r- -- � - � �� . _ 1,� � � e-7 ---- n � �� rwa � .�' ; � ._ �"�, I �� � Q � w � � � �' - _ -----__ I -- ,�j.f_i �:J a �------ 1,�-, 'V1 1 � � W u� i j � - f . ! _. -.__ -� � � -- - - -�-- f3� � ' � �� � + ' _ -- - � ''� � -- -- _ ; � -----.._- .. � �i� I _ i � !��N � � W ! I 1 • � I C,t `�' I I i'�! � tl � � ��-+�► � - �-- - — � �- � � °�i� � ! f � � —1 ; , � : � -- -- _ . _ _ ; : , �- W� � n , � i - ------ � � . - - _ � '4Q �n � �' � a + � � x � ,�- n �- � �L ���Jr� a� I + + � --- - � � —L--, � � `� q—.__-_,� ,�, � � �o r� ,v �+ c� + � + na � wm +� # � rn �� b ] — + + °�" N i'�*I j �l � j ° ..�� ° � � x � t b N �''' II �� l J a, `�l I� I' !! + }� � � d� � y iil ... rt,. r-- � wFxnr corr7 s,+ssoow�s, wc 50 0 100 200 �.,.�.a . �.,�..b . �,.� a..z,e rm cw�o�u rten� . s�nr �rs � i ! rm wnem. r[t�f niv f � f """,".. SCALE IN FEET WLA P990a8 CI TX Q� �CIRT WaRTH, TEXAS� ������I ! ����' �C� I � I F+p�J � p'� � fi ! a,, I �� EX� I B IT E=�-3 �1�"IA� [ N �� R C� ra i n�,�e Are� SAI�I T�aRr SEW�R SYSTEf� REHAB� LI T�AT� 'N A�10 I MP��V�h��MY5 (GRf?UA 7� CQN1fRAC�31, PART 3 � TT� I I � R�A I� I -� ���' 9+80 4,:��'�''+5C I I I � I� � � �, u� � . _ � * ! � � � � � �-- i R�n� �. ___ _ __ �. q �� vc ����a� , L�— l� _, -, �� �, � ; L-/�' 6�2C � =: 6" FVC:3+ f 5 c� I�6� � '��7 i � , _ _ � � 9 �, �'. w I� �. . �„ • ` ,r� 2 8�E � o ; � ' E + � r,_�_� G�+Rfi L I A [ � VE. � --_ _ _z � - - -a . ,� � �9+lJLt w � .� , � -- � � — � `Q � � � � °� �� � R. � _ ��2_.�_`_ — �; � L - 7�G � vc _ �, � � 7 * p r ,� �� 2 � 8 � --- --- � 6+��E ; 3+ I C _., � I � � i " ( - - ----.r (,,� ----- � � � � . ! E IMC�RFHY �T. � -„— �` `� (1* ,� -� �� + , ���j�SS I $+37 � i . ' + il I �1 _ " , __ _ -J � ��i � ' �I � v: I � � ' ' � � M - L - � 1�� 2t �`�� ��� � ' ' __ � �� �-- , � ,� � �;,�_L 7'��, �, � �_3� i �--- ; ----� � i ----� +�� �+s� � ' f � I ' s• �c � �*�a� � �— : ; w�����r s7. , ,� i � �' � � �� � Q �2+��� �����,� � � �'� i ; 57. �IYR�I_€ ; 5T � � —c�� A I� � � c�p � r., I I � � � � � �� I � I 1,.1 � � ' � _ C'"� � � � � �' ; � ; 7�'6L r 7�6i � � ��� � �,� � -.��� 1 � � wrT+vr urr� t�wTsz rnvC Sd 0 1�Q 2�I;10 .b..�.o - ......� . �,,.� �...,�. M!i SN�iBlld O�IFT � A�fP �."S F HVI i�i111,•S�S aµ �s�5i II � �k SCALE 1 N FEE� ��� ������, e �� r�r Q� ��R�r woa�r�. r�ns EXIH I B I� E 1-4 MlA1C�! ��f� C�r��na,�e Ar�� SAMI TARV 5EWER SMSTEM REHABI �,I TATI N Ad�a f�'�ROV�M��TS . - (GRp4J�'P 7, C��T{iAC73}� PART 3 I aj�'�Q? ! 7 � � `�.� � ��� � I a � I R�� ; '� � T� � 4. �`�� 9;�Q � ���+5� $• II I � � u , �, � � �`• � — _ c„ \ � �ia � � ' i t� � � � � �- -- -- -- I ��� , �., � —��vc ������� , ,�;-�'��� --� � ° �� - , �' � ` � , �'' � i +���� � L - / /� 6 � 2C E � F VC:�+ I !� _ , f � � � I�,�� 1 , � r � : �— � .r � r�.. � x I� , � `"� � � � � � �GC�(7L I A � � V�E, � : �*��� �-T __ � � — � "• 4�� I ��+�1�� � � � � � , U T I I . `� � 1- I � � � � � � �-�z� � - . 9�! � - ! I L — 78� � vc � �_. . � z 84 � � . _ � .�. _. _---- __ . C�I � I�+4��] I��� � � 6*0� ! 3*IG i , se � , � i � , � I � � .. �+ _. � T `� � � � ` ` � ' E h�{�RFHY ST, cc� __ — � `p � .��� � I �+37 v� � y--.� ' � ,f.,� 1 �/. , �. � � _ � � ---� �I,Q'� 7 ��� � � I � � i R ��_ _ ; � , � , L - �l'�"�, � - � �"�; �+ � � - � l�r� 2s +gp �g� �� I i — '�- . !�► � � ; +����.�+�� � �:� �u'�'� �+3(JE �' � j KrLLY s�. � i � O � � � ���7� � �� � �� � � �`�,, ; 5T, � M1�RTI_ E ST � � _�� 1 � �� � ' � � � _ , � _' -- -� � I j � ; � r"�i o i �„�, ��M 4� I r�� I � ' T �c �' � � � - %�CL I' 7 �'bl �' ,�� �:.� L - � ! I �,�Y � � .�,�� sa a 7oa z�o ..�.�,..�..�,�.�. �,�,�, ,�,�. !iV }�K�4SIt fyFi - A/f( �N I I� .l I rnrr wnes� mu nni � � � "'"1'�" 5CALE IIV FEEF v�La �9��0� CI TY QF FORT WORTH. �E7CAS E� �' I��T E� I—� �4A1f`�1 �1� [�r��rna � �rea r�� SAMI 1'k�Y 5�"HE� SY5TE1� FiEHAE f LI TATa�N ANQ I M'pR0V�MENT5 ��{�* � ' (GRC�I�P 7, CC�NTRAC731, PA�� 3 �►'�R ul`Nl1.y� �p I _ _ rt + � * ---------. ut � � -�. — _�_�. m � � m + cr� as . — 5____--- � . (r�J� k/� 5 [� • .. r-•� � ._� - .�..._.....___ � i"} _ _ +�.1 m --- _ --tad-fTl '� — - - � f�"I 7 `� ._ _ r - - --- - - _ _ �� �����_ ,� ��, � _ � + --► c�, � m � . 4"� __ . __ � � —. � � — � —i-- . --- — �, ,_, _. _ . _ �_ _, � C] � � — f�~ �- - � f7l C'"� dTl "`\I � _ '`� -�---��]. �i_ - -- l p � � _ �,p^' _� -� - _; fV � C� - � ` � � °' � �, __�� W � i �, _ � � -J � `�' ' � n ..,: -�---- -- r — . - �-- � � � + ,�y � o I`�'1 � � "" — s ---- _ _ _ ----- — - � �,---� � ' _ � t9T � --_.._ __ . ._.._ _ _. — + � (�7 L — � C7 � � � 4 �l �I '� � 4��9C� SO�JTH ' u, ! �t I V"�;RS � Df �' ; DF�. � I � ( I �+ ! + ; � _ � kS? � _ — I W � _ �. L- SI , �,�--7fi�'_-���; �i '�3 � , ; � �'�'�'' i (�J � � �� �� i � � VC ' 9+ I ��` ���!�' 6" VC �+'�o t,�a _ � � : . � � u n, u N ry � qp I I t ,00 � +' i i , L`1 — —. ``+r' °� �' +`� ' ' �o' I ; ry � p� � _ �,,� ��. , .p �rl-3f3R� � ,�s� ��cj��s����r � ! ��r� L -� 42.3 � �� �� �' i a� �� 2 i + i � �+20 ,� �� ��� � � �+o�� � S -;---- '`_ -- ---- � � � �,, I H I G�L A NDS �, � M � � � # � i � la - �! � v i" ' � � u' a �i �,a Lcl � � �• tX � : � ___k � ' , � __ � -�— — - - ,� �^-- _ __ �— _ _ _ _ --- - ' �.7 `-' + r43 ' '' � � �1 '� + L - 2' ' T� � �' - ° r * � ;�� L-1 l�?3 . �� -., � _ �� � - � - — � � � --.., �, c� - _ , �, ,� '� �, - $� ; � � �oE cx, , -�= w _ --- � I ' I � �! �� � I '' - - -. _ � _ I i r`' I , c.aa _ �} �'`I � � ' ! r� x i � � � ! �' � � —$.�6 i �' 13E1'_Z I SE � � L -�4��4 7 ; � T�F! � --�',9 ��-, �. � 7+9�E 4+35� I�+O� C" J+�QE � c� J I 4 I I I I I 1 f 11 I '� I I 'I � M R.� I f in M11�7VDY LOlF3` d/1≥S9RAlECPNC '�� Q IVV �CV1J reewo . msmir�mn wa,r� Y snrrelel nmf � .ist� w�smn �ICw! MR�F1(!{�H /�111 1 � 'p R�ll��] s��E �rr �EEr WL� P9�9QC�8� � � cM rY o� FaRr wa�Y�, ��cA� '�XH 1� 1� E 1�b ,f'v�A1N �1� �r��n��� r�►rea dAh9f 1'ARY SE1M€R 5YSTE�1 REHABI LI TATI P� AND I MF'#tOVEMENT5 ��I� . c�ac��� 7, caN��ac r��, ��a�� � ��T'�RJI� NEI�� Ta6 + I + ' � + - --- . i- --_m —__ _ __ �;�_--- ---�=:� � aa . — �, w � °? ' CD lJ c' • � _-- D --... _ . _..._ _ _ _, � L , ---- ----_ c.., �, r^ � . _ . � rr' F' + _ .n � � �' � u �' f"'- t�- _ _- _ _— r - - M �'� ~ + +�' '� -. �+ � — �'' i r�' �„ �"' ---- - ---- _ � _- - � c, . � � � �-- �r _ ' = e_ n,D _ � � m w in ``�I -�-.�------ _ � '' 'ti -- - _ ! '-- � � -. � � � - --- � � Cp � � .� u� � t y � c�, m�7aj ,-, __ w_ r� � m , � n r u' ' _ + . � .a - � � _o m _ � �, -� , n _ — ------ _ _. _ �------ i — _ r: • . ,,, cn ;M —,. _ _. _ � _ � c.``�'� ,� !,. — 7 $ � � � � � Y �� ���c� SflUTH �„ R I V�RS I DF �' � DF�. .�I , n � + - ~ � - - � �-��, � �! f � ����'� �,�7��.� �r �83 � I , � � '� �r`l C_+.l 'N 6" , i n� '�' 'y� � g+ I�� co P Ci'' 6�i ' 6" V C ' � 2�" r � 4r �' � � �j[� � � '�p i� � ; � I +� � � �f ' � ' � i _ r+,i � � � } 1�i - .� C71'-S � mrn i�i 5'� i � � �� E � C � �J � r" c D � � S T: � . � .�� � �,� � � �`� �� � . s� ' ��+I� 1 742�D � � I �} �'r � '� � + I q �a 4 +� {} 6 = � �_ -- � i J �, ' ' -� _---��`�� + , + �' _. � � h' 1 G��'L ;411J`�.� � �, ,�; � � r--- �' �'' � na �p �--ti � �. C� � ' I � � n '' � -,� �3 C3-- � - + - ---- s-- �--- � I � + � a _ � � � � r ___ �'', � � - f � �.�.� `r", I � -� I 7� � x �, �� � � � � � 4 -.a ,� � � '�' rn _ ; " � � ;� 0 E p� = r-- _ � � � _ � _ op �} _ -- � -- - -- c�-, � --J A � ' � m I �' , .* � I � � � �. �-- CJC7 � I co � _ , '� ; � -83E� � �ELZ I SE ' '� � ._4�'�` � ' � TERR. � � o � 7+92E 4+35� I f+D�j 6" I+8C3E � P I I f I I I ' ' ti l t`� �- ---�- � � -- - '` �-------� __ f_ ' � -- ----- - e -� � wr�rnr wrez a tixs�r,��.c r� �Q 0 1fJCl 240 �..� . R�.,�..n . �.�,.o» .�.�,. �..� .,,..v.�� �, . �� ,.. �� ��� � `� i ���ty�;,.,,� s�a�E rr� ���r r WL�4 P9�3C�Q� � ! CI TY OF FORT WORTH, TEXAS ' EXHIBIT E 1-7 MAIN 21R Draina�e Area - SANITARY SEWER SYSTEM REHABILITATIDN AND IMPROVEMENTS (GROUP 7� CONTRACT3), PART 3 UTERAL NUMBER 798 �' I I E.I a�' ��N I I'� I I F I+ I I � I I l � R 1 r r�� I �� �� � � . ,I . � 1 � , I , I , � � , . I ; �L - 3234 I ,1 � �" I � � L t _, � r � j: � 2�+O�E I q 2C +7 i� I N � I 5 45 � 5� ' � ��hg ' `�+5 '�_ �" � I =L �� I' ; , � �: ' j � ' � I I � fWUO I � � f � I , C' RR�L I M. � P�:AK' �S Q+RL `�' , I. I , I � ' � I , �' : i I � �I i �!- f R f �AT�E '�E P �E , "`� .� / �' �I � � I I � ,` ���� �D � ( I _ � I �+0 $''' yC' � 2+4,'_ + `' $� 38 ' $" I �C •' I- � � - . I � ( l , � � � �I�� ���� or�� ��'i �� � � I; �� � . � ���,1��� � � � , . � � ' ( � ��� ( _ � _� , (� � �j_a _�s �I i � � � 1 � 3�4 � � �� i �.�� � � g� ' � : 4+ rvr. + � rFY i 2+ 3E � �' � , �, I; ��- I � r �� � I ;�. F i c�n � . i I I � �v� I I! i I w �r�� : ( � � � I, � ,r� p � ; � �'�, I ! i ' 6 I I `'k �J � j � `1 � ' �� ` � � I � � � I i ; l I I ' � o�' * - � � * � � ��- , i f , i ' � � � � - ? �f : i I �I � � 1� � �5 � I L , 7 � 8 �R � '"'4 �t �F-4 � � _ _ . . „ ,. � � � = T� . n � c i I' r � w�vnr r.or�z �e ��r,� 5{} 'f� 1�I'� '�QQ � . w......� • �Y,K,�» ..� rwe s.���u omR - svrr ,n.. rn�i � nr}rttu mrr n n ur. � sc�,�� iN �E� WLA P�3�aQ8 CI �'Y �F �URT WQRTFi. TEX'AS ,�� N l B IT E� i—� ,�'4AlN �1 f� f�r�in��e Are� SANITARY 5EWER 5YST�M REHA$ILITATI M AN0�IMPROVEM�NTS _ (GRQUP 7� CQN�SRAC73l, PART 3 L,ATERAL h�B��� 2E�+9C1 �� � � � ` � �—�I�$ � ' _ ' ! � �i�-�� � � � � , ;, , 2�30E �" � r � KELL Y ST. � ------- ; i ;�, r� � `o Q ��+7� � �+ � 2E � _ ._ _.---- � � � 6+83 8" PV( � � v� — c3� , � �r + � � � � ; ; I J � ! --___ � r � , � , � I '� ' f � � -, u; ' f �7 'r� � ' ' I � i I � � — - � � E. MYR-��E� ; ; �T. : r� �� L���1; p —. _I- �+�+9�E L— f t 1 f � 6+92- � 2 5 + � '� --�1' , — 3 I +7[l -� �+ p QE=' � , 6" • ;. 3+2D � �i 1 i ,�-- __ � I w � I i ; ; . � —�-- _ _ _ _ � — c�,,_. � I � �i --.1 � --- �' 2�+4:: � � � `' m ='� Q � � �? #z3 Cl€ � i �{ ' � r + ; i � , I , ?� ��,. � �' _ : � �s � � :; � � + + I�A[�d4�K � � ' AV�. � � 32+39 ,�,+'-,381�� 29+33 � r' � ) I 'ti 3�+.. � � = I +2� I +45 6�55E � - ,� %,� b 3��� '. �5 - , � . -. � _-,-_ -- - - - �`' . � . - � -- _- � !I �+ �g- �a �' � r`- 66 . -- -_ __� a,._ __. _ � a�7 -- _ _.__ _ _�_ �.r-. _ _ .- � ; t'�, � ___ --. _ __ _ . _ + ,, --- - � �.: .� � -._. _. _ i _ _- _ _ _ _. - ----- -- `ra +,�,1 � : . -_--__- ___---- � f� c`� r -- � � - — � - _� . __ . _.. -- ---- -- -- _ , _ - - , - ; ----- -----i - _.._.. _ _ __ — --_ � � i s- p -' .___�"_._ - --.� .___ _.._. � d `� -- � --- � � - --.. -- _._ � - — � _ __. _ _ . --- _. - If`. -1��. --- --- � Y - _ .. -_ - �, �� - --- _._ � _ _ — . _ _ —.__ _ -- . -- - — - � � � ti� _ � - - -- - — = - •._�. _._� [r _ _. _ ___. .. ' - -- ! t-^-_ _ ' _ _ —! '� " - ----- _ 1� • - r - - — C� -- - -- -- - . -_ + -- � ��- �ra. � � y:�. _ ._� LLI. -_- - -� _ � - �-y -F�,,f - -_--- - � _ _. . . __ _ .. _ � _t!'k . _.. ..--- �_ . _ � _� �--y i c - � � --- i.i �........ � _ . � ' � . _._...__. ___ _.. .� tiJ' ... . ... . . .. . . _�. _ " _ � ` � -' � �� "_ '. ..... __' � - ......._.. ...__. ._ .___._. . � --_ - + _. . . .__ _ _ . � i -_ �_ _ .._. _ �._ ' 1.1� �G3 E _ .._. _._. _ �_ f� � — - - . . . __ - - — _ _ N � � � � � � .� i - -- qp � � - - - _ - -- ���r cQ�r�e_n.�soc�h �;-��,. 50 0 i�� 20C� �.wnviuw� wnr�c�•• ii � i'� rrar �n�a�i v.µ. nii� p � A s�,L� �ra FF� �`LA Pg9(7C�8 CI TY 4F FQR�f WORT�i� 7EXA5 EXH�BIT E-�-� �fl�� ��� {�t'�{Clc��f� �"►i'+�'� SANI TARY SE�ER S�'53E� �E�A�i �c'r�1`u � �a�� i r���¢�v������s (G��UP 7, C4N�f�tAC�3)� PhRT 3 �/ ��.,�, E�A � / �, � i r i � i ',_ i � �t q � �_.-!.!� .� q' �'� '--�' /�C SD I I $ i � _ _ _ -_---__ - _ I, � �t � I I 3l+ � �; _ _ _ - �� ��F�P H'! r � .i � _. - 5+70L � _ I _ cn � E! �I(��RP�IY 5�. cn ---� �° f��i � 18+3�' I �"'� s,`� �q45�= � . - !� cW �/l ��* � t �� � _ _ v�. � � t�.r 2-+�4 ��R�� � -�_ w � � � KE�LLY ST. � - � � 22+7E � � �2+ f �'E � .. crr � � � � ' ,� ' + �1" � �3 � ' 4 �P __ �, - .—� ,� ►`""� <' � ' tr y � � L i— �2 ! � � 25�4�� �*I�I� '`� 31 +�0 -J � � � � � '� � a 26+4�� � `c�d'�c� ��an� ¢' �+ � _ _—� � i� , � c7i �J + [}.� f�— � �- -_ , �__ � . � � . � ; � i,�acf�nQ;� `� ' _" � r * ��U � * 32+39 �-���� 2�+3�� I +2 I +45 33+-�� - ' � � 'I� � �_ _ __ -____ _._ 3 5 + 8 = -_ .__ __ �.._ _ I � 7 7 _ _ �: _------- - —__ I� -- -�-- -� - -- - - t,,� -- - �_ � _ __ _ _ -� - _-- ---- - � i- _ __ _ �,�� �,� � ,,.��� sa � to� 2ov �.,���. �.,� �,.� ran y � wcu - swr ,rs �a. �,y� �..t, SCA�E ]N �EET � f J . i ,� E�. M'�'R—L E I � � o+�o� L- I I f f _ � -���b _.._ _ ..� � �+�� 8" F'VC i c �f 6*92= ' �■ : ! i � 3+2�7 � � � ' � � i � ' , , , r _ � ,-, _ ._ .......... � _-.,� � I .� � � �i7 _ �� �v�. ; -�� �6+5�� � � J� l� � � 3+83 � C M �M �- I P +6G, ._^, _ _ — _ . _ � �.�,�_. - - _ __- - � �_� _ � — c�,� co �_ �I � � _� ' ` _ - -- _ , �_� � + � � - -- o Q � i - _ _. � __ _; _ -- � � � - '-��� "i c w�r� ���ao�� City of Fo�t Wo�th, Texas n✓i�' Ayar And C,�unc�l Commun�cAt�an DATE REFERCNCE NUMBER LOG NAME PAGE 3/30/99 *'�'C-17350 301RMA 1 of 2 SUBJECT ENGINEERING AGREEMENT WITH WENDY LOPEZ AND ASSOCIATES, INC. FOR MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 3), PART 3 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an engineering ag�eement with Wendy Lopez and Associates, Inc. in the amount of $69,632.77 to prepare plans and specifications for Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements {Group 7, Contract 3), Part 3. DISCUSSION: The engineering services to be performed under this agreement consist of preparing plans and specifications for the replacement of approximately 4,200 linear feet of sanitary sewer mains. This project is part of the City's Integrated Wet Weather Wastewater Management Program to comply with an administrative order from the U.S. Environmental Protection Agency to eliminate sewer overflows from the City's wastewater collection system. The project is generally bound on the north by Irma Street, on the south by Richmond Street, on the east by Belzise Street, and on the west by the Union Pacific Railroad. Wendy Lopez and Associates, Inc. proposes to perform the design work for the project for a fee not to exceed $69,632.77, based on established hourly rates. Staff considers this fee to be fasr and reasonable for the scope of services proposed. Wendy Lopez and Associates, Inc. is in compliance with the City's M/WBE Ordinance by committing to 21 % M/WBE participation. The City's goal on this project is 17%. The praject is located in COUNCIL DISTRICT 8, Mapsco 77L, M, Q and R. In additson to the contract amount, $3,000.00 is required for project management by the Department of Engineering. City of Fort Worth, Texas n►�c�yar And Caunc�l Carr�mun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 3/30/99 **C-17350 301RMA 2 of 2 sus�ECT ENGINEERING AGREEMENT WITH WENDY LOPEZ AND ASSOCIATES, INC. FOR MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 3), PART 3 FISCAL INFORMATION/CERTIFICATION: The Finance Director certsfses that funds are available in the current capital budget, as appropriafed, of the Corrimercial Paper-Sewer Fund. MG:j Submitted for City Manager's Office by: Mike Groomer Originating Department Head: A. Douglas Rademaker Additional Information Contact: A. Douglas Rademaker G14U <157 � 6157 I FUND I ACCOUNT I CENTER ! AMOUNT (to) (from) PS46 531200 07Q460410310 $69,632.77 CITY SECRETARY APPROYED c�rY cou�ci� MAR 30 �999 �, l i�i��,..�,; Cltp Secretary of the City ot Fari Wort�'�, TeFas