HomeMy WebLinkAbout058040-A2 - Construction-Related - Contract - Texas Department of Transportation (TxDOT)Docusign Envelope ID: E8BFF3DF-AF7B-8153-8128-524B4A83D632
TxDOT:
CCSJ # 0902-00-315 AFA ID Z00002833
AFA CSJs 0902-00-315
District # 02 Code Chart 64# 15000
Project Name 2018 Railroad TRE at North Beach
Street
Federal Highway Administration:
I CFDA No. 120.205 I
I CFDA Title I Highway Planning and Construction
AFA Not Used For Research & Development
THE STATE OF TEXAS § CSC No. 58040-A2
THE COUNTY OF TRAVIS §
ADVANCE FUNDING AGREEMENT
For
Federal Railway -Highway Crossing Program
OFFICIAL RECORD Off -System
CITY SECRETARY
FT. WORTH, TX AMENDMENT #2
THIS AMENDMENT is made by and between the State of Texas, acting through the Texas Department of
Transportation, called the "State", and the City of Fort Worth, acting by and through its duly authorized
officials, called the "Local Government". The State and Local Government shall be collectively referred to
as "the parties" hereinafter.
WITNESSETH
WHEREAS, the parties executed a contract on 08/23/2022 to effectuate their agreement for safety
improvements at the crossing of North Beach Street and the Trinity Railway Express (TRE)'s track; from
25O feet South of the Railroad (TRE) Crossing to 4OO feet North of the Railroad (TRE) Crossing. The scope
also includes pedestrian improvements; and,
WHEREAS, the parties executed Amendment #1 to the contract on 01/23/2023 to increase Federal
funding to 1OO% from 8O% due to project meeting fully funded eligibility federal requirements and
decreasing indirect state cost by $257.00 due to fiscal year 2O23 new rate of indirect state cost; and,
WHEREAS, it has become necessary to amend that contract in order to increase Federal funding for
construction due to low bid amount, increase construction direct state costs by $17,379, and decrease
indirect state costs by $27,146 due to fiscal year 2O26 new rate and calculation method of indirect state
costs;
NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the
parties, the parties do agree as follows:
AGREEMENT
1. Attachment B-1, Project Budget, is deleted in its entirety and replaced with Attachment B-2,
Project Budget, which is attached to and made a part of this Amendment. The total estimated
cost of the Project increased by $528,926.00, from $714,810.00 to $1.243,736.00, due to
the increase of Federal funding for construction because of the low bid amount and the
increase of construction direct state costs because of the increased construction funding.
AFA Amend Page 1 of 2 Rev. 10/03/2024
Docusign Envelope ID: E8BFF3DF-AF7B-8153-8128-524B4A83D632
TxDOT:
CCSJ # 0902-00-315 AFA ID Z00002833
AFA CSJs 0902-00-315
District # 02 Code Chart 64# 15000
Project Name 2018 Railroad THE at North Beach
Street
Federal Highway Administration:
I CFDA No. 120.205 I
I CFDA Title I Highway Planning and Construction
AFA Not Used For Research & Development
2. Attachment C-1, Resolution, Ordinance, or Commissioners Court Order, is supplemented by
adding Attachment C-2, Resolution, Ordinance, or Commissioners Court Order. The resolution
is being updated to reflect the increase of Federal funding for construction due to the low bid
amount and the increase of construction direct state costs because of the increased
construction funding.
All other provisions of the original contract are unchanged and remain in full force and effect.
Signatory Warranty
Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of
the entity represented.
Each party is signing this Agreement on the date stated under that party's signature.
THE STATE OF TEXAS THE LOCAL GOVERNMENT
DocuSigned by: Signed by:
LOL
Ina ure
Kenneth Stewart
Typed or Printed Name
Director, Contract Services
Typed or Printed Title
9/22/2026
Date
AFA Amend
Page 2 of 2
Jesica McEachern
Typed or Printed Name
Assistant City Manager
Typed or Printed Title
9/22/2026
Date
Rev. 10/03/2024
Docusign Envelope ID: E8BFF3DF-AF7B-8153-8128-524B4A83D632
TxDOT:
CCSJ # 0902-00-315 AFA ID Z00002833
AFA CSJs 0902-00-315
District # 02 Code Chart 64# 15000
Project Name 2018 Railroad THE at North Beach
Street
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
ATTACHMENT B-2
PROJECT BUDGET
Costs will be allocated based on 100% Federal funding until the Federal funding reaches the
maximum obligated amount. The Local Government will then be responsible for 100% of the
costs.
Description
Total
Local
Estimated
Participation
Cost
%
Cost
Environmental (by
$15,17
100%
$15,175
Local Government)
Engineering (by Local
$136,19
100%
$136,198
Government)
Right of Way (by Local
$11,42
100%
$11,424
Government)
Utilities (by Local
$2,13
100%
$2,136
Government)
Construction (by Local
$1,016,477
0%
$0
Government)
Subtotal
$1,181,41C
100%
$164,933
$759
Environmental Direct
$75
State Costs
Engineering Direct
$6,81
100%
$6,810
State Costs
100%
$571
Right of Way Direct
$571
State Costs
100%
$107
Utility Direct State
$10
Costs
Construction Direct
$50,82
100%
$50,824
State Costs
Subtotal
$59,071
$59,071
Indirect State Costs
$3,25
0%
$0
(5.51%)
TOTAL
$1,243,736
$224,004
Federal
Participation
Cost
0%
$0
0%
$0
0%
$0
0%
$0
100%
$1,016,477
$1,016,477
0%
$0
0%
$0
0%
$0
0%
$0
0%
$0
$0
0%
$0
$1,016,477
State
Participation
Cost
0%
$0
0%
$0
0%
$0
0%
$0
0%
$0
$0
0%
$0
0%
$0
0%
$0
0%
$0
0%
$0
$0
100%
$3,255
$3,255
Initial payment by the Local Government to the State: $_8,247.00 .
Payment by the Local Government to the State before construction: $ 50,824.00
Estimated total payment by the Local Government to the State $ _59,071 .00 .
This is an estimate. The final amount of Local Government participation will be based on actual
costs.
Page 1 of 1
AFA LongGen Attachment B-2
Docusign Envelope ID: E8BFF3DF-AF7B-8153-8128-524B4A83D632
TxDOT:
CCSJ # 0902-00-315 AFA ID Z00002833
AFA CSJs 0902-00-315
District # 02 Code Chart 64# 15000
Project Name 2018 Railroad TRE at North Beach
Street
Federal Highway Administration:
CFDA No. 20.205
CFDA Title I Highway Planning and Construction
AFA Not Used For Research & Development
ATTACHMENT C-2
RESOLUTION, ORDINANCE, OR COMMISSIONERS COURT ORDER
A Resolution
RESOLUTION 26-6347
A RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO.2
TO AN ADVANCE FUNDING AGREEMENT WITH THE TEXAS
DEPARTMENT OF TRANSPORTATION TO INCREASE THE PROJECT
AMOUNT TO 51,243,736.00 WITH CITY PARTICIPATION IN THE
AMOUNT OF $224,004.00 PLUS ANY COST OVERRUNS FOR THE
CONSTRUCTION OF THE 2018 RAILROAD TRINITY RAILWAY
EXPRESS (TRE) AT N. BEACH STREET PROJECT.
WHEREAS, on August 23, 20.22. the City of Fort Worth and the Texas
Department of Transportation ("TxDOT") entered into a Local Project. Advance
Funding Agreement (`-AFA") for the construction of the 2018 Railroad Trinity
Railway Express (TRE) at N. Beach Street Project (M&C 22-0334: Resolution No.
5563-05-2[122; City Secretary Contract No. 58040, CSJ70002-00-315). and
WIIEREAS, on January 23. 2023. the City and TxDOT executed Amendment
No. I to the Advance Funding Agreement to increase federal funding to 1 00% from
80% and decrease indirect state cost by $257.00 (City Secret ry Contract No.
58040A.-1, Resolution No. 5651-11-2022. M&C 22-0987): and
WHEREAS, due to the Infrastructure Investment and Jobs Act of 2021 (IIJA'},
I00% of the construction estimate can now be covered by the Federal Highway
Administration Railway -Highway Crossing Section 130 Program fund, and
WHEREAS, bids were received on January 22.. 2026, and the low bid was
$538.693 higher than the estimated construction cost anticipated in the AFA, as
amended; and
WHEREAS, it has become necessary to amend the AFA to increase the overall
total project costs by the amount of $528,926 with federal funding increasing to
$1.016.477.00, State Costs decreasing to $3,255.00 and City funding increasing to
$224,004.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS THAT:
l- The City Council authorizes the City Manager or Assistant City Manager to
execute Amendment No. 2 to the Advance Funding Agreement with the Texas Department of
Transportation for the 2018 Railroad Trinity Railway Express (TitE) at N. Beach Street project
(City Secretary No. 58040; CSJ40902.-011.315) to increase the project amount to
$1 243.736.00 with city participation in the amount of 5224,004.00 plus any cost averrurts.
2_ This resolution shall he effective from and after its passage by the City
Council.
Page 1 of 2
AFA LongGen Attachment C-2
Docusign Envelope ID: E8BFF3DF-AF7B-8153-8128-524B4A83D632
TxDOT:
CCSJ # 0902-00-315 AFA ID Z00002833
AFA CSJs 0902-00-315
District # 02 Code Chart 64# I 15000
Project Name 2018 Railroad THE at North Beach
Street
A opted this Ata�iist ii. 2025.
ATTEST:
By:
Jannette S. Goodall. City Secretary
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
Page 2 of 2
AFA LongGen Attachment C-2
FORT WORTH
MAYOR AND COUNCIL COMMUNICATION
7.1.52 TXDOT ADVANCE FUNDING AGREEMENT AMENDMENT NO.2 FOR 2018 TRE AT N
BEACH STREET PROJECT
DATE: 08/11/26 M&C FILE NUMBER: M&C 26-0770
DEPARTMENT: TRANSPORTATION PUBLIC WORKS
SUBJECT
(CD 11) Rescind Resolution No. 6316-06-2026 and Adopt a Resolution Authorizing Execution of
Amendment No. 2 to an Advance Funding Agreement with the Texas Department of
Transportation to Increase the Project Amount to $1,243,736.00 with City Participation in the
Amount of $224,004.00, Plus Any Cost Overruns, for the 2018 Railroad Trinity Railway Express
at North Beach Street Project
RECOMMENDATION
It is recommended that the City Council:
1. Rescind Resolution No. 6316-06-2026; and
2. Adopt the attached resolution authorizing execution of Amendment No. 2 to the
Advance Funding Agreement with the Texas Department of Transportation (City
Secretary Contract No. 58040, CSJ# 0902-00-315) to increase the project amount to
$1,243,736.00 with City participation in the amount of $224,004.00, plus cost overruns,
for the 2018 Railroad Trinity Railroad Express at North Beach Street project (City Project
No. 101865).
DISCUSSION
The purpose of this Mayor and Council Communication (M&C) is to rescind Resolution No.
6316-06-2026, adopted by M&C 26-0500, to correct errors and adopt a new resolution
authorizing execution of Amendment No. 2 to the Advance Funding Agreement (AFA) with the
Texas Department of Transportation (TxDOT) in the amount of $1,243,736.00, with City funds in
the amount of $224,004.00, for the 2018 Railroad Trinity Railroad Express (TRE) at North Beach
Street project (City Project No. 101865).
All other actions of M&C 26-0500 shall remain valid.
The project is located in COUNCIL DISTRICT 11.
1 of 2
FORT WORTH
This contract will be with a governmental entity, state agency or public institution of higher
education.
FISCAL IN FORMATION/CERTIFICATION
The Director of Finance certifies that approval of these recommendations will have no
material effect on City funds.
SUBMITTED FOR CITY MANAGER'S OFFICE BY: Jesica L. McEachern, # 5804
ORIGINATING BUSINESS UNIT HEAD: Lauren L. Prieur, #6035
ADDITIONAL INFORMATION CONTACT: Monty Hall, #8862
ATTACHMENTS
1. Resolution - TxDOT AFA Amendment No. 2 [7.1.52.1 - 2 pages]
2 of 2
ADVANCE FUNDING AGREEMENT
AMENDMENT 2
CSJ: 0902-00-315
PROJECT NAME: 2018 Bond Railroad Trinity Railway Express at North Beach Street
Safety Improvements
ADDITIONAL ROUTING SIGNATURES
CITY OF FORT WORTH
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
a.
Paul D. Clutts, PE / Name of Employee/Signature
Title: Sr Professional Engineer
Email: paul.clutts@fortworthtexas.gov
APPROVAL RECOMMENDED:
Olawwa� / n:.wL
BY: Lauren Prieur (Oct 20, 2026 08:43:54 CDT)
Lauren Prieur, Director
Transportation and Public Works Department
Email: lauren.prieur@fortworthtexas.gov
CONTRACT AUTHORIZATION
M&C: 26-0770
Date Approved: 08/11/26
Form 1295: N/A
APPROVED AS TO FORM AND LEGALITY:
BY: Douglas Black (Oct 20, 2026 17:06:47 CDT)
Douglas W. Black
Senior Assistant City Attorney
Email: douglas.black@fortworthtexas.gov
ATTEST AS TO CITY MANAGER SIGNATURE:
Jannette S. Goodall
City Secretary
Email: Jannette.Goodall@fortworthtexas.gov
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
0 docusign
Certificate Of Completion
Envelope Id: E8BFF3DF-AF7B-8153-8128-524B4A83D632
Subject: FTW - AFA Fed Railway-HCP Amend 2- CSJ 0902-00-315 / Z00002833 - City of Fort Worth
Source Envelope:
Document Pages: 11 Signatures: 2
Certificate Pages: 5 Initials: 0
AutoNav: Enabled
Envelopeld Stamping: Enabled
Time Zone: (UTC-06:00) Central Time (US & Canada)
Record Tracking
Status: Original
9/22/2026 10:47:18 AM
Security Appliance Status: Connected
Holder: Brenda Clemency
Brenda.Boyd@txdot.gov
Pool: StateLocal
Status: Completed
Envelope Originator:
Brenda Clemency
125 E. 11th Street
Austin, TX 78701
Brenda.Boyd@txdot.gov
IP Address: 209.112.107.133
Location: DocuSign
Signer Events
Signature
Timestamp
Jesica McEachern
1—Signedy:
b
Sent: 9/22/2026 10:52:02 AM
Jesica.McEachern@fortworthtexas.gov
Viewed: 9/22/2026 10:54:58 AM
Assistant City Manager
F4BA53B,Bs,4427.
Signed: 9/22/2026 10:55:33 AM
Security Level: Email, Account Authentication
(Optional)
Signature Adoption: Uploaded Signature Image
Using IP Address: 204.10.90.100
Electronic Record and Signature Disclosure:
Accepted: 9/22/2026 10:54:58 AM
ID:4fcb2678-0aaa-475b-8bfa-b465b0815c18
Kenneth Stewart
[D—USig"Id by'
In�n� Sft,wavt
Sent: 9/22/2026 10:55:35 AM
kenneth.stewart@txdot.gov
Viewed: 9/22/2026 10:58:36 AM
Director Contract Services
F,CDA80FDB8C4B6...
9 SI ned: 9/22/2026 10:58:41 AM
Texas Department of Transportation
Signature Adoption: Pre -selected Style
Security Level: Email, Account Authentication
(Optional)
Using IP Address: 204.64.21.249
Electronic Record and Signature Disclosure:
Not Offered via Docusign
In Person Signer Events
Editor Delivery Events
Agent Delivery Events
Intermediary Delivery Events
Certified Delivery Events
Carbon Copy Events
Shelia Jenkins
Shelia.Jenkins@txdot.gov
Texas Department of Transportation
Security Level: Email, Account Authentication
(Optional)
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Signature
Status
Status
Status
Status
Status
COPIED
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Sent: 9/22/2026 10:52:00 AM
Carbon Copy Events
Paul D. Clutts
Paul.Clutts@fortworthtexas.gov
Security Level: Email, Account Authentication
(Optional)
Electronic Record and Signature Disclosure:
Not Offered via Docusign
F I N_LOCAL-PARTICIPATION
FIN_LOCAL-PARTICIPATION@TXDOT.GOV
Security Level: Email, Account Authentication
(Optional)
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Status
COPIED
COPIED
Witness Events Signature
Notary Events Signature
Envelope Summary Events Status
Timestamp
Sent: 9/22/2026 10:52:01 AM
Sent: 9/22/2026 10:58:43 AM
Timestamp
Timestamp
Timestamps
Envelope Sent
Hashed/Encrypted
9/22/2026 10:52:00
AM
Certified Delivered
Security Checked
9/22/2026 10:58:36
AM
Signing Complete
Security Checked
9/22/2026 10:58:41
AM
Completed
Security Checked
9/22/2026 10:58:43
AM
Payment Events Status
Electronic Record and Signature Disclosure
Timestamps
Electronic Record and Signature Disclosure created on: 1/9/2015 7:21:34 AM
Parties agreed to: Jesica McEachern
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, Texas Department of Transportation (we, us or Company) may be required
by law to provide to you certain written notices or disclosures. Described below are the terms
and conditions for providing to you such notices and disclosures electronically through your
DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully
and thoroughly, and if you can access this information electronically to your satisfaction and
agree to these terms and conditions, please confirm your agreement by clicking the 'I agree'
button at the bottom of this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. For such copies, as long as you are an authorized user of the
DocuSign system you will have the ability to download and print any documents we send to you
through your DocuSign user account for a limited period of time (usually 30 days) after such
documents are first sent to you. After such time, if you wish for us to send you paper copies of
any such documents from our office to you, you will be charged a $0.00 per -page fee. You may
request delivery of such paper copies from us by following the procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your
DocuSign account. This will indicate to us that you have withdrawn your consent to receive
required notices and disclosures electronically from us and you will no longer be able to use your
DocuSign Express user account to receive required notices and consents electronically from us
or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through your DocuSign user account all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
How to contact Texas Department of Transportation:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: kevin.setoda@txdot.gov
To advise Texas Department of Transportation of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at kevin.setoda@txdot.gov and in
the body of such request you must state: your previous e-mail address, your new e-mail
address. We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in DocuSign.
To request paper copies from Texas Department of Transportation
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to kevin.setoda@txdot.gov and in the
body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with Texas Department of Transportation
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign account, and on the subsequent
page, select the check -box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to kevin.setoda@txdot.gov and in the body of such request you must
state your e-mail, full name, IS Postal Address, telephone number, and account number.
We do not need any other information from you to withdraw consent.. The consequences
of your withdrawing consent for online documents will be that transactions may take a
longer time to process..
Required hardware and software
Operating Systems:
Windows2000? or WindowsXP?
Browsers (for 1
SENDERS):
Internet Explorer 6.0? or above
Browsers (for
SIGNERS):
Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above)
Email:
Access to a valid email account
Screen Resolution:
800 x 600 minimum
Enabled Security
Settings:
. Allow per session cookies
• Users accessing the internet behind a Proxy Server must enable HTTP
1.1 settings via proxy connection
** These minimum requirements are subject to change. If these requirements change, we will
provide you with an email message at the email address we have on file for you at that time
providing you with the revised hardware and software requirements, at which time you will have
the right to withdraw your consent.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you were
able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to e-mail
this disclosure and consent to an address where you will be able to print on paper or save it for
your future reference and access. Further, if you consent to receiving notices and disclosures
exclusively in electronic format on the terms and conditions described above, please let us know
by clicking the 'I agree' button below.
By checking the 'I Agree' box, I confirm that:
I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
Until or unless I notify Texas Department of Transportation as described above, I consent
to receive from exclusively through electronic means all notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided
or made available to me by Texas Department of Transportation during the course of my
relationship with you.
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Texas Department of Transportation
Subject of the Agreement:
Amendment No. 2 to CSC No. 58040, an Advance Funding Agreement for the 2018
Railroad Trinity Railway Express at North Beach Street Project
M&C Approved by the Council? * Yes 8 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
58040-A2
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 101865
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.