Loading...
HomeMy WebLinkAbout024790-U - Construction-Related - Contract - I&M Rodriguez, Inc.C� � `�' �ECRETARY '� � � . �.�.�. Fi�E ���IUTRACT+�R'S �OI�tDtI�G CO. �.�o�rsrRucTioN�s Co�Y SPECI�IL COs�!TP.,�,CT DOCi.1�,�E(`J���� DEP�RT14AEf�fi FOR CITY SECRETARY n ; , C0NTRACT NO. ��` � D LAKE WORTH WATER SYSTtUi IMPROVEMENTS KENNETH BARR MAYUR INDIAN COVE VJF,TE�; EXTENSfU�v D.O.E. Pn'JJECT NO. 234'� Water Project �vc�. �V�J77-GF07'0153960 SEP i EMBEf� 1 J98 BOB TEF�RELL �CIT'Y' MANA+GEr� A. DOUGLAS RADEMAKER, P.E. DIRECTOF� n�PARTMENT OF ENGINEERI��G POE ENG�NEERS, INC. 68�C NIANHATT;�N BLVD., Sl)ITC 210 FORT �V�iORTH, TEXAS 7612G j� � - �.,i,:.. - �� ���'�!''�: UG�=all, ��'��?"� "'�"!' �'. �o� � �,������,�,,�, ,; J� �� ,r�� � �:��. I� � U'�'iT�1�� � , �� o U �' :r . ��' � , � 1� n:: �. . 21 SPECIAL CONTRACT DOCUMENTS FOR LAKE WORTH WATER SYSTEM IMPROVEMENTS INDIAN COVE WATER EXTENSION D.O.E. PROJECT NO. 2341 Water Project No. PW77-060770153960 SEPTEMBER 1998 KENNETH BARR .MAYOR A. DOUGLAS RADEMAKER, P.E. DIRECTOR DEPARTMENT OF ENGINEERING POE ENGINEERS, INC. 6850 MANHATTAN BLVD., SUITE 210 FORT WORTH, TEXAS 76120 BOB TERRELL +CITY Vlr'lA,hdAC'�R � TABLE OF CONTENTS 1. Part A- Notice to Bidders 2. Special Instructions to Bidders 3. Prevailing Wage Rates (U.S. Dept. of Labor) 4. Part B - Proposal 5. Disadvantaged Business Enterprise 6. Part C- General Conditions 7. Part D- Special Conditions 8. Part E 9. Part F A. Performance Bond B. Payment Bond C. Maintenance Bond D. Certificate of Insurance E. Contractors Compliance with Workers' Compensation Law 10. Part G Coniract 11. Soil Report 12. List of Paid Customers NOTICE TO BIDDERS Sealed proposals for the following: COKSTRUCTION OF LAKE WORTH WATER SYSTENI IMPROVEMENTS INDIAN COVE WATER EXTENSION Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 P.M. January 14 ,1999, and then publicly opened and read aloud at 2:00 P.M. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of EnQineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of documents will be provided to prospective bidders for a deposit of twenty dollars ($20.00); such deposit will be refunded if the document is returned in good condition within l0 days after bids are opened. Additional sets may be purchased on a non-refundable basis for twenty dollars ($20.00) per set. Bid security is required in accordance with the Special Instructions to Bidders. The Ciry reserves the ri�ht to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of forty-nine (49) days from the date bids are opened. The award of contract, if made, will be within forty-nine (49) days after the opening of bids, but in no case will the award be made until the responsibility of the bidder to whom it is proposed to award the contract has been verified. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contracting the Department of Engineering at (817)871-7910. For additional information concerning this project, please contract Weldon Jarratt, P.E., Poe and Associates of Texas, Inc. at (817) 429-7870. [n accord with City of Fort Worth Ordinance No. 11923, The City of Fort Worth has goals for the participation of Minority and Women Business Enterprises in City Contracts. The City's Goal is 11 % of the Dollar value of the contract. You may obtain a copy of the Ordinance from the Office of The City Secretary. "The bidder shall submit ttie MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The Documentation must be received by the managing departrr►ent no later than 5:00 p.m., five (5) business days after the bid openin� date. The bidder shall obtain a receipt from the appropriate employee of the contracting department to whom delivery was made. Such receipt shall be evidence that the Documentation was received by the City." For additional information, contact Madelene Mayhall, City of Fort Worth @ 871-8423. BOB TERRELL CITY MANAGER Advertisin; Dates: December 17, 1998 December 24, 1998 Fort Wo rth, Texas Department of En�ineering A. D ademaker, Director B : 1 � �-,� ,1 �-�"'�� Y Rick Trice J Manager, Engineering Services ALICE CHURCH CITY SECRETARY SPECIAL INSTRUCTIONS TO BIDDERS 1. PREQUALIFICATION REQUIREMENTS: A current financial statement, an acceptable experience record, and an acceptable equipment schedule, must be filed with the Director of the Water Department at least one week prior to the hour for opening bids. The financial statement required shall have been prepared by an independent certified public accountant of an independent public accountant holding a valid permit insured by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one (1) year ofd. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Proposals submitted by a prospective bidder who has not fulfilled the above requirements shall be returned unopened. Prospective bidders whose qualifications are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received will be notified before the date of the bid opening, and any proposals submitted by them shall be returned unopened. Liquid assets in the amount of ten (10%) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been on projects completed not more than five (5) years prior to the date on which bids are to be received. The Director of the Water Department shall be the sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. 2. BID SECURITY: Cashter's check or an acceptable bidder's bond payable to the City of Fort Worth, in an amount of not {ess than five percent (5%) of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten (10) days after the contract has been awarded. For the bid bond to be acceptable, the name of the surety company issuing said bond shall be licensed to do business in the State of Texas and shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of the Special Instruction to Bidder 1 of 3 bond written by any one acceptable company shall not exceed the amount shown on the U.S. Treasury list for that company. 3. BONDS: A performance bond, a payment bond, and a maintenance bond each for one hundred (100%) percent of the contract price will be reguired, Reference C 3-3.5. 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be licensed in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a non-resident bidder unless the non-resident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would not be required to underbid a non-resident bidder to obtain a comparable contract in the state in which the non-resident's principal place of business is located. "Non-resident Bidder" means a bidder whose principal place of business is not in this state, but excludes a contract whose ultimate parent company or majority owner has its principal place of business in this state. "Texas Resident Bidder" means a bidder whose principal place of business is in this state, and includes a contract whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for its bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. Special Instruction to Bidder 2 of 3 8. PAYMENT: If the bid amount is less than $25,000.00, the contract amount shall be paid in one (1) lump sum upon completion and acceptance by the City of F.ort Worth Water Department. 9. AGE: In accordance with the policy ("Policy) of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with employment, advancement or discharge of employees or in connection with the terms, conditions, or privileges of their employment, discriminate against persons qualification, retirement plan or statutory requirement. 10. DISABILITY: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate of the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contract warrants it will fully comply with ADA's provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnity and hold City harmless against any claims or allegations asserted by third parties or subcontractor's alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. CONTRACT DOCUMENTS: Contract documents may be obtained from the offices of the Transportation and Public Works Department of The City of Fort Worth, 1000 Throckmorton Street, Fort Worth, Texas 76102. Plans may be purchased for the deposit amount of $50.00; such deposit will be refunded if the documents are returned in good condition within 10 days after bids are opened. Special Instruction to Bidder 3 of 3 CITY Or FL�:'T Nti:r.i}i iiIC�3�iAY C�NIRi3C.TICxi CL.FSS I F I CIhT I Ot� pRFNAILING HAC.E RF,ii FOR 1995 RATE CL�SSIFICATION AIk 1L�OL Or�A'IC�R A5� ��T RA.i�.'� AS?:-�LT Sc'.OVII,E� BA'it}3IPiG PL�ANT WEI�t."� BF:'I i'ERbC�F.RD SETT"tR CAi�..�'I'F� OOC�._n_.zTF' F i N I S�R ( PAV ) C�t�;,F.ETE F I N I Sr�R ( SIRS ) CI�cS�,"'I'c. 1�`JB8 -��i � .� .�IR I CIP*i �� F0�': BU I LIk'R (57RS ) FC7:�:�i LII� FCk-=`i SE,TI'�.R ( PAV b QJR3) FO�: � �'IT�t ( S1xUCILT�tE�S ) IA'��r.� , OCM�4�t�i LA�?F�, (TI'ILITY M�"__�_.�-� .N I C OI L�.� S� VI� PI`�IY� PIF-�F� E?�F i L. P�. _� D�U I .P�'.:1�i' OP�.'�ATOP.S FSr�'r'_�.LT DISIRI�siT'!`OR AS?s-i�.LT P'r.VIlr'G N.�iCriIlvr, Bif�X�! QF, S�g2 OP'r�2AT0�t &.� �".j:.�D�^c...�� , 1 SO h1� OR I•FSS FJ'LLLYJ� . W r'� 150 FiP CCt�"�.� rAv iIvG CLTRING MAC�i . CXX�.-TE PAV FIN I Sr:ING l�Cfi . 0.�.nEI'E PAVING FL�i (Rp,,DF� ��.�I'E PP.VIIiG JOINT MAQ3. Q��.� PAVING J�INT S"cALR t�t�',E'I� PAV IIr'G FI�CIAT aCt�...F'TE PAVING S�AY� O�S�c...z'I'E PAV I NG SPftr'�DF� SLIPr�GRM N.AC�iINE C�'�.�, , Q�A�'.Sr�ZL . PACXi-IOLE , D� RIC}:, LtiR.AGLI2ZE, Sc� (L..�'SS��,N11/2CY} � ='�. , (,'L�'ViS�-.r�,L , BACXEiOLE , Dr �-; I CX. DRAGLIIZE , Sc.� (1 1/ 2 CY b OV�.�) .('r;JSr.i?ri� 0? S�cI�iG PLT OFR. ��'J:.T i 2�G C�F�-' ti F�?�F:T I CN iFtI L�L OFE"nAT'QR { C.�.z'r; � �CJ(JIv'I'ID ) FCLZ�'�F�TION Ifr'cILL OPERATOR 57.554 S8.Sb5 58.255 $9.371 58.920 59.447 59.345 59.058 57.733 $12.761 55.598 $5 . 717 S8.913 58.686 58.427 56.402 57.461 5?0.658 5�.698 58.104 57.500 58.509 S11.333 $8.444 59.053 57.908 58.703 ss.i6a 58.213 59.453 58.500 S9.042 57.350 57.875 59.290 59.750 59.000 59.040 $9.513 510.517 S9.500 S10.004 RP.TE f'C�'� E�(J I Pl�NI' (�''FRA�RS H? LL I NG i�,C�-i I NE 0?F�tATQR HI}� (CNE� 16 C.F. ) HI� (16 C.F. b LFSS) HIX�- CXJNCRF.TE PAVII�G MC'JN�c C�,P,D�tt OF'gtATQR (FII1i C�ADE) MJIUZ ��iDFR OF'�.rtATOR FA r..:l MhRKIt�G l�iQ:INE' PCrS'I�iOLE DRI LL� OPr'u3ATOt2 s ROL�I.Eii, S'!'FZ ��, {PLANT-}�lIX PAVr7�I�S) ROI.T�E'rt, S'I'�'Z t�'rI��� ( F'L�!'I4�.'��L OR TAt�II3G ) ROLI.FR, Pfi�.]MATIC SII�'- PRO &�A. �?- 17 C.Y. b I�SS S�:.�- CNFR 17 C.Y. SIDL, BO".H TFcACiG't'c— CRP,�,'L�.� TYPE { 150 I� � LESS ) Tr =C'I`OF:— ��r,s�TL� '!'YPE ( UVc.� 150 HP ) TFyC'I'OR —Pf�<k:''nTIC Tr�F.V'tZING HIXF�t TR�F�iING lSAC�iI2�-LI(�T TFc ��CHING N.AQ�iIi�-ii'r"AVY W.?GJIti-Ik-.ILL, BOnING HAQiI2� REilrr'�CING SI'r�- , SE'ITII� ( PAVIt�G ) REIt�i'r'�.''CII�i^v S'T�,' SE,TTII� ( STRLICILTRA.i.� ) ..�'i'"'r�I, i�?O�h'Et'c-STtZUCIURAI, SIGi tx:,..-ivtt SFn.?.D� BQX OPE�ATCfft &LrcFcIC'AIk. Sc�r VIC� ZCt� WK. l�..'Ut�i'� SICxi INSTALLgt i F�.�.''�'I' C�OUPiD ) TR'� DRIV�-SIIiGLE AXI�E (LIG'ci'T) '!�'c'JC'x: DP,IVt�r -SINGL� AXI�E (HFANY) 1'r�`�3CX L1ZIVr�-�`Ah'Dg! P.XL�E ( rS 2�.I -TRAI LE? ) . � . . Trr."�KF T�IVr�—I�Y/FZ,CIAT T.^JG� L�f"cIV�.—Z�AiVSIT MIX T'rcvCi: I'r ;IVF"'r.il;N�i VIr.?nTG� OrE�TOR i�"..rDt."�. 56.650 59.000 57.913 59.500 510.346 59.891 56.402 59.000 58.339 57.963 $7.403 58.138 $8.205 57.793 53.448 53.873 57.735 $7.615 $8.188 S12.49$ 59.000 59.218 511.54E $16.340 S11.436 56. 988 56.402 56.402 S7.465 $2.067 57.816 $9.653 57.507 $8.200 $7.000 514.459 JI.P.� 6, 1995 h'tk'r ti F�.�.�::� 9�:��fr C I TY OF FCk1kiT k�'�'TH HIC��iY �Fd��TiON PRbYAILIIVG i�IAGE RATE �UR 1995 ( TRCKX �JUNTID ) 511.138 FCJ(Jt�'I�ATIaN L�RILL OPR I�-Z�R FRC�IIT II�T I�QADF� (2 1/2 CY OR I,�SS) $8.823 FRO�1T FZ1T L�QADr�tr (CN"rR 2 1/2 GY) 59.311 HOI ST ( DcY1c3L,E DRL2�i b LF5g ) $8 . 917 J'tit�i 6, 1°95 H(�'�'N R.���O(JRCE5 9Sr?Grv''_' PART B - PROPOSAL (This proposal must not be removed from this book of Contract Documents.) TO: Robert Terrell City Manager Fort Worth, Texas PROPOSAL FOR: The furnishing of all materials, equipment and labor for the installation of 12-inch water pipes and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: INDIAN COVE WATER EXTENSION Department of Engineering Project Number 2341 Water Project Number PW77-060770153960 Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and contract Documents and subject to the inspection ad approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents fo� the performing and completrng of the said work. Contractor proposes to do the work within the time stated and for the following sums: ITEM APPROXI. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID (Furnish and install, including all appurtenant work, complete in place, the following items) (D- No. refers to related items in the Part D Special Conditions:) INDIAN COVE STA 0+00 TO STA 18+20 1. * 1,820 L.F. 12-Inch Water Pipe; Per Linear Foot: Dollars Cents $ .� l � �" � s�, �e10 � � � ITEM APPROXI. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS 2. 3. 4 � � 7. 3 EA. 12-Inch Gate Valve w/Cast Iron Box and Lid, E2-10; Per Each: �.�, �,.,,,,� �,��, Dollars y and —� Cents 3 EA 3 EA 3.0 TONS 6-Inch Gate Valve w/Cast Iron Box and Lid, E2-10; Per Each: �� � � ,�,�( Dollars and -�-�t' Cents Standard Fire Hydrant, 3'-6" Bury Depth; E2-12; Per Each: � ,,�'o�,,.,, �� Dollars - �- and -��- Cents Cast Iron/ Ductile Iron Fittings; D-25; Per Ton: „ �, ,�r�` �,,,,,•,�, Dollars . - - and -� Cents 2 EA. 1" Inch Air Release Vacuum Valve; Per Each: ��,c,v,�,,,,, ,�ha„;„�� Dollars lEA U N IT TOTAL PRICE AMOUNT BID � � �C�. ```� $ � ��'-(� ,� - , $ ���' �D $ � ���� oa . �� $ ! `�"b�s.`�� $ �5'0�. . � $ 3: d� c� � c $ 9. �Da � -, �` �' ,�� and � Cents $ �, /f�0 _ $ �, � {�p , . , 8" Pressure Reducing Valve; Cal Vai, Ames or Approved Equal; Per Ea h: , ��,��+�.�� ��� i�,F,�,,,�,,, �,�,� Dollars � � �+ � �� � and �` Cents $ �. s(� i� , $ � .� �p". � � : � ITEM APPROXI. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID 8. 10 C.Y. Class B(2500#) Reinforced Concrete; Per Cubic Yard: 1 �� ,��,,�,,�„r►„�,.� , Do I I ars t d �' �,T and � Cents $ � U�� � � �bf7d- r � 10. 11 10 L.F. F.H. Barrel Extension; Per Linear Foot: �,�, Dollars and � Cents 14 EA. 1" Service Taps; Per Each: � (,�'''�,,�a -�,A,�.,? ,,,,� Dollars and �-- Cents 540 L.F. 1" Service Line; Per Linear Foot: �,�,, �,k,�.., Dol lars and �" Cents 12. 14 EA. Class A Meter Box with Lid, E2-17, D-23; Per Each: ��Dollars J and � Cents a� � l D �° $ 1,�'�e $ l�G�.��� $ i4�� �� $ �:�n� � 7�����°� � �j�. �� $ ���,c� `� ITEM APPROXI. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID 13. 1,820 L.F. Trench Safety; Per Linear Foot: t�J'�' �ollars er an+d ,�+,1�, Cents $ 1.�+� � ��3d � �1 � � 14. 20 C.Y. Crushed Limestone Mat'I; Per Cubic Yard: �/ J,�K�—�' Dol lars . , Zf and � Cents $ ���• �� $ �'(�b, � 15. 150 L.F. Trench Repair for Water Line 2-lnch HMAC on 2:27 Concrete; Per Linear Foot: ��.� .�c.,I Dr�l lars , � +. ��,� �- ���t� 16. 300 L.F. Trench Repair For Service Line 2-Inch HMAC on 2:27 Concrete; Per Linear Foot: , �•,�,,�{ -�...,� Dollars , , . and �` Cents 17. 1,820 L.F. Silt Fence; Per Linear Foot: �,1•yrj,� Do I I ars and , �,�,�,,,�,��' Cents � • � ��+ $ ,��.c�c� � �.��a� , $ F���,cr. � � .�� �` f- � !� �" c:r�'. , � � � � �/-�'• � ,, � �� ITEM APPROXI. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID 18. 20 C.Y. Topsoil; Per Cubic Yard: '�a,� Dollars �� � and � Cents $�' D•6 $ � '��•� 19. 0.3 AC. Seeding; Per Acre: A �%�� � _,,��� Dollars , � and � Cents 20. 1 EA Removing Old Structures; Per Each: � r.� �,�.r�.,�,�,v,,�� Dol lars • _ � - and ��� Cents 2� � � �'�.�, �` ` $ � 7a � � � ab°o. °� $ � G0°� �� 1 EA Manholes and Inlets (6' x 6'); Pre-Fab Vault, Brooks or Equal; Per Each: � � Dollars "'' � .:� a A h f� r� �, /+� and -��� . . Cents $ � '(3C�. � ` $ �j bEk�. * ✓PVC (C-900) (DR 14); DIP (CLASS 51) : �� ���� '� l'� , d� . �. ��' 71 i �I � PART B - PROPOSAL (CONT.) Within ten (10 days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety bond and such other bonds as required by the Contract Documents, for the faithful performance of the contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one (1) set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plant. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract on or before June 10, 1999 as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) / v I•1 : The principal place of business of our company is in the State of ; � � �r�, � . ,_ _ Nonresident bidders in the State of our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Nonresident bidders in the State of our principal place of business, are not required to underbid resident bidders. The principal place of business of our company or our parent company or majority owner is in the State of Texas. :. Receipt is acknowledged of the following addenda: Addendum No. 1 (SEAL) If Bidder Is Corporation Addendum No. 2 Addendum No. 3 Respectfully submitted, .� .� � ���� �,�_ �� . �- � �ry w w BY� \� 11�n � t'��.�r r �-� .., � .. - � �,�I..�`, i �r•� rt; � Title PD ��� �o � �� Address PART B - PROPOSAL (CONT.) MATERIAL SUPPLIER INFORMATION FROM �-'�_ �� �, .�6 / Es 7 The valve supplier information form bound with this project manual shall be provided by the Contractor at the time that bids were submitted. 1. ,/� �/ F= Y,� t 1" ��_ �. � Name of Manufacturer Home Office Address of Manufacturer GATE VALVES Location of Plant in Which Valves are to be Manufactured. 2. /�Me.S I: CHECK VALVES Name of Manufacturer Home Office Address of Manufacturer Location of Plant in Which Valves are to be Manufactured. 3. � ���5 �_? � � AIR RELEASE Name of Manafacturer AIR VACUUM VALVES Home Office Address of Manufacturer Location of Plant in Which Valves are to be Manufactured. (a) Contractor agrees to provide to the City a certificate showing that it has obtained � a policy of workers compensation insurance covering each of its employees employed on the project in compliance with state law. No Notice to Proceed will be issued until the Contractor has complied with this section. (b) Contractor agrees to require each and every subcontractor who will perform work on the project to provide to it a certificate from such subcontractor stating that the subcontractor has a policy of workers compensation insurance covering each employee employed on the project. Contractor will not permit any subcontractor to perform work on the project until such certificate has been acquired. Contractor shall provide a copy of all such certificates to the City. .. c+f of Fort wortn Minority and Women �usiness Enterprise Specifrcations SPECIAL 1NSTRUCTtC)NS FOR BIDDERS APPL1CATlON OF POI.fCY If the total dollar value of the contract is $25,000 or more, the M/W8E goal is applicabte. If the totai dollar value of ihe contract is less than 325,000, the M/WBE goa[ is not applicable. POLICY STATEMENT It is the policy cf the City of Fort Worth to ensure the full and equitable participation by Mrnorih,�/Women Business Enterprises (M�NBE) in the procurement of al! goods and services to the Ciry on a contractual basis. Tne objective of the Policy is to increase the use of Nt/WBE firms to a level comparable to the availabifity of M/WBEs that provlde goods and services directly or indirectly to the City. MM/BE PROJECT GOALS The City's MBE/WBE goal on this project is �� % of the base bid value of ihe contract. COMPLIANCE TO B{D SPECfF1CATIONS On City contracts of �25.000 or more, bidders are required to comply with the intent of the Ciry's N1lWBE Ordinance by either of the fo(lowing: 1. Meet or exceed the above stated M(VVBE goal, or; 2. Good Faith Effiort documentation, or; 3. Waiver documentation. SUBMITi'AL OF REQUIRED DOCUMENTATION The applicable documents must be received by ₹he Managing Department, within the fellowing times allocated, in order for the entire bid to be considered responsive to the specificatiens. 1. M/WBE Utilization Form: 2. Prime Certractor Waiver Form: 3. Good Faith EFfort Form: received by 5:00 p.m., five (5) City business days after the bid opening date, excfusive of the bid opening date. received by 5:00 p,m., five (5) City business days after the bid opening date, exclusive of the bid opening daie. received by 5:00 p.m., five (5) City buslness days after the bid opening date, exclusive of the bid opening date. �FAILURE TO COMP�Y WITH THE CITY'S MNVBE ORDINANCE, W{LL RESUL.T IN THE B!D BEING � CONSIDERED NON-RESPONSiVE TO SPECIF1CATlONS. Any questions, please contact the M(WBE Office at (817) 871-6104. Rev. 6/2�98 :.;` . _ ".:� � - ~•i City of Fort Worth Minority and Women 6usiness Enterprise Sp�flc�fions MBEIWBE UTILIZATION E���r�N���I�G/C`�`4 �„� ;'�'1 f�n �rir�ue Z /ti+�. . PRlME COMPANY NAME �' , I.a_r� �. U;r�fi kL.:a�tr �,o. ( I,�r�ia�v �� �vc �� PROJECT NAME ' �� o� I CTTY'S �UWBE PROJECT GOAL: ATTACHMENT 1A Page 1 of 2 � � ��� �1 A(1 11 `I 1 BID DATE P�,/ ?7- � � �ni5.3 9�0 PROJECT NUMBER /? % I �'BE PERCENTAGE ACFIIEVED: � Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or,befare 5:00 p.m. five (5) City 6usiness days after bid opening, exciusive of bid opening date, will result in the bid being considered non•responsive to bid specifications. � The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this schedufe, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing >misrepresentation of facts is grounds for consideration of disquaiification and will result in the bid being considered non-responsive tv specifications. Company Name, Contact Name, Address, and Telephone Na RaMbo ir1cK;�t4 �!'r-c! fZaMb n � so1 � A�l�seN csrAr� � e� r�� �' i � � �4-o T l s� ���.� y �?- R�/ - 3 04- +�iI��CX� S7'L� �,Q�YI.tGflO,t/ ,�a��� �u P.o. �ox 3�S�, �P��rsd�s� rx. 7�07� 940 � 433 -:�w7 _M � RJ7-72� , �71 Certified � on ~ � �U x z '' r ✓ �J Specify All Contracting - Scope of Work (*) h'au/ ia Savd a.,� d �au / a{� ,Soo,' /' . paui,uy �Scpair ¢5O �F. Specify 1�11 Items to be Suppiied(*) - �';. - U ` 31 'L' N 47 H .:,�-t:�r'•� .�.;[,��.�'ave.uf` �,r� �"lJ Co,uc. ,�'�vv/� 1��3e AsP� �f �a��N� Dollar Amount 3,338•S� I 0, 350 . o0 M/WBEs mus2 be located in the 9(nine) county marketplaca or currently doing husiness in the maricetplace at the time of bid. I(') Specify alI areas In which MWBE's are to be utillzed andlor itemsto be supplied�_ .- (') A complete listing of items to be supQlied is required in orde� to receive credit toward the M/WBE qoal. i (") Identify each Tier level. Tier. Means the Ievel of subcontraciing helow the prime conVactor/consultant, I.e., a direct payment Rom the prime contrador io a subcontracior is considered 1" tfer, a payment by a subconUacior to its supQlier(s considered 2n° tier. _ THIS FORM MUST BE RECEIVED BY THE MANAGiNG DEPARTMENT BY 5:00 p.m., FNE (5) CITY BUSINESS DAYS AFTER 81D OPENING, EXCLUSIVE OF THE BID OPEiVING DATE Re�. erzrss Pages 1 and 2 of Attachment 1A must be received by the Managing Department �.' � .. • .�-• . _ . ' • _.. ��� . - - ,- -.. - r ��. _-`^i.��,, . . . , _k � � . . ,,s��3.✓^.. r . , � `:�'-�.' � � ATTACHMENT 1A Page 2 of 2 LL city of Fort wortn Minority and Women eusiness Enterprise Specifications MBE/WBE llT1LIZATION Company Name, Cantact Name, - Certified= Specify A1LContracting - Specify �,I! Items to be DollarAmount `- Address, and Telephone No. ';-. Scope of Work (') Supplied(') ,�;- - U oo � � m V x '}� tA h� Z ~ S - The bidder further agrees to provide, directly to the City upon request, complete and accurate info�mation regarding actual work performed by all subcontractors, inciuding MBE(s) and/or WBE(s) arrangements submitted with this bid. � The bidder also agrees to allow an audit andlo� examination of any books, recards and files held by their company that will substantiate the actual work perfo�med by the MBE(s) and/or WBE(s) on this cantract, by an authorized officer or employes of the City. Any intentional andlor knowing misrep�esentation oi facts will be grounds for terminating the , contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, ' State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. �-` . AL ,MBEs and WBEs MUST BE C�RT1FlED BY THE ClTY BEFORE CONTRACT AWARD T � '� ���i�.".� �,• ..c � •�... �S F �'r � �i-.� r i .� u f � Authorized S nature � Printed Signature ' ��i-� �,� � Title, ,e. Contact Name and Title (if different� '�;:�� �r `i�' � �� :►. � , _.. ��t , �c f �7 • � � �' r�'� �� � Company Name �� � ` Telephone Number (s) €�- � • r.� , �d ��� � ; f�`� i � � r� � — ��' �; � � �'a� �/ � �Address �y � Fax Number .. �i �Jr+1� ! f�, /`,rs-u�,� � '���;� �'t� >> � � r' f � 1 � �" r ;CitylState2ip Code Date �,. � ' THIS FORM MUST BE REC�IVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., F3VE (5) CiTY BUSiNESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev. 6/2198 � Pages 1 and 2 of Attachment 1A must be received by the Managing Department C� �EPr or EF+�lNEERING/CFW 99 JrN 21 A��l il `�1 MBE/WBE DOCUMENTATION RECEIVED DEPARTMENT OF ENGINEERING BID DATE: � � � �-I - � "� PROJECT NAME/D.0.E. NO. ��- V\�� � S- '�r. \ n�n �c�. �Prr�.p1't'�5 I r1 d��.r� �v � w v��c. -�f'r �X'��'� 1e�'11 �� � '��'��r� PROJECT MANAGER: �"� �,r��.� �' r32 �� �--�-tic:.,_� I FORMS SUBMIT'TED BY: NAME: COMPANY: '� �. C� ��c� c�. r, c�,x �.Z � TITLE: SIGNATURE OF PERSON RECEIVING: } �i, .,,r, , ,r-, � 1.� _. �!� � 4 � D-23 Sanitan� Sewer Sen-ices Anv reconne�tion, relocation, replacement, or ne��• sanitary sewer services sha11 be required as show�n on the plar:s, and%or as described in these Special Contract Documents in addition to those located in the fizid and identified by the EnQineer 2s acti��e se��er taps. The sen�ice connections shail be consLructed by the Contractor utilizi�a star�dard factory manufacrured tees. Factort• manufactured saddle tags may be used, but onl� as directed bv the En�ineer. The decision to use saddle taps as opposed to te�s shall be made on a case by case basis. The Contractor snall be responsible for coordinatin� the schedulina of tappina cre��s ��ith buildinQ owners and the EnQineer in order that the ��-ork be performed in an e�peditious manner. a minimum of 24 hours advance notice shall be Riven when taps w�ll be required. Severed service connections shall be maintained as specified in section C6-6.15. l. SEVIiR SERVICE RECO?�?�+TECTION: When sewer sen�ice reconnection is called for the Contractor shall verticall� adjust the existina sewer sen•ice Iine as required for reconnection and fitrnish a new� tap. The firtinRs used for ��ertical adjustment shall consist of a maximul�n ber,d of 4� deQrees. The tap shall be located so as to line up �vith the sen�ice line and avoid anv horizontal adjustment. All sanitary sewer service lines shall be replaced to the propem line or easement, to the back of curb in streets, or as directed by the En�ineer. Procedures listed below for Se��er Service Replacement shall be adhered to for the installation of any sewer sen•ice line includina the incidental four (=�) feet of service line ���hich is included in the price bid for Sanztary Sewer Taps. Pavment for w�ork such as backfill, saddles, tees, fittings, incidental four (4) feet of ser��ice line a��d all other associated appurtenances rzquired shall be included in the price for Sanitan- Se���er Taps. ?. SE`�"ER SERVICE REPLACEI��LEtiT: All buildinR se�er sen-ices encountered durin� construction shall be adjusted and/or replaced by the Contractor as directed by the En�ineer as required for there connection of the sewer service line. If the sewer sen�ice line is in such condition of adjusunent necessitates the replacement of the sew�er sen�ice line, all work shall be performed bv a licensed plumber. The lens-th of the replacement shall be determined by the Enaineer. :'111 se�i�er serti�ices shall be installed at a minimum of ri�•o (?) percent slope or as approved b�� the En<Tineer. Connection to the e�istina se�•er service line shall be made �yZth appropriate adapter fir�ina. The fittina shall be a urzthane or neoprene couplin� A.S.T.M. C-42� ���ith series 300 stainless steel compression s�aps. Pavment for w�ork and materials such as backfill, pipe, fittinas, and all other associated u-ork for service replacements in excess of four (�) linear feet shall be included in the linear foot price bid for sanitary sewer service line. Pavment for all work and mater,aI involvina the `'tap" shail be included in the price bid for sanitary sewer service taps. D-9 D-24 �tiater Sen�ces: Th� relocation, replac�ment, or reconnection of ���ater sen�ices will be required as shown on the plans, and or as described in these Special Contract Documents in addition to t�'�ose locat�d in the field and identified by the En�ineer :�11 service's shall be constructed by the contractor utilizina approved factory manufactured tap saddles (��hen required) and corporation stops, n�pe K copper w�ater tubin„ curb stops �ith lock �-in�s, meter boxes, and if required approved manufactured s;.rvice branches. All materials used shall be as specified in the Nlaterial Standards (E1-17 8:. E1-18) contained in the General Contract Documents. All w�ater ser��ices to be replaced shal] be installed at a minimum depth of �6 inches below final prade. . All existin� 3'4-inch water sen�ice lines which are to be replaced shall be replaced �-ith 1-inch T�pe K copper, 1-inch diameter tap saddle when required, and 1-inch corporation. All ser�-ices w�hich are to be replaced or relocated shall be installed �Zth the sen%ice main tap and sen�ice line beina in line w�th the sen�ice meter unless otherw�ise directed by the En�ineer. A minimum of ?4 hours advance notice shall be gi��en ��hen service interruption will be required as specified in Section C�-�.1 � II�TERRUPTIO�i OF SERti7CE. All water sen ice meters shall be removed, ta��ed, and collected by the contractor for pick-up by the V�'ater Department for recondi�ioning or replacement. After installation of the water service in the proposed loeation and receipt of a meter from the project inspector the contraetor shall install the meter. The meter box shall be reset as necessary to be flush with existinQ Uround or as other�ise directed b�� the EnQineer. All such work on the outlet side of the service meter shall be performed bv a licensed plumber. 1. `�'ATER SERVICE REPLACEI��NTS: Va'ater service replacement or relocation is required when the existin� service is lead or is too shallo��� to avoid breakaae durintr street reconstruction. The contractor shall replace the existina sen�ice line �-ith Type K copper from the main to the meter, curb stop with lock ��in�s, and corporation stop. Pa�•ment for all work and materials such as bacl:fill, fittinas, ri�pe Iti copper tubiny, curb stop ��zth Iock w-�n�s, sen•ice line acljustment, and anv relocation of up to 1?-inches from center line eYistina meter Iocation to center line proposed meter location shall be included in the Linear Foot price bid for Copper Sen�ice Line from 1vlain to five (�) feet behind I�leter. Any vertical adjustment of customer sen�ice line �ithin the � foot area sha11 be subsidiary to the service installation. Pa�-ment for all work and materials such as tap saddle (if requiredl, corporation stops, and fittinas shall be included in the price bid for Service Taps to Main. D-10 2. �'ATER SERVICE RECOi���ECTION: Water sen�ice reconnection is required w-hen the e�istinQ service is copper and at adequat� depth to avoid breaka�e durina s�reet reconstruction. the contractor shall adjust the e�istin� water se;vice line as required for reconnection and furnish a ne�� tap ��zth corporation stop. The con�-actor w�ll be paid for one (1) Ser��ice Tap to Main for each service recor.nected plus for anv copper se�•ice line used in e�cess of fi��e (�) feet from I�1ai.-? to five ��) feet behind t�'�e Ivleter. 3. V�'�TER SERVICE METER .4.��D METER BOX RELOCP.TIO?�S: V�hen the replacem�nt and relocation of a«�ater service and meter box is required a�-�d the location of the meter and meter bo�c is moved more than tu-•et�•e (1?) inches, as me�ured from the centei line of e�istina meter to center line of the proposed meter location separate payment w�Il be allowed for the relocation of service meter and meter box relocation. W�hen relocation of sen�ice meter and meter box is required pa��ment for all work and materials such as backfill, fittinQs, five (�) fe�t of tti�pe K copper service and all materials, labor, and equipment used by and for the licensed plumber shall be included in the price bid for the sen�ice meter relocation. �.I1 other costs wzll be included in other appropriate bid item(s). This item w-ill also be used to pay for all service meter and meter boti relocations as required b�� the En�ineer «hen the sen�ice line is not being replaced. Adjustment of only the meter boY and customer service line «,Zthin 5 feet distance behind the meter w�ll not justifti� separate pa�•ment at any time. Locations �i�ith multiple service branches ��ill be paid for as one service meter and meter box relocation. 4. NEW SER�'ICE: VJhen new• services are required the contractor shall install tap saddle (�-hen required), corporation stop, T��pe K copper service line, �tu�b stop w-iih lo�k ��inas, and meter box. Pavment for all worl: materials such as bacicfill, fittings, n-pe K copper tubinQ, and curb stop �zth lock win,s shall be included in the Linear Foot price bid for Sen�ice Line from �1ain to :��leter Ti��e (�) feet behind the meter. Pavment for all �vork and materials such as tap saddle, corporation stops, and fittinas shall be included in the price bid for Service Taps to I�lains. Pa�•ment for all ��ork and rnaterials such as furnishinQ and settin� new meter box shall be included in the price bid for furnish and set meter box. �. MULTIPLE SERVICE BR�IvCHES: W-hen multiple service branches are required the contractor shall fur�ish appro�ed factor�� manufacrared branches. Pavment for muitiple sen�ice branches ��-ill include furnishina an� inst�llina the multiple se��ic� branch only and all other cost wzll be included in other appropriate bid item(s). D-11 6. MULTIPLE STREET SER�"ICE LI?��ES TO SI?vGLE SERVICE I��TER: Anv multiple sen�ice lines ��zth taps servicin� a sintrle service meter encountered durinQ construction shall be replaced ���th one service line that is applicable for the size of the e�istinQ sezvice meter and approved by the Enaineer. Pa�ment �hall be made at the unit bid price in the appropriate bid item(s). D-?� Remo��al, Sah•a�e, and Abandonment of E�isfinQ Facilities: .Anv removal, salz•aaina and/or abandonment of existina facilities will necessarilv be required as sho�n on the plans, and�'or described in these Special Contract Documents in addition to those located in the field and identified by the Encineer. Tlus work shall be done in accordance «zth Section E?-1 S Salva�ina of Material and E?-?7 Removina Pipe, of the General Contract Documents and Specifications unless amended or superseded b�� requirements of this Special Condition. 1. S:�LVAGE OF EXISTING WATER METER A?�D METER BOX: ExistinQ ��ater meter and meter bor shall be removed and retumed to the Water Department ���arehouse b�- the contractor in accordance with Section E2-1.� sal�•a�ina of materials. Bacltfill material for the void meter bo� shall be suitable excavated material approved by the EnQineer. Surface restoration shall be compatible u-ith existinQ surroundin� surface and �rade. If �;�ater main is to remain active, the contractor will be required to plua �ti-ater sen�ice line at main. 2. SALVAGE OF E�ISTI�'G w'ATER NIETER ��iD C0�ICRETE VAULT LID: ExistinQ ��ater meter and concrete vault lid shall be removed and returned to the Water Depam�ent warehouse by the contractor in accorda.nce w-ith Section E?-1.5 sal��aain� of materials. The concrete vault shall be demolished in place to a point not less than 18-inches below fin�l arade. The concrete �•ault shall then be backf`illed and compacted in accordance w7th backfill method as specified in Section E?-?.9 Back.fill. Backfill material shall be suitable excavated material appro��ed by the En�ineer. Surface restoration shall be compatible wzth e�istina surroundina surface and �rade. � 3. SALV.aGE OF E�STTI�'G FIRE HYDR4.�iTS: E�istina fire hvdrants shall be removed and ren.uned to the «"ater Department warehouse by the contractor in accordance wzth Section E2-l.� Salvaaina of Materials. The void area shall be backfilled and compacted in accordance titizth backfill merhod as specified in Section E?-2.9 Backfill. Backfill material shall be suitable exca�-ated material approved by the Enaineer. Surface restoration shall be compatible w�th existina surroundin� surface and �rade. D-1? 4. SAL,VAGE OF E�STI?vG GaTE VALVE: Existina �ate valve and valve box and lid shall be removed and returned to the ��v'ater Depastment ���arehouse by the contractor in accordance ��ith Section E2-1.� Sal��a�ina of I��laterials. The void area caused bv the Valve remo�-al shall 'b� bacicfilled and compacted in accorc��ce w7th backfill method as spe�iiied in Section E�'-`'.9 Bacltfill. Bacicfill mater;al shall be suitable excavated material approved by the En�ineer. Surface restoration sha11 be compatible w�th exastina surrounding surface and r-rade. If t�'�e ��al��e is in a concrete ��ault the ��ault shall be demolished in place to a point no less than I 8" below final arad;.. �. ABA.�IDONIvfENT OF Ek�STItiG G:�TE �%�I.VE: Existin� aate ��alve and box lid shall be abandoned bv first closina the ��al��e to the fullv closed position and demolishinQ the v�Ive box in place to a point not less than 18-inches below final Prade. Concrete shall then be used as bacl:f�ill material to match e�istin� Rrade. 6. AB:�NDOI�i�fENT OF EXISTI.NG VAUI..TS: Vaults to be demolished in place shall ha��e the top slab and lid removed and vault �valls demolished to a point not less than 18" below� fir.al Qrade. The void area caused shail then be backfilled and compacted in accordance w7th bacl:fill method as specified in Section E?-?.9 Bacicfill. Backfill material sha11 be suitable excavateci material approved by the En�ineer. Surface restoration shall be compatible ���th the existin� surroundin� surface and �-rade. 7. ABA.�IDO�1i�1ENT OF �L�.NHOLES: Manholes to be demolished in place shall have all pipes enterinQ or esistin� the structure plu�aed �ith lean concrete. Nlanholes tops or cone section shall be removed to the top of the f�sll barrel diameter s�ction or to point not Iess than 18-ir.ches belo�;� final erade. The structure shall then be backfilled and compacted in accordance �t�tr. bac�ill method as specified in Section E?-?.9 Backfill. Backfill material ma� be either clean w�ashed sand of clean, suitable exca��ated material approved by En�ineer. Surface restoration shall be coml,aTible wlth surrounding surface. Pavment for work involved in backfillina, pluoairta of pipe and alI other appurtenant required, shall be included in t�le appropriate bid items). 8. REMOV:4L, OF I�-L�.�iHOLES: Nlanholes to be removed shall ha��e all pipes enterina and e�tin� the suucture disconnected. The complete man.hole includinQ, top or Cone Section, all fuil barrel diameter section and base section shall be removed. The excavation shall then be hacicfilled and compacted in accordance ��ith backfill method as specif ed in Section E2-?.9 Back�ill. Bac�:fill material mav be with Type C Bacicfill or T�pe B Backfill as approved b�- the Enaineer. Surface restoration shall be compatible ���th surroundina surface. � 9. CliTTING :�iv"D PLt1GGI�iG OF Ek7STI?vG NLANS: At various locatior.s on this project it may be required to cut, plu� and block existin� w�ater mains/sen•ices or sanit�� se�.; er mains�'services in order to ab�don these lines. Cuttin� and plu��ina existin� mains ana or sen ices shall be considered incidental and all eosts incurred �iill be considered to be inciuded in the linear foot price of the pipe, unless separate trenchina is required. D-13 10. REv10VAI, OF EYISTNG PIPE: w"here removal of the existin� pipe is required. It shall be the Contractor's responsibility to properly dispose of all removed pipe. Al] removed vaives, fire hvdrants, and meter boxes shall be delivered to Wat�r Deparrment Field Operations, Storaae Yard. 11. PA��fENT: Payment for work and mate�ial im�olved in salvaain�, abandoninQ and/or removinQ e�istina tacilities shall be included in the linear foot bid price of the pipe except as follows: Separate payment ��ll be made for removal of all Fire Hydrants, Gate Valves 16-inch and larQer, and Sanitan- Se�ver Manholes reRardless of location. Pa�•ment �zIl be made for sal��a�ina, abandonina and/or removing of all other e�istina facilities when said facility is not beina replaced in the same trench, i.e., when removal requires a separate tre�china operation. D-?6 Valve Blocl;in�: All �•alves shall have concrete blockintr for support. Valves shall have polyethylene ��rappina per Material Specification E1-13 and Construction Specification E?-13 installed prior to concrete blockir�a. No separate pavment �uill be made for any of the work involved for this item and al1 cost incurred w-ill be considered to be included in the bid price of the valve. D-27 Ductile-iron and Grav-Iron Fittinas: Reference Part E? Construction Specifications, Section E?-7 Installina Cast Iron Pipe, FittinRs, and Specials, Sub section E2-7.11 Cast Iron Fittin�s: the Para�raph shall be revised to read as follows: E?-i.l l DliCTILE-IRON 4�1D GR�Y-IRON FITTItiGS: All ductile-iron and g-rav-iron fittinas shaIl be fumished with cement mortar luun� as stated in Section E1-7. The price bid per ton of fittinas shall be payment in full for all fittinQs, joint accessories, polyerhylene wTappina, horizontal concrete blockina, vertical tie-dow�n concrete blockina, an� concrete cradle necessary for cons�uction as desi�ned. All ductile-iron and aray-iron fittinas, valves and specials shall be �Tapped ��--ith pol�•eth��lene wTapping conformin; to Material Specification E1-13 and Construction Specification E?-li. Wzappina shali precede horizontal concrete blockinQ, vertical tie-dow�n concrete blockina, and concrete cradle. Pa��rrient for the pol�eth��lene wrappina, horizontal concrete blockin�, vertical tie- down concrete blockina, and concrete cradle shall be includeci in bid items for valves and fittinas and no other pa��ment w711 be allo�ved. D-1� D-32 1�Iinoi-i�ty/Women Business Enterprise Compliance: Reference Part C(General Conditions), Section C3-3.2 Entitled "1�IINORITY BliSINESS E�iTERPRISE/VVOMEN-OWNED BUSINESS EtiTERPRISE COI�fPLI.�'�CE" shall deleted in this its entirely and replaced w7th the follo�vin�: tipon request. Contractor a�rees to provide to Owner complete and accurate information regarding actual work performed by a i�linority Business Enterprise (�iBE) and/or a Women Business Enterprise (WBE) on the contract and payment therefore. Contractor further a�rees to permit an audit and/or examination of any books, records or files in its possession that �vill substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a nealigent misrepresentation) and/or the commission of fraud by the Contractor w�ll be grounds for ternunation of the contract and/or initiating action under appropriate federal, state, or local la���s and ordinances relatina to false statements; further, any such misrepresentation (other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. D-33 Val��e Cut-Ins: It may be necessary to cut-in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require closinQ valves in other lines and puttint7 consumers our of service for that period of time necessary to cut in the new valve; the work must be expedited to the utmost and all such cut-ins must be coordinated w-ith the en�ineer in charae of inspection. All consumers shall be individually advised prior to the shut out and advised of the approYimate len�th of time they may be without service. Payment for work such as backfill, beddin�, fittin�s, blockina and alI other associated appurtenants required, shall be included in the price of the appropriate bid items. D-3� Connection of ExistinQ l�Iains: TYie Contractor shall determine the exact location, elevation, confiauration and angulation of existina water or sanitary se�ver lines prior to manufacturin� of the connectin= piece. Any differences in locations, elevation, confiauration, and or anaulation of existinQ linzs be���een t�le contract drawin�s and what mav be encountered in the said work shall be considered as incidental to cons�-uction� ��1�ere it is required to shut dow-n e�cisting mains in order to mal:e proposed connections, such do�vn time sha11 be coordinated with the EnQineer, and all eiforts shall be made to keep this do��n time to a minimum. In case of shuttin� do��n an existinQ main, the Contractor shali notih�� �1r. Joseph Gaaliardi, �fana�er, Construction Servic�s, Phone 871-7813, at least �8-hours prior to the required shut down time. D-1 � The Contractor's attention is directed to Paraaraph C5-S.1� INTERRUPTION OF SERVICE, Pa,e C�-5(�), PART C- GENER.=�L CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS A.�TD GEN�ERAL SPECIFICATIONS. The Con�actor shall notify the customer both personally an in w-riting as to the location, time, and schedule of the service intezniptzon. The cost of removina any existing concrete blockina shall be included in the cost of connection. Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size. D-37 Del�oles (1�Iisc. Est.): The Contractor excavates for existina water and/or sanitary sewer main as detailed by work order together �v7th a sketch. The location and dimensions shown on the plans relative to other existina utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite Iocation of, existing underground utilities. It shall be the Contractor's responsibilitv te� veriiy locations of adjacent and/or conflictin� utilities sufficientiv in advance of construction in order that he may neQotiate such local adjustments as necessary in the dehole process to provide adequate clearances. The Contractor shall take all necessary precautions in order to protect all services encountered. Any dama�es to utilities resultin� from the Contractor's operations, shall be restored at his expense. Pa�ment for �vork such as backfill and other associated appurtenants required, shall be inciuded in the price of the appropriate bid item. D-38 Easement and Permits: Easements and permits, both temporary- and permanent, have been secured for this project at this time and made a paz � thereto. Any easement and/or permits, bot�� temporary and permanent, that have not been obtained by the time of publication shall be secured beFore construction st�rts. No work is to be done in areas requirina easements and/or permits until the necessary easements are obtained. The Contractor's attention is directed to the easement description and permit requirements, as contained herein, alon� with any special conditions that may have been imposed on these easements and permits. Where the pipeline crosses privately o�vned property, the easements and construction areas are shown on the plans. The easements shall be cleaned up after use and restored to their oriainal conditions or better. In the even additional ���ork room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property o��ners involved for the use or additional propertti� required. No additzonal payment w�ll be allowed for this item. � D-16 D--�0 Construction Limitations: The Contractor shall have no more than three (3) locations under construction at any one time, unless approval by the Engineer has been granted in wTiting. D-�1 Concrete E�casement: Conerete. encasement shall be Class E(1 �00 psi) concrete and for sewer line encasements shall conform to Fia. 113; for water line encasements it shall conform to Fia. 20 of the General Contract Documents. Requirements for such encasement are specified in Section E1-20 and E2-?0 of the General Contact Documents. Payment for work such as formina, placin�, and finishing including all labor, tools, equipment and material necessan�• to complete the work shall be included in the linear foot price bid for Concrete Encasement. D-�2 Connecdon to Esistina Structures: All connectzons beR��een proposed and existing facilities, sha11 consist of a �vaterti�l.Zt seal. Concrete used in the connection shall be Class A(3000 psi) concrete and meet the requirements of Section E1-?0 and E2-20 of the General Contract Documents. Prior to concrete placement, a Qasket, R�tif-Nek or approved equal shall be installed around penetrating pipe. Payment for such work as connectin� to e�isting facilities includina all labor, tools, equipment, and material necessary to complete the �vork shall be included in the linear foot pri�e of the appropriate pipe BID ITEM. D-�3 Bid Alternad��es: The Proposal section of this documents is arranQed to allo�v the Contractor to base his bzd on either ductile iron pipe or poiwinyl chloride plastic pipe. Contractor shall indicate t��pe of pipe to be used. However re2ardless of the �eneral type pipe specified by the Contractor at certain locations a specific ty�pe pipe has been specified on the plans. All cost for this shall be considered as subsidiar�� and no additional compensation ���ill be allowed. D-17 D-4�t Pressure Cleanin� and Tes₹inQ (l�lisc. Est.): Care shall be taken to keep all water extensions clean and free from foreiQn objects. Chlorinated lime shall be placed in the first joint of pipe of the e�tension and upon completion of the pipe layina, water shall be introduced slo�vly for sterilization, after which the eYtension shall be thoroughiy flushed with clean water. Risers shall be installed, as directed by the En�ineer, for flushing and for providing sample points for bacteria tests. y The water main extensions of the project shall be tested under normal line pressure and any leaks observed shall be immediately repaired. D--�� Site Preparation: The Contractor shall clear ri�ht-of-�vay or easements of obstruction which must be removed to make possible proper prosecution of the work as part of this project construction operations. The contractor's attention is directed to paraaraph C6-6.10 �vork w�thin easements, page C6-6(4), part G General Conditions of the Water Department General Contract Document and General Specifications. Clearin� and restoration shall be considered as incidental to construction and all costs incurred will be considered to be included in the Linear Foot price of the price. D-�7 Bid Quanti#ies �Iisc. Ext.): Bid quantities of the various items in the Proposal are for bid comparison onlv and may not reflect the actual quantities (See General Conditions C2-?.2 and C4-4.3). IVloreover there is to be no limit on the variations between the estimated quankities shown and actual quantities performed. D-18 D-�#8 Determination and Iniriation of ��'or3� (�Iisc. E�-t.l: Tne Ea�-�e�r shall de;e�e �d cesi�at� to the Contrrctcr t�e loca�on of the servie� �ain reat:ir:nQ etit��.sicn b�� a Rior�{ Order toQether wz�h a sk�xh for eacn suc� e:�easion, �vina t�e 1?mits, siz� and t�e na;�:r� oi w'or'_�c re�uired. Sina?e or seve�I w�or'.{ orde� ma�; �e is�:e� at one time. ine Con�ctor s��?1 ir,icate wors on an ereasion w� �hin 5 wor'_�� �vs a��e: rec�ipt oi �e wort order, a�.d conunne wor� on the ereasion until it hzs be�a comDle;ed, not incluciaa �2�7IlQ. II L11Z LLl?lIl e`Cl2LS10Il wor� Ioad incre�.ses in volu=ae wLe.ei,� the Coa�.c�or has �ore than 10 w-or�n� c2ys w�or�C on ha �,�, he w-ill be r�a�..Te�' to add the ne��ss� � w'or'.{ c.-ews to retiuc� the w�or'.t Ioad to a��YimLm oI 10 wor'_�� �vs. tiL"at�: ma�a es:e�sioLs suaL be l:.ic a mir,ir^u� ef 4 fe�t be'o�� t�e teo o; the ac�iacent c�� �, to the top of �z pi�e. D--�9 Life of Contract (tilisc. Ezt.l: It is c�nt��ala.e� �2t �v"or:� Or�e._ w�?? �e issue�' to t�e Cor_�:zctor fer w�or'_c to be �z-;cr_^ec �rr�e: t��ss CoL��c� =cr � et to e.��e�� I80 cale^c;� cays �olio��:.::� -�e dat� cr t.e �e���c: nor to eYc�e� tw:e li�i: ei t�e bic price. �tii�icze��er sLot:lc oceL:r �.zs�. T�e Conc:.c:er s�+�11 �e re :�-�� to coc_�l�te �.r�� w�or:c covere::� b�• a �v'or:t Or�er iss`e� pr_c�r �o t�at c` te oi te:�2ron bLt w:L� �ot �e rect:i:z� to acce�� a..�� w-er� oree: for e��cLro� �t�c �.�e: t��t c�te e` ��-�ina�on. I� t:�e cost of the wori pe:lor�e� t:.cce: �Iiis Con�ct is Iess t�� the li.�L� of t �e bi� rr�c� at tne e�d of the 1$0 c�?eacar dav pe�od, at the CirY's oplion ana the Ccn�ctors c�ncur_e�ce, t�.e Projec� ci�v be e.�eaced to the iim;t oz t:�.e bic ��r�ce. D-�0 Concrete Ri�r�D: 1 C��R.�.L: ine fellcw�rs su�I �ove.:� tre funis�a aua piac�� of c�nc:e:e r.�r�p 2s sLcwu cr. t�e pia.r.� o� � c.�-e�.e� ��- the En��e�:. ?�,r a � ��r � T c: Cenc...:� ���r �:�ra� s�� �e �Iac��? � ac�or�c� w-:-� u7e details a�d to �z �:z^.s:or� sucwn cn tLe �,i�s cr �s es;.abi:s�z� bv t�e �n�re�:. t�ess o�e: W;sz s�cw� er. �� pla.r..s, ce�c.e:� �:�ra^ s��? �e r�•:�orc�� us�� w�:.�e ar �z r�:��rc��.e�t i ce c�Lc;ete sL�:'_ �z � GCC ��I at =3 c: ;� �. Cl�s �. u��: ;�:�=�rc��e�t sLait �e sLY (�; c�� s�Y (cj irca'tie. 6�:i� e�ec;�c ti�e'.Ce� re:nfor�ii� �� ' P� �, � �� •,—, = ' -, ; , �' -, � �r a,�� " � i� ;:c cr �� L:�.. .���-M� I�� c� sL� (5) i�.c�..e u�1I �e L�� _�Lc�s. At t�:.. e��e ��� t�.z :�� �� �e w�r� :�cr_c s��._l nct Ce l�ss �n ene (i) i�c�, �c �.ere thaa t:�:e� (=) inc�es Lo� L�e e�'_e oi L:e c�Lc:e:� �..�� su�.il �z,ae no �Y�� �roj�..--? �evenc Lz 1��� D-19 �ember p�allei to t�e ed`e oi we cor_crete R�in.for�meat s'r�.11 be sugpored properl� throe�out the plac��eat zo �a.�atain its posirion eq�ciis'�ce �or� the top and bottom s;irace of the slab. T tne slopes and bot�ora o� the trench for toe walls are � � and not co�oli�te� properly, the Ea�n.eer mav require the ea�e �z�3 to be s�rinke;'., or s,�r�kled and consolid.ated before tne concrete is placed. All s•�aces sh�11 be noist whea conc:etz is place-�. A��e: t:ne concrete has be�n place� comcac��d, anC silaped to conf'or�n to tiie e�easions s�ow� on the plans, and a:ser it has s�t sut�ciently to avoia slunoin4, tae suriac� shall be �nis�e3 w�tn a wooden fioat to secure a re�sonably snooth surac�. �. P���L�+�'I': Pa���nent for concr�te ri�ra� in plac� saa11 be m�ce at the t:nit prc� bid in t�e P=oposal mulripLed by the q��nLry of �ater:al use�. Bid price w�:ll �e full co��e^sation for placir.� �?? r�ate:: �s, anc for a?1 labor, tools, e�ui�nent, a�c i.nci�eu�s ne�essar;J to conplete thz wor:t. Pa;��eyt for all ne�ess�:r� e.csvaron b�?e -z- �a:�rr�l �o�C, a�c bot'o� or sic�ce ol L�e eYc��•atec c��-�el w-ill be i�c:uce� ir t�`�e bic� pn_c�. D-�1 Cooc:-ete and �cc�ssories: l. SCOPE: T'ne r�a����eat� o� �s Se��en sL2'.i �ove.0 for �1 nate���s �e� ��c for T�� SO �rP, �1�CI��, �Z351::�?. FrOl�CfOIIlIlQ, �.. G1 II'iLY:Il? OI COZ17�ir�1?`? SuCil I_u"�2�:.?IS ia pracLcin� concre�e for s, ec:al ��neles and inciceat:l pie: cons��crion. :�?1 otner co�cre;� consrac�on sh�l �e �ove^e� bv t�e Geae:~,�1 Contact Dec�,rneat Speci�catens. P.11 nate:ia?s s'��11 be in accor�:�ce w-it�� re�ui:e.Len�s ot ACI �01, uniess �.�e^ce� or s��e.se.^.�'� L'�ti� I��ui.:e�e�Ts of follo�i�:�Q a��cles er �eae ri notes on �e Pl�. --- 4 - Co�r.ete sLall ce com�es�� c� nor�: � Per�a�c c��eat or h:� er..T_� s�ea�-� c�;-�e�t, ce�..r� aQ�e`ate, fi�e a�Ye_�t�, �C w�a:�- pro�o�sene� an� u?:ce� � he:e�.��e: pr��Zce� in these s, ec�ca�o�. Gv �e� not s�ec•:�.crilv saow3 on t_:e pi�s or s,���c in t:�e Sy e�:� Conlac� Dcc;:,ye�ts, a?1 ce�c.ece s;,��l 'ce �OOQ ps: Tt• �e L�, �^ ess ot�e^�:s� c�ec�e� b� t�e En�e�:. nC.''.�L�.� PiP.."..t��� CL �}Ti'�.L.'Si_ ��::C�."..�� C��C:.'.:.'. ��;+ GC' � C' �.'L=�.''..., CL'� Q�:i W?� �u�'=i G'��� , 2��L�V?1. ?. iL� i�C� � CLtiCti�. a1? te��� su� ce cece b� 2^ ���r���� te��, laccr�.cr� seie���:� and p�c b�- tiz Cont-3.c�er. T'�.re� (: )c-��cz_ ����izs s�c�c �e re-�c,�.e� at e�ca ?0-�-�a inte:'�a: o co�c.�t� t'�at is plac��. D-? 0 �. CEtiIE�T (.ACI 301 ?.1): Only one brand of c�ment shall be used in anv one s�ucrure, e�cept by written per�nission of the Enaineer. a nen such permission is �anted and more than one bra.nd is used in one s�ucrure, the resul�ina eoncrete sha?1 be uni=orm in color. - Portland ce�ent shall me�t L�:e req� e�ents of AST=v1 C 1� 0, T�ve II wZT� a naYimum of �% tricalcuim aluminate for exposure to sew�e. All cement shall be sa�pled and tested _ in accordance with ASTI�1 C 183, C 18-�, C 187, C 188, C 190, and C 191, "Samplina and Testina Portland Cement". 4. WATER (ACI 301 ?.3): The ��•ater used in all concrete shall be �re� from objec�ionable quantities of silt, or�anic matter, a1l:ali, salts, and other imFurities. �. CO�RSE AGGREGATE (.ACI 301 2.4): Coarse ago-re�ate shall consist of �avel or crushed stone me�ting the requirements of ASTl�1 C�3. w`hen tested bv AS�1 C131 procedt:res, coarse a��eEate s�all have a percentaae of wear of not more than fom� (40). Coarse agare�ate for Class F concrete shall have a minim�n of fiiry (�0°'0) percent calciLm carbonate equivalent. 6. FI��E AGGP.EGATE (ACI 301 ?.4): Fine aac-reQate shall consist of natural sand, manuiactured sand, or a combination thereof conforniing to AST�1 C-33. Whe� tested in accordance with ASTti140, "Test of Oraanic Impu.rities in Sands for Conc:ete", the fine aa�reoate shail not show a color darker than the stan��d color. uhen the fine aa�eQate, to be used on the job, is mixed with Hign Early Stren�t.h Portland Cement in the proportion of one to thre�, the averaQe te^sile s�enath of not Iess than three standard mortar briquets shall be equaJ. to or areater than the teasile srrenath of Ottawa sand morrar br�quets of the samz consistency when tested at the aae or three days. 7. AD�fI_XTURES (ACI 301 ?.?): A. General: Unless specifie�, no admi.�es mav be used without specinc approval of the En�ineer. Admixtures con-�nins more than 1% chloride ions mlav not be used. B. Air Fnrraining Aaent: Conform to ASTNI C260. Add air entrair�ina aQent as indicated in ACI �01, Table 3.�.1. C. W ater ReducL�Q Ad..�.ixtures: Confor.7 to AST�1 C�94, Type �; Euclid Chem.ical Co. Eucon ovR-7�, �Saster Buil�e.s Po�olith 200I�, Protes PDA or aDprove� eaual. (At Contractor`s option, water reducin� adrniYtUre mav be used to reduce cemeat conteat and ;mprc,ve workability.) Use accordinQ te manufacrurer's recommeadations. D. Hiah R�nQe water Reducin, Admi.�ure (SuDer Plasticizer): Conforn to ASTVI C494, Ty�e F or Type G; Euclid Chemical Co. Euco n..�7, Sike Chemical Cor�. Sikar�eat or approved equal. D-21 8. STORACE OF CE�I��T (ACI 301 2.�): Unless otherwise prov�ided, a11 c�ment shall be stored in well ventilated weatherproof builclinas wliich wzll protect the cement rrom aampness. TIZe floor support�ing the c�meat shall clear the �ound a su�cieat distance to prevent the absorption of moisture by the cement. Provisions for stora�e shall be ample in capaciry, and the sh.igments shali be se�e�ated in such a manner zs to grovide e�sy access �or identification and inspe�zion of each shipment. The Enaine�: may pezrxut sm�?1 quantiries of cement to be stored in the opea for a short period of time, (maximum 48 hours) if a raised storaae platiorm and adequate waterproof coverin� are provided. No cet�ent sna11 be used which has become lumped, calced or hardened. 9. STORAGE OF AGGREGATES(?�CI �01 2.�): The handlina and storaQe of a`�egate to be used in malcina concrete shaIl be such as to prevent the admisture of forei�n materials. If the a��reaates are stored on the �ound, the site of the stock piles shall be orubbed, cleared of alI weeds, arass and other vegetation, and leveled off so that the enrire area wzll be properly drained. The bottom layer of aaare�ate sha11 not be disturbed or used. V��ben the contract requires the use of rivo (2) or more sizes of aQ�eQates, the different sizes shall be stored in such a manner as to prevent inte�ixina. l�faterials in stock piles snall be handled and placed i.n such a manner that seoreaarion of mate�ials wzthin the pile will be avoided, and each pile shail be built up in hor�zontal layers of not more than three (� ) feet in depth. 10. CO?�'STRUCTION JOItiT BONDI?vG (ACI 301 6.1.4.1): Poh-vinvl acetate type bondina compound. Euciid Chemical Co. Euco Vdeld, La.�sea VJelacrete or approved equal. OrzLt 6.1.4.? and 6.1.4.3 11. ACCESSORIES FOR FOR�1S (.�CI :01, Chapter 4): A. Cone Ties: 11/16" diameter, 1" depth, plastic cone and neoprene waterstop rin� with suita.ble snap rie. B. Chamfer Strips: 3/4" 4� de�ree job cut wood. 1?. STRUCTUR_AL, REPAiR NL4TERI.aI,S (ACI 301 9.4): Vvith prior approval of the En�ineer as to methods a.nd procedures, make structural repairs w�ith Euclid Chemical Co. Euco Epoxy 4�b, 400, 463 or Sika Chemical Corp. Culma Dur �Ior�.�r, Sikadur Hi-Niod L.V. ,or Sil:adur Hi-I�1od or approved e�ual. 13. MUYL�IG OF CONCRETE: A. Cea�al Nlixing Plant: A central miYing plant will be allowed provided the method of mi�cina and handli.ns has first been approve3 by the Enaineer. and conerete produced is in confor.nity wzth the specification requirements. Concrete: D-22� 1. HaulinQ Time: DischarQe all concrete transmitted in a truck mix�r, asitator or other �ansport.a.tion de�-ice �ithin 1-li? hours ��er the mi�nQ wat�: has beea added. ?. E�ctra Water: Deliver concrete to the job in exact quantities required by the desi� miY. . Should e�ua wat_: be r��uzred before depositna the concrete, the Enai.�eer sha]I have sole aut:�orzn• to zu�zoriz� tiie add.ition of w•ater. An� addition�l w�ater added to the mi.� - afrer leavina the batch plant s��all be indicated on the truck ticket and si�ed by the � person responsible. �Lhere e�a water is aCded to the concrete it shall be mixed � thorougnly for 40 revolutions of the drum or 3-1/? m�nutes at mixinQ speed, whichever is ereater. B. Tra.nsit Mi�cina: `Zhen tra.^.sit mi�ina is used, the transit mi�er shall be or an approved revolving drur�t or revolving blade type so cons�-ucted as to produce a thorou�hly mi�ed concrete with a uniform dis�ibution of the materials throuQhout the mass and shall be equipped w-ith a dischar�e mechanism which w-iil insure the dischar�in� of the n��ced concrete w7thout se�-re�ation. The mz.tier drum shall be water-tiQht when closed and shail be equipped with a l�ckina device which w711 automaticall� prevent the dischar�ina of the mixer prior to receivina the re�uirzd nu.moer of revolutions. The entire quantiN OI II11YlIlQ water shall be accuratelv measured and controlled. Each batch sha?1 be mi�ed to the consistenc�- as desc;ibed herein. .�iv additional mixin� sh�?1 be done at a slow� spe�d s�ecified by the rna.nt�.faczurer for aa:tation and shall be continuous until rhe batch is disc�araed. 1�. CONSTRUCTIO�1 JOI�iTS: Consffuction joi.�ts shall be placed as show�n on the plans unless orhe;wise s�ecificallv authorized b y the EnQineer. All const�:ction joint shall be made on hun_zontal and ve: �zcal pianes and formed w-ith znortises or kevs made in the concrete unless shown otherwise on the plans. A. Construcuon Joint Bondina (.4CI �0� 6.1.4.1) Pol�-��invl Acetate t�pe bondinQ . compounci. Euclid Chemical Co., Euco Weld, Larsen u'elacrete or approved equ�1 and applied as recommended. Omit 6.1.4.1 and 6.1.4.3. 1 �. FOR�IS: A. FOR�Iu�ORK (ACI �01, C�L4PTER 4) l. E�rth Cuts (.-�CI �01 4.1. �): Shall not be used as Tonns for vertical surFaces unless approved b�� the En�ineer. ?. Char�fer Strips {ACI �0? 4?.4): Inst�11 �� de�-e�s chanfer strps at e�posed outside corners. B. FORti1 RE�1OV:�L (�CI 301 4.�)1. Fora� Removal: Reazove for�work su�porina wei�ht of concrete onlv a.�e: noti#vinQ EnQine�: and in a manner to i.nsure safety of the structure. Under normal conditions. Formworic nay be remove� whea concrete is at le :st 14 days old and has reac�ed 90 pe:cent of s�ecined s�en�-th. V+�-hen tempe:-ature is below 4� de?:ees F lesve formwark in plac� an additional period of the equalin� time s�ucture D-23 w�as exposed to lo��er temperature. No live load permirted on new construction after form removal until concrete is at least �8 days old and has reached full speciiied s�enath. 2. For�n Facins Mater�al Removal: Form facina material w•]�ch is remavable without disturbing shores ma� be removed when concrete is at le :.st 7 days old. Facin� may be removed earlier if speciSically appzoved by tne EnQine�r a.-�d acceptable curin� cor�pound is applied to all su�-fac�s immeciiately after form removal. C. RESHORLtiG (_�CI 301 4.6)ReshorinQ pe�itted only afzer prior review by EnQineer. D. FOR'�1 REUSE Clean aIl form material suitable for reuse before erection. No torm mate�ial wzll be acceptable for reuse if, i.n the opinion of the Enaineer it will not produce a finished surface required by these Specifications or called zor on the draw�in�s. 16. PLACING CONCRETE (ACI 301): On vertical formwork, use approved bar chairs or spacer as required to maintain proper conc;ete cover and bar position. 17. REPAIR OF SURFACE DEFECTS (ACI �09 9.1): Allow Enaineer to inspect concrete suraces imr�zediately upon removal of rorms. Modify or replace concrete not conforming to required lines, detail and elevations. Repair or replac� concrete not properly placed resultin� in excessive hone�combin� and other defects. Do not patch, repau or replace ehposed architectural finished concrete except upon express directions of Enaine�r. Patcnin, of tie holes and defe�ts is requi�ed. 18. FOR:�IED SLRrACE FI�,ZSHED (ACI 301 10.4): Formed surr"ace fi�ished per ACI �01 10.4. 19. CL�R.P.�G (ACI 301 1?.l): A. Imperviot:s CoatinQ: Applied specified curin�- compounds immediately af�er final finishina of slabs. Apply in quantities recommended by the manufacturer. B. WZL COveRilg: CllI7Ila shall be continued for at least four curin� days after the concrete is plac�d. ?0. NIISCELL.���EOUS F�,ZSH REQU`IRE�1EtiTS: All ou'�er concrete finish w°ork not indicated on the plans shall be provided herein, even thouah not specifically mentioned, as foilows: 1. Finishina E;cposed Surfac�s: All tie wires shall be cut below surface then pointed over. All i.nperfections such as fins snall be remo��ed and local suriace de�ressions pointed over. ? l. P��C i�NT FOR COIvCRET�: The concrete quantiries for the various strsctures will be paid for at the lump sum for the construction of the special manhole and pie:s. Price wZll be full compensation for fiinishing, haulinQ, and mi�in� all concrete materials; D-24 placing, curina and fin�shin� aIi concr�te; aIl �outina and pointinQ; cost of concrete mi� desio-n e�cept as provided in Special Con�act Documents; furnishin� and placina netal fl�'tvnQ str.ps; and for all forms and formworx, labor, tools, equipm�nt, and incidentals necessa.ry to complete the work. D-52 Temnorar�- Pavement Repair: The Contractor shall pro�-ide a tzmporary pavement repair im_mediately arter trench bacl�ll and compaction �ina a minimum of ?-inch hot or cold mix asphalt over a min;mum of 6 inches of compacted flex base. This temporary repair sha11 be rolled to provide a smoot.h transition between the eYis�n� pavement and the temporary repair. The un.it price bid under the appropriate bid item of we proposal shall cover all cost for providina te�porary pavement repair for all s�e�ts cuts pro; to s�eet reconstrucuon. D-�3 Intec-�retation and Preparation of Proposal: Part C- Gene:al Conditions, Section C2-? ItiTERPRETaTION A.�,-D PREP:�R�TION OF PROPOSaI.., Paae C?-? (=�) exchan�e para�raphs C?-?.7, C2-?.8 anci C2-?.9 w�th the foilowin�: � C2-?.7 DELIVERY OF PROPOSAI.: No proposal will be considered unless it is delivered, accompanied b�� its propzr Bid Securiry, to th� Purchasin.� N1ana�er or his re�resentative at the o�icial Iocation and stated time set fortn in the "Nouce to Bidders." It is the Biddez's sole res�onsibility to deliver the proposal at the proper time to the proper plac�. The mere fact that a proposal was dispatched w�ill not be considered. The Bidders must have the propesal actually delivered. Each proposal shall be in a seaied envelope plainly marked vvith the word "PROPOSAI.," and the name or description of the project as desi�nated in the "�otice to Bidders." The en�•elope shail be addressed to the Purchasina yfana�er, Ciry of Fort w'orth Pur�hasinQ Divi.s2on, P.O. Bo� 170?7, Fort Wor�h, Te�as 76102. C?-?.S wZT�IDRa�"I�G PROPOSALS: Proposals acraallv filed w-ith the Purchasi�za �fana�er cannot be w-ithcirawn prior to the tirle set f01' Ope:lilla proposals. � request for non-consideration of a propesal must be rnade in writin�, addressed to the Ciry ?�1anaQer, and filea with him prior to the tirze set for the openin� of proposals. After all propesals not requeste3 for non-consideration are opeaed and publicly read aloud, the proposals for which non-consideration requesu have be�n properly filed may, at we oprion of the Owne;, be re^sned unopened. C?-?.9 TELEGR�PHIC MODIFICATION OF PROPOS �I.S: ��v bidder nay modify his proposal by tele�aphic communicatzon at a.ny time prior to the time set for opening proposals, provided such telearaphic communication is rec�ived b�� the Purchasi.r.� Nlana�er pr�or to the said proposal openir.Q time, and provided fi:r�her, that the Citv M�n�Qer is satisfied thar a w-rire:� and duly autheaticated confir.nat�on of such tele�raphic communication over Lhe si�natuze of the bidde, was maile� prior to t�e D-2� proposal openina time. If such confirn�ation is not received v��ithin forry�-eight (=�8) hours after the proposal openin� time, no further consideration v�-il1 be Qiven to the proposal. D-�� Bonds (Citt� Let Pro,jects): Reference Part C, General Conditions. dated November l, 1987; (Cin� let projects) mal:e the followina revisions: 1. Pa. C�-3(3); the para�raph after paragraph C3-3.7d--Other Bonds should be revised to read: Ivo sureri� «�ill be accepted b�- the O��ner which are at the time in default or delinquent on an}' bonds or which are interested in anv liti�ation a�ainst the Ov�ner. All bonds shall be made on the forms furnished b} the O�mer and the surery shall be acceptable to the Owner. In order for a sureri• to be acceptable to the Ciry, (1) the n�une of the sureri� shall be included on the current U.S. Treasury List of Acceptable Sureties [Circular 870], or (2) the suret}� must have capital and surplus Pq>>al to then times the amount of the bond. The sureri� must be licensed to business in the state of Te�as. The amount of the bond shall not e�ceed the amount sho�n on the Treasun• list or one-tenth (1!10) of the total capital and surplus. If reinsurance is required, the company wTitin` the reinsurance must be authorized, accredited, or trusted to do business in Texas. 2. Pg. C3-3(�), Para�raph C�-�.11 INSUR4.�10E deleted subparaaraph a. COMPE?��SATION INSUR�,NCE. 3. Pg. C�- �(6), Para�raph C3-3.11 II�TSURANCE deleted subparagraph g. LOCAL AGENT FOR INSUR4NCE A1�TD BONDING. D-�6 Barricades, «'arnin�s and Fia�men: Reference Part C- General Conditions, Section C6-6.8 B;4RRICADES, WARNI?�1GS A.'��D WATCHMEN: 1. ��'here��er the word �'atchmen appears in this paragraph, it shail be chanaed to the word fla�men. � 2. In the first para�raph, lines five (�) and sih (6), chan�e the phrase tal:e all such other precautionary measures to take all reasonable necessary measures. D-�7 Turbo I�leter With Vault and Bypass Installation: All combination turbo meter installations will be per attached Fi�ure 33 unless otherw�ise directed by the EnRineer. D-? 6 The contractor shall use Bilco Type J-3 Nlodel 30'- x 36" Steel Sinale Leaf Doors or approved equal unless the vault door is subject to vehicular traffic i.e.: in street, parkin, Iot, or driveway. The appropriate size turbo meter w-ith strainer and check valve if required wiIl be iurnished to the Contractor free of charoe; however, the Contractor will be required to pick up these items(s) at the Field Operations Warehouse. Payment for all �r�ork, materials, and all necessary appurtenances from bvpass tee to bvpass tee which are required to provide a complete and functional Combination Turbo tileter Installation complete ��ith Bypass and Concrete Vault shall be included in the price bid of each. D-�8 Disposal of SpoiUFill Material: Prior to the disposin� of any spoiUfill material, the contractor shall ad��ise the Dzrector of the Department of En�ineerina, actin� as the City of Fart Worth's Flood Plain Administrator (`Aciministrator'), of the location of all sites where the contractor intends to dispose of such materials. Contractor shall not dispose of such material until the proposed sites have been deternZined by the Administrator to meet the requirements of the Flood Plain Ordinance of the City of Fort `�'orth (Ordinance No. 1 1517). All disposal sites mist be approved by the Admuustrator to ensure that fillinQ is not occtu-rina �vithin a tlood plain without a permit. A flood plain can be issued upon approval of necessary en�ineerina studies. No fill oermit is required if disposal sites are not ii� a tiood plain. Approval of the contractors disposal sites shall be evidenced by a letter siQned by the Admulistrator statin� that the site is not in a known flood plain or by a Flood Plain Fill Pe�nit authorizin� fill within the flood plain. Any eYpenses associated ��th obtainin� the fill permit or a letter from the Administrator approving the disposal site, upon notification by the Director of t�ie Department of Enaineerina, Contractor shall remove the spoiUfill material at its expense and dispose of such materials in�accordance tivith the Ordinances of the City and this section. D-59 Temporan� Erosion, Sediment, and Water Pollution Control: 1 DESCRIPTION: Tlvs item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessarti• bv thz Engineer for the duration of the contract. These control me�sures unlzss other���ise directed by the Engineer and t�zey shall not include meast�red taken bv the CONTIZ�CTOR to control conditions created bv his construction operations. The temporary measures shall include dikes, dams. berms, sediment basins, fiber mats, jute nettina, tempurar� seedin�, stra�i� mulch, asphalt mulch, plastic liners, rubhle Iiners, baled-ha�� retards, dikes, stope drains and other devices. D-?7 2. CONSTRUCTION REQLTIREMENTS: The Engineer has the authority to define erodible earth and the authoritv to limit the surface area of erodible-earth material eYposed by preparing right-of- way, cle3.rina and grubbin�, the surface area of erodible-earth material e�cposed by excavation, borrow and to direct the CONTR4CTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of �vater impoundment. Such �vork mav involve the construction of ternporary berms, dzkes, dams, sediment basins, slope drains and use of temporary mulches, mats seeding or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion dzat may develop during construction prior to installation of permanent pollution-controt features, but are not associated with pemnanent control features on the project. The Engineer �vill limit the area of preparing right of way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keepin� the finish gradinQ, mulchina, seeding, and other such permanent pollution-control measures current in accordance w-ith the acceptable schedule. Should seasonal conditions make such limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Enaineer. The amount of surface area of erodible-earth material exposed at one time shall not exceed 750,000 square feet for each excavation operation, 7�0,000 square feet for each material source operation (other than from commercially operated sources), 750,000 sc{uare feet for each preparing of right- of-way operation or 750,Q00 square feet for each clearina and grubbing operation, unless otherwise sho�vn on the plans or w�th prior approval by the EnQineer in w1-itina. The CONTRACTOR shall also conform to the followin� practices and controls. All labor, tools, equipment, and incidentals to complete the �vork will not be paid for dzrectly but shall be considered as subsidiary work to the various items included in the contract. (a) ��'aste or disposal areas and contruction roads shall be located and constructed in a manner that will minimze the amount of sediment enterin� streams. (b} Frequent fordin�s of live streams will not be permitted; therefore, temporary bridQes or other structures shall be used wherever an appreciable number of stream crossin�s are necessary. Unless othentilse approved in �ritinQ by the Enaineer, mechanized equipment shall not be operated in live streams. (cj When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other bamer to keep sediments from enterina a flotivin� stream. Care shall be taken durina the construction and removal of such barriers to minimize the muddvzna of a stream. D-? 8 (d}. All waterways shall be cleared as soon as practicable of falsework, pilzna, debris or other obstructions placed durin�, construction operations that are not a part of the finished tivork. (e). The CONTRACTOR shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs w-ith fueIs, oils, bitumens, calcium chloride or other hamiful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid intzrference wzth movement of mi�ratory fish. 3_ SUBNIITTALS: Prior to the start of the applicable construction, the CONTR�CTOR shall submit for approval his schedules for accomplishment of soil-erosion-control work and his plan ta ke�p the area of erodible-earth material to a minimum. He shal] also submit for acceptance his proposed method of soil-erosion control on construction and haul roads and material sources and his plan for disposal of waste materials. No work shall be started until the soii-erosion control schedules and methods of operations have been reviewed and approved by the Enaineer. �. �IEASURE�fE�1T OF PAY�IENT: All work materials and equipment necessary to provide temporaru erosion control shalI be considered subsidiary to the contract and no e�tra pay �vill be given for this tivork. D-61 Hr-dro 1�Iulcla Seedin� and Soddina: Anv soddinC7 or hy�dro mulchin� required will be done in accordance w7th Fort Worth Public Works Department Standard Specifications Item 118 and 1?0. If the opinion of the Enaineer, additional seedin� and/or soddina is required due to the Contractor's constructio, this ��-ill be seeded and sodded at the e�cpense of the Contractor. Pavment for work and all associated appurtenants required, shall be included in the appropriate bid items(s).. D-b2 Pavment (:l-Iisc. EYt.): Because of the unique nature of this project, C8-8.5 PARTIAL ESTI�IATES AND RETAII�;AGE of �the General Conditions shall not appl:✓ and shall be superseded by the fol lo�vina: (Please initial ooth pa17es included in chanae). `'�L'henever the improvements prescribed bv an individual Work Order have been completed, the Contract shall nutify the En�Tine�r. The En�ineer or other appropriate official of the O��ner ��z11, within reasonable time, perform the inspections. If such inspection reveals that the improvements are in an acceptable condition and have been complete� in accrodance �vith the terms of t�ie Contract Docur�ents and alI approved modifications thereof: the En�ineer ��Z11 recommend acceptance of the e�tznsion under that particular �� or: Order and recommend payment therefore. D-29 If the EnQineer finds that the work has not been completed as required, he shall so advise the Con�actor in �vriting, furnishin� his an itemized list of all known items which have not been completed or which are not in an acceptable condition. When the Contractor has corrected all such items, he shall aaain notify the Enaineer that t}le improvements are ready for inspection, and the EnQineer shall proceed as outlined above. Whenever the improvements prescribed by the individual Work Order have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, an estimate showina the value of the �vork will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. The amount of the estimate w-ill be gaid to the contractor after acceptance by the Water Department Director, provided the Contractor has furnished to the Owner satisfactory• evidence of payment as follow�s: Prior to submission of the estimate for payment, the Contract shall execute an affadavit, as fiu-nished by the City, certifyina that all persons, firms, associations, corporations, or other oraanizations furnishina labor and/or materials under ihat Work Order have been paid in full, that the �,va�e scale established by the City Council in the City of Fort Worth has been paid, and that there are no claims pendina for personal injury andlor property damaaes. The acceptance by the Contractor of the individual payment as aforesaid shall operate and shall release the O��ners from all claims or liabilties under the Contract for anyrthinQ done or furnished relatin, to the tivork under that Work Order or any act or neglect of said City relatina to or connected �vith the Contract. The makin� of the payment of the Ow-ner shall not relieve the Contractor of any �uarantees or other requirements of the Contract Documents w�hich specifically continue thereafrer."y Bidder's Initials D=69 Traffic Control (LTti1. Cut): Tne Contractor shall be responsible for providina traffic control durina the construction of the project consistent w�th the provisions set forth in the "19�0 Texas I�1anua1 on t_in;form Trafiic Control Deviced for Streets and Hi�h�vays" issued under the authority of the "State of TeYas Unifonn Act Regulatina Trafric on Hi`zhways", codified as Article 6701 d Vernon's Civil Statues, pertinent sections beina Section Nos. ?7, 29, 30 and 31. � � D-30 The Contractor shall execute this work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic �vithin the project area. Barricades, �vamin� and detour sians shall conform to be the Standard Specifications for street and storm drain construction, "Barriers and Warnin� and/or Dztour Si�ns", Item 524, and/or as directed by the En�ineer. The Contractor w-ill not remo��e any re�ulatory si�n, instructional sign, street name siQn, or other sign which has been erected y the City. If it is determined that a si�n must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Tra�ce Services Division (phone number 817-8100), to remove the si�n. In case of re�ulartory siQns, the Contractor must replace the permanent si�n �vith a temporary sian meeting the requirements of the above referenced manual and such temporary sian must be installed prior to ihe removal of the permanent specifications, the permanent sian shall be left in place until the temporary sian requirements are met. W1ien construction work is completed to the eYtent that the permanent sign can be re-installed, the Contractor shall a�azn contact the Si�ns and �iarkinRs Division to re-install the pernlanent si�*n and shall leave his temporary sign in piace until such re- installation is completed. D-72 Liquidated Dama�es (Util. Cut): Failure to complete work on time: The O�rner and the Contractor a`nee that it �vill be most difricult or impossible to ascertain the amount of damaaes that will be sustained by the Owner if the Contractor fails to complete the ���ork in the allotted time, but they both agree that the Owner would sustain substantial dama�Tes in such an event. Accordinaly, if the Contractor fails to complete the contract in the calendar days specified, a time charae shall be made for each workrna day thereafter, not as penaltv but as liquidated damaQes. � The contractor shall pay liquidated damaaes of rivenry-five dollars (�2�.00) per day per ticket for each repair cut not completed �vitlun t���enty-one (:21) calendar days and liquidated damaQes shall end on da�� that repairs are compieted. Should the amount otherw�ise due the Contractor be less than the amount of such ascertained and lzquidated dama�es, the Contractor and his surety shaIl be lrable to the City of such delivery. D-73 Pavin� Repair Edaes {Util. Cu#}: AIl pavinQ repair edves shall be undama�ed neat lines (by sawino and equal) and shall be parallel or perpendicular to the center line of the stre�t. D-�I D-7� Clean-Up (LJtil. Cut): Final clean up �vork shall be done for this project as soon as the pavina and curb and Qutter has been constructed. Contractor shall remove all excess cold mix, washed rock and debris from the street in the area of repair. No more than seven days shall elapse after completion of construction before the roadway and riaht-of-way iscleaned up to the satisfaction of the EnQineer. Refer also to Page C�-� (3) Section CS-5.17 Clean-Up of Part C General Conditions. � D-76 Property Access (Util. Cut): Access to adjacent property shall be maintained at all times unless othenvise directed by the Engineer. D-90 Workers' Compensation: A:Contractor's Workers' Compensation Insurance. Contractor aQrees to provide to the Owner (Ciry) a certificate sho�vinQ that at has obtained a policy of workers compensation insurance covering each of its employees employed on the project in compliance with state law. No Notice to Proceed wzll be issued until the Contractor has complied �vith this section. B: Subcontractor's worker's Compensation Insurance. Contractor aarees to require each and every subcontractor who �vill perform work on the project to provide to it a certificate from such subcontractor statina that the subcontractor has a policy of workers compensation insurance coverin� each employee employed on the project. Contractor ��711 not permit any subcontractor to pe�orm work on the project until such certificate has been acquired. Contractor shall provide a copy of all such certificate to the Owner (City). C. Workers Compensation Instuance Coveraae D-3? 1. Dennitons: Ce� �-icate of cove�e ("ce;�a,�c�te"). a co�� of a ce�.:�ca;e cf insw�rnc�, a ce^�cate of 2L'F'10I1N i0 S��u-i�sur� iss�e� bv t`�e Te:ca.s �Jor:{ers' Cors�eas�rien Co�ission, or a ccv� �e �T-e�ment (TGvCG81, T�%CC-82, i��CC-8�, or Ta'CC- 8-'.), suow-in� swtutorv- wer{e.s' corl�e..sazon s�ur�c� c�ve.a_� for �e pe.s�n's er ea�ty's e�plo��e�s pr�vidinQ s�; yZces on a proje��.; zor the c�r3�:on oi t7e proje�t. D�a�en e: �e Prcject. InclLdes tLe �e �on tue �e^s�r�n� o� �e w-ork o� the proiec� unr_1 the con�c�orsi�e:son's wor� o� t�z proje�� n�s bz�a co��lete� �e� ac�e�te� b�• t7e C ir�� . � Pe:sons prov:c:no se��ices on'�z projec; („s�:ceentac�ar" i.� s�c�on 4��6.096�- i� ciudes aIl �e���ns or ea* �:es pe-=or�� all cr pa.* � o� �e se��ces t�e con�actor �.s uace:t�'{ea to pe�or� or. t�e proiec� r���.r�iess of tiYi��?�er t'�at pe:scn con�acte� c.i���' � w;t�: �e con��c�er �c re_�.— �ess of w�le��e: thuz �er�on ��s e��lo�•e�s. T'�s ;Lc:uces. ��:�.hout l���ion. ince�ea��at c����c�ors.�suoconcrc�ors. lers�� c�m�anies, �otor crr.e:s, ew�e.-oce �tors, e.�:�iove�s o� z..T � s�c� e��r�, or e��io.�e�s oi ��`- e�t:rf w-;�ica r4::^..is�es pe�sor�s to provice se: Yic�s on jue project. "�e��ices" inciL'Ce, w:tneLt 1ir.�.�ta�on. ; ro� �cia�. ha�� ���. or e'esve.�na e.t:i�ne�t or ��Te.��s, or rrovi�i�Q la�or, t��cr,a.ie� er ot;e: se^�Zc�s rz'.2te� to a proie��. „`z� �:ces" dees net znc'.uCe ac;i�Z�es t��lated to the proje��. s`c� as fco�,'beve��� veacors, o�c� su��i,� ceiive�ies, �C celive^a or'per.able tei?er�. ?. T'ne c�n�.ctc�r shu? �ro���e c�ve.�Qe, ���� en FreFe; re�er_�� oi c?�s�ca�on codes �:c �z��oL �o�U �rl� nli�� of �v c�ve:��e a�--���eu�, wiucL me"s the s�r�tor� rel�e�e�ts a� T� :as Lacer Ccce, S�;�en 401.OI1(^.—'.) fer al? e.��Io�e�s of ?..�'1.z COIl��C.uL �r;?V1G1.^Q 5�:'y.C�5 OI �:z y I�iZ�' ICr ihz CL':��.OIl OI ii.�. cr��e��. , �. T'�e Ce�zactor �us cro�:ce a c�^�:cat� o� coye�.C� to �e �o��e:�.�:e.�� �atir�r pr�er t0 �Z'.i�? cW��Z: Cl� C�Il�CL. �. L: �:e cc��e�Je pe^OG� S�.Ow3 CII i.yz C�L�.3C,Or�S C:iI'��i C�.�uC3�� GI C�V�:'�,.c? e^CS D-33 REQUIRED R%ORItER'S CO?�iPENSATION COVER�GE "The law requires that each person worlcin� on this site or pro��din� services related to this construction project mi:st be covered by worker's cor�pensation insurance. This includes persons providina, haulinQ, or deliverinQ equipment or materials, or proti7dzn� labor or transpor,�.tion or other service related to the project, reQardless of the idenuty of their employer or status as an employe�". "Call the Te;cas Worke�'s Compeasation Commission at 51? r-?0-3789 to receive infor�.nation on the le�al requirement for coverage, to ��erifv whether yflur empiover has provided the required coveraQe, or to report an employer's failure to pro�Zde covera.?e. D-91 Operatin� and �Iaintenance Manuals: A. The Con�actor shall provide five copies of complete "O & M Nlanuals." All information should be bound in five separate loose-leaf binde:s and delivere� to the Owner at least two weeks prior to fi.nal inspection of the pzoject. B. For each product, eqt:iprnen�. or syste� the follow-inQ data sha.11 be provided (unless deened inappropriate by the Enaineer): l. A aeaeral description of the eauipmeat or system. listina t�e major com�onents, intended service, and other aeneral data. ?. Technical data inciudiaQ nameplate data, desi� p�rar�eters, ratinas, c�pacity, pe�or�ance datL, ope�rion curves, characteristics and the like. Cle :rly ci;stinauisb between inforrla�ion which does and does not applv. 3. Lis� of warninQs and cautions to be obse� ved durino ins'�.alla�ion, operation, ane� mainteaance. 4. Fullv de�aile3 installation and operatin� instzuc�ons inclucinQ s�e�ial tools required, ali�.meat ins�uc�ons, start-up and shut-down sequences. �. I�lainteaance, se�ice, and reYair ins�uctions includinQ ma.inten��ce and se: �-ice sche�ules, mate:�als and rie;hoe�s for pe�or.n3nQ rou�ne, spe�ial, and ann>>al ser�ice. 6. T;oubleshoo �n� miide ana che�k list i.ndicatinQ co�on failures, test mzthoe�.s a.nd procedures for dete�iP.�a �onpo�e:7t fault or failure. 7. Spase parts list indicatins par and orde� numeer wZth �.ue aae� aCcress of suppLer. Include ct:r.eat prices of re�lace�eat Farts and supelies. 8. Typew?iren tes� repor`s includinQ mate�ial and sys�ea� tesS pe�or�ed. L:�clucin� date of test, testi.n� partv, wi�ess�s and record of test concitions and resulu in tes re�or�s. D-� � 9. Dia`�a..Tns to i.nclu�e conrrols, w�irina, i.ns�allation or operation oi the equipr,�ent er s�'stem. � 10. Copies oi a11 "REVILWED" snop d:awi.n�s. 1 I. Copies of all �anufactuer suppiied w��aaties a.nd �uara.�te�s. C. Tne con�.actor shou!d submit two prelininary copies oi tne operation and main�eaance man�s to the En�ine�r at leas� six w���ics prior to final project inspec�on for re�zew. One cooy of the documents will be rer�-ne� to the Con�-actor �arked "A.PPROVED" or "REtiZSE A.V�J RESUB�BT." If it is marked APPROVED, the con�actor only needs to provide four addirional cogies. If it is mark�� "R.EVISE 4.��D RESUB�IIT," repe3t the "O &�I I�fa.nual" s4bmittal in accordance wi-�n this item. D-9? State Sales Ta� (do not usel: Delete Para�aph C6-b.?1, "State Sales T�.�c," in its entirety from P�-t C, Gene:al Corditie�, General Con�act Doc�.�r�eats a.�d Specification.s. Tnis contact is issue� bv aa orarr�izstion which quali�ies for exe.� ption purs��nt to the pro�zsions oi :�.-ticle 24.04 (F) of the TeY�s L�-rsted Sa1es, E:c;.ise, a.nC lise T�.Y �ct. .411 eaui; meat �,Zd mater�a�s not consnr.le� b�� or incor�orate� into the project cors�uctien a:e subje�� to Statz sales tzY under HoLse Bill 1 I, enacted �u��st l�, 1991. ??� s�ch taY�s shatl be included in the various amounts on the Proposal forl. The succ�ssisl Bidder s�a11 be required to suomic a bre�down between labor and mater;al costs pr�or to esecstion of the cor��act. D-93 Trench Escav�tion. Bacl.-fill and Comnaction Treaca e�cavation and bac��il unde� p�r'.�.r?a 1ats, dlzvew-ays, �avel su.�ac�d roa�s, �ti�thin ersements. an� w-ithin e:�is�inQ er tsture R.O.�". shall be in ac�or3�ce w;t� Secaons E1-� Bac;jill and E?-? Exca��ation and Bacl�ll oft�e Geze�a� Con�act Dec�ceats and Specificatior.s eYce�t as specined herein. 1. TR��;CH EXC �.VATION: In accord�.�c� w-ith Section E?-? Escavat�on a..nd Bac?�ll, i' tne s,ated ma�::r-1Ln �each wicths are e�ce�ded, either thro� ac�icient or etherNis�, a.nd if the En�:�eer �aerer-,�;.n.e� that the de�i� loa�as of t�e pi�e w;i1 be e:�ceede:�, the Con�ctor will be re-,uire� to s��por: the pipe with �. i.��rove� *-euca bcron. T'ne eY�e�e oi such re�e�ial neasures sual �e ea=rel� t�e Co��cters own. ?11 ��ac�s ocerations sLa11 be confined �o tne w-idth o� per�anent r���-of-«��, Fe�anent e�..�emeats, and an�� tempor-�,..r;� constracson er.s��ents. ?,.1 ex:,as�a.=or_ sha'1 �e in s�ict comcliar.ce wit� �e Treac� S�re;v S��stems Spe�:a1 Co�ciuon oi �:s docL.�e-�t. 2. i t�ZE�iCH B 4CKFILL: Trenches which l�e out;ide of e:�s�i�� cr ruxure ; a�� ��eat D-3 � shall be backfilled above t'tie top of the embe3ment material with Ty-pe "C" back�ll material. Excavated mate�ial used for Type "C" backfill must be mechanically compacted unless the Con�actor can furnish the Enaineer with satisiactory evideace that the P.I. of the excavated material is less than $. Such evidence shall be a test report from an independent testinQ laboratory and must inciude represeatative samples of soi?s in all involve�. areas, wZLh a m2p showry;�1Q the location and depth of the vanoLs test holes. If eYcavated mate^al is ob�iouslv �anular in na�ure, contain..ina little or no glasric mate�al, the Enaine�r may waive the test report requirement. Se� E1-2.3, T��pe "C" or "D" Backfill, and E?-?.11 Trench Bacic�`ill for additional requirements. rW'hea Ty�e "C" back- fill material is not suitable, at the direction of the Enaineer, Type "B" bacldll mat��ial shall be used. In aeneral, all bacl�ll material for trenches in e:{istin� paved stree*s �ha]1 be in accardance wlth Fiaure A. Sand material specified in Fi�ure A shall be �hra;necl from ae approved source and shall consist of dL:rable particles free of thin or elon�ated pieces, lumps of clay, soil, ioam or veQetable natter and shali meet the follow-�:n� o-radaton: Size Sieve °% Retained � 0-� r 16 0-20 r�0 0-�0 T 100 60-9� T?00 90-100 (P.I. = 8 or less) �. TRE�iCH CO�LPACTIO?v: All trench backfill sh�11 be placed in liLs pe: E?-?.9 Bac1�'ill. Trenches which lie outside existina or futur� pave�eats shall be compacted to a mini�um of 90% St.�n�rc Proctor Deasity (A.S.T.?�1. D693) by means oi tampinQ onlv. Treacaes wnich lie unde: e:,.ist:n� or fi�ture paveme�t shall be bac?�lle� per Fi�ure A w-ith 9�% Standard Proctor Deasity b� jer�ir.�, mech�nical tampina, or a comi-�inari�n of methods. Backl�ll mate.�al to be mechanically tamped mus; be w-ithin =-�.°% of its opc;mam �oi � t e conteat. T�e top two (?) fe�t of sewer line treaches and t�e top ei�hte�n (18) incnes of water line mav be rolled in w-ith heaw ect:;pnent tires, Dro�ZCed it is placed in lifrs approprate to the mater��1 be:.no us�d an� the ope:ation can �e peZor:�ed w-ithoLt dama�e to the installed pipe. ine Citv, at its own e�ease, w-ill pe-for�n trzach co�paction tes's pe: A.S.T.?�i. stan�r�s on a11 treach back-fill. An�� retestinQ re�ui..red a.s a result of failue to con�act the bac�ill nater:al to r�e�t the sta.�da.rds wZll be at the ex�ease of the Concac.ar and w-ill be billed at the co��.e:cia? rates as dete�i,�ed b� the Ciry. These soil ceasi�� tes-�s sha11 be pe�ormed at two (?) foot ve�ic�l iater�als be?�nirtQ 2t 2 leve? i�.�'o (?) fe�; above �ie top of ine ins,:lled pipe and cont�nuin� to the top oi the coripietzd bac.�11 at inte:-�,� :ls a1on� the �ench not to eYce�d 300 line�r fe�t. The Conn-�.ctor will be responsible for providi�� access a.nd �ench s�fe;v sys�em to the leve? of �eaca bac'�ill to D-36 be testzd. No e�-c�a compens�tion w-iIl be allowed for eYposina the bacl�ill layer to be tested or pro�-idin� treach safety system for tests conducted bv the Ciry. 4. N�ASliRE����T A�� P��tiIENT: A11 material, includina any and a?1 Tvpe'B" �ac?�i11, and labor cos+�s of excavation �.d bacl�ill w-ill be included in the price bid per linear foot of water and sew�er pipe. D-94 Statement of tilaterials and Other Charaes (DO tiOT USErrt►�: ihe Bidde. shall ta.ke note of Lhe last paae o� P�.�t B-Proposal entitled "St�tement of Matzrials and Other Char�es." The bI� spaces on this p�e are not to be filled in by the Bidder at the tiLne of subrr.irdng his propesal. This for�n is included to familiarize the Bidder wzth the form which the successful Bidder w-ill be required to execute. D-9� Shoo DraR•in�s: 1. Submit s�vea (7 j copies of s�op dr���1I1�5, la��outs, man�acnr�r's da�.4. and material schedules as ma�- be reauired bv the Er_�ine�r for his review. Subru�tals mav be checkea bv ar:C s'��ped w-it,� the appro��al of the Gor.�actor and ideati�ied z the En��neer mav require. Such re�•ie�v by� the EnQir�e�r s:.a1.1 inclue.e checkin� for ae..er�l con%rmanc� w-ith the desi�-*1 conce�t or t�e project �d aeazral ca�pli`nce w-i-� ir.�or.��auon �vea i� the Ge�e:al Cor.�ac� Docu.�ne�ts. Indic�ted actions by� tne Eng1�eer, w',li�'cn mav resa1T from his re�•iew, s: all r.ot co�s�it�ste corc�:enc� w-irh ��� deviation i�o� the plans �c speCliiC3Lor.s unless suc� deviat�ons ar� s�ecincall�� i�eatirie� bv t�e �eu'�od desc�ibec below, and fizrther shall not relieve tne ConTMactor of responsibilir�- for e..ors or omissions in the subruZed dat�. Processed s�op d.-aw�:n� submittals a.re not chanae orders. T"ne pun�. ose of subr�^.it���s by the Contractor is to demonsuate that the Con�actor unde:��nds the desi�n conc��� and t'rlat he demonsuates his undersr.an��� by indicar:n� which equipment and mate� �s he inte�cs to fu.�ish and install, �d b�- cer.ailinQ the fabr�ca;ion and installation �ae�hods he inten�s to use. Ii de��iations, ciscre�ancies or coruiic�s berwe�n submit',.ais anc the desi� drwwinas a.nd,'or speci21C3ii0IIS are _ discove;e3, either pr.or to or a.*�er sub��irW.ls are processe� the desi� �awzn�s and specificsrions si all gove�. The Con�actor s��ll be res�onsible for Ci.�e.�sions w-bich ar. to �e cor.�-ined and correlated at the joo site, iabrcation processes and tecnniques of cons�ic:ion, coordinar:on oi his wor�c w�th that of o�e: �ades and sat�s�actory pe�or��c� his wern. Tnz Con�actor shall chec'.< anc ver�fv all r�e:su.r��eats a.nd review subni�rt:ls prior i0 ��lIl� Slll7IT11���`�. and si� er inirizl a s��e�eZt included w�th the st:b�i�`�1, which si�ines com��li�c� wzth pl�r.s �d sre.�.IY1C�r.�cr.� �,d ui.�e�sions s�t.ac+e ior tue applic�:ion. An�' devia�or. �o� t: e s�ecse� cr:�e��a su�.Il be exrres�lv s`,.: t�c i� wri�in� in �e submit'�.31. i nree (�) copies oi the a�oroved suc���: l� s�a11 be re*�e� bv t�e Conmc;or t.nsl canple�on of t�he project and presea�Y� to t:�e City in bo�c fora�. ?. S;�co �w;.nQs s�all be subrLtted fer we followin� items prior to �s����on: D-37 D-100 Specification References: When reference is made in these specifications to a particular AST�1, A�VWA, �tiSI or other specification it shall be understood that the latest revision of such specitication, prior to the date of these general specifications of revisions thereof, shall apply. D-101 E?cplanation of Bid Items: The total scope of work for this job has been separated into several bid items as shown in the ProposaL All materials and workmanship necessary to furnish a complete and f-'unctional job, whether sho��n, included or implied in the construction plans and/or specifications, shall be supplied in this contract. The Contractor shall include the cost for all miscellaneous and subsidian� work not specifically mentioned in the Proposal in the various bid prices. D-102 Cost Breakdown: In order to estabiish a basis upon �vhich partial payments to the Contractor may be authorized, immediately after e�ecution of the contract the Contractor shall furnish a detailed cost breakdo�tin of his contract price arranged and itemized to meet the approval of the Enaineer. D-10�t Samples and Qualitti� Control Testin�: a. The Contractor shall furnish, at his own expense, certifications by a private laboratory for all materials proposed to be used on the project, includin� a mix design for any asphaltic and/or Portland cement concrete to be used, and oradation analysis for sand and crushed stone to be used along �vith the name of the pit from which the material was taken. The Contractor shall provide manufacturer's cenifications for all manufactured items to be used in the project and will bear any erpenses related thereto. b. Tests of the desi�n concrete mix shall be made bv the Contractor's laboratory at least nine days prior to the placin�7 of conerete usina the same aaGreQate, cement, and mortar which are to be used later in the concrece. The Contractor shall provide a certified copy of the test results to the City. c. Quality control testina of in-place material on this project �vill be performed by the city at its o�in e:cpense. Any retestinU required as a result of failure of the material to meet project speci2ications w�ill be at the eYpense of the Contractor and w711 be billed at commercial rates as dete�rnined by the City. The failure of the City to make any tests of materials shall in no �vay relieve the Contractor of his responsibiliri• to fi.irnish materials and equipment confornung to the requirements of the contract. D-38 d. Not less than 2�F hours notice shall be provided to the Ciry by the Contractor for operations requirina testin�. T77e Contractor shall provide access and trench safety system (if required) for the site to be tested, and work effort involved is deemed to be included in the unit price for the item beinQ tested. e. The Contractor shall provide a copv of the trip ticket for eaeh load of fill material delivered to the job site. The ticket shall specify the name of the pit supplyin� the fill material. D-10� Protection of Trees, Plants, and Soil: All property along and adjacent to the Contractor's operations includina la�vns, yards, shrubs, trees, etc. shall be preserved or restored, after completion of the �vork, to a condition equal to or better than existed prior to the start of work. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimminy, removal, or root prunin�) can be done on trees or shrubs �row-in, on public property includinQ street Ri�ht-of-Ways and desiQnated alleys. This permit can be obtained by callina the Forestry Office at 371-5738. AI] tree ���ork shall be in compliance ���ith pnuun�� standards for Class II Pn.uuna as described bv the National Arborist Association. A copy of these standazds can be provided by callin� the above number. Anr� dama�e to public trees due to ne�liaence by the Contrart shal] be assessed usin� the current formula for Shade Tree Evaluation as defined by the Intemational Society of Arboriculture. Pa�-ment for ne�liQent dama�es to public trees shall be made to the City of Fort Wonh and mav be �tizthheld from�funds due the Contractor bv tne City. To prevent the spread of the Oak Wilt fun�us, all �vounds on Live Oak and Red Oak trees shall be immediatelv sealed usina a commercial pruninQ paint. This is the only instance w•hen pnuuna paint is recommended. ~ No separate payment will be made for anv of the work involved for this item and all cost incurred �vill be con�idere� a subsidiary cost of the project. D-l0S ��'or� Near Pressure Plnne Boundaries Contractor shall take note that the ��ater Iine to be placed under this contract crosses or is in close proYimity to an existina pressure plane boundarv. Care shall be taken to ensure all ``pressure plane'' valves installed are installed and closed and no cross connections are made ben��een pressure planes. A location map has been included to help keep temporan� services from crossina pressure Flane boundaries. D-39 D-132 Asphalt Driveway Repair At locations where H.M.A.C. driveways are encountered, such drive�vays shall be completely replaced for the fuil e�tent of utility cut with H.M.A.C. equal to or better than the existinQ driveway. � D-133 Top Soil: Where directed by the Engineer, top soil shall be applied in accordance �vith the City of Fort W'orth Transportation and Public Works Department's Standard Specifications for Street and Storm Drain Constructian, Item 116, except as follows: AIl labor, equipment, tools, and incidentals shall be included in the square yard bid price for the top soil. _ D-139 Crushed Limestone (Fles Base): Crushed limestone required for use as a flexible base material shall conform to Specification Item No. 208 of the Standard Specifications for Street and Storm Drain Construction for the Ciry of Fort Worth Transportation and Public Vl�'orks Department. �� L�' D-�0 2.25" � 4 � 2.25'° C� � N �T.5�a PMS 167 (Copper) , PMS 288 (Blue ' ` 8'-p�� � � . r � r r �\ . 1 � I 3" ' 3' -1.5" ' 3" , . , . , ; . , , , . , , I � ', , — �� x o-�T o T� .� � ., i �. � �� �� Fu ��.� 0JI1 £�/J6 % � // / � �� � ^���i ,, , , , , , . 'w White ) ., PMS 288 (Blue) ., a i � � � � � 1 I � �' ;1 4' -1.5 �� , -, . . , , , , , . ,� . � � . � � 4 �'ou�. W�z�er �,, . . nds In �lct�ron , . , ; ., . . ;w '1 PMS 288 ����ue} PR4JECT SOCN Fogue�e 30 3" 3.75" � � � 3.75" N i �7 � 4.5" %/3" Radius / �/ / � � Scale 1 " = 1' E2-1 Construction SEE NOT[ 4 �[LOW EXIST f.UH0 �- EXISG II.MA�:. 8 GUf IEIt 5lf121=h4:�E ` �. � � . � , •� � � . f. ' �� � ��y / •. �r-�-� r�%%i // .� /� SAWW f;41 f Itl 7�.S A C. R�F'LACEM�NT (l' MIl� J SnW r.�rr ExIST 111.1 A C SURFACF \� , a � � �� F I y � I � � y � � a ��'4� •� I I y . 1. � � i � �.��1� � '- � '� � � 1 � i` • ,��'�,�� r, ��t}� �� - �f /J�) . �. � �3rJ) yy �h �, 1 �^ p` �� �'}�J{11t' "c ' .r },"� � �Pf� 11�4 : � �.� � L�cx� l�'��.1���� �1�1 � �1��117�11���►���� �4� �� ��1bb'���� , 7 o J ` '.. _ . � . ' . � � - a�l �L' � . . . . . . * �-�� _��nT�s � 11 I 2?7f,(114f,kEIE Sllnit DEIf1SIA1IEIl�MI1J t)F0" ��� 0LI.OWLiOIIU�AOfEX1S( IIh1AC.YAVk:�d[t�f � AI l EKIST ASPI IAf T Si lal 1 f1E RF:PI Af,f:� TO if If: Uf11GINAI fiGl'lll f.11NilAUb11'AVI:IAGNf ftFP1ACF61f_N� SIIAI I. HE 1't1F FINL GitAi�EU SUItFACE COUIt5E � �) 13[flf>IIJG OP PIPE 1(1 65A(�:II AU.IACFtJI 5[f.71ON 1"iR SPFCIhlf.nll�lfl dn2, NJ111CIfhVLlt IS f9i�NE siuu�r,ri+i ��� ntlfdAlOItl'HfIJ[CIS.IIIGPRC�1f:Cl[11(�IIIFFRORh[SIG�JI:Rh111Sf EVflI11AlE IlIF I�UII l^JI(�IUUf I�XISIIIlt;I11:tAC.1'/1VFf.1F�71 AS IU IIiE IIIICI<NESS.1:1"�IlUIIIUNSdkHI111Y IOWIIIISIAIII)f,fINSIItUC11UN l lIAI)INIi. tl' AI'PHUI'121A I L, 111f f Ul l. Wll l f l l Uf' SI1121'l�CE $I IAI L O[ ItllfdUV[(� S IttPl AGE13 WII II AI'PHUPIUJ�I[ IitLAIG1f:N I OP CXIS I ING UASE UH SIIRFACL- 1.7ATL-NIAI.. ru. �io c.�t 1 � ' ' • i � 1'PtIM� GOAT • . ' , • •� '� 727 CONCRE(E • '• ��--^ AI.L 71tF�1C11 B�CI(FII l SI i�l L 61ELT + '. • � RFQUiHE61EtJiS FOR GHAI)AIION AHD � �� COMPACIIpN AS SPEf,IFIED I�! I IEM 402 Of 111[ STANI)ARI) SPff.IFICAIIONS FUR � . • f,O1J5 fI1UC I IC)N, 1'1181 IC WORKS I�ENf , CItY ' UffOItlWOliII1,1C:XASOR0ACkfIILi1S � SPEf,If ILD IN SEC I I[lt! F: 1�2 P.tlll E? 2 11f I I IE . . SI'[CIfICAIIIINi PUii W�181t UEPA.Itff.lf:Nf , _ f'H(�IFC�S,Ff�ItIWC1HIIIWNFHDfPI.,CItY . Of FI�Rf N,'UHIII, �IGX�S . � �'`�-� � � • �,~��� PROI'nSEU FACII 17Y INS IAl l AllO�! , ^ � � ' " " - 1'II'E • . �r . � �• '. � • . . , ' ' ; ' � ; �— rnraiwni� T Y(' I.C_!� L_S_E C Y I 0 N_��' R F_N C�-4 _f� C I�� I 1�. Y Y f? I C_1� l_--1-� . M._�_._ C M s u r� r� c_� w i Y�-� _s_o s_�_t� �n_sr_ M IMIT ►IM II�U�,TIC CO�FC�(Ti ciry �f ��,rr Mt)�fTN R,�-a-,,,��I 71inr��:1'OftTATl�11/i=�f>>i.►� ��,c,i�Ks nC H r. nrv-n-�-r� fN4/N£FA'/,VI !►/V/_f/CrA� �tv•i�.io-�o EXIS'C ClIFT13l6� l�Qlf iE�t I:xISf H/4SE HMAC REPLACEMENT (2" MIN) EXISTING HMAC SAWCUT SAWCUT � � � � ������/��/. �///��1./�i''�/ � / d ' � �� � + r e I / , O . . � ' P �, � I A1� p � " . I ��� �.. EXfSTWG � � � = PRIME COAT BASE MATERIAL � NOTES� 1. 2.27 CONCRETE SHALL BE A MIN. OF 8" BELOW BOTTOM OF EXIST. IIM.A.C. PAVEMENT. 2, ALL ExIST. ASPHALT SHALL 8E REPLACED TO THE ORIGINAL DEPTH. MINIMUM PAVEMENT REPLACEMENT SHALL BE 2" OF FINE GRAOED SURFACE COURSE. 3. BE�DING OF PIPE TO MA7CH AOJACENT SECTiON OR SPECIFICATION 402, WHICHEVER IS h40RE STRINGENT. 4. ON MAJOR PROJECT5, THE PROJEC7 ENGINEER OR DESIGNER MUST EVA�UATE 7HE FULL WIDTH OF EXISTING II M.A,C. PAVEMENT AS TO THE THICKNESS, CONDITIONS & ABILITY TO WITIISTANO CONSTRUCTION LOADING, IF APPROPRIATE, TfiE FULL WIDTH Of SURFACE SHALL BE REMOVED & REPLACED WITH APPROPRIATE TREATMENT OF EXI5TING BASE OR SURFACE MATERIAL. 2�27 CONC (8" DEPTH MIN) ALL TRENCH BACKFIIL SHALL MEET REOUIREMENTS FOR GRADATION AND COMPACTION AS SPECIFIED IN ITEM 402 OF THE STANDARD SPECIFICATIONS FOR CONSTRUCTION, PUBUC WORKS DEP7., CITY OF FORT WORTH, TEXAS OR BACKFILL AS SPECIFIED IN SECTION E1-2 AND E2-2 OF THE SPECIFICATIONS FOR WATER DEPARTMENT PROJECTS, FORT WOTRN WATER DEPT., CITY OF fORT WORTH, TEXAS. I g., � MAX 1" SERVICE UNE TYPICAL SECTION-TRENCH REPAIR FOR SERVICE LINES TYPICAL H.M. A.C. SURFACE WITH SOIL BASE CITY OF FORT 4vORTH OEPARTMENT OF ENGINEERING f.f. SLNvCP�O\PC(_t!_11A1CR�E� irV_yCi ___.._._. .... �� .,� . _ - .�..._..-,.�....,.�...�.� ��•�,�..�-- �,i T e .� . o� .a . yP �BQckfi/I J'�'�!}�Cl��� �QY�� .5'T�4�� T ���r�e��h ���'ur� �'��ing ��rl�r�' fPr.rr�'�'1 " + ,"� *', � ' , � '••• �• �+�\dSl"i!!. .w . � • � .,,.`� tl ` �. •�w' ' ,� .. �. � `,f � , `�. " �' . , . + � � �-___'� ----�. S�, . 'i :r.' SQrIl1 !�'iQ(Ei'"!Ql �� 1y`, '9 �f' .� . �1' r :�� u� � ���.' - Embe�men��� ��'� �� 4��:�;.����;�,��F�iC1 ;; Includcd In Line�sr Fxt $id Price cf Pipe. C,�SE %: PROPOSFD PAYED STR��T u.T. S. fX/ST/NG PAV�D SrREET St�eet AQving �f�' � � . _ ,�:�: ��,��:,� �' _�`' ':�: '� y �•�. ! - � _ � ��` � ,�=y.�, Curb � Gu�ter Qnd�ar SidewQlk �����. �, �,f . tY0 TE = �' �S� ShQII B� �a yltem Only Ij With�rr � l�avemen� R�pQrr fs �r � �� 1.5}'eet� Nor3�rnQl Pi� Diameter LineQr Foo� f3Qsis,,oQring � �� 2 h/id f h is UsuQl/y Orrp Foo� 8o�h + f� , c '� (2 fer� Min.) �o The �of The Pi,�� Sic{es of T�nch,Non�rerUp,acr �_.::. ;..� .::.:.:...:..'� And Is Rep�Qced as Di�ezted ,by Po�tion �f l�erxh klid�h Shall Be �' � The Eng�neer. ����� � De�ermined by C�nlractoi-. ���:: � SQnd 1�'la�erial n �., � ��•r • �. .. Emb�mtnt — � �"�::.:i..:.3.:�:�: -, �Gy � i����r��;'yl �7�r8� ;�; Incic�ded I� li��ea� Faot $id P�ice of Pipe. CASE 2: EXIS7lNG PAVE.o STRFET N. r. S. EXCA VA TION, J3A CKFI � L A�r� PA vENrEN r RF�A �R UNDER f�ROpOS�� OR EXIS Tl1tlG STR�E T S F�G URE A , � R�v�sed -�-9-°2 ���� �� �c������ o �� a� � � � � � � . ���� WATER OEPARTMEPiT SE{.iION E SPECI FI CATIONS JANU�RY l � 1918 All maLerials, construction methods and pr�c�dures used in this project shall conforn to Sections E7, E2, and E2A of the Fort worth Kater pepartment General Contract Lbcuments and General Specificat�ons, together with any . additional mat�r�al specification(s), construction(s) or later revisicn(;). (See revisions listed on this sheQt). Sections El, E2 and E2A of the Fort 4�'orth uater Department General Contract Docur�ents and General Specifications are hereby made a part of this contract doc�cment by r2fer�nce for all purposes, the same as if copies verbatin nerein, and such Sectiens are filed and kept in thz office of t}le City Secretary or the City or Fort �,'crth as an offi ci a1 retord of the C� ty of Fort uoru�i. El E'L E2A IN:,�X M�TERIAL SYiCIFICATICHS C�JNS.TRJC► I Or� SPcCI FI CAiIONS GcNERAL I}�S I G'�. DETAI LS Revisions as of April 20, 7981, follcw: E7-2.4 Backfill: (Corrett minimun �anpacticn requir�ment to 95� Prcct�r ��nsity and corrett P.I. values as follews:) c, Addi t�onal backfi 11 requi re�nents when approved fcr use z n stre=ts: l. type B Backfill (c} Maximum pla5tic �ndzx (PI) 5ha71 be 8 Z. T e C Back`i 11 � (a� Materia� m�eting r�qu{re.�ents and having a PI of 8 or less sfiall be ca•,sider�d as suitable for compact- ian by ,jetting (b) Haterial 1t�°tlnc, r�quirement and having a PI af 9 �r more s�a11 be tons�dered fer use only wi th �ethanic3l tcrr,�action �Z-2.11Trench Backfill; (Correct raini�;��m car,paction require.ment where-ver it appearS in this section t� 95S Procter density exce�t for para5ra�h a.1. �+here the '9�S mcdified P-oct�r de�sitJ' shali remain unc>>ang��). _ Part F- Bonds NOTICE The following blank spaces in the Certificate of Insurance, Contractor Compliance with Workers' Compensation Law, Performance, Payment and Maintenance Bonds, and Gontract are not to be filled in by the Bidder at the time of submitting his proposal. These forms are included herein to familiarize the Bidder with such forms which the successful Bidder will be required to execute. PERFORMANCE BOND No. KO-6157063 TI� STATE OF TEXAS COUNTY OF TARRANT KNOW ALL MEN BY THESE PRESENTS: Tt►at ���e (1) I& M RODRIGUEZ. Inc.a (2)Corporation of TEXAS, hereinafter call Principal, and (3)Indemnitv Insurance Comnanv of North America a corporation organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, are held and firmlS� bound unto the City of Fort Worth, a municipal corporation organized and eaisting undcr the laws of thc State of Texas, hereinafter called O��ner, in the penal sum of: ONE HUNDRED EIGHTEEN THOUSAND FOUR AUNDRED SEVENTY FOUR AND NO/CENTS... ($118,474.00) Dollars in lawful money of the United States. to be paid in Fort Worth. Tarrant County, Texas, for the payment of which swn well and truly be made, we hereby bind owselves, our heirs, executors, administrators and successors. jointly and severally, firmly by these presents. THE CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain contract with the City- of Fort Worth, the O��mer, dated the 1GTH of MARCA ,]999 a copy of whicli is hereto attached and made a part hereof: for the construction of: INDIAN COVE WATER EXTENSION designated as Project No. (s) PW57-0G077U153960 , a copy of which contract is hereby atiaclied. referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and consiruction being hereinafler refened to as the "work". NOW THEREFORE, if ihe Principal shall well, truly, and faithfully pedorm the work in accordance with the plans, specifications, and contract documents during the original tenn thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnifv and save harmless the Owner from aU costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and etpense which the Owner may incur in making good any default, then this obligation shall be void; othen�ise to remain in full forcc and effect. F1 PROVIDED FURTI�R, that if any lega] action filed upon this bond, venue shall lie in Tarrant County, State of Texas. AND PROVIDED F'LTRTE�R, that tlie said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it dces hereby waive notice of any such change, cxtension of time, alteration or addition to the terms of the contract or to the work or to the specifications. N WITNESS WI�REOF, this instrument is executed in 7 counterparts each one of which shall be deemed an original, this the 25TH of MARCH ,]999. ATTEST: ...� • •1�11J �,,� �L,[ t� o�'�� /f f {Priacapal) Secretary (SEAL) ���� �'" itness as�to Princi 1 � � I �'VtG%,i'�, '�T"I:�l � Address A�TTEST: � . �� r���� ����� � (,$u+ rety) Secretary +J/ (SEAL) � ��� � � � � i� " �itness as to Surery � 811 Laniar. Suite 310. Fort Worth Texas 76102 (Address) I & M ROD[ZiGUEZ. INC. CIF !4j �, �v �� - �,� ��t� �-�`"���r'�- `� � ��' � P.O. BOX 50187 FORT WORTH, TX 76105 {Address) Inde�nnit�. lnsura�ce +C+amn��� af N4r�h Anneri��a Su tV r --• �Y.1�1 � t � � • � �r�� 4 ,- �'� _� (AttarneV-itr-fad�}{S} Martin A. Prisant 8] 1 Lamar, Suitc 310. Fort Worth Texas 76102 (Address) NOTE: Date of Bond must not be prior to datc of Contract (1) Correct Name of Contractor (2) A CorporaUon, a Partnership or an Individual, as case may be (3) Correct name of Surety (4) If coniractor is Partnership alt Pariners should eYecute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Atiorney-in-Fact.. F2 � ''ower o�� ittorney INDEMNITY INSURANCE COMPANY OF NORTH AMERICA Bond No. KO-6157063 79S741 �� CIG�vA Know all men by these presents: Thac INDENIVITY I1vSURANCE COMPANY OF NORTH AMERICA , a corporation of the Commonwealth of Pennsylvania , having iu principal office in the City of Philadelphia , Pennsylvania , pursuant to the following Resolution, adopted by the Board of Directors of he said Company on December 5, 1983, to wit: "RESOLVED, That punuant to Articles 3.18 and S.l of rhe By-Lews, the following Rules shall govern the execution for the Compeny of bonds, undenakings, recognizances, wnvacta and other writings in Ne naare thoreof: ;1) That ihe Praident, any Srnior Vice Presiden� any Vice President, end Assistant Vicc Pr�aident, or any Attomey-in-Fect, may exxu[e for and on behalf of the Company my and nll bonds, undertakinpy, raognirancar, convacts end otha writings in the nawro thereof, the same tv Ee anesied when necessary by ehe Corporate Secreiary, or nny Assistant Corporate Secretary, end the seel of che Compeny �xed thaeto; and that the Praidrni, eny Smior Vice President, any Vict President or any Assistant Vice Praident mey appoint and authoriu any o�ha O�cer (eleded or appo�nted) of the Company, ent Attomeys-In-Fact tn so ezec�re or aaes[ w the execution of all such wntingv on behalf of tht Company and to atiix �he seal of the Company thereto. :2) My such writing e�cecuced in accordance with �hese Rulec shall be as binding upon �he Company in any case as though aigned by Ne Praident and attesud to by the Corporaee Sxretary. ;3) The signature of the President, or a Senior Vice Presiden� or e Vice Presiden4 or an Assistan[ Vice President and the seel of the Company mey be aFFixed by facsimile on eny powa o' _.._..._y tr._.,�[ pursuent w this Resolution, end the signaare of a certiFying Otiicer and �he seal of the Company may 6e aftixed by facsimile to eny certificate of any such power, end any such power or certifitate bearing such facsimile signsture end seal shall be valid and binding on the Company. ;4) Such other Officen of the Company, and Attumeys-In-Fact shall have authority tn catify or verify copies of this Raoiudon, the By-Laws of the Company, and any �davit or record of the Company nxessary to the discharge of their duua. ;5) The pusage of thif Resoluuon does not revokt nny tulier authonty grented by Resolutions of the Boerd of Diratnrs adopted on June 9, 1953, Mey 26, 1975, and March 23, 1977." does hereby nominate, constitute and appoint MARTIN A. PRISANT of [he City Of Miartli, State of Florida , each individually if there be more than one named, its we and Iawful attomey-in-fact, to make, execute, seal and deliver on its behalf, and as its act and deed any and all bonds, undertakings, recognizances, conVacts and o[her writings in the nature thereof in penalties not exceeding Five Hundred Thousand Dollars ($500,000) and the execution of such writings in pursuance of these presents shall be as binding upon said Company, as fully and amply as if they had been duly executed and "� ackowledged by the regularly elected officers of the Company at its principal office. IN WITNESS WHEREOF, the said William ]ungreis , Vice-President, has hereunto subscribed his name and �xed the corporate seal of the said INDEMNITY INSURANCE COMPANY OF NORTH Ay1ERICA this 19th day of August 1998 . 1NAEMPIITY �1�SURAIYCE CID'VIPe�'YY i��I• i'4ll�d In AMEWCA aL�'-+ K.k4►Ap�,i�. ,1.�'� Fy's ¢ �,4" � � �;��``�� � ,._ . 9���.... ,,,�,��+" . ��.�a��� W'rl�liam Jut�gre°��s , Vic� Presidcnt COMMONWEALTH OF PENNSYLVANIA COCJNTY OF PHILADELPHIA ss. On This 19th day of August , A.D. 1998 , before me, a Notary Public of the Commonwealih of Pennsylvania in and for the County of Philadelphia came William Jungreis , Vice-President ofthe INDEMNITY INSURANCE COMPANY OF NORTH AMERICA to me personally known to be the individual and officer who executed the preceding inswment, and he acknowledged that he executed the same, and that ihe seal �xed to the preceding instrument is the corporate seal of said Company; that the said corporate seal and his signature were duly affixed by the authority and direction of the said corporation, and that Resolution, adopted by the Boazd of Directors of said Company, referred to in the preceding inswment, is now in force. IN TESTIMONY WHEREOF, I have hereunto set my hand and �xed my official seal at the City of Philadelphia the day and year first above written. N0TARIAL SEAL DEBRA M. MARANO, Nohary Publie Ciry of Philadelphia, Phlla. County My Commissan Expires Dee 20,1998 �'✓�, � ' +��'�./�.+�C�'lf.!! Notary Public T, the undersigned Secretary of 1NDEMNITY INStiRANCE COMPANY OF NORTH AytERICA , do hereby certify that the original POWER OF ATTORNEY, of which the foregoing is a substantially true and correct copy, is in full force and effect. In witness whereof, I have hereunto subscribed my name as Secretary, and �xed the corporate seal of ihe Corporation, ihis 2 5 tday of M��r-�h ?l�S�C�• w�ryM�� �'�y�^ f �µ� ! � 3.,- y.».�k � �,'�!i'1r'J : V.'i Q�: ;. Ss� �3!'r�`J7':�°°'e° 3�rF �.r.e ��,��,����� Debra H. Pazia�a , �ecret�ry `+�.°�r � � ���` ��,.M�. THIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPTION DATE AFTER August 19, 2000 . NOT VALID UNLESS PRINTED ON TEAL BACKGROUND PAYMENT BOND No. KO-6157063 TI� STATE OF TEXAS COUNTY �F TARRANT KNOW ALL MEN BY THESE PRESENTS: That we (1) 1& M RODRIGUEZ. 1NC., a(2) Coraoration of Tcsas, hereinafter call Principal, and (3) Indemnitv Insurance Companv of North Amcrica, a corporation organized and e.*zisting under ihe laws of the State and fullv authorized to transact business in the State of Tc�as, as Surcty, are held and firmly bound unto thc Cit�� of Fort Worth, a municipal corporation organircd and existing under the laws of the State of Texas, hereinafter callcd Owncr, and unto all person, firms, and corporations ���ho may furnish materials, for or perform labor upon the building or improvements hereinafter refened to in the penal sum of : ONE HUNDRED EIGHTEEN THOUSAND FOUR HUNDRED SEVENTY FOUR AND NO/CENTS... (�118.47d.00) Dollars in lawf'ul money of the United States, to be paid in Fort Worth, Tarrant County, Te�as, for the payment of which sum well and truly be made. we hereby bind ourselves, our heirs, executors_ adsuinistrators and successors, jointly and severalh�, firnily to these presents. T'HE CONDITION OF T'HIS OBLIGATION is such that Whereas. the Principal entered into a certain contraci with the City of Fort Worth, the Owner, dated the 16TH day of MARCA A.D. .]999, a copy of wtuch is hereto attached and made a part dtereof, for the construction of:: INDIAN COVE WATER EXTENSION Project No. (s) PW77-060770153960. a copy of which is hereto attached, referred to and made a part hereof as tully and to the same extent as if copied at lengtli hercin, such project and construction being hereinafter referred to as the "work". NOW 'i'I�REFORE, the condition of this obligation is such that, if the Principal shall promptly make payment to all claimants as defincd in Article 5160, Revised Civil Statutes of Texas, supplying labor and materials in Ihe prosecution of the work provided for in said Contract, then this obligation shall be null and ��oid, otherwise it shall remain in full forcc and effect. F10 TI� BOND IS MADE AND ENT'ERED into solel� for the protection of all claimants supplying labor and material in the prosecution of the work provided for in said Contract, as claimants are defined in said Article 5160, and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of the Revised Civil Statutes. PROVIDED FURTHER. that if any legal action be filed upon this bond, venue shall lie in Tarrant County, State of Texas, that the said Surety, for value received, hereby stipWates and agrees that no change, ertension of time, alteration of addition to the ternis of ihe contract or to the work to be perfornied thereunder or the specification s accompanying tl�e same shall in any ��ise affect its obligation on this bond, and it does hereby waive notice of anv such change. extension of time, alteraUon or addition to the terms of the contract or to the work to the specifications. PROVTDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied. IN WITNESS WHEREOF, this instrument is e�ecuted in 7counterparts each one of which shall be deemed an original. tlus the 25TH dayo uf MARCH A.D., 1999. ATTE ST: r , iy � �4��1.+��cJ4w r� �ncipal} �ecretary ' (SEAL) !�''�.�-�'��''�G� Witness as�io Principal ��� 1.�.�c�..� f '�l�W Address i' �����r,� � r� �, � / ��, � 4St� _ ) S�cr�taryr � ( SEAL) itness a Sureh' t � v �� � 811 Lamar. Suite 310, Fort Worih_ Tcxas 76102 I � M$Q�RIGUEZ, INC. r � p�� �„� ) C BYj z ��� � ��i � � �, �`-�' � '� � T�t��� -e��ti �I--���,,� P.O. BOX 50187 FORT WORTH, TX 76105 (Address) Indemnitv �nsurance Comuanv of North America _ Surety� r s�: i�l � 1 Y� l� e� �,�"�� � �,r� ��artQ����-�- er� . Martin A. Prisant (Address) 811 Lamar, Suite 310. Fori Worth. Texas 76102 (Address) NOTE: Date of Bond must not be prior to date of coniract (1) Correct Name of Contractor (2) A Corporation, a Par[nership or an Individual, as case may bc (3) Correct name of Suretv (4) If contractor is Parinership all Partners should execute Bond (5) A irue copy of Po��-er of Attorney shall be attached to Bond by Attorney in Fact. � 'ower of ttorney INDENINITY TNSiIRANCE COMPAIYY OF NORTH A�iERICA Bond No. KO-6157063 �� CIGNA 795741 Know all men by these presents: That INDE�'ITY INSURAtiCE CO�IPAI�'Y OF NORTH A�IERICA , a corporation of the Commonwealth of Pennsylvania , having iu principal o�ce in the Ciry of Philadelphia , Pennsylvania , pursuant to the following Resolution, adopted by the Board of Directors of the said Company on December 5, 1983, to wit: � 'RESOLVED, That pursuant tn Articln 1.18 end 5.1 of the By-Laws, che following Rula shell govem �he extcu�ion for the Compeny of bonds, undertakings, r�cognizancn, convacv and otha wnongs in tiu naaue rhereoF (1) That the Prcsidm� any Smior Vice President, any Vice Presiden�, and Assis�nt Vice Praident or any Attomey-in-Fact, may execum for and on behalCof the Compeny any and all bonds, undertalcing�, recogniuncn, convacts and other wribng� in [he nawre thereof, the sarne [o be auested whm necessary by'he Cnrporete Secretary, or sny Assietant Corporate Sare[ary, and the seel of the Company af£ized �hereto; and thaz the Prniden� eny Senior Vice Presidrnt, any Vice President or my Pssistant Vice Prnidrnt may appoint and aufhonze eny other Officer (tlected or appomted) of Ne Company, ant Aunrnrys-In-Fact tn w ezea,m ot anest m �he execution uf all such writings on behalf of the Compmy and tu �z ihc seal of che Company �hcreto. (2) My such wridng executed in accordance with these Rule� shall be as binding upon the Compeny in any cue at though signcd by the Praidmt and anated to by the Corporate Secretary. (3) The signamre of the Praidenr, or a Senior Vice President, or a Vice Praiden� or an Assis�ant Vice Presiden[ and the seal of the Company may be �xed by facsimile on any powa of attomey grenud pursuant to this Rcsolution, nnd �he signauirc of a certifying OtTicer end the swl of the Company may be afiixed by fatsimile rn eny cenificate of any such powa, end any such powv or certifiute bearing such fauimile signanue and teal shall be valid and hinding on the Company. (4) Such other O�cen of the Compeny, end Annmtys-In-Fact shell have authoriry rn certify or verify copia oC this Rcsolution, the By-Laws uf the Company, and any �davit or record of the Company nx.�ssary tn the discharge of their dutin. (5) The paasage of this Resoludon doa not revoke any earlier authoriry granced by Resoluuons of the Board of Direcwrs adopted on ]une 9, 195J, :btay 26, 1975, and hlarch 23, 7977 ' � does hereby nominate, constitute and appoint MARTIN A. PRISANT of the City of Miami, State of Florida , each individually if there be more than one named, iu we and lawful attorney-in-fact, to make, execute, seal and deliver on its behalf, and as its act and deed any and all bonds, undertakings, recognizances, contracts and other writings in the nature thereof in penalties not exceeding Five Hundred Thousand Dollars ($500,000) and the execution of such writings in pursuance of these presents shall be as binding upon said Company, as fully and amply as if they had been duly executed and _' ackowledged by the regularly elected officers of the Company at its principal office. IN WITNESS VVHEREOF, the said William lungreis , Vice-President, has hereunto subscribed his name and affixed the corporate seal of the said IPIDENIIYITY L'VSURANCE COMPANY OF NORTH A;14ERICA this 19th day of Augus[ 1998 . IIYDE�ITY L\SURAu�'CE CO11PANY OF NORTH AMERICA � William Jungre�is , Vice President COMMONWEALTH OF PENNSYLVANIA COUNTY OF PHILADELPI-QA ss. On This 19th day of August , A.D. 1998 , before me, a Notary Public of the Commonwealth of Pennsylvania in and for the County of Philadelphia came William Jungreis , Vice-President of the INDE�L�]ITY INSURA��ICE CONIPAutiY OF nORTH A.NIERICA to me personally known to be the individual and officer who executed the preceding inswment, and he aclrnowledged that he executed the same, and that the seal �xed to the preceding insuwnent is the corporate seal of said Company; that the said corporate seal and his signature were duly �xed by the authority and direc[ion of the said corporation, and that Resolution, adopted by the Board of Directors of said Company, referted to in the preceding inswment, is now in force. IN T'ESTIMONY WHEREOF, I have hereunto set my hand and �xed my official seal at the Ciry of Philadelphia the day and year first above written. NOTARIAL SEAL DEBRA M. MARANO, Notary Public Clty o( Philadelphia, Phila. Courtry My Commission Expires Dec 20,1999 Notary Public I, the undenigned Secretary of I�\DEMIYITY INSURAPICE COMPANY OF NORTH A,vIERICA , do hereby certify that the original POWER OF ATTORNEY, of which the foregoing is a substantially true and coRect copy, is in full force and effect. In wimess whereof, I have hereunto subscribed my name as Secretary, and �xed the corporate seal of the Corporation, this 2 5 tdSy of M�,-�r_ ic�c�� �W rY.`.M'� � �� 'r � I Y . . ��er�ru�.;as` ��� `� ; *. �' 3,9i n � r = 3�� ''� "^?G; t�i^�i�- ' �`' .' �r� Debra H. Paziora , Szeret�ry �f�;�,�„rf THIS POWER OF ATTORNEY IvfAY NOT BE USED TO EXECUTE ANY BOND W1TH AN INCEPTION DATE AFTER August 19, 2000 . VOT V�LII? IJNLFSS PRINTED ON �C�AL BACi{GRO�.iND , , _ , ,� , . � MAINTENANCE BOND No. KO-G 157063 THE STATE OF TEXAS COUNTY OF TARRANT KNOW ALL MEN BY THESE PRESENTS: That (1) I& M RODRIGUEZ, INC. as Principal, acting herein by and through (2) ISRAEL RODRIGUEZ its duly authorized PRESIDENT and (3) INDEMNITY INSURANCE COMPANY OF NORTH AMERICA a corporation organized under the laws of the State of Pennsylvania, as surety, do hereby acknowledge themselves lo be held and bound to pay unto the City of Fort Worlh. A Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at Fort Worth, in Tarrant County, Texas ihc sum of ONE HUNDRED EIGHTEEN THOUSAND FOUR HUNDRED SEVNETY FOUR AND NO/CENTS... (�118.�l74.00) in lawfiil money of the United States, for the payment of which sum well and tnily be made unto said City of Fort Worth and its successors, said Coniractor and suren� do hereby bind themselves, their heirs, executors. administrators, assigns and successors, jointly and severally. This obligation is conditioned, ho���ever; that, W�IEREAS, the Principal has entered into a certain contract with the City of Fort Worth MARCH 16„ 1999 the performance of the following described public work and the construction of the following described public improvements: INDIAN COVE WATER EXTENSION of same being referred to herein and in said contract as the Work and being designated as Project No. (s) PW77- 0G0770153960and said contraci, including all of the specifications, conditions and written instrumenis referred to therein as contract documents being hereb�� incorporated hercin by reference for all purposes and made a part hereof, the same as if set out verbatim hcrcin; and , WI-�REAS, in said Contract, Contractor binds itself to use such materials and to so construct the work ihat it will remain in good repair and condition for and during it►c period One (1) Year after ihe date of the final acceptance of the work bv the City; and W�IEREAS, said Contractor binds iisetf to maintain said work in good repair and condilion for said term of One (11 Year: and, WHEREAS, said Contractor binds itseLf to repair or reconstruct the w�ork in w�hole or in part at any time within said period, if in the opinion of thc Director of the Water Departmcni of the City of Fort Worth, it bc nccessary; and, VdHEREAS, said ConVactor binds itself, upon receiving notice of the need therefor to repair or rcconsiruct said work as herein provided. I� 5 NOW 'THEREFOR�i, if said Contractor shall kecp and perti>rm i[s said agreement tc> maintain, repair or reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwisc this }3ond shall be and remain in full force and et�ect, and said Cin� shall have and recover from the said Contractor and its surety damages in the premises prescribed by said Contract. This obligation shall be continuing one and successive recovenes mav be had hereon for successive breaches until the full amount hereof is exhausted. Wf-�REAS, all partics covenant and agrec that il' any lcgal action be filed upon this bond, venue shall lie in Tacrant County, Texas; and, IN WITI�IESS VJHF'I2EOF, this insirument is eYecuted in 7counterparis, each one oF which shall be deemed an original, dated MARCH 25"', 1999 ATTEST: '�i ��a��, J�'a��,.�.� �'` (Principal) Secretaryd (Seal) I & Nl RODRIGUEZ. LNC. PRINCLP (4) BY: �-�t��� � ,�L.t.� I � V Titl�(�� �'1-t`'�'1� , �� ���� �. Witness as to Principa� ri��.�a��� t� , t�t� (Addressl ATT�S'I': 'r _1'� F �.� � � ,/ {Surety Secretary I (SEAL) f �,1� � �S ld �Ll!`�LV P.O. BOX 50187 FORT WORTH. TX 76105 (Address) INDEMNITY INSURA.NCE CiOMPANY OF NORTH AMERICA su�ety BY: f �_ .l_1_C��I ,.1;[�,� � 1 (Attorney-in- ) �5�' ��,,� Martin A. Prisant 811 Lamar, suite 310. Fort Worth Texas 76102 (Address) NOTE: Date of Bond must not be prior to date of Contract (1) Corre�K Naine uf ConVactor (2) A Corporation, a paRnership or an Individual, as casz may be (3) Correcl nanie of Surety (4) if Contractor is Partnership all Partners should executc Bond (5) .A true copy of Powrr of Attomey shall be attached to Bond by Attorney-in-Fac.�t. FG 'ower ot ttorney INDEMNITY INSURANCE COivIPAN1' OF NORTH AMERICA Bond No. KO-6157063 - 795741 �� CIGNA Know all men by these presents: Tha[ INDEM�'ITY INSURA,ICE COMP.auYY OF NORTH AMERICA , a corpora[ion of the Commonwealth of Pennsylvania, having iu principal office in the City of Philadelphia , Pennsylvania , pursuant to the following Resolution, adopted by the Board of Directors of the said Company on December 5, 1983, to wit: � 'RESOLVED, That punuent ro Anicic 3.18 and 5.1 of the By-Laws, the (ollowing Ruln shell govem che aeauon for the Company of bondt, undertakings, recagniranw, contracu and otha wriungs in ti�e nanue thereof: (I) That the Pr�siden� eny Senior Vice Praident, any Vice President, and Assis[ant Viu Pr�sidenS or any Aanmey-in-Fact may execute for and on behal(of the Compeny any and all bondt, undertakinge, recognizanca, convacv and oNer writing� in the nawre �hereof, the same to be a¢ested when ne�cssuy 6y the Corporete Seae[ary, or any Assisrant Corporste Secrewy, and �he senl of the Company �zed [hereru; and rhee rhe Praidrnt, eny Senior Viu Presidmt, any Vice President or any .4�sistant Vice Presidmt mey appoint and euthonze eny other Officer (elected or appointed) of [he Compeny, mt Aaomeye-In-Faa m so aeeate or attest m �he execuuon of all such wri[ingv on behalf of the Compeny and tn aPfix ihe seal of the Company thaetn. (2) My such writing axuied in accordance with �hae Rula shell be as binding upon the Compeny in eny rase a� though �igned by �he Prdident and anested m by Ne Corpora�e Secretary. (3) The signanue of the Preident, or a Senior Viu Preidenr, or a Viu Praiden� or an Assistant Vice Pr�vident and Ihe etal of the Company may be affixed by fanimile on eny powv of avnmey granted pursuam tu �hie Rcsoluoon, and the signenue of a certifying Officer and the seal of ehe Compeny miy be �xed by faaimile m any certifi�ate of any such power, end any such powa or certificaie beenng 9uch faesimile �ignnnue end seal shell be valid and hinding on the Compeny. (4) Such other Offiurs of the Company, and Avnmey�-In-Fatt shall heve authority m certify or verify copies of thif Raoluvon, ihe By-Law� of the Company, and any �davit or record of ihe Company nemsary m the discharge of their dutia. (5) 1'ht pazsage of thie Resolution don not revoke any tarlier authoriry granud by Raolutions of the Board of Directon adopte� on ]une 9, 1953, May ?B, 1975, and March 2J, 1977.' � does hereby nominate, constitute and appoint MARTIN A. PRISANT Of the City of Mlan]i, State of Florida , each individually if there be more than one named, its we and lawful attomey-in-fact, to make, execute, seal and deliver on its behalf, and as its act and deed any and all bonds, undertakings, recognizances, convacts and other writings in the nature thereof in penalties not exceeding Five Hundred Thousand Dollars ($500,000) and the execution of such writings in pursuance of ihese presents shall be as binding upon said Company, as fiilly and amply as if they had been duly executed and �' ackowledged by the regularly elected officers of the Company at its principal office. IN WI"NESS WHEREOF, the said William Jungreis , Vice-President, has hereunto subscribed his name and affixed the corporate seal of the said LYDE�IITY ItiSL'RA,1'CE CONLPAir'Y OF NORTH AMERICA this 19th day of August 1998 . w�, 11r�ErINITY INSURANCE CO11P.Ai�IY OF NORTH AMERICA � `�� "�� +�� ' .'� • 3.� •r 7 " �� � � » a a rt����'� �s; � . ��•�,.:�� William Jungre~is , Vice President COMMONWEALTH OF PENNSYLVANIA COUNTY OF PHILADELPHIA ss. On "Chis l9th day of August , A.D. 1998 , before me, a Notary Public of the Commonwealth of Pennsylvania in and for the County of Philadelphia came William Jungreis , Vice-President of the LYDE�L�IfTY INSURANCE COrIPANY OF NORTH .A�yiERICA to me personally known to be the individual and officer who executed the precedi�g inswment, and he acknowledged that he executed the same, and that the seal affixed to the preceding insvument is the corporate seal of said Company; that the said corporate seal and his signature were duly �xed by the authority and direction of the said , corporation, and that Resolution, adopted by the Boazd of Direc[ors of said Company, referred to in the preceding instrument, is now in force. IN T'ESTIMONY WHEREOF, I have hereun[o set my hand and �xed my official seal at the Ciry of Philadelphia the day and yeaz first above written. NOTARIAL SEAL DEBRA M. MARANO, Nonry Public Clty M Philadelphia, Phila. Courriy My Commissan Expiras Dec 20.1999 ��� �f7 ' �'�1.�.�.,{�i Notary Public 1, the undersigned Sec�etary of INDE�IIVITY IPiSliRANCE CObIPANY OF NORTH Ar1ERICA , do hereby certify that the original POWER OF ATTORNEY, of which the foregoing is a substantially we and corzect copy, is in full force and effect. In wimess whereof, I have hereunto subscribed my name as Secretary, and affixed the corporate seal of the Corporation, this 2 5 tdaY of �=Y�r_ ic�c�� '~��$ v �x�� h.�/� 1''� ��. ��7^ -� E/�:s �if ti� ��� € ,/ �....v,. h f}ehra H. paziaaa , Secr�t�3+ �+.'eR7 . eY�. '�.'4WpM THIS POWER OF ATTOR.�IEY MAY NOT BE USED TO E,}CECUTE ANY BOND WITH AN INCEPTiON DATE AFTER August 19, 2000 . �1GT VAd.ID �Ti+I�.E.SS P�2I`idTED (�i'd T�AL BACKGRi�[,iN'� ' �. ; • 1 1� • TO: CITY OF FORT WORTH NAME OF PROJECT: PROJECT NUMBER: IS TO CERTIFY THAT : Date; is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for the type of insurance and accordance with provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Worker's Compensation Comprehensive General Liability Insurance (Public Liability) Blasting Collapse of Building or structures adjacent to excavations Damage to Underground Utilities Builder's Risk Comprehensive Automobile Liability Contractual Liability Other Locations covered: Descnption of operations covered: Limits of Liability Bodily Injury: Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ Ea.Occurrence: $ Ea.Occurrence: $ Ea.Occurrence: $ Bodily Injury: Ea. Person: $ Ea. Occurrence: $ Property Damage: Ea. Occunence: $ Bodily Injury: Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ � The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five (5) days after the insured has received written notice of such change/or cancellation. Where applicable local laws or regulations require more than five (5) days actual notice of change or cancellation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. Aeenc�� Fort Worth Aeent_ Address B S� Title , u:;t- :a ��� �Ht� 11 : 15 F:�_l' *� y��l p��+ DATE(AIIMl6��rrr.`� , A�+��Vr� ���f�i�1FF1� LA�� �� ��..�11�OL.t 1 ! [Itl�5.l�l�►1qV� 3r24/99 , ?RODUCE� `' � TNIS GER�"MFICATE IS 15SUED AS A HAAT"ER OF INFGRIIqArlON I 4NLY '.1ND COtdFERS NO R;OHTS UPON 7lIE CER71F1CATE l�Al;L HbfFMEY=�i 1fJSlli�ANCE SERVICE5 Hl7LDE:R. 7Ni5 CEf�71FICATE DOES NOT AMtND, EXTENA OR � 114 OLD GUN BAf2REL ! tv., SO.. 5TE. G � ALTER TNE CCVERAGc AFFI�RDE0 BY THE POL�CIe3 elELOW. ; P.U. �iQX 5556 COMPAMIES AFFOiiDiTJG C04'ERAG� .. _ _. . , _ _, � G{JN BARF�EL CITY. TEXA,S T5147 � c_+,wi,r,v p ��M'RAL lNSU�,NC_ COMPAN" iN5uAfD ,� 7 • - -- ------ C�^.rr,a�r�v ----_�. P,OC'�nlQllE�, IIJC. r`E>(qS 1r1rURIS�RS COMPENSA i;ON FUfvD I MR, I;'>r"dE�i. RODF�IC.'rUE?, PRE;iII]E'�T — � -------._.�.. . ... . _ ..__ �____ 1671 : C;R ;?B30 co��n�nr�r MA9ANK, ��E�lDERSON C4UN1Y,''EXAS '3'd1 C COMPANY D I � C�VE�GE5 _ _ _ _ ...._ __.. _.. _ _. , _ . _, _�.. ..... _ ..: -.'-- -. : .. _.._.� , . � Tli;S �5 T0 GERT{Fr TH,17 F'�_ PGUG�5 �'�F 1NS��w+��CE UST"� BEL�Nl N,�V6 SEE.0 15: U�C, TO 7HE !NSURED tdHMED reOVE FOR T�IE P0LICY PERIOC �NGICA � ED. '�GN1�TH3TAND!�1 ; ANY RcQUIREL?�N7, TERP�! 0R CC)N��T!pN 0F ANY COP�'FL;t`T OR 0THER DCCUMENT �R'ITH RES?EC7 T� bV^I CH TFIIS � C°RTfFir,FT= �vSAY 3E lSSL�ED GZ MAY FEBTAIN.'HG INSURl+NCE AFF0RUED 6 Y 71r' P�UCIES DESCRIBEC� HEREIN IS SUBJECT 1'C AU_ THC TERME, ck'CLUSIO�d5 ANC i:L`N0?I0NS 0F SUCH PO�iC'�[S Llt.41TS SNUI'�Ml hbA'i 41�VE B==iJ ��C!'Cc�' BY PAID CL.AiMS _, _____ ___ ' , ..... . -- i — -- —� CO � ' � pOl ICy FFrFC.^.LF_� mOLICY F�CPiRATiCN � ��H, T'!pE OF INSIJRANCF i�OLiCY NUMBfR ��jp?E �M6!�v0!rY) anrE I���'Y1 LIMITg GEIVEFALLIABILffY ;RCF. VL J8��3�ti-��� �1/'�;'1U.C,q q��.��rn �EhERALAG�FEGATE ii � � 2.Q'JD,a(1Q.OU A X cowRre+�c.�a. reNEw,i. ��ar��Tr ' -- ccA��:; �.�wre Lj(' vcw�r. �lUhEN'? 5 C�.4TRp.CTOF'S F�iU' � AU TOMAFIILE L:�,4P.ILITY AnY'AU•T0 � All GVJNED ?JJ7U5 ' SGFiEC�LEDA�T05 � � '�I�.E�AU''0S NG'N-U1hTlEU iUTQS � GARACG LIABILITY � aouv nu � o � EXCESS 11ABIiiTY _ UYIBRE�W FGHIuY 6Tht�t Yh,+h UM6RE��.LA FOF�+i VJORIIER'� �0f�1Y�N9AT10lJ A�D 6 , E�LIF�YERS' LIHBILITY TMe aao-aiec�:v � i'�CL F�,:i�a�_�rxe � �, we ,^.FsiCGA6J.P.E X � GXCL OTHER PfiGDU��u • COS1F/0P Ai;U S j,0�.�. COO.OO � � ?FASON4L8aRVINJUAY S ';.�Q`J.QQQ.QQ I � EAGrO.SCUR4ENGE S 1,Q,70,0Q7.QC ; Fia� �,v�+a�F �,L,; e�ni��; � 50.QCO.Q!J IvicD EXP ;My of.o Par5�n; � 3 -�- -- �. � C0�'AOINE� SIIJGLE Lth117 BOOIIY INlUf.Y !PC� Go�Lc�; � 30DiLY I!V.;URY ner sccicenq I � b ?ROAERT" DAI+�IAGE 5 RUTG ON6Y • EA ACC�D�hT � $ . • OTHER T}iAV AJTO ONLY' i .—.� eA�r+ACC10£NT 3 � AGG�Fe�n*E : 8 ' !EkCH OCCU4RENCE �3 AGGFEGnI'E '-.-�.' :e � . S -5� �,nrn�2�94n, qr.r�caa 4�,�2..0� ,�o-,.,.� ����_ � a n ..kv _�wrs , X :� I EL EACNRCcioerr a 5C(],000.4C � �� nisE,�s� - =ou�:r una;r � �_ 5UC.�D��.uO � EL DISEAS� -:A �M?�GrEt S SOd (�Oii CJ � 1 �r.y�rar i wn ur ur erw i wn:v �u�:w i,ui�ai � cn wLLar�r �.q,. I I tua CE�TIFICATE HUL�ER SHA.�t_ 3E CONSiD�REG AN F,CGITI�NAi_ �NSUR�b OR�LY'�J tMG EXTENT THAT TI-lEIR I1�ITERES'T' MF,Y APPEJ��^<. CER71¢iC�1TE KOLDER', . crr� OF FT. WORTH Ai f!�. MS. TOt�YA IV1In0 � ooe �t�oc�cr.�oRror�i FT. Wl3RTH, 7,; XAS 7F102 F?JC NC. (817) 332-5478 achRo�2s-s t�issf _ � _ _ i CANG�CL.AT1�y .. : r . I _ _ . _... . .. _. . - - - � SMCULD HNY6F THE A80VE OESCf11BED POL.�IE9 BE C7WCSLlEp 2EFORc TME I � IOCPft.aTiOV DATE THEREOF, THE ��NILL EMCEA`!�R TO MAtL I � QAYti W W'fl"EN NOTI THE CERTICICATE �LDE� HAME1 ;'D TME IEFT, � I 6L'T FIULLRE/`r�5NL SUG T1C� 5HA..L iMPDBE OBL�,AT70N O(k LiA81l7T'I I � oc aur �1�rr � rHe , rts QR RfPfi�5ENTArIvsS. 1 AUTH0R1Z�70 RE!'RF� TATC ���� � � �' � f ` + . .I'� ..:� • , . - �a;acoFta �o�oRai�ior►'��aes 4 CONTR.ACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A Labor Code Section 406.096, Contractor certifies that it provides workers' compensation insurance coverage for all its employees employed on city of Fort Worth Project Number PW77- 060770153960 J & M RODRIGUEZ, INC. i�tte % � .� �'��I��' Date � STATE OF TEXAS COUNTY OF TARR.ANT � § �/1 � BEFORE ME, the undersigned authority, on this day personally appeared ��►�-, )� �' _'�c' �� �, r known to me be the person whose name is.suhscri�ed2gthe fqregoing instrument, and acknowledged to me that`he executed the same as the act and deed of �, r�( C.nS�u'''�' � G t, ,`.� J for the purpose and consideration ` therein expressed and in the capacity therein stated. (��� �r N UNDER I� ,� �l 1 � ��D . �-' - r AND SEAL OF OFFICE this --�� _day of ; �,+�** � TANYA M! R0 �, � N�TARY PUBLIC ° ; ���f.��l'i � State of Texas �' �,'�or�� Comm. Exp 08-02-2001 ' �.,,r, � '•' •►r.��� THE STATE OF TEXAS § COLTNT'Y OF TARRANT § THIS CONTRACT, made and entered into MARCH 16. 1999, by and between the City of Fort Worth, a home-rule municipal corporation located in Tarrant County, Texas, acting through its City Manager thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER", and I & M RODRIGUEZ, INC., of the City of FORT WORTH County of TARRANT and State of TEXA , Party of the Second Part, hereinafter termed "CONTRACTOR". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second Part (Contractor) hereby agrees with the said party of the First Part (Owner) to commence and complete certain improvements described as follows: CONSTRUCTION OF INDIAN COVE WATER EXTENSION And all extra work connected therewith, under the terms as stated in the Contract Documents, and at his (their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendent, labor, bonds, insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirernents of the Contract Documents, which include all maps, plats, blueprints and other drawings and printed or written explanatory matter thereof, and the specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been identiiied by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's Written Proposal and the other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contractor pocuments and General Specifications, all of which are made a part hereof and collectively and constitute the entire contract. G1 The Contractor hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been given to him, and to substantially complete same within the time stated in the proposal. The Owner agrees to pay the contractor in current funds for the performance of the contract in accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the Contract Documents and all approved modifications thereof, and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in 7 counterparts in the year and day first above written. Citv of Fort Worth. Texas (Owner) Party of #he First part . BY; `�. ASST. City Manager I & M RODRIGUE7. IN�, : . CW Contractor �, � � I By: � -�4 ti.t.� � I1 � Title: �,�,r .� ' , � � _ ,, — - APPROVED: �� "� +L.12�'� _�'-1��'� Pn A. Douglas Rademaker, P.E. Director Deparhnent of Engineering cw I�4M�x.�IA r'' �-- ;, , �`/, �� +,���� -:� ? +,�,� �- �,�-<' c �r� t_ � �City Se�retary (Seal) WITNESSES: Approved as to Form and Legality: ��� � Gary Steinberger, Asst. City Attorney ��- 1�3a/ Contract Authorization ✓ � ��J ��C� Date � GEOTECFINICAL INVESTIGATION LAI�E 1�VORTH WATER SYST�M T\�IPROVENIENTS FORT tiVORTH, TE\AS Ti��1I REPORT NO. FE94029 TO POE ENGINEERS, INC. rORT �VORT�T, TE\AS BY TERRA-NtAR, I�'C. D�.LLAS / T'ORT �VORTH / IIOUSTON NOVEII�IBER 199� (P:1\l'ORDG�I'L•9�RL•PN' -t029C.DOC) - . _ _ • • . -, �'�� - -- �" i. � i CK'l'�i14,�'� .�_ ^ Consulting Engineers • Geotechnical • Envi�onmental • Co�struction Materials Testing POE Engineers, Inc. 6�S0 Manhattan Boulevard, Suite 210 Fort Worth, TeYas 761?0-1292 FORT WORTH • DALL.�►5 • HOUSTON November 3, 1994 Report No. FE94029 Attn: Mr. H. Wayne Barton, P.E. Vice President GEOTECHNICAL INVESTIGATION LAKE WORTH WATER SYSTENI LI�IPROVEMENTS FORT �VORTH, TE�C�S Gentlemen: Submitted here is the report of our geotechnical invest;�ation relevant to design aspects of the referenced project. The study was performed in accordance witli our contract dated September 21, 1994. We appreciate the opportunity to assist on this project and trust that our field and labora�ory data and en�ineering recommendations will be of assistance in your desi�n e�orts. Please cail if there are any questions, or when we may be of further service. Two unbound copies of the report have been provided, alon� with one bound copy. Sincerely, TERRA-MAR, rnc. � • rv� �r 0_ ,�'c��...Y , � - Nasir Marakali, E.I.T. Staff Engineer (Pc��l'O R DG�.['L• 94 R f•.P'Tl9aQ?9 L D1�C) lt4�0 Grav�r l Drive; 6idg, 43, �ort Ww�tft, 7cxas 7611 �! Ptsene z�! 7�-i13+Ss PART 1 - TNTRODUCTION 1.1 PROJLCT D�SCRIPTIOti It is proposed to improve the water system in an area focated alon� ihe south shore of Lake Worth, and extendin� along the north Access Road of Highway S20, ►n Fort Worth Texas. The site configuration is shown on Fi<vures I throu�h 3, attachcd. Based on available information tlle diameter oF the water line will vary from 8 inches to 22 inches. Tl1e deptli of tl�e flowline will be approximately 3 feet below ground surface. 1.2 PURPOSE AND SCOPE This investi�ation was designed to evaluate subsiirface conditions at the project site, and from those data to develop recommendations to be used in tl�e e�cavation, construction, and bac�llin; oper.ations. Our services included: obtaining samples of subsurface formations and measurement of groundwater levels; 2. evaluation of ;eneral soil, rock, and groundwater conditions along the proposed water line alignme;�ts for tlle purpose of definition of excavation conditions; 3. performing field and laboratory soil tests for classification purposes and to evaluate the consistency of subgrade soil and rock strata; and 4. providin� recommendations for desi�n lateral loading of trench boxes, allowable bearin� pressure for tl�il�st blecks, and backfillin� of trenches. PART 2- FiF.T,TI ANTI I,qTi(�RATORY TNVLSTTG�TTONS 2.1 FIELD INVESTIGATION 2.1 1 Test Borines, Subsurface conditions in tl�e aress enconlpassed by tl�e project were evaluated by forty six test borings, drilled in locations sp�ced at a����roximately 500 feet center -to-center alon� the proposed water line alignment. Tl�e locations are sl�o�vn approximately on the Plan of Borings, Figures 1 throu�h 3. Sample deptl�s, soil descriptions, and soil classifications (based on the Unified Soil Classification System), are sl�own on tlie Lo�s of Borin�s, Figures 4 through 49. Keys to descriptive terms and symbols used on tl�e lo�s are presented on tl�e Key to Terms and Symbols, Fi�ure 50. �r•:nt-ORDG�fC9aarr•i�.�an��iz.n�c� r�s� i orc TF3�A-NI�� . Undisturbed samples oF tl�e coliesive sub�rade soils were obtained usin� a Shelby-tube sampler. Consistency of tf�e soils was evaluated in tl�e field usin� a calibrated hand penetrometer. The results oF tl�ese determinations are tabulated at tl�e respective depths on the borin� lo�s. Non- cohesive and slightly cohesive granular soils were sampled using a split-tube sampler used in conjunction with ihe Standard Penetration Test (SPT). In this test, the sampler is driven into ihe undisturbed soil using blows from ] 40 pound drop hammer, falling 30 inches. The number ef blows rec;uired to drive the sampfer throu�h tl�ree six-incl� increments is shown on the borin� lo�s. At borin� locations B-10, B-1 l, II l4 th�-ou�h B-?7, B-?9 throu�il B-31, B-36, B-4? through B- 44, and B-�6, �veathered limestone rock ��as encountered at re!atively shallow depth. The strength of ihe rock stratum was evaluated by means oFTHD Cone penetration tesis. The resuits of these determinations are tabulated at tl�e respective depths on the borin� logs. 2.12 Groundw�ter Obse.rv�tions All borin�s were drilled usin� dry ai��er methods. Ground��vater observations were made in open boreholes at completion of drillin� and at�er a minimum peried of ?4 hours. All borings �vere backfilled and pavements patched after completion of the 24 hour water readin�s. De:ailed �roundwater level meast�rements at tl�e individual borin� locations are noted on t}Ie Lo� of Borin�s. ?.2 LABOR-�TOR1' 1\r1�ESTIGATION 2.? 1 Laboratory Tests Engineering characteristics of the soils were evaluated by tl�e fol(owin� laboratory tests: (1) visual and laboratory classification (Unified Soil CiassiEication System); (?) natural moisture content and unit dry density; (�) Atterberg limits; (4) Unconfined Compression on undisturbed soil samples; Test procedures and results are described in follo�vin� sections. 22? Classification Tests Field classification of soil samples were verified in the l�boratory throu�h visual classific�tion of samples by a �eotechnical en�ineer. Samples were classitied accordin� to color, texture, '' predominant material type, and consistency. Laboratory tests ���ere perFormed on representative soil s�mples to determine natural moisture content, and lic�uid and plastic limits. These tests were performed in ;eneral accordance with ASTM Ntethods D-2? 16, D-4?3, and D-4?4, respectively. Classification test results are tabulated at the correspondin� sample depths on the borin� lo�s: Both soil classification test results and visual soil classifications are used to determine the Unified Soil Classification System symbol(s) for each generalized soil stratum. These symbols are shown �r:;��'C�RI)G'•t'T:9.i:ri� r�an��iz.nc�c•� r:,s� : or� . - � TE3�!?A—MAlt .. — on the borin� logs. Procedures for determining the classification are in accordance with ASTi�1 Nlethod D-24S7. 2 23 Unconfined Comoression Tests Unconfined compression tesis were performed from Shelby tubes. In tl�is test, a cylindrical approximately 2.0 is stibjected to an axial load applied at a uniform strain rate until tl�e peal< strengtl�s determined from tliese tests are sl�o��m depth together with natural moisture content and performed in compliance with AST\�1 D-? 166. on undisturbed cohesive soil samples extruded specimen havin� a height-to-diameter ratio of without lateral confinement. The axial load is compressive stress is reached. Compressive on the borin; lo�s at the correspondin� sample dry density oF each specimen. These tests were PART 3- STTE AND SUBSURFACE CONDITiOi�'S 3.1 SITE GCOLOGY The primary �eoloeical %rmation L�nderlyinR the site west of intersection of Heron Street and Las Vevas Trail is the Paluxy Sand, Cretaceous sedimentary deposits. The Walnut Clay Formation, also a Cretaceot:s sedimentary deposit, is tlle primary formation for the portion of the site east of tl�e intersection of Heron Street and Las Ve�as Trail and south of the intersection down to Higllv��ay S?0 Service Road. Tl�e pri���ary ;eolo�ic formation underlying the rest of the site is ihe Goodlard Limestone Formation. 3.? SUBSURF'ACE STP�.�TIGR4PIIY �1�1D GROUNDtiVAT�R 3.21 General The subsurface materials alon� tlie m�jor;ty of tl�e water line ali�nments consist primarily of medium to high plasticity stirficial residual clays, overlyin, the Eimestone formation. Some clayey sand and silty sand soil materia! was encountered along Heron Street. The upper portions of the limestone formation exhibit varying de�rees of weatl�erin�. The subsurface materials at the sites can �enerally be �rouped into tl�ree strata. Tl�ese strata are described in the following para�raphs. �.2? Residual Clays In general, ihe near-surface clay soils consisted oP bro��rn, tan and gray clay, silty ciay, and sandy clay material, with depths ran��n; between one and five feet. Measured Liquid Limits of the clay soils ran;ed from 32 to 60 percent. Plasticity Indices ran�ed from 17 to 37. The so�l classification of these materials is CH to CL Tlie clay soils contained reck fraRments, gravel, and calcareous particles. 3.23 Sand In �eneral, the sand soils consisted oF bro��m, tan, ;ray, and oran�e sand, clayey sand, and silty sand, with depth ran�in� between one and fi�•e feet. The sand soils �ene�ally consisted of loose to (P:��l'OI2DG'�CC9aRLPT�94p29R.DUC) Pige 3 ofG .. r�a-�i .-- . . -- � very dense material. I�'IC1SU1'CCI LICILIICJ LlIl11lS of tl�e sand material ran�ed from 20 to 23. Plasticity Indices ran`ed From S to 8. Tl�e sand soils contained �ravel, calcareous particles and iron sta;ns. 3.?4 Weatl�ered L,imescone Tan �veathered Limestone was encountered in afl borin�s except Borings S-I throu�h B-9, B-28, B-32 throu�l� B-;5, 8-37 throu�h B-41, and B-45. Tl�e deptl� of tl�e limestone formation ranged between 0.5 and 4 feet. Details of ihe composition and physical characteristics oFsubsurface materials at specific locations are sl�own on tl�e Lo�s oF Borin�s. 3.25 Groundwater Groundwater was not encountered durin� drillin� operations or after a period of approximately 24 l�ours. A11 borin�s were backfilled and pavements patched after the completion of tl�e 24 hour water readings. It sl�ould be noted tl�at �roundwater can fluctuate with seasonal variations in rainfall, surficial runof�; and water in nearby waterways. P,�RT 4- ANA LYSES f1ND RECO�I1�iF.NDr�1TTONS =�.1 E,l'CAVATIO\TS 4.11 Subsurface Materials Medium to higl�ly plastic residual clays, ��eatl�ered limestone, and some sands are present within the proposed excavation deptl�s of tl�e water lines. Tl�e clays are generally stiff to hard in cons�stency, tl�e sands are loose to very dense, and tl�e «�eathered limestone moderately hard to hard. No percl�ed groundwater �vas present �.vitl�in tl�e proposed excavation depihs. It is anticipated that rock excavation may proceed satisfactorily usin� heavy backhoes fitted with rock buckets. Blastin� should not be reqt�ired. Groundwater, if encountered at tl�e time of construction, should be controlled during excavation. Dewatering measures should be instituted, to allow excavation and construction to proceed safely within a dry work are�. Measures should be instituted to protect the excavation durin� perieds of rainfall, when surface water may be cl�anneled into tl�e excavation bottom. 4.1? Trench Backfillin� All trench backfill above the pipe beddin� materials should consist of site excavated clays, sands, and limestone fra�ments. All rocl: ft"1�?I11Cf1�S I11VII1� il 111c�X1I11U111 C�IIIIeIlSl0f1 lil eXCeSS Of S1X 111CIleS should be removed from the backfill. The bac!<till shoulcl be compacted in lifts having a maximum compacted thickness of eiryht inches The backfill fill should be compacted to an in-place de�sity oF at least 90 percent oFythe maximum dry density as obtained in the laboratory compaction procedure AST��( D-69� (Stanciard Proctor). Fill placed beneath pavement or at depths of over five feet below surface �rade should be compacted to at least 95 percent of the maximum dry (F.���'ORDG'.?'L•9aRCP"I19�0?9R.nnC) --- �-- -. .._... _ �rt14-�►ri � , - P��t 3 uf 6 density as obtained in the laboratory compaction �rocedure ASTM D-69S (Standard Proctor). The moisture content of the compacted fill should be in the range of two percent be'ow optimum to five percent above optimum. 4.? TIIRUST BLOCI{S Tl�rust blocks are planned due to bends in tl�e waterlines. Stations and elevations were not provided by Poe En�ineers, Inc. Based on available inFermation, t}�rust blocks will be placed at depths oF aoout tl�ree to four feet be(o�v existin� �rade witl� a soil cover of approximately three feet from the top of the concrete blocks. In Undisturbed Residual Clav - Allowable lateral soil loadin� for earth-formed thrust blocks in undisturbed residual clay soils is 3,000 pounds per square foot (ps�. Blocks must be cast in contact with undisturbed clay. No backfillin� or formin� should be allowed. A1! loose materials should removed From tl�e excavation prior to concretin�. In Undistt�rbed Sand - Allowable lateral soil loadin� for elrth-formed thrust blocks in undisturbed residual sand or clayey sand soils is ],500 pounds per square foot (ps�. Biocks must be cast in , contact wrth undisturbed sand. No backfillin� or formin� sheuld be allowed. All loose materials � should removed From the e�cavation prior to concreting. If the excavation sides will not stand unsupported prior to concretiny, the sides m�y be sloped, the thrust blocks formed, and the area adjacent to the thnist blocks backfilled in accordance ���ith compaction specifications �iven in � Section 4.1?. 1n tliis case an allo�vable lateral loadin� of 1,000 pounds per square foot should be used in desi�n calculations. In Weatfiered Limestone - Allo�t�able fateral soil ]oadin� for earth-formed thrust blocks in undisturbed weati�e;ed limestone is 7,000 pounds per square foot (ps�. Blocks must be cast in contact with undisturbed rock. No backfillinv or formin� sllould be allowed. All loose materials should removed from the eYcavation prior to concretin;. 4.3 LATERaL LOADS FOR SELECTION OF TRENCH SHI�LDS Based on available information, it is antici��ated tl�at trencil sl�ields maybe used to protect workers in tlie ti�encl� e�cavations. B�sed on tl�e worst-cnse soils encountered in the test borings, and assumin� drained soil conditions, it is recommended that trench shields be designed to car.y uniformly distributed lateral loads on tlie order of 20 pounds per square foot, per foot of trench depth (i.e. for a five foot deep trencl�, tl�e trench box sl�ould be desi�ned to carry uniform lateral loadin� of 100 pounds per square fooc). {P:\�VORDG�I'L9�RL•PT�940?9RnOC) P�ga 5 of6 . TF3�2A-1M�Z -- -. ... PART S - LTMiTATi01�'S This study was conducted for the exclusive use of Poe En�sneers and the City of Fort Worth. The findings and recommendations presented in this report were based on a discrete number of soil test borings. Althoti�l� our field personnel visually survey the site for surface features indicative of variable soil conditions (fill, borrow or draina�e areas, etc.), subsurface conditions may be encountered that difE�er From these data. In this case, we should be notified immediately so that the ef�'ects of tl�ese conditions on desi�n and construction can be addressed. The reproduction of t{�is report or any part thereof, in plans or other documents supplied to persons other than ihe owner, sllould bear lan;ua�e indicating that the information contained therein is for �eneral desi�n purposes. All contractors referrin� to this geotechnical report should draw his or her o�vn conclusions for biddin� piirposes. �r•:���roa���r•e�aRcrr�aoz�a.noc> rz;z 6 or� - - . - Tf7�ltA-MAR _ . - . � �,. � ' � . p�GVRF ' �iA"M�AR .y. e ecw+� �f,i �o�i,r i,.�.�s.. !M M4 � i •� IFiT �-aIa M4f�Y 77�Is1 i]sxw ����f�piM � fYfl M4fl�, Y�IM •� PLAH pF $4RINGS r€A�k-u�R r�c. FE9l.Q29 �� - FlC7U1kE' S PLATE I 7E�iA-lilNlft ��— , � W a Nor1l �} ' • • ��,� �,t�� � � � ' - • . �y�- .`� �_ ��'` . �� • � ' R�7���' r;. . y�ti,w t�,rn. rta��. LEGCND � Bo�l.� Ix��la� f i�/ !44 1P90 �� I!!J �.�� wo��► w.�� s�u.m i.p�e.....0 ian wonl 7..0 �PLAN OP B0RINGS �TERR�-YAR NC.I �9I-029 II Na+rH FIGUAE 2' I PLATE I ,_„_ „ .. -.,, ,_� �� �:.:,_v:.� �•� � .�..,.a.�y TI(is FE44-024 FCGUR� 3 PLATE I LOG OF BORING BORING B-1 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-5-94 Elev.: 603 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: 10-6-94 was: Dry Depth to caving wtien checked: 10�-94 was: 5.0' , ELEVATION/ SOIL :;tt�OLS MC Il. PL -200 D.D. P.PIIi UNCQN. D� sar.�� � srr�ors DESCRIPTION (feet) & FI� TESS' DATA A � % PI X pci tsf Csf 603 — 0 i •- - , -------------------:--------:----------------------- .... .... .. 3/6.00 ....... ...... ....... ....... ......... s/6. oo S� to very suff reddish brown { ,��I i�/6.0o silry CLAY w/ calcareous pamcles �� I � _ t� I bo2 --i '. �� I 8/6.00 10/6.00 14/6.00 � 601 � 2 � -I-3 599 -;-4 598 --5 I 16 34 14 20 � I (CL) � _�._��------------------ --------------------__ ... . ...... ....... .... . .. Hard brown siltv CLAY w/ calcareous 15 117.6 4. s�� s: �9 inclusions, calcareous nodules & � iron stains 597 �6 596 -I-7 .I. Notes: Completio❑ Depth: 5.0' (CL) T�RRA-[VSAR. CNG. � � i � � i � I h I FIGURE NO.: 4 I � LOG OF BORING BORING B-2 Project: Lake 1�'orth Water System Improvements Date: 10-5-94 Elev.: 601 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: 10-6-94 Depth to caving when checfced: 10-6-94 EZEVATION/ SOIL SYMBpIS °� s.ar�'� srr�ors DESCRIPTION (t�t) a FIELD TES'f DATA, 601 --0 - --------------------------------------------------- � v •.6 lo •, y, 2" Asphalric Concrete � I�.�� �° �. 10" ran gravelly sandy clay w/ i° .'�-� •- �� � �-�� trace asphaldc concrete Base � b_�� y::s . v� d .v' c-�_ �'-� v �9 -- � a .� � (PAVEI�iENT) 600 --i � .�:s�. ya° � a� Brown Qravellv clavev SAND�—�-----���_ _ ,7'—,u ' _ .��� �` ? ry �P' • 599 --2 �.��' , . �• . ��r•� _ ;� �'i �: — .� �' � �$C� 59 Projeci No.: FE94-029 was: Dry was: 5.0' hiC LL PL pi I-2D0 D.D. P.P£.*I UNC�N. , % % % X pcf ts! tsi j . ..... ..... ..... ...... ....... ........ ......... 7 21 16 5 8 -3 •-• ... ....... ................. - �----------------------------------------------------- - .. ..-- -•-•�----� S/6.00 7 20 15 S 39 „ :: �: : c: a�6. oo Loose to medium dense siltv fine s/s. oo SqI�1D w/ qlcareous particles - :I: _" .�:: -- : :i� :,i 597 --4 � =!� :�: ., '�:'I: .. � : : : i�i - 5/6.00 _ t : : : :�: � 6/6.00 ' ,I 9/6.00 596 --5 � :I' - � M � =1: .. ;I; .. � ]I: ... � :j; 4 : " :;: .,. k :I'I'j:i: ;i: • _. (SC1 SQS --,� f :;:I:':I: � � 59� --7 Notes: Completion Depth: 6.0' FIGURE NO.: 5 - TErIRA-MAR, INC. � � ---- .. __.- --.... LOG OF BORING ' BORING B-3 � Project: Lake Worth Water System Improvements Date: 10-5-9�3 Elev.: 616 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: 14-6-94 Depth to caving when checked: 10-6-94 ELEVATIOlJ/ SOIL SY!ffipL$ o� s,ar�r�x sYr�oLs DESCRIPTION ( f ee t) � F I EZD TEy'1' DATA 616 0 —•--------- .____�_.-- -- ---------_•--_.------ ' `�'' ' 125",�m naluc Concrete a.'�a'' 3/6.00 ".'t' �-�--7�° 2/6. o0 10.75" brown �avelly sand Base '�'} `��' 19/6.00 - ?'?'4a G 4 ,4' � P �- a.-a.y � 3+ o a� r�.'Y So' - [.'a,�a7 ��.=�:. r.� (PAVEMENT) 615 --1 s. v a.o. � _�. _---- �� � Medium dense grayish brown siltv � ���'� = SAND . :I: ' 614 I 2 " '� 7/6.00 � ' I : : -: 6/6 . 00 �c � � 12/6.00 _ li�: � :1= ,� 613-3 �:; - :�=li= :I:I: ��� 10/6.00 � --------- -�_._ .... ..... ............... .. — -.. _...... ......... :�: i i/s. oo Very sriff tan &�aysar� dy SILT 1 i �s :_: p �s/6. oo w/ calcareous nodules & uon stains 612 --4 • • : �� 611 --S — Project No.: FE94-029 was: Dry was: 5.0' MC LL PL pI —2�0 D.D. P.PF27 UNC�N. % % A % pcf tsf tsf 610 --6 I � I6Q9 --7 �I �l � Notes: Completion Depth: 5.0' FIGURE NO.: 6 , _ r�Qn_nnnR wr - - _...,r„ _ _ -. _ ... ....--- � -�---, LOG OF BORING k BORING B-4 � � Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-5-94 Elev.: 617 +/- �ocation: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checfceti: 10�-94 was: Dry Depth to caving when checked: 10�-94 was: 4.4' Q= �AT I�� S0 I L SYHBpL5 MC Il. PL -200 D. D. P. P�?I � UNCCN . I °�x s.�r� s�or..s — DESCRIPTION %% % PI J% P�, ts� �Sf I { f ea �) � F I IID T"rST DATA 617 -- 0 • . i � 7/6 . 00 - - - - - - - - - - - . . . . . . . . . l . . . . . . . . . I - ------ ---- ---- ----- -- ---- -- --- - ------ -- --- .... ..-- ...... ....... ....... — �'�;' �/e. oo Medium dense yellowish brown clavev `- ', ��; �/s. oo SAND w/ ralcareous particles & I trace calcareous nodules ��•x ; �r . �_�� /�;��„� �SC� � 616 --1 '� ,_ ....,._.. ------ .... .... ......... _..... ....... ....... ......... Very sriff to hard yellowish tan = sandv SiLT __ ;,12/6.00 11 57 16/6.00 _ : 21/6.00 I ' 615 --2 • ' .. : I I . 614 �-3 • ?3/6.00 _ 28/6.00 I � 50/4.50 � � i � i � 613 -I-4 � I ' - � — (�> . - i biz --s � � I ' 611 --6 � � 6'10 -I- 7 �I I � Notes: Completion Depth: 4.4' � I FIGURE NO.: 7 T�Fi�A-�AA�_ 1N�' LOG OF BORING BORING B-5 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-5-94 Elev.: 604 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checiced: 10�-94 was: Dry Depth to caving when checked: 10-fi-94 was: 5.0' II�VAT I ON/ S0 I L SfT�OL$ MC L,L, P? -200 D. D. P. P�1 UNCQN . �� sv�r� srt�ois DESCRIPTION %%� Pr % �f csf Lsf (feet) tr FiEID I'�Si DATA 604 —0 -. . . . � _�-___-----------------•----------•---------------- s/�.�Q I}, ... .... ...... ....... ....... _........ � .:'.: g/s.ao ve stiff brown sandv CLAY w/ -- ... I �: s,re_4�s trace gravel & calcareous particles — � — ' .:; , �� 603 --1 ��—, ...... ....... ........ ......... — --- -------- �CL) ---------��_ .... ..... .... . ..... Ve sriff broum to reddish brown � �+�'� siltv,CL4Y w/ calrareous particles � - '� ,� � & calcareous nodules ! _ ,�n� �` 7/6 , 0L] 15 35 15 20 _ �'��� � TS/6.04 I 602 --2 � � I � _ I.� ✓t I �- r. " � � - 601 -- 3 I � "— I •- �r ✓ / � �+ $�6.Q0 I d _ /�� lE'./Cs _ 40 � '�rM 13fb.00 � f�}li —4 /'; � /' i � I — ,�,� � r � � � � ,�� �„ I r f � � � '� I (CL) s� —s �r. i-,� _ " Notes: Completion Depth: 5.0' I FiGURE NO.: 8 � i�RA-MAR. l�C. LOG OF BORING BORING B-6 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-�-94 Elev.: 612 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth 10 water when chec4ced: 10-6-94 was: Dry Depth to caving when checked: 10-6-94 was: 5.0' ' I II�VAi I ON/ � SO I L StiBOL5 [1[ u, pL -200 D. D. P. PE�i U?ICON . D� su�� srrffioLs � DESCRIPTION x x x � PI x �r I c5t cst (Leet) & FiEID 7E$i DATA _ 512 = — 0 �— - ------- --- -------------------------------- .... ... ::::�:::: ::.... ....... ................. ------ --- • ,- -�- �- 8/6.00 ` �'.0.75" Asphaltic Concrete ------= '_ .ii. �� �s a --.. ... .. . _.� .. - . ' !'=i • 5/6.00 �--------- ------------------------------ •`, ��; " 4/6. ao Loose to medium dense brown to ` �y='• � yellowish brown clavev silry �e ''I% ` i SAI�ID w/ iron stains & calcareous ; .I'w: f. paivcles :�'�' F ' 611 —1 �',�I'. � ' i�,l'�• I _ . _ �JI�r " '�F�f — r � S/b.00 f + •' �- 9/6. 00 �% 11/6.00 � �; � �,.�: " 610 --2 �'��{ - _ ; �� � ✓: — ,�,��I`� � _ f -Ipx-�<I�� � � 609-3 y�;�,�- � !' ����� F` 7/6.00 8 47 9/6.00 _�� �� � ; 19/6.00 : 1. 608 - 4 .= �� �. 'I�' "I'.I� . . i �4'��w, I •�� - � ;.� :�;�':• (SC-SM) 607 --s � _ � 605 -��' Notes: Completion Depth: 5.0' FIGURE NO.: 9 !� TERRA-MAR . I NC' i __ - -- - . - _--_ -- LOG OF BORING BORING B-7 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-5-94 Elev.: 618 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: 10-6-94 was: Dry Depth to caving when checked: 10-6-94 was: 5.0' — . I �Z.5VATICN/- SOIL SYltBpLS I�� I u, pL PI -200 D.D. P.PE`I �UNCCH. I o�'x s,ac��x srr�oLs DESCRIPTION � � % �f c5r es� � i f� �) � F I II.D TESi' DA?A 618 � 0 — ---------------------------------------------------- �.... .... ......... •� •'�' 6/6.00 M�ium dense brown claveY.SAND w/ .... .... ...... ... ... .. .... '�� 6/6.00 � ��i - i 6/6. 00 calcareous particles & grave! I��� �J� I F / r • 1�,. � �.t... � � ,�e•i 6'17 —1 r�' � � ,_ �^`�`' . �' I i .r, � - . f�� . h S _ � f;z;fi , ✓°�s = . 5/6. 00 6 27 i'"-`i'�.. • 6/6.00 � , _ .ff y!�'" 11/6.00 � �r � , 616 — 2 ,�` , f ,�� . � ''.;,� t'��!, � .�;��.� ;. ���. . � ,�..� .. t �;.�,` I '�y�°- I 615 I 3 :':.%�� — ''�,.r'.� i. I ; �" ;: 1 (SC) � �� ��=.'i; --�-- �� ..... ......... i ---------_____...,� .... . ---- ---- ----- -- — r 5%6.00 Sriff btowll silty CLAY w/ ��� 6/6.00 C3�C3tepU$ j�BI'tiC�2S � 614 =4 i I I ' I 613 —5 — � � 612 I 6 .I_ � -�- 611 --7 Notes: ComQletion Depth: 5.0' � TFRRA-MAR Wr' FIGURE NO.: 10 II i -- ._ _ .::. LOG OF BORlNG BORING B-8 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-S-94 Elev.: 605 +/- �ocation: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: 1(}-6-94 was: Dry Depth to caving when checked: 10-6-94 was: 5.0' I ES�.VAT I 0N/ S0 I L SYPffipL5 !fC ?1, PL -200 , D. D. ' P. PQ7 U2:CCN . D� s�r� s�r,so�.s DESCRIPTION %% % PI % �f , csf Ls: (Ceet} fi FIEL� TE� DATA , 605 -0 -�------------------------ --------- . . . . . _ .. .... . .. . - - - - - . . _ . . _ . . . . . .. . . . . . . . . . . �+���i ��b.00 Stiff to hard reddish brown siltx S/6.00 r�; a/6. oo CLAY w/ calcareous pardc3es & � � trace �avel I 604 -I-'1 603 -�-2 602 -�- 3 601 - 4 boo --s 599 --6 598 --7 10/6.00 18/6.00 29/6.00 (CL) 14/6.00 -:._ .----__�_._.... _�____------ ' . . ...........•••.. .. .... ' ••• .. ............. Zo/6. oo Hard brown siltv CLAY w/ limestone : iz� ��v 13 � z.s�b.00 nodules & calcareous paivcles a Notes: Completion Depth: 5.0' (CL) FIGURE NO.: 11 ; .e _ ,. ,_ � i�f�A-�4U4R, WC. ._— .. . ..�:: _..... _ _ _..._ --- - LOG OF BORING BORING B-9 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-6-94 Elev.: 607 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checfced: 10-7-94 � was: Dry Depth to caving when checked: 10-7-94 was: 5.0' II.`�IIATi�!/ SOIL �L� 1'iC LL PL -2QI] D.D. F.P�2i UINGCN. �Q'�t s�z.._.� �tr�oas QESC��PTiLAI z z x�I x �s ��� c�f { f ee L) 6 F I�L1 I"EST aATA �o� --o ---------------�_-_�----------�..y_--_._ . ... . ___--._� .... .... . .. ...._...... .... �'.` : � Ha,rd �ray sa�idv +�LAY w�' �e sand � � s. . . � ���� inclusaorc�, eaJcareous "cies, � - . decayed cr�t� & �careaus n�d�kes -- �'� � ' - i ., ;�; - b�'k5 --'9 ��. : : ' . .. /I. . . f�'l5 — 2 b44 —3 b03 —�4 � � � 501 --b 4��,� 4 . 2 �.---------------------•------------------------------- --- .................--•- --._... ................. �r'ery suff to� har�i 6rcawrr 5artdv CL�+,Y �`� 4a 1� z� �a�. � s.6 i.s� w/ caicai-ec�us pa�ic�es � caieareous At�dules E�C1Q — 7 NoteS: 'G(]ffi�lletl�II UC�t�l: �.U' 3.4 A.3 6.4 TERRA-MAR, INC. FIGURE NO.: 12 LOG OF BORING BORING B-10 Project: Lake W'orth Water System Improvements Project No.: FE94-029 Date: 10�5-94 Elev.: 625 +/- �ocation: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: 10-7-94 was: Dry Depth to caving when checked: 10-7-94 was: 4.b' ELE�/AT I ON/ SO I L S`Ci*.BOLS MC LL PL P I -200 D. D. P. P�I UNCON . D� s�rrn� � srr�oLs DESCRIPTION I P` I (feet) � pi� �� DArp A % X f ts� tsf 625 --0 , . ------------------------------------------------______� .... . .... .... .... ...... ....... ....... ......... s��. a��- 3S" Asphalric Concrere �� '''�� 4° 4" brown clayey �avelly sand Base � a:�� .. ���-,�. �� � � a (PAVEMENT) ._ e o Q �_���----------____________________�..._----------- - - - ...... ....... ....... . i!�' .: H2rd brown�a vellv sandv CLAY w/ 11 3s� is �ii� �� '� . calcareous nodules , 624--1 623 --2 622 —3 621 --4 620 --5 619 --6 6'18 --7 so/z.nn soji.00 (CL) — -- ----------------------------------• Moderately hard to hard tan weathered LIMESTONE Notes: Completion Depth: 4.6' TERRA-MAR, INC. _ FIGURE NO.: 13 f LOG OF BORING BORING B-11 , Project: Lake Worth Water System Improvements Date: 1U-6-94 Elev.: 625 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when ct�ecked: 10-7-94 Depth to caving when checfced: 10-7-94 � EL�5VAT I QH/ $p I L$Y?ffipL$ o� sAr�� srr�oLs DESCRIPTION ( f ee t) & F I EID 7'FS.' DATA bzb To ..,.� �, -------------------------------------------- ---------- � �s�-4;�� 3S" Asphalric Concrete � �_;`� ;;� I 6" dark brown silry sand w/ — �`� � limestone gravel Base �:�.. �:p ��4 9� - �. .'Y � P �. �'+� �i ■ T ei— Project No.: FE94-029 was: Dry was: 3S' IiC LL PL —200 D. D. P. PEJ UNCCN .' I % % X pI % pcf tsf Csf i - , �' -- (PAVEMENT, .. .... ......... ........... ....... ................. 625 �1 � '-------------------- ---------------�..-------=� is 32 is i7 Hard ran silry CLAY w/ ralcareous +� nodules � - (CL) , -- ----------------------- -------------------------- Moderately hard [o hard tan � weathered LIMESTONE 624 � 2 � .f� � I —, � ° - � � � � ,---7 ' 5D1z.�s " _, „' � I S�S/i3. 50 �- � b22 -'- 4 � � � 621 — 5 , .� , I _ i � � � 4 620 — 6 1 � l� 619 �7 � Notes: Completion Depth: 35' FIGURE NO.: 14 I� T'�f�A-MA'�, IS�IC. LOG 0F BORING BORING B-12 Project: Lake Worth Water System Improvements Date: 10-12-94 E!ev.: 603 +/- Location: Se� Figure ] Depth to water at completion of boring: Dry Depth to water when checked: 10-13-94 Depth to caving when checiced: 10-13-94 ELEVATION/ f SOIL SYTffiOL$ D� s�,r.�'� sn�oi.s DESCRIPTIQN (Leet) � FIELD T'c$T DATA 603 - - 0 Project No.: FE94-029 was: Dry was: 55' MC LL PL pI -200 D.D. P.P='*1 UNCQN. ,. % x x �xf �s: zsL �� �.---------------__--.__.----------__�__-----------____ .. ......... ....... ....... ...... .. .. ..... ..... .. _ � Brown clavev aravellv S�,ND . - �,�� (SP-SC) ,• ,r � — ---------------------------------------------------- - ... ..... ..... ..... ...... ....... ....... ......... � �• Hard tan & gray CLAY w/ ca.lcareous . _ f inclusions 602 - -1 ,/ bo� --2 / � � (CH) 600 -•-3 � .�----------•----------------------------------------- ._ Hard tan CIAY w/ limestone nodules & silt ,. �f ! 599--4 � _ � � ., �I � (CL) 598 --5 � - - - — ---------�-----------._.W_--------------- - _ _____ .. - '�%6: oo Very dense tan & orange fine SAND .. --�j's3/6.00 .. ��. . I .. . i 597 --6 • - _ ' ' (SP) 596 --7 Notes: Completion Depth: 6S' 17 52 16 36 113.1 a.5+t 8.a2 q.$T� . ..................•-- --..... ...._..,......... 10 33 13 20 9 0 3 � � i FIGURE NO.: 15 ;, 7ER'RA,MAR, INC. ._ -'� LOG OF BORING BORING B-13 Project: Lake Worth Water System Improvements Project No.: FE94-0?9 Date: 10-12-94 Elev.: 62A +/- Location: See Figure 1 Depth to water at completion of boring: Dry' Depth to water when checked: 14-13-94 was: Dry Depth to caving when checiced: 10-13-94 was: 5.0' EL.�VATI0N/ $0IL SY?ffi0L$ MC LL PL -200 D.D. P.Py'I UNC0N. D� s,ar�� srr�ors DESCRIPTION ; I z % P� % �f I�St �Sf (r�t) e� FIELD TFSZ DA?A 620 -0 -.--------•----------------<_______.�.___----- . , . - . ....... ......... ,/� Hard olive & brown CLAYw/ �� ib sz i� �ss� ���- iia:i a.s�- — limestone fra;ments & �ace tan -- silt 617 --3 616 --4 615 --5 614 --6 613 - 7 27/6.00 37/6.00 31/6.00 � I � �� � �,/� ! 3 6.00 /' 5/6.00 / � 7/6.00 �- � � � � � Notes: Completion Depth: 5.0' -SII� �IOW 3' (CH) 4.5•+ FIGURE NO.: 16 , TERRA-MAR, INC. � LOG OF BORING BORING 8-14 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 623 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Project No.: FE94-029 Depth to water when checked: 14-13-94 was: Dry Depth to caving when che�ked: 10-13-94 was: 2S' �.E.VATION/ SOIL $Yt�OLS t{[ u pL -200 D.D. P.PF.1'i UNCON. I D�TH s.�r�� srr�oLs DESCRIPTION % A A Pi x pcf tsf Lsf i (feeC) � FI�TD TFSI' DATA � 623 -0 . . , _ �...__,_----------------------------------------- - -- . - - .. ..................... ....... ....... ......... � p a, asP� 3' ,qsphalric Concrete — 9'� ��va 6°�-'--°' so/s . o0 6" brown clayey gravelly sand Base o •.o a_ p• ` �.v^.v�. o L'F'R _ ,.$ .,z • (PAVEMF��VT') ,.• � �.-• �.� _ _ __----_------------------�_�_----------�..,ee__------ . Moderately hard to hard tan QZZ --i � weathered LIMFSTONE 621 - 2 � �- � �r-,r-�,� i�, ,, , SO/1. 50 �� 50/0 . 50 _ 620 --3 619 --4 518 --5 617 - 6 61ti --7 Notes: Completion Depth: 2.5' — — TERRA-MAR, INC. -- FIGURE NO.: 17 ; I � � LOG OF BORING BORING B-15 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-12-94 Elev.: 627 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: 10-13-94 w2s: Dry Depth to caving when checiced: 10-13-94 was: 35' �,�''A:iORi✓ S4}II. ��t'l�OLS 171C Li. FL �2i7[] D.I}. F.P�i lJi�t��N. f r�y I �.�� r��a�iA D�SCRIPTi�}N � f x��� x �f c,�f �sf �� --a --------------------------------------------- - '����' Har�₹ tan s�,�ty CIAY w�+ c�lc�a-eo�us ---T_ .. .... .... .... . ....... . ... ......... _ ��lb 35 17 1$ +b. $ I �rr �c��uions & limes�vne ��te�� . _ �� r � r ._ / } /f �� -�1 / * �- � (CL) . a.s ` _ �r�derateIy hard to �iard rasi_�_�_._______ .. .... .... .... .... ...... ....... ....... ......... — wea ered L�ESTONE h�5 --2 � - bc4 —3 6�3 — 4 SO/2.Of] 5Q/1.4p I�ates: Gotnp�etivn Depth: 35' , FiGURE NO.: 18 TEARA�v1AR. INC. ` _ _ � LOG OF BORING BORiNG B-16 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 620 +/- Location: See Figure 1 [�epth �a water �t �compl�tivr� of bQring: Dt�,y Project No.: FE94-029 CC�ept'h t� water w�l-�en c�ecked: 10-i3-94 was: �ry �3epih� to c,a,uing wfiaen eheck�ci: TO-13-9� w�s: SA' E�.�.1/ATI0N/ I 5^vIL �IS F!C LL PL -2fl0 F?.I}_ P.P�i [1l7C�i_ n�srx sa�r.�z.� �u G��RIPTI{?N x x x PI x r es� cs� (teecp � �i� r�st nr�rn €'c d20�0 ,.------------------------------------------------ � ----- �1Q 32 i3 14 -•- -- - ----- -a.�+. �� �CCl'WIt t�S�£ i'clTl ���''W"� . .... . � i P1lLTfl�ft?Ll� �+ESt43�C �aII3�i1L5 . ' �� � . � � I I / � 6�� �� �� � ._ � � / / ._ / / � •- ! � ✓ t� A S't 8 = 2 �I� � 8/6 . �4 _ �tr i�/6.�a .. I �✓!� iao/z.aa �.I �!� i - - ��� .. Ir �� ���� 617--3 ,i �` _ __�1�derafely ha.rd tio ha.rd-ran-----------�� -- — weati�ered L�ST[�I'��. -- � -- � �,�b —�, bZS—s �.� „.''�,so�o_so _ sar�n . �s �ts � r ,�_ Nate�: Goa�pleriaz� �3�pth: 5.0' 4_5+ I� FIGURE NO.: 19 TERRA-MAR, I h��. _ - LOG OF BORING BORING B-17 Project: Lake 1�'orth Water System Improvements Date: 10-12-94 Elev.: 620 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Project No.: FE94-029 Depth to water when checked: 10-13-94 was: Dry Depth to caving when checked: 10-13-94 was: 45' II�.n/A2I ON/ SO I L SYiBOL5 FIC L,I, pL -200 D. D. P. PEI UNC�N . .°� s.�� sn�ors DESCRIPTION %% % PI % �_ csr c5f (feet) & FI�.D TE5i' DAI'A 620 -0 - -- - ---------------------------•-------- - .... ...... ....... ---.... ......... i! : ' . : - - - ---------- �10. ..... ..... . 125 4. 5* . Hard brown sandv CLAY w/ ralrareous � . : ;,� particles & rock fra�Qmenu 6'19 --1 6'18 --2 617 - 3 616 --4 615 --5 614 --6 613 --7 (CL) - --------•-------------•------------------------------ ---. ..... ............... ....... ....... ..�--.... Brown clavev �ravellv SAND (SP-SC) — -------..,.----------------------------------------- .... ..... ..... ..... ..---- �--.... ....... ..... ... Hard tan siltv CLAY w/ weathered 4. s� limestone fra�Qments & laye� 4. s (CL) _ .___----------------�------------------__.._,.------ .... ..... ......._....---� ....... ....... ......... Moderately hard to hard ran weathered LQvtESTONE 50/0.25 50/0.00 - Notes: Completion Depth: 4S' FlGURE NO.: 2'J i _ _ TEARA-MAR, INC. _ : ' LOG OF BORfNG BORING B-18 IProject: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-12-94 Elev.: 637 +/- Location: See Figure 2 ' Depth to water at completfon of boring: Dry �iDepth to water when ct�ecked: 10-13-94 `�� DrY Depth to caving when checked: 10-13-94 was: 5.0' ' J EI.P,VAT I ON/ SO I L SYMSOLS MC LL PL -200 D. D. P. PE�i I LIIJC DN . ill D� I �.u�� sYr�oLs DESCRIPTION %% x PI x p�z c5r esz ( f ee C) 6 F I II.D '�5? DATA i. ....... ....-•-.- ' I 637 —0 — ---------------�---___.._-__________..��------_---- .... .... ..... ..... ..... a.5 r �': ,,r' ' Hard very sandv CLAY. �I� � � f I �, � �. --- _ (CL) -------------------- .... ..... .. ... ..... ...... .. ..... ... .... . . .. . . . .. . �� � � �- �''`� Moderately hard to hard tan J y _ weathered LIMESTONE w/ clay layers , � � 636 --1 � � � � � -- ' � li •- � II , 4.5 I 635 � 2 � I ..r, i . _ r" I -• � �„ � 634 — 3 i - - �^� � I •- I � II 633 --4 I a.5 � . - �l ._ i � II -w/tan & gray silry clay layer 14 a� 1� 3o i21. 0 3. 03 �_ '� .. . @ a��-5' :,�'�_ � 632 - - 5 -• �J • I"^� 631 --6 630 --7 � Notes: Completion Depth: 5.0' FIGURE NO.: 2� TERRq-MAR, INC. _ LOG OF BORING BORING B-19 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-12-94 Elev.: 630 +/- Location: See Figw-e 2 Depth to water at completion of boring: Dry Depth to water when checked: 10-13-94 was: Dry Depth to caving when ctieciced: 10-13-94 was: 3.0' , E3E'Vn7I0H/ 50IL SYtf�[}L� 3�iC i�. PL -�flQ U.k. P_P�i CINCON. I, a� I s.�r�r� sram�Ls D'��GRf��IGI� � x x pI x �i «r r.�: (leec7 & FIE�.o T�4'Y DAxA d3�Y--D �------------------------------------------------------ -.. ..................... ....... ................. �. , �r�own �dv CLa`t' w�' limestone . ,�J� { nc�dules ._ �i' . � - - {CL} . _ — -- ----•--•---------- ----�--__----�t �.._._______ . - - --- ---� .... .... ...... ....... ......... .. 1'vtodesately 1�arx� to harci tau � 625� -� �� ,� LI3�fFS�`C7M� � " I 628 —� 627 —3 � ; ' " '�I So/o.�E 50/'S�.25 — 6�b —4 625 —5 ls24 --Fs b23 --7 hiates: ��ppeiion D�pth: 3.U' �I FiGURE NO.: 22 TEi�RA-1v1AR, INC. _ � LOG OF BORING BORING B-20 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-12-94 Elev.: 632 +/- Location: See Figure 2 Depth to water at completion of boring: Dry Depth to water when checked: 10-13-94 was: Dry Depth to caving when checked: 10-13-94 was: 25' EL_�VAT I ON/ SO I L SYAIDOL$ HC IS. PL -200 D. D. P. P�i UHC�t7 . °� I s.��x s�r�or.s DESCRIPTION % PI x �t csr �5t (feet) � FIEI.D TEST nA."A " '° .__.. _- _ 632 --0 —.__--�_____.__---------------------..�.____ � '-^:f'. i -------_ .... .... ..... .... ...... ....... ....... _ ,, . , . Reddish brown clavev siltv SAND � � � � � � ,� - � (SC-SM) � � — -- ---------------------------------------- . _ - ---------- . . . . . . . . . . . . . . . ... . . .. . . . . . . . . . . . . . .. . . .. . . . . .. . Moderately hard to hard tan -- weathered LIMFSTONE _ -w/ gravel @ 4" 631 --1 • i � 630 —2 � .� ��: 5o/o.so _ .. 50/0.25 629 --3 628 --4 627 --5 626 - - 6 625 - -7 Notes: Completion Depth: 25' I i FiGURE N0.: 23 TERRA-MAR, INC. _ �. � LOG OF BORING BORING B-21 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 62A +/- Location: See Figure 2 Depth to water at completion of boring: Dry Depth to water when checked: 10-13-94 Depth to caving when checked: 10-13-94 �.var t orr/ s,� r L s�rrmou D� s.arpr� srrffiaLs DESCRIPTION (feet) S FI�'T.D TEST DAI'A 620 --0 --- ------------------------------------------------- _ !''.' Very stiff brown to tanish brown ��! sandv CLAY w/ calcareous pacvcles � & limestone fragmenrs + ��� 619 - -1 j!��/.' - r,�` � � -- ;�� (CL) . - - - ------------------------------------- — � Moderateiy hard to hard ran .� weathered LIMESTONE � 618 --2 � 617--3 � '-� � ��� so/o . so _ __ 50/0.13 616 --4 615 � 5 614 --6 513 - - 7 Notes: Completion Depth: 35' Project No.: FE94-029 was: Dry was: 35' t7C LL PL —200 D. D_ P. P�*7 UNCO2I . A % X PI A pc1 tsf tsf .... .... .... .... ...... ....... . _. ......... 3.1 3.a . FiGURE NO.: 24 _ T�4F�,A-MAR, IP+1C. - — — LOG OF BORING BORING B-22 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-12-94 Elev.: 637 +/- Location: See Figure 2 Depth to water at completion of boring: Dry Depth to water when cliecked: 10-13-94 was: Dry Depth to caving when checked: 10-13-94 was: 35' EL.=VAT I ON/ $p I L SYPIDOL$ MC LL PL -200 D. D. P. P�'�t �R7CCN . D� s.ar�r.� srr�ors DESCRIPTION %,� % PI % �t tst �S� (E�et) & FIII..D TE.57 DATA 637--0 =...-- --------___�._._.________�__.___��-•_- a=f�sA 4 ' "".-�,.y� .... ..... ..... ..... ...... .""" '.... e• o v�. 4" Asphaltic Concrete � - �.o ; b`,:� (PAVEMENT) ,. �-�--- _ --------•-•_._Y---------------------_---------------- . ...... ....... ....... ...... , . ... ..... ..... ... �-�-� Moderately hard to hard tan ' . 'f weathered LIIviESTONE 636 - -1 �, I - ,� ' 635 -2 � -_ � 634 -3 � � 1 V � 50/2.00 i 50/0.13 �� 633 - - 4 � - ' 632 --5 � ._ 631 --6 � .. t '- 630 --7 � Notes: Com letion De th: 35' P p � I�� I �V I FIGURE NO.: 25 ! TERRA-MAR, INC. LOG OF BORiNG BORING B-23 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 643 +/- � Location: See Figure 2 Depth to water at completion of boring: Dry Depth to water wtien checked: 10-13-94 was: Dry Depth to caving when checked: 10-13-94 was: 3.0' EL�VA?ION/ SpIL 5'fPffiOL$ HC LL PL -200 D.D. P.PE'I UNC�?7. D� s,�rrnr� s�ors DESCRIPTION � x PI % �Sr L5� (feeC) S FIELD TESi' I1ATA " �' 643 ---0 - ----------------------•---------------------•--•----- -- .... .... .. - - - - Project No.: FE94-029 642 - -1 641 --2 640 - - 3 639 --4 638 --S 637 --6 636 --7 Hard brown CLAY w/ ralcareous ls s� za 33 <. s particles & trace sand -limesrone bravel @ 1' (CH) ^ Moderately hard to hard tan weathered LIMESTONE 50/0.25 5�/0.00 — Notes: Completion Depth: 3.0' a.s TERRA-MAR, INC. FIGURE NO.: 26 � � , � LOG OF BORING BORING B-24 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-12-94 Elev.: 633 +/- Location: See Figure 2 Depth to water at completion of bo�ing: Dry Depth to water when checked: 10-13-94 was: Dry Depth to caving when checked: 10-13-94 . was: 25' ELt1/AT I 0!I/ SO I L SYt�LS h1C L,I, PL -200 D. D. P. PEN UNCON . °E-'TH sar�r�x sn�oLs DESCRIPTION %% PI x �r �Sr esr (feet) � FIIID TFSI' DATA '" 633 ---0 - -------------------------- .... .... ..... ..... ...... ... ... . _ . .. .. . .. . ..... -------------------------- - ���9�•� 2S"Asp halric Concrete -- ���'g �_ 1" sand arave] Base (PAVEMENT) .,. � � y h-- -- - - ------- --------------------- .... .... .---..... ...... ....... ..... .. .. .. ... �" �'T Moderately hard to hard tan -- weathered LIMESTONE -- � � i 632 --1 � r' � ', — �:� _ :, ' .' , :'=� 631 — 2 �� so�o.sa __ so/o.zs — 630 --3 i — i 629 --4 I 628 --5 527 --6 626 —�7 � Notes: Completion Depth: 25' � � FIGURE NO.: 2? TERRA-MAR, INC. LOG OF BORING BORING B-25 Project: Lake W'orth Water System Improvements Date: 10-12-94 Elev.: 627 +/- Location: Se� Figure 2 Depth to water at completion of boring: Dry Depih to water when checked: 10-13-94 Depth to caving when checfced: 10-13-94 II�VATION/ SQIL SYPffiOLS °� s.v�� s�or.s DESCRIPTION (feet) � FIEL� iE�' DATA �� -�a Project No.: FE94-029 was: Dry was: 5.0 MC LL PL PI -200 D.D. P.P�?I UNCCN. x x x z �r esr est — --_-___---------------------__--------------------.�_ .... .... .-�-� --- :::::: ::::::: �:: :: � ��,038" As�haluc Concrete (PAVEMENT,) . .. . . . . . . . . . . � . - . : : : : : : : � ��- �--- --- -- -------------------------------------• - ��'�r' Hard brown silry CL�,Y w/ calcareous "" ,' nodules & lime'stone fr�Qments r . _ �,, �r' -- f �. / u�6 -�� ,r� r � / r __ � �'' ,r ' -- � 8 38 17 21 _ � r � szs —� b24 —3 623 — 4 f�22 � 5 621 --6 620 --7 (CL) — ----------------------------------------------------- .... .... .......... .....- --..... ....... .. ...... I�foderately hard to hard tan weathered LIMESTONE sc�/o.sa s�/a_zs — Notes: Completio❑ Depth: 5.0' I FIGURE NO.: 28 -- - TERRA-MAR.INC. LOG OF BORING BORING B-26 Project: Lake Worth Water System Improvements Date: 10-12-94 Eiev.: 650 +/- Location: See Figure 1 Depth to water at completion of boring: Dry Project No.: FE94-029 Depth to water when checked: 10-13-94 was: Dry Depth to caving when chec4ced: 10-13-94 was: 35' EIF.VAT I CN/ SO I L SYPIDOLS MC LS. PL -200 D. D. P. P�*I IJNCCN . °� snr�:Fx srrmars DESCRIPTION %� % PI � f �St �5� (feeC) � FIELD TFS[ DA?A � 650 — 0 -----�------------------------------------ ---------- .... .... ......... ...... ....... ....... °' '' Hard brown sandv CLAY w/ numerous 11 4s zo zs 4. s�+ ����� � - _ �,�. limestone fragment� -- ! . -- �. 649 - -'1 ; . : : ' . - � � � (CL) . . ��- so/a.00 =----------------___:.....-�------------------_..�_e_ �` Moderately hard to hard tan ._ - weathered LTMESTONE w/ brown clay �ca —z � Parunbs �. .. � � - �� �� 5cr7 —3 50/5.50 � — 646 --4 645 --S 644 - - 6 b43 - - 7 Notes: Completion Depth: 35' 4.s�, TERRA-MAR, INC. FIGURE NO.: 25 ; � LOG OF BORING BORING 8-27 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 652 +/- Location: See Figure 1 Depth to water at completion of boring: Dry' Depth to water when checiced: 10-13-94 Depth to caving when checketi: 10-13-94 �ZE'vAiION/ SOIL SfTBOLS D� sar�r� sn�ors DESCR�PTION (teec) � �t�.o rEst nnra ,GS] �!1 ��� .. _"_--�""""".____"_"'""'_ / �{ -L�. .50. . .19 31. . . . . - � - SO6. k . . . . . . . . .2 . g.3 . . _ �, Hard brown CLAY l 651 —1 bso —� -numerous limestone nodules @ 2' — (CL) �,-, � so/o.�s — ----------------------- --------------------- ---- ............... ..._.. ....... ........ ...... .. — so�o. zs Moderately hard to hard tan _ weathered LII�fEST01�1E w/ soft clay �, seams 649 � 3 �� � — --7 ;--T-, _ - ',.�',� _ � T 648 - 4 T- T -T �so�o.is _ SO/0.25 - 647 - � S 646 —6 645 —7 Project No.: FE94-029 was: Dry was: 45' MC LL PL -200 D.D. P.PEi UNCON. % x x PI x �r esr c5r Notes: Completion Depth: 45y TERRA-MAR, INC. FIGURE NO.: 30 - .. - ' I LOG OF BORING � BORWG B-28 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: Dry Elev.: 645 +/- Location: See Figure 1 Depth to water at completion of boring: _ � Depth to water when checked: 10-13-94 was: Dry Depth to caving when checked: 10-13-94 was: 5.0' IIy5VAT I ON/ SO I L SYMBOL$ M.C LL PL -200 D. D. P. PEi UNCON , ��� �SF�ELJ' TEST�DA A DESCRIPTION ,� % : PI % pcf tsf Csf 645 --0 . —,_�.--�-----------------__._-------�.,_._..__-------_ ._ �. �: - ... ..................... ..�--.. ................. . Tan sandv CLAY w/ limestone _f ;f� fiagments .. '�/.': ' ' � � � (CL) i 644 — 1 - • • �.----------•----------------� .____....__--------------- .. ._.. ....... -•-.--•......---. , .. -� .. ............ • Hard gray CLAY w calcareous I � "- particles & u�on stains � ' � � � a.5 I �'3 -z � 18 50 21 29 110.1 4.25 �.68 ' ,� i � � � i ._ � 642 --3 � I _ / �� � i � ._ � i / <.5+ i 6�.1 --4 I " � 4.S+ � � _ . � I -- (CL) 4. s- I �o --� � — �, i' 639 --6 ; ,_ 4 ! '� � 638 --7 ; Notes: Completion Depth: 5.0' I F3GURE NO.: 31 ! _ . , ?E.RRA-MAR.INC. � LOG OF BORING BORING B-29 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 652 +/- Locatior: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: 14-13-94 Depth to caving when checked: 10-13-94 EL=VATION/ SOIL SYiiBOL5 D� I s�L.� sn�oLs DESCRIPTION (feet) n FIE'.D TES' DATA 652 — 0 — _------ --- ----------_._-__�_�---�--------•- ---____ '.' �'=�; ZS" Asphal�c Concrete -- � �-`�.�' 6^ gravelly sand Base � �_.z :.. � — �_� �; s��o _ A=a 94 (P.AVEMENT) �-.� k� , ; ., .� ----------•-------------------------------------__._. — ��.�� Brown clavev aravellvSAND 651 — —1 �,�C:. . '!. �'= 1 — �� ���c � __ 1��� ��f �'!/' --- (SP_SC) . 650-2 ---.. .4.5............ � ------------�------- --------------•--------- 2� 48.. .18.. .30, . ..... . 100. 5 3. 17 Hard gray to bmwn CLAY w/ sand ' lenses, iron stains & calcareous - - pamcles Project No.: FE94-029 was: Dry was: 5.0' !SC LL PL —200 D.D. P.PFN UHCON. A % % PI % pcf tsf csf ..... ..... ..... ..... ...... ....... ........ ......... I 649 - 3 -limestone nodules @ 4' (CL) 648 - - 4 - --------------------------------------------------- Moderately hard to hard tan � ` � '� � weathered LIMESTONE 647 - - 5 646 - - 5 645 --7 so/i.00 50/0_50 - Notes: Completion Depth: 5.0' 4.5 i TERRA-MAR, INC. FIGURE NO.: 32 LOG OF BORING BORING B-30 Project: Iake Worth Water System Improvements Project No.: FE94-029 Date: 10-6-94 Elev.: 662 +/- Location: See Figure 3 Depth to water at completion of boring: Dry Depth to water when checked: 10-7-94 was: Dry Depth to caving when checketi: 10-7-94 was: 5.0' ���lA7I �N/r SO I L SII�t�IS MC LL FL -Zfl CD D. D. P. PIIi UNCC3i . p� sar�r�x �rr�oi s DE�CRf��'IJN � � x�t (ieeG) & FIF.FSY 1'�57 UATA _ ,• pct [sf Csf &5� ---�0 ��—� �. .-------------'------___------________w...----------- .... ` / ■ ��I� i1V l'(3C�C � I9 .............. ...... 1{]5.9 .4.5.. ..3_�3. ��'' � � � �r � ,� ° f'� calcareous p�rticles & coais�e sand 56'1 —1 � �� 659 --3 f�5� --4 657 —5 b5b --6 655 —7 ��� � , _..---a�----------------------f-�_--------------------- .... ............... ...... ....... .---- - - xa�a t��firr gray cI.�,Y w� c�le�reo�is ..... ' pa�ticles (CL) a.s — ---------------------------------------------•------- .... ._ .............._... ....-•- --............... Hard olive �ray CIAY w/ tr�ce sar��, 1� sa xp �i a. s calc�..r�eous partacles (Ci��} —�-- ------ --------------------------� Moderateiy ha.a�i �o hard tar� w�athered LII�t �"[? �,�� sa/i.zs � 54�'4.50 — iV�tE5: �4III��L't10i1 �C�Jf�3: Jr.�' �.s 4.5 ---�------- .... ..................... ....... ................. . �.s i TERR�,-MAR, fNC. FIGURE NO.: 33 � 1 LOG OF BORING BQRING B-31 Project: Lake Worth Water System Improvements Date: 10-6-94 Elev.: 672 +/- Location: See Figure 3 Depth to water at completion of boring: Dry � Depth to water when checked: 10-7-94 was: Dry Depth to caving when checked: 10-7-94 was: 6.0' '' II�YATIQN/ $pIL SYPBOLS � � PL PI -XO D.D. P.P�*( UNCCN. �� s,ar�� sn�oLs DESCRIPTION �t Lst tsf (feet) � FIElD 7EST DATA 672 --0 - -----�__-----__.�,._�.-•---------..,_ ._�_--- --V._ ... � �` / Hard gray CLAY w/ ralrareous zo. .s3. _is. _ss . ..... ...... . 4: s.. . . . . _; �/' parricles � � I 671 - -'1 ' 670 -2 - - (CH) , _ -- --------__--__--------------..____��-------------- - � Moderately hard to hard tan _ weathered LIMFSTONE 669 -3 � � _ � -- � � 668 -�- 4 �� ?5/6.00 19/6.00 667 - - 5 .. , — -yellowish �-ay clay layer __ @ SS'�.0' � --� � � _ �s --� Project No.: FE94-029 Notes: Completion Depth: 6.0' a.s� 4.25 FIGURE NO.: 34 TERRA-MAR, INC. LOG OF BORING BORING B-32 Project: Lake VVorth Water System Improvements Project No.: F'E94-029 Date: 10-6-94 Elev.: 675 +/- l.ocation: See Figure 3 Depth to water at completion of boring: Dry � Depth to water when checked: 10-7-94 wa_s: Dry Depth to caving when checked: 10-7-94 was: 4.8' F�I/AI I DM�"' I SC T L S"[M�9L5 l�SC L.L �L �Zi}0 T? . D. P. P�*I UNC�H _ �� s,v�� srr�sazs p�SC�dIPi'I(]N PL , (Zee�) & FIEL7 SFSi T3AYA •• X X X ptT tst ts. 67S�0 �._------------------•----___--------------------�__. ... . ..... ...... ....... ....... . � 1��rd daricbr+awn rc��rawrt CLA�w,I d6. -.. 1a�.z �.s s:r�i-. . _ caieaseovs ry�ar�cles, mrc�n stair►s � - & tr�ce sand, siig3�icly sl,ic��nsidetl / 674 - - i b�'3 � 2 fa72 - -3 b73 — 4 67'(l --5 bb9 —b +'5S� —7 Notes: Completion Depth: 4.8' a.s« 15 46 16 3[] �.5* A_�j4 a.s+ ��L� � I �.__-___-•---•----------------------------------..�� .... ..................... . ...• .. ............. N �� ,�j1L511 �7r(JWIl � 44� W}� caleare�us a�cl�sic�ns, u�on s�ras, g t�aec s�and & e,�caxec�us p�rticles ' � (CL} <.s- a 0 � I � TEFtRA-M�A�, ah�C. FIGURE NO.: 35 i LOG OF BORING BORING B-33 Project: Lake Worth Water System Improvements Date: 10-6-94 Elev.: 675 +/- Location: See Figure 3 Depth to water at completion of boring: Dry Depth to water when checked: 10-7-94 was: Dry Depth to caving when checked: 10-7-94 was: 5.0' F_:_EVAT I QN/ 501 L SYTIDOLS [g I,L, PL -200 D. D. P. PE7 UNC�ti . D�rx s.�,r�r� sYrmor.s DESCRIPTION x z % pI x �t cs: csr (feeL) a FIEZD iF.SI DAI'A bis —� ....... ........ ......... — -------•---------------------___-___��_----------�-- --�- ---. ..... ..... -----� ��r� Brown clavev �ravellv SAND (SP-SC) `. s" --- ----------.._-------------------------------____,_. .... ..... ......... ...... ....... ....... ......... ._ Hard gray CLAY w/ calcareous Particles, calcareous nodules & uon stains ._ � 674 - -1 673 — 2 � 672 —3 — (CL) 671 - 4 � — - -----------------_._..---------------------------- Hard brown CIAY w/ calcareous _ � nodules, slighdy slickensided — � (CH) 670 - - 5 — 669 --6 668 -- 7 Project No.: FE94-029 Notes: Completion Depth: 5.0' 4.5* 105.8 4.5 5.36 k.5 � .... .............. . .. ....... ..........�- ---� � 22 51 18 33 4.5 a.s �_ _ _ TEr�P.A-MAR. INC. FIGURE NO.: 36 � ' � LOG OF BORING BORING B-34 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-6-94 Elev.: 672 +/- �ocation: See Figure 3 Depth to water at compietion of bonng: Dry Depth to water when chec4ced: 10-7-94 was: Dry Depth to caving when checked: 10-7-94 was: 5.0' II�VATION/ SOIL SYMSOLS M[ Il, pL -Z00 D.D. P.P�T UNCO?I. D�TH s.v�r� s�rr�oLs DESCRIPTION % z x PI % �t cst cs: (feeC) � FIELD ';ESI' DA?A 672 --0 -,.---------------------•-----------------.__.__._----_ . . . .............. .....� ---�--- �--............ , /,/ Very stiff dark gray to gray CLAY 3- 8 �� � w/ calcareous parncles & trace . ,/� sand ��f � 3.1 671 — 1 23 54 1� 37 3.75 -- / 670 - - 2 669 --3 .I. � ._ 668 -� 4 � ._ • � 667 --5 f - .l. � .�_ 666 -I- 6 I 665 -- 7 -_ Notes: Completio❑ Depth: 5.0' (CH) —___------•------------------------------------ Very stiff olive gray CLAY w/ trace sand, ralcareous parricles & limestone nodules (CL) 4.25 3.6 3.3 --.., ..................... . ._........_.. 22 108.. .4.5 2.20 3.5 TERRA-MAR, INC. FIGURE NO.: 37 LOG OF BORING BORING B-35 Project: Lake Worth Water System Improvements Oate: 10-fi-94 E�ev.: 670 +/- �ocation: See Figure 3 Depth to water at completion of boring: Dry Depth to water when checked: 10-7-94 Depth to caving when checked: 10-7-94 �A� / s� �a�is L�E5+C�IPTIC7N i t�'L) �S r Ir 1T 'L'FST IYATA ��c� --a _ _____-�_-----___�-_------- �,- �--------------------- /' I�ard b�own CLAY w W�eszo�� FragmlenlS 8� weat�,et�d li�esTone - layers +55g —1 f,68 —2 i�'/5. Uo ._ z9/6.oa -- lis/�.oa � bb7 �-3 � � � ���� 7- �— 12/6. Qfl ' --------•------------------------------------------- � ,{� — 27f6.0� H3C� �3}�'l�tl �£tiW'A _ ����1` W�1 e ��'I M��_ tiz,��.oa �eathemd lnmestone �nts & av� — c ,'"�I � G6 — rl Lr _ �It' � I -I� _ _ ��I�"� - � � �� � I, � (CL) 565 —'S — �ls4 - 6 6fi3 —7 N�tes: Cam�a��ti0a Dep#�; S.�I' Project No.: FE94-029 was: Dry was: 5.0' HC I�. PS. —2C10 D.Lr. P.PE?i �CaDi. � k X PI X pct' tsf Lsf ...... .. .. . ..... ... . 16 �5 lb �4 114.8 I0.3a T�RRA-��IIAR, if�1C. FIGURE NO.: 38 LOG OF BORING BORING B-36 Project: Lake Worth Water System Improvements Date: 10-6-94 Elev.: 680 +/- �ocation: See Figure 3 Depth to water at completion of boring: Dry Project No.: FE94-029 Depth to water when checked: 10-7-94 was: Dry Depth to caving when checked: 10-7-94 was: 5.0' EZ_F1/AT I ON/ SO I L SYN.BOLS NC L,I, PL -200 D. D. P. PIIi UNCON . D� s,u�!� sYr�ors DESCRIPTfON % % x PI % i �S1 cst �f��) & Fiu7 TE$(' DATA � 680 --0 �, — -- ------...-'--------'-'--'------'--------- � ... ............•-•- --�--.. ....... ......... _ Hard gray to light aray CLAY w/ i s ios . � 4. s� io . o� ralcareous parncles, calcareous - noduies & limestone fra,�menu 679 —1 678 —2 — � (CL) �1/6.00 — ---------------------------------------------- '� - v/6. oo Soft tan severelv weathered `� . -, zo/6. oo LIMFSTONE �,:. bn '—� , _ _� _ _ ,, .� 676 --4 '' ' � 12/6.00 _ x— � +� 14/6. 00 , ,, , , , 17/6. 00 675 - 5 •' �' � ._ . 674 --6 6T3 --7 Notes: Completion Depth: 55' 4_$+ a.5+ 4.5+ ... .....................,....... ........----.._.. FIGURE NO.: 39 _ TERRA-MAR, INC. �� � � - LOG OF BORI�lC BORING B-37 � Project: Lake w'orth Water System Improvements Date: 10-11-94 Elev.: 693 +/- �ocation: See Figure 3 � Depth to water at completion of boring: Dry Depth to water when checked: 10-12-94 Depth to caving when checked: 10-12-94 � EI.EVAT I ON/ SO I L SYt�IDOL.5 ..._. ��'TH s.v�� srr�o�.s DESCRIPTION {feet) fi FI�D iEST DATA �o� �� r_ �„ ------------------------------------------------------ � Hard dark gray CLAY w/ calcareous �1t �,,� paivcles & uace iron stains t �az�� � , _ -+ - � . � ! (CL) � a.s-• 691 — 2 —•------------------------------------------------ - ..................... .._.... ........--- --�-- � Hard brown CLAY w/ ca.lcareous i9 ios. s s.9 s. s9 � i T particles, trace calcareous nodules & trace sand, slighdy slickensided � � 690 —3 � - � 689 I 4 t , - (CL) � c�88 �-5 _ _��____---�___._..._�------- ��"� Hard tan siltv CLAY w/ tan limestone fragments _ i � ! (�L� � ._ 687 -�- 6 �I- � 1 � � 686 -II- 7 � 1_ Notes: Completion Depth: 55' Project No.: FE94-029 was: Dry was: 5.1' KC LL PL PI -200 D.D. P.P�I UNCQN. % ,. % % pcf tsf tsf ... ..................... ....... ................. a.s•, a.5* 4.2 -----____. .... ...-� .... .........•- ---�--. ......_.......... j a.s I r� � FIGURE N0.: 40 TERRA-MAR, INC. � __ ._ — ,� LOG OF BORING BORING B-38 Project: Lake Worth Water System Improvements Date: 10-11-94 Elev.: 703 +/- Location: See Figure 3 Depth to water at completion of boring: Dry Depth to water when checiced: 10-12-94 Depth to caving when checked: 10-12-94 II..�VhT T tlH/ S0 I L 5`f C�1IS p� ��� �� aEscRrPriary (f�t} & =w�'.3 1'FSt DATA 7q3--Q Q..__�---------------------------__�__________________ � �c"�(� (��C �T3V CU t°,�d�' ��!' ,��N Cd��'d1.LS �],�C��S �oa —� 70'� — 2 7ao —3 �s� —� _ � -gravet & c�� sand �a 4�' - - (CI-£} �_ - —.___-._..__-------------_..._;.___------------------ S�ff [aa� � gray �i�tv t'LAY w/ 6�8 --s � • — li�nesrone fr�a�menzs . _ '��L) 6�7 --6 69h —}7 il'�li]t�S: �(1II1Q���Q�1 D�*�Jf�: J�.{}' Projeci No.: FE94-029 was: Dry was: 43' MC Li PL �� —244 f] .1? . F. PE24 aDNCpN . z x x x �� rsr es. .... ..................... ....... . ............. 4.5 I 4_5 �o aa �7 4.1 .... ......... ........... ....... . ............. �i.o TERRA-MAR, INC. FIGURE NO.: 41 LOG OF BORING BORING B-39 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-11-94 Elev.: 716 +/- Location: See Figure 3 Depth to water at completion of boring: Dry Depth to water when checked: 10-12-94 was: Dry Depth to caving when checked: 10-12-94 was: 4.9' E'iE`VAI' I Cit7/ S�} I � S-Y't�3l3LS PSC IS. PL -200 D. D. P. PE.*I UhLON . � �� sn�T � s�or.s DESCRIPTION {;�yf � F7�i.A ,IEST pATA % % % PI X pcf ts! tsf 798 --0 a -- -------------------------------------------------- • ---. ..... ...._. _...... ........ ......... i . f / Hard oray CLAY w/ �cavel & coarse - � - � - - - 4 . o � / ,/ sand �CL) � — • ---- - - ---- --------------� . . . . . . . . . . _ . . . . . . . . .. _ .. . . . . . _ . . . . . . . . . . . . . . . . . � -- � Very stiff aray CLAY w/ calcareous p ._ nodules & trace sand, slighdy � �1 � � 1 � slickensided -- � _ � . _ � 7�4 --2 r � 3. 3 . ......... (CL) — -a---------------------------•--•------__...------- .... .......... ........... .. ..---- � Very sriff brown CLAY w/ calcareous 3.6 _ � nodules, trace sand, iron stains, sliahrly SliCke11s1ded I — / � (CL) a . a 713 �3 � ----------------------------- ------------------------- .... ......---.-._........ ....... . ...._......_... Very sriff tanish bmwn CLAY w/ 21 �04 . e a. s 2. 63 __ � n-ace sand, iron stains & _ calcareous particles � _ / 71,� —4 � _ � _ � (CL) � — ---------------------------------------------------- .... ..................... -•-- 3.9 ........ — I, Very stiff tan silry CLAY w/ trace I _' I"� sand> iron stains & calcareous I �1� _� � � g inclusions (CL) 7'10 --b I 7Q9 — 7 Notes: Completion Depth: 5.0' � TERRA-MAR, INC. FIGURE NO.: 42 � �� R ,. LOG OF BORING BORING B-40 Project: Lake Worth Water System Improvements Date: 10-11-94 Elev.: 730 +/- Location: See Figure 3 Depth to water at completion of bo�ing: I}ry Depth to water when checked: 10-12-94 Depth to caving when checked: 10-12-94 EI�.�/A2I ON/ SO I L:i12'SBpLS D�n-I s.ar�r� s�rr�oLs DESCRIPTION (feet) 6 FI�D rE.ST DATA rso--o �, ,------------------------------------------------ _ � Hard �ay CLAY w/ calcareous --- aa pardcles & calcareous nodules 729 --1 � (CL) �zs —z — ----------------------------------------------------- Hard brown CLAY w/ calcareous . _ particles, slightly slickensided 727 - - 3 Project No.: FE94-029 was: Dry was: 5.0' !SC LL PL I-200 D.D. P.PQJ UNCON. .. % % PI X pcf Lsf tsf .... ..� .................. ....... ....+Y .......... a.5 a.5*+ � .... ......... ........... ....... ....... ........ . 4.5- I � / (CL) 4. s.. nb --4 — - ---------------------- ----------------------- ---- ��-- - -- �- - .. ...... ....... ....... . . .. Hard brown silry CLAY w/ calcareous 16 li4.a 4.s*- � s.9� � nodules _ �� r � �r 7�s — 5 — 7Z4--6 723 - - 7 Notes: Completion Depth: 5.0' (CL) a.s*� TERRA-MAR, INC. FIGURE NO.: 43 LOG OF BORING BORING B-41 Project: Lake Worth Water System Improvements Project No.: FE94-029 Date: 10-11-94 Elev.: 741 +/- Location: See Figure 3 Depth to water at completion of boring: Dry Depth to water when checked: 10-13-94 was: Dry Depth to caving when checfced: 10-13-94 was: 5.0' �.vario4r/ saiL smsa� r� r.i. �a� —2on �.n. P_��r fis�ac�rr. �� snr�� s•rr�aLs UE�1PT��lN x x x PI x r est csr �t�c} a� �r� r�sr �hxr� � 747 --4 • --,-..__---------- ---------------•_..____ .... ..... .... .-•- ---•-- --..... ..... ........ Harxi grdyCLAY W�' C1dC� S�[lt� 8[ a.5�- W�3C�1�T� �7.1't1CSt�]i!C �3]fCTS � _ ! - � 74f} � 1 � � -• I I �I �/`� I �� --z // _ � - / . _ � , ('��-) T38--3 , ---_--------------------�__-- -------------------- ---. .. . �.i� 15 37 ..14...�� ........ ....... .d_g... _._..---- Hard tan & �7tv CLAY w,l iro� 737 --4 �'3b �-5 7'35 —b 734 -p7 Nc�tes; C�m�pletion De�ath. S.d' �Y s�ins ��� 4_5 1`E�?FtA-�AR, I�iC. FIGURE NO.: 44 LOG OF BORING BORING B-42 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 737 +/- Location: See Figure 3 Depth to water at completion of boring: Dry Project No.: FE94-029 Depth to water when checked: 10-13-94 was: Dry Depth to caving when checked: 10-13-94 was: 5.0' II�YATIpN/ SOIL SYHBOLS [� u, pL -200 D.D. P.P�t UNCON. °� sAr�� srr�oi.s DESCRIPTION % I z % PI % f cst �S: ( rie'G � D e� F I E..TD TE$Z' DATA � 737-0 -----------------------ss__-»__.__------------.�_�.... ._................... ....-�- - -- -- ......... _ �" ,/ Hard brown CLAY w/ ralcareous 4. s ; �" particles & uace sand � 736 - -1 - - (CL) o . s+. 'T35 --2 •--------------------------------------�---. .... ...........---. ...... ....... ........ --...... _ Moderately hard to hard ran weathered LIMFSTOI�TE �- � ., � .. � T34 — 3 � — � _ � � _ �,� T33 — a � 732_�5 �' 'T�so/i.is � �50/0.38 — 73'i - - 6 730 - - 7 Notes: Completion Depth: 5.0' FIGURE NO.: 45 _ 3EFiFtA-MAR, 11`a�. � LOG OF BOR{NG BORlNG B-43 ' Project: Lake Worth Water System Improvements Date: 10-12-94 E(ev.: 730 +/- Locatior: See Figure 3 ' � Depth to water at completion of boring: Dry Depth to water when checked: 10-13-94 Depth to caving when checiced: 10-13-94 � I ELEVATIQN/ � SOIL $YHBOLS D�ra s.u�r� sYr�oLs DESCRIPTION (feet) � FI�D TESI' DAI'A r3o —o ,�� — Hard can �avellv sandv CLAY, -----__�.,__ ' � - - �� (Severely �Veathered Limestone) �� � � I ._ '� ;. � -� � � , �, � 729 - -1 I ' ' � ,�`� , � . , �, I • - a' f�: r � � .- � . : � . �cL} ..... ...... .... ....... ..:.............. a 5+ h• • _ r728 —2 °'� - _.--_---------------•------------------------_�� ..... . � � �Moderately hard to hard tan � �� weathered LIIviFSTONE w/ clay layeis ' � � - - �� , � � � 727 —3 � I , � � - , �� . � 726 --4 ; - � '- ` - ., , . . , � � .- - 725 --5 � �- � -- 724--6 '." _ � � _ � L. 723 - - 7 r� �, , Notes: Completion Depth: 65' Project No.: FE94-029 was: Dry was: 65' MC LL PL pi -200 D.D. P.PEi UNLON. a b ^,�' ^,b' pcf Cs: Csf ..... -� .... ....... ....... ....... . ....,.... a.5* -w/ very sdff co hard gray clay layer �a 45'�S' 15 115.9 3.7 2.28 4.$ 1--cRRq-MAR, INC. FiGURE NO.: � LOG OF BORING BORING B-44 Project: Lake Worth Water System Improvements Date: 10-19-94 Elev.: 724 +/- �ocation: See Figure ? Depth to water 2t compietion of boring: Dry Depth to water wt;en checked: 10-20-94 Depth to caving when checked: 10-20-94 IIPYAT I 0!i/ 50 I L SYiIB0L5 I D�� I sarPT � s�ors DESCRIPTION (feet) & FIE�'TD TEST DATA 724 —0 � — ---------- --�_. ___�__.__�__-- _ � Sdff to very sri.fl';ray CLAY w/ calcareous paracles, trace — calcareous nodules & trace sand 723 — —1 722 --2 (CL) 721 --3 — ---------------------------------------------------- _ Moderately hard to hard tan weathered LIMFSTONE � �� 720 — 4 � _ ,���,`� _ � _ �' '--� _ � 7'19 --5 =��� so/0.50 S0/0.13 — 718 --6 717 --7 Nates: Completion Depth: 5.0' Project No.: FE94-029 was: Dry was: 5.0' MC Il. PL PI —200 D.D. P.P=i iJNC0N. A % % .. pcf Lsf Csf .... .... .... .�--....... ---.... ....... ........ i.�s 2.5 .... ..................... ....... ................. - TEr�RA-MAR, INC. FIGURE N0.: 47 LOG OF BORlNG BORING B-45 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 720 +/- Location: See Figure 3 Depth to water at completion of boring: Dry Depth to water when checked: 14-13-94 Depth to caving when checked: 10-13-94 ELE1/ATION/ SOIL SYTIDOLS D�TH sa,r�*�x sYrffior.s DESCRIPTION (feet) 6� FIE'I.D ?F.57' pA�'A_ . 720 —0 ---- ------------------------------------------------- .. �,/+ Hard gray CLAY w/ fine sand lenses, _ � limestone fragmenu, ca]careous ' � pardcles & trace sand -- f 719 --1 � 718 --2 717 --3 716 --4 7'15 --5 714 --6 7'13 --7 i Project No.: FE94-029 was: Dry was: 5.0' MC LL PL P I —200 D. D. P. P�t UtiC�ti . % % X % pc! csr ts; .... .... ........._...... ....... .. ........... 4.5+ a.5+ 15 44 16 28 113.3 4.5* 12.68 (CL) a . s- � --____--------��--------._�.------------------------ .... ...... ............... ....... .. .............. Hard brown & tan silry CLAY w/ °• S+ limestone fra,�nents Notes: Completion Depth: 5.0' (CL) TERRA-MAR. INC. FIGURE N0.: 48 LOG OF BORING BORING B-46 Project: Lake Worth Water System Improvements Date: 10-12-94 Elev.: 647 +/- Location: See Figure 2 Depth to water at completion of boring: Dry Project No.: FE94-029 Depth to water when checked: 10-13-94 was: Dry Depth to caving when checked: 10-13-94 was: 3.0' EL5V A? I ON/ SO I L SYh�OL5 !SC LL PL -200 D. D. P. PF2I [R7CON . D� s��x s�oLs 0ESCRIPTION PI (:eet) � FI� �y� ppTp % % X % pcf tsf Lsf 647 ---0 - ----------------------------------------------------- ... ys �,. - � ... .... .... ...... ....... ....... ......... Brown clavev SAIVD w/ limestone 12 43 3. �s , �- ;:;'; ;,�; ravel & asphaldc concrete I -- �';�',;� �amenu �'� � . �f'��, ( ) ( ) • FILL SC f 646 -1 �*�' ✓ -•------------___4_-------------_________.------a__ . ._ Moderately hard to hard tan weathered LIMESTONE f -- i 645 -2 � I , � - � _3 3�-.`�I50/0.25 _ 50/0.13 643 - 4 642 --5 641 - 6 6�.0 - 7 Notes: Completion Depth: 3.0' P TERRA-MAR, INC. FIGURE NO.: 49 Y ' � Symbol Description stra�a svm�v�s Cla�r, �iity � � v•; '; s PAVEMENT w,� }�a� s :c � <, '� yyi a iit- R � "Si rC:�B :f'v a�, � i ��v a•a, � � �LAY, � "����' . ' gravelly . . . sandy i ° �A�r13, s3.l�y 5�I.T, sandy � ,r;�r�; • SAN�, clayey '`��✓�� . �I.AY, : ; . sandy d '� KEY TO LOG TERMS & SYMBOLS Symbol Description Symbol � r- � SA,13D . � � �'�' elayey ,� graveliy �;.r' � Clay � e �IMESTONE, Severely � Weather�d �1�.ND �3,'�sc. Svr�.00ls � �epth tv cavin� Soi� Sam�lers �! Standard U penetration test � Thin wall Shelby Tube �' _ SAt�iD, ciayey, J•. , �:' silty 1 '. � ;,',' ,, I.I�:STC]NE, We�.ttlEi6d ��� Auger Nvtes: 1. Exploratory borings were drilled on dates indicated using truck mounted drilling equipment. 2. Water level observations are noted on boring logs. 3. Results of tests conducted on samples recovered are reported on the boring logs. Abbreviations used are: DD = natural dry density (pcf) LL = liquid limit ($) MC = natural moisture content ($) PL = plastic limit (�) Uncon.= unconfined compression (tsf) PI = plasticity index P.Pen.= hand penetrometer (tsf) -200 = percent passing #200 Description THD penetration test Bulk/Grab sample FIGURE NO.: 50 TERRA-MAR, INC. 11� Indian Cove Water Extension PW77-060770150030 ��f-. `�1eld�r� ;�.rrert, i'E November 14, 1998 � Customers Paid as of October 30, 1998 as noted in Applications Sect:on Project File Lot 3 a 5 6 7 s 9 12 15 18R 19 Address 2472 Indi2n Cove 2468 Indian Cove ?464 Indian Cove ?460 Indian Cove 2��6 :r.dian Cove 2=�5? Indian Cove ?�8 Indian Cove 2�28 IrLdiar. Cove 2�16 Iraian Cove ?=!04 Indian Co��e 2 ^ J0 Indiar Cove Cus�omer Dewey Hickson Lois Ann Teeples R. B. IvIuL'ins ?�Iichael & Kim Bernard Je:. y �Iiller Terry Srr,ith Lcnnie Ethridae Eeverly Rudder James C. & La�vanda Smith vlark Rosenfield R�wland Broiles �ncunt Paid $941.0C �°�4 i .00 �9� 1.00 59z:.00 �9!.1.00 c��,, , JiT1.CC �941.00 51179.�? �11?9.5? S1179.�2 c, l�c, S� JL l�...-� City of Fo�t Worth, Texas n►�Ayor And �,aunc�l Cammun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 3/16/99 **C-17321 60COVE 1 of 2 SUBJECT AWARD OF CONTRACT TO I& M RODRIGUEZ, INC. FO THE CONSTRUCTION OF INDIAN COVE WATER EXTENSION RECOMMENDATION: it is recommended that the City Council authorize the City Manager to execute a construction contract in the amount of $118,474 with I& M Rodriguez, Inc. for the construction of the Indian Cove Water Extension. DISCUSSION: In accordance with policy for the installation of community facilities, the residents of Indian Cove on Lake Worth submitted a petition for water service to the Director of the Water Department. These residents have already paid the required water tap and impact fees. This project was advertised in the Commercial Recorder on December 17 and 24, 1998. On January 14, 1999, the followrng bids were received: BIDDER I & M Rodriguez, Inc. Estrella Construction, Inc. Fu Techn Construction Davila Construction, Inc. Cleburne Utility Company M. E. Burns Construction, Inc. Architectural Utilities, Inc. Radich Construction Company, Inc. AMOUNT E31[� $118,474 $119,255 $121,700 $123,483 $126,134 $128,255 $161,130 $182,751 I& M Rodriguez, Inc. is in compliance with the City's M/WBE Ordinance by committing to 12°/o M/WBE participation on this project. The City's goal is 11 %. In addition to the contract amount and contingencies, $2,500 is budgeted for construction inspection and $2,500 for staff support and review. This project is located in COUNCIL DISTRICT 7. � City of Fort Worth, Texas �1✓1'jAyar �r�r� Caunc�l C,ammun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 3/16/99 **C-17321 60COVE 2 of 2 sue�ECT AWARD OF CONTRACT TO & M RODRIGUEZ, INC. FO THE CONSTRUCTION OF INDIAN COVE WATER EXTENSION FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Water Fund. MG:j Submitted for City Manager's Office by: Mike Groomer 6140 Originating Department Head: Lee Bradley, Jr. Additional Information Contact: Lee Bradley, Jr. I FUND I ACCOUNT I � (to) � s2o� � �rTom� I PW77 s2o� � CENTER I AMOUNT 541200 060770153960 CITY SECRETARY � APPROVED � i C1TY COUNC � MAR 16 1999 � $118,474.00 � ; � ` I A.. r .�i ari.� . � I City Sc�cci�ary ot the I Clty ot Por4 S1Porih. Tezas PA.RT C - GENERAL CONDITIONS TABLE OF CO�ITENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 C1-l.l C1-1.2 C1-1.3 C1-1.4 C1-1.5 C1-1.6 C1-1.7 C1-1.8 C1-1.9 C1-1.10 C1-1.11 C1-1.12 C1-1.13 C1-1.14 C1-1.15 C1-1.16 C1-1.17 C1-1.18 C1-1.19 C1-1.20 C1-1.2I C1-1.22 C1-1.23 C1-1.24 C1-1.25 C1-1.26 C1-1.27 C1-1.28 C1-1.29 C1-1.30 C1-1.31 C1-1.32 DEFINITIONS Definition of Terms Contract Documents Notice to Bidders Proposal Bidder General Conditions Special Conditions Specificatioas Bond Contract Plans City City Council Mayor City Manager City Attorney Director of Public Works Director, City Water Department Engineer � Contractor Sureties The Work or Project Working Day Calendar Day Legal Holiday Abbreviations Change Order Paved Streets and Alleys Unpaved Streets and Alleys City Streets Roadway Gravel Street C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2.2 Interpretation of Quantities C2-2.3 Examination of Contract Documents and Site C2-2.4 Submi�ting of Praposal C2-2.5 Rejection of Proposals C2-2.6 Bid Security (1) (1) (2) �2} (2) (2) (2) (2) (2) (3) (3) (3) (3) (3) (3) (3) (4) (4) (4) (4) (4) (4) (4) (4) (4) (5) (6) (6) (6) (6) (6) (6) C2-2 (1> C2-2 (1) C2-2 (2) C2-2 (3) C2-2 (3) C2-2 (3) (1) � C2-2.7 Delivery of Proposal C2-2.8 Withdrawing Proposals C2-2.9 Telegraphic Modification of Proposals C2-2.10 Public Opening of Proposal C2-2.11 Irregular Proposals C2-2.12 Disqualification of Bidders C3-3 C3-3.1 C3-3.2 C3-3.3 C3-3.4 C3-3.5 C3-3.6 C3-3.7 C3-3.8 C3-3.9 C3-3.10 C3-3.11 C3-3.12 C3-3.13 C3-3.14 C3-3.15 AWARD AND EXECUTION OF DOCUMENTS Consideration of Proposals Minority Business Enterpise Women-Owned Business Enterprise compliance Equal Employment Provisions Withdrawal of Proposals Award of Contract Return of Proposal Securities Bonds Execution of Contract Failure to Execute Contract Beginning Work Insurance Contractor's Obligations Weekly Payroll Contractor's Contract Administration Venue C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4.2 Special Provisions C4-4.3 Increased or Decreased Quantities C4-4.4 Alteration of Contract Documents C4-4.5 Extra Work C4-4.6 Schedule of Operations C4-4.7 Progress ScheduZes for Water and Sewer Plant Facilities CS-5 CONTROL OF WORR AND MATERIALS CS-5.1 Authority of Engineer 'CS-5.2 Conformity with Plans CS-5.3 Coordination of Contract Documents CS-5.4 Cooperation of Contractor CS-5.5 Emergency and/or Rectification Work CS-5.6 Field Office C5-5.7 Construction Stakes C5-5.8 Authority and Duties of Inspectors CS-5.9 Inspection CS-5.10 Removal of Defective and Unauthor.�zed CS-5.11 Substitute Materials or Equipment CS-5.12 Samples and Tests of Materials CS-5.13 Storage of Materials • CS-5.14 Existing Structures and Utilities CS-5.15 �nterruption of Service CS-5.16 Mutual Responsibility of Contractors CS-5.17 Cleanup CS-5,18 Final Inspection � C2-2 (4? ,�, C2-2 (4) C2-2 (4) C2-2 (4) � C2-2 (4) C2-2 (5) C3-3 (1) C3-3 C3-3 C3-3 �3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 (1) (1) (2) (2) (2) (2) (4) (4) (4) (4) (7) (7) (7) (8) C4-4 (1) C4-4 (I) C4-4 (1) C4-4 (2) C4-4 (2) C4-4 (3) C4-4 (4) CS-5 CS-5 C5-5 C5-5 C5-5 CS-5 CS-5 CS-5 C5-5 Work C5-5 C5-5 CS-5 CS-5 C5-5 CS-5 CS-5 CS-5 CS-5 (1) (1) (2) (2) (3) (3) (3) (4) (5) (5) (5) (6> (6) (7) (7) (8) (8) (9) � (2) C6-6 C6-6.1 C6-6.2 C6-6.3 C6-6.4 C6-6.5 C6-6.6 C6-6.7 C6-6.8 C6-6.9 C6-6.10 C6-6.11 C6-6.12 C6-6.13 C6-6.14 C6-6.15 C6-6.16 C6-6.17 C6-6.18 C6-6.19 C6-6.20 C6-6.21 C7-7 C7-7.1 C7-7.2 C7-7.3 C7-7.4 C7-7.5 C7-7.6 C7-7.7 C7-7.8 C7-7.9 C7-7.10 C7-7.11 C7-7.12 C7-7.13 C7-7.14 C7-7.15 C7-7.16 C7-7.17 C8-8 CS-8.1 CS-8.2 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY Laws to be Observed Permits and Licenses Patented Devices, Materials and Processes Sanitary Provisions Public Safety and Convenience Privileges of Contractor in Streets, Alleys, and Right-of-Way Railway Crossings Barricades, Warnings and Watchmen Use of Explosives, Drop Weight, etc. Work Within Easements Independent Contractor Contractor's Resoonsibility for Damage Claims Contractor's Claim for Dam�ges Adjustment of Relocation of Public Utilities, etc. Temporary Sewer Drain Connections Arrangemert and Charges of Water Furnished ,�y City Use of a Se,tion of Portion of the Work Contractor's Responsibility for Work No Waiver of Legal Rights Personal Liability of Public Officials State Sales Tax PROSECUTIO[� AND PROGRESS Subletting Assignment of Contract Prosecution of the Work Limitations of Operations Character of Workman and Equipment Work Schedule Time of Commencement and Completion Extension of time of Completion. Delays Time of Completion Suspension by Court Order Temporary Suspension Termination of Contract due to Vat�ional Emergency Suspension of Abandonment of the Work and Annulment of Contract Fulfillment of Contract Termination for Convenience of tne Onwer Safety Methods and Practices MEASUREMENT AND PAYMENT Measurement of Quantities linit Prices C6-6 (1) C6-6 (1) C6-6 (1) C6-6 (2) C6-6 (2) C6-6 (3) C6-6 (4) C6-6 (4? C6-6 (5) Cb-6 (6) C6-6 (8) C6-6 (8> C6-6 (10) C6-6 (10) C6-6 (10) C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 (1) (1) (1) (2) (2) (3) (4) (4) (4) (5) (6) (6) C7-7 (7) C7-7 (7) C7-7 (9) C7-7 (10) C7-7 (13) C8-8 (1) C8-8 (1) (3) C8-8.3 C8-8.4 C8-8.5 C8-8.6 C8-8.7 C8-8.8 C8-8.9 CS-8.10 C8-8.11 CS-8.12 C8-8.13 � Lump Sum C8-8 (1) � Scope of Payment C8-8 tl) Partial Estimates and Retainage C8-8 (2) Withholding Payment C8-8 (3) Final Acceptance C8-8 (3) Final Payment C8-8 (3> Adquacy of Design � C8-8 (4) General Guaranty C8-8 (4) Subsidiary Work C8-8 (5) Miscellaneous Placement of Material CS-8 (S) Record Documents C8-8 (5) (4) � _ . � -- �- � --m- - ._ .� �_ �.__. � ___ _ - - .._��- - - p -- - PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1.I DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are used, the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance of the contract. These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A- NOTICE TO BIDDERS (Sample) PART B - PROPOSAL (Sample) PART C - GENERAL CONDITIONS (CITY) (Developer) PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT (Sample) (Sample) White White Canary Yellow Brown Green E1-White E2-Golden Rod E2A-White Blue White White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A- NOTICE TO BIDDERS above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS . PART G - CONTRACT PART H- PLANS (Usually bound separately) (Advertisement> Same as C1-1 (1) ' � C1-1.3 NOTICE TO BIDDERS: Al1 of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-I.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for perForming the work contemplated under the Contract Documents, constitutes a bidder. C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. Wherever Conditions precedence there may be a conflict between the General and Special Conditions, the latter shall take and shall govern. C1-1.7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions and other ele,nents of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents whicn sets forth in detail the requirements which must be met by all materials, con5truction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements, statutes, etc., such referred to documents shall become a part of the Contract Documents just as though they'were embodied therein. C1-1.9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2) i� � � � r � � 'd faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3.7) c. Maintenance Bond (see paragraph C3-3.7? d. Proposal or Bid Security (see Special Instructions to Bi3ders, Part A and C2-2.6) C1-1.10 CONTRACT: The Contract is the formal signed agreement ' between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. ' �J n 1� C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail the location, dimension and position of the various elements of the project, including such profiles, typical cross-sections, layout diagrams, working drawings, Areliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents, but they are a part of the Contract Documents just as though they were bound therein. C1-1.12 CITY: The City of Fort Worth, Texas, a municipal ' corporation, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its City Manger, each of which is required by charter to perform � specific duties. Responsibility for Final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are synonymous. � � � C1-1.13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. C1-1 (3) � � � C1-1.17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1.18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Deoartment of the City of Fort Worth, Texas, or his duly authorized reorPsentative, assistant, or agents. C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. C1-1.20 CONTRACTOR: The person, persons, gartnership, company, firm, association, or corporation, entering into a contract with the Owner for t'ne execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therzin. C1-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limit�d to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to producz a completed and serviceable project. C1-1.23 WORKING DAY: A working day is defined as a calendar day, not including �aturdays, Sundays, and legal holidays, in which the weather or other conditions not under the control of the Contractor permit the oerFormance of the principal unit of work for a period of not less than s�ven (7) hours between 7:00 a.m, and 6:00 p.m., with 2xceptions as permitted in paragraph C7-7.6. C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. � C1-1.25 LEGAL HOLIDAYS: Legal holidays shall be prescribed by the City Council of the City of Fort ooservance by City employees as follows: Cl-1 (4) observed as Worth for � � � � � � � V � � � � � l. 2. 3. 4. 5. 6. 7. 8. 9. New Year's Day M. L. King, Jr. Birthday Memorial Day Independence Day Labor Day Thanksgiving Day Thanksgiving Friday Christmas Day Such other days holidays as the may determine January 1 Third Monday in 3anuary Last Monday in May July 4 First Monday in September Fourth Thursday in November Fourth Friday in November December 25 in lieu of City Council When one of the above na�ed holidays or a special holiday is declared by the City Council, falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following ,�onday, by those employees working on working day operations. Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1.26 ABBREVIATIONS: Wherever the a'obreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: AASH'I'0 - American Association oF MGD State Highway Transportation Officials ASCE - American Society of Civil Enginzers LAW - In Accord3nce With ASTM - American Society of Testing Materials AWWA - American Wat�r Works Association ASA - American Standards Association HI - Hydraulic Institute Asph. Ave. Blvd. CI CL GI Lin. lb. MH Max. - Asphalt - Avenue - Boulevard - Cast Iron - Center Line - Galvanized Iron - Linear or Lineal - Pound - Manhole - Maximum - Million Gallons Per Day CFS - Cubic Foot per Second Min, - Mono.- � - R - I.D. - Elev.- F - C - In. - Ft. - St. - CY - Yd. - SY - L.F. - D.I. - Minimum Monolithic Percentum Radius Iaside Diameter O.D. - Outside Diameter Elevation Fahrenheit Centigrade Inch Foot Street Cubic Yard Yard Square Yar3 Linear Foot Ductile Iron C1-1 (�) �, . C1-1.27 CHANGE ORDER: A"Cnange Order" is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change OrdPr unless the increase or decrease is more than 25$ of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of t�e following types of wearing surfaces apPlied over the natural unimproved surface: l. Any type of asohaltic concrete with or without separate base material. 2. Any type of asphalt surface treat�nen�, not including an oiled surface, with or without separate bas` material. 3. Brick, with or without separate base matPrial. 4. Concrete, with ar without separate bas` material. 5. Any combination of the above. C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys." C1-1.30 CITY STREETS: A city street is defined as th�� area �etween the right-of-way lines as the street is dedicated. C1-1.31 ROADWAY: oarallel lines two (4'? feet back of exists. The roadway is defined as the area between (2') feet back of the curb lines or Four the average edge oE oavz�ent where no cur'o C1-1.32 GRAVEL STREET: A gravel street is any unpaved strPet to which has been added one or more a�plications of gravPi or similar material ot'ner than the natural mat�rial found on the str�et surface before any i�provement was made, C1-1 (6) SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder's general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for openinq of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10$) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been on projects completed not more than five (5) years prior to the date on which are to be received. The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. . C2-2.2 INTERPRETATION OF QIIANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal C2-2(1) forms or other parts of the ConLract Documents will be considered as approximate only and will be used For the r�urpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents an3 Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter providzd, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part oF the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are r�quired, prior to the filing of proposal, to read and become familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. Th�y must judge for themselves t:�e difficulties of the work and all attending circumstances affecting the cost of d�ing the work or the time requi�ed for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any rapresentative oF the Owner other than that contained in the �ontract Documents and officially promulgated addenda •t'ner�to, shall be binding upon the Ow;�er. Bidders shall rely exclu�ively and solely upon their own estimates, investigation, research, tests, ex�lorations, and other 3ata which are necessary for full and complete information uoon which tne pr000sal is to be bas`d. It is mutually agreed that the submission of a pror�osal is Prima-Facie evidence that the bidder has madz t'ne investigations, examinations and tests herein required. Claims for add�tional compensation due to variations between conditions actually encountered in construction and as indicat�d in the Contract Documents will not be allowed. , The logs oF Soil Borings, if any, showing on the plans are for genzral information only and may not 'oe correct. Neither the C2-2(2) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices, written in ink in both words and numerals, for which he proposes to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member.must be given, and the proposal must be signed by a member of the firm, association, or partnership, or by a person duly authorized. If a proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for alternate bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalance value of any items. Proposal tendered or delivered after the official time designated for receipt of �roposal sha11 be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a"Proposal Security" of the character and in the amount indicated in the "Notice to Bidders" and the "Proposal." The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2(3) C2-2.7 DELIVERY OF PROPOSAL: No pr000sal will be consider2d unless it is delivered, accompanied by its proper Bid Security, to the City Manag�r or his representative in the official Dlace of business as set Forth in the "Notice to Bidders." It is the Bi3der's sole responsibility to deliver the pr000sal at the prooer time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidd�r must have the proposal actually delivared. Each �roposal shall be in a sealed envelope plainly marked with the ''i" word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. l� C2-2.8 WITHDRAWING PROPOSALS: Proposals actually £iled with the City Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all oroposals not requested Eor ' non-consideration are opened and oublicly read aloud, the proposals for which non-consideration requests have been li properly filed ma , at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his prohosal by telegraphic communication �t any time I prior to the time set For opening proposals, provided such telegraphic communication is received by the �ity Manager prior to the said proposal opening time, and provid�d furt'ner, that the City Manager is satisfied that a written and duly y authenticated confirmation of such telegraphic cocnmunication over the signaLure of the bidder was mailed prior to the i proposal opening time. If such confirmation is not received within forty-eight (48? hours after the �r000sal opening time, no further consideration will be given to the pronosal. C2-2.10 P(JBLIC OPENING OF PROPOSAL: Pr000sals which have been properly filed and For which no "Non-consideration Request" has been received will be �ublicly opened an3 read aloud by the City Manager or his authorized representative at the tiine and olace indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the Owner until the contract has �een awarded. Bidders or their authorized representatives are invited to be present for the � opening of bids. C2-2.11 IRREGULAR PROPOSALS: Praoosals sha11 be considerzd as being "Irregular" if they snow any omissions, alte.rations of form, additions, or conditions not called for, unauthorized altarnate bids, or irregularities oF any kind. However, the '° C2-2(4) �� � Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be disqualified and their proposals not considered for any of, but not limited to, the Following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. c. The bidder being interest2d in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior cont.ract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement, experience record, equipment schedule, and such inquiries as the Owner may see fit to make. g. Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2. A current experience recard showing especially the projects of a nature similar to the one under consideration, which have 'oeen successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder w�o, in the judgment of the Engineer, is disqualified under the req�lirements stated herein, shall be set aside and not opened. C2-2(5) PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS S�CTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all pr000sals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by Owner, to allow and audit and/or an examination oF any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements; further, any such misrepresentation may be grounds for disqualification of Contractor �t Owner's discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrirnination in employment practices. C3-3 (1) The Contractor shall �ost the required notice to that effect on the project site, and, at his request, will be provided assistance by the City of Fort Worth's Equal Em�loyment Offic�r who will refer any qualified applicant he may have on file in his office to the Contractor. Aporopriate notices may be acquired from the Equal Emoloyment Officer. C3-3.4 WITHDRAWAL OF PROPOSALS: After a pr000sal has been read by the Owner it cannot be withdrawn by the Bidder within forty-five (45) days after the date on which the pr000sals were ooened. C3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the pr000sals for a reasonable time, not to exceed forty-five (45) days after tne date of opening proposals, and in no event wi11 an award be made until after investigations have been made as to the rasponsibility of the proposed awar3ee... The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not 'oecome effective until the Owner has notified the Contractor in writing of such awar3. C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as oroposed price totals have been determined for comparison of bids, the Owner may, at its discretion, return the oroposal security which accompanied the pr000sals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest bidders, will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise diaposed of the bids, af�er which they will �e returned by the City Secretary. C3-3.7 BONDS: With the execution and delivery of tne Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND: A good an3 sufficient performance bond in an amount not less thaa 100 percent oP the amount oE the contract, as evi3enced by the proposal tabulation or otnerwise, guaranteeing the fu11 and faithful execution of the work and oerformance of the contract, and for tne protection of the Owner and all other persons against damage by r�ason of negligence of thz Contractor, or improoer execution of t'ne work or tne use of i�f�rior mat�rials. This perFormance C3-3 (2) bond shall guarantee the oayment for all labor, materials, equipment, supQlies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND: A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by tne pr000sal tabulation or otherwise, guaranteeing the prompt, full and faithful performance of the general guaranty which is set forth in paragraph C8-S.10. c. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959, effective April 27, 1959, and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until a11 payments as above stipulated are made. d. OTHER BONDS: Suc'n other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to t�e owner. In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of accenta'Qle sureties, and the amount of bond written by any one acceptable company sh�ll not exceed the amount shown on the Treasury list for that company. Each bond snall be properly executed by both the Contractor and Surety Company. Sho uld any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 (3) new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties, as r2quired, have qualifie� and.have been accepted by the Owner. The contract shall not be o�erative nor will any payments be due or paid until ap�roval of the bonds by tne Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by approgriat� resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the City Secretary, approved as to form and legality by t'ne City Attorney, and �xecuted for the Owner by either tne Mayor or City Manager. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to execute the requiY ed bond or bonds or to sign the required contract within ten (10) days after the contract is awarded shall be considered by the Owner as an abandonment of �is proposal, and the Owner may annul the Award. By reason of the uncertainty of the mar�et prices �f material and labor, and it beiag impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee's failure to execute said bonds and contract within ten (10) days, the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the par� of the Awar3ee and shall thereupon immediately be forfeited to the Owner. The filing oF a proposal will be consider�d as an acceptance of this provision by the 3idder. C3-3.10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner. S'nould the Contractor fail to cosnmence work at the sit� of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order", it is agreed that the Surety Company will, within ten (10) days after the commencement date set forth in such written authorization, co�nmence the physical execution of the contra�t. C3-3.11 INSURANCE: The Contractor shall not commence work under this contract until he Zas o'ot-3ined all the insurance required under the Contract Documents, and suc'n insurance has besn approved by the Owner. The �rime Contractor sha11 oe responsible for delivering to the Owner the sub-contractors' C3-3 (4) certificate of insurance for approval. The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his iasurance covers sub-contractors. It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub-contractors. a. COMPENSATION INSURANCE: The Contractor shall maintain, during the life of this contract, Workers' Compensation Insurance on all of his employees to be engaged in work on the oroject under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers' Compensation �tatute, the Contractor shall provide adequate employer's general liability insurance for the protection of such oF his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contract Contractor's Comorehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $500,000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $500,000 covering each occurrence on account oF property damage with $2,000,000 umbrella policy coverage. c. ADDITION AL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned policies, and in the amount as set �orth for public liability and property damage, the following insurance: 1. Contingent Liability (covers General Contractor's Liability for acts of sub-contractors). 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation (if excavations are to be performed ad�acent to same). 4. Damage to underground-utilities for $500,000. C3-3 (S) d. 5. Builder's risk (where above-qround structures are involved). - _ 6. Contractual Liability (covers all indemnification requir�ments of Contract). AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maint�in, during the life oF this Contract, Comprehensive Automobile Liability insurance in an amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each nerson an amount not less tha� $50O,OOQ on account of one accident, and automobile property dama�? insurance ia an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Cori�r3ctor and his sub-contractors, respectively, against damage claims which may arise from operations under tnis contract, whether such ooerations be I�y the insured or by anyone directly or indirectly e�nployed by him, an3 also against any of the followrng soecial hazards which may be encountered in the performance of the Contr�ct. f. PROOF OF CARRIAGE OF INSURANCE: The Con�ractor sha11 turnish the Owner with satisfactory proof of coverage by insurance required in thes2 �ontract Documents �n amounts and by carri�rs satisfactory to the Own�r. (Sample attached.) All insurance requirements made ugon the Contractor shall aoply �o the sub-contractor, shoutd the Prime Contractor's insurance not cover the sub-contractor's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance and bonding companies with whom the Contractor's insurance and gerformance, nay�ent, maintenance and all such other bonds are written sha11 be r�orese�ted by an agent or agents having an ofEice located within the city limits of the C3-3 (6) City of Fort Worth, Tarrant County, Texas. Each suc� agent shall be a d�ily qualif ied, one upon whom service of process may be had, an� must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other ciai�nant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged, may have against the Contractor, insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth-Da11a5 area. The name of the agent or agents shall be set forth on all oF such bonds and certificates of insurance. C3-3.12 CONTRACTOR'S OBLIGATIONS: Under tlze Contract, the C�ntractor shall pay for all materials, labor and services when due. C3-3.13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all �erson engaged in work on the project at the site oE the project shall be furnished to the Owner's re�resentative within s`ven (7) days after thA close of each payrolZ period. A cogy or copies of the aoplicable minimum wage rates as set forth in the �ontract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract. Copies of the wage rates will be furnished the Contractor, by the �wner; however, oosting and protection of the wage rates shall be the r2s�onsibility of the Contractor. C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, wnether a p�rson, p�rsons, �artnershi�, company, firm, association, corporation or other who i.s approved to do businQss with and ent�rs into a con�ract with the City for construction of water 3nd/or sanitary s2wer facilities, will have or shall establish a fully ooerational business ofFice within the �'ort �Iort'n-Dallas metrogolitan arna. The Contractor shall charge, delegate, or assign tnis office (or he ma� delegate his Project Superintendent) with Fu11 authority to transact all business actions required in the �erfo�mance of the Contract. This local authority shall be ma3` resoonsible to act for the Contractor in all mattzrs pertaizing to t�e work governed 'oy the-Contract whether it be administrative or otnerwise and as such shall be empowered, �hus delegated and dir�ctzd, to settle all m�t�rial, labor or otner expenditures, all claims against the wcrk or any other C3-3 (7) matter a5sociated such as maintaining adequate and agoropriate insurance or security cove.rage for the oroject. Such local authority for administration oF the work under the Contract sha11 oe maintained until all business transaction5 executed as part of the Contract are complete. Shouid the Contractor's principal bas� of ooerations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor's assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, all appropriately signed and sealed, 3s applicable, by the Cont.ractor's responsible offic�rs with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents. The intent of these requirements is that all matt�rs associated with the Contractor's administration, whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverag2. Should the Contractor's local re�oresentative Fail to perform to the satisfaction of Engiaeer, the Engineer, at his sole discretion, may demand that such local representative be rzplaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of working time will be for periods in which worx stopnages ar� in effect for this reason. C3-3.15 VENUE: V?nue of any action hereinunder shall be exclusively in Tarrant County, Texas. C3-3 (8> PART C - GENERAL CO�DI'rIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK C4-4.1 INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish, all in full compliance with the requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as Qrovided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable maaner. The Contractor shall, unless otherwise specifically stated in these �ontract Documents, furnish all labor, tools, materials, machinery, equipment, special services, and incidentals necessary to the prosecution and completion of the project. C4-4.2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered 'Qy these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Docunents just as theugh they were originally written therein. C4-4.3 INCREASED OR DECREASED QUANTITIES: The Owner reserves th2 right to alter the quantities of the work to be performed or�to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, incrsas�d or decreased at t'ne unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes incr�ase or decrease the original c�uantity of any item or items of work to be done or materials to be furnished 'Ay the 25 nercent or more, then either party to the contract shall upon written request to the other party 'pe entitled to a re�ised consideration upon that nortion of the work above or oelow the 25 oercent of, the original quantity stated in the proposal; suc� r?vised-consideration to be determined b�y special agreement or as hereinafter provided for "Extra Work," vo allowance will be made for any changes in anticipated grofits nor shall such changes be considered as C4-4 (1) � � waiving or invalida�ing any conditions or provisions of t'ne Contract Documents. Variations in quantities of sanitary s`=.a�r ni�es i� depth � categcries, shall be interpr�ted ha�ein as applying to tn2 overall quantities or sanitary sewer pipe in each Qi4e size, but not to tne various depth categories. C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner re5erves the right to make such changes in tne Contrac� Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in tne most satisfactory manner, provid�d such chang?s do not materially alter tne original �ontract Documeats or change the general nature of the project as a w�ole. Such changes sha11 not oe consid�re3 as waiving or invalid.�ting any condition or orovision of the Contract Docum?nts. C4-4.5 EXTRA WORK: Additional work made necessary by c:�anges and altera�ions oE the Contract �ocuments or oE quanr_ities or for other r�asons f�r which no prices ar� provided iz th� Contract Documents, shall be defined as "Extra Work" and shall be p�rformed by the Contractor in accordance with these Contracr_ �ocuments or ap��roved additions tizereto; provided, however, that beEor� any extra work is begun a"Chang? Order" shall be executed or �aritten order issued by the Owner to do tne work for payments or credi�s as shall be determined by one or more compination of the following mathods: a. Unit bid �rice prev.iously apProved. b. An agra_ed lump sum, �. The actuai reasonable cost oF (1) labor, (2) rental of equipment used on the extra work Fcr ti�e time so us�d ac As:�ociated ��eneral Contraccors oF Am�r;ca curr?nt equipmen: rental rates; (3) materials entering permanently into the project, and (�) a�:tual cost of ins�iranc?, oond�, an3 so��ial 5ecurity a5 det2rmined by the Own�r, �lus a fix�d f�e to oe agrned uoon bu� not to �x^eed 10°� oE tne actual cost of sucn ex=ra wor'�c. The Fixed f�e i.� no� to inc1u32 any addit.ional orofit to t;�e Cont.ractor �or r?ntal of equi�ment own��.� �y hi�n and uszd For tn? extra work. Tne E�e shall o� f�i11 and co�nplete compensati�n to cover the cost oE sup�rintendence, overhea'�i, other prof.it, general �nd al L other :�x��ns� not inc.lude3 i�z ( 1), ( 2), i3;, an� t4) abov?. The Contractor �hall keer� accurat� cost rzcords on the forn an� i�z the method C�-4 (2) ,�... suggest�d by the Owne.r and s�all give tize Owner access to all accounts, bills, vouchers, and r?cords relating to the �xtra Work. No "Change Order" shall become effective untit it ha� been approved and signed by each of the Contracting parti�s. No clai�n for �xtra �Vork o.E any kind wi11 be allowe<� unless or3ered in writing ny the Owner. In case any ord`rs or instructions, ei�her oral or written, app?ar to the Contractor to involve Extra Work for w:�ich he snoul3 receive compensation, he shall mak2 written request to the Engineer For written ord�rs autnorizing such Extra Work, orior to beginning sucn work. Should a diFfer�nce arise as to wha� do?s or does not constitute Extra Work, or as to th? payment th�reof, and th� Engineer insists upon its performance, the Contractor shall pro;,eed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as orovided undz� method (Item C). Claims for extra work will not be pai� unl?ss the Contractor sha11 file his claim with the Own�r witnin five (5) days before the timP For making the first estimat� after such work is done and unless �he claim is sup�oorted by satisFactory voucners and certified payrolls covering all labor and materials expended upon t'ne said Extra v�ork. The �ontractor shall furnish t'ne �wner such installati�n recoids �f all deviations from the original Contract �ocuments a.� may be necessary to enable the Owner to pre�ar� for �ermanent reco�d a corrected set of �lans showing the actu�31 installati�n. The comp�naation agree3 uPon for '�xtra wor�c' whe�her or not iniiti3ted by a'change order' sha11 be a fu11, c��mplet� an3 f ina� na�ment Eor all coats Contractor i:�clirs as a r.=_sult or re1�t_ing t� i:he cnange or extra work, whPther said costs ara kr.own, 1inknown, for�s�en or unfores�en at t�at time, inclsdi�g wit:�out iimitation, any costs for d?lay, extend?d ov�rh�ad, rioole or impact cost, or any otner :�ffect on c'nan3?d or uncnang�d work as a r�sslt or the �'.Zar�ge or zxtr� wor'�c. �_�-4.6 SCHEDULE OF OPERATIONS: BeEore commencing any wor�c under tnis contract, the Contractor shall submit to tne Own�r dC1� r�C?1 V� �i1P_ �Wil�t � 3 aporov�l theraof � d'�SC(]�.'c�lll? O� Opera`ions," show:ng by a str•�ight 1•ine method �ne date oE commencir.g and finishiZg ?ach oE the major elements oE th? cont�act. Tii�r? sl.Z�ll �e als� s�iown t%�c� �stimated rnont�ly COat OE WOCi{ fOC WY11(;`l ?3�`.1!Ildt?S 3C� `O 'Oe �K�?Cr?t�. Tr1E..'C3 �4-4 (3) shall be presented also a composite graoh showing the anticioated progress of construction wit'n the time being olotted horizontally and the percentage of completion plotted vertically. The orogress cnarts shall be prepared on 8-1/2" x 11" sheets and at l�ast five alack or blue line prints shall be furnished to the Owner. C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten (10) days prior to submission of first monthly progrzss �ayment, the Contractor shall prepare and submit to the Owner For approval �ix copies of the schedule in �hich the Contractor pr000ses to carry on the work, the date of which he will s�art the several major activi�ies (includi�g Qrocurement of materiala, �lans, and equipment> and the contemplated dat2s for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) n�twork 3iagram, As tne work progr�sses, the Contractor shall enter on the dia7ram the actual orogress at the end of eac'n partial payment p�riod or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time a�proved 'oy the Engineer. Three copies of the updated schedule shall be delivere� at such i�tervals as dir�cted by the Owner. As a�inimum, the construction schedul? shall incorporate all work ?lements and activities indicated in the proposal and in the technical sDecifications. Prior to the final drafting oF the detail?d cons�ruction schedulP, the Contractor shall revi�w the draft schedule with the Engine�r to ensure the Contractor's understanding of the contract .r?quirPm�nts. .The f�llowiag guidPlines sha11 be adher�d t� in praparing the construction schedule: a. Milestone dates and final project com�letion dates shall 'Qe d�vetoped to conForm t� time constraizts, sequencing r�quire�nents and co�npletion time. b. The construction proces� shall be divided into activi�ies wit'n time durations oL ap�roximately iourt`en (14) days and construction values not to �xceed $50,000. Fabrica.tion, d:�livery a�� ssbmittal activities ar� exc�r�tions to this guideline. C4-4 (4) c. Durations shall be in calendar days and normal holidays an3 weather conditions over the duration o� the contract shall be accounted for within the duration of each acti��ity. d. One critical path shall be shown on the construction schedule. e. Float time is deFined as the amount of time 'oetween the earliest start 3ate and the latest start dat� of a chai� of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either �ne Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise sQecified. The construction schedule shall as a minimum be divided into gen�ral categories as indicated in the Proposal and Technical Specifications a�d each general category sha11 be broken down into activities in enough detail to achiPve activities of approximat�ly fourteen (14) days duration. For each general c�tegory, the constriiction schedule shall identify all tra3es or subcontracts whose work is reoresented Qy activities that follow the guidelines of this Section. For each of the trades or subcontracts, the construction schedule shall indicat� the foilowing orocurements, construction and �reaccept3nce activities an3 events in their logical sequence for equipment and mat�rials. l. 2. 3. 4. 5. Pre�oaration and tr.3nsmittal of submittals. Submitral revi�w periods. Shoo Ea�rication and delivPry. Eraction or installati�n. Transmittal of manufact�sr�r's ooeration and maintenance instructions. 6. Installed equipment and mat�rials testing. 7. Owner's operator instrucr_ion (if. applic3bla). 8. Final inspection. �4-4 (5) 9. Operational �esti�g. 10. Final insoection. If, in the o�inion of the Owner, work accomplished falls behind that scheduled, the Contractor shall take such action as necessary te improve his progr�ss. In addition, the Owner may require the Contractor to submi� a revised schedule de�onstrating his grogra�n and propose3 plan to make up lag in scheduled �rogress and to i�sure com�l�tion oF the work within the contract time. If the O�ner finds the oroposed �lan not acceptabl?, ��e may require the Contractor to increas` t'ne work force, �he constructi��n olant and e�uir�ment, tnP numoer of wor'{ snifts or the ove�time ooerations without additional cost to the Owner. Failure of tne Contractor to comply with tizes2 r�quirements shall be considere3 grounds for 3etermination by tiie Own�r that tize Contractor is failing to prosecute t'ne work ;vith such diligenc-a as will insure it� comple�ion within the time s�ecified. �4-4 (6) PART C - GENERAL CONDITIONS CS-5 CONTROL OF WORK AND MATERIALS SECTION CS-5 CONTROL OF WORR AND MATERIALS C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished, work performed, rate of progress of the work, overall sequence of the construction, interpretation of the Contract Documents, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible for Contractor's means, methods, techniques, sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the contract documents. He shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy.+ C5-5.2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines, grades, cross-sections, finish, and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents. Any deviation from the approved Cont�act Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. C5-5 (1) C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up oF several sections, wnich, taken together, ar� intended to describe and provide for a complete and useful project, and any requirements aopearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern over specifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proQosal. The Contractor shall not takz advantage of any appar�nt error or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for tne fulfillment of the intent of the Contract Documents. In the event the Contractor discovers an apnarent error or discrepancy, he sha11 immediately call this condition to the attention of the Engineer. In the event of a conflict in the �rawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5.4 COOPERATION OF CONTRACTOR: The Contr�ctor will be furnished with tlzree sets of the Contract Documents and shall have available on the site of tne project at a11 times one set of such Contract Documents. The Contract shall give to the wor� the constant attention necessary to facilitat� the progress th�reof and shall cooperate with the Engineer, his inspector, and other Contractors in every possible way. The Contractor shall at all times have comp�tent person�el available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent, English-speaking superintendent and an assistant who are fully authorized to act as the Contractor's agent on the work. Such superintend�nt and his assistant shall be capa'ole of reading and understanding the Contract Documents and shall receive and fulfill instructi�ns from the Owner, the Engin�er, or his authorized representatives. Pursuant to this responsibility of the Contractor, the Contractcr shall designate in writing to the project superintendent, to act as the Contractor's agent on the work. Such assistant.oroject superint?ndent shall be a resident of Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of the wee'�t on wizich the Engineer determines tna� circumst.�nces require the presence on tize project site of a.rzoresentative of the Contractor to CS-5 (2) adequately provide for the safety or convenience of the traveling public or �he owners of property across which the project extends or the safety of property contiguous to the project rauting. The Contractor shall orovide all facilities to enable the Engineer and his in5pector to examine and inspect the workmanship and materials entering into the work. C5-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or Enginee.r, a condition of emergency exists related to any �art of the work, the Contractor, or the Contractor through his designated representative, shall respond with dispatch to a verbal request made by t�e Owner or Engineer to alleviate the emergency condition. Such a response shall occur day or night, wheth�r the project is scheduled on a calendar-day or on a working-day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discreoancies, omissions, or corrections necessary to conform with the requirements of the project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall then deduct an amount equal to the entire costs for such remedial action, nlus 25�, from any funds due the Contractor on the project. C5-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate Field office for use of the Engineer, if sQeciEically called For. Th? field office shall be not less than 10 by 14 feet in floor area, substantially constructed,, well heated, air conditioned, lighted, and weathzr-proof, so that documents will not be damaged by the elements. C5-5.7 CONSTRUCTION STAKES: The City, throug'n its Engineer, will furnish the Contractor with all lines, �rades, and measurements necessary to the proper prosecution and contr�l of the work contracted for under these Contract Documents, and lines, grades and measurPrne�ts wi11 be established by means oF stakes or othar �ust��nary metnod of marking as may 'oe found consistent with good practice. C5-5 (3) These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings as may be established for the Contractor's use or guidanc� shall be �reserved by the Contractor until he is authorized by the Engineer to remove them. Whenevar, in the opinion of the Enginezr, any stakes or mar:{ings hav� been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of nis employees, tne full cost of replacing such stakes or marks plus 25$ will be charged against the Contractor, and the full amount will be deducted from pay�ent due the Contractor. C5-5.8 AUTHORITY AND DUTIES OF CITY INSPECTORS: City Inspectors will be authorized to inspect all work done and to be done and all material� furnished. Sucn inspection may extend to all or any part of the work, and the oreoaration or manufacturing of the mat�rials to be used or equipment to be installed. A City In5pector may be stationed on the work to report to tne Engineer as to the progr?ss of the wor'�c and t'ne manner in which it is being performed, to report any evidence that the materials being furnished or the work be�ng performed by the Contractor fails to fulfill tne requirements of the Contract Documents, 3nd to call th? attention of the Contractor to any such failure or other infringements. Such inspection or lack oF inspection will not relieve tne Contractor from any obligation to perform the wor�c in accordance with the requirements of the Contract nocuments. In case of any dispute arising b2tween the Contractor and the City Insoector as to the materials or equipment .furnished or t'n� manner of performing the work, the City Inspector will have authority to reject materials or �quipment to suspend work until the question at issue can be referred to and be decid?d by the Engin�er. The City Inspector will not, however, be autnorized to revokP, alter, �nlarge, or release any requirement �f thes� Contract Documents, nor to aoprove or accept any portion or section of the work, nor to issue any ins�ructions contrary to cne rzquirements of the Cont.ract Documents. He will in no case act as ssperintendent or foreman or nerform any ather 3uties f�r the Contractor, or interfere with the management or operation of the work. �ie will not accept from the Contr�ctor any co�npensation i� any form for performing any duties. The Contra�tor shall regard and ooey the directions and instructions of the City Inspector or Enginear when the sa�ne are consistent witll the obligations of th� Contract Docurnents, provided, howev�r, should the Contract<�r ooject to any or3Prs or instru�tions of the City Inspector, the Contractor may within six days make aritten appaal to th2 Engine�r for nis d�cision on the matter in controversy. C5-5 (4) CS-5.9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accor3ance with the requirements of the Contract Documents. If� the Engineer so requests, the Contractor shall, at any time bzfore acceotance oF the work, remove or uncover such portion of the finished work as rnay be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the Contract Documents. Should the wor'� exposed or examined prove acceptable, the uncovering or removing an3 replacing of the covaring or making good of the parts removed shall be paid for as extra work, but should be wor� so exposed or examined prov� to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged narts shall be at the Contractor's expense. No wor:{ shall be done or materials used without suitable supervision or inspection. C5-5.10 REMOVAL OF DEFE�TIVE AND UNAUTHORIZED WORK: All work, materials, or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense, Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraQh, the Engineer will have the authority to cause detective work to be r�medied or removed and replaced and unautiz�rized wor� to be removed, and the cost tnereof may be deducted From any money due or to become due to t�he Contractor. Failure to require tne removal of any def�ctive or unauthorized work shall not constitute acceptance of such works. CS-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: If the Specifications, law, ordinance, codes or regulations permit Contractor to f�lrnish or use a substitute that is equal to any material or equipm�nt specified, and if Contractor wishes to furnish or use a proposed substitute, he shall, Drior to the preconstruction conFerence, mak? written aPnlication to ENGINEER for approval of sucll substitut? certifying i� writing that the �r000sed substitute will o-erForm adequately the functions called for by the general 3Psign, be similar and of equal substance to that speciEie3 and be suited to the same use aad capable of performing the same function as that specified; and identifying a11 variations of the proposed �5-5 (S) substitute from that specified and indicating available maintenan�e service. No substitute shall be ordered or install�d without the written,a�proval of Engineer who will be the judge of the equality and may require Con�ractor to furnish such other data about the proposed substitute as he considers pertinent. No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor's expense. Contractor shall indemnify and hold harmless Owner and Engineer and anyone directly or indirectly employed by either of them from and agaiizst the claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted mat�rials or equipment. C5-5.I2 SAMPLES AND TESTS OR MATERIALS: Wher�, in the ooinion of the Engineer, or as call�d for in the Contract �ocuments, tests of materials or equipment are necessary, such tests will be made at the expense of and oaid for direct to the testing agency by the �wner unless otherwise speciFically provid�d. The failure of the Owner to make any tests of materials shall be in no way relieve the Contractor of his res�onsibiLity of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials, unless otherwise soecified, will bz made in accordance with the latest methods prescribed by the American Society for Testing �at�rials or specific requirements of the Owner. The Contractor shall nrovide such facilities as the Engineer may require for collecting and forwarding samples and shall not, �aithout specific written permission of the Engineer, use the materials represented by the samples until tests have beea made and the mat�rials approved for use. The Contractor will furnisil adequat� samoles without charge to the Owner. In case oF concrete, the aggregates, design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concr�te is placed, and the Cont3ctor shall be r�sponsible for replacing any concrete which d�es not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of co�icrete, usiag samples from the sa�e aggregat�, cement, and mortar which are to be us?d 1at�r in tne concrete. Should the source of supply change, n?w test� shall be made Prior to the use oE the new ;naterials. C5-5.13 STORAGE OF MATERIALS: All �nat?rials which ar� to be us2d in the construction operation shall �e stor�d so as to insure the preservation of the quality and fitness oF the wor'�c, When directed by the Engine�r, th�y shall b' plac�d on woode� platforms or other har3, clean durable ssrfaces and not on the C�-5 (6) ground, and shall be �laced under cover when directed. Stored materials shall b? placed and located so as to facilitate prompt inspection. CS-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities. The location of many gas mains, water mains, conduits, sewer lines and service lines for all utilities, etc., is unknown to �he Owner, and the Owner assumes �o responsibility for failure to show any or all such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing th2 pay quantiti�s in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, �rovision for which is not made in the Contract Documents, in which case the provision in these Contract Documents for Extra Work shall apply. It shall be the Contrac�ors responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of constructi�n in order that he may negotiate such local adjustments as nec�ssary in the constru�tion process to provid� adequate clearances. The Contractor shall take all necessary preeautions in order to protect all existing utilities, structures and service lines. Verification of existing utilities, structures and service lines shall include notification of all utility companies at least forty eight (48) hours in advance of construction including exploratory excavation if necessary. All verification of existing utilities and their adjustment shall be considered as subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal nrosectuion of work where the int�rruption of service is necessary, the Contractor, at least 24 hours in advance, shall be r�quir�d to: 1. Notify the Wat�r Dep•artment's Distribution Division as to location, tim?, and schedule of service interruption. CS-5 (7) 2. Notify each customer personally through responsible personnel as to time and schedule of the interruption of their service, or 3. In the event that personal notification of a customer cannot be made, a prepared tag form shall be attached to the customer's entrance door knob. The tag sha11 be durable in composition, and in large bold type shall say: "NOTICE" Due to Jtility Improvement in your neighborhood, your (water) (sewer) service will be inter- rupted on between the hours of and . This inconvenience will be as short as possible. Thank you, Contractor Address Phone b. Emergency: In the event that an unforeseen service interruption occurs, notice shall be as above,but immediate. CS-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through acts or neglect on the part oF the Contractor, any other �ontractor or any sub-contractor shall suffer loss or damage on the work, the Contractor agr�es to settie with such otner Contractor or sub-contractor 'oy agreement or arbitration. If such other Contractor or sub-contractor sha11 assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify the Contractor, who shall indemnify and sav? harmless the Owner against any such claim. C5-5.17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site during the orosecution of the work under these Contra�t Documents shall be accomplished in ke�ping with a daily routine estabZished to the th� satisfaction of the Engineer. Twenty-fours fours aFter written notice is given to the Contractor that the clzan-up on the joo si'�a is proceeding in a manner unsatisfactory to the Engineer, if the Contractor fails to correrr_ the CS-5 (8) R`�' c unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, and the costs of such direct action, plus 25$ of such costs, shall be deducted from monies due or to become due to the Contractor. Upon the completion of the project as a whole as covered by these Contract Documents, and before final acceptance and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials, temporary structures, and debris of every kind. He shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to t'ne Engineer. The Contractor shall thoroughly clean all equipment and materials installed by him and shall d�liver over such materials and equipment in a bright, clean, polished and naw appearing condition. No extra compensation will be made to the Contractor for any clean-up required on the project. C5-5.18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the �on�ract Documents has been satisfactorily completed and finaZ cleanu� oerformed, the Engineer will notify the proper officials of the Owner and request that the Final inspection be �a3e. Such inspection will be made within 10 days after such notification. After such final insQection, if the work and mat�.rials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper resolution has been passed by the City Council, No tim� charge will be made against the Contractor between said date of notification of the Engineer and tne date of final inspection of the work. C5-5 (9) PART C - GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with aTl Federal and State Laws and City ordinances and regulations which in any way affect the conduct of the work or his operations, and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers, agents, and employees against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation, or order, whether it be by himself or his employees. C6-6.2 PERMITS AND LICENSES: The Contractor shall procure all permits and licenses, pay all charges, costs and fees, and give all notices necessary and incident to the due and lawful prosecution of the work. C6-6.3 PATENTED DEVICES, MATERIALS AND PROCESSES: If the Contractor is required or desires to use any design, device, material, or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner of such patent, letter, or copyrighted design. It is mutually agreed and understood that without exception the contract prices shall include all royalties or cost arising from patents, trade-marks, and copy rights in any w�y involved in the work. The Contractor and his sureties shall indemnify and save harmless the Owner from any and all claims for infringement by reason of the use of any such patented design, device, material or process, or any trade-mar k or copy right in connection with the work agreed to be performed under these Contract Documents, and shall indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of such infringement at any time during the prosecution of the work or after completion of the work, provided, however, that the Owner will assume the responsibility to defend any and all suits brought for the infringement of any oatent claimed to be infringed upon by the design, type of construction or material or equipment specified in the Contract Documents furnished the Contractor by the Owner, and to hold the Contractor harmless on account of such suits. C6-6 (1) PROVISIONS: The Contractor shall establish his employees such regulations in regard to 3isposal of garbage and waste as will tend to :ion and spread of infectious or contagious affectively prevent the creation of a nuisance any property ei�her public or private, and s as are required by Law shall be put into id effect by the Contractor. The necessary iences for use of laborers on the work, ied from public observation, shall be maintained by the Contractor and their use y enforced by the Contractor. All such be kept in a clean and sanitary condition, �nable odors so as not to cause a nuisance. s and regulations of the State of Texas and strictly complied with. FETY AND CONVENIENCE: Materials or equipment work sha�l be so placed and used, and the 11 times be so conducted, as to cause no ion or inconvenience to the public than is absolutely necessary by the Engineer. The iired to maintain at all times a11 p�ases of h a manner as not to impair the safety or � public, including, but not limited to, safe ngress and egr�ss to property contiguous to Ze �ontractor shall make adequate provisions able ingress and egress ror normal vehicular iring actual trenching or pipe installation 11 driveway crossings. Such provisions may placement of crushed stone or gravel or such roviding proper ingress and egress for the � the driveway as the Engineer may approve as ch other means may include the diversion of with specific approval by the Engineer. If affic is approved by ti�e Engine`r at any tractor shall make arrangements satisfactory at any location, the Contractor shall make sfactory to the Engineer for the diversion of 11, at his own expens2, provide all materials work necessary For the construction and roadways and bri3ges for such diversion of {s must aot be oostructed except by special Engineer. . �avated and the construction materials such as �onstruction of the work shall be placed so �r the work or prev?nt free access to all fire srm boxes, polic� call boxes, water valves, C6-6 (2) r gas valves, or manholes in the vicinity. The Owner reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety whicii may come to its attention, after twenty-four hours notice in writing to the Contractor, save in cases of emergency when it shall have the right to remedy any neglect without notice, and in either case, the cost of such work done or materials furnished by the Owner or by the City shall be deducted from monies due or to become due to the Contractor. The Contractor, after ap�roval of the Eng,ineer, shall notify the Fire Department Headquarters, Traffic En�gineer, and Police Department, when any street or alley is req�ested to be closed or obstructed or any fire hydrant is to be rha3e inaccessibler and, when so dir�cted by the Engineer, sha�ll keeo any street, streets, or highways in condition for unobstructed use by fire apparatus. The Contractor shall prompt�y notify the Fire Department Headquarters when all such ob�tructed streets, alleys, or hydrants are again placed back in� service. Where the Contractor is required to c�nstruct temporary bridges or make other arrangements for crossing over ditches or streams, his responsibility for accid�nts in connection with such crossings shall include the roa#3way approaches as well as the structures of such crossings. The Contractor shall at all times conduc� his operation and the use of construction machinery so as not to damage or destroy trees and shrubs located in clos� proximity to or on the site of the work. Wherever any such damage may be done, the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in settlement of such claims. The Contractor shall file with the Engineer a written statement showing alI such claims adjusted. C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT-OF-WAY: For the performance of the contract, the Contractor will be permitted to use and occupy such portions of the public streets and alleys, or other public places or other rights-of-way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifS.cally authorized in writing by the Engineer. A reasonable amount of tools, matArials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction ooerations. Excavated and waste materials shall be piled or stacksd in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be C6-6 (3) carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Owner may, for all purposes required by the contract, enter uQon the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoining work. Any additional grounds desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6.7 RAILWAY CROSSINGS: When the work encroaches upon any right-of-way of any railway, the City will secure the necessary eas�ment for t'ne work. Where the railway tracks are to be crossed, the Contractor shall observe all the regulations and instructions of the railway company as to the methods of performing the work and ta�e all precautions for safety of property and the public. Negotiations with the railway companies for oermits shall be done by and through the City. The Contractor shall give the City notice not less than five days prior to the time of his intentions to begin work on that portion of the project which is related to the railway properties. The Contractor will not be given extra or additional compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: Where the work is carried on in or adjacent to any street, alley, or Qublic place, the Contractor shall at his own expense furnish, erect, and maintain such barricades, fences, lights and danger signals, shall provide such watchmen, and shall take all such other precautionary measures for the protection of persons or Droperty and of the work as are necessary. Barricades and fences shall be painted in a color that will be visible at night. From sunset to sunrise the Contractor shall furnish and maintain at least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to k?ep pedestrians away from, and vehicles from being driven on or into, any work under construction or being maintained. The Contractor shall furnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work and prev�nt accident or damage. Al1 installations and procedures shall be consistent with the provisions se� forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State flf Texas-UniForm Act Regulating Traffic on �ighways", codified as Article 6701d Veron's Civil Statutes, pertinent sec�ions being Section Nos. 27, 29, 30 and 3i. C6-6 (4) The Contractor will not remove any regulatory sign, instructional sign, street name s�gn, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works department, Signs and Mar�ings Division (phone number 8780-8075), to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign, If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign reguirements are met. When construction work is completed to the extent that the permanent sign can be rz-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor will be held resoonsible for all damage to the work or the public due to failure of barricades, signs, fences, lights, or watchmen to protect them. Whenev�r evidence is found of such damage to the work the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor's own expense. The Contractor's responsibility for the maintenance of barricades, signs, fences and lights, and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner. No compensation, except as specifically provided in these Contract Documents, will be paid to the Contractor for the w,ork and materials involved in the constructing, providing, and maintaining of barrica3es, signs, fences, and lights or for salaries of watchmen, for the subsequent removal and disposal of such barricades, signs, or for any other incidentals necessary for tne proper protection, safety, and convenience of the public during the contract period, as this work is considered to be subsidiary tc the several items for which unit or lump sum prices are requested in the Proposal. C6-6.9 USE OF EXPLOSIVES, DROP WEIGHT, ETC.: Should the Contractor elect to use explosives, drop weight, etc., in the prosecution of the work, the utmost care shall be exercised at all times so as not to endanger l�ife or property. The Contractor shall notify the proper representativ� of any public service corporation, any company, individual, or utility, and the Owner, not less than twenty-four hours in C6-6 (5) advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where tne use of explosives is to be permitted on the project, as specified in the Special Contract Documents, or the use of explosives is requested, the Contractor shall submit notice to the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out oF such use of explosives. All claims arising out of the use of explosives shall be investigated and a written report made by the Contractor's insurers to the Engineer within ten (10) days after receipt of written notice of the claim to the Contractor from eitner the City or the claimant. The City shall proceed to give notice to the Contractor of any such claim. The use of explosives may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. Whenever explosives are store3 or kept, they shall be stored in a safe and secure manner and all storage places shall be plainly marked "DANGEROUS EXPLOSIVES" and shall be under the care of a competent watchman at all times. AI1 vehicles in which explosives ara being transported shall be plainly marked as mentioned above and shall, insofar as possible, not use heavy traffic routes. C6-6.10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will orovi3e such right-of-way or easement privileges as the City may deem necessary for the prosecution of the work. Any additional rights-of-way or work arza considered necessary by the Contractor shall be provided by him at his own expense. Such additional rights-of-way or ��vork area shall be acquired for the benefit of the City. The City sha11 ne notified in writing as to the rignts so acquired before work begins in the affected area. The Contractor shall not enter upon orivate property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unl�ss and until the �pecified approval of the property owne.r has 'Deen secured in writing 4y the Contractor and a copy furnisned to the Engineer. Unless soecifically provided otherwise, the ContraCtor shall clear all rights-of-way or easements of obstructions which must be removed to makz possible prouer �rosecution of the work as a part of the project construction operations. Tne Contractor shall be resoonsible for the praservation of and shall use C6-6 (5) every precaution to prevent damage to all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences, and to all otner public or private property along adjacent to the work. The Contractor shall notify the proper representatives of owners or occupants of public or private lands or interest in lands which might be affected 'oy the wor�c. Such notice shall be made at least 48 hours in advance of the beginning of the work. Notices shall be apolicable to both public and private utility companies or any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the work, or at any time due to defective work, material, or equipment. When and where any direct or indirect or injury is done to public or private property on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non-execution thereof on the part of the Contractor, he shall restore or have restored at his own cost and exoense such property to a condition at 12ast equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise replacing and restoring as may pe directed by the Owner, or he shall make good such damages or injury in a manner acceptable to tne owner of the property and the Engineer. Al1 fences encountered and removed during construction oF this project shall be restored to the original �r a oetter than original condition upon completion of this project. When wire fencing, either wire mesh or bar'oed wire is to be crossed, the Contractor shall set cro5s braced posts on either side of nermanent easement before the fence is cut. Should additional fence cuts be necessary, the Contractor shall provide cross braced posts at point of the oroposed cut in addition to the cross braced posts provid�d at the permanent easements limits, before the fenc� is cut. Temporary fencing shall be erPcted in place of the f�ncing removed whenever the wor!c is not in orogress and when thP site is vacated overnight, and/or at all times to prevent livestock from entering tne construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary to th? various items bid in the oroject C6-6 (7) proposal. ThereFore, no separatz payment shall be allowe3 for any service associated with this wor�. In case of failure on the part of the Contractor to restore such property to make good such darnage or injury, the Owner may, upon 48 hour written notice under ordinary circumstances, and without notice wh�n a nuisance or hazardous condition results, oroceed to repair, rebuild, or otherwise restore such prooerty as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract. C6-6.11 INDEPENDENT CONTRACTOR: It is understood a�d agreed by the oarties h�r�to that Contractor sha11 perform all work and services hereunder as an independent contractor, and not as an officer, agent, servant or emoloyee of the Owner. Contractor shall havP exclusiv� control of and the exclusive right to control the details of all the work and services performed h�reunder, and a11 person� performing same, and shall be solely responsible for the acts and omissions of its officers, agents, servants, employees, contractors, subcontractors, licens�es and invitees. The doctrine of respondeat superior snall not apply as between Owner and Contractor, its officers, agents, employees, contractors and su'Qcontractors, and nothing her�in shall bP construed as creating a partnershio or joint enterprise between Owner and Contractor. C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contract�r covenants and agrees to, and does nereby indemnify, hold har��less and defend Owner, its oFficers, agents, servants, and employees from and against any an a11 claims or suits for property damag� or loss and/or personal injury, including death, to any and all persons, of whatsoever kind or c.haract�r, whether real or asserted, �risiag out of or in connection with, directly or indirectly, the wor� and services to 'oe oerformed hereunder by Contractor, its officers, agents, employees, contractors, subcontractors, licensees or invitees, whet'ner or not caused, in whole or in part, by alleged negligence on the part of officers, agents, servants, employees, contractors, subcontractors, licensees and invitees of the Own�r; and said Contractor does nere'ny covenant and agree to assume all liability and responsibility of Owner, its officers agents, servants and employ�es ior property damage or 1oss, and/or per�onal injuri�s, includi�g death, to any and a11 persons of whatsoever 'cind or charact�r, whzther real or assarted, arising out of or in coanection with, dir�ctiy or indirectly, the work and servicPs t� oe perFormed ner�un3er by Contractor, its oFficers, agents employe-�s, contractors, su4contractors, licensees and invitees, whether or not cassed, C6-6 (8) in whole or in part, by alleged negligence of officers, agents, servants, empl�yees, contractors, subcontractors, licensees or invitees of the Owner. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries,loss or damages to prooerty of the Owner during the performance of any of the terms and conditions oF this Contract, whether arising out of or in connection with or resulting from, in whole or in part, any and all alleged acts or omissions of officers, agents, servants, employees, contractors, subcontractors, licenses, or invitees �f t�e Owner. In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Wat�r Department for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been s�ttled and a release has been obtained from the claimant involved. If the claim concerned remains unsettled as of the expiration of the a'Qove 3�-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final �ayment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of the performance of such work, and such semi-final payment may then be recommended by the Director. The Director shall not recomrnend final payment to a Contractor against whom such a claim For damag�s is outstanding for a period of six months following the date of the acceptance of the work p�rformed unless the Contractor submits 2vidence in writing satisfactory to the Director that: 1. The claim has been szttled and a releasz has been obtained from the claimant involved, or 2. Good faith efforts hav� been made to settle such outstanding claims, ar.d such good f a i tn e f f orts have failed. If condition (1) above is met at �ny,time within the six month period, the Director shall recommend t'nat the final payment to t'ne Contractor be made, If condition (2) above is met at any time within the six month period, the Director may recommend that the final paymznt to the Contractor be made. At the C6-6 (9) expiration of the six mont'n period the Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the �irector. The Dirzctor may, if he deems it appropriate, refuse to accept bids on other Watzr Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City contract. C5-6.13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor claim compensation for any alleged damage by reason of the acts or omissions of the Owner, he shall within three days after the actual sustaining of such alleged damage, make a written s`atement to the Engineer, setting out in detail the nature of the alleged damage, and on or before the 25t'n day of the month succeeding that in which any such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statemen� of t'ne details and amount of such alleged damage and, upon request, shall give the Engineer access to all booics of account, receipts, voucners, bills of lading, and other books or papers containing any evidence as to the amount of such allzged damage. Unless such statements shall be filed as hereinabove required, the Contractor's claim for compensation shall be waived, and he shall not be entitled to payment on account of such damages. C6-6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES, ETC.: In case it is necessary to change, move, or alt�r in any manner the property of a public utility or others, the said property shall not be moved or interfered with until orders thereupon have been issued by the Engineer. The right is reserved to the owners of puolic utilities to enter the geographical limits of the Contract for the purpose of ma;cing s'uch changes or repairs to their property t'nat may be necessary by the performance of this contract. C6-6.15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be taken up or removed, the Contractor shall, at his own expensz and cost, orovide and maintain temporary outlets and connections for all private or Dublic drains and sewers. The Contractor shall also take care of all sewage and 3rainage which will be rec?ived from these drains and sewars, and for this purnos2 he shall orovide and maintain, at his own cost and expens�, ad2quate purnping faciliti?s and tem�orary outlets or div�rsions. The Contractor, at his own cost and ex�ense, shall construct such troughs, pioes, or ot'nar structurzs necessary, and be prepared at all times to dis�ose of drai�age an3 sewage C6-6 t10) received from these tzmporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and maintained under the Contract, except when specified or ordered to be abandoned by the Engineer. Al1 water, sewage, and other waste shall be disposed of in a satisfactory manner so t'nat no nuisance is created and so that the work under construction will be adequately protected. C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water Department for so doing. City w�ter furnished to the Contractor shall be delivered to the Contractor from a connection on an existing City main. All piping required beyond the poir�t of delivery shall be installed by the Contractor at his own expense. The Contractor's responsibility in the use of all existing fire hydrant and/or valves is detailed in Section E2-1.2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. When meters are used to measure the water, the charges, if any, for water will be at the regular established rates. When meters are not used, the charges, if any, will be as prescribed by the City Ordinance, or where no ordinance applies, payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. C6-6.17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in the opinion of the Engineer, any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Enginee*, and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents. Al1 necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, ?quipment, or to deficient o�erations on the part of the Contractor, shall be performed by the Contractor at his own expense, C6-6.18 CONTRACTOR'S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as'provided for in these Contract Documents, the work shall be under t'ne charge and care of the Contractor, an3 he shall take every necessary precaution to prevent injury or damage to the work or any part C6-6 (11) thereof by action of the elements or from any cause whatsoever, whether arising from the execution or nonexecution of the work. The Contractor shall rebuild, repair, restore, and make good at his own expense all injuries or damaga to any portion of the w�rk occasioned by any of the hereinabove causes. C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by tne Engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or any possession taken by the City sha.11 not operat� as a waiver of any provision of the Contract Documents. Any waiv?r of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. The Owner reserves tne rignt to correct any error that may be discovered in any estimate that may have been paid and to adjust the same to meet the requir`ments of the Contract Documents. C6-6.2� PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall �e no liability upon the authorized representa�ives of the �wner, either personally or otherwise as they are agents and representatives of the City. C6-6.21 STATE SALES TAX: On a contract awarded by the City of Fort Worth, an organization which qualifies for exemption pursuant the provisions of Article 20.04 (H) of the Texas Limited Sales, excis?, and Us� Tax Act, tne Contractor may purchas�, rent or leas� all materials, supplies and equipment used or consumed in t�e performance of this contract by issuing to his supplier an ex�motion certiEicate in lieu oF the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such �x�mption certiEicate issued by the Contractor in lieu of t�e tax shall bz subject to an3 shall comply with the provisions oF Stat? Comptroll�r's Ruling .011, and any oth�r aoolicable �tate Comptroller rulings pe�taining to th2 Texas rimited Sales, Excise, and 'Jse Tax Act. On a contract awar3ed �y a dzveleper for tne construction of a publicly-owned improvement in a street rig�t-of-:�ay or other easement which has been dedicated to the public and the City � of Fort Worth, an organization w�ich qualifies Eor exemption Ipursuant to the provisions oF Article 20.04 (H) of the Texas limite3 Sal�s, F.xcis�, and 'Js� Tax Act, ttle Contractar can ���" orooanly be exempt�d in the sa�ne ma�ner .�tat�d a�ove, C6-b (12) Limited Sale, Fxcise and Use Tax permits and information can be obtained from: Comptroller of Public Accounts Sale Tax Division Capitol Station Austin, TX C6-6 (13) PART C - GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS SECTION C7-7 PROSECUTION AND PROGRESS: C7-7.1 SUBLETTING: The Contractor shall perform with his own organization, and with the assistance of workman under his immediate superintendance, work of a value of not less than fifty (50�) percent of the value embraced in the contract. If the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed under these Contract Documents. Al1 transactions of the Engineer will be with the Contractor. Subcontracters will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements as to character and competency. The Owner will not recognize any subcontractor on the work. The Contractor shall at all times, when the work is in operation, be represented either in person or by a superintendent or other designated representatives. C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or his right, title, cr interest therein or any part thereof, to any person or persons, partnership, company, firm, or corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state, attempt to dispose of the contract may, at the option of the Owner be revoked and annulled, unless the Sureties shall successfully c�mpie}e said contract, and in the event of any such revocation or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual damages. C7-7.3 PROSECUTION OF THE WORR: Prior to beginning any construction operation, the Contractor shall submit to the Engineer in fiv? or more cooies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a brief outlining in detail and step by step the manner of C7-7 (1) prosecuting the work and ordering mat2rials and equipment which ne 2xpects to follow in order to complete the project in the scheduled time. There shall also 4e submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under this contract within th� time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equioment, materials, and labor as is necessary to insure its completion within the time limit. The sequence request�d of all construction operations shall be at all times as specified in the Special Contract Documents. Any deviation from scuh sequencing sha11 be submitted to the Engineer for his approval. Contractor shall not proceed wit'n any deviation until he has received written approval from the Engineer. Such specification or apGroval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7-7.8 "Extension of Time of Completion" of t'nis Agreement, and a progress schedule shall not constitute a change in the contract time. C7-7.4 LIMITATIONS OF OPERATIONS: The working oQerations shall at all times oe conductPd by tne Contractor so as to creat� a minimum amount of inconvenience to tne public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a portion of a street or public way greater than is necessary for the prooer execution oF the wor'�c, the Engineer may require the Contractor to finish the section on which onerations are in progress before the work is commenced on any additional section or street. C7-7.5 CHARACTER OF WORKMEN AND E�UIP'�IENT: Local labor snall be used by the Contractor is avai�abl�. The Contractor may bring in from outside t'ne Cicy of Fort Wortn his key men and nis superintendent. All ot:Zar workmen, including equipment operators, ma1 be import�d only after the local supply is exhausted. The Contractor �ha11 empl�y only such superir_tendents, for�nen, and wor'�men who ar� car2Es1, competent, and fully qualiF_ied to n�rFor�n t:�� duties or tasks as5igned to them, and the ingineer may demand and secura tne summary dismissal of any oarson or persons employed 'oy the Contractor in or about or on t:ze work who, in the oninion of thz Owner, shall misconduct hims?lf or oA found to b� incompetent, disrespectful, intem�erat�, dishonest, or C7-7 (2) otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or carry out the directions of the Owner, and such p�rson or persons shall not be employed again thereon without written consent of the Engineer. Al1 workmen sha11 'nave sufficient skill, ability, and experience to prooerly perform the work assigned to them and operate any �quipment necessary to properly carry out the performance of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satis£actory rate of progress. All equipment, tools, and machinery used for handling materials and executing any part of the work shall be subject to the approval �f the Engineer and shall be maintained in a satisfactory, saf2 and efficient working condition. Equipment on any portion oF the work shall be such that no icjury to the work, workmen or adjacent prooerty will result from its use. C7-7.6 WORK SCHEDULE: Elapse3 working days shall be computed starting with the first day of work comoleted as definPd in C1-1.23 "tiVORKSNG DAY" or ttle date stipulated in the "WORK ORDER" for beginning work, whichever comes first. Nothing in these Contract Documents shall be construed as prohibiting the Contractor from w�r;cing on Saturday, Sunday or Legal Holidays, providing that the to].lowing requirements are met: a. A request to work on a s�ecific Legal Holiday must be made to the than the proceeding Thursday. Saturday, Sunday or Engineer no later b. Any work to 'oe done on the project on such a specific Saturday, Sunday or Legal Holiday must be, in the opinion of the Engineer, essential to the timely completion of the project. The �agineer's decision shalt be final in res�onsa to such a request for approval to work on a specific Saturday, Sunday or Legal 'rioliday, and no extra compensation shall be allowed to the Contractor For any w�rk perEormed on such a specific Saturday, Sunday or Legal �oliday. , Calendar Days shall be deFined in C1-1.24 and the Contractor may wor',c as he so desires. � C7-7 (3) C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: Tne Contractor shall commence the working operations within the time specified in the Contract Documents and set forth in the Wo�k Orde.r. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owne= may proceed as he sees fit. The Contractor shall maintain a rate of progres� such as will insure t'nat the whole work will be perFormed and the premises cleaned up in accordance with the Contract Documents and within the time established in sucn documents and such extension of time as may be properly authorized by the Owner. C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request for an extension of time of complstion shall be considered only when the request for such extension is submitt2d in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an extension of the time of completion be requested such request wi11 be forwarded to the City Council for approval . In adjusting the contract time For completion of work, consider3tion will be given to unForseeable causes �eyond the control of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy, acts of the Owner, fir2, flood, tornadoes, 2pidPmics, qu�rantin� restrictions, strikes, freight embargoes, or 3elays of sub-contractors due to such causes. Wher. the date of completion is �ased on a calendar 3ay bid, a request for extension of time because of inclement weather will not 'Qe considered. A request for extension of time due to inability to obtain supplies and materials will be c4nsidered only when a r?view of the Contractor's purchas` order dates and other per�inent data as requested by the Engineer indicates that the Contractor has made a bonaFide attempt to secure delivery on schedule. This shall include eff�rts to obtain tne supplies and materials from alternate sources in case the first source cannot make delivery. If satisfactory execution and completion of the contract should require work and materiats in �reatzr amouats �r quantities than those set fort�l iz the aporoved Contract Documents, tnen the contract time may b� incr`ss2d by Change Order. C7-7.9 DELAYS: The Contractor shall receive no com�ensation for delays or izindranc�s to the work, exce�t when direct and unavoidai�le extra cost to tne Contractor is caused by the failure of th? City to provid� information or mat�riat, iF C7-7 (�) any, which is to be furnished by the City. Whzn sucn extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Enginser and if by him found correct shall be anproved and reFerred by him to the Council for final aoproval or disapProval; and the action thereon by the Council shall b� final and binding. If delay is cause3 by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City Council; and no suc'n extension of time sha11 r�lease t'ne ��ntractor or the surety on his perFormance bond from all his obligations hereunder which shall remain in full force until the dischar3� oF the contract. C7-7.10 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder shall indicate in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require to fully complete this contract or the time of completion will b� specified by the City in the Proposal section of the contract documents. The number of days indicated shall be a rzalistic estimate of the time required to comvlete the work covered by the specific contract being bid upon. The amount of time so stated by the successful bidder or the City will becc�me the time oF completion specified in the Contract Documents. For each calenda.r day that any work shall rPmai!z uncompleted after th� tirne specified in the �ontract �ocuments, or the increased time granted by the Owner, or as atitomatically i,ncreased by additio:�al wor�c or mat�rials or3�red after th? contract is signed, the sum per day give;� in the following schedul?, unless otherwise specified in other parts of the Contract Docur,lents, will be deducted from monies due the Contractor, not as a penalty, but as liqui3ated damages suffered by the Owner. AMOUN'I' OF CONTRACT $ 5,001 $ 15,001 $ 25,001 $ 50,001 $ 100,001 Less t'nan $ 5, 000 to $ 15,000 to $ 25,000 to $ 50,�00 t� $ 100,00� Lo $ 5�0,�00 C7-7 (S) inclusive $ inclusive $ inclusive $ inclusiv� $ inclusiv� $ inclusive S 35.00 45.00 63.00 105.00 154.00 210.00 $ 500,001 to $1,000,000 inclusiv� $ 315.00 $1,000,001 to $2,000,000 inclusive $ 420.00 $2,000,001 and over a 630.00 The parties hereto understand and agree that any harm to the City caused by the Contractor's delay in completing the work hereunder in the timP soecified by the Contract Documents would be incapable or v�ry difEicult of accurate estimation, and that the "Amount of Liquidated Damages Per Day", as set out above, is a reasonable forecast of just compensation due the City for harm caused by any delay. C7-7.11 SUSPENSION BY COURT ORDER: The Contractor shall suspend operations on such part or parts of the work orderzd by any court, and will not be eatitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the event the work is suspended by a Court Order. Neitner wi11 the Owner b� liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. C7-7.12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the wor'� ooeration wholly �r in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the ooinion of the Owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interzst of the project. During tamporary suspension of work covered 'Qy this contract, For any reason, the Owner will mak� no extra �ayment for stand-by time of construction equipment and/or construction crews. If it should become n�c`ssary to suspend wor� for an i•ndefinite period, the Contractor shall store a11 materials in such manner that they will not obstruct or impede the public unnecessarily nor become damagPd in any way, and he shall tak? every precaution to pr�vent damage or deterioration of the work pPrformed; he shall provide suitable 3rainage a'Qout tne work, and erect te�npo.rary structures wh�re necess3ry. Should the Contractor not be abl� to complete a portion of the project due to causes beyond thP �ontrol of and �aitnout the fault or negligence of the Contractor as s�� Eorth in Paragrapn C7-7.8 EXTE�SION OF THE 'rIME OE COMPLE'rION, and should it be determined by mutual cons�at of the Contractor and the Engineer that a solution to a11ow construction to proceed i� not available wit�iin a raasona�le oeriod of time, then the Contractor may be reimbursed for the cost of moving his squioment off tne job and returning the necessary equioment to the job w�en it is determinzd by the Engineer C7-7 (6) that constrscti�n may bs r.=_sumed. Such reimbursement shall be oased �n actsal cost to the Contractor of moving the eqsipment and ao oroFit will be allowed. vo r�imbursement shall be allowed if_ t:ne �quipment is mov�d to another construction project for t'r.e City oF Fort �Tor�ti. The Contractor shall not suspend work wi�hout written notice Lrom the Engine�r and �hali nroceed with �he work ooerations �romptly when notified 'oy the Engineer to so resume operations. !�7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: �Theneve?', '�ecause of Natioaal Einergen�y, so declared 'oy the President oE the United State5 or other lawful authority, it oecom`s impossible for the Contractor to o'Qtain al1 O� tne necAssary labor, materials, �nd Pquipment for the prosecution oF t�e work with reasona4le con�inuity For a p=riod o� t<ao mont'ns, t'ne Contractar shall �aithir. seven days notify the City in writing; giving a detailed statem2nt of_ tne eFEor`s wni.ch nave be�n mad�� an3 listing all necessary it�ms of la�or, materials, and equipment not obtainable, If, after investigations, the Owner finds that such conditior.s exi�ting and tnat tne inability oE the Contractor to oroceed is not a�tributa'ole i� whole or in part to tiie Fa��1t �r �iegl�ct of the Contract, then if_ che Owner cannot after rzasona'�1e �ffort assist t'ne Contractor in pr�curing and ma;�ing availa'Qle the nec�saary labor, materials an3 eq�ii�ment within tliirty days, the Contractor ma�� request the Owner �o �erminat? the cont�act and tn` �wn�r ma� comply witi7 t�ie req�zest, �nd t��� termination :�'�all be conditioned an3 oase3 ��oon a Final settlement mutualiy �ccp�table to bot'n t:�a Owner an3 the � on` rac to.r an:3 final �a�ment s�lall be madz in accoc3aac? wit'n tiie t�rms oF t,zz agre�d sQt�lement, whicn shatl in�lude, but not Qe limit�3 `o, rhe pa�ment Eor aIl work execuL-ed 'our_ �lo anticipat�3 �roFits on wor�c �ahich has not 'oeea perf�rmeci. ��7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT Or CONTRACT: T!�e work oo�ra�ions on a11 :�r any por�ion or sec�_ion of t'ne work under ��ontr�cc s�lall be sus�endecl immed.iat��ly on writ�en �r3er o� t`�? Enginear �r the Contr�ct may� b� 3�.clared ca�cPllJd 'oy t:ie City Co�incil Eor a�y good an3 s��fEicien� ^.3sse. The follo�aing, ?�1� way of c�xamnlA, but zo� o� 1i�nitation, may be consi3�1�.P;� grounds Eor susoPnsion o� �an�.ellation: �. Failur? oF t:ne Contractor �o cominencP work op�rati�ns witnin �he rim� specified in th� �1�r�c �'?r��r isssed by the Ow�er. �,7-7 � 7 ) ��. b. Substantial evidence that progress of the work ooPrations by Contractar is insufficient to complete the wor�c within the specified time. c. Failure of the Contractor to �rovide and maintain sufEicient labor and equipment to �roperly execute the working operations. � e. Substantial evidence t'nat t'ne Contractor has abandoned the work. Substantial evidence that the Contractor has 'oecome insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requirements o� the Contract Documents or to comply witn any orders given 'oy the Engineer or Owner providPd for in these Contr3ct Documents. g. Fail��re of the Contractor promptly to make good azy defect in materials or workmanshio, or any defects of any nature the correction of whicn has been directed in writing by the Engin�er or th� Owner. h. Substantial evidence of of illegally procuring a fraud on the City in the contract, collusion for the purpose contract or peroetrating constructiun o� work under i. A substantial indication that the Contractor has made an unauthori2ed assignment of the contract or any funds due ther�from for the benefit of any credit�r or for any other purpos�. J• k. If the Contractor shall for a�y cause whatsoever not carry on the wor;cing operation in aci acceptable manner. If the Contractor commences legal acti��n against ti�e Owner. A copy of the suspension order cr action o` th� City Council shall be s?rved on the Contract�r's Sur�ti�.�. Wnen wor't is suspended for any cause or causes, or w:�en th� contract is cancPlled, the Contractor sh�ll discontinue the wor� or such oart tner�of as th2 �wner shall designate, whereuoon the Surzties may, ar t�eir o�tion, ass�zme the contract or tnat portion ther�oF wnich the Owner has ordered t'ne Contractor to discontinue, and may p�rForm t�� 5ame or m_sy, with the �vritten �7-7 (8 ) consent of the �wner, sublet t'ne work or t�at portion oi the work as ta�cen over, provided however_, that the Sur2�ies sha11 exercise their option, if at all, within two weeKs after tiie written n�tice t� discontinue the work has aeen sz.r_ved upon the Contractor aad uoon the Sureties or tneir authoriz�d agents. The Sureties, i� such event shall assume the Contract:�r's place in all respects, and shall be paid by the Owner for all wor�c p�rFormed by them in accordance with the ter�ns of the Contract Documents. All moni��s remaining due the �ontractor at thz time of this default sha11 thereupon 'oecome due an3 payable to the Suraties as the work progress�s, subject to all of tne terams of the Contract Docum�nts. In case the Sureties do not, within the hereinaoov� speciEied time, exercise their ri3ht and option to assumz t'ne ccn�ract responsiUilities, or tnat oortion ther`o.E which t�ze Owner has ordered by the Contractor to discontinue, then t.(12 Owner shall have the power to complete, by contract or otherwis�, as it r�ay deter�nine, t:ie work '�erein described or sucn part tli�reof as it ;nay dzem necessary, and the Contractor her�to agr�es tnat tne Own�r shall have th� rig'nt to take �o5s2ssion oF an3 use any materials, plants, tools, equipment, suppli?s, and orooerty oF any kind provided by the Contractor for the purpose of carrying on the work and to hrocure otner tools, equipment, materials, labor and prooerty Eor tile comoletion of the work, and to c'narge t� t11e accoun� of t'r,e �ontractor ��E said contract expease for labor, mat�rials, to�ls, equipment, and all expenses incidental therato. The expen5e so charged shall be deducted by tile �wn�r from s��cn monies as may be due or may bzcome du� at any time tilerea�`�r to tne Contract�r under_ and by virtue of_ tne Contracc .�r any 03rF t��reof . T'ae Owner silali not be r��quir�d to o'o�aiz tne lowes� bi<3 for ti�e work comnleting the contiract, but tne �xo2nse to be deducted s�all be t:�e ac:tual cost of the owner o� such wor'�c. In case sucn sxpenses shall exceed thti amount which wosld 'nav� 'aeen payable und�r the Contracc i� th� sam� nad been comol��ed by the �ont.ractor, then tr12 �onrr.�ctor and his Sur�ties s�a�t oay tZe amount oE suc'n exc�s5 to the City on no�i�� Lr��cn th= Owner oE the excess due. Wnen any particuiar �ac� �E tne wor'�c is being ca.rried on by th� Ownar 'oy contract �r o�;i�rwis� under tne provisions of tnis s�c+:ion, t`Ze Contr3ctor shail continu? t,ie remainder of t�e wcc'�c in conformity wit�i th� terms o� tile ��ontract Docum?nts and ia sucz a mann�r as to no� hi*�der or inter�ere with performance oE tile wor'r by t�l� Owner. C7-7.15 FULFTLLMENT OF CONTRACT: Th� Contra�t wi11 be consi3ered as 'naving �een fu1fi11ed, �av� as pr���id�d i.l any bond or �onds or c�y law, jahen atl the wor�c a:.d �ll s�ctions or oarts c�f the projee'r_ C;0VPrP_r3 �1 c?�P �_on`cact Docu�ent� hav� i 7-7 ( `� ) been finished Engineer, and the Owner. and completed, the final inspection made by the th� final acceptance and final payment made by C7-7.14 TERMINATION FOR CQNVENIENCE OF THE OWNER: A. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner in whole, or from time to time in part, in accordance witn this section, whenever tne Owner shall determine that such termination is in the best interest of the Owner. Any such termination shall be effected 'oy mailing a notice oF termination to the Contractor specifying the ex�ent to which performance of wor�c undPr the contract is terminated, an3 the date uoon whicn such termination becomes effective, R2ceipt of tne notic� shall b2 3eemed conclusively presumed and established when the letter is placzd in the Unit�d Stat�s �Iail by the Owner. Further, it shall be deemed conclusively presumed and established that such termination is made witn just cause as therein stated; and no oroof in any claim, demand or suit shall 'oe required of the Owner rzgarding such discretionary action. B. CONTRACTOR ACTION: After receipt of a notic� oi termination, ana except as otherwise directed by the Enginzer, the Contractor s'nall: 1. Stop work under the cont.ract on the dat2 and to the extent specified in the notice of termination; 2, place no further ord�rs or subcontracts £or materials, services or Facilities except as may be nec�ssary for completion oF �uch portion of the work und�r tn? contract as is not termina�?d; 3. t�r�ninate all or_3ers and subcontr3cts to th? extent that t�ley �elate to the oerformanc� of work t�rminat2d by t��e notice oE termin3tion, �. firansfer title t� the mannsr, at t'n� iE any, dir�c��d by tne Owner anc� deliv�r in times, and to t'n� extent, the ingineer: � �� � ������������ :� �� -- - — C7-7 (10) �. the Eabricata3 or �in`abric:ar�d �art5, wor:t in process, compl:�t�d work, sun�li�s and otner mat�rial produc?d as a part of, or acqui,:�d in connection with the performance of, the work t�rminated by the notice of termination; and �. the compl?�ed, or partially complet�d �lans, dra�aing�, inEormation and ot;�:=_r property which, if the contract had b�en completed, woul3 �ave "�een required t� 'oe furnished to the Own?r. 5, complete performance oF suc'n part �F t't12 work as shall no� liave '�een te.r,ninated by tn� notice oF ter:ninafi ion; and 6. take such action as :nay be necessary, or as the c.ngine�r may ��irect, for the grot�ction and preservation oF th� oroperty relat�d to its contract w'nich i,� in tne oossession of_ the Contractor and in which the Owner has cr �nay acquire the rzst. At a timP not l.ater ttian 30 days •�i ��r t'ae termination datz speciE.ied in the no�ice oF termination, the Contr3ctor_ may su'omit to the Engineer a 1ist, czrtifie3 as t�� q�ian:ity and gua�ity, of any or a11 items o� t?rmination invzntory not previously disp�sed of, exclusive of it�ms th� disposition of_ whic'Z has been di��c�?d or authorized 'oy the Engine�r. ��ot later t,�an 15 da;�s thAr�a�c�r, t'ne Own�r snall acc?pt titte to S1C'tl items pro�rid?rl, t'na� the list su'omitt�d sha11 'o? subjecr t� vAriEication ay the Engineer uoon rem��ai oF tn�� it��ns or, iE �'ne items are stor:d, withi� 45 days �cocn ti1? date of sunmissi��n oE tn� list, and any nP��ss3ry �dj us �ments to cor rec} �:�:�� 1 i s t as s u'nmi ttPd, sha11 bP mad� pr ior t�� E i�zal settlement. C. TERMINATION CLAIM: Wi �hin o'U day�s a���c ��orice oE ter.min��ion, tlie Con".racc�r shalt su�mit nis termina�i�n ci�im to th� r�gi�eer in t�(lE' �or_m and wir_h t�1e certiEicati�n ����s.rioe�3 by th� cngine�r. Unless �ne or morz ext�nsion5 iZ wri:.i.ng �;� granted by .ha Own�r� u�on reqs`s t o E �n� Contrac'��r, !nade i�� wriLing within sucn o0-3a•� pariod oc a�ich���ize3 �xtension th�reof, an1� and ��11 s:icn claims s.ialt be c��c1�1S1'J�ii7 deeme3 w:�i�:T�d. ��7-7 (11) D. AMOUNTS: Subject to the orovisions of Item C7-7.16(C), the Contractor and Owner may agree uoon the whole or any part oF the amount or amounts to be paid to the Contractor by rzason of the total or partial tzrmination of work purssant hereto; provided, that such agreed amount or amounts shall never excee3 the total contract price as reduced by the amount of �ayments otherwise ma3e and as furt�er reduced by t�e contract price of work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No amount shall be due For lost or anticipated profits. �othing in C7-7.16(E) hereaFter, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the t�rmination of work pursuant to this section, shall be de2med to limit, restrict or otnerwise 3etermine or affect the �mount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraoh. E. FAILURE TO AGREE: In the event of the failure of the Contractor and the Owner to agree as provided in C7-7.16 (D) upon the whole amount to '�e oaid to the �ontractor by r�ason of th� termination of work pursuant to this szction the Owner shall determine, on the basis of information availa'Qle to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount sh�ll be due for lost or anticinated orofits. F. DEDUCTIONS: In arriving at tne amount du? the contractor undzr tzis section, th`r� shall be deducted (a) all unliquidatzd advance or otner payments on account th�retofore made to the Contractor, appli�abl� t� t'ne terminated �ortion of this contract; (b) any claim which the Owner may have against the �_ontractor in connection with tai5 contract; and (c) the 3greed price for, or tne �roceeds of sale of, any materials, suppli�s or othzr things kept by the Contractor or so1d, purssant to the provisions of this clausz, an3 not otherwise r�coverad 'uy or credited to the Owner. G. ADJUSTMENT: If the termination 'nereunder �e �artial, orior to the szt�lement of the termin3ted porti�n oF this contract, the Contractoc ma1 file with the Engineer a request in writing F�r an C7-7 (1"2) equitable adjustment of the price or prices soecified in tne cantract relating to the continued portion of the �ontract (the portion not terminated by the notice oF termination>, such equitable adjustment as may be �greed upon shall be made in such price or prices; nothing contained herein, however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter th� rigiits which thz Owner may have for termination of this contract under C7-7.14 hereoF entitled "Suspension of Abandonment of the work and Amendment of Contract" or any other right which Owner may have for default or breach oF contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal, state, and local laws, ordinances, and re�ulations so as to orotect person and property from injury, including death, or damage in connection with the work. C7-7 (13) � PART C - GE�ERAL CONDITIONS C8-3 MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT C8-8.1 MEASUREMENT OF QUANTITIES: The determination of quantities of work performed by the Contractor and authorized by the Contract Documents acceptably complet2d under the terms of the Contract Documents shall be made by the Engineer, based on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents, numbers, and weights of the materials and items installed. C8-8.2 UNIT PRICES: When in the Proposal a"Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures, cleanup, finished, overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other causes, delays, profits, injuries, damages claims, taxes, and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a satisfactory condition for operation. C8-8.3 LUMP SUM: When in the Proposal a"Lump Sum" is set forth, the said "Lump Sum" shall re�resent the total cost for the Contractor to furnish all labor, tools, materials, machinery, equipment, appurtenances, and all subsidary work necessary for the construction and completion of all the work to provide a compl�te and functional item as detailed in the Special Contract Documents and/or Plans. C8-8.4 SCOPE OF PAYMENT: The �ontractor shall receive and accept the compensation, as herein provided, in full payment Eor furnishing all labor, tools, materials, and incidentals for performi!�g all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from tne action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution of the work at any time C8-8 (1) � before its final acceptance by the Owner, (except as provided in paragranh CS-5.14) for all risks of whatever description connect�d with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuancQ of such prosecution of the working operations as herein soecified, or any and all infringements of patents, trademar'�s, copyrights, or other legal reservations, and for completeing the wor'� in an acceptaQle manner according to the terms of the Contract Documents, The payment of any current or partial estimate Drior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect t'ne obligations of the Contractor to repair, correct, renew, or replac2 at his own and proper expense any deFects or imperfections in th� construction or in the strength or quality of tne mat2rial used or equioment or macninery furnished in or about the construction of the work under contract and its appurt�nances, or any damage due or attributed to such defects, which defects, imperfection, or damage shall hav� been discover2d on or before the final insoection and acceptance of work or during the one y�ar guaranty period after final acceptance. The Owner shall be the sole judge of sucn defects, imperfzctions, or damage, and the Contractor snall be liable to the Owner for failure to correct t�e same as provided her2in, C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Between the lst and Sth day of each month the Contracter shall submit to the Engineer a statement showing an estimate of the valne of the work done during tne pr�vious month, or estimate p?riod under the Contract Documents. Not later than the lOth day of the raonth the Engineer shall verify such estimat?, and if it is found to be acceotable and the value of work performed since the last partial oayment was �ade exceeds one hundred dollars ($100.00) i1 amount, 90$ of such Pstimated sum will be paid to the Contractor if the total contract amount is less than $400,000, or 95$ of such estimate3 su�n will be paid to the Contractor if the to�al contract amount is $400,000 or greater within twenty-fiv� (2S? days aFt�r tne re�ular estimate period. The City will have the ogtion of greparing estimates on Forms furnish�d by the City. The partial estimate may include acceptabl� nonp�=isha�le �nat�rials dzliv�red to t?�e work which ara t� be incor�orat�d into tne w,or;c as a�er�nanent �art thereof, but which at the th� time of the estimate iiave not been ins�all�d. (such payment will be allowed on a basis of 85� oF tne n�t invoice value thereof.) T!�e Contraccor shall furnish the Eng�n�er such information �s he may r��uest to aid �_8-8 ( 2 ) him as a guide in the verification or the preparation of partial estimates. It is understood that the partial estimate from month to month will be approximate only, and all oartial monthly estimates and payment will be subject to correction in the estimate rendered following the discovery of an erro.r in any nrevious estimate,and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City reserves the right to withhold the p3yment of any monthly estimate if the contractor fails to perform the work strictly in accordance with the specifications or provisions of this contract. C8-8.6 WITHHOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of the construction oDerations is not in accordance with the requir�ments of the Contract Documents. C8-8.7 FINAL ACCEPTANCE: Whenev�r the improvements provided for by the Contract Documents shall have been completed and all requir�ments of the Contract Documents shall have been fulfilled on the part of the Contractor, the Contractor shall notify the Engineer in writing that the improvem�nts are ready for the final inspection. The Engineer shall notify the appropriate officials of the Owner, will within a rzasona�le time rnake such f inal inspection, and if the worlc is satisfactory, in an acceptable condition, and has been completed in accordance with the terms of the Contract i�ocuments and all approved modifications theraoF, the Engineer will initiat� t'ne processing of tne final �stimate and recommend final acce�tance oE the project and final paymnnt thereFor as outlined in C8-8.8 below. C8-8.8 FINAL PAYMENT: Whenev�r all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been compl?ted and all requir�ments of the Contract Documents have been fulfilled on the part of the Contractor, a final estimate showing the value of the wor;� will be prepared by the Engineer as soon as the nec�ssary measurements, computations, and checks can be made, All prior estimatas upon which payment has been ma3e are subject to necessary corrections or r�visions in thz �inal payment. �'8-8 (3 ) __ � __ � The amount of the final estimate, less orevious payments and any sum tnat hav� bPen deducted or retained under the provisions of the Contract Documents, will be paid to t'ne Contractor within 60 days after final accep�ance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the Owner satisfactory �vidence of payment as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit, as Purnished by the City, certifying that all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and tha� therz are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall r�leas2 the Owner from all claims or liabilities under the Contract .for anyttling done or furnished or relating to the work under Contract Documents or any act or neglect of said City relating to or connected with the Contract. The making of the final payment by tne Owner shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which speciEically continue thereaft2r. C8-8.9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent Engineers and design�rs to prepare the Contract Documents and all modifications of the aoproved Contract Documents. It is, t'nerefore, agreed that thz Owner shall be responsible for the adequacy of its own design features, sufficiency of the Contract Documents, the saF�ty of the structure, and the practicability of the opsrations of the completed project, provided the Contractor has complie3 with the requirements of the said Contract Documents, all aoproved modifications thereof, and additions and alterations thereto aporoved in writing by the Owner. The burden of proof o� such comolianc� shall be upon the Contractor to show that he has complie3 witn the said requirements of the Contract Documents, approved modifications t'nereoF, and all aporoved additions and alterations thereto. C8-8.10 GENERAL GUARANTY: Neither the final certificat� of payment nor any provision in the Con`ract �ocume:�ts nor partial or entirz occunancy or use.�f the pre�nis?s by tha Owner shall constitute an acce�otance of work not done in accordance witn the Contract Docum?nts or reliev2 tne Contractor of li�bility in resnect to any express warranties or r=s�onsi'Qility for faulty materials or work�nanship. The Contractor snal.l remedy.any 3eF�cts or damag?s in t�e work and C8-8 (4) pay for any damage to other wor'� resulting therefrom which shall appear within a Deriod of one year from the date of final acceptance of the work unless a longer period is specified andshall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the perFormance of the general guaranty as above outline. The Owner will give notice of observe3 defects with reasonable promptness, C8-8.11 SUBSIDIARY WORK: Any and all work specifically governed by documentary requirements for tne project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific item for bid has been provided for in the Proposal, shall be considzred as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each bid item. Surface restoration, roc� excavation and cleanup are general itzms of work which fall in the category of subsidiary work. C8-8.12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These mat�rials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of mat�rial will 'oe made for only that amount of material used, measured to the nearest one-tenth unit. Payment for misc�llaneous placement oF inataria� shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. C8-8.13 RECORD DOCUMENTS: Contractor shall keeo on r2cord a cooy of all spPcifications, plans, addenda, modifications, shop drawings and samples at the site, in good order and annotated to sllow all changes made during the construction process. These shall be delivered to Engineer upon completion of the work. C8-8 (S) PART D - SPECIAL CO�IDITIONS TABLE OF CONTE�ITS ITEM D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-S D-9 D-10 D-11 D-12 D-13 D-14 D-1� D-16 D-17 D-18 D-19 D-20 D-21 D-23 D-24 D-2� D-26 D-27 D-32 �� -�� D-3� D-3 i D-38 D-40 D-Y 1 D-�? D-s3 D-4� D-4� TABLE OF CONTENTS General Project Destination Right to Audit Project Signs Purging and Sterilization of Water Lines WaQe Rates Coordination «�th Fort Worth Water Department Dewatering Crossin� and Existin� Utilities Existina Utilities Exploratory E�ccavations Test Holes Substitutions Concrete Side���alk and Driveway Replacement Do Not Use (Type "B" Backfill) Do Not lise (Type "C" and "D" Bacl:fill) Crushed Limestone Bacl�fill ?:27 Concrete Pavement Repair (E2-19) Pavement Repair in Parkina Area Trench Safety System Sanitary Sewer Services Water Services Removal, Salvatre, and Abandonment of E:cistina Facilities Valve BlockinQ Ductile-Iron and Grav-Iron Fittinas �linority,�Vl-'omen Business Enterprise Compliance Valve Cut-Ins Connection of ExistinU I�Iains Deholes (ylisc. Ext.) Easements and Permits Construction Limitations Concrete Easement Connection to Existina Structures Bid Alternatives Pressure CleaninR and TestinQ (�1isc. E:ct.) Site Preparation � P�RT D- SPECIAL CONDITIONS TABLE OF CONTENTS ITEi�1 D-47 D-48 D-49 D-50 D-51 D-�2 D-�3 D-54 D-56 D-≥ 7 D-�8 D-59 D-61 D-62 D-69 D-7? D-73 D-7� D-76 D-90 D-91 D-9? D-9� D-94 D-95 D-100 D-101 D-102 D-10� D-10� D-106 D-108 D-132 D-13 � D-1�9 TABLE OF CONTE�ITS Bid Quantities (Misc. Ext.) Detennination and Initiation of Work (�1isc. Ext.) Life of Contract (tilisc. E�ct.) Concrete Riprap Concrete and Acc�ssories Temporary Pavement Repair Interpretation and Preparation of Proposal Bonds (City Let Projects) Barricades. Warninas and Fla,men Turbo Meter With Vault and Bypass Installation Disposal of SpoiUFill I�laterial Temporary Erosion, Sediment, and Water Pollution Control Hvdro i�lulch Seedin� and Soddina Pavment (�1isc. Est.) Traftic Control (Util. Cut) Liquidated Dama�es (UtiL Cut) Pavin� Repair EdQes (L1til. Cut) Clean-Up (Util. Cut) Property Access (Util. Cut) Workers' Compensation Insurance OperatinQ and Nlaintenance I�lanuals State Sales Tax (do not use) Trench EYcavation, Backfill and Compaction Statzment of �Iaterials and Other Char�es (DO NOT USE!!!) Shop Drawin�s Specifrcation References Explanation of Bid Items Cost Breakdown Samples and Quality Control Testino Protection of Trees, Plants, and Soil Partial Estimates and Recainaae 1,Z'ork �ear Pressure P;ane Boundaries Asphalt Drive���ay Repair (Util. Cuts) Top Suil (L'til. Cuts) Crushed Limestone (Fle�c-Base) (Util. Cuts) PART D - SPECIAL, CONDITIONS D-1 General: Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and Specifications, effecrive July 1, 1978, �rzth the latest revisions are made a part of the Contract Documents, and the rules, reQulations, requirements, instructions, drawZngs, or details referred to by manufaciurer's name, number or identification included therein as specifyinQ, referrin� or implyin� product control, performance, quality, or other shall be bindina upon the Con�actor. The specifications and drawin4s shall be considered cooperative; therefore, w�ork or material called for by one and not shown�or mentioned in the other shall be accomplished or furnished in a faithful manner as thouQh requi_red by all. The order or precedence in case of conflicts or discrepancies between various parts of the Cortruct Documents subject to the rulina of the Enaineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Contract Documents 3. General Contract Documents and Specifications The followin� Special Conditions sha1l be applicable to this project and shall aovern over any conflicts w-ith the General Contract Documents under the provisions stated above. � D-2 Project Destination: Construction under these Special Documents shail be performed under the Fort `�'orth `�"ate: Depar�nent Project Destinations: Water Project Number PW77-060770150030 D.O.E. Nurnber 466 D-3 R.i�ht To Audit: RI�GHT TO ALrDIT: Part C- General Conditions. Section C8-8 �IE aSURE�IENT ?uVD PAY�fENT, Paae C8-8 (�), a�d followin�: "C8-8.14 RIGHT TO AUDIT: (a) Contractor aQre�s that the City shall, until the eYpiration of three (3) years afzer final pa`-rnent under this contract, have access to and the ri�ht to eYamine and photocopy any directiv Fe�tineat books, documeats, papers and records of the Contractor 'tnvolvina transactions rel�tinQ to this conQact. Con�actor aQrees that the Cin� shall have access durina norrnal ���or'.�nr hours to �? nec�ssary Con�actor facilities and shall be provided �de�uate �:d appro�r.ate w�ork s��uce in orCe� to conduct audirs in compliar.c� wzth the provisions of this section. The Ciri• shall Qive contractor reasonanle advar.ce notice of intended audits. D-1 (b) Contractor further a�rees to include in all its subcontracts hereunder a provision to the effec� that the subcontractor aarees that the City shall, until the eYpiration of three (3) years after final payment under the subcontract, have access to and the riaht to exaznine and photocopy any duectly pertinent books, documents, papers and records of such subcontractor, involvina transactions to the subcontract, and further, that City shall have access durina normal �vorking hours to all subcon�actor facilitzes, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. city shall give subcontractor reasonable advance notice of intended audits. (c) Contractor and subcontractor aaree to photocopy such documents as mav be requested by the City. The City a�rees to reimburse the Contractor for the cost of copies as follows: 1. �0 copies and under - 10 cents per paQe 2. Nlore than 50 copies - 85 cents for the first page plus fifteen cents for each pa�e thereaf[er. D-� Pro_ject Sians: Project Sians are required at all locations which will be under construction for more than thirty (30) calendar days as indicated in Part B Proposal. Project Signs shall be in accordance wzth FiQure 30 (dated 8-?8-89) of the General Contract Documents. The si�ns may be mounted on skids or on posts. The exact locations and methods of mountina shall be approved by the en�ineer. Any and all costs for the required materials, labor, and equipment necessarry for the furnishin� of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation w-ilI be allo�ved. D-� Pur�ina and Sterilization of `Vater Lines: Before beina placed into sen�ice all newly constructed water lines shall be pur�ed and sterilized in accordance with E2-2� of the General Contract Documents and Specifications except as modifie� herein. The Ciry will furnish all water for NITIAL cleanin� and sterilization of water lines. All other materials for construction of the project, includin� appropriately sized "pipe cleanin� pigs" and chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in su�cient quantities to provide a chlorine residual of fifty (�0) PPI��I. The residual of free chlorine shall be measured after 2� hours and shall not be less than 10 parts per million of free chlorine. Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary se�ver not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The line mav not be placed in service until t�vo successive sets of samples, taken 2� hours apart, have met the established standards of puriry-. D-? Pur�ina and sterilization of the �;�ater lines shall be considered as incidental to the project and all costs incurred �111 be considered to be included in the linear foot bid price of the pipe. D-6 VVaae Rates: The Iabor classifications and minimum ��a�e rates set forth herein have been predetermined bv t�le Cit�� Council of the City of Fort �'orth, Texas, in accordance wittl statutory requirements, ��� beina the prevailina classifications and rates that shall govern on all work performed by the Contractor or anv sub-contractor on the site of the project covered b}- these Contract Documents. In no event shall ]ess than the follo�vin� rates of wa�es be paid. (Attached). D-7 Coordination with Fort Worth «'ater De�artment: During the construction of this project, it will be necessary to deactivate, for a period of time, eristinQ lines. The Contractor shall be required to coordinate with the Water Department to deternvne the best times for deacti��atin� and activating those lines. D-8 De�i•atering: The Contractor shail be responsible for determinina the method of dewaterina operation for the water or se«a�e flo���s from the existina mains and �round water. The Contractor shall be responsible for dama,e of any nature resultin` from the de��aterin� operations. The DISCH.ARGE from any dewaterin� operation shall be conducted as approved by the Enaineer. Ground ��ater shall not be discharged into sanitan� sewers. De���aterino shall be considered as incidental to a construction and all costs incurred «ill be considered to be included in the Iinear foot bid price of the pipe. D-� CrossinT of E�istin� Udlities: Where a proposed �•ater line crosses over a sanitary sewer or sanitaxy sewer service line and/or a proposed sew°er line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made water tiRht or be constructed of ductile iron pipe. The required lenQth of replacement shall be determined by the Enaineer. The material for sanitary se« er mains and sanitary sewer laterals shall be Cla.ss � 1 Ductile iron Pipe �•ith polyethytene �iTappina as specified in Material Standard E1-6 contained in the G�neral Contract Documents. The material for sanitary sewer service lines shall be extra strenath cast iron soil pipe w�ith polyethylene wrappin� as specified in the General Contract Documents. Adapter fittinas sliall be a urethane or neoprene coupling A.S.T.M. C.-4?5 with series 300 Stainless Steel compression straps. D-3 Paymeat for work such as backfill, firtinas, tie-ins and a11 other associated appunenants required, shall be included in the linear foot price of appropriate bid item. D-10 EsistinQ L�tilities: The plans show the locations of all lcnown surface and subsurface s�uctures. However, the Owner assunes no responsibility for failure to show any or all or these s2rucnu-es on the Plans, or to show them in their eYact location. It is mutually a�eed that such failure shall not be considered suaicient basis for claims for additional compeasation for extra work or for incre3sina t�'�e pay quantities in any manner whatsoever. The Con�ractor sha11 be responsible for verifying the locations of and protectin� all etistins utilities, se;vice lines, or other property crossed or exposed by his consuuction operations. Contractor shall make alI necessary provisions for the support, protection, relocation, and or tempor�� relocation of all utility poles, Qas lines, telepnone cables, utiliry servic�s, w-ater rnains, sanitary sewer lines, electrical cables, drainaQe pipes, a.nd all oLher utilities and structures both above and below �ound durina cor.��uction. The Contractor is liable for all dama�es done to such elistinQ facilities as a result of nis operations and anv and all cost incurred for the protection and or tenporar✓ relocation of sucn facilities shall be included in the cost bid per linear foot of pipe installed. �;O ADDITIOl�AL, CO�IPEtiS:�TION WZLL BE ALLOWED. Where eZistinQ utilities or ser�•ice lines are cut, broken or cama�ed, the Cont�actor shail replace or repaiz the utilities or servic� lines with the same t��pe of or,Qinal mate��al and construction, or better, unless otherw-ise shown or noted on the plans, at his own cost and eYpense. The Con�actor shall irnmediatelv notity the Owner of the da�a�ed utiliry or service line. He sha11 cooperate with the owners of all urilities to locate e�istin� under�round facilities and notif'y t�`�e EnQineer at once of any eonfiic�s in �*ades and ali�meat. In case it is necessary to chanae or move the property of any ow�ne: of a puntic utility, such propert� shall not be moved or inte�ered w-ith until ordered to do so bv the Enaineer. The r��ht is reserved to the owner of public utilities to enter upon the lunits of the project for the pur,�ose of makina such changes or repairs, of thes propertv that mav be made necessary by pe�ormance of this contract. D-11 E�ploratory Ecc�vations: In adciuon to those areas a.s may be desi�iated on the Draw-inss, it sha11 be Lhe Contracior s resaonsibility to eYcavate aad locate e:�stin� utilities w�nich mav a�ect cons�action of the water and/or sewer fac;lities. All eYploratory escavations shall occur far enouah in advanc� to per_nit any- nec�ssary re'.ocation to be made w-ith minimum delay. All costs incured by the Contractor in makino exploratory excavations D-� s��il be conside;ed to be inc?uded in the unit price bid for cens�uct�� or wate:'sew•er line er -�e �sociated s�uctures. D-1? Test Fioies: T'AZ II12'uz. OT 5U��i:.:i3C� z?C�lorarson to z.sce:'�.9.L� L1e I'i�L11L� Of L�P SO11S. L'7C�LCinv �� amount o' rock, ii �v, �:-ou�n w�;,ic� Lhis nip�'.i��e i�.s'�.�Ila�on is to be :�la�e is tLe res�or�siaiii�v of �v anc �1.1 prospec�.�ve bidders, ar.C an�� bidcer on tais project sh�l s�br�.ic his bid unc.er this conciuon. W�aerher prospec���e biceers pe�or� tnis subs•�race e�plora�on joi.r.tly or i.ndepenae�tiv, a�nd whether tbev ma.k� such dete�.�rio�s bv the use of �est holes or o�er ner.�s, shall be lefr to the dis�.re�on o� such prospec�i�-� bicders. T�e cost of r.�e rock re�oval a.nd othe� associated a�pureaa.nts, if reauired, s�all be inciuce� in �'�e Iinear foot bid price oi we pipe. D-13 Subsriturions: Tnz saeci icat?ons Tor mate^als set out L�e rninimur�. s-wnda.sd o: aua?it�- w�P�ch the Ciry belie�;-es aecess�:r� to procure a satisfactery prcje�t. _vo substi�stions w�il be pe.-���ed until the Con�actor ha.s re�eived w-rire:� pe.�uissior. of the En��ne�r to m�� a su�s�irution for �e �ate:�al whic� has been sre�ine�. ti`he:� �.he te� "or ��uai," or "or a��ro���� ee•,� " is usee. it is unCe:stooc u'�at if a r,late�al. �rocuct. or oi��� or �����ie�t �`t'yrlllc L�lt' T'i?..L�lc.' �0 U.5�:^ 1S i'.:.r'_11Sti'��.'� 1L R,il� �t' ��cro�•able, as t��e v.�..i'�?Cli��.'�i �:3Q: �31i?.'. tiVy$ L.$�... F�i LLlt' :�. j;Cs� �i Z$i3�li$iuTC �$'.3.i:S;�..r'� 01 4L''G��L�� �C���tc l.'1� LQ u1� �IL �. li 2 �7rOG�uci OI ai:�� OL".�. Il"�e 1S rTOpOS�`� i0I' 1L�, ttlz r.�?a?riz�:�� aDpi'0�'21 �.zT�Oi i�l:_.r �z ebr.`ined bz?ore �� �r000se� substir�te is proc��;re� b�� the ConLactor. `Z�he�e ��e te� "or eq�1,'� OI' ��or appro��ed equal" 1S IIOI 1:S2� LIl i�1z SNzCif1C�I=0riS, i��'.1S `OZS IIOt necessaril�� e�clude alte:-aative items or mater�al or equipmeat w=nich �a�� accorzpiisn thz i��teaae� pur�ose. Howe�,-er, thz Con�actar s�a.11 n��-e the � i> responsaoi?iry oi proti�in� that tCe pro�esed su�stirution is, in fact e�ual, and the En�ine�;, ��ue reares�at�tive of t'�e Cir�, sh�ll 'oe �he sole jLd�e or the acce�csbilir� of su�s�i��ror�s. Tue pro��isions oi t��.is s�b-sec:ien as r�?a�ed to "Sucstitutiors" sha11 be a��lica�le to all szc�iers o� these s�eciLcatior.s. D-1� Concre�e Side��alk and Dri� eR��v Realacemeat: .�t locs:ions in �e proie�t whe:e �ains zre �e�uire� to be r1�ce� �.:nee: e:�stin� sice���L'tis anc.%or dr.ve�,��ays, suc� s;ce��aiks anc�'or drive���a�•s s�-��11 ce corLple;e?v r��l�ce� �or thz iz1l e:cis�a� ��Z�th, ber�•e�� ��s��� cens��csor. or ex��icn jcinu w:� �OOC= conc:e.e w:th r��-iforc�� s�e�i on a s�c c;is�icn :n ac�or;�^.c� w�-� Ciz� at For C�'or.h T�uaL�aoc;�P�b1ic a�or�s De��z�c 5�4;;_d�.ru S�,e�incario� for Ce�s�sc�o� Ite� � 0�: . �t lecater.s w�her� ��ins a�e re�uire� �o be p1ac�� t:nce; e usin�- ci� �e' �arer, suca c;ir� a..�d �utte: suall be re�i�c��' to m�tcZ t�Ye �rc oeo�leti-� oi �z r�;�c�-e� c•W � a.^d D-� �utter and sha?1 be installed in accordance w7th Ciry of Fort Vvorth Public Vvorlc.s Department Standard Spe�irication tor Cons�-uction, Item �0?. Pavment for curtina, backfill, concrete, forminQ materials and all other associated appurtenants required, shall 'be included in the price bid. D-1� Do'�ot tise (T}Pe "B" Backfill) D-16 Do tiot lise (Type "C" and "D" Backnll) D-17 Crushed Limestone Bacltfiil: Vvhere specified on the plans or directed bv the En�ineer, crushed limestone sha11 be used for trench bac'�.�fill on this project. The material shall conform to Transportation and Public Works Standard Specifications for S�e�t and Storm Drain Construction Division ? Item ?08.? Materials and Di��ision ? Items ?08. � Material Sources. Trench bacicfill and compaction shall meet the requirements of E?-? Eaca��ation and Backfill of the General Con�act Documents Specifications. Payment for crushed limestone bacicfill in place shall be made at the unit price bid in the Proposal multiplied b�� the quantiri� of material used in accordance v��th E?-?.16 Measurement of Backfill Materials of the General Contract Documents and Specifications. D-18 ?:27 Concrete: Transportation and Public V✓orks Department npical Sections for Pa�•ement and Trench Repair for Ltiliry Cuts FiQ's 1 through � refer to usina ?:27 Concrete as base repair. Since this call-out includes the ���ord "concrete', the consistent interpretation of the Transportation Public �� orks Department is that this ratio specified two (?) sacks of cement per cubic yard of concrete. ��'ith the exception of the cement content, all other requirements shal] meet or exceed Transportation and Publzc Works Deparnnent standard specification Item �06 Class D Concrete. D-19 Pavement Repair (E2-19) (E?-19): The unit price bid under the appropriate bid item of the proposal shall co��er all cost for providina pavement repair equal to or superior in composition, thickness, etc., to existina pavement as detailed in the Public Works Department n�pical sections for Pavement and Trench Repair for Utility cuts, FiQures 1 throuah �. All requued pavinQ cuts shall be made w�ith a concrete saw in a true and strai�ht line on both sides of the trench, a minimum of tt��elve (12) inches outside the trench walls. �The trench shall be bacl�illed and the top nine (9) inches shall be filled �z2th required materials as shown on pavina detaiis, compacted and level wzth the fuushed street surface. The finished Urade shall be maintained in a serviceable condition until the pavin� has be�n replaced. All residents' drive���a� s shall be accessible at niQht and o��er weekends. D-6 It has been determined bv the Transportation and Public Works Department that the strip of e�istin� I�'�1.SC pa�•ement berween the eYistina Rutter and the edQe of the trench pavement repair wzll not hold up if such strip of existina pavement is two (2) feet or less in �vidth. Therefore, at the locations in the project where the trench wa1l is three (3) feet or less from the lip of the etistina gutter, the Contractor shall be required to remove the existina paving to such autter. The pa��ement repair shall then be made from a muumum distance of rwelve (1?) inches outside the trench ���all nearest the center of the street to the w.rter line. The pavement shall be replaced wlthin a maximuri of five (�) working days, providina job replacer.rent conditions ��711 permit repavina. It pa��ing conditions are not suitable for repa��li�y, in the opinion of the Ow�ner, the repavinQ shall be done at the earliest possible date. A pe:mit must be obtained from the Department of Enaineering's Permit Desk bv the Contractor in conformation �zth Ordinance i�To. 3-�=�9 and/or Ordinance I�o. 79? to malce utilitv cut in the stre�t. Ciri� Inspectors w-ill inspect the pavina repair after construction of each ��ater and/or sanitar�- se��zr main replacement. D-?0 Pavement Repair in Parl:inQ Area: The unit price bid under appropriate BID ITEIv1(S) of the Proposal shall cover all cost for providina pavement repair equal to or superior in composition, thici;ness, ete., to existinR pavem�nt. All required cuts shall be made u�ith a concrete sati�� in a true and strai�ht line on both sides of the trench, a minimum of tu�elve (1?) inches outside the trench ���alls. The trench shall be backfilled and the top nine (9) inches shall be filled with crushed limestone base material, compacted and level w7th the finished adjacent surface. The finished �-rade shall be maintained in a ser� i,:ea��le condition until the pavin� has be�n replaced. D-21 Trench Safetv Sti•stem: 1.. GENER�.L: This specitication covers the trench safety requirements for all �rench e�cavations in arder to protect workers from cave-ins. The requirements of this item govern all trenches for mains. manholes, vaults, sen ice lines, and all other appurtenances. ?. STA,'��D:�DS: The latest version of the U.S. Depaitment of Labor, Occupational Saietr• and Health 4dminist�ation Standards, ?9 CFR Part 19?6, Subpart P-Excavations, are hereby made a part of this specification and sha11 be t�he minimum aoverning requirements for trench safety. D-7 �. DEFINZTIO?�TS: .�. TRE'.vCHES: A trench is referred to as a narrow excavation made below the surface of the sround in which the depth is greater than the wzdth, where the v�7dth measured at the bottom is not �reater the fifteen (l�) feet. If forms or other su�uctures are installed or constructed in an exca��ation so as to reduce the dimension mea.sured from the forms or s�-ucture to the side of the esca`�ation to Tifteen (l�) fe�c or less at the bottom of the e�cavation, the excavation is also consi�ered to be a trench. B. BENCHI'_�iG SYSTEM: Benchinc means exca��atin� to form sides of a trench to forn one or a series of horizontal levels or steps, usually wlth vertical or near-vertical surfaces betu�een levels. C. SLOPItiG SYSTEM: Slopina means e�cavating to form sides of a trench that are inclined away from the e�ca� ation. D. SHIELD SYSTEM: Shields used in trenches are aenerally referred to as "trench boxes" or "�ench shields." Shields means a structure that is able to w�thstand the forces imposed on it by a cave-in and protect workers ��ithin the structure. Shields can be permanent structures or can be desi�ned to be portable and move alona as the w�ork proac�esses. Shields can be either premanufactured or job-built in accordance �izth OSHA standards. E. SHORNG SYSTEv1: Shorina means a sm.icture such as a metal hydraulic, mechanical or timber system that supports the sides of a trench and �-hich is desi�ned to prevent cave-ins. Shorins systems are �enerally comprised of crossbraces, �ertical rails (upriahts), horizontal rails (w•ales) and/or sheetin�. 4. MEASLR�'iv�i�T: Trench depth is the venical measurement from the top of the e�istina Qround to the bottom of the pipe or st�uctures. The quantitv of trench safety systems shall be based on the linear foot amount of trench depth Qreater than five (�} feet. �. PAYIvfE�T: Separate pa}�ment «ill be made only «�hen trench e�cavations exceeds a depth of five (�) feet and shall be full compensation for safet�• system desian, labor, tools, materials. equipment and incidentals necess�� for the instailation and removal of trench safen- systems. D-8