Loading...
HomeMy WebLinkAbout024789 - Construction-Related - Contract - Davila Construction, Inc.City of Fort Worth, Texas n►�Ayar And Caunc�( Cammun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 3/23l99 C-17345 30UNIT1 1 of 2 SUBJECT AWARD OF CONTRACT TO DAVILA CONSTRUCTION, IN . FOR SANITARY SEWER REHABILITATION, CONTRACT XLV (45), UNiT 1 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Davila Construction, Inc. in the amount of $388,081.25 for Sanitary Sewer Rehabilitation, Contract XLV (45), Unit 1. DISCUSSION: On March 13, 1997 (M&C C-15932), the City Council authorized the City Manager to execute an engineering agreement with Spiars and DeOtte, inc. to prepare plans and specifications for Sanitary Sewer Rehabilitation, Contract XLV (45). The project is generally bound on the north by Monticello Drive, on the south by Camp Bowie Boulevard, on the east by Carroll Street, and on the west by Belle Place. The proposed improvements consist of the replacement of approximately 4,1 Q0 linear feet of 8-inch sewer pipe. The project is lacated in COUNCIL DISTRICTS 7 and 9, Mapsco 612, 62W, 62X and 75N. The project was advertised for bid on December 17 and 24, 1998. On January, 14, 1998, the following bids were received: BIDDER Kebo Services, Inc.* Davila Construction. Inc. Larry H. Jackson, Construction, Inc. Texas-Sterling Construction, Inc. B&H Utilities, Inc. Hall-Albert Construction, Inc. Stocker Enterprises, lnc. Conatser Construcition, Inc. AMOUNT $382,473.10 3$8.081.25 401,469.05 408,385.30 431,001.00 462, 335.00 486,910.00 494,3$0.50 TfME OF COMPLETION 110 Calendar Days '`Staff recommends that no new contracts be awarded to Kebo Services, until the company has satisfactorily completed a majority of its on-going sewer projects with the City. Staff met with Kebo to review their deficiences pertaining to clean-up activities and completing projects in a timely manner. Kebo has assured staff that the necessary changes will be smplemented to merit award of future City contracts. In addition to the contract cost, $39,000.00 is required for inspection and survey and $20,000.00 is provided for project contingencies. City of Fort Worth, Texas �1��,�+�� And �aunc�l C,ommun�cAt�on DATE REFERENCE NUMBER LOG NAME PAGE 3123/99 C-17345 30UNIT1 2 of 2 suB�ECT AWARD OF CONTRACT TO DAVILA CONSTRUCTION, IN . FOR SANITARY SEWER REHABILITATION, CONTRACT XLV (45), UNIT 1 Davila Construction, Inc. rs in compliance with the City's M/WBE Ordinance by committing to 14% M/WBE participation. The City's goal on this project is 13%. FISCAL INFORMATION/C�RTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Sewer Fund. MG:k Submitted for City Manager's Office by: Mike Groomer Originating Department Head: A. Douglas Rademaker Additional Information Contact: A. Douglas Rademaker I FUND I ACCOUNT I CENTER I AMOUNT � (to) G140 I 6157 � (from) I PS46 541200 070460172890 $388,081.25 � 6157 I CITY SECRETARY APPROVED ; CITY COUN��. MAR 23 1999 ����;�..,,� � ��..�1. ,, City Secretarq ot the Csty o[ �'ort Worth, Texaa CITY SECREfARY r� � � D.Q.E. FILE CONTRACT�OR'S 30NJI�VG CO. CUfi1STR�lCTlO�'S COf'Y SY�;CIFICA'I'10N����.� ���A�ME�'f � ClTY SECRETARY - CONTRACT DOCUMENTS C0NTRqCT Np � ; �� � ��9 FOR SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS CONTRACT XLV (45) Unit 1 DOE No. 0798 L-888A, L-1883; L-2132; L-2694; L-2701 Unit 2 DOE No. 2348 L-1292; L-1292A; L-1326; L-2583R/L-1131R, I:t-74, M-74R, M-79 Unit 3 DOE No. 2349 L-1647; L-5125 SEWER PROJECT: PS 46-070460172890 IN THE CITY OF FORT WORTH, TEXAS 1998 HUGO A. MALANGA, P.E. A. DOUGLAS RADEMAKER, P.E. DIRECTOR. DIRECTOR TRANSPORTA'1'ION & PUBLIC WORKS llEPARTMENT OF ENGINEERING L.C. BRADLEY, JR. P.E. DIR�CTOR WATER DEPARTMENI' PREPARED BY ��� a� �� �� � S�'':�' ... . . �'q�,111 � �'� ' ' ���i "�,. � * ' . �; i'' I �. llUNAWAY ASSOCIATES, INC. � . RICNARD..V:..DeDTTE...� ENGINEERS � PLANNERS � SURVEYORS �. : � 1501 Merrimac Circle, Suite 100 ��t�'�' ,,�,�,7, 4232� .•��,s Fort Worth, Texas 76107-6572 , R�p�l'£j,�'�lSi'�� ��'� Phone (817) 335-1121 Fax (817) 335-7437 A�etro (817) -ti'.9-1 � 5 R,1;lt)` L� � DAI No. 9654300 �� _ ��� ��� �^��I��4i�l�I•':1�, �''�������� �� I �,� 9 '� V� ��' y ��:�`'�;,�.�� �, `���:�, ��i� . � " ` CI�'Y QF FQRT WORTH, TEX.AS DEPARTMENT OF ENGINEERINC ADDENDUAI Nn. 1 TO THE SP�:CIFICATIONS ANA CON"fRACT DOCUlV1ENTS � FOR ��� Contract YLV (4S) Se�ve�• Department Projeet No. PS 46-070460172K90 � D.�.E. Project Nos. 0793, 23�S, 2349 Acldeadum issued: January 1.2, 1999 Bids rece.ived ur�til ranuary 14, 1�99, 1:30pn� �"` The Coniract Documents for the subject project are hereby revised or amended as follows: rR l. PART $- FROPOSAL: Unit 3 Pay Tten� No. 11 }ias changed to 1 EA standard 4-ft. diameter drop SSMH (tv 6-ft. depth). Pay Item �10. 12 has ehanged to 1S VF' 4-ft. extra depth drop SSMH. See attached replacement page for page 1'ari B 3-2. Bidder shall attach these replacemer�t pages to original bid documents. This Addendum forms a part of the Cuntract Documents referenced above; and modi�ies the origanal Contract Documents and plans. Acknowledge� receipr of this Addencium on the spac� pr4v�ded below ��d on ave Part B 3-7 of vour Bid ProRosal and note on the outer envelope of your bid. Fazaure to acknowl.edge receipt of ik�is Addendum eould sttbject bidder to disqualification. � �+��IP AC 'WLEi]C1��: � B '�i� _; '� ; _ y' � � - � Tit1c: r��`.l�r`.�r�r.l,�', P % `-' r ' ���� /� Address: �J.� � 5 s� � , , , , � Teleplione: r'-'���'`� � c���' �,��� L' 1 ' 1 FZick Trice, P.E, and Manager Consultant Services (7DOE) By: Tv�t �� �,�� f � l�' � R �� C [ �r i (�'�.. � ?h5a�oo_Addendtunl .0� l ��r)_6SD ti.pJ ,-;DDf:NDUM NCi. I TABLE OF CONTENTS PART A NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS SPECIAL INSTRUCTIONS TO BIDDERS PART B UNIT 1 MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS PROPOSAL CITY APPROVED PRODUCT AND METHOD UNIT 2 MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS PROPOSAL CITY APPROVED PRODUCT AND METHOD UNIT 3 MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS PROPOSAL CITY APPROVED PRODUCT AND METHOD BID SUMMARY PART C GENERAL CONDITIONS PAftT C 1 SUPPLEMENTAR,Y CONDITIONS TO PART C PAR.T D SPECIAL CONDITIONS PART DA ADDITIONAL SPECIAL CONDITIONS PART E SECTION E SPECIFICATIONS SECTION E100 - MATERIAL SPECIFICATIONS PAR,T F CERTIFICATE OF INSURANCE CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW VENDER COMPLIANCE TO STATE LAW EXPERIENCE RECORD EQUIPMENT SCHEDULE PERFORMANCE BOND PAYMENT BOND MAINTENANCE BOND 9654300_Specs.wpd 1 PART G CONTRACT APPENDIX A DETAILS APPENDIX B EASEMENT DOCUMENTS TEMPORARY RIGHT-OF-ENTRY AGREEMENT APPENDIX C GEOTECHNICAL REPORT 9654300_Specs.wpd 1� 1 ' � C II [ [ C� I� I � � � � � � { 1 I 1 PART A NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS SPECIAL INSTRUCTIONS TO BIDDERS I� 9654300_Specs.wpd NOTICE TO BIDDERS Sealed Proposals for the following: FOR: SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS CONTRACT XLV (45) SEWER PROJECT NO. PS 46-070460172890 __ �_ __ UNIT 1 L-888A, L-1883; L-2132; L-2694; L-2701 (DOE No. 0798) 2,722 LF 8-inch sewer by open cut �— �_ 1,301 LF 8-inch sewer by pipe enlargement 25 EA Manholes UNIT 2 L-1292; L-1292A; L-1326; L-2583R/L-1131R, M-74, M-74R, M-79 (DOE No. 2348) 2,072 LF 8-inch sewer by open cut 331 LF 6 to 8-inch sewer by pipe enlargenient 1,811 LF 10-inch sewer by open cut 1,138 LF 10-inch sewer by CIPP or FAFP 20 LF 10-inch sewer by other than open cut 28 EA Manholes UNIT 3 L-1647; L-5125 (DOE No. 2349) 1,261 LF' 8-inch sewer by open cut 1,057 LF 6 to S-inch sewer by pipe enlargement 10 EA Manholes �--- - - - - - Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Te �ill be received at the �.Yurchasin� Office until 1:3U p.m., �anuary 14.i�99 , and then punllci ened and read aloud at 2:00 p.m., in the Council Chambers. � Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a deposit of 50.00. These documents contain additional information for prospective bidders. �� I � I I ' r �� For additional information, please contact Mr Rich DeOtte, P.E. at (817) 335-1121, or Mr. John Boyer at (817) 332-5474. Advertising Dates: December 17, 1998 December 24. 1998 I� 9654300_Specs.wpd Part A- 1 1 � � � LJ � IJ COMPREHENSIVE NOTICE TO BIDDEftS Sealed Proposals for the following: FOR: SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS CONTRACT XLV, (45) SEWER PROJECT NO. PS 46-070460172890 UNIT 1(DOE No. 0i98) L-888A, L-1883; L-2132; L-2694; L-2701 UNIT 2(DOE No. 2348) L-1292; L-1292A; L-1326; L-2583RlL-1131R, M-74, M-74R, M-79 UNIT 3(DOE No. 2349) L-1647; L-5125 Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m., January 14, 1999 , and then publicly opened and read aloud at 2:00 p.m. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Off'ice Building, 1000 Throckmorton Street, Fort Worth, Texas. A�v_ dollar 50.00 deposit is required for the first set of documents and additional sets may be purchased on a non-refundable basis for fiftv_ dollars 50.00 per set. These documents contain additional information for prospective bidders. All bidders will be required to comply with Provision 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders. The major work on the above-referenced project shall consist of the following: UNIT 1 L-888A, L-1883; L-2132; L-2694; L-2701 (DOE No. 0798) 2,722 LF 8-inch sewer by open cut 1,301 LF 8-inch sewer by pipe enlargement 25 EA Manholes UNIT 2 L-1292; L-1292A; L-1326; L-2583R/L-1131R, M-74, M-74R, M-79 (DOE No. 2348) 2,072 LF 8-inch sewer by open cut 331 LF 6 to 8-inch sewer by pipe enlargement 1,811 LF 10- inch sewer by open cut 1,138 LF 10-inch sewer by CIPP or FAFP 20 LF 10-inch sewer by other than open cut 28 EA Manholes UNIT 3 (DOE No. 2349) L-1647; L-5125 1,261 LF 8-inch sewer by open cut 1,057 LF 6 to 8-inch sewer by pipe enlargement 10 EA Manholes Included in the above will be all other miscellaneous items of construction as outlined in the Plans and Specifications. 9654300_Specs.wpd Part A - 2 �' � � The City reserves the right to reject any and/or all bids and waive any and/or all formalities. Bidders shall not separate, detach, or remove any portion, segment, or sheets from the contract document at any time. Bidders must complete the proposal sections and submit the complete specifications book or face rejection of the bid as non-responsive. � AWARD OF CONTRACT: No bid may be withdrawn until the expiration of forty-nine (49) days from the date the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GooD FAITH EFFORT FORM ("Documentation") as appropriate is received by the City. The award of contract, if made, will be within forty-nine (49) days after this documentation is received, but in no case will the award � be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. �i � � � � � 'I u Bidders are t•esponsible for obtaining all addenda to the conti�act documents prior to the receipt time and acknowledging them at the time of bid receipt. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817) 871-7910. Bids that do not acknowledge all applicable addenda may be rejected as non-responsive. SUBMISSION OF BID(S) AND AWARD OF CONTRACT(S): This document is designed as three (3) separate contract documents and shall not be construed as being a single contract. The proposal sections are provided as three (3) individual proposals with three (3) individual M/WBE specifications and are arranged in units to allow prospective bidders to submit bids on one unit, some of the units, or all of the units. Award of contract(s), if made, shall be to the responsive low bidder for each individual unit. If a contractor is the responsive low bidder on two units or more, a single set of contract documents consisting of all applicable units will be created and one single award of contract shall be made. The Contractor shall comply with the City's M/WBE Ordinance on each unit. Construction time on all units will run concurrently. For situations involving approved contracts with multiple units, the total allowable construction completion time period for all the units shall be the same as the unit with the longest construction time period. In accordance with the City of Fort Worth Ordinance No. 11923, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the M/WBE UTILIZATION FORM, PRIME CONTR.ACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation"), as appropriate. The Documentation must be received by the contracting department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the contracting department to whom delivery was made. Such receipt shall be evidence that the Documentation was received by the City. For additional information concerning this project, please contact Mr. Rich DeOtte at (817) 335-1121, or Mr. John Boyer, at (817) 332-5474. BOB TERRELL CITY MANAGER ADVERTISING DATES: December 17. 1998 December 24, 1998 9654300_Specswpd GLORIA PEARSON CITY SECRETARY DEPARTMENT OF ENGINEERING DOUGLAS A. RADEMAKER, P.E., DIRECTOR sy: I� 0 ►? �l � �� �3 � �ck Trice, F.E_ Manager, Consulting Services Part A - 3 � SPECIAL INSTItUCTIONS TO BIDDERS (WATER DEPAftTMENT) � 1. PRE-OUALIFICATION REOUIREMENT: All contractors submitting bids are required to be pre-qualified by the Forth Worth Water Department prior to submitting bids. This pre- � qualification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable � equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. (a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by n appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more that one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. The Director of the Water Department shall be the sole judge as to the acceptability for financial qualif`ication to bid on any Fort Worth Water Department project. Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. Any proposals submitted by a non-pre-qualified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. (g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary pre-qualification. 2. BID SECURITY: A cashier's check or acceptable bidder's bond payable to the City of Fort Worth in an amount of not less than five percent (5%) of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within (10) days after the contract has been awarded. To be an acceptable surety o the bond, (1) the name of the surety shall be included on the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount shown on the treasury list or one-tenth (U10) the total capital and surplus. BONDS: A performance bond, a payment bond and a maintenance bond each for one hundred (100%) percent of the contract price will be required, Reference C 3-3.7. 9654300_Specs.a-pd SI - 1 � ' e � � � � � � � � � � 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth, Texas, and set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the State in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business in not in the State of Texas, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in the State of Texas. This provision does not apply if this contract involves Federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specif`ications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. PAYMENT: If the contract amount is $25,000 or less, the contract amount shall be paid within forty-five (45) calendar days after completion and acceptance by the City. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it, nor any of its officers, members, agents, employees, program participants or subcontractors while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification, retirement plan, or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors and/or its subcontractors' alleged failure to comply with the above referenced policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on; the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply � 9654300_Specs.wpd SI - 2 1 � with the ADFA's provisions and any other applicable Federal, State and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations , asserted by third parties or subcontractors against City arising out of contractor's and/or its subcontractors; alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. � 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fort Worth Ordinance No. 11923 the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance � can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The documentation must be received no � later that 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. � Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Women Business Enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facis (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal state or local laws or ordinances relating to false statements. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. � Revised 9/24/97 ' �_ 1 1 1 ' , ' � 9654300_Specs.wpd SI - 3 , 1 1 1 �I PART B � UNIT 1 MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS PROPOSAL � CITY APPROVED PRODUCT AND METHOD UNIT 2 MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS � PROPOSAL CITY APPROVED PRODUCT AND METHOD UNIT 3 MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS � PROPOSAL CITY APPROVED PRODUCT AND METHOD �, BID SUMMARY � NOTE � M/WBE goals are different for Units 1 through 3. Individual M/WBE documentation must be completed with the proposal for _ each unit. 1 ' 1 ' � 9654300_Specs.wpd i� i� �� � � � � � � PART C r � 1 1 u , L 1 ' ' GENERAL CONDITIONS ' 9G54300_Specs.wpd � � � � � � � � � � � � � � � � � � � DEPT OF �i�CI����EN+�/ut�'� "�"� ��'+`� �� ��1 10 35 �ID DA`GE: n���wB� �ocunr��rrrr,���aN ���rva�n DEFARTMENT 0F �N�II�E�R1�G � - ��-1-'�'I�'k �'RC?JECTNAM�JD.0.E.N(7. �� ��e � �vr,�,�,-,� �,�'� ��-LYr-.r'�r I. ,�;� 1 P1t4JE�T MANA�E�L: ��';�e� r� �i t� .� — , F0RMS SUBMITI"El� B�Y: NAh�E: C0MI'ANY: �� �E 1�z. ��'L,t�' Y--� o r�tr.� �`I'�`1,�: l` �y SIGl'�1ATUR� �� P��RS�}N R�C�IV�`J�a: � , � � 'v�� .,n , �, � �� \ ! �� � �-- — I� �,,1 �. � � ; ..�� � � �-^�� �€�. ��i c� � n 1-�4- �i"�1 � �� �.z-IS� n 01/25/1999 09:35 817-535-8034 DAVILA CONSTRUCTION PWGE B3 A1i �'ACHMEN'C lA �a�. t .t z c a� �F�rt �Ic�r#h Minoflty and Women�usine�� nterp�ise Specificatir,�� ns .� � MBE/WB� �TIL-iZ4Tl0(� �"�`GCii� ►�����'`i�1� /-�J� �'� PRIME C4hD�ANY'NAMfi , � 8[D DwTg r'� �,+� r�� �'�� C�1 �.�r.�' �.G � .�.�,��� ��`�'� � ,�r°',��',�"'1�"�i PROJBGT NA74� : PAtI,���C'I' 1Yi�1Mi8'�, - ' - - -, ---- ---� - I , % A� / '�'"r .,.� iP*r�f' � /�i � . � r . tr� r r � �� . � _ � �r . f �✓,�' . c �' 7r'� � � ,+ , �' .�i��.*.� �`'�-"�(Z.C'� . '�', � � /�J�t�� �� �� �,� ,/� � �� � I � /J7� I''f 11 � .i � � � �� . � � �' 1 � r ; � . ��� �� T�.(! �� �� � . J ��-�r,���r�,�� � � --� ` �%� �r ,_., , . �.. . � ...� �� . � ; . � � . f � � �� �� � , �� � n � �• '`�"` �`� � � ' �7 �•a�+�• �derkr� w•nw�. �� KoeW c.a�.� T.x�. a.�on� c«tiaa � on llo.epr �� �'iqa� O+p�tn�t d Tnnapoetaqon lH� ��war olYiuonf e"! �+4r +�r�..+�....iat �.r w�.�ru�h �t w loewa in e�M ���an�? aoww► a A�1spi�o� ar - «,�.�wr aotio a�w�«s � au mu��.o..ca o. arba. � �as POEw 1dSi� e� R�CEiv� �Y TH� Iw�►Na►aNG o��►aTr�[r er 6�00 �ea� �(�] �rtir suatNess OAYB �1FTER 8� OP�H(NG aw. mv� PROPOSAL TO: Mr. Bob Terrell City Manager Fort Worth, Texas FOR: SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS CONTRACT XLV, (45) SEWER PROJECT NO. PS 46-070460172890 UNIT 1(DOE No. 0798) L-888A, L-1883; L-2132; L-2694; L-2701 Pursuant to the foregoing "NOTICE TO BIDDERS", the undersigned has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment and materials necessary to fully complete all the work as provided in the plans and specifications and subject to the inspection and approval of the Director; Department of Engineering of the City of Fort Worth. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Maintenance Bond, and Payment Bond approved by the City of Fort Worth for performing and completing the sewer construction work within the time stated and for the following sum, to-wit: SEWER MAIN REPLACEMENT ' PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY UNIT PRICES WRITTEN IN WORDS PftICE BID 1. 2 EA Storm Drain Pre-Construction ll-Hole ' ,��✓e�y ,d�`�•k'�.��� �,�,y llollars � and —'� ' Cents per �A $/ SQ . D� S!j J��• d� 2. 1,907 LF 8-inch San. Sewer Pipe (.All Depths)* 3 4 /�� ���/� Dollars and � — !� '� Cents per LI' � 7/`f •�C/' � �/V, ✓ ! �� �Q 815 LF 8•inch DIP San. Sewer Pipe (All Depths) �/�"?``7� �i/�� p�llars and � --- � � Cents per LF $ �7"�� � $�'"'!`(1 � ��• �'� 1,301 LF 8-inch HDPE Sewer Rehab by Pipe Enlargement � Method** ��U�l`i� /-1 !� Dollars and f ��� Cents per LF $��l/!� $�/..���(s'�/ � *, ** Contractor must complete City Approved Product & Method form on Page "Part B 1-6". 9f54300_Specs_PartB_Unitl.wpd Part B 1-1 Unit 1 PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY UNIT PRICES WRITTEN IN WORDS PKICE BID 5. 200 LF Sag Adjustment for Pipe Enlargement 6. �li/�f�P 'r �/ .1�' Dollars and �l�I" '� Cents per LF ;{� �p•L/� $ � /, �L��• � � . 2,083 LF Trench Safety System for Trenches (Depth > 5 feet) m/i/,C Dollars and `°'� "" Cents per LF $ �, �� $�,(/�.J� � � . 7. 15 EA Remove Existing San. Sewer Manholes ��� ��� �Grr�?,,q(/„�/ t'/!/� Dollars � and �� " Cents per EA S�/�!� �� $.3�i (gf�'•C?1� 8. 21 EA Standard 4-foot Diameter SSMH (to 6-foot Depth) � �/'� /��C�,y�'5� .,%�L-t� !�'�l�X� ��l��Y+"7' ��� Dollars and —D — Cents per EA $ �, 275•�� $ �t�, �/�, ��� � 9. 9 VF' 4-foot Diameter Extra Depth for SSMH 10 11 12 13 Q/(�� IJNC�Pd Dollars and '—O � Cents per VF $ l �� ��Q $ 7��• �� 4 EA Standard 4-foot Diameter Shallow Cone Manhole �.C/'.�/��+l�� !7'I�'i��s,C.F'� .'�r+/p/���L/�.�'f �/'L�� Dollars and C�' '' Cents per EA $�i �7�`, �U $�i ��d• d � 25 EA Watertight Nianhole Insert for SSMH � ��v'�'�c!'7`j/ ��!/� 'Do11ar� ! �L / 7 and '�� � Cents per EA $ /,7�/� $ f. � /��� . . 22 EA Concrete Collars for SSMH �i�r_ �� r�'"�.►,rr,�'e.��'` lG���l`9�' �f �G� Dollars . �J and " d � Cents per EA $ c/f-J t � � $/, �Sv• � 23 VF SSMH Corrosion Resistant Coating � �i4��°i /Yll.�2�� rY llollars and -- � '� Cents per VF $ ,���, D� $ (�f 9��• �� *, ** Contractor must complete City Approved Product & Method form on Page "Part B 1-6". 9654300_Specs_PartB_i7nitl.wpd Part B 1-2 Unit 1 PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY UNIT PRICES WRITTEN IN WORDS PRICE BID 1�. 25 EA Vacuum Test SSMH �,�r� ��.� r�.� :�l�t/4°,��Y ,�`� �G �loBlars and ' "D '� Cents per FA $ �f�7 •�� �, li�J - �d l5. 45 EA 4-inch Sanitary Sewer Service Taps ��c� .�'uN��' ������ ��� Dollars and �� � Cents per EA $ ��+.� "'�� $ I��.�l� � lf�. 31 EA Sewer Service Reinstatement for Pipe E:nlargement � 17 I� 19 20. 21 22. �.!� I7v.'5r�s.��¢ T]nPlr�rfi and —D " Cents per EA $ �^1�� �'� $ / s'Si 7 -��w �'� 243 LF 4-inch Sanitary Sew�er Service Lines* /"�,[�ia�N7`Y' /�tat� Dollars ! L� /� d and � C� � Cents per LF $�!• C/(�p �.''jr, /!��-�p 1.75 TN DIP Fittings for Water and Sewer ,,i��.es�.tAf'i' �f���dlCJri'�"�� D�llars ! /�" Q �f' �/� � an+� " � " Cents per TPd � /�i (!�� � �l. �!i'�/` l 62 LI' 4-inch DIP Sanitary Sewer Service �� �/ " ����1"! y /'Vl.�f�G� 1)allars I /f"4i and ;-- � f Cents per I.�' �w L- /_ �� $ � •�� 45 LF 8-inch Water Line Adjustment r f�/'il�.�� /`tlld(/C.�il� 6;rf Dollars and '— �' � Cents per LF �5 /��� L/� '�+' 'J. �T~�� 35 LF Concrete Curb and Gutter Replacement � �i.c�f�'frM,�` '�s'' �t�f/J� Aollara ar�a � � '� Cents per I.F` $ �• �Lr �i ����� 856 LF Permanent Asphalt Pavement Repair per Fig. 4 ��1�✓�!T +V �/ L Ff� Dollars and , " � -� Cents per LF � �`'+ �. V � $ ��. +� VI? �/� �� *, ** Contractor must complete City Approved Product & Method form on Page "Part B 1-6". 9654300_Specs_PartB_Unitl.wpd Part B 1-3 U111t 1 PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT ITEM QTY UNIT PRICES WR,ITTEN IN WORDS PRICE `?3. 122 LF Permanent Concrete Pavement Repair per Fig. 1 l�r;�'`r c�l�i�f� pc�l�$rs � 5�S.1J0 anrl '� � Gent� per LF $ � 24. 1G SY 7-inch Concrete Valley Gutter Replacement `L5. 2G. . �f.!/i/ ��.4�� Dollars ♦ / and ""� `�' Cents per SY � li��•�� 64 LF Concrete Driveway and Sidewalk Replacement /��F'..�fJ`)`'Y /`�✓ �� Dollars / qc eslr] `'� � Cents per LF $, sCCJ• �O 1,830 LF Hydromulch Seeding �ir(I'�� Dollars and l���IIT"� /'�"/�� Cents per LF $ !•�t5� r 27. 155 LF Solid Sod Replacement 'l8 AMOUNT BID $ 7,�>6.00 � /, e�'f��'. G'f $ l. ���'.�i�1 $_C1, �// !• c7 � ✓ f l F/� Dollars and — D — Cents per LF $ �0O � �/�• '�� 1,G31 LF Pre-Construction Cleaning and TV I�spection of Sanitary Sewer Line ��% O Dollars and 71� ��lr t',rl�� Cents per LF $,�• �� $"(. 7 17��� � 29. 4,023 LF Post-Construction T' �Inspection of Sanitary Sewer �lV�� Dollars and 1�'/f TY Cents per LF $ � J� / ", ** Contractor must complete City Approved Product & Method form on Page "Part B 1-6". 9654300_Specs_PartB_Unitl.wpd Part B 1-4 UTllt 1 PAY APPROX DESCItIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY UNIT PftICES WRITTEN IN WORDS PRICE gID 30. 25 LF Concrete Encasement /r 1�C.%�O/I�d"1`Y � �/�� Dc�llars r � and " � '� Cents per LF � �/J. VC/ $ ���• �� TOTAL AMOUNT BID UNIT 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . �, ��8� �J������ � NOTE Forward total to Bid Summary Page *� ** Contractor must complete City Approved Product & Method form on Page "Part B 1-6". 9654300_Specs_PartB_Unitl.wpd Part B 1-5 Unit 1 CITY APPROVED PRODUCT AND METHOD FOR * AND ** *CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED Standard Spec No E1-31 ✓ E1-25 E 1-27 E 1-28 E 100-2 Size 4" through 30" 4" through 15" 4" through 15" 18" through 27" 18" through 48" Consult with "City of Fort Worth, Texas Standard Product List" to obtain the Generic/Trade Name and the Manufacturer for the pipes listed above. **CONTRACTOR SHALL SELECT PIPE ENLARGEMENT METHOD TO BE USED AND PROVIDE NAME OF SUBCONTRACTOR FOR INSTALLATION PIM Method � (/� T.R.S. Systein McConnell Method Expanded System Name of Subcontractor if Applicable .�'/��'-.1�.I��r4 Name of Subcontractor if Applicable Name of Subcontractor if Applicable Naine of Subcontractor if Applicable Note: Only tee service connections will be allowed. Failure to provide the information required above may result in rejection of bid as non- responsive. Only products listed above will be allowed for use in this project. Any substitutions shall result in rejection of bid as non-responsive. 9G54300_Specs_PartB_Llnitl.wpd Part B 1-6 UIllt 1 � Within ten (10) days of notification by City, the undersigned will execute the formal contract —. and deliver an approved Surety Bond and such other bonds as required by the Contract � Documents, for the faithful performance of this Contract. The attached bid security in the amount of $ ,S °lo is to become the property of the City of Fort Worth, Texas, in 1 the event the contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has obtained at least one set of the General Contract � Documents and General Specifications for Water Department Projects dated January 1, 1978, ' and that he has read and thoroughly understands all the requirements and conditions of those _ General Documents, and the specific Contract Documents and appurtenant plans. �" The undersigned assures that its employees and applicants for employment and those of any � labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by the City Ordinance No. 7400. 1 The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 110 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. The work order will be issued no later than 90 days after the award of contract. The principal place of business of our company is in the State of Non-resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. The principal place of business of our company or our parent company or majority owner is in the State of Texas. 9654300_Specs_YartB_Unitl.wpd Part B 1-7 Unit 1 � Receipt is acknowledged of the following addenda: Addendum No. 1 (Initials) Addendum No. 2 (Initials) Addendum No. 3 (Initials) Respectfully submitted, l�e���//��� / c �� ��i`G'�''r'� . � $�: _ � _ �. .��.�,��/ � Title: �/'�� � ��'�y`" t t``�l�l�.l'E'.58: r � �!/r f �/1�7'�,//�r ,�-! �.r�� /�x 7� �'� 3 . . ,- Telephone: /,,�" � � �%�� (SEAL) If Bidder is Corporation Date: �( -- �' `� � q'� 9G54300_Specs_PartB_[Jnitl.wpd Part B 1-8 Unit 1 C1-1 C1-1.1 C1-1.2 C1-1.3 C1-1.4 C1-1.5 C1-1.6 C1-1.7 C1-1.8 C1-1.9 C1-1.10 C1-1.11 C1-1.12 C1-1.13 C1-1.14 C1-1.15 C1-1.16 C1-1.17 C1-1.18 C1-1.19 C1-1.20 C1-1,21 C1-1.22 C1-1.23 C1-1.24 C1-1.25 C1-1.26 C1-1.27 C1-1.28 C1-1.29 C1-1.30 C1-1.31 C1-1.32 C2-2 C2-2.1 C2-2.2 C2-2.3 C2-2.� C2-2.5 C2-2.6 PART C - GENERAL TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS DEFINITIONS Definition of Terms Contract Documents Notice to Bidders Proposal Bidder General�Conditions Special Conditions Specifications Bond Contract Plans City City Council Mayor City Manager City Attorney . Director of Public Works Director, City Water Department Engineer Contractor Sureties The Work or Project Working Day Calendar Day Legal Holiday Abbreviations Change Order Pavzd Streets an� Alleys Unpaved Streets and Alleys City Streets Roadway Gravel Street INTERPRETP.TION AND PREPARATION Or PROPOSAL Proposal Form InterprPtation of Quantities Examination of Contract Documents and Site Submitting of Proaosal P.ejection o` Proposals Bid Security (1) CONDITIONS C1-1 C1-1 C1-1 C1-1 C1-1 Cl-1 Cl-1 C1-1 C1-1 C1-1 C1-1 Cl-1 C1-1 C1-1 Cl-1 C1-1 Cl-1 �l-1 Cl-1 C1-1 C1-1 C1-1 Cl-1 C1-1 C1-1 Cl-1 C1-1 Cl-1 Cl-1 CZ-1 C1-1 Cl-1 (1) (1) (2) (2) (2) (2) (2) (2) (2> (3) (3) (3) (3) (3? (3) (3) (4) (4) (4) (4) (4) (4) (4) (4) (4) (5) (6) (6) (6) (6> (6) (6) C2-2 (1) C2-2 (1) C2-2 (2) C2-2 (3) C2-2 (3) C2-2 (3) C2-2,7 Delivery of Proposal C2-2,8 P7ithdrawing Proposals �2-2,9 Telegraphic Modification of Proposals C2-2.10 Public Opening of Proposal C2-2.11 Irregular Proposals C2-2.12 Disqualification of Bidders C3-3 C3-3.1 C3-3.2 C3-3.3 C3-3.4 C3-3.5 C3-3.6 C3-3.7 C3-3.8 C3-3.9 C3-3.10 C3-3.11 C3-3.12 C3-3.13 C3-3.14 C3-3.15 AWARD AND EXECUTION OF DOCUMENTS Consideration of Proposals Minority Business Enterpise Women-Owned Business Enterprise compliance Equal Employment Provisions Withdrawal of Proposals Award of Contract Return oE Proposal Securities Bonds Executio� of Contract Failure to Execute Contract Beginning cvork Insurance Contractor's Obligations Weekly Payroll Contractor's Contract Administration Venue C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4.2 Special Provisions C4-4.3 Increased or Decreased Quantities C4-4.4 Alteration of Contract Documents C4-4.5 Extra Work C4-4.6 Schedule of Operations C4-4.7 Progress Schedules for Water and Sewer Plant Facilities CS-S COtiTROI� OF WORK r`,ND h1ATERIALS CS-5.1 Authority of Engin�er CS-5.2 Conformity with P1ans C�-5.3 Coordination of Contract Documents C�-5.4 Cooperation of Contractor C�-5.5 Emeraency and/or Rectification Work C�-5.6 Fie1d OrLice C5-5.7 Cons�ruction Stakes C�-5.8 Au�i:ority and Du�ies of Inspectors C5-5.9 Ir.spection CS-S.10 Removal of Defective and Unauthorized C�-5.11 Substitute �iaterials or Equipment CS-5.12 �an�les and Tests of Materials C�-5.13 Storace o` Materials C�-5.14 E:cistinc Structur2= and Utilities C�-5.15 T_:�terrupt�o-� o= S2rvice C�-�. � 6 `•'.�����al RE=�or:si�iii �y of Co�tractors `.�-� . 1 % 1:12.=.['UD C�-5.i8 Final Ins���tion C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (5) C3-3 (1) C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 (1) (1) (2) (2) (2> (2> (4) (4) (4) (4) (7? (7) (7) (8) C4-4 (1) C4-4 (1) C4-4 (1) C4-4 (2) C4-4 (2) C4-4 (3) C4-4 (4) CS-5 C5-5 CS-5 CS-S C5-5 C�-5 C�-5 CS-5 CS-5 work CS-5 C5-5 C�-5 C�-5 C�-5 C�-5 C�-S CS-5 C�-� (1) (1) (2) (2) (3) (3) (3) (4) (5) (S) (S) (6) (6) (7) (7> (8) (8) (9) 1 f_J � � � 1 ' (?l � � � � � � C � C6-6 C6-6.1 C6-6.2 C6-6.3 C6-6.4 C6-6.5 C6-6.6 C6-6.7 C6-6.8 C6-6.9 C6-6.10 C6-6.11 C6-6.12 C6-6.13 C6-6.14 C6-6.15 C6-6.16 C6-6.17 C6-6.18 C6-6.19 C6-6.20 C6-6.21 C7-7 C7-7.1 C7-7.2 C7-7.3 C7-7.4 C7-7.5 C7-7.6 C7-7.7 C7-7.8 C7-7.9 C7-7.10 C7-7.11 C7-7.12 C7-7.13 � C7-7.14 � C7-7.15 C7-7-. 16 C7-7.17 � � ' LEGAL RELATIO:�S AND PUBLIC RESPONSIBILITY Laws to be Observed Permits and Licenses Patented D�vices, Materials and Processes Sanitary Provisions Public Safety and Convenience Privileges of Contractor in Streets, Alleys, and Right-of-Way Railway Crossings Barricades, Warnings and Watchmen Use of Explosives, Drop Weight, etc. w'ork within Easements Indep=ndent Contractor Contractor's Resoonsibility for Dana�e Claims Contractor's Claim for Damages Adjustm�nt of Relocation of Public Utilities, etc. Terr.porary Sewer Drain Connections Arrangement and Charges of Water Furnished by City Use of a Section of Portion of the Work Co�tractor's Responsibility for work No Waiv�r of Legal Rights Personal Liability of Public Officials State Sales Tax PROSECUTION ANB PROGRESS Subletting Assignment of Contract Prosecution of the Work Lirr,itations of Operations Character of workman and Equipment �rork Schedule Tin� of Com.mencement and Completion Ext�nsion of time of Completion D�lays Tim� oF Completion Suspension by Court Order Te�nporary Suspension Ternination of Contract due to �ational Emergency S�is��nsion of �bandonment of the w�ork and F.nnulm�nt of Contract Fulfillment of Contract Ternination for Convenience of th� Onwer Safety Methods and Practices C8-8 M.= =:SURE���NT AtiD PIyYi•lEh i C8-8.1 til�asure:n�nt of Quantities C8-8.2 Uni� ?�ices C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 (3) (4) (4) (S) (6) ca> (S> (10) (10) (10) (1) (1) (1) (2) (2) (3) (4) (4) (4) (5) (6) (6) C7-7 (7) C7-7 (7) C7-7 (9) C7-7 (10) C7-7 (13? C8-8 (1) Ca-8 (1) (3> � CS-8.3 C8-8.4 C8-8.5 C8-8.6 C8-8.7 CS-8.8 CS-8.9 C8-8.10 C8-8.11 CS-8.12 C8-8.13 Lump Sum Scope of Payment Partial Estimates and Retainage Withholding Payment Final Acceptance Final Payment Adquacy of Design General Guaranty Subsidiary Work Miscellaneous Placement of Material Record Documents (4) CS-8 (1) C8-8 (1) C8-8 (2) CS-8 (3) C8-8 (3> C8-8 (3) C8-8 (4> C8-8 (4) C8-8 (5) C8-8 (S> C8-8 (S) �� � PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1.� DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are used, the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents, such as specifications, bonds, addenda, olans, etc., which govern the terms and perfornance oF the contract. These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A- NOTICE TO BIDDERS (Sample) White � PART B - PROPOSAL (Sample? White PART C- GENERAL CONDITIONS (CITY> Canary Yellow � (Developer) Brown ^ PART D- SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White � E2-Golden Rod E2A-White � PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White � � b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Docum�nts and include the following items: PART A- NOTIC E TO BIDDERS (Advertisem�nt) Same as � above _ PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS � PART E - SPECIFICATIONS PERMITS/EASEMENTS � PART F � BONDS PART G - CONTRACT P�RT H PLANS (Usually bound separately) , � Cl-1 (1) 1 t_1 � �' C1-1.3 NOTICE TO BIDDERS: All of the legal publications ,_ either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work �" contemplated under the Contract Documents constitutes the notice to bidders. P C1-1.4 PROPOSAL: The completed written and sianed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and rea3 and not rejected by the Owner. � C1-1.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through � a duly authorized representative, submitting a proposal for _ perforning the work contemplated under the Contract Documents, constitutes a bidder. � � C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern t�e performance of the work so that it will be carried on in � accordance with the customary procedure, the Iocal statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. r Wherever there may be a conflict between the General Conditions and Special Conditions, the latter shall take -. orecedence and shall govern. 1" C1-1.7 SPECIAL CONDITIONS: Special conditions are the specific reauirements wnich are necessary for �he particular � project covered by the Contract Documents and not specifically covzred in the General Conditions. Wtien considerea with the veneral Conditions and other elements of the Contract � Documents they provide the information whicn the Contractor and Owner should have in order to gain a thorough knowledge of the project. � C1-1.8 SPECIFICF.TIONS: The Specifications is tnat section or part of the Contract Docu�ents which sets forth in detail the requirements which must be met by all materials, con5truction, �" work�anship, equipment and services in order to render a �.. com�leted and useful project. Whenever referencz is made to standard spacifications, regulations, requirenents, statutes, � etc., such referred to docunents shall become a oart of the �, Contrac� Docu��nts just as tho��gh they were e��odi�� tn�rein, �C1-1.� BO`ID: Tne bo�d cr bon5s ar2 tha •.�=:`�e�: :�.:arantee or f securi�v �ur:�isnec bv r.'r�e Co.^.tractor for the ��o�pt and � � C1-1 (2) � faithful performance of the contract and include the following: a. Performance Bflnd (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3.7) c. Maintenance Bond (see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bi3ders, Part A and C2-2.6> C1-1.10 CONTRACT: The Contract is the formal sign�d agreement b2tween the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's represent3tive showing in detail the location, dimension and position of the various elements of the oroject, including such profiles, typical cross-sections, layout diagrams, working drawings, oreliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents, but they are a part of the Contract Documents just as though they were bound therein. C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corooration, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its City hlanger, each of which is required by charter to perform specific duties. Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1.13 CITY COUNCIL: The duly elected and qualified aoverning body of the City of Fort Worth, Texas. C1-1.14 MAYOR: The officially elected Mayor, o� in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. C1-1.16 CZTY ATTORNEY: The officially appointed City Attorney of the City of Fort worth, Texas, or his duly authorized representative. Cl-1 (3) , � �� C1-1.17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, reFerred to in the Charter as the City Engineer, or his duly authorized representative. C1-1.18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed � Director of the City Water Department of the City of Fort Worth, Texas, or his duly authorized reoresentative, assistant, or agents. C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to th�m. C1-1.20 CONTRACTOR: The person, persons, oartnership, company, firm, association, or corporation, entering into a contract with the Owner for tne execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and aoproved changes ther2in. C1-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limit�d to the furnishing of all labor, naterials, tools, e�uipnent, and incidentals necessary to produce a completed and serviceable project. C1-1.23 WORKING DF,Y: A working day is defined as a calendar day, no� including �aturdays, Sundays, and legal holidays, in which the weath�r or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7) hours between 7:00 a.r-i, and 6:00 p.m.. , with exceptions as permitted in paragrapn C7-7.6. C1-1.24 CALENDF�R DAYS: � calendar day is any day of the wee�C or month, r.o days being exc?ote3. C1-1.25 LEG-.L 'r:OLIDFY5: i�cal holidays s:��11 O� o'�ser�ec as �=c5�_'_...�.... :�:r `f:_ C1�.�' �C',1r:C11 Oi the Cltb' O� CO_L i'�Or�`..fl fOr 00��_ V�c':�� �': C1 ��' E:�'.�� OV?�S d5 �O� ZO'rIS : C�-'_ (�) 1. 2. 3. S. 5. 6. 7. 8. 9. hew Year's Day January 1 M. L. King, Jr. Birthday Third Monday in January Memorial Day Last Monda-y--in May Independence Day July 4 Labor Day First Monday in Se�tem�er Thanksgiving Day Fourth Thursday in November Thanksgiving Friday Fourth Friday in November Christmas Day December 25 Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council, falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following ;�Ionday, by those employees working on working day operations. Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1.26 ABBREVIATIONS: Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: ?�ASHTO - Amzrican Association of MGD - Million Gallons Per State Highway Transportation Day �fficials ASCE � American Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With ASTM - A.�n�rican Society of Min. - Minimum Testing Materials Mono.- Monolithic Ai^�rvA - A.�erican hatar Works $ - Percentum Association R - Ra3ius ASA -- Amarican Standards Association I.D. - Inside Diameter HI �- Hydraulic Institute O.D. - Outside Di3meter Asp`�. - As�halt Elev.- Elevation Ave. - Avenue F - Fahr2nheit 31v3. - B�ulevard C � Centigrade CI - Cast Iron In. P Inch CL - Center Line Ft. � Foot GI - Galvanized Iron St, - Street Lin. -- Linear or Lineal CY - Cubic Yard lb. - P�und Yd, - Yard Mci - t�Sanhole SY � SQuare Yard Max. - Maxi*�un L.F. - Linear Foot D.I. - Ductile Iron C1-1 (5) � � � .� � � �r. C1-1.27 CHANGE ORDER: A"Change Order" is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature w:�ich may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25$ of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shali be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment, not including an oiled surface, with or without separate bas2 material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. S. Any combination o€ the above. C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, a11ey, roadway or other surface is any area except those defined above for "Paved Streets and A11eys." C1-1.30 CITY STREETS: A city street is defined 2s that area between the right-of-way lines as the street is dedicated. C1-1.31 ROADWAY: ►� parallel lines two � (�') feet back of exists. ., � , � The roadway is defined as the area between (2') feet back of the curb lines or four the ave� age edge oF pave�nent where no curb C1-1.32 GRAVEL STREET: �: gravel street is any unpaved street to wnich has bezn add�d one or more applications of gravel or similar material other than the natural material found on the street surface beEore any i:,iorovenent was made, CL-1 (6) � � [_� SECTION C - GENERAL CONDITIONS � C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL �� SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C�-2.1 PROPOSAL FORM: The Owner will furnish bidde�s with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requeste3. The Progosal forrr. will state the Bidder's general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial Statement," a11 of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an indep�ndent certified public accouritant or an independent public accountant holding a valid permit issued by an appro�riate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statemen� must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification, Liquid assets in the amount of ten (10�) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given p�oject, it must reflect the experience of the firm seeking aualification in work of both the saT�e nature and nagnitude as that of the project for which bids are to be received, and such experience mus`. have been on projects completed not more than five (5) years prior to the date on which are to be received. The Director o� the i�ater departm�nt shall be sole judge as to the acceptability of expe�rience for qualification to bid on any For� Worth Water Department oroject. The prospective bidder shall schedule the equipment he has available for the project and state that h� will rent such additional equipment as nay be required to complete the projec� on wnich he submits a bid. C2-2.2 INTERPRETATIOti OF QUANTITIES: in� quan�.�ties of work anc ,::at=: ials to b� furnishe� as na�• b� listed ir. �he proposal C2-2(1) � � forms or other parts of the Contract Documents will be considered as approximate only and will be used for the � ourpose of comparing bids on a uniform basis. Paym�nt will be made to the Contractor for only the 3ctual quantities of work � performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities �f work to be � performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way '�" invalidating the unit prices bid or any other requirements of �y the Contract Documents, � C2-2.3 EXAh1INATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. A11 additional information and data which � the owner will supply after promulgation of the formal � contract documents shall be issued in the form of written addenda and shall become part oE the Contract Docum2nts just " as though such addenda were actually written into the original �, Contract Documents. � Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions, to inform themselves by their own independent � research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of th2 conditions which will be encountered during the construction of the project. Th�y must judge for themselves t'�e � difficulties of the work and all attending circumstances affecting th� cost of doing the work or the time re�ui�ed for � its completion, and obtain a11 information requirea �o make an intelligent proposal. No information given by the Owner or �' any representative of the Owner other than that contained in the Con�ract Documents and officially promulgated addenda "�' the.-Ato, shall �e binding upon the Owner, Bidders shall rely �; exclusively and solely upon their own estimates, investigation, research, tests, ex.plorations, and other data � which are necessary for full and com�let? inforc,ation upon w•�ich the proposal is to be ba5�d. It is mutually ayr�?d that the submission of a pr000sal is prima-Facie evidence tnat the � bidder has r�ade the investigations, exaninations and tests herein reQuired. Claims for additional compensation due to �- variations between conditions actually encoLntered in construction and as indicated in the Contract �oc�ments will �` not be allowe3. T�e iogs oF Soil Bo=i^cs, if anv, sho�;ina on the plans ar� for � C2.^.2'_"c�l 1.^.i0!"�.?�.10:1 C::lr Z.^� !i:?�' I10� }J� CO�rE^�, t.�:"1�r the L'_{ �2-2�2) 1 Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2.4 SUBMITTING OF PROPOSA�:-•- The Bidder shall submit his Proposal on the form furnished by the Owner. Al1 blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state �he price�, written in ink in both words and numerals, for which he proposes to do t�� work contemplated or furnishz the materials required. All such prices shall be written leyibly. In case of discreoancy b�tween the price written in words and the price written in numerals, the price �ost advantageous to the City shall govern. IL a proposal is submitted by an individual, his or her name nust be signed by him (n�r) or his (her) duly authorized agent, If a proposal is submitted by a firm, association, or partnership, the name and address of each nember must be given, and the proposal must be signed by a member of the firm, association, or partnership, or by a person duly authorized. If a proposal is submitted by a company or corooration, the compan.y or corporate name and business address �ust be given, and the proposal signed by an official or duly au�horized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign pro�osal ��ust be properly certified and must be in writing and submitted with the proposal. C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for alternate bids, incomplet� bids, erasures, or irregularities of any kind, or contain unbalance value of any items, Proposal t2ndered or celivered after the official time designated for receipt of proposal s�all b? returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accom�anied by a"Proposal Security" of the cnaracter an3 in the an�unt indicated in the "Notice to Bi�ders" and the "Pr000sal." The Bid Security is reauired by tne Owner as evidence o� good faith on the part of the Bidder, and by way of a guaranty that iF awarded the contract, the Bidder will within the required time execute a formal contract and furnish the re�uire3 o�rfornance and other bonds. Th� �id security of the three lowest bidders will be retained until the contract is awarde� or oth=r disposition is made thereof. The bid security or all other bidd�rs may be returned promptly after �he canvass o� bids. C2-2(3) � � � C2-2.7 DELIVERY OF PROPOSRL: No proposal will be considered R"' unless it is delivered, accompanied by its proper Bid _ Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to -- Bidders." It is the Bidder's sole responsibility to deliver � the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidd�r must have the proposal actually delivered. Each � proposal shall be in a seale3 envelope plainly marke3 with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be � addressed to tne City hianager, City Hall, Fort Worth, Texas. � � � � , � � C2-2.8 WITf:DRAhING PROPOSALS: Proposals actually filed with the City Manag2r cannot be withdrawn prior to ths time set for ooening proposals. A reauest for non-consideration of a pr000sal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been proQerly filed m�, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set Eor opening proposals, provided such telegraphic co.�,municatio:� is received by the City Manager prior to the said proposal opening time, and providzd further, that the City Manager is satisfied that a written and duly authenticGtAd conf irmation of such telegraphic co�;��nunication over the signature of the bidder was mailed prior to the proposal opening time. If such conEirmation i� r.ot received within forty-eicht (�8) hours after the proposal op�ning time, no further con=ideration will be aiven to the propos�l. C2-2.10 PUBLIC OPENING OF PROPOSP.I,: Proposals wnicn have been properly fiied and For which no "No:�-consideratio:� Request" has �ee� received will be publicly opened and re�d aloud by the Cit<< rianace� or his authorize� reoresentative �t the tir�,e and olace indicated in the "Notice to Bidders." F.11 proposals which have b�en o�ened and read will rernain on file with the Owner until the contract has been awarded. Bidders or their authorized re�resentatives are ir.vited to be oreser.t for the openina of bids. � C2-2,11 ?R��G:;�r� PROPOSe:LS: Pro�asals shall be co^siderzd as b�ir;_ "�:��=_i1,�r'� 1� t�lE'; ":C'� dR;� O(.^.1SSlOf1S� �lt.c_2�?OC15 Of _C_.. � zG...- --Q..: � C'_" COi.C,_ =�0�:� ..C.. C�.� 1_� i0'_" � L::i?'1��'iOL"1Z�Q a'_�e�,.=_..� �ic=, c� __re��i=_.. i�_e= o` a�y kina. ro•w���er, the ��_-s��� 1 Owner reserves the right to waive any and all irregulariti?s and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waive3. C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be disqualified and their proposals not considered fcr any of, but not limitzd to, th� following reason: a. Reasons for believing that collusion exists among bidders. b. Raasonable grounds ror believing that any bidder is int�rested in more than one proposal For work contem�lated. c. Tne bidder b2ing interest2d in any litigation a�ainst the Owner or where thz Owner may have a claim against or be engaged in litigation against tne bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f, Lack of competency as revealed by the financial statement, experience record, equipment schedule, and such inquiries as the Owner may see fit to make, g. Uncompleted work which, in the judgment of the Ownzr, will prevent or hinder the prompt completion or additional work if awarded. h. The bidder not filing with the Owner, one week in advance of th2 hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as speciried in Part "A" - Special Instructions. 2. A current experience record showina es�ecially the Frojects or a nature similar to the one under consideration, which have been successfully completed by the Bidder. 3. An eQuipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder w'�o, in the judgn�nt of the Engineer, is disaualified under the requirements stated herein, shall be set aside and not opened. C2-2(�) PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: ,�. C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the �- basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other � methods of bringing items to a common basis as may be established in the Contract Documents. � The total obtained by taking the sum of the products of unit prices quoted an3 the estimated quantities plus any lump sum `J items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of � the bid. Until the award of the contract is rr.ade by the Owner, the �'" right will be reserved to reject any or all pr000sals and _, waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for �, the best interest of the Owner. �"' C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, r upon request, complete and accurate information regarding �� actual work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE) on the �; contract and the paynent therefor. Contractor further agrees, upon request by Owner, to allow and audit and/or an exanination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed � by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or � local laws and ordinances relating to false statements; .� further, any such misrepresentation may be grounds for disqualification of Contractor at Owner's discretion for ^ bidding on future Contracts with the Owner for a period of � tim� of not less than six (6) months. � C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall co�ply with Current City Ordinance prohibiting discrimination in er�;�loym�r.t practices. C 1 C3-3 (1) C� � ' The Contractor shall post the required notice to that effect � on the project site, and, at his request, will be provided assistance by the City of Fort Worth's Equal Employment Offic2r who will refer any qualified applicant he may have on � file in his office to the Contractor. AQpropriate notices may .� be acquired from the Equal Employment Ofiicer. ._ C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been � read by the Owner it cannot be withdrawn by the Bidder within forty-five (45) days after the date on which the proposals were opened. � C3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time, � not to exceed forty-five (45) days after the date of opening proposals, and in no event wi11 an award be made until after `"' investigations have been made as to the responsibility of the _, proposed awardee.. � The award of the contract, if an award is made, wi11 be to the lowest and best responsible�bidder. The award of the contract shall not become effectiv2 until the Owner has notified the Contractor in writing of such award. I'^ C3-3.6 RETURN OF PROPOSP.L SECURITIES: �s soon as proposed ' price totals have been determined for comparison of bids, the ,� Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would �•• not be considered for the award. All other oroposal securities, usually those of the three lowest bidders, will be � retained by the Owner until the reQuired contract has been executed and bond furnis:�ed or the Owner has otherwise cii�oosed of the bias, after wnich they will be r�turned by the � City Secretary. " C3-3.7 BONDS: with the execution and cielivery of the Contract Documents, the Contractor shall furnish to, and file with the � Gwner in the amounts h�rein reauired, the follo�wing bonds: a. PERFORMANCE BOND: A good and sufFicient wr+ performance bond in an amount no� less than 100 � percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, � guaranteeing the fu11 and faithful execution of the wor�c and p�rfoYc�ance of the contract, and for the �' protection of the Owr.er and all otner persons a��i�st ca��g2 b� reason o� r.egl icer:ce of the � �.O':�?'dC�Or, O_ 1�.,_�L'O�cr �X�?Cll`.lOri O� L.'l2^WOrn OL th� ;�se o� � ^��rio- ^at��ials. This ��r�orr�ance � ..- J � � � � bond shall guarantee the payment for all labor, materials, equipment, supplies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated ar2 accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND: A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the pronpt, full and faithful perfor�ance of the general guaranty which is set forth in paragraoh C8-8.10. c. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959, effective April 27, 1959, and/or the latest version thereof, suoplying labor and materials in the prosecution of the wor� provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until all payments as above stipulate3 are made. d. OTHER BONDS: Such other bonds as nay b� required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the tim= in default or delinquent on any bonds or which are interested in any litigation against the owner. A11 bonds sha11 bz made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City o� rort Worth, Texas, and which is acceptable to the owner, In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the a�ount of bond written by any one acceptzble company sha11 not exceed the amount shown on the Treasury list for that company. Each bond shall be properly execu�ed by both the Contractor and Surety Company. Shoula anv surety o� the contract be d�termined unsatisfactory at any `.ir�.� b�• tne Owner, notic� will be giver. the Contractor to tha� e��ect and th� Cor.tractor shall imT��c�at2ly provide a C3-3 (3) �. � � new surety satisfactory to the Owner. No payment will be made r' under the contract until the new surety or sureties, as � required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be -� due or paid until aoproval of the bonds by the Owner. � C3-3.8 .EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the �contract, the Contractor shall execute and file with the Owner � the Contract and such bonds as may be required in the Contract Documents. . No contract shall be binding upon the owner until it has been attested by the City Secretary, approved as to form and �.. legality by the City Attorney, and executed for the Owner by � either the Mayor or City Manager. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the � Awardee to execute the required bond or bonds or to sign the required contract within ten (10) days after the contract is awarded shall be considered.by the Owner as an abandonment of � his proposal, and the Owner may annul the Award. By reason o� ' the uncertainty of the market prices of material and labor, j and it bei:�g impracticable and difficult to accurately .., determine the amount of damages occuring to the Owner by reason of said awardee's failure to execute said bonds and � contract within ten (10) days, the proposal security accomoanying the proposal shall be the agreed amount of � damages which Owner will suffer by reason of such failure on the part of the Awar3ee and shall thereupon immediately be forfeited to the Owner. ' The filina of a proposal will be considered as an acceptance of this provision by the Bidder, � C3-3.10 BEGINNING WORK: The Contractor shall no` commence work until authorized in writing to do so by the Own2r. Should the Contractor fail to commence work at the si�e of the �" oroject within thA time stipulatPd in the written _ authorization usually termed the "Work Order" cr "Proceed Order", it is aareed that the Surety Company wi11, within ten -- (10) days after the commence�nent date set forth in such � written authorization, co:run�nce the physical execution of the contract. � C3-3.?1 INSURANCE: Tne Contractor shall not co:�m2nc? work �ncer this contract until he :�as obtained all th= insurance r�cuir�d un�er the Cont=act Documents, and such izsurance has � „�._'�1 Z��rO'.'c3 D�' �;1? O;,'fler. Tfl�? Drl�i'.4? Contrac�0: �I:dll b? `?���.^.�1�� = �c� deliveri:lC t0 t"]2 �'wR�r ��'1e S�:C-C�,^.�'_''�C�OrS� -�, � C3-3 (4) ' certificate of insurance for approval. The prime contractor shall indicate on the certificate of insurance included in th? documents for execution whether or not his insurance covers sub-contractors. It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub-contractors. a. COMPENSATION INSURANCE: The Contractor shall �aintain, during the life of this contract, Workers' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected und�r the Workers' Compensation Statute, the Contractor shall provide adequate employer's generat liability insurance for the protection of such oi his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of. this con�ract Contractor's Comorehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $500,000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $500,0�0 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. c. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-l�entioned policies, and in the amount as set rorth for public liability and property damage, the following insurance: 1. 2. 3. � Contingent Liability (covers General Contractor's Liability f�r acts or sub-contractors). Blasting, prior to any blasting being done. Collapse of buildings or structures adjacent to excavation (if excavations are to be performed adjacent to same). Danage to underground utilities for $500,000. C3-3 (�) S. 6. Builder's risk (where above-qround structures are involved). Contractual Liability (covers all indemnification requirements of Contract>. d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain, during the life of this Contract, Comorehensive Automobile Liability insurance in an amount not le.ss than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 on account of one accident, and automobile property damage insurance in an amount no� less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub-contractors, respectively, against damage claims which may arise from operations under this contract, whether such operations be by tha insured or by anyone directly or indirectly employed by him, and also against any of the following soecial hazards which may be encountered in the performance of the Contract. f. PROOF OF CAP.RIAGE Or INSURANCE: The Contractor sha11 furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner. (Sample attached.) A11 insurance requirements made upon the Contractor sha11 apply to the sub-contractor, should �he Prime Contractor's insurance not cover the sub-contractor's wor;� operations. c�, LOCP.L AGENT FOR INSURANCE RND BONDING: The � �nsurance and bonding companies with whom the Co;:tractor's insurance and p�rformance, payment, nain�enance ana all such other bonds are written sha11 �� raoresented b;� an agent or a�e:�ts having ZI: OL�_,�� �O�d�GQ '.r'lt�'1'_i. �.ii? (..1�.V' I1�? `,.S Oi tC12 C3-3 (6) City of Fort Worth, Tarrant County, Texas. Each such agent shall be a duly oualified, one upon whom service of process may be had, and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, any claims that the City of rort Worth or other claimant or any property owner who has been damaged, may have against the Contractor, insurance, and/or bonding company. If the local insurance representative is not so em�ow�red by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth-Dallas area. The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. C3-3.12 CONTRACTOR'S OBLIGATIONS: Under tl�e Contract, the Contractor shall pay for all materials, labor and services when due. C3-3.13 WEEKLY PAYROLL: A certified cooy of each payroll covering payment of wages to all person engaged in work on th� project at the site of the project shall be furnished to the Owner's representative wit�in seven (7) days after th? close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of tre project at all times during the course of the Contract. Copies or the wage rates wi11 be furnished the Contractor, by the Owner; however, pos�ing and protection of the wage rates shall be �he responsibility of the Contractor. C3-3.14 CONTRACTOR'S COtiTRACT ADt•IINISTRATION: Any Contractor, whether a person, p�rsons, partnership, cor-,oany, firm, association, corporation or other who is approved to do business with and ent�rs into a contract with the City tor construction of water and/or sanitary sewer facilities, wi11 have or shall establish a fully oo�ra�ional business office within the Fort worth-Dallas metropolitar� area. The Contractor shall charg?, delegate, or assign this office (or he nay delegate his Project Superintendent) with full authority to transact a11 business actions reauired in the oerformance of the Contract. This local authority shall be crad� responsible to act ror tt�e Contractor in all matters pertai.^.ing to the work governe3 by the Contract whether it b� administrative or other�.�ise and as such shall '�� empowered, trlll5 Q2� �^yZt.2� cRCl CI1'_'?Ct.�a� `O S�`.t.l� �� 1 fitdt.?:ld]., labor Oi other ex�e:�3ituT-e�, all clzir�s aaainst the work or any other C3-3 (7) � � matter associated such as maintainin ade uate and a ro riate 9 q PP P insurance or security coverage for the project. Such local � authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. � Should the Contractor's principal bas� of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor's a�signment of local authority shall be � made in writing to the Engineer in advance of any work on the project, all aopropriately signed and sealed, as applicable, by the Contractor's responsible officers with the �" understanding that this written assignment of authority to a 1.. local representative shall become part of the project Contract as though bound directly into the project documents. The � intent of these requirements is that all matters associated with the Contractor's administration, whether it be orient2d in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and � surety coverage. Should the Contractor's local representative Fail to perform to the satisfaction of Engi�eer, the Engineer, at his sole discretion, may deinand that such local � representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of �working time will be for periods in which work stoppages are � in effect for this r2ason. � C3-3.15 VENUE: V�nue of any action hereinunder shall be exclusively in Tarrant County, Texas. C� [� 1 1 1 1 e c_-� �a� ' ' PART C - GENERAL CONDI'TIONS � C4-4 SCOPE OF StiO�K SECTION C4-4 SCOPE OF WORK C4-4.1 INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these Contract Documents to provide for a cor,plete, useful project which the Contractor undertakes to construct or furnish, all in full compliance with the recruirements and intent of the Contract Docun2nts. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do a11 extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. Th� Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment, special services, and incidentals necessary to the prosecution and completion of the project. C4-4.2 SPECIAL PRGVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "Special Provisions" cov�ring a11 such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. A11 such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4.3 INCREASED OR DECREASED QUANTITIES: Th� O�:aer reserves the right to alter the quantities of the work to b� performed or to extend or shorten the improvernents at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increas�d or decreased at the unit prices. Such increased or decreased quantity sha11 not be �ore than 25 percent of the contemplated quantity of such it�n or items. When such changes increase or decrease the origin=_1 quantity of any i�em or iter-�s of work to be done or materials to be furnished by the 2� percent or more, then either party to the contract shall upon written request to the oth�r party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original auantity statec in the proposal; such revised consideration to be de�err�ined by special agreement or as hereinaiter �rovided for "Ex�ra korK." tvo allowance will be made for an�• changes in a::�ici�a�e� p�oFi�s nor s:;a11 such changes be c�� sid�red as L_� � waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth �categories, shall be interpr�ted herein as applying to the ' overall quantitiPs or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or auantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, orovided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considere3 as waiving or invalidating any condition or orovision of the Contract Documents. C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or apnroved additions thereto; provided, however, that before any extra work is begun a"Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. D. Unit bid price previously approved. An agreed lump sun. c. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so use� at ?�ssociated General Contractors of Ar,ierica current equioment rental rates; (3) materials entering permanently into the project, and (4) actual cost of insurance, bonds, znd social security as det2rmined by the Owner, plus a fixed fe� to be agreed u�on but not to excee::� 10� of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of eauipment owne^ by him and Lsed for th= extra work. Th� fee shal? be full and cor,olete compensation to cover the co5t of su��rintendence, over:�ead, other pro=it, general a n� a 11 othe r�x.��;�s? no`_ � r.cluded � n ( 1), ( 2), ; � ) , ar.� ( � ) ����,•�. 'i'i-» Ccntractor �hall keep �.^.Cl_`rz�._ COS`� ?"2COYCS O."l t:i� iOi�T, c�f1� _r; t.rl� I�1�t}'lOQ C-�t-y � Z � suggested by the Owner and shall give the Owner access to all accounts, bills, vouchers, and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra �'ork of any kind will be allowed unless ordered in writing by the Owner. In case any ord�rs or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive comoensation, he shall make written request to the Engineer tor written orders authorizing such Extra Work, prior to beginning such work. Should a difference arise as to what does or does not constitute Excra Work, or as to the payment th�reof, and the Engineer insists upon its performance, the Contractor sha12 proceed with the work after making written request for written orders and shall keep an accurate account or the actual reasonable cost thereof as provided under method (Item C). �laims for extra work will not be pai3 unless the Contractor sha11 file his claim with the Ownzr within five (5) days before the time for making the first estimats after such work is done and unless the claim is supported by satisfactory voucners and certified payrolls covering all labor and materials expended upon the said Extra Work. Tne Contractor shall furnish the Owner such installation — records of all deviations fro� the original Contract Documents � as may be necessary to enable the Owner to prepar� for p�rmanent record a corrected set of plans showing the actual installation. Tne comp�nsa�ion agreed upon for 'extra wor�' whether or not iniitiates b}- a'change order' sha11 be a full, conplete and final payment Eor all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that tin=, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any othzr effect on changed or uncnang�d work as a r?sult or the cnanga or extra work. C�-�.6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor snall submit to the Owner and receive the Owner's approv�l thereof, a"Schedule of Operations," showing by a straight line method �he date of cor.�;�encinc ar,a finishing each of the major elemants of the contract. ���re s�a11 be also shown the estimated monthly COj� O� w'��� =0� H71C� eS�l���t�5 2r� t0 bA eX��C�2d. Tner� 1 � shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage oF completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furn.ished to the Owner. C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT i FACILITIES: Within ten (10) days prior to submission of first monthly progress payment, the Contractor shall prepare and submit to the Owner for approval six copies of � the schedule in which the Contractor proposes to carry on the work, the date of which he will start th� several major activities (including procurement oE materials, plans, and � equipment) and the contemplated dates for completing the ' same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the dia3ram the � actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any �adjustments in contract time approved by the Engineer. ' Three copies of the updated schedule shall be delivered at such i;�tervals as dir�cted by the Owner. � As a;ninimum, the construction schedule shall incorporate a11 work elements and activities indicated in the proposal and in the technical specifications. �, Prior to the final drafting of the detailed construction schedul?, the Contractor shall review tne draft schedule � with the E�gineer to ensure the Contractor's understanding � of the contract requirFments, The following guid?lines shall be a3h�red to in preparing t��e constructicn schedule: a, �!ilestor.e dates and final project co,�.pletion � cates shall be developed to conForm to time constraints, seauencing r�auirer,��r.ts and comoletion time. b, - The construction process shall be divided into ��tivities with time durations oL aporoximately �ourteen (14) days and construction valu�s not to ex,ceed $50,C00. r^aorication, deliv�ry and subr.it�al activities ar� exceptions �o this c�idelin�, � � ' c. Durations shall be in calendar days and normal holidays and weather conditions over the duratio� of the contract shall be accounted for within the duration o£ each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start 3ate and the latest start date of a chai� of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of ap�roximately fourteen (14) days duration. For each general category, the construction schedule shall identify a11 trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts, the construction schedule shall indicate the following procurements, construction a�d preacceptance activities and events in their logical sequence for equipment and matsrials. l. Preparation an3 transmittal of submittals. 2. Submittal review periods. 3. Shop fa�rication and delivery. 4. Erzction or installation. 5. 6. 7. 8. Transmittal of manufacturer's operation and maintenance instructions. Installed equipment and materials testing. Owner's o�erator instruction (if aoplicabl�). Fin�l insa�ction. C4-� (�) � � 9. Ooerational testing. 10. Final inspection. � If, in the opinion of the Owner, work accomplished falls � behind that scheduled, the Contractor shall take such action as necessary to improve his progress. In addition, � the Owner may require the Contractor to submit a revised �„ schedule demonstrating his program and proposed plan to nake up lag in scheduled orogress and to insure com�letion � of the work within the contract time. If the Owner finds the proposed plan not acceptable, he may require the Contractor to increase the work force, the construction plant and e�uipment, the number of work shifts or the � overtime o�erations without additional cost to the Owner. Failure of the Contractor to comply with these reauirements sha11 be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. iI I� , L__.' , ' ' e �.�_� �E� � PART C - GENERAL COhDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION CS-S CONTROL OP WORK AND MATERIALS C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all qu=stions which arise as to the quality and acceptability of materials furnished, work performed, rate of progress of the work, overall se�uence of the construction, interpretation of the Contract Documents, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible for Contractor's means, methods, techniques, sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the contract documents. He shaZ1 determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to th= right of the Contractor to receive money due him under the Contract. The Owner shall hays executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, within a reasonabl� time, upon written reauest of the Contractor, render and deliver to bcth the Owner and Contractor, a written decision on the matter in controversy. C5-5.2 COtirORMITY hITH PLANS: Tne finished project in all cases shall conform with lines, grades, cros�-sections, finish, and dimensions shown on the plans or any other requirem�nts otherwise descri�ed in the Contract Documents. Any deviation from the approved Contract Docum�nts required by the Engineer during construction will in a11 cases be determinec by the Engineer and authorized by the Owner by Cnange Ord��. C�-5 (1) C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract � Documents are made up of several sections, which, taken together, are intended to describe and provide for a complete and useful project, and any requirements appearing in one of �„ the sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall ' govern over scaled dimensions, plans shall govern over specifications, special conditions shall govern ovzr general conditions and standard specifications, and quantities shown �+ on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage oE any appar�nt error � or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the � Contract Documents. In the event the Contractor discovers an apparent error or discrepancy, he shall imm�diately call this - condition to the attention of the Engineer. In the event of a conflict in the drawings, snecifications, or other portions of ^" the Contract Documents which were not reported prior to the �„ award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution oF the conflict. � C5-5.4 COOPERATION OF CONTRACTOR: The Contr�ctor will be furnished with tl�ree sets of the Contract Documents and shall � have available on the sit? of the project at a11 times one set of such Contract Documents. The Contract shall giv� to the work the constant attenti�n �necessary to facilitat� the orogress thereof and shall ' cooperate with the Engineer, his inspector, and other Contractors in every possiule way. � Tne Contractor shall at all tirnes have competent ��rsonnel "' available to tne project site for proper performa�ce of the � work. The Contr3ctor snall provide and mai:�tain a� all times at the site of the project a competent, English-speaking � superintendent and an assistant who are fully authorized to act as the Contractor's agent on the work. Such sugerintendent and his assistant shall be capabl� o� reading � and und�rstanding the Coatract Docum�nts and saall rece=vE and fulfill instructions from tne Owner, the Engin�er, or his � authorized reuresentatives. Pursuant to this respo�sibility of the Gontractor, the Contractor shall designate in writing "' to the project superintendent, to act as the Contractor's ... agent on the work. Such assistant project superintendent sha11 be a resid�nt of Tarrant County, Texas and shall be � subjec�. ta cai1, Gs is the project Su��rintend?^�, a� any time c` th� ca_: or nicht o� a�v 6a�� of th� wee:� or. w�-�ich the � `�'•C�'.�?c� `F _�:.`_.,? ` ���3= �'_'_�Ct_'i:'.��Zi:CCJ rc _lllr` �.:}= : ��j?C!C2 O!"1 ��� �ci�^� s�`e o= � rz�resentati�•P o` th� Cor.t-^ctor �o � :� C�-� (2) adequat�ly provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of property contiguous to the project routing. The Contractor shall orovide all facilities to enable the Engineer and his in�pector to examine and inspect the workm�nship an3 materials entering into the work. CS-5.5 EMERGENCY AhD/OR RECTIFICATION WORK: W��n, in the opinion of the Owner or Engineer, a condition oi emergency exists relatsd to any �art of the work, the Contractor, or the Contractor through his designated renresentative, shall respond with dispatch to a v�rbal request made by t�� Own�r or E�gineer to alleviate the em�rgency condition. Such a response shall occur day or night, wheth�r the oroject is scheduled on a calendar-3ay or on a working-day basis. Should the Contractor fail to respond to a rzquest from the Engineer to rectify any discrepancies, omissions, or corrections necessary to conform with th� requir�ments of the project specifications or plans, the E�:gineer shall give the Contractor written notice that such work or changes are to be p�rformed. The written notice shall direct attention to th� discrepant condition and request the Contractor to take renedial �etion to correct the condition. In t�� event the Contractor does not take positive steps to fu1fi11 this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall then deduct an amount equal to th� entire costs for such reme3ial actio�, olus 25�, from any funds due the Contractor on the projec�. C5-5.6 FIELD OFFICE: The Contractor shall pro�•ide, at no extra co��ensation, an adequate fipld office for use of the Engineer, ir specifically called for. The field o`rice shall be no� less than 10 by 14 feet in floor area, substantially constructad, well neated, air conditioned, lighted, and weath�r-proof, so that docum?nts will not be dar.��ged by the elz:�.ents. C5-5.7 CONSTRUCTION SiAKES: The City, through its Engineer, will furnish the Contractor_with all lines, grades, and measur�ments necessary to the proper prosecution and control of the work contracte3 for under these Contract Do�u�ents, and lines, grades and r��asureme:�ts wi11 b� established by means of stakes or other customsr}� m�thod of marking as rr,��� be found con�istent with gooa practice. C 1 L� � 1 These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings as may be established for the Contractor's use or guidance shall be preserved by the Contractor until he is authorized by the Engin�er to remove them. Wheneve;, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the fu11 cost of replacing such stakes or marks plus 25$ will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. CS-5.8 AUTHORITY AND DUTIES OF CITY INSPECTORS: City Insoectors will bz authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or r�anufacturing of the mat�rials to be used or equipment to be installed. A City Inspector may be stationed on the work to reoort to the Engineer as to the progr25s of the work and the manner in which it is being performed, to report any evidence that the rrraterials being furnished or the work being performed by the Contractor fails to fulfill tne requirements of the Contract Documents, and to ca11 the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection wi11 not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents. In case of any dispute arising b?tween the Contractor and the City Insgector as to the materials or equipment furnished or th� manner of performing the work, the City Inspector will have a��'-:"�rity to reject materials or equipment to suspend w�rk until the question at issue can be referre� �o and be decid?d by the Engin�er. The City Inspector will not, h�wever, be authorized to revoke, alter, enlarge, or releas? any reauirer�ent of these Contract Docurents, nor to ao�rove or �ccept any portion or section of the work, nor to issue any ��:structions contrary to the requirenents of the Contract Docur;�ents. �:e will in no case act as suQerintendent or rore.�,an or perforr� any other duties for the Contractor, or interf�re with the manage;�ent or operation of the work. He ��:ill not accep� from the Contractor any compensation in any form for p�riorming any duties. The Contractor shall regard and on�y the directions and instructions of the City Inspector cr Encineer when the sam� are consistent with the obligations o� th� Cor.�ract �ocur�ents, provided, however, should the Cont�a�tor object to any orders or ir.structions of the City _'�.SDcC�0� � �;lc �,0il��dC�0L ('�3�' Wl�r?1P. S1X Qay5 Iflc'rC2 +.Lltten a��_�_ to �.,.- ... __�._�_ _`o� �i= decisio^ o;: �he �.�tter in C.^.'.'i��J':G:S_ . C�-5 ( � ) C�-5.9 INSPECTION: The Contractor shalZ furnish the Engineer witti every reasonable facility for ascertaining whether or not the work as performed is in accordance with the raquirements of the Contract Documents. If the Engineer so requests, the Contractor shall, at any time before acceptance of the wark, remove or uncover such portion of the finished work as may be dir�cted. After examination, the Contractor shall restore said portions of the work to the standard required by the Contract Docum�nts, Should the work exposed or examined prove acceptable, the uncov2ring or rem�ving an3 replacing of the cov�ring or naking good of the parts re�oved shall be paid for as extra work, but should be work so exposed or examined prove to be unacceptable, the uncovering or re�oving and the replacing of all adjacent defective or damaged parts shall be at the Contractor's expense. No work shall be done or materials used without suitable sup�rvision or inspection. CS-S.10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: AIl work, materials, or equipment which has been rejected shall be remedied or r�moved and replaced in an acceptable manner by the Contractor at his own expense. W�rk done beyond the lines and grades given or as shown on the plans, except as herein specifically provided, or any Extra Work done witnout written authority, will be considered as unauthorized and done at the expe�se of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of the Contractor' to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be renedied or removed and reolaced and unautl»rized work to b� removed, and the cost th.=_reof ma;� be de3ucted Fron any money du2 or to become due to th? Contractor. Failure to require the removal o� any de��ctive or unauthorized work shall not constitute acceptance of sucn works. C�-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: If the S��cifications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is e�ua1 to any naterial or e�uipm�nt specified, and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the precons�ruction conferen�e, make written application to ENGINEER for approval of such substit�st? certifying in writing that the pro�osed substitute will perform adeauateiy the functions called for by th� general design, be similar and of eaual s�5stance to that sgeciFied and b� suited to the sam� use a;�c capable oT performing the same function as that sp?ci`=e�; ar.d ic�n�.ifving all variations of the pro�osed C�-� (S) substitute fron that specified and indicating available � maintenance service. No substitute shall be ordered or installed without the written approval of Engineer who will be the judge of the equality and may require Contractor to � furnish such other data about the proposed substitute as he conside�s pertinent. No substitute shall b,� ordered or installed without such performance guarantee and bonds as � Owner nay require which shall be furnished at Contractor's expense. Contractor shall indemnify an3 hold h�rcrless Owner and Engineer and anyone directly o: indirectly emoloyed by either of them from and a�ainst the claims, damages, losses � and expe�ses (including attorneys fees) arising out or the use of substituted mat�rials or equipment. � C5-5.12 �AhiPLES AND TESTS OR MATERIALS: Wher�, in tne o�inion of the Engine?r, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will � ba nade at the expense of and paid for direct to the testing agency by the Owner unless otherwise specifically provid�d. The failure of the Owner to make any tests of materials shall be in no way relieve the�Contractor oF his res�o�sibility of � furnisning naterials and equipment fu11y confor�:ing to the requirements of the Contract Documents. Tests and sampling of materials, unless otherwise soe�iFied, will be nade in �wp accordance with the latest methods prescribed by the American � Society For Testing yat�rials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer nay require for colle�ting and forwarding samoles and � shall r.ot, without specific written permission of the Engineer, use the materials represented by the sam�les until tests hav� bee:� made and the materials a�proved for use. The � Contrac�or will furnisil adeQuate samoles without ch�rce to the Owner. � 1 i � In case oE concrete, the aggregates, desi3n mini*�:�am, and the m'_xing Gnd trG�sporti;�g equipment shall be approved by the Engineer before any concrete is placed, �nd tnG Con�actor shall b= responsibl? for replacing any concrete which does not n�et tn� recruirements of the Contract Documents. Tests shall be r„ade at least 9 days prior to the placing oi concrete, usi�g samples from the same aggregate, cenen�, and nortar wnich are to be us�:� later in tha concrete. Should the source of �upp?v change, new tests shall be r��ae prior to the us? of the new materials. C5-5.13 ST0P.AGE OF MATERIP.LS: P.11 ma`=rials w�i�:� ar? to be us?d i^ the construction or�eration shal� �� sto==u so as to �:�su_e ��� p:�se��.•ation of the aualit�• an,:� iitness o- the work. r,�:'r: di,=�te� bv the �r,ci���•� th�•r s:-��1� b= plac_� o� w�oode� �la~_=or,:.s c� .,_h�r h�r , ci��.. durz�? � s��.r*eces �:-_ r.�` o-� thz � � ��-� ( 6 ) 1 ground, and shall be pla�ed und�r cover when dir�cted. Stored materials shall b? placed and located so as to facilitate prompt inspection. CS-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities. The location of many gas mains, watar mains, condui�s, sewer lines and s�rvice lines for all utilities, etc., is unknown to the Owner, and the Own�r assumes no responsibility for fail��re to show any or all such structures and utilities on th� plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for ad3itional compensation for Extra Work or for increasi�g thz pay quantities in any manner whatsoever, u�less an obstruction encountered is such as to necessitate changes in thz lines and grades oF co�sid�rable magnitude or requires the building of special works, �rovision for which i� not made in tha Contract Documents, in which cas�.the provision in these Contract Docume�ts for Extra Work shall app1�. It sha11 be the Contractors responsibility to verify locations of adjacent and/or conflicting utilities sufriciently in advance of construction in order that he may negotiate such local adjustments as nec�ssary in the construction process to provid� adequat� clearances. The Contractor shall take all necessary precautions in order to protect a11 existing utilities, struc�ures and service lines, Verification of existing utilities, structures and service lines shall include notification of all utility companies at least forty eight (48) hours in advance of construction including exploratory excavation if �ecessary. All verificati�n or existing utilities and their adjustment shall be considered as subsidiary work, ��-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the norR�al prosectuion of wo�k where the int�rru�tion of service is nec�ssary, the Con�ractor, at least 24 hours in advance, shall be required to: _ 1. Notify the Wat2r Department's Distribution Division as to location, time, and schedule of service interruption. C�-5 (7) r, � 2. NotiEy each customer personally through responsible personnel as to time and schedule of the interruption of their service, or � 3. In the event that personal notification of a customer cannot be made, a preoared tag form ' shall be attached to the customer's entrance _. door knob. The tag shall be durable in composition, and in large bold type s'�all say: � "NOTICE" Due to iJtility Improvement in yo�lr neighborhood, your (watzr) (sewer) 5ervice will be inter- rupted on between the hours of and . This inconvenience will be as short as Qossible. Thank you, Contractor Ad�dress Phone b. Emerqency: interruption immediate. In the event that an unforeseen service occurs, notice shall b� as above,but C5-5.16 MUTUAL RESPONSIBILITX OF CONTRACTORS: I=, through acts or neglect o� the part oF the Contractor, �ny other Contractor or any sub-contractor shall suffer loss or dama�e on th� work, the Contractor agr`es to settle with such other ConLractor or sub-contractor by agreement or arbitration. If such otn�r Contractor or sub-contrac�.or shall assert any claim against the Own�� on account of any damage alleved to have been sustair,ed, the O�:ner wi11 r.otify the Contractor, who sha11 indemnif�� and save harmless the O�ner �gains� any sucn claim. CS-5.17 CLEAN-UP: Clean-u� of surplus and/or wast� materials accu-nulated o� th� jo� site durinc the orosecution o= the work under these Contract Docum?nts shall be accomplished in :ceeping witn a aaily routine establish�d to the the satisraction o` t'ne �^air.eer. Twent��-fours �ours after writt�r-: r.o�ic� _� __:e�. t� t�_ Co�tractor _�at tn� ci�z�-up on �.^.? �iOJ S'_`_= LS :=CCJc�_R:. :.^. = C'.?�lilG� _�.SZ�i= - _'J='� �.O t(l� �r��ir.2er, i� ��:� Cor.�r�ctor �aiis to cor=ec` the C�-5 (8) unsatisfactory procedure, th� City nay take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, and the costs of such direct action, plus 25$ of such costs, shall be deducted from monies due or to become due to the Contractor. Upon the completion of the project as a whole 3S covere3 by these Contract Documents, and before final acceptance and final �aym�nt will be �adz, the Contractor shall clean an3 remove from the site of the orojPct a11 surplus and discarded materials, temporary structures, and d�bris of every kind. H� shall leave the site of all work in a neat and orderly condition equal to that wnich origi►ia11y existed. Surplus and wa5te mat�rials removed from th? site of the work shall be disposed of at locations satisfactory to the Engineer. Tne Contract�r shatl thoroughly clean all equipment and materials installed by hiin and shall deliv�r over such materials and e�uipment in a bright, clean, polished and n�w appearing condition. No extra comp�nsation will be made to the Contractor for any clean-up required en the project. CS-5.18 FINAL INSPECTIO�: Whene���r the work provided Eor in and contemolated und�r the Contract Documents has been satisfactorily complated and final cleanup performed, the Engineer will notify the proper officials of the Owner and request that the Final inspection be �a3e. Such inspection will be made within 10 days after such notification. After such final insp�ction, if the work and mat�rials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper resol�ltion has been passed by the City Council. No time charge will b? made against the Contractor between said dat2 of notification of thz Engineer an3 tne date of final insp�ction of the work. C�-5 (9) � � � � � C6-6.2 PERMITS AND LICENSES: The Contr3ctor shall procure all � permits and licenses, pay all charges, costs and fees, and give al1 notices necessary and incident to the due and lawful prosecution of the work. PART C - GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal and State Laws and City ordinances and regulatio:�s wrhich in any way affect the conduct of the work or his operations, and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify an3 save harmless the City and all of its officers, agents, and employees against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation, or order, whether it be by himself or his employees. C6-6.3 PATENTED DEVICES, MATERIALS AND PROCESSES: If the Contractor is required or desires to use any design, device, material, or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner of such patent, letter, or copyrighted design. I� is mutually agreed and understood tha` without exception the contract prices shall include a11 royalties or cost arisin3 from patents, trade-marks, and copy rights in any way involv�d in the work. The Contractor and his sureties shall indennify and save harmless the Owner from any and all claims for infringement by reason of the use or any such patented design, d2vice, material or process, or any trade-.;.ark or copy right in connection with the work agreed to be performed under these Contract Documents, and shall indemnify the Owner for any cost, exp�nse, or damage which it nay be o5liged to pay by reason of such infringer�ent at any tir�e during the prosecution or the work or after completion of the work, provided, however, that the Owner will assume the responsibility to defend any and a11 suits brought for the i:zfringe�nent of ar.y patent claimed to be infringed upon by the desigr., t}�pe of construction or naterial or equipment spzcifie� in the Co�tract �ocuments furnished the Contractor b,� th� O�w^er, and to hold tn� Contractor harmless on account or su�n saits. Co-6 (1) C6-6.4 SANITARY PROVISIONS: The Contractor shall establish and enforce among his employees such regulations in regard to cleanliness and disposal of garbage an3 waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance about the work on any property either public or private, and such regulations as are required by Law shall be put into immediate force and effect by the Contractor. The necessary sanitary conveniences for use of laborers or, the work, prooerly secluded from public observation, shall be constructed and maintained by the Contractor and their use snall be strictly enforced by the Contractor. All such Eacilities shall be kept in a clean and sanitary condition, free from oojectionable odors so as not to cause a nuisance. All sanitary laws and regulations of the State of Texas and the City shall be strictly complied with. C6-6.5 PUBLIC SAFETY AND CONVENIENCE: hiaterials or equipment stored about the work sha11 be so placed and usad, and the work shall at all times� be so cor.ducted, as to cause no greater obstruction or inconvenience to the public �han is considered to be absolutely necessary by the Engineer. The Contractor is required to r�aintain at a11 times all p'�ases of his work in such a manner as not to impair the safety or convenience of the public, including, but not limited to, safe and convenient ingress and egr�ss to property contiguous to the work area. The Con`ractor shall make adequate provisions to render reasonable ingress and egress for norcr�al vehicular traffic, except during actual trenching or pipe installation operations, at all driveway crossings, Such provisions may include bridc;ing, placement of crushed stone or gravel or such other means of providing proper inaress and egrzss for the proo�rty �erved by the driveway zs the Er:gineer may approve as aopropriat�. Such other maans may include the div�rsion oF �riv2way traffic, with specific approval by the Encineer. If diversion of traffic is approved by tlze Engine`r at any location, the Contractor shall nake arrangements satisfactory to the Encineer at any location, the Contractor sha11 make arranae:�ents satisfactorf to �.he Engine�Y for the civersion of traffic, and shall, at his ow� exp�nse, �rovid� all materials and p�rform all work necessary For the construction and naintenance of roadways and bridges for such aiversion of traffic. Side:�alks r�ust no� be obstructed except by special germissio:, of the En�ineer, ^ne .,a�2L"ia�� exc_vz�.ed and the construction m3t�rials such as �_o� �s�� :n ��� co�struc�ion o� the w��k sh�11 �e placed so =_s � c� __ e:-...�:,� __ ��-:� w�_ :< �_ �� =�-_�:t L� GG acces� to z11 f ire ._ �c�,�S� �--� 3�,:.`'C. ��X�� �*�J^v� 1C� C�' _:�OK25� WcC�Y calves� ^ ���. �' 7 } ' � � f�. � � � � l`� gas valves, or manholes in the vicinity. Tne Ow�er reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety whicl� may come to its attention, after twenty-Four hours notice in writing to the Contractor, save in cases of e�nergency when it shall hav� the right to rem�dy any neglect without no�ice, and in either case, the cost of such work done or mat�rials furnished by the Owner or by the City shall be deducted from monies due or to becomz dus to the Contractor. The Contractor, after approval oE the Engineer, shall notify the Fire Departmen� Headquarters, Traffic Engineer, and Police Department, wnen anv street or alley is re�ueste3 to be close3 or obstructed or any fire hydrant is to be na3e inaccessible, and, when so di��cted by the Engineer, shall kee� any street, streets, or h�ghways in condition for unobstructe3 use by fire apparatus. The Contractor shall promptly notify the Fire Department Headauarters when all such obstructed streets, alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary bridges or nake other arrat�gements for crossing over ditches or streams, his responsibility for accidents in connection with such crossings shall include the roadway approaches as w�ll as the struc�ures of such crossings. � The Contractor s;�all at all times conduct his operation and the use of construction machinery so as not to damage or � destroy trees and shruhs located in close proximity to or on the site oi the work. Wher�ver any such damage nay be done, the Contractor sha11 immediately satisfy all claims of property owners, and no payment will be made by the Owner in � settlemen` or such claims. The Contractor shall file with the Engineer a written staten�nt showing all such clai�s a3justed. � C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS, hLLEYS, AND RIGHT-OF-WF,Y: ror the performance of the contr�.ct, the Contractor will be permitted to use and occuoy such portions of the public stre�ts and alleys, or other oublic places or � other rights-of-way as provided for in th� ordinances of the City, as 5l�own in ttie Contract Documents, or as may be specifically authorized in writing by the Engineer. A reasonable amount of tools, mat�rials, and eauipment for � construction purposes nay be stored in such space, but no more than is necessary to avoid delay in the construction � ooerations. Excavated and waste r�a�erials sha11 b� piled or stack�d in sLch a way as not to interfere with the use of spaces tha`_ T.�_.� �� d�signated to b� left free a�d unobstructed and so as r.�_ t� in�o��,•c:�ience o�cu�ants o� aajac��c Droperty. � I� the s �_ _� __� o�c��_�� bs �ai1w�;� `rac'.�cs, th= ���� shall be i� C6-6 (3) I ' carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Own�r may, for all purposes required by the contract, enter upo� the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoinit�g work. Any additional grounds desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6.7 RAILWAY CROSSINGS: Wnen t�e work encroaches upon any right-of-way of any railway, the City will secure the necessary easa�ent for the work. Where the railway tracks are to be crossed, the Contractor shall observe all the regulations and instructions of the railway company as to the methods of performing the work and take all precautions for safety of property and the public. Negotiations with the railway com�anies for permits shall be done by and through the City. The Con�ractor shall give the Ci}y notice not less than five days �rior to the time of his intentions to begin work on that portion of the project which is related to the railway prooerties. The Contrackor will not be given extra or eddi�ional compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: Where the wor'� is carried on in or adjacent to any street, alley, or Qublic place, the Contractor shall at his own expense furnish, erect, and maintain such barricades, fences, lights and danger signals, sha11 provide such watchmen, and shall take all such other precautionary measures for the protection of p�rsons or �roperty and of the work as are necessary. Barricades and fences shall be painted in a color that will be �isible at night. Fror, sunset to sunrise the Contractor shell furnish ar,d maintain at least o�e easily visible burning lic;^t at each barricade. P. sufficient number oF barricades shall b� erected and maintained tc kee� pedestrians aw�y from, anc vehicles from beina ariven on or into, any work under cons�ruction or b�ing r;,aintain�d. The Contractor shall furnish watchmen and keep then a� their respective assignments ir. sufficient 1111;'�lb�iS �O DLO�ECt t�'i� WOriC 2.RQ pr�v�nt u�CCLQ�;�t Or ca�age. �11 installaLions and procedures shall be consistent with the provisiozs se� fort`� in the "1980 T�xas Manual on Uniform Traffic Control Devices for Streets and highways" issued under the aut�o�ity ot tne "State of Texas Uniforr� Act �egulating Traf f ic cn "r:� cnways" , codif ied as F�rticl� 6701d V�ron's Civil 5t? �ll���, D?= �'_R?:�1� S�C�1O"1S DA? RQ S�Ct1O'1 t:O5. 2% � L9 � 30 dI1Q �6-5 ( � ) � r� f �. The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works department, Signs and Markings Division (phone number 8780-807S), to remoye the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenczd manual and such temporary sign must be installed prior to the renoval of the permanent sign. If the tem�orary sign is not installed correctly or if it does not meet the required specif ications, the per:nanent sign shall bs left in place until the temporary sign requirements are met. When construction work is comoleted to the extent that the pzrmanent sign can b� re-installed, the Contractor shall again contact the Signs and Markings Division to re-i;,stall the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor will be held r�soonsible for a11 danage to th� work or the public due to failure of. barricades, signs, fences, lights, or watchmen to protect them. Whenev�r evidence is found of such damage to the work the Engineer may order the damaged portion immediately remove3 and replaced by the Contractor at the Contractor's own expense. The Contractor's responsi�ility for the maintenance of barricades, signs, Fences and lights, and for groviding watchmen shall not cease until the project shall havz been completed and accepted by the Owner. No compensation, except as specifically provided in these � Contract Documents, will be paid to the Contractor for the work and mat�rials involved in the constructing, providing, � and maintaining of barricades, signs, fences, and lights or ., for salaries of watchmen, for the subsequent removal and disposal of s��.ch bar--icades, signs, or for any other v incidentals necessary for the proper protection, safety, and convenience of th� public during the contract period, as this � �aork is considered to be subsidiary to the several items for .� which unit or lur�,� su�n prices are requested in the Proposal. � �6-6.9 USE OF EXPLOSIVES, DROP WEIGHT, ETC.: Should the Contractor ele�t to-use explosives, drop weight, etc., in the prosecution of the work, the utmost care shall be exercised at all tir�es so as not to endanger life or prop2rty. The ' Contractor shall notify the proper representative of any oublic sarvice corporation, any comoany, indi��idual, or utilit`•, ana �ne 0•�aner, not less than twenty-four hours in � 1 �6-6 (�) 1 advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special Contract Documents, or the use of explosives is requested, the Contractor shall sub,�it notice to the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arisina out oE such use o€ explosiv�s. A11 claims arising out oE the use oF explosives shall be investigated and a written report made by the Contractor's insurers to the Engineer within ten (10> days after receipt of written notice of the claim to the Contractor from eitner the City or the claimant. The City shall proceed to give notice to the Contractor of any such claim. The use of explosives �ay be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. �nenever explosives are stored or kept, they shzll be stored in a safe and secure manner and all storag� ulaces sha11 be plainly marked "DANGEROUS EXPLOSIVES" and shall b� under the care of a competent watchman at all times. All vehicles in which explosives are being transported shall be plainly marked as mentioned above and shall, insofar as oossible, not use heavy traF�ic routes. C6-6.10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the O�aner wi11 p�ovide such right-of-way or easement privileges as the CiLy may deem necess=ry for the prosecution of the work. Any additional rights-of-way or work arza considered necessary by the Contract�r sha11 be pr�vided by him at his own expe:,se. Such additional rights-of-way or work area shall be a�auireci for the ben�fit of the City. The City shall be notified in writina as to the rights so acquired b�fore work becins in the afEectea area. Tne Contractor shall not enter u�on Qrivate property for any purpose without having previou=ly obtained permission fro:n tne o�,�ner of sucn property. The C�ntractor will not be allowed to store equipnznt or material on private property unless and until the specified appzoval of the oroperty owner has been secured in writing by the Contractor and a copy furnished to the Engineer. Unless soecifically �ro�,•idec otherwise, the Contractor sha11 clear a11 �ic�ts-of-�,�ay or ease��nts oE ob�tructions whic� must be r":���:�ec te nake pos=i�1� �rOD�� prosecutioa oL th� work as a p��� o` the oroject co�str�ctio:: o�?r?tions. Tn� ��ontractor ��._1 i�_ r:�cOO:i5'_�i� �0= �f'.� �L"CSe�Vc�?OC; OL d,^,... ::1211 ll5e � � every precaution to prevent damage to all trees, shrubbery, �, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas �- lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of tenporary fences, and r to all otner public or private property along adjacent to the �,� work. �-- The Contractor shall notify the proper representatives of � owners or occupants of public or private lands or interest in lands which might be affected by the wor�c. Such notice shall b� made at least 48 hours in adva�ce of the beginning of the � w•ork. Notices shall be ap?licable to bo�h public and private ��• utility com�anies or any corporation, company, individual, or other, Pither as owners or occupants, whose land or interest � in land might affected by the work. The Contractor shall b= „�, respo�sible for all damage or injury to property of any character resulting from any act, omission, neglect, or � misconduct in the manner or method or execution of the work, or at any tim� du? to defective work, material, or equipment. khen and where any direct or indirect or injury is done to r` public or private property on account oF any act, omission, _ neglect, or misconduct in the execution of the work, or in co;�sequence of the non-execution thereof on the part of the � Contractor, he shall restore or have restored at his own cost � and exoense such property to a condi�ion at least equal to that existing before such damage or injury was done, by repairing, rebuildin�, or otherwise replacing and restoring as � may be directed by the Owner, or he shall make good such damages or injury in a manner acceptable to the owner of the _ property and the Engineer. � All fencas encountered and removed during construction oF this project sha11 be restored to the original or a better �than original condition upon completion of this project. � Wh�n wire fencing, ?ither wire mash or barb�d wire is to be crossed, the Contractor shall set cross braced posts on � either side of permanent easement before th� fence is cut. Should additional fence cuts be necessary, the Contractor a shall provide cross braced posts at Qoint of the proposed cut in addi�ion to the cross braced posts provid�d at the � permanent easements linits, bezore the fence is cut. Tenporary fencing shall b2 erPcted in place of the fencing , re;�oved whenever th� work is not in progress and when the s�te is vacated overnight, and/or at all times to prevent li�•estock fro:n er.te�ing the constructio� area. The cost for � ��:�ce re�o��al, tem�orarti• closures and replacem�nt sha11 be � s�sbsidiary to �he various iter^s bid in the oroject -, � Co-6 (7) ' proposal. Therefore, no separate payment shall be allowed for any service associated with this wor;�. In case of failure on the part of the Contractor to restore such property to make good such damage or injury, the Owner may, upon 48 hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results, proceed t-o reQair, rebuild, �r otherwise restore such property as may be determined by the Owner to be necessary, and the cost th?reby :�ill be deducted fron any monies due or to become due to the Contractor under this Contract. C6-6.11 INDEPENDENT CONTRACTOR: It is understood and agr2ed by the oartie5 I��reto that Contractor shall perforn al1 wor;� and services hereunder as an in3ependent contractor, and not as an officer, agent, �ervant or emoloyee of the Owner. Contr�.ctor shall have exclusiv� control of and the exclusive right to control the details of all the work and services performed hereunder, and a11 persons performina same, and shall be solely responsible for the acts and omissions �f its officers, agents, servants, ?m�loyees, contractors, subcontractors, licensees and invitees. The doctrine of respondeat superior shall not apoly as betw2en Owner and Contractor, its officers, agents, emoloyees, contractors and suocontractors, and nothing her2in shall be construed as creating a partn�rshio or joint enterprise b�tween Owner and Contractor. C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to, and does hereby indemnify, hold harmless a�d defend Owner, its oFficers, agents, 5erva�ts, and em�loyees fro� and against any an all claims or suits for property darnag� or loss and/or oersor,al injury, inclu3ing death, to ar.y and all p�rsons, of wnatsoe��`r kind or c�aracter, w;,ether real or asserted, arisi�g out of or in connection with, directly or indirectly, the work and services to oe oerformed hereund�r by Contractor, its office�s, agents, employe�s, contractors, subcontractors, licensees o� �nvitees, whether or not caused, in w;�ole or in part, bv alleged r.G�ligence on the oart of officers, agents, servants, e:��loyees, contractors, subcontractors, licensees and invitees of th_ Own�r; and said Contractor does hereby covenant and acree to assume a11 liability and responsibility o� Owner, its oLficers agents, servants an3 em�loy�es for propert��� danage or �oss, and/or personal injuries, includi�g death, `o any and aii ��rsons o= wnatsoz�er kind or character, wheth�Y real or a=sertec, z�i=_:nc out of or i:, connecti�n with, c�r�ctly or :r.�:ire��1�•, t�_ work and s�rvic�s to oe p�rformed ��r�under by _..._�2C�0C� _�5 C��1C'�?'S� �CZ�:�`..S 2:�.710�'EES� CG":��actors� S.::��C.^.�rZC�rJ:�� __�_::Scc3 �.^.C _i.�l��c�� t�.':1=��':�r C?" f:0� C�ullS@C�� r^ � � ' � � � , 1 ' 1 ' 1 � � � � in whole or in part, by alleged negligence of officers, agents, servants, employees, contractors, subcontractors, licensees or invitees of the Owner. Contractor likewise covenants and agrees to, and does h�reby, indemnify and hold harmless Owner from and against any and all injuries,loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract, whether arisin� out of or in connection with or resulting from, in whole or in part, any and all alleged acts or omissions of officers, agents, servants, emoloyees, contractors, subcontractors, licenses, or invitees of the Owner. � In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time � all work on the proje�t has been completed to the satisfaction of the DirPctor of the Water Dzpartment, as evidenced by a "�' final inspection, final payment to the Contractor shall not be j� recommended by the Director of the Water Department for a period of 30 days after the date of such final inspection, � unless the Contractor shall submit written evidence satisfactory to the Director that ttie claim has been settled and a release has been obtained from the claimant involved. � If the claim concerned remains unsettled as of the expiration - of the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such " semi-final pa}�ment to b� in an amount equal to the total � dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of the � performance of such work, and such semi-final paym�nt may then be recomm�nded by the Director. The Director sha11 not recomm�nd final pay�n�nt to a Contractor � against whom such a claim For damag�s is outstanding for a -+ p�riod of six months followin3 the dat� of the acceptance of the w�rk perform�d unless the Contractor submits evidence in ^ writing satisfactory to the Director that: � 1. The claim has b�en settled and a release has been obtained from the claimant involved, or 2. Good fzith efforts have b�en made to settl? such out.standing claims, and such good faith efforts have failed, If. cor.dition (1) above is met at any tim� within the six month p�riod, the Director sha11 recommend that the final payment to the Contracto� b� r„ad?. I� condition (2) above is met at any �im� wit�,�:, tne six r;��tn ��riod, th� Director c:a_.• recommend that the f ir,al �z•✓r�nt to tne Contractor be r..�d�. At the C6-6 (9) expiration of the six month period the Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been net to the satisfaction of the �irector. The Director may, if he deems it appropriate, refuse to accept bids on other Watar Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work p=_rformed under a City contract. C6-6.13 COhTR�CTOR'S CLAIM FOR DAMAGES: Should the Contractor claim conpensation for any alleged damage by reason of the acts or omissions of the Owner, he shall within three days after the actual sustaining of such alleged damage, make a written statenent to the Engineer, settin� out in detail the nature of thP alleged damage, ann on or beEore the 25th day of the month succeeding that in which any such damag� is claimed to have been sustain?d, the Contractor shall file with the Engineer an itemized statement oE tne details and amount of such alleg�d damage and, uoon request, shall givP the Engineer access to all booxs of account, receipts, voucners, bi.11s of lading, and other books or pap�rs containing any evidence as to tn� anount of such allzged damage. Unless sucl� statements shall be filed as hereinabove required, the Contractor's claim for comoensation shall be waiv?d, and he shall not be entitled to payrtent on account of such damag?s. C6-6.1� P.DJUSTMENT OR RELOCATION OF PUBLIC UTILITIES, ETC.: In case it is necessary to change, move, or alt�r in any manner the property of a public utility or otners, the said prooert� shall not be moved or intzrLered with until orders thereuoon have b�en issuPd by the Engineer. The right is res�r�=d to the owners of oublic utilities to enter the geoc-a�hical limits of the Contr^ct for the purpose of ma�ing such chances or repairs to their pro�erty tnat may be necFssary by the performance oF this contract. C6-6.i5 TEriPOnARY SEWER AND DRAIN CO�NECTIONS: rihc� existing sew2r � i;�e5 have to b= taken ue� or removed, the Contractor shal�, �t his own ex�ense anc c�st, �roviae ar.c maintain te,-;�o�arr outlets and connections for a11 private or oublic drair.s and sew�rs. Th� Contractor snall also take care of a11 s�wa�� and drainag� w�ich will be re�eived from thes� drains and se���rs, and for this pur�ose he shall provide and �aintaia, at his own cost and expensA, adequate pumping TZC11�='_GS �?;1� ���i!�OC3CY OJtl?tS Or Q?V�rS10C1S. =�e C�:,�ra�tor, ac �i� o�wn cost and ex��nse, sna11 con5truct SLC.^. __O"Cr:c� i���� G. O�}":�� =_?"UC`.._�E5 neC�SSd_�'� dRC� be ;����_ �... a� a_1 =i-.__ �o d_s_ cse o� drzi:-��ae an�. sewage ��-�. �!4ti ' � receive3 from these temporary connections until such times as _, the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and � naintained under the Contract, except when specified or ordered to be abandoned by the Engineer. All water, sewage, '�' and other waste shall be dis�osed of in a satisfactory manner , so that no nuisance is created and so that the work under construction will be a3equately protected. � C6-6..16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE ~"� CITY: When the Contractor desires to use City wat�r in �, � connection with any construction work, he shall m�ke complete and satisfactory arrangements with the Fort Worth City Water � D2partment for so doing. r' City water furnished to the Contractor shall be delivered to � the Contr3ctor from a connection on an existing City main. All piping required beyond the point oF delivery shall be �- installzd by thz Contractor at his own expense. "�" The �ontractor's responsibility in the use of a11 existing fire hydrant and/or valves�.is detailed in Section E2-1.2 USE �' OF FIRE HYDRANTS AND VALVES in these General Contract �... Docum�nts. � When meters are used to measure the wa�er, the charges, if any, for water will be at thu regular establishe3 rates. When meters are not used, the charges, if any, will be as � prescribed by the City Ordinance, or where no ordinance applies, payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. � L C6-6.17 USE OF A SECTIO'� OR PORTION OF THE WORK: khenever, in the opinion of the Engineer, any section or portion of the � work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer, �nd such usage shall not be held to be in any way an acceptance of said � work or structure or any part thereof or as a waiver of any of the pro�isions of these Contract Documants, A11 necessary re�airs and removals of any section of the work so put into use, due to defectiv? rr,aterials or workmanship, e�uiQment, or � to deficient operations on the part of the Contractor, shall b? performe3 by the-Contractor at his own ex�znse. C6-6.18 CONTRACTOR'S P.ESPONSIBILITY FOR THE kORK: Until � writ�en acceptance by the Owner as provided for in these Cor.tract Docun�nts, the work shall be under the charge and � care of th� �..ontractor, and he shall take every necessary pYe�.a�.:�io� to Pr?v�nt ir.jury or dana�� to the �tiOT_�'{ or any part � C5-5 (11) �� thereof by action of the elements or from any cause whatsoever, whether arising from the execution or nonexecution of the work. The Contractor shall rebuild, repair, restore, and make good at his own expense all injuries or damage to any portion of the w�rk occasioned by any of the hereinabove causPs. C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or any possession taken by the City shall not operate as a waiver of any provision of the Contract Docum�nts. A�y waiver of any breacn or Contract shall not be held to be a waiver of any other or subsequent breach. The Owner reserves the right to correct any error that may be discovered in any estimate that may have been paid and to adjust the same to me�t the require�ents of the Contract Docum2nts. C6-6.20 PERS0NAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no liability upon the authorized representatives of the Owner, either personally or otherwis� as they are agents and reoresentatives of the City. C6-6.21 STATE SPLES TAX: On a contract awarded by the City of Fort Worth, an organization wnich qualifies for exe mption pursuant the provisions of P.rticle 20.04 (H) of the Texas Limited Sales, excise, and Use Tax Act, tne Contractor may purchase, rent or 1eas� a11 materials, supplies and equipment used or consuned in the p�rformance of this contract by issuing to his supplier zn exemption certificate in lieu of the tax, said exenption certif icate to co�ply k�ith State Comptroller's P.u=ing .007. Any such �xemption certificate issued by the Contractor in lieu of thP tax sha11 b� subject to an3 shall comoly with th� provisions of State Co��troller's Ruling .0ll, and any other apglicable State Conptroller rulincs oertainin^ to th� iexas Li�:i�ea Sales, Exc�s�, and Use iax Act. On a contract awarded by a developer for the construction of a publicly-owned improve�n�nt in a street righ`-of-wav or other easement which has been dedicated to the public and the City o� For� riorth, an organization w�ich aualifies for exemption DI:�SL`Zr.t to the provi=ions of F.rticle 20.0� (H) c` the Texas 1ir�.ite� Sa�es, Excise, anc Us� Tax tc�, the Cont�actor can �ro�z'�1,� b� ex�;�.�t=_� in the saT� na�ne� st�t2d abov_. Co-6 (12) � Limited Sale, Excise and Use Tax permits and information can be obtained from: � Comptroller of Public Accounts Sale Tax Division � Capitol Station Aust�n, TX � ' 1 ' 1 IJ I� I , I , �� I ' I ' I ' I 'f C6-6 (13) � r � PART C - GENERAL COhDITIONS C7-7 PROSECUTION AND PROGRESS � SECTION C7-7 PROSECUTION AND PROGRESS: C7-7.1 SUBLETTING: The Contractor sha11 perform with his own � organization, and with the assistance of workman under his ialmediate superintendance, work of a value of not less than fifty (50$) percent of the value embraced in the cor.tract. If �„ the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circur�stances - be relieved of the responsibility and obligation assumed under these Contract Documents. All transactions of the Engineer "' will be with the Contractor. Subcontractors will be W considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements as to � character and competency. The Owner will not recognize any subcontractor on the work. The Contractor shall at a11 times, when the work is in operation, be represented either in pers on � or by a superintendent or other designated representatives. C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part thereof without the previous c onsent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous conse�t, assign, transfer, sublet, convey, or otherwise dispose of th� contract or his right, title, or interest therein or any part thereof, to any person or persons, partnership, company, iirm, or corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state, attempt to dispose of the contract may, at the o�`ion of the Owner be revoked and annulled, unless the Sureties shall successfully complete said contract, and in the event of any such re<<ocation or annulnent, any monies due or to become due under or by virtue of said contract shall b� retain�d by the Own�r as liquidated dar�ages for the reason that it would be impracticable and extremely difficult to fix the actual damages. - ' C7-7.3 PROSECUTION OF THE WORK: Prior to beginning any construction operation, the Contractor shall sub<≤<it to the Enaineer in five or nore copies, if requeste3 by th� Engineer, a pro�ress schedule preferably in chart or diagrar. =orm, or a � ��iJf ou�iining in de�ail anc step by step the nanner of � 1 �i C7-7 (1) � prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate period. Tne Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials, and labor as is necessary to insure its completion within the time limit. The sequence requested of all construction operations shall be at all times as specified in the Special Contract Documents. �ny deviation from scuh sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with any deviation until he has rzceived written approval from the Engineer. Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7-7.8 "Extension of Time of Completion" of this Agreement, and a progress schedule shall not constitute a change in the contract time. C7-7.4 LIMITATIONS OF OPERATIONS: The working operations shall at all times be conducted by the Contractor so as to create a minimum amount of inconvenience to the public. At any ti�e when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a por�io� of a street or public way greater than is necessary for the pro�er execution of the work, the Engineer may require t7e Contractor to finisn the section on which operations are in progress b�fore the work is commenced on any �dditional section or street. C7-7.5 ChARACTER OF WORKME� AND EQUIPMENT: Local labor shall b2 usea by the Contractor is available. The Contractor may arinc in fron outside the City of Fort Worth his key men and nis suoerintendent. All othzr workmen, including equipment ooerators, may be inoorted only after the local supply is exnausted. ihe �ontractor shall employ only such superintendents, foremen, and wor�men who ar= careful, co:�pe�ent, zn� rully aualified to oerform the duties or tasks assign�d to them, anc the Engineer may de;,land and secure the s�.::;�:�;ary dis�.� ssal of any person or persons emoloyed by the C�n�ractor ir. or aoo�t or on the work who, in the cpinion of �.,_ G.: ;er, s�.all misccr.cuct himselr or b� f OL!';Q to be _:;CO:'.�z�ER�, c�sres: �C�`_L� , lnte�oeYzt2� C15hO;leSt, Or C7-7 (2) � � otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or carry out the directions of the Owner, and such p�rson or persons shall not be employed again thereon without written consent of the Engineer. Al1 workmen shall have sufficient skill, ability, and experience to prop�rly perform the work assigned to them and operate any equipment necessary to properly carry out the performance of the assigned duties. The Cortractor shall furnish and maintain on the work all such equipm2nt as is co�sidere3 to be necessary for prosecution of the work in an accentable nanner and at a satisfactory rate of progress. A11 eauioment, tools, and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory, safe and efficient working condition. Equipment on any portion of the work shall be such that no injury to the work, workmen or adjacent property will result from its use. C7-7.6 WORK SCHEDULE: El.apse3 working days shall � starting with the first day of work completed as �, C1-1.23 "WORI;ING D�Y" or the date stipulated in ORDER" for beginning work, whichever comes first. be computed defined in the "WORK Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays, providing that the followi*�g requirements are met: a. F� request �o work on a soecific Le�al Holiday must be nade to the than the proceeding Thursday. Saturday, Sunday or Engineer no later b. P.ny work to 'oe done on the project on such a soecific Saturday, Sunday or Legal Holiday must be, in the opinion of the Engineer, essential to the tim�ly completion of the project. The E:�gineer's d�cision shall be final in response to such a request for approval to work on a specific Saturday, Sunday or Legal i�oliday, and no extra compensation shall b� allowed to the Contractor for any work perform�d on such a specific Saturday, Sunday or Leaal ;ioliday. Calen3ar Days shall be deFined in C1-1.24 and th� Contractor may woYk as h� so desires. C7-7 (3) C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the timP specified in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. The Contractor shall maintain a rate of progress such as will insure that the w�ole work will be performed and the premises cleaned up in accordance with the Contract Documents and within the time establish?d in such documents and such extension of time as may be properly authorized by the Owner. C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request for an extension of time of completion shall be considered only when the request for such extension is subnitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval . In adjusting the contract time for completion of work, consideration will be given to unforseeable causes �eyond the control of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy, acts of the Owner, fire, flood, tornadoes, epidemics, auarantine restrictions, strikes, freight embargoes, or delays of sub-contractors due to such causes. when the dat? of completion is base3 on a calendar day bid, a reauest for extension of timz because of inclemen� weather will not be considered. A request for extension of time due to inability to obtain supplies and materials will be consicer?d o�1�� w�e;, a r2view of the Contractor's purchase order dates and other per�inent nata as requested by the Engineer indicates that the Contractor has made a bonafide atte��t to secure delivery on schedule. This sha11 include efforts Lo obcain the supplies an6 materials fro� alternate sources in c�se th? first source cannot m�ke deliver}•. Ir satisfactory ex�cution and completion of the contract sho�.:lc req�ire work and naterials in greater ar�,ounts or auanti�ie= than those set forth in the aporoved Contract Docur�,ents, tnen the contract tir�e nay be inereased by Change Order. C7-7,G D�L..YS: T�e Contractor saall receiv� no co�?ensation ro� c�_a� - c_ �.�r.�_a:�c`� �o �:-:� w�r;:, ��:ce�t when cirect and _-:=•:�:c��'_= _..._� cos� *o tn� �o��racto= is ca��_=�d bv th� _dl�._=� ..� �..�. C_ _ �.C _ r�• i�.� i.,_�=i:.=_?O.^. O� �:.�..__1?� � 1t Ci-i (4) n any, which is to be furnished by the City. Whe� such extra compensation is claimed a written statement thereof shall be oresented by the Contractor to the Engineer and if by him found correct shall be approved and reFerred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is cause3 by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an e�uivalent extension of time, his application for which shall, however, be subject to the approval of the City Council; and no such extension of time sha11 release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. � C7-7.10 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder sha11 indicate � in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will re�uire to fu11y complete this contract or the tim� of completion will � be specified by the City in the Proposal section of the contract documznts. � � 1 L The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon. The amount of time so stated by the successful bidder or the City will become the time of completion specified in the Contract Documents. For each calendar day that any work sha11 rPmain uncompleted after th= time so�cified in the Contract Documents, or the increased time granted by the Owner, or as automatically increased by additional wor�c or materials ordered after the contract is signed, the sum per day given in the following schedule, unless otherwise specified in other parts of the Contract Documents, will be deducted from monies due the Contractor, not as a penalty, but as liquidated dar..ages suffered by the Owner. FiMOJNT OF CONTRACT S 5,001 $ 15,001 S 2�,001 S 50,001 S 100,001 Less than $ 5,0G0 to $ 15,000 to S 25,000 to S 50,000 to � 100,000 �o S 500,000 c�—; c>> inclusive S inclusive S inclusive S inclusiv= S inclusiv� S inclusi��e S 35.00 45.00 63.00 105.00 154.00 210.00 , $ 500,001 to 51,000,000 $1,000,001 to $2,000,000 $2,000,001 and over inclusive $ 315.00 inclusive $ 420.00 S 630.00 The parties hereto understand and agree that any harm to the City ^aused by the Contractor's delay in completing the work hereunder in the time specified by the Contract Documents would be incapable or very difficult of accurate estimation, and that the "Amount of Liquidated Damages Per Day", as set out above, is a reasonable forecast of just compensation due the City for harm caused by any delay. C7-7.11 SUSPENSION BY COURT ORDER: The Contractor shall suspend operations on such part or parts of the work ordered by any court, and will not be entitled to additional compensation by virtue of such court order, Neither will he be liable to the City in thz event the work is suspended by a Court Order. Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. C7-7.12 TEMPORARY SUSPENSIOti: The Owner shall have th2 right to suspend the work operation wholl�� or in part for such period or periods of tine as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the o�inion of the Owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract, for any reason, the Owner will make no e�tra payment for stand-by time of cons�ruction equipment and/or construction cre�s. If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such �anner that they will not obstruct or impede the public Lnnecessarily nor h�come damaged in any w-y, and he shall take every precaution to orevent damage or deterioration of the wor� perform�d; he shall provide suitable drainage about the wor�, and erect �emoorary s�ructures where necessary. Should tne Contractor not b� able to complete a portion of the p�oj?�t du? to causes beyo�a the control of and without the �ault or negli5er.ce oi �he Contractor as set forth in Paragraoh C7-7,8 EkTENSION OF THE 'rIME OF COMPLc1I0N, and should it be determined by mutual consent of the Contractor anc th� �ncineer that a so?ution to a11ow cor.str��ction to p�oceec �s r.o� available wzthin z reasonable pericc of time, �n�:� �r= Cc, t_acto= �;a�' D� �21?TID��rse� ior �he cost of movinQ ,. _ s �_ i�.,.e:� � o� ` thc j b 2;,d re`.Lrnina the ..ecessar __ _..._..t t� ..'�� �o� �w;^._.. _= _s c�t_rcined by t�� ..ngineer C�-7 (6) that construction may be resumed. Such reimbursem�nt shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. No reimbursement sha11 be allowed if the equipment is mov�d to another construction project for the City af Fort Worth. The Contractor sha11 not suspend work without wfitten notice from the Engine�r and s�all proceed with the work operations promptly when notified by the Engineer to so resume oo�rations. C7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because oL �ational Emergency, so declared by the President o� the Uni�ed States or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor, naterials, and equipment for the prosecution of the work with reasonable continuity for a pzriod of two months, the Contractor shall within seven days notify the City in writing, giving a detailed statement of the efforts which have been made and listing all necessary items of labor, materials, and equipment not ob�ainable. If, after investigations, the Owner finds that such conditions existing and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contract, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials and equipment within thirty days, the Contractor may request the Owner to terminate the contract and the Owner nay com�ly with thz request, and the termination shall be conditioned and base3 upon a final settlement n�ltually acceptable to both the Owner and the Contractor and final paymant shall be r,�ade in accordance with the terms o` the agreed settlenent, w�ich shall include, but not be limited to, the payment for all work executed but no anticipated profits on work which has not bzen perforned. C7-7.14 SUSPENSiON OR F.5ANDONMENT OF THE WORK AND P.NNULMENT OF CONTRACT: The work operations on all or any portion or section of the work under Contract shall be suspended im�ediately on written order of the Engineer or the Contract �;�ay b� declared cancelle3 by the City Council for any good an3 s�.:fficient cause. T�� following, by way of exanple, but not oE limitation, may be considered grounds for suspension or cancellation: - a. Failure of the Contractor to comnence work ogerations within the time specified in the Work Ord�r iss�sed by the Owner, C7-7 (7) b. Substantial evidence that progress of the work operations by Contractor is insufficient to complete the work within the specified time. c. Failure of the Contractor to provide znd maintain sufficient labor and equipment to properly execute the working operations. d. e. Substantial evidence that the Contractor has abandoned the work. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requir�ments of the Contract Documents or to comply with any orders given by the Engineer or Owner orovided for in these Contract Documents. g. Failure of the Contractor promptly to make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed in writing by the Engin�er or the Owner. h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud on the City in the construction of work under contract. i, A s�bstantial indication that the Contractor has naae an unauthorized assignment of the contract or any funds due therefrom for the benefit of any credit�r or for any otn�r purpose. J- k Ir the Contractor shall ror zny cause whatsoever not carry on the working op�ration in an acceptable �anner. If the Contractor commences legal action against the Owner. r. cony of the suspension order or ac�ion of the City Council shall b2 s�r�•ed on the Contractor's Sureties. hhen work is suspended ror any cause or causes, or when the contract is cancelled, the Contractor shall discontinue the work or such oart ther�o� as t�e Owner shall designate, whereuoon the Suretie=_ ��a�: , �t t:-:eir o��io:�, assu�e the contract or that DOL' �`.10.^. �.^.�'= =^v= P;;': � C.� t.Cl� �'+:i��r �"id5 o�cerec the CO.':�`.rZCtOr t.0 ciscon`.ir.��=, _..� ...-_ ��� Eo�-:�. t�e s=-._ o= ms�•, with =:�� written C7-7 (8) � � �1 consent of the Owner, sublet the work or that portion of the work as take� over, provided however, that the Sureties shall r* exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon " the Contractor and upon the Sureties or their authorized _. agents. The Sureties, in such event shall assume the � Contractor's place in all respects, and shall be paid by the Owner for al1 work performed by them in accordance with the terms of the Contract Documents. All monies remaining due the �Contractor at th= time of this default shall thereupor. become ` due and payable to the Sureties as the work progresses, subject to all of the terms of the Contract Documents. � In case the Sureties do not, within the hereinabove specified �` time, ex�rcise thzir right and option to assume th2 contract �, responsibilities, or that portion thereof which the Owner has ordered by the Contractor to discontinue, then the Owner shall � have the pow2z to complete, by contract or otherwise, as it nay determin�, the work herein described or such part thereof � as it may deem necessary, and the Contractor hereto agrees that the Owner shall have th� right to take possession of and use any materials, plants, tools, eq:iipment, supplies, and � property of any kind provided by the Contractor for the purpose o� carrying on the work and to procure other tools, "` equipment, c�aterials, labor and property for the completion of � the work, and to charge to the account of the Contractor of said contract expense for labor, materials, tools, equipment, � and all expenses incidental thereto. The e�pense so charged sha11 be deducted by the Owner from such monies as may be due � or may become due at any time thereafter to the Contractor under and by virtue of the Contract or any part thereof. The Owner SY12� 1 no� be required to obtain the low�st bid for the � wor}: com�let� ng th� contract, but the expense to b� deducted shall be tn� actual cost of the owner of such wor;c, In case such exp�nses shall exceed the amount which would have � been payable under the Contract if the sam� had been completed by the Contractor, then the Contractor and his Sureties shall pay the arn�•snt of such excess to the City on noticz from the � Ownsr of the e�:cess dse. When any particular part of the work � is being carried on by the Own�r by contract or otherwise under the provisions of this section, t�,e Cor.tractor shall continue �he re.,;ainder of the work in conforr,-�ity with the � ter�rs of the Co�tract Docum_nts and in suc;� a manner as to not hinder or interfere with performance of the work by the Owner. ' C7-7.15 FULFILLMENT OF CONTRACT: The Contract will be coasid�re� as hacing been Lulfilled, save zs provided in an�� bond or 5�::�S O� Dy law, wh�:� a11 the w�r;c a:�d ��? sections or � D�.'_��S O� �..� D=Cj_..� COV..��� tiJ�� �til� C0:1�_c:'� U�C_: �?.'1�.S rl?Va � � � been finished and completed, the final inspection made by the Engineer, and the final acceQtance and final payment made by the Owner. C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: A. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner in whole, or from time to time in part, in accordance with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner. Any such termination shall be effected by mailing a notice of termination to the Contractor specifying the extent to which performance of work under the contract is terminated, and the date upon which such termination becomes effective. Rzceipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail by the Owner. Further, it shall be deemed conclusively presumed and establishe3 that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. ' � � � B, CONTRACTOR ACTION: After receipt of a notice oF termination, and except as otherwise di•rected by � the Engineer, the Contractor shall: 1. Stop work under the contract on the date and � to the extent specified� in the notice of ternination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for comoletion of such portion of the work under the contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the notice of termination; �. �ransfer title to the Owner and deliver in �I7� I:;�R;l�r � u� �`. t.�'1? t 1Iii�?S � dRQ t.0 t.r?? 2Xtent � if an_, dir��t�c by the Engineer, �--� �_��i ' , � � � 1 � a. the Fabricatzd or unfabricated parts, work in process, completed work, supplies and other material produced as a part of, or acquired in connection with the performance of, the work terminated by the notice of termination; and b, the completed, or partially completed plans, drawings, infornation and other property which, if the contract had been completed, wou13 have been required to be furnished to the Ow�er. � _. 5, complete performance oE such part o.E the work as shall not have been terminated by th� .-. notice of termination; and �"' 6. take such action as may be necessary, or as the Engineer may direct, for th� orotection � and preservation of the property related to its contract which is in the possession of the Contractor and i� which the Owner has or � may acquire the r2st. � At a time not later than 30 days after the _. termination date specified in the notice of termination, the Contractor may submit to the �" Engineer a list, certified as to quantity and guality, of any or all items of termination � inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by the Engine�r. Not later than 15 days � therzafter, the Own�r sha11 accept title to such items provided, that the list subnitte3 shall be subject to verification by the Engineer upon removal of the items or, if the items are stored, � within 45 days from the date of sub�ission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final , settlement. C, TERhiltv�,TION CLAIM: Within 60 days af`.er notice of � ternination, the Contractor shall submit his termination claim to the Engineer in the form and with the certification prescribed by the Engineer. 1 Unless one or more extensions in writing are granted by the Owner upon reau�st of the Contractor, made in writing within such 60-3ay p�rio:� or authorize3 extension th=reo`, any and all � S11�.41 ClZlii'.S SLl?11. .`�� CO;1C1L1S1Vcly Q�e:�?c� Wc�'_V?..^.^i. .w w�a � C7-/ (11) D. AMOUNTS: Subject to the provi�ions of Item C7-7.16(C), the Contractor and Owner may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by r?ason of the total or partial termination of work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the total contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not terminated. The contract shall be amended accordingly, and the Contractor shall b2 paid the agreed amount. No amount shall be due for lost or anticipated profits. Nothing in C7-7.16(E) hereafter, prescribing tne amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be de2med to limit, restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. E. FAILURE TO AGREE: In the ev2nt of the failure oF the Contractor and the Owner to agree as provided in C7-7.16 (D) upon the w�ole amount to be paid to the Contractor by reason of the tzrmination of work pursuant to this section the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. �. DEDUCTIONS: In arriving at the anount due the contractor under this section, there shall be deducted (a) all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract; (b) cny claim which th=_ 0wr.er may nave against tne Cor.tractor �n connectio� with this contract; and (c) the 3greec price for, or the proceeds of sale of, any naterials, suoplies or other things kept by the Contractor or sold, ours;�ant to the �rovisions of this clause, and not otherwise recover2d by or creaited to th� Owner. �, rDJUS1r�Lr�T: If the termin�tion hercunder be ��r�ial, ��io� to the szt�le:�ent cf the terminate3 _..: �10!'� OF t:l'_S COC:��ZCt � �f?� CORtr'c.'��O?" r.:av file '.:��:i �flE ��.^.�^:2=r a recues� ifl W?'1�_i:C Lr�r �ufl Ci-% (12) � � equitable adjustment of the price or prices speciFied in the contract relating to the continued � portion of th� contract (the portion not terminated by the notice oF termination), such equitable adjustment as may be agreed upon shall be made in � such price or prices; nothing contained herein, however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the co�npletion of the � continued portion of the contract when said contract does not contain an established contract price for such continued portion. � H. NO LIMITATION OF RIGHTS: Nothing contained in this '� se,:tio� sha11 limit or alter th� riants which th� ^ Owner may have for termination of this contract under C7-7.14 hereoF entitled "Suspension of � Abandonment of the work and Am`ndment of Contract" or any other right which Owner may have for default �+ or breach oF contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: Th� �ontractor shall be �,,,, responsible for initiating, maintaining, and sup�rvising all safety precautions and programs in connection with the work at ' a11 times and shall assume all responsibilities for their enforcement. I�r The Contractor shall coinply wi�h federal, state, and local laws, ordinances, and re�ulations so as to protect person and property from injury, including death, or damage in connection � with the work. ' 1 1 1 L 1 t C7-7 (13) ' PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT � C8-8.1 MEASUREMENT OF QUANTITIES: The deterriination of quantities of work performed by the Contractor and authorized � by the Contract Documents acceptably completed under the terr,ls of the Contract Docume�ts sha11 be made by the Engineer, based on measurements made by th� Engineer. These measurements will be made according to the United States Standard Measurements � used in common practice, and will be the actual length, area, � solid contents, numbers, an� weights of the materials and items installed. C8-8.2 UNIT PRICES: When in the Proposal a"Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. � The "Unit Price" shall include al1 permanent and temporary -� protection of overhead, surface, and underground structures, � cleanup, finished, overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other causes, delays, profits, injuries, damages claims, taxes, an3 all � other items not specifically mentioned that may be required to fully construct each iten of the work complete in place and in a satisfactory condition for operation. � C6-8.3 LUMP SUM: tvhen in the Proposal a"Lump Sum" is set forth, the said "Lump Sum" shall re�resent the total cost for .-. the Contractor to furnish all labor, tools, materials, � ma�-hinery, equi�ment, a�purtenances, and all subsidary work necessary for the construction and completion of all the work to provide a com�lete and functional item as detailed in the � Special Contract Documents and/or Plans. � C8-8.4 SCOPE OF PAYMENT: The Contractor shall receive and ; i accept the compznsation, as herein provided, in full payment � for furnishing all labor, tools, materials, and incidentals for performing al1 work contemplated and embraced under these , Cor.tract Documents, for all loss and damage arisin� out of the na�ure o� the worK or `ro�n th� action of the elem�nts, for any unforeseen defects or obstructions which may arise or be � e:�cos�tz_�a du�i^_ th� prosec��tion of the work at any �ime C3-8 (1) L ' before its final acceptance by the Owner, (except as provided in paragraph CS-5.14) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or otner legal reservations, and for co��leteing the work in an acceptable nanner accorcing to the terms of the Contract Documents. The payment of any current or partial estimate prior to final accep�ance of the work by the Owner shall in no way constitute an acknowledgmen� of the 3cceptance of the work, materials, or equip^en�, no� in any way prejudice or affect the obligations oi the Contractor to repair, correct, renew, or replace at his own and proper expense any deFects or imperfections in th� construction or in the strength or quality of the material used or eauipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which de�ects, imperfection, or damage s�all havz been discovered on or before the `in=_1 inspec�ion and acceptance of work or during the one year guaranty period aFter final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to th? Owner for failure to correct the same as provided h2rein. C8-8.5 PP.RTIAL ESTIMATES AND RETAINAGE: Between the lst and 5th day of eacl� month the Contractor shall submit to the Engi�eer a stateT��nt snowina an estimate of the value of the work do�e c�rinQ the previous month, or estimate p?riod under tr�e Contract Docum�nts. Not later than the lOtli day of the r„onth the Engineer shall verify such estimat?, and if it is found to be acceotable and the value of work p�rformed since the last partial oaym�n`. was made exceads one hundred dollars (S100.00) in a�ount, 90� of such estimated sum will be paid to the Contractor if the total contract amount is less than 5400,000, or 95� oT such estimate3 sum wi11 be paid to the Contractor i?= the totai contrzct anount is $400,000 or greater within �w?ntv-riv� (25) days zFt�r the r2aular estimate period. The Citv will have the option of oreoaring estimates on forms �urnished by the City. The partial estimate nay include acce��able r.or.o�rishaole materials dzlivered to the work which ara to be incorgorate�3 into the work as a oer�:anent part the_e�`, b.:� waicn at tt�,e th� `ir�e of the estir��ate have not ��2.^. '_:'.��'�� 1� :. � SL'Cfl D2��,T:�;i�. W1� 1 b� d110W�C� 0C: '� bdS1S Of ��"__ c� =n_ ..�� �:�ro:�= �al�� th�reof. ) The Con�r'cCL0r snall � _. - «.. __.� �. _ _..�_. ti..�.. �_.ic_,. � __�� �� �:� r.=v rY� ����. �o �:.� 4�.-� . � r � � � him as a guide i� the verification or the preparation of par�ial estimates. It is understood tha� the partial estimate from month to month will b� approximate only, and all partial monthly estimates and payment will be subject to correction in the estimate rendered following the discov�ry of an error in any previous estimate,and such estimate shall not, in any reso�ct, be taken as an admission of the Owner of the amount of work done or of its quality o£ sufficiency, oL as an acceptance of the work done or the release of the Contractor of any of his responsibiliti?s un3ar the Contract Documents. The City reserves thz right to withhold the paym�nt of any mo7tnly es�ir�ate if th� contractor fails to perform the work strictly in accordance with the soecifications or provisions of this contract. C8-8.6 WITHH0LDING PAYMENT: Payment on any estimate or � estimates may be held in abeyance if the performance oF the construction operations is not in accordance with the requirements of the Contract Documents. C8-8.7 FINAL ACCEPTAIvCE: Whenevar the improvem�nts provided for by the Contract Documents shall have been completed and all requir�ments of the Contract Documents shall have been fulfilled on the part of the Contractor, the Con�ractor sha11 notify the Engin�er in writing that the improvem�nts are ready for the final inspection. The Engineer shall notify the appropriate officiaLs of the Owner, will within a reasonable tirne make such final insp?.ction, and if the work is satisfactory, in an acceptable condition, and has been comoleted in accordance with the terms of the Contract Documents and all approved modifications thereoF, the Engineer will initiat� the processing of the final estimate and recommend final acceptance of the project and final payment thereFor as outlined in �8-8.8 below. C8-8.8 FINAL PAYMENT: Whenever all the improver�=nts provid�d � for by th� Contract Documents and all approved nodifications u thereof shall hav� been completed and al1 requir��?nts of the Contract Docum�nts have beer. fulfilled on the part of the ^t Contractor, a final estimate showing the value of the wor;c � will be prepared by the Engineer as soon as the necessary maasurements, computations, and ch�cks can be made. � � � Al1 Drior estimates upon which payment has b�en made are subject to necessar�• corrections or r�visions in the final o a y,;.� a � . C8-$ (3) Tne amount of the final estimate, less previous payments and any sum that have been deducted or retained under the provisions of the Contract Documents, will be paid to the Contzactor within 60 days after final acceptance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the Owner satisfactory evidence of payment as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit, as Furnished by the City, certifying that all persor.s, firms, associations, corporations, or otner organizations furnishing labor and/or macerials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are no claims p2nding for oersonal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall ooerate as and shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under Contract Documents or any act or neglect of said CiLy relating to or connected with the Contract. � Tne making of the final paym�nt by the Owner shall not relieve the Contractor of any guarantees or other requirem�nts of the Contract Documents which speciEically continue ther�after. � C8-8.9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent Engine�rs an� designers to prepare the Contract Docunents and all modifications of the ao�roved Contract Documents. It is, therefore, agreed that the Owner shall be responsible for the adequacy of its own d?sign features, sufficiency of the Contract Documents, the safety of the structure, and the practicability of the op�rations o� th� completed project, provided the Contractor has complied with the reauirenents of the said Contract Documents, all ao�roved modifications thereof, ana adaitions and alterations tnereto approved in writing by th� Owner. The burden of proof of such complianc� shall b� upon the Contractor to show that he has complied with the said requirem�nts of t�,� Contract Documents, ap�roved r:.odifications �hereof, and all ap�roved additions and alterations thereto. CS-8.10 GEh�RAL GUARANTY: Neither the final cer�ificate of payment nor any provision in the Contract Doc�me�ts nor partial cr entirz occupancy or use of the pre,.-:ises by the O�.:ner shall co�s�itute an acceptance of work net done in accordazce wit�: tne Contract Documents or r2lieve the Co:�tra�to� c= 'i�'�ilit�. i� �esne�`. to aay ex�re�=_ •«arra„�ies o= r�s�o��_�_? it�• ��� =a�? �v naterials o: wo�-k-.��:shi�. Tne Cc::�.�.._.,_ _-.:.'_� __:�,��; _:�_ ce��...c� o� d�::�ac�s i�. �.._ work and cs—s cY� � � � pay for any camage to other work resulting therefrom which shall appear within a oeriod of one year from the date of � final acceptance of the work unless a longer period is � specified andshall furnish a good and sufficient naintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general � guaranty as above outline. The Owner will give notice of observea d�f2cts with reasonable promotness. � C8-S.11 SliBSIDIARY WORK: Any a;�d all work s�=cifically governe3 by docum�ntary requirem�nts for the �roje�t, such as condi�ior.s inpose3 by the Pl�ns, the Genera? Contrac` �I Documents or these Sp�ciat Contract Do�Ln=nts, :� which no ,�, specific it�� for bid has been provided for in th=_ Proposal, sha?1 b� co�sid�re� as a su�siaiary item oL work, the cost of r. cahich shall b� included in the price bid in the P�onosal, cor � each bid ite�. SurEac� restoration, roc�c excavation and cleanug are general it2ms of work which fall in the category _ of subsidiary work. �i C8-8.12 r:ISCELLANEOUS PLACEMENT OF MATERIAL: Material may be alloca�e3 un��r various bid ite:ns in tr,� Pro�osal to establish � uni� prices for miscellaneous placement of material. These J nat=rials shall be used only when directed by th=_ Engineer, dep�ndin7 on field conditions. Paymert for miscellaneous _, placem�nt o_` nat�rial wi11 ba made for only that amount of � material use3, measured to the nearest one-tenth unit. Payn�nt for misc�llaneous place:nent of nat�rial shall be in accord�nc� with the General Contract Docum�nts r��ardless or � the actual a�ount used for the project. C8-8.13 ?�CO: D DOCUhIENTS: Cor�tractor snall ke�� on record a � cooy o� al? soecifications, �lans, addenaa, riodi�ica�ions, shop craw�n�s and sar-�ples at the site, in gooc oraer and annotat�a �o sho�.; all cnange� nade during the cc�5truction � process. in�se s�al1 be delivered to Engineer upo^ completion of �ne wor;�. ' ' C 1 cs—s cs> 1 � � ' � � � � PART C 1 SUPPLEMENTf1RY CONDITIONS TO PART C �-- 9GSa300 Specs.wpd � � SUPPLEAIENTARY CONDITIONS TO PART C � A. General These Supplementary Conditions amend or supplement the General Conditions of the �''' Contract and other provisions of the Contract Documents as indicated below. �.. Provisions which are not so amended or supplemented remain in full force and affect. B. Paragraph C3-3.? should be deleted in its entirety and replaced �vitli the following: � Upon request, Contractor agrees to provide to Owner complete and accurate � information regarding actual work performed by a Minority Business Enterprise (MBE) anci/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records � or files in its possession that �vill substantiate the acttial work performed by an MBE and/or WB�. The misrepresentation of facts (other than a negligent ' misrepresentation) and/or the commission of fraud by the Contractor will be grounds � for termination of the contract and/or initiating action under appropriate federal, state or local laws or under appt•opriate federal, state or local laws or ordinances relating to � false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being � deterinined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. Part C- General Conditions: C3-3.7 Bonds, the paragraph aftcr subparagraph d. Change the paragtaph to i•ead as follows: "No sureties will be accepted by the Owner which are at the time in default ot• delinquent on any bonds or which are interested in any litigation against the Owner. All bonds shall be made on the forms furnished by the Owner and the surety shall be acceptable to the Owner. In order for a surety to be acceptable to the City, (1) tlie name of the surety shall be included on the current U.S. Treasury List of' Acceptable Sureties {Circular 870}, or (2) the surety must have capital and surplus equal to ten times the ainount of the bond. The surety must be licensed to business in the state of Texas. The amount of the bond shall not exceed the amount shown on the Treasuiy list or one-tenth (1/10) of the total capital and surplus. If reinsurance is required, the company «�riting the reinsurance must be authorized, accredited or trusteed to do business in Texas." Section C8-8.5 should be deleted in its entirety and replaced with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the �vork is in progress. The estimate shall be proceeded by the City on the lOth day and 25th day respectively. Estiinates �vill be paid within 25 days follo�ving the ei�d of the estimate period, less the appropriate retainage as set out belo�v. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the �vork as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such inaterials are included which a pay estiinate, payment shall be based upon 85%of the net voice value thereof. The Contractor will furnish the Engineer such inforination as inay be reasonably requested to aid in the verification or the preparation of the pay estimate. ' �GS•1340_Specs.wpd Part C1 - 1 i � � I'or contracts of less than S��00,000 at the time of e.r•ecutioii, retaiiiage shall be ten ,,,,,� percent (10%). For contracts of $400,000 or more at the time of eYecution, retainage � shall be five percent (5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to inake the required payments to subcontractors will authorize the City to withhold future payments froin the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate �i e rendered following the discovery of the mistake in any previous estimate. Payment of any partial pay O�vner of the amount of work done or of its quality or sufficiency or as I� an acceptance of the work done; nor shall same release the Contractor of any of its responsibilities under the Contract Documents. � The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or I other provisions of this contract. E. Part C- General Conditions: Paragraph C3-3.11: Delete subparagraph a. F. Part C- General Conditions: Paragraph C3-3.11: Delete subparagraph g. �I� , �_ J ' ' ' � � � 9u5•1300 Specs.w•pd Part C1 - 2 , � , , � ' � � YART D SPECI�L COND1'I'IONS ' , 1 ' � 1 ' ' e��c:� i:,a��_s,��.�� �,,,�i D-3 D-4 D•5 D-G D•7 D•8 D•9 D-10 D• 11 D�12 D-13 D-ia D•15 D-IG D-17 D-18 D•19 D-2Q D-?1 D-2'l D•23 D•24 D•?S D•?G D•27 D•28 D•29 D-30 D-31 D-32 D-33 D-3-I D•35 D•3G D-37 D-38 D-39 D•40 D•�l D..32 D•a3 D-�14 D•45 D-4G D--17 D-48 D-49 D-50 D•51 D•5? D�53 D•5d D-55 D-56 D•57 D•58 D•59 D-G0 D-Gl D-G° D•G3 D�G 1 n�c:� U�GG D•G � D•GS D-G� SPECIAL CONDITIONS AWARD OF CONTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-1 SU[3�IISSION OF CONTRACT DOCUMENTS, CONSTRUCTION START TIME AND PRE-CONSTRUCTION SUB�(ITTAI,S ............................................................................. SC•1 GENERAL, ................................................................................ SC•1 T,a.\ EXEti4PT[ONS ......................................................................... SG2 P ROJE CT DESIGN?,TION ................................................................... SC-2 EQUr1L EhiPLOYI�tENT PROVISIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-2 PRE•CONSTRUCT[ON CONFERENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-3 COORDINATION bfEETINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-3 PROJECT ABANDON�iENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-3 BREAFiDOWN OF BID PROPOSAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•3 INDEh1Iv'IFICATION ........... SC-3 ........................................................ CONTRACTOR COb1PLI:INCE WITH �VORIiER'S COI�iPENSATION LAW . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•3 MINORITY AND WOMEN'S BUSINESS ENTERPRISE (I�f/WBE) CObiPLIAIdCE . . . . . . . . . . . . . . . . . . . . . . SG4 C[TY FURNISHED NLaTERIALS (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•5 SUBSIDI?,RY �4'O RI� ....................................................................... SC•5 �VAG E RaT ES ............................................................................. SG5 EASENIENTS AND PERMITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-6 COORDINATION Yl-'ITH FORT tib'ORTH WATER DEP.�RTMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SGG D�L�,GE TO PRIVATE PROPERTY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-? SHO P DR4�VINGS ......................................................................... SC-7 CROSSING OF EXISTING UTILITIES ......................................................... SC-7 EXISTING UTILITIES AND IMPROVEIvfENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-7 CONSTRUCTION TRAF'FIC OVER PIPELINES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC• i TRAFFIC CONT ROL ....................................................................... SC-7 PAI'I�IENT ................................................................................ SC•8 DE LAYS .................................................................................. SC-8 DETOURS ................................................................................ SC-8 B.aRRICADES AND �VARNING SIGNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•8 E�.A1biIN�TION OF SITE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-8 ZO N[NG COhiPLIAN CE ..................................................................... SC•8 �VATER FOR CONSTRUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-8 WASTE b�IriTERI:�L ........................................................................ SG8 CLEANUP FOR FIN:�L, ACCEPTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•8 PROPERTY ACCESS ....................................................................... SC-8 CONSTRUCTION SCHEDULE AND SEQUENCING OF IVORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-8 S.�F'ETY RESTRICTIONS - G�'ORI� NEAR HIGH VOLTAGE LINES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SG9 CONTRACTOR'S RESPONSIBILITY FOR D:1M.4GE CLAIMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-9 SANITA.RY FACILITIES FOR �NORKERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-9 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-9 RIG HT TO AUDIT ......................................................................... SC-10 INCREASE OH DECREASE IN QUANTITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-10 CUTTING OF CONCRETE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-10 PROJECT D ESIG NATION SIG N ............................................................. SC•10 CONCRETE SIDEWr1LK AND DRIVEWAY REPLACEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SG11 h1ISCELLANEOUS PLACEhIENT OF h�f.4TERIAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-11 TYPE��C„ BACI{FILL ...................................................................... SC•11 CRUSHED LIb1ESTONE B.�.CIiFILL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . SC•11 2:27 CON CRETE .......................................................................... SC•11 TRENCH EXCAVATION, BACIiFILL, AND COD4PACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-11 PAVEhfENT REPAIR (E2•19) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•12 TRENCH SAFETY SYSTEbt FOK �VATER DEPARTMENT PROJECTS ONLY . . . . . . . . . . . . . . . . . . . . . . . SC-12 SANITARY SEWER bLANHOLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SG13 S.�NITARl�' SEV�'ER SER�nCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-15 NOT USE D .............................................................................. SC•15 RENIOVAL, S:�LVAGE, AND ABANDONh1ENT OF EYISTINC FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . SC-15 DETECTABLE �V�RNING TA.PES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-16 PIPE CLEAIVIN G ......................................................................... SC-1G B.�RRICr1DES, WARNINGS, AND FLAG:�fEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-16 DISPOSaL OF SPOIL/FILL hLaTERIAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SG1G DIECH_�IJICS:IND bLaTERIALTfEN'S LIEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-17 S U BSTIT UTIO NS ......................................................................... SG 17 PRE-CONSTKUCTION TELEVISION INSPECT[ON OF S:�'�IITAKF SE�VER . . . . . . . . . . . . . . . . . . . . . . . . SC•17 �':�CUU�t TESTING OF S.�IJITARI" SE��'ER bL-INHOLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-19 B1'P�1SS PU�IP1tiG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SG19 .............. POST•CO�STRUCT[Oti TELE�'ISION INSPECT[ON OF S:1.NITARY SE�VER . . . . . . . . . . . . . . . . . . . . . . . SC•19 S.��IPLGS �D QUrlLIT1' CONTROL TESTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•21 TL�IPOR:�R1' EROS[Oti, SED[`IENT, AND WATER POLLUTION CONTROL . . . . . . . . . . . . . . . . . . . . . . . SG21 I`GRESS .�tiD EGRESS/OSSTRUCTION OF ACCESS TO DRIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•21 PROTECTIOV OF THEES, PIL��lTS :�ND SOIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-22 9G5l300_Spec;_YartD w'pd SC-I Revi�ed 1?!09/98 D•70 D•71 D-72 D-73 D-74 D•75 D-76 D•77 D-78 D-79 D•80 D•81 D-82 D•83 D-84 D-85 SITE RESTORATION ...................................................................... SC-22 CITY OF FORT WORTH STANDARD PRODUCT LIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC•22 STATE REVOLVING FUND (SRF) REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-22 TOPSOIL, SODDII�IG AND SEEDING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-22 CONFINED SPACE ENTRY PROGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-25 SUBSTANT1r1L CO1�1PLETION INSPECTION/FINAL INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-26 EXCAVATION NEAft TREES ................................................................ SC-26 CONCRETE ENCASEhfENT OF SEWER PIPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-26 CLAYD.AIvt .............................................................................. SC-26 E�CPLORATORY E:CCAVATION (D�HOLE) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-26 INSTALLATION OF WATER FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-27 SPRINIQ,ING FOR DUST CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-30 D EWATE RIN G ........................................................................... SC•30 TRENCEi EXCAVATION ON DEEP TRENCHES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC-30 TREEPRUNING .......................................................................... SC-30 TREE REMO�'AL ......................................................................... SC-31 9GSd300_Specs_PartD wpd SC-11 Re��ised 13/09/98 ' � . FOR: SANIT�RY SE�VER SYSTEbi REH.�.BILITATION AND IMPROVEMENTS FORT �b'ORTH, TEXAS CONTRACT XLV (45) SEWER PROJECT N0. PS 4G-070460172890 .`. D.O.E. Nos. 0798, 2348, and 2349 � D-1 AWARD OF CONTRACT: The City reserves the right to abandon without obligation to the contractor, any part of the project, or the entire project, at any time before the contractor begins any construction work authorized by the City. Award, if made, shall be to the responsive low bidder. The following shall apply for contract documents with multiple units of work. Each unit represents a separate project, each with i' an individual �f/WBE specification and proposal section. The proposat sections are arranged to a[low prospective bidders to submit bids on one unit, some of the units, or all of the units. Award of contract(s), if made, shall be to the responsive low bidder ' for each individual unit. If a contractor is the responsive low bidder on two units or more, a single set of contract documents consisting of al! applicable units will be created and one single award of contract shall be made. The Contractor shall comply —� wSch the Cit�s hi/�VBE Ordinance on each unit. Bidders shall submit individual and separate monthly M/WBE reports for each Unit included in the Contract. � Construction time on all units will run concurrently. For situations involving approved contracts with multiple unzts, the total r, allow•able construction completion time period for all the units shall be the same as the unit with the longest construction time perfod. D-2 SUB�IISSION OF CONTRACT DOCUMENTS, CONSTRUCTION START T[ME AND PRE-CONSTKUCT[ON SUB�IITTAI.S: The contractor(s) shall execute and return the contract documents to the Engineer within ten (10) working days after notification by the City. i� A Pre-Construction meeting date will be established and noted in the Letter to Contractor. The effective work order date will be set at the pre-construction conference. � The contractor(s) shall be required to start construction on the project no later than ten (10) calendar days after the pre- construction meeting date. The City shall begin to charge time on the project to the contractor eleven days after the pre- construction meeting date. r Per City ordinance 11923, the contractor(s) shall submit the letters of intent or a copy of the agreements with the approved •— bi/�VBE subcontractor(s) at or before the pre-construction conference. To expedite M/�VBE compliance contractors are strongly encouraged to submit the executed letters of intent (with h'I/WBE subcontractors) at the time of submittal of the UTILIZATION -• FORI�S or GOOD FAITH EFFORT FORh4. The letter(s) must be signed by both parties. If the contractor(s) fails to submit the letter(s) or agreement(s), ihe contractor(s) �vill no[ be allowed to begin work. Time on the project will s[art to accumulate at the I.r end of the ten (10) days as stipulated above. � r Additional submittals at time of pre•construction meeting shall include (but not limited to): Contractors Work Plan and Schedule Disposal Site £or Waste Material Information Sub-Contractar ldentification Trench Safety Design (if required) Confined Space Entry Program Name and number of a responsible person for off hour emergencies Project schedule �vhich must re�ect a project completion date to be determined by the completion time period stipulated in the proposal section. �" The pre-construction conference is intended as a forum between the contractor and the appropriate City staff to go over the project in detail and to afford the contractor the opportunity to submit all the required documents listed above. If the contractor fails to submit any of the required document9, the contractor will not be allowed to begin work and time on the project �vill start to accumulate. � D-3 GENERAL: The order or precedence irt case of conflicts or discrepancies between various parts of the Contract Documents subject Co the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: � 1. Plans ? Contract Documents 3. Special Conditions �' The follo�ti ing Special Conditions shall be applicable to thes project and shall govern over any conflicts with the General Contract Documents under the pro�•isions stated above. The Contractor shall be responsible for defects in this project due to faulty ' materials and �corkmanship, or both, for a period of one (1) y�ear from date of final acceptance of chis project by the City Council of the Cit}• of Fort «'orth and �cill be required to replace at his expense any part or all of this project which becomes defective '" due to these causes. rr � 9G3a300_Specs_Par[D µpd sC-1 Revised 12/09/98 r. Thc City reserves [he right to abandon, without obhgation to the Contractor, any part of the project, or the entire project, at any time before the Contractor begins any consiructiort work authorized by the City. Contract, if awarded, shall be as described in "Aw•ard of Contract" above. r.� Subject to modi6cations as herein contained, the Fort �Vorth lVater Department's General Contract Documents and General Speci6cations, with latest revisions, are made a part of the General Contract Documents for this project. The Plans, these Special � Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers name, or identi5cation indude therein as specifying, referring or implying product control, performance, quaiity, or other shall be bindrng upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though � required by all. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre-qualified with the Water Dep�rcment to perform such .�•ork in accordance �vith procedures described in the current Fort �Vorth Water Department General Specifications, which general specifications shall govern performance of all such work. This contract and projec[, where applicable, may also be governed by the two following published specifications, excep[ as �" modified by these Special Provisions: r 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCT[ON - CITY OF FORT WORTH -� 2. ST.4NDr1RD SPEC[F[CAT[ONS FOR PUBLIC �VORKS CONSTRUCTION - NORTH CENTRAL TEKAS A cop}• of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorcon Street, 2nd Floor, I�lunicipal Building, Fort Worth, Texas 7G102. The speciFications applicable to each pay item are indicated by the call•out for the pay item by the designer. If not shown, then applicable published specifications in either o£ these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Dicision 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully esecute contract without retaining contract documents intact may be grounds for desig�iating bids as "non-responsive" and rejecting bids or voiding contract as appropriate as determined by the Engineer. INTERPRETAT[ON AND PRF,PARATION OF PROPOSAL: ^ A. DELIVERY OF PROPOSP.L: No proposal will be considered unless it is delivered, accompanied by its proper Bid � Security, to the O«�ner or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deiiver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each � proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". B. WITHDRA�VING PROPOS:�LS: Proposals actually filed with the Owner cannot be withdrawn prior to the time set �,,, for opening proposals, A request for non-consideration of a proposal must be made in writing, addressed to Che Engineer, and filed with him prior to the tSme set for ihe opening of proposals. After all proposals not requested for � non-consideration are opened and publicly read aloud, the proposals fur which non-consideration requests have been properly filed mav, at ihe option of the Ow•ner be returned unopened. �� C. TELEGRAPHIC MODTFICATION OF PROPOSr1LS: Any bidder may modify his proposal by telegraphic � communication at any time prsor to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing hlanager prior to the said proposal opening time, and provided further, that the City �fanager is satisfied chat a Fvritten and duly authenticated confirmation of such telegraphic communication over the � signature of che bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty- eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. D-4 TAX EXEbIPTIONS: This contract is issued by an organization which qualifies for exemption pursuant of the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act. All equipment and materials not consumed � by or incocporated into the project construction, are subject to Sta[e sales tat under House Bill 11, enacted August 15, 1991. All such taees shall be included in the various amounts on the Proposal Form. The successful Bidder shall be required to submit a breakdo�vn between l�bor and material costs prior to execution of the contract. D-5 PROJECT DESIGNATION: Construction under these Special Documents shall be performed under the Project Designation: Project No. PS 4G-0c0-1G017?890. �, D-6 EQUAL E1IPLOY�IENT PROVISIONS: Contractor shall comply Gcith Cit}• Ordinance Number 7278 as amended bc Cin• Ordinance \umber �-S00 (Fort \�'or�h Cit�• Code Sections 13-A•21 through 1?-A-29) prohibit�ng discriminat�on in _, emplu�•ment practices. The �ntractor shall post the required notice to that effect on the project site, and at his request, �vill be provided assistance by —' the City of Fort ��"orth's Equal Emplo�•ment Officer �vho �cill refer any qualified applicant he may have on file in his of5ce to the � Con[ractor. :�ppropriate notices ma}• be acqu�red from the Equal Employment Officer. � 9G51300_Specs_PartD �cpd ��-� Revised 12/09l98 D-7 PRE-CONSTRUCTION CONFERENCE: Before the project work order is issued, a pre-construction conference shall be held with representatives of the following agencies present: City Engineering Depariment, City Water Department, City Public Works Department, other interested City Departments (such as Traffic), interested utility companies (such as gas, telephone, and electric), Design Engineer and the successful Contractor. Contractor shall submit a schedule of operations at the pre�construction conference. D-8 COORDINAT[ON 1�1EETINGS: For coordination purposes, weekly meetings at the job site may be requrred to maintain the project on the desired schedule. The Contractor shall be present at all meetings. D-9 PROJECT r1BAI�iDONi�tENT: The City reserves the right to abandon, without obligation to the Contractor, any part of the project, or the entire project, at any time before the Contractor begins any construction work authorized by the City. D-10 BREAKDO�i'N OF BID PROPOS�iL: �Vhen requested by the Engineer, the Contractor shall furnish a cost breakdown of those bid items shown in the Proposa] as lump sum items. This information is for use in the preparation of a recommendation to the City for award of contract. D-11 INDEhINIFICATION: The Contractor agrees to fully indemnify and save whole and harmless the City, Otiener and Engineer from all costs or damages arising out o£any real or asserted claim or cause of action against it of any kind or character and in addition from any and all costs or damages arising out of a�y wrongs, injuries, demands or suits for damages, either real or asserted, claimed against it that may be occasioned by any act, omission, neglect or misconduct of the said Contractor, his agents, sen�ants and employees. The Contractor further agrees to comply with all applicable laws, regulations, ordinances, building and construction codes of the City of Fort Worth and State of Texas and with any regulations for the protection of workers which may be promulgated by the Government and shall protect such work with all necessary lights, barriers, safeguards and warnings as are provided for in said specifications and in the ordinances of said City. D-12 CONTRACTOR CO:1-IPLIANCE WITH WORKEB'S COMPENSATION LAW: A. Definitions: Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self• insure issued by [he commission, or a coverage agreement (TlVCG81, TWCC-82, TWCG83, or TWCG84), showing statutory tivorkers' compensation insurance coverage for ihe person's or entitvs employees providing services on a project, for the duration of the project. Duration of the project - includes the time £rom the beginning of the �vork on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in §40GA96)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has emplayees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, o�vner operators, employees of any such enti[y, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related [o a project. "Services" does not include activities unrelated to the p►-oject, such as food/beverage vendors, o�ce supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contrac[. D. If the coverage period sho�ti�n on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificaces of coverage showing coverage for all persons providing services on the project; and 2. No later than seven days after receipt by the contractor, a ne�vi certificate of coverage showing extension of coverage, if the coverage period sho«n on the current certificate o£coverage ends during the duration of the project. F. The contractor shall retain all required certificates of co��erage For the duration of the project and for one year thereafter. G. The contractor shall notif}� the go�•ernmental entity in writing by� certifed mail or personal delivery, within ten (10) da}�s after the contractor knew or should have known„ of any change that materially affects the provision of coverage of any person providing services on the pi•oject. 9GSJ360_Spec�_PartD Kpd SC-3 Revised 1?/09/98 The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of che project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided £or all employees of the person providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with �ehom it contracts, and provide to the Contractor. a) b) A certificate of coverage, prior to the other person beginning work on the project; and A new certi5cate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain alt required certi�cates of coverage on 61e for the duration of the project and for one year thereafter. G. Notify the governmen[al entity in writing by certified mail or personal deLivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision o£coverage of any person providing services on the project; and 7. Contractually require each person wi[h whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage �vill be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements wili be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the go��ernmental entitp to declare the coniract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. The coniractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notsce does not satisfy other posting requirements imposed by the Texas �b'orker's Compensation Act or other Texas �Vorker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker populatiofi. The text for the notices shall be the following test, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGF. "The law requires that each person ��•orking on this si[e or providing services related to this construction project must � be covered by a�orkers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the pro}ect, regard►ess of the identity o£ their emplo�•er or status as an employee. "Call the Tesas Worker's Compensation Commission at (512)440-3789 to receive information on the legal requirement for cocerage, to verify �vhether pour emplo}�er has provided the required cocerage, or to report an emplo}•er's failure to provide coverage". D-1:� hI1tiORITT A\D «'OA1EN'S BUSINESS ENTERPR[SE (lI/NBE) CO:�IPLIANCE: In accordance with City of � Fort «'orth Ordinance No. 119?3, the Cicy of Fort «'orch has goals for the participation of minorit�• business enterprises and �vomen business enterprises in City contracts. The Ord[nance is incorporated in these spec�fications by i•eference. A copy of the � Ordinance ma}• be obtained from the Oflice of the City Secretary. Failure to comply �vith the ordinance shall be a material breach of contract. � The AL'��'BE CiTILIZ_�1'IOV FORJI, :�1/«BE CO:�L.S ��'.-IT��R FOR�I :1ND GOOD FrIITH EFFORT FOR�I, as applicable, must be submicted within fi�•e (5) city business days after bid opening. Failure to compl} shall render the bid non-responsive. � 9GS IJ00_Specs_PartU.wpd Sc--1 Revised 12/09/98 Upon request, contractor agrees to provide the City complete and accurate information regarding actual work performed by a Minority or Women Business Enterprise (l�f/�VBE) on the contract and payment thereof. Contractor further agrees to permit an audit andlor examination of any books, records or files in its possession that will substantiate the actual work performed by an biBE andlor �l'BE. The misrepresentation of acts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, s[ate, or local laws or ordinances relating to false statement. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of £raud will result in thc Contractor being determined to be irresponsible and barred &om participating in City work for a period of time of not less than three years. The City will consider the contractor's performance regarding its ht/WBE program in the evaluation of bids. Failure to comply with the Cit}�s M/b4'BE Ordinance, or to demonstrate "good faith effort", shall result in a bid being rendered non-responsive to specifications. Contractor shall provide copies of subcontracts or co-signed letters of intent with approved bt/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly reports on utilization of the subcontractors to the City's bf/WBE office. The Contractor may count first and second tier subcontractors and/or suppliers toward meeting the goals. The Contractor may count toward iks goal a portion of the total dollar amount of the contract with a joint venture equal to the percentage of the b1/4VBE participation in the joint venture for a clearly defined portion of the work to be performed. All NI/�VBE contractors used in meeting the goals must be certified prior to the award of the Contract. The M/�VBE contractor(s) must be certified by either the North Central Texas Regional Certi6cation Agency (NCTRCA) or Texas Department of Transportation (TXDOT), Highway Division and must be located in the nine (9) county marketplace at time of bid. The Contractor shall contact all such M/WBE subcontractors or suppliers prior to listing them on the hI/�VBE utilization or good faith effort forms as applicable. Failure to contact the listed NI/�VBE subcontractor or supplier prior to bid opening may result in the rejection of bid as non-responsive. �Vhenever a change order affects the work of an hf/WBE subcontrac[or or supplier, the D1/WBE shall be given an opportunity to perform the work. Whenever a change order exceeds 10% of the original contract, the b1l1tiBE coordinator shall determine the goais applicable to the work to be performed under the change order. During the term of the contract the contract shall: 1. Make no unjustified changes or deletions in it's bi/WBE participation commitments submitted wxth or subsequent to the bid, and, If substantial subcontracting and/or substantial supplier opportunities arise during the term of the contract which the contractor had represented he would perform with his forces, the contractor shall notify the City before subcontracts or purchase orders are let, and shall be required to comply with modifications to goals as determined by the City, and , Submit a ftEQUEST FOR APPROVAL OF CfiANGE FORM, if the contractor desires to change or delete any of the M/WBE subcontractors or suppliers. Justi6cation for change may be granted for the following: a) Failure of Subcontractor to provide evidence of coverage by Worker's Compensation Insurance. b) Failure of Subcontractor to provide required general liability of other insurance. c) Failure of Subcontractor to execute a standard subcontract form in the amount of the proposal used by the Contractor in preparing his 141/WBE Participation plan. d) Default by the M/\VBE subcontractor or supplier in the performance of the subcontractor. Within ten (10) da}'s after final payment from the City, the contractor shall provide the I�I/�VBE Office with documentation to retlect 6nal participation of each subcontractor and supptier used on the project, inclusive of rt/WBEs. D-14 CITY FURNISHED riIATERIAI.S [O.ti17TTEDJ D-15 SUBSIDIARY VVOAK: Any and all Gcork specifically governed by documentar}• requirements for the project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal for each bid item. Surface restoration, removal aiid replacement of fencing, and cleanup are general items of �cork «•hich fall in the category of subsidiary work. D-1G NAGE RATES: The labor classifications and minimum wage rates set forth herein have been predetermined by the Cit�• Council of the City of Fort �Vorth, Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govern on all work performed b�• the Contractor or any Subcontractur on the sire of the project covered by these Contract Documents. In no event shall less than the following rates of �vages be paid. 9G5�1300_Specs_PartD.wpd Sc-5 Revised 12/09/98 *.'q�y,��r.S. i+q . CITY OF FORT WORTH HIGHWAY CO�ISTRUCTION PREVAILING WAGE RATES FOft 1995 CLASSIF[CATION Air Tool Operator Asphalt Raker Asphalt Shoveler Batching Plant Weigher Batcerboard Setter Carpenter Concrete Finisher (PA� Concrete Finisher (STRS) Concrete Rubber Electrician Flagger Form Builder (STRS) Form Liner Form Setter (Pav & Curb) Form Se[ter (Structures) Laborer, Common Laborer, Utility Niechanic Oiler Servicer Piledriver Pipelayer Blaster POWER EOUIPhIENT OPERATORS Asphalt Distributor Asphalt Paving blachine Broom or Sweeper Operator Bulldozer, 150 HP or Less Bulldozer, Over 130 HP Concrete Paving Curing Mach. Concrete Pav Finishsng Mach. Concrete Paving Form Grader Concrete Paving Joint Mach. Concrete Paving Joint Sealer Concrete Paving Float Concrete Paving Saw Concrete Paving Spreader Slipform h4achine Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (L,ess than 1%, cy) Crane, Clamshell, B�ckhoe, Derrick, Dragline, Shovel (1 '/2 cy � Over) Crushing or Scrng Plt Opr. Elevating Grader Foundation Drill Oper. (Crawler �Iounted) RATE $7.55-t �8.5G5 $8.255 $9.3? 1 $8.920 $9.447 $�J.343 �9.058 $7.733 $12.761 $5.598 �8.717 $8.913 $8.686 $8.427 $G.402 $7.4G1 $10.658 $8.G98 $8.104 $7.500 $8.509 $11.333 �w8.404 �9.053 $7.908 �8.703 S9.1G0 $8.213 �9.453 $8.500 S9.0�42 $"r.33U $7.875 �9.290 $9.750 �9.000 �9.513 �10.517 $9.600 � 10.000 CLASSIFICAT[ON Foundation Drilt Operator (Truck Mounted) Foundation Drill Oper Helper Front End Loader (2 Y� CY or Less) Front End Loader (Over 2'h C1� Hoist (Double Drum & Less} Alilling Machine Operator Nlixer (Over 16 CF) I�fixer (16 CF & Less) Mixer • Concrete Paving Motor Crader Operatar (Fine Grade) blotor Grader Operator Pavement I�iarking Machine Posthole Driller Operator Roller, Steel Wheel (Plant-blix Pavements) Roller, Steel Wheel Bulldoaer (Flatwheel or Tamping) Roller, Pneumatic Self-Pro Scraper - 17 CY & Less Scraper - Over 17 CY Side Boom Tractor - Crawler Type (150 HP & Less) Tractor - Crawler Type (Over 150 HP) Tractor - Pneumatic Traveling Ivfixer Trenching Machine - Light Trenching Machine - Heavy «'agon•Drill, Boring blachine Rein£orcing Steel Setter (Paving) Reinforcing Steel Setter (Structural) Steel�Vorker- Structural Sign Erector Spreader Box Operator Barricade Servicer Zone �V6. Nfounted Sign Installer (Permanent Ground) Truck Driver - Single Axle (I.ight) Truck Driver - Single Axle (Hea�y) Truck Driver - Tandem Axle (Sem i-Trailer) Truck Driver - Lowboy/Float Truck Driver - Transit btix Truck Driver - �'inch Vibrator Operator �Velder RATE �11.138 $8.823 $9.311 $8.917 $6.650 �9.000 $7.913 $9.500 $10.346 $9.891 $G.402 $9.000 $8.339 $7.963 $7.403 $8.138 58.205 57.793 $8.448 $8.873 $7.735 �7.615 $8.188 �12.498 $9.000 $9.218 511.548 "�IG.300 �11.436 $6.988 SG.402 $6.402 $i.4G5 Si3.0G7 �7.81G $�J.G53 57.507 $8200 $7.000 $10.439 D-17 EASEbIENTS AND PERMITS: The performance of this contract requires certain temporary construction and/or right-of•entry agreements to perform work on private property. The City has attempted to obtain the temporary construction and/or right-of-entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer Lnes or manholes. For focations where the City was unable to obtain the easement or right•of•entr}•, it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements which the City has obtained are available to the Contractor for review by concacting the plans desk at the Department of Engineering, City of Fort �Vorth. rllso, it shall be [he responsibility of the Contractor to obtain written permission from property o�cners to perform such «rork as cleanout repair and se«•er service replacement on private property. Contractor shall adhere to all requirements of Paragraph CG•G 10 of che General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that ma}• hace been imposed on these agreements, by the property owners. The easements and/or private propert}• shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by- the Contractor, it shall be the Contractor's responsibility to obtain �vritten permission from the property o«•ners invol�ed for the use of addi[ional propert� required. No additional pa}•ment �cill be allowed for this item. D-13 COORDIti.�T1O� �4TTfi FORT «'ORTH �VATER DEP�IRTJIEtiT: During the construction of this project, it will be necessary to deac[i�•ate, for a period of time, esisting lines. The Contractor shall be required to coordinate with the Water Department to determine the best times ior deacti��ating and activating those lines. 9G5a300_Specs_PartD wpd sC-6 Revised 1?!09/98 D-19 DAMAGE TO PRIVATE PRUPERTY: The Contractor shall immediately repair or replace any damage to private property, including but not Gmited to fences, walls, pavement and water and sewer services, at no cost to the Owner. This shall be subsidiary to the contract and not a separate pay item. D-20 SHOP DRA�NNGS: Shop drawings shall be submitted by the Contractor to the Construction Engineer, for all equipment and materials for this project. Shop drawings shall be submitted in quintuple (5) and two (2) shall be returned to the Contractor. Shop drawings must be approved by the Engineer prior to the start of work. D-21 CROSSING OF EXISTING UTILITIES: Where a proposed water line crnsses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made water tight or be constructed oF ductile iron pipe. The required length of replacement shal] be determined by the Engineer. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe «�ith polyethylene wrapping. Adapter SUings shall be a urethane or neoprene coupling ASTM G425 with series 300 stainless steel compression straps. Payment for work such as backfill, fittings, tie•ins and all other associated appurtenances required, shall be included in the linear foot price of the appropriate bid item. D-22 EXISTING UTILITIES AND IbiPROVEMENTS: The plans show the locations of all known surface and subsurface structures. However, the Owner and Engineer assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their e�cact location. It is mutually agreed that such failure shall not be considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, service lines, or other property e:cposed by his construction operations. Contractor shall make all necessary provisions for the support, protection, relocation, and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLO�VED. Where e:cisting utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, u»less otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service ]ine. He shall cooperate with [he O�vners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. Any and all permanent structures such as parking lot surface, fencing, and like structures shall be replaced at no cost to the Owner by material of equal value and quality as that damaged. In case it is necessary to change or move the property of any O�vner of a public utility, such property shall not be moved or interfered �vith until ordered to do so by ihe Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of iheir property that may be made necessary by performance of this contract. The utilit}• lines and conduits shown on the plans are for information only and are not guaranteed by the City or the Engineer to be accurate as to e�tent, location, and depth; they are shown on the plans as the best information available at the time of design, from the o�vners of the utilities involved and from evidences found on the ground. D-'L3 COIrSTRUCTION TRAFFIC OVER PIPELINES: It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the ne�v line and the e�cisting lines fi•om these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe «•ich a truck delivering new pipe to the site. Anv damaee. to the e�isting or new pipe «•ill be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City. In locations �vhere it is not permissible to cross the e�cisting or proposed pipes �vithout additional protection the Contractor may elect to provide additional protection of the pipes so that more &equent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the e�cisting or proposed lines, if the damage results from any phase of his construction operation. D-?-t TRAFFIC CONTROL: The Contractor shall be responsible for providing traffic control during the construction of this project consistent ��ith the procision set forth in the "1990 Texas �tanual on Uniform TrafFc Control Devices for Streets and High«a}•s" issued under the authority of the "State of Texas Uniform Act Etegulating TrafCic on High�vays," codified as Article G �0ld �'ernon's Ci��il Statutes, pertinent sections bein; Seccion Nos. ?�, ?9, 30 and 31. In addition, the Contractor shall comply «•�th Cit�• of Fort «'orth, Tesas, Februar}• 19i�J, Traffic Control Handbook for Construction and blaintenance �Vork Areas. The Contractor «•ill not remo�•e any regulator}• si;n, instructional sign, street n�me sign or other si;n which has been erected by the Cit}•. If it is determined that a sign mu�t be remoeed to permit required construction, the Contractor shall contact the Transportatron/Public \Corks Department, Signs and I�Iarkings Division, (Phone Number 871•8100) to remove the sign. In the 9G5a300_Specs_PartD wpd SC-7 Revised 12/09/98 — case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the -- temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. �Vhen construction work is completed to the extent that the permanent sign can r.. be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. � 1. The Contractor shall furnish barricades, �ares, etc., for the protection of the public and the work. 2. The cost o£ the traffic control shall be included in the price bid for pipe complete in place as bid in the _ Proposal, and no other compensation will be allowed. 3. The Contractor shall furnish a traffic con[rol plan to the City at the pre•construction meeting. The cost for traffic control shall be subsidiary to the unit prices for this project. ' D-25 PAYI1tENT: Payment for all work and material involved in salvaging, abandoning, and/or removing of existing facilities shall be included in the linear foot bid price of the pipe escept as follows: � 1. Separate payment will be made for removal of all fire hydrants, gate valves 16-inch and larger, and sanitary ►� sewer manho{es regardless of location. Payment will be made for salvaging, abandoning, and/or removing of all other existing facilities when said faciLity is not being replaced in the same trench, i.e., when remova( requires a separate trenching operation. ~ D-26 DEL.AYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and +,,, unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. V4'hen such extra compensation is claimed, a written statement thereof shall be presented by the � Contractor to the Engineer, and if by him found correct, shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by speci6c orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Con[ractor to an equivalent extension of time, his applica[ion for which shall, however, be subject to the approval of the City Council; and no such extension of time shall release �" the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. D-27 DETOURS: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to tra�c � and pedestrian facilities and to the flo�v of vehicular and pedestrian traffic within the project area. � C � D-28 BARRICADES AND �VARN[NG SIGNS: Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers and Warning andlor Detour Signs," Item 524, and/or as shown on the plans. Construction signing and barricades shall conform with "1980 Texas htanual on Uniform Traffic Control Devices, Vol. No. 1" or latest edition there of_ D-29 EXr�fINATION OF SITE: It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions which may a�ect construction of this project. Particular attention should be given to methods o£ providing ingress and egress to adjacent private and public properties, procedures for protecting existin� improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions which may give rise to later contingencies should be brought to the attention of the O�vner prior to the submission of the Proposal. � D-30 ZONING COhiPLIANCE: During the construction of this project, the Contractor shall comply with present zoning � requirements of the City of Fort �Vorth in the use of vacant property for storage purposes. D-31 bVATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor at his own expense. � D-32 WASTE bLATERIAL: All �vaste material shall become the property of the Contractor and shall be disposed of by the " Contractor a[ locations approved by the Engineer. Ali material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abut[ing property. D-33 CLEANUP FOR F[NAL ACCEPTANCE: P'inal cleanup work shall be done for this project as soon as all construction � has been completed. No more than seven days shall elapse after completion of construction before the roadway, right•of-w�ay, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a 5nal cleanup of all parts of the «�ork � before acceptance by the City of Fort ��'orth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. Final accepcance of che completed project .vork shall be given by the City of Fort «'orth Department of Engineerin;. � D-3-1 PROP�RTY ACCESS: Access to adjacent propert}� shall be maintained at all times unless otherwise directed by the _ Engineer. _ D-35 CONSTRUCTIO\ SCHEDULE A\D SEQUEtiC1NG OF «'ORIi: Prior to esecuting the Contract, it shall be the responsibilit}• of the Contractor to furnish a schedule outLning the anticipated [ime for each phase of construction with starting � and completion dates, including sufficient time 6eing alloued for cleanup. ' 9G3a300_Specs_PartD Kpd SC-8 Revised 12/09/98 D-36 SAFETY RESTRICTIO�IS - WORK NEAR HIGH VOLTAGE LItiES: The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches, painted yellow with black Ietters that are legible at twelve feet shal] be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile driver9, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT l-4'ITHIN SIX FEET OF HIGH VOLTAGE LINES." 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage•type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. 3. ��'hen necessary to work within six feet of high voltage electric lines, notification shall be given the power company (Tesas Utility Electric) who µ•ill erect temporary mechanical barriers, de•energize the lines, or raise or lo�ver the lines. The w•ork done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to Teras Utility Electric, and shall record action taken in each case. 4. The Contractor is required to make arrangements �vith the Texas Electric Service company for the temporary relacation or raising of high voltage lines at the Contractor's sole cost and erpense. 5. No person shall �vork «�ithin six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D-37 CONTRACTOR'S RESPO�iS1BILITY FOR D.�14IP.GE CLAIMS: The Contractor covenants and agrees to indemnify, hold harmless and defend the City, and their of6cers, agents servants or employees, and/or owners of the units and lot abutting the units in this contract from and against any and all claims for damages or injuries, including death, to any and all persons or property, of whatsoever kind of character, whether real or asserted, arising out of or incident to the services relating to the project to be performed by said Contractor, its officers, agents, servants or employees, under the terms and conditions of this Contract, whether or not caused by negligence on the part of the City, or their officers, agents, servants or employees; and said Contractor does hereby covenant and agree to assume all liabili[y and responsibility of City for injuries, claims or suits for damages to any and all persons or property, of whatsoever kind or character, occurring during the term of this agreement and arising out of or by reason of service, covenants or agreements performed by said Contractor, its officers, agents, servants or employees. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless the City &om and against any and all injuries or damages to property of City during the performance of any of the terms and conditions of this Contract, «hether arising out of or in connection with or resulting from any and all acts or omissions of the City, their officers, agents, servants, or employees, or caused by negligence on the part of City, or their officers, agents, servants employees and/or o�vners of the units and lots abutting the units in this contract. In the event a written claim for damages against the Contractor remains unsettled at the time all work on the project has been completed to the satisfaction of the Director for the Department of Engineering, as evidenced by a final inspection, finat payment to the Contractor shall not be recommended by the Director of Department of Engineering for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. Although the claim concerned remains unsettled as of the expiration of the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final payment to be in an amount equal to the total dollar amount then due Iess the dollar value of any written claims pending against the Contractor arising out of the performance of such �cork, and such semi-final payment may then be recommended by the Director. The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of six months follo«ing the date of the acceptance for the «•ork performed unless the Contractor submits evidence in writing satisflctory to the Director that: The claim has been settled and a release has been obtained from the claimant involved. or Good faith efforts have been made to settle such outstanding class, and such good faith efforts have failed. If condicion (1). above is met at any time «•ithin the six-month period, the Director shall recommend that the final payment to the Contractor be made. If condition (2) above is met at any time within the sis-month period, the Director may recommend that the 6nal payment to the Contractor be made. At the expiratioa of the six-month period, the Director may recommend that final payment be made if all o[her «•ork has been performed and all other obligation of the Contractor ha�•e been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bids on other Department of Engineering contract work from a Contractor against �chom a claim for dama;es is outstanding as a result of «•ork performed under a Cit�� contract or under a de�•eloper-let contract for City of Fort ��'orth street anci/or storm draina;e facilities. D-38 S?�hITARY FACILITIES FOR WOR[�ERS: The Contractor shall provide all necessar�• sanitary conveniences for the use of «•orkers at the project site. Specific attention is directed to this requirement. D-39 LEGAL REL.ATIO�S AND RESYO\SII3ILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Item GG-G, "L.egal Relations and Responsibilities to the Public" of che Fort Worth General Condi[ions. 9G5-1300_Specs_PartD µpd SC-� Revised I?/09/98 • n � F� �[ �i1�� � D-30 R[GHT TO AUDIT: A. Contractor agrees that the City shall, until the expiration of three (3) years after 6nal payment under this contract have i.. access to and the right to examine and photocopy any direc[ly pertinent books, documents, papers and records of the Contractor involving transactions relating to Lhis contract. Contractor agrees that the City shall have access during r,,,� normal working hours [o all necessary Contractor facilities and shall be provided adequate and appropria[e work space in order to conduct audits in compliance with the provisions of this section. The City shall give Contractor reasonable �,,, advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor � agrees that the City shall, under ihe expiration of three {3) years after 6nal payment under [he subcontract, have access to and the right to e�camine and photocopy any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to "' conduct audits in compliance with the provisions of this article [ogether with subsection (c) hereof. City shall give subcontractor reasonable advance notice of intended audits. � C. Contractor and subcontractor agree to photocopy such documents as may be requested by the City�. The City agrees r- to reimburse Contractor For the cost of copies as follows: - I. copies and under - 10 cents per page 2. more ihan 50 copies - 85 cents for the first page plus 6fteen cents for each page thereafter . D-41 INCRE�+SE OR DECREASE tN QUANTITIES: The quantities shown in the proposal are approximate. It is the �., Contractor's sole responsibility to verify all the minor pay item quantities prior to submitting a bid. � When the quantity of the work to be done or materials to be furnished under any major pay item of the contract is more than 1259'0 of the quantit}- stated in the contract, «•hether s[ated by Owner or by Contractor, then either party to the contract, upon demand, shall be entitled to negotiate for re��sed consideration on the portion of work above 123% of the quantity in the contract. When the quantity of the �vork to be done or materials to be furnished under any major pay item of the contract is less than ?5% r" of the quantity stated in the contract, whether stated by Owner or by Contractor, then either party to the contract, upon demand, shall be entitled to negotiate for revised consideration on the portion of work below i5% of the quantity stated in the contract. � This paragraph shall not apply in the event Owner deletes a pay item in its entirety from this contract. —' A major pay item is defined as any individual bid item included in the proposal that has a total cost equal to or greater than 5 � percent of the original contract. A minor pay item is defined as any individual bid item included in the proposal that has a total cost less than 5 percent of the original contract. 1. In the event O�cner and Contractor are unable to agree on a negotiated price, Owner and Contractor agree that the consideration will be the actual 6eld cost of the work plus 15% as described herein below, agreed upon in writing by the Contractor and Director � of Department of Engineering and Contractor and D�rector of Department of Engineering and approved by the City Council after said work is completed, subject to all other conditions of the contract. As used herein, field cost of the work will include the cost , of all workmen, foremen, time keepers, mechanics and laborers; all materials, supplies, trucks, equipment rental for such time as actually used on such work only, plus all po«�er, Fuel, lubricants, water and similar operating expenses; and a ratable portion of premiums on performance and pavment bonds, public liability, �Vorkers Compensation and all other insurance required by � law or by ordinance. The Director of Department of Engineering will direct ihe form in which the accounta of actual field cost � will be kept and will recommend in x•riting the method of doing the work and the type and kind of equipment to be used, but such �vork Gvill be performed by the Contractor as an independent Contractor and not as an agent or employee of the City. The 15% of the actual field cost to be paid to the Contractor shall cover and compensate him for profit, overhead, general supervision and �"' field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein specified. Upon � request, the Contractor shall provide the Director of Department of Engineering access to all accounts, bills and vouchers relating thereto. � D-42 CUTTING OP' COtiCRETE: �Yhen existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective i[em. D-43 PROJECT DESIG:�TAT1ON SIGN: Project signs are required at all locations. It shall be in accordance with the -� attached Figure 30 (dated 9•18-9G). The signs may be mounted on skids or posts. The exact locations and methods of mounting shall be appro��ed by the Engineer. In addition to the 4' c 8' project signs, project signs shall be attached to barricades used where r., manhole rehabilitation or replacement is being conducted. Signs suspended fi�om barricading shall be placed in such a way that signs do not interfere �cith retlectice paint or colorino on the barricades. Barricade signs shall be in accordance with Figure 30, � except that they shall be 1'-0" bp 2'•0" in size. The information box shall have the follo«•ing information: ' For Questions on this Pro}ect Call: (817) 871•830G I�I•F 7:30 am to 4:30 p.m. or (81i) S"r 1•8300 Nights and ��'eekends � , � 9G51J00_Spec�_PartD.«pd Sc-1� Revised 12/09/98 jLi My and all cost for the required materiats, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. D-44 CONCRETE SIDEWALK AND DRIVE'�VAY REPLACEMENT: At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for [he full existing width, between existing construction or expansion joints with 3000 psi co�crete with reinforcing steel on a sand cushion in accordance with City of Fort VVorth Transportation/Public Works Department Standard Specifications for Construc[ion, Item 50-�. AC locations w•here mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match tppe and geometry of the removed curb and gutter shall be installed in accordance with City of Fort �Vorth Public Works Department Standard Speci5cation for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D-45 NIISCELLANEOUS PLACEb1ENT OF Nfr1TERIAL: Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one•tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. D-46 TYPE "C" BACKFILL: Excavated material used for Type "C" backfill must be mechanically compacted unless the Con[ractor can furnish ihe Engineer �vith satisfactary evidence the P.I. of the excavated materiaf is less then 8.' Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E-1.24, Type "C' Back611, and E2.11 Trench Backfill.*` ' Revised 3/20/81 '* Revised 4/20/81 D-47 CRUSHED LIMESTONE BACKFILL: VVhere specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public �Vorks Standard Specifications for Street and Storm Drain Construction Division 2 Item 208.2 - h4aterials and Division 2 Item 208.3 - Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Back511, Construction Speci&cations, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2•2.1G A�feasurement of Backfill Materials, Construction Specifications. General Contract Documents. D-48 2:27 CONCRETE: Transportacion and Public �Vorks Department typical sections for Pavement and Trench Repair Cor Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call-out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cu6ic yard of concrete. D-49 TRENCH EXCAVATION, BACKFILL, AND COMPACTION: Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and �vithin existing or future R.O.W. shall be in accordance with Section E1-2 Bac6fill and E2•2 Exca�•ation and Backfill of the General Contract Documents and Specifications, except as specified herein. A. TRENCH E�CAVATION: In accordance with Section E2-2 Excavation and Backfill, if the stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loading of the pipe w•ill be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedial measures shall be entirely the Contractor's own. rlll trenching operations shall be confined to the width of permanent rights-of-way, permanent easements, and any temporary construction easements. All ercavation shall be in strict compliance with the Trench Safety Systems Special Condition of this document. TRENCH BACI�'ILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of ihe embedment material with Type "C' backfill material. Excavated material used for Type "C' backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less than 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soiis in all involved areas, with a map sho4ving the location and depth of the various test holes. If esca�•ated material is obviously granular in nature, containing little or no plastic material, the Engineer ma}� wai�•e the test report requirement. See E1•2.3, Ty-pe "C' or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. «'hen Type "C" backfill material is not suitable, at the direction of the Engineer, T}�pe "B" backfill matcrial shall be used. 9G5l300_Spec;_PartD.wpd sC-11 Revised 12/09/98 , �a - 1n general, all backfill material under existing or fu[ure streets shall be in accordance with Figure A or B. Sand material speci6ed in Figures A and B shall be obtained from an approved source consisting of durable particles free .. of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: L � Size Sieve °a Retained Size Sieve % Relained #4 0-5 #50 0-50 #16 0•20 #100 60•95 #200 90-100 � C. TRENCH CODIPACTION: All trench backfill shall be placed in lifts per E2-2.9 BackfilL Trenches which lie outside existing or future pa��ements shall be compacted to a minimum of 90°/a S[andard Proctor Density (ASTM D698) by � means of tamping only. - � Trenches which lie under existing or future paving shall be backfilled to 93% Standard Proctor Density (ASTNf D698) by jetting, tamping, or a combination of inethods. L� This density testing will be performed by City personnel at City espense and will not be charged to the Contractor. *.,, However, the Contractor �vill be responsible for providing access and trench safety system to the level of trench back£ill to be tested. No extra compensation will be allotived for exposing the backfill layer to be tested or providang trench , saiety system for tests conducted by the City. D. AfEASUREhIENT AI�ID PA1'I�fENT: All material and labor costs of excavation and backfill �vill be included in the price bid per linear foot of water and sewer pipe. � D-60 PAVEMENT REPAIR (E2-19): The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement as de[ailed in the Public �"'" �Vorks Department typical sections for Pavement and Trench Repair for Utility Cuts, Figures 1 through 5. �` r111 required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench «�alls. The trench shall be backfilled and the top nine (9) inches shall be filled wsth �rn required materials as shown on paving details, compacted and level with the 6nished sireet surface. This finished grade shall be mnintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night • and over weekends. Ic has been determined bq the Transportation and Public Works Department that the strip of e�isting HbS_�C pavement between the existing gutter and the edge of the trench pavement repair �vil] not hold up if such strip of existing pavement is two (2) feet i.. or less in width. � Therefore, at the locations in the project where the trench wall is three (3) feet or less &om the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of iwelve (12) inches outside the trench wall nearest the center of the street to the gutter ]ine. The pavement shall be repl�ced within a maximum of five (5) working days, providing job placement conditions will permit �"" repa��ing. If paving conditions arc not suitable for repa�•ing, in the opinian of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance �' with Ordinance No. 34d9 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will insper.t the paving repair after construction. This permit requirement may be waived if �vork is being done under a Performance Bond i" and inspected by the Department of Engineering. .. D-51 TRENCH SAFETY S�STE�1 FOR �VATER DEPARTbZENT PROJECTS ONLY: A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and all other appurtenances. The design for the trench safety shali be signed and sealed by a Registered Professional Engincer licensed in Texas. ir,► B. ST:�ND:�RDS: The latest version of the U.S. Departme�t of Labor, Occupational Safety and Health Administration � Standards, 29 CFR Purt 192G, Sub-Part P• Excavations, are hereby made a part of this specification and shall be the minimum governing requirements for trench safety. C DEFINITIO�IS: � 1. TRLNCHES -?. trench is referred to as a narrow ecca��ltinn made below the surface of the ground in which the depth is greater than che �� idth, «�here the �cidth measured at the bottom is not greater than 6fteen (13) " feet. " 2. BENCHING Sti'STE'�I • Benching means excavating the sides of a trench to form one or a series of horizontal level or steps, usuallc «ith �•erucal or near•vertical siu•faces bet�ceen levels. � � �G54300_Specs_PartD wpd SC-1'� Revised 12/09/98 3. SLOPING SYSTE�1 • Sloping means excavating to form sides of a trench Lhat are inclined away from the excavation. 4. SHIELD SYSTEbI • Shields used in trenches are generally referred to as "trench bores" or "trench shields". Shield means a structure that is able to withstand the forces imposed on rt by a cave-in and protect workers within the structure. Shields can be permanent structures or can be designed to be portable and move along as the work progresses. Shields can be either pre-manufactured or job-built in accordance with OSHA standards. SHORING SYSTEti1 - Shoring means a structure such as a metal hydraulic, mechanical or timer system that supports the sides of a trench and which is designed to prevent cave•ins. Shoring systems are generally comprised of cross•braces, vertical rails. (uprights), horizontal rails (wales) and/or sheeting. D. hIE1�.SUREMENT - Trench depth is the vertical measurement &om the top of the existing ground to the bottom of the pipe or structures. The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five (5) feet. PAY�fENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench safety systems. D-52 SANITARY SE�VER biANHOLES: GENERAL: The installation, replacement, and/or rehabilita[ion of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Speciai Contract Documents in addition to those located in the 6eld and identified by the Engineer. All manholes shall be in accordance with sections E1•14 Materials for Sanitary Sewer hlanholes, Valve Vaults, Etc., and E2•14 Vault and hlanhole Consiruction of the General Contract Documents and Speci5cations, unless amended or superseded by requirements of this Special Condition. 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as per Figure 121 2. WATERTIGHT M.ANHOLE INSERTS: Watertight gasketed manhole inserts shall be installed in all sanitary sewer manholes. Inserts ahall be constructed in accordance with Fort 1Vorth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations. Stainless Steel manhole inserts shall be required for all pipe diameters 18" and greater. 3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shal! be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIbi ELE�'ATIONS: I�fanhole rims in park�vays, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3) feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. blanholes in ope� fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. 5. hL4NHOLE COVERS: All lids shall have pick slots in lieu of pick holes. I�Ianhole frames and covers shall be blcIunley, Type N, with indented top design, or equal, with pick slots. Covers shall set �ush with the rim of the fi�ame and shall have no larger than 1/8 inch gap between the &ame and cover. Bearing surfaces shall be machine finished. Locking manhole lids and frames will be restricted to locations within the 100-y�ear floodplain and areas speciScally designated on the plans. Cer[ainteed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified. G. SH.ALLOW CONE Iv1ANHOLES: Shallow manhole construction «•ill be used when manhole depth is four (4) feet or less. All shallo«• cone manholes shall be built in accordance with Figure 103. All sE�allow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: NLaNHOL.ES PER FIGURE l0G WILL NOT BE :�LLOWED. 7. I�iANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole. 8. E�TERIOR SURFACE CO;iTING Erterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy-, Koppers "Bitumastic Super Service Black" Tnemec "4G•450 Heavy Tnemecol," or equal to, a minimum or 14 mils dr}• film thickness. �J. bia.�lHOLE JOINT SC.4LItiG: All interior andlor exterior joints on concrete manhole sectioas constructed for the City of Fort ti�'orth W'ater Department, excluding only the joints using a trapped ty�pe performed O-ring rubber gasket shall require Bitumastic joint sealants as per r'igure bI. This sealant shall be pre-formed and [ro��elable Bitumastic as manufactured by Iient•Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either e�truded pipe form or suitable cross-sectional area or flat-tape and shnll be sized as recommended by the manufacwrer and approved by the Engineer. The joint 9G51300_Spec�_PartD.wpd sC-13 Revised 12/09/98 - sealer shall be protected by a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The Joint .. sealer shall remain totally �exible without shrinking, hardening, or oxidizing regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of �„ the product as a pre-formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years. � B. � v EXECUTION: 1. INSTALLAT[ON OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. A primer shall be applied to all surfaces prior to installing the joint sealant in accordance with the recommendations by the manufacturer. The prokective �vrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on t«�o (2) rows (inside and outside) of Bitumastic joint sealer. 2. SEAi,ING AND/OR �1DJUSTING EXISTING bL4NHOLES� Excavate (rectangular full depth saw cut if in �., pavement) adjacent to the manhole to expose the entire manhole &ame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. Remove manhole &ame from the manhole structure and observe the condition of the frame and grade rings. __ Any &�ame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre-cast concrete rings, or where necessary � and approved by the Engineer, shall be replaced wi[h a pre-cast fla[top section. Pre-cast concrete rings, or a pre-cast concrete flattop section will be the only adjusiments allowed. � In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. If the «�alls or cone section below this level are structurally unsound, notify the Engineer prior to replacement of the grade rings and manhole frame. Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. �^ ��ire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris. Coat exposed ' minhole surfaces �vi[h an approved bonding agent foltowed by an application of a quick setting hydraulic cement to provide a smooth working surface. If the inside diameter of the manhole is too large to safely support new adjustmen[ rings or frames, a flat top I� section shall be installed. � Joint surfaces bet�veen the frames, adjustment rings, and cone section shall be free of dirt, s[ones, debris and voids to ensure a watertight seal. Place tlerible gasket joint material along the inside and outside edge of each joint, or use trowelable material in lieu of pre•formed gasket material. Position ihe butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not � specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten � (10) feet long so that the top of the casting will conform to the slope and 6nish elevation of the paved surface. The top of the casting shall be 1/8 inch below the 5nished elevation. Allowances for the compression of the '" joint material shall be made to assure a proper final grade elevation. ElPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black"; Tnemec "46-450 Heavy Tnemecol", or equal, to a minimum of 1<1 mils dry film thickness. � 4. The exterior surface of all pre-cast section joints shali be thoroughly cleaned with a�vire brush and then �caterproofed �vith a 1/2-inch thick coat of trowelable bitumastic joint sealant from G-inches below to G•inches � above the joint. The coated joint shall then be wrapped with G mil plastic to protect ihe sealant from damage during backfilling. C. AiEASUREbiENT AND P.aYI�1ENT: The price bid for new manhole installations shall include all labor, equipment, and m�terials necessary for construction of the manhole including, but not ]imited to, joint sealing, manhofe inserts, � lift hole sealing and esterior surface coating and pavement repair. The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessar}• for cons[ruction of ne«� manhole, xncluding, but not limited to, excavation, backfill, disposal of materials, join[ sealing, lift � hole sealin�, esterior surface coaGng and pavement repair. � The price bid fur ad�usting and/or sealing of e�istine manholes shall include all labor, equipment and materials necessary for adjusting andlor sealin; the manhole, including but not limited to, joint sealing, lifthole sealing, and �" e�terior surface coatine. � Ya}•ment Cor concrete collars �cill be made per each. Pa}�ment for manhole inserts will be made per each. � 9G53300_Specs_PartD.�cpd SC-1-� Revised L?!09/98 D-53 Sr1NITARY SE�VEft SERVICES: Any reconnection, relocation, replacement, or new sanitary sewer service shall be made as shown on the plans, and/or as described in these Special Contact Document9 in addition to those located in the field and identi6ed by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. Factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision [o use saddle taps as opposed to tees shatl be made on a case by case basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6.15. A. SE�VER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the esisting sewer service line as required for reconnection and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap sh-'1 be located so as to line up with the service line and avoid any horizontal adjustment. I'or open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using trenchless repair methods shall be reconnected only (no seccer service replacement necessary). Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service line u•hich is included in the price bid for Sanitary Se«�er Taps. Payment for work such as backfill, saddles, tees, fittings incidental four (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. SE�4'ER SERVICE REPLACEh1ENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Coniractor as directed by the �ngineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The length of the replacement shall be determined by the Engineer. Al! sewer services shall be installed at a minimum of two (2) percent slope or as approved by the Engineer. Connection to the existing sewer service line shall be made with appropriate adapter fitting. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. Conlractor is responsible for locating existing se�ver service and cleanout for all lots when replacing or rerouting the se�ver services. Replacement of any cleanouts shall include the riser for the cleanout. Surface restoration, removal and replacement of fencing, and cleanup in general shall be performed to return the site to original conditions or better after sewer service construction is complete. Payment For work and materials such as backfill, pipe, 6ttings, and all other associated «�ork for service replacements in excess of four (4) Linear £eet shaU be included in the linear foot price bid for sanitary sewer service line replacement. Payment for all work and material involving the "tap" shail be included in the price bid for sanitary sewer service taps. D-5-� NOT USED D-55 REAIOVAL, SALVAGE, AND ABA?rDON�IENT OF EXISTING FACILITIES: Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as shown on the plans, and/or described in these Special Coniract Documents in addition to those located in the 6eld and identified by the Engineer. This cvork shall be done in accordance with Section E2-1.5 Salvaging of Nlaterial and E2•2.7 Removing Pipe, of the Generai Contract Documents and Specifications, unless amended or superseded by requirements of this Speciai Condition. �. SALVAGE OF EXISTING WATER METER AND METER B0�{: Existing water meter and meter box shall be removed and returned to the �Vater Department warehouse by the Contractor in accordance with Sec[ion E'2-1.5 Salvaging of I�laterials. B. SALVAGE OF E�ISTINC IVATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shatl be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The concrete vault shall be demoGshed in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compa[ible with existing surrounding surface and grade. C. SaL,VAGE OF E�ISTING FIRE HYDR,�TS: Existing fire hydrants shall be removed and returned to the Water Department �ti•arehouse by the Contractor in accordance with Section E2•1.5 Salvaging of Ivlateriais. The void shall be backfilled and compacted in accordance �vith bac{�fill method as specified in Section E2-2.9 Back611. Backfill material shall be suitable escavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. S:\I,�'aGE OF EXISTING G:�TE �'.aLVE: Esisting gate val�•e and valve box and lid shall be removed and returned to the ��'ater Department «arehouse by the Contractor in accordlnce �cith Section E2•1.5 Salvaging of blaterials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E?•2.9 Backfill. Backfill material shall be suwtable exca�•ated material approved by the Engineer. Surface restoration sha]l be compatible with exiscing surrounding surface and grade. If the valve is in a concrete vault, the �•aulc shail be demolished in place to a puint no less than 18" belon• final grade. E. �E3_1NDON�I�NT OF E\I5TIVG G�TE �'�L�'�: Existing gate val��e and bos lid shall be abandoned by 6rst closing the vah�e to the full}• closed position and demolishing the vahe bos in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to ma[ch esisting grade. 9G5�300 Specs_YartD wpd SC-1� Revised 1?/09/98 Pi11�� �' I_� -; �~ '4 � � F. AB:�NDO1Vh�NT OF E�FSTING V?,ULTS: Vaults to be demoGshed in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and .�. compacted in accordance with backfill method as specified in Section E2•2.9 Backfill. Backfill material shall be suitable excavated material approved by Che Engineec Surface restoration shall be compatible with the existing surrounding �. grade. � G. AB:�NDONhfENT OF hfANHOLES: Manholes to be demolished in place shall have all pipes entering or exiting the structure plugged with lean concrete. AIanhole top or cone section sha11 be removed to the top of the full barre! diameter section, or to point not less than l8 inches below final grade. The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section EZ•2.9 Backfill. Back611 material may be either clean washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be r" compatible with surrounding service surface. Payment for work invoh�ed in backSlling, plug; ng of pipe(s) ar� all o[her appurtenances required, shall be included in the appropriate bid item - Abandon Existing Sewer ll-lanhole. H. REhfOVAL OF h1.ANHOLES: hlanholes to be removed shall have all pipes entering or exiting the structure ""' disconnected. The complete manhole, including top or cone sec[ion, all full barrel diameter section, and base section shall be removed. The excavation shall then be bac6filled and compacted in accordance with back6ll method as g"' speciSed in Section E2•2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the Engineer. Surface restora[ion shall be compatible with surrounding surface. ... I. CUTTING AND PLUGGING EXISTING h1.�1INS: AC various locations on this project, it may be required to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order [o abandon these lines. Cutting and plugging existing mains and/or services shal! be considered as incidenta] and all costs incurred will be considered to be included in the linear foot bid price of the pipe, unless separate trenching is required. J. REbIO�:AI. OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire hydrants and meter boxes shall be delivered to �Vater Department Field Operation, Storage Yard. _. �i. PAYI�LENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be induded in the linear foot bid price of the pipe, except as foltows: separate payment will be made for removal of all 6re hydrants, gate valves, 1G inch and larger, and sanitary sewer manholes, regardless of location. Payment will ^ be made for salvaging, abandoning and/or removing all other existing facilities when said facility is not being replaced in the same trench (i.e., when removll requires a separate trench). L � � D-56 DETECTABLE WARNING TAPES: Detectable underground utility warning tapes which can be located from the surface by� a pipe detector shall be installed directly above non-metallic water and sanitary se�ti�er pipe. The detec[able tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved eqUal, and shall consist of a mrnimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall ihickness of the tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight of 2'/z pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as fo[lows: Tvoe of Utilitv «'ater Sewer Color Code Safety Blue Safety Green Le¢ends Caution! Buried �Vater Line Below Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allo�a a minimum of 18 inches between the tape and the pi�e. Payment for work such as backfiil, bedding, blocking, detectable tapes, and all other associated appurtenances required shall �e included in the unit price bid for the appropriate bid item(s). D-57 PIPE CLEANING: Joints shall be «•iped and then inspected for proper installation by the iinspectors. Each joint shall be s�vept daily and kep[ clean during installation. A temporary night plug shall �e installed on all exposed pipe ends during any period of work stoppage. D-SS BARRICADES, �VARNINGS, AND FLAGNIEN: Reference Part C-�General Conditions, Section CG-G8 Barricades, ��'arnings, and lVatchmen: �. B �,�"here�•er the «ord Watchmen appears in this paragraph, it shall be� changed to [he «•ord Flagmen. In the 6rst paragraph, lines 6ae (�) and six (G), change the phrase "tak`� all such other precautionary measures" to "take all reasonable necess�ry measures". .+ D-59 DISPOS.-�L OF SPOIIJFILL I1L�TERI:�L,: Prior to the disposing of �int• spoiUfill material, che Contractor shall advise the Director of Engineerin; Deparunent, actino as the Cit}• of Fort �Vorth's Flo�d Plain Administrator ("Administrator"), of the _,,, location of all sites ��here the Contraccor intends to dispose of such material. Cc ntractor shall not dispose of such material until the proposed sites ha��e been determined b�• the :1dm�nistrator to meet the reauirements of the Flood Plain Ordinances of the � City� of Fort «'orth (Ordinance No 10U3G). :�11 disposal sites must be approved by the Administrator to ensure that filling is not � 9GSd300_Specs_PartD«pd SG16 Revfaedl?/09/98 occurring within a �oodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fi!1 permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the si[e is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the 511 permit, including any necessary Engineer�ng studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoiU611 material at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering Department, Contractor shall remove the spoiUfill material at its expense and dispose of such materials in accordance with the Ordinances of the City and this section. D-60 h1ECHr1NICS A.tiD hir+.TER[AL.IDIEN'S LIEN: The Contractor shall be required to execute a release of inechanics and materialmen's liens upon receipt o£payment. D-61 SUBSTITUTIONS: The specifications for materials set out the minimwn standard of quality which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material which has been specified. Where the term "or equal", or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it �vill be approvable, as the particular trade name Gvas used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the proposed substitute is procured by the Contractor. Where the term "or equaP', or "or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptabiiity of substitutions. The provisions of this sub•section as related to "substiwtions" shall be applicable to all sections of these specifications. D-62 PRE-COtiSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER: A. GENER4I,: Prior to the reconstruction, tILL sections of existing sanitary sewer lines to be abandoned, removed (except �vhere being replaced in the same location), or rehabilitated (pipe enlargement, cured-in-place pipe, fold and form pipe, slip•Gne, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the se�r•er lines from damage that might be inflicted by the improper use of cleaning equipment. HIGH ��ELOCTTY JET (HYDROCLEr1NING) EQUIPh1ENT: The high-�•elocity sewer line cleaning equipment shall be constructed for easy and safe operation. The equipment shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high-velocity gun for w�ashing and scouring manhole walls and �oor. The gun shall be capable of produczng flows &om a fine spray to a solid stream. The equipment shall carry its own water tank, auxiliary engirtes, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning opera[ion to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease. If se�ver cleaning balls or other equipment which cannot be collapsed is used, special precautions to pre�•ent flooding of the se�vers and public or private property shall be taken. The flo�v of sewage present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high•velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or equipment fails to traverse the entire manhole section, it �ti�ill be assumed that a major blockage exists, and the cleaning effort shall be abandoned. �Vhen additional quantities of water from fire hydrants is necessary to avoid dela}� in normal working procedures, the water shall be conserved and not used unnecessarily. No fire h}•drant shall 6e obstructed in case of a fire in the area served by the h}'drant. Before using any water from the City 1�'ater Distribution System, the Contractor shall apply for and receive permissson from the bVater Department. The Contractor shall be responcible fur the water meter and related charges for the setup, including the water usage bill. AIl expenses shall be considered incidental to cleaning. DEBRIS REhiOVAL AND DISPOS�L,: �111 sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section bein; cleaned. Passing material &om manhole section to manhole section, «hich could cause line stoppages, accumulations of sand in �cet wells', or damage pinnping equipment, shall not be permitted. �.l] solids or semisolid resulung fi•om the cleaning operations shall be remo�•ed from the site and disposed of at a site desi�nated b}� the Engineer. :�ll m�teri�ls shnll be removed from the sice no less often than at the end of each ��orkda}• and disposed of at no additional cost to the City. 3 U^�TDGR I�0 C[RCUAIST:�I�10E SH_1LL S�GCAGE OR SOLIDS REI�10�'ED THEREFRODI BE DUbtPED ' O�TO STREETS OR INTO D[TCHES, C,�TCH B.�SItiS, STOR�I DR:1I;�S OR 5:1NI'fARY SE�VER DLatiHOLF.S. �JG51300_Specs_PartD wpd SC-1! Revised l2/09/98 ' A G. TELEVISION INSPECTION EQUIP�IENT: The television camera used for the inspection shal] be one r„� specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100°/a humidity y,,, conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. r w.. B. E�ECUTION: 1. TELEVISION INSPEC'I'ION: The camera shall be moved through the line in either direction at a moderate � rate, stopping �vhen necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV ' cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. «'hen manually operated «•inchea are used to pull the television camera through the Gne, telephones or other � suitable means of communications shall be set up betcveen the two manholes of the section being inspected to ensure good communications between members of the crew. � The im�ortance of accurate distance measurements is emphasized. :411 television inspection video tapes shall have a footage counter. Nfeasurement for location of sewer service taps shall be above gmund by means of meter device. b[arkin; on the cable, or the like, �chich ���ould require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a•tape, or other suitable device, and the accuracy shall be satisfac[ory to the �ngineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The � cos[ of retrieving the Telecision camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. 2. DOCUI��NTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor � and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of significance such as locations of unusual conditions, roots, • storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. 3. PHOTOGR:�PHS: Instant developing, 35 mm, or other standard-size photographs of the television picture i. of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. ' 4. VIDEOT�IPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of L,y problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. � Equipment shall be provided to the City by the Contractor for review of the [apes. Tapes will be returned to J the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line �" or to locate service connections, the Contractor shall be required to re-televise and provide a good tape of the line at no addicional cost to the City. If a good tape cannot be provided of such quality that can be reviewed r+ by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of Gnes not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SH.�I.L BE SUBh1ITTED TO THE ENGIN�ER PRIOR TO CONSTRUCTION FOR REVIEW __ AND DETERI�IINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be noti6ed as to which sections of the sanitary sewer are to be corrected. Tapes will be returned to ihe �„ Contractor upon completion of review by the Engineer. � AIl costs associated with this work shall be incidental to unit prices bid for items under Television Inspection ofthe Proposal. C. P:1Y�IEI�T OF CLE�NING :1ND PRE-CONSTRUC'I'[ON TELEVISION INSPECCION OF S.�NITARY SEV�,'ERS: The cost for Pre•Construction Cleaning and Tele��sion Inspection of sanitar}• se�cers shall be per linear foot of se�ser actually �"" televi�ed The Contractor shall pro�ide the Engineer «•ith tapes of a quality� that the particular piece of sewer can be readily e�•,iluated a� to exiscin; se��er cond�tions and for providing appropriate means for revie«• of the tapes by the � Engineer including collection and remo� al, transportation and disposal of sand and debris from the sewers to a legal dump site. � Tele��ision inspection shall include necessar}� cleaning (h}•draulic jet or mechanical cleaner) to provide video image required for line anahsis. sl 9GSJ300_Spec;_PartD.wpd sc-ls Revised 1?109/98 � The primary purpose of cleaning is for television inspection and rehabilitation; when a portion of a line is not or cannot be televised or rehabilitated, ihe cleaning of that portion of line shall be incidental and no payment shal! be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to TV Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D-63 VACUUM TESTING OF SANITARY SEWER MANHOLES: A. CENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. � C. EXECUTION: TEST PROCEDURE: Nlanholes shall be tested with al] connections in place. Lift holes shall be plugged, and all drop-connections and gas sealing connections shall be installed prior to testing. The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be i�stalled in the lines beyond the drop-connections, gas sealing connections. etc. The test head shall be placed inside the frame at the top of the manhole and in�ated in accordance with the manufacturer's recommendations. A vacuum of ten inches of inercury (10"Hg) shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table I below in accordance with ASTM C1244•93: Table I MINIh1UM TIME REQUIRED FOR VACUUM DROP OF 1" Hg (10"Hg - 9"Hg) (SEC) Deptli of i�IH. 48-Inch Dia. 60-Inch Dia. (FT.) htanhole hlanhole Oto1G' 18' 20' 22' 2�1' 2G' 28' 30' For Each Additional 2' 40 sec. 45 sec. 50 sec. 55 sec. 59 sec. G4 sec. 69 sec. 74 sec. 5 sec. 52 sec. 59 sec. G5 sec. 72 sec. i 8 sec. 85 sec. 91 sec. 98 sec. 6 sec. 2. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one•inch of inercury (1" Hg) after the required test time. Any manhole which fails to pass the initial test must be repaired with a suitable material which conforms to the construc[ion material of the manhole. The manhole shall be retested as described above until it has successfully passed the test. Following completion of a successful test, the manhole shall be restored to its normal condition, all temporar}� plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to [he Engineer. PA1�fENT: Payment for vacuum testing of sani[ary se�cer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, and all �ncidentals, including all bypass pumping, required to complete the test as speciFed herein. D-6-1 BYPASS PUMPING: The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The byPass shall be made by plugging existing upstream manhole and pumping the sew�age into a do�ti�nstream manhole or adjacent system or other method as ma}• be approved by the Engineer. The pump and by-pass lines shall be of adequate capacit}• and size to handle the flow «•ithout sewage backup occurring to facilities connected to the sewer. Pro�•isions shall be made at driveway�s and street crossings to permic safe �•ehicular tra�•el �cithout interrupting flow in the bypass s�•stem. Under no circumstances «ill the Contractor be permicted to discharge sewage into the trenches. Payment shall be incidental to rehabilitation or replacement of the se�cer line. D-GS POST-COtiSTRUCTIO�I TELEVISION INSPECTIO�I OF SANITARY SE��'ER: :�. GEtiERAL: Af'ter construction, 4LL sections of sanitary sewer lines shall have a tele�•ision inspection performed. \�'ork shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means 9G51300_Spec3_ParcD wpd SC-1� Revised 1�/09l9& of closed circuit televis�on. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. TELE�7SION INSPECTION EQUIPbIENT: The television camera used for the inspection shall be one speci5cally designed and constructed for such inspection. Lighting for the camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment sh�ll be removed and no payment will be made for an unsatisfactory inspection. C. E\ECUTION: � 1. TELEVJSION INSPEC'I'ION The camera shall be moved ihrouKh the line in either direction at a moderate rate, stopping �ti•hen necessary co permit proper documentation of any sewer service taps. In no case will the ' television camera be pulled at a speed greater than 30 feet per minute. blanual �vinches, po�cer winches, TV cable, and po�vered rewinds or other devices that do not obstruct the camera view or interfere with proper -� documentation shall be used to move the camera through the sewer line. � When manually operated winches are used to pull the television camera through the �ne, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The imoortance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. A[easurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cabte, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of ihe distance meter shall be checked by use of a walking meter, roll•a•tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee iha[ all of the sanitary sewers to be entered are clear for the passage of a � camera. The methods used for securing passage of ihe camera are to be at the option of the Contractor. The cost or retriev�ng the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. r* Sanitary sewer mains must be laced with enough �vater to fill all low pints. The television inspection must be done immediately follo�ving the lacing of the main with no water flow. If sewer is active, flow must be restr�cted to provide a clear image of sewer being inspected. � 2. DOCUtiLENTATION: Television Inspection Logs: Printed ]ocation records shall be kept by ihe Contractor and will clearly sho��• the location in relation to an adjacent manhole of each sewer service tap observed i.. during inspection. rUl television logs shall be referenced to stationing as shown on the plans. A copy of these television logs will be supplied to the City. � PHOTOGR:IPH5: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. � 4. VIDEOT.aPE RECORDINGS� The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed ' that it w•as recorded. The television tapes shall be furnished to the City for review immediately upon completion of the [elevision inspection and may be retained a maximum of 30 calendar day�s. Equipment shall `� be provided to the City by the Contractor for review of the tapes. Tapes will be rewrned to the Contractor upon completion of revie�v by the Engineer. Tapes shall not be erased without the permission of the '"' Engineer. � If the taoes are of such 000r oualitv that the Eneineer is unable to evalu�(,e the condition of the sewer line or to locate sen�ice connections. the Contractor shall be reouired to re•telev�se and orovide a eood taoe of the - line at no additional cost co the Citv. If a good tape cannot be provided of such quali[y that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no pa}•ment shall be made for —. portions of lines not televised or portions where manholes cannot be negotiated �cith the television camera. D. P.�.l"DtENT OF POST•CONSTRUCTION TELEVISION INSPECTION OF S:INITAF2Y SEWERS The cost for post- construction Television Inspection of sanitar}� sewers shall be per linear foot of se�ver televised. The Contractor shall provide the Engineer «ith tapes of a qualit}• that [he particular piece of sewer can be readily e��aluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Televi�ion inspection shall include necessary cleaning (h}•draulic jet or rtlechanical cleaner) to provide video image required for line anal}sis. Thc quantit�• of T�" inspection shall be measiu�ed as the tutal len;th of new pipe �nstalled. :all costs as�ociated ��ith thi� ��ork shall be included in the appropriate bid item - Post-Construction Television I nspection The item shall also indude �ll costs of installing and maintainin; any bypass pumping required to provide reliable, regular sewer sen�ice to the area residents. .all b��pass pumping shall be incidental to the project. 8 9G5�300_Specs_PartD �vpd SC-�� Revised 1?109/98 D-66 SA,�IPLES AND QUALITY CONTROL TESTING: A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mLr design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The con[ractor shall provide manufacturer's certifications for ali manufactured items to be used in the project and wi11 bear any expense related thereto. B. Tests of the design concrete mi.� shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in-place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project speciScations will be at the e�pense of the contractor and �vill be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish maierials and equipment conforming to the requirements of the contract. D. Not less than 2-4 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. D-67 TEbIPORARY EROSION, SEDIMENT, AND �VATER POLLUTION CONTROL: A. DESCRIPT[ON: This item shall consist of temporary soil erosion sediment and water pollutio� control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREbfENTS: The Engincer has the authority to define erodibie earth and the authority to limit the surface area of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution•control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such «•ork may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of tzmporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures sh�ll be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of•way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and olher such permanent pollution-control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil• erosion•control measures shall be performed as directed by the Engineer. l. �ti'aste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 2. �Vhen �vork areas ar material sources are located in or adjacent to live streams, such areas shal] be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize Che muddying of a stream. 3. All waterways shall be cleared 1s soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not a part of the finished work. 4. The Contractor shall take sufficient precau[ions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumens, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. P C. hIEASURE�tENT r1ND P:11`�fENT: All «•ork, materials and equipment necessary to provide temporary erosion control � shall be considered subsidiar}• to the contract and no extra pay «�ill be given for this work. D-68 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES: The Contractor shall provide ingress and egress to the property being crossed b}• this construction and adjacent propert}• when construction is not in progress and at night. llri��es shall be left accessible at night, on �ceekends, and during holida}•s. The Contractor shall conduct his activities to minimize obstruction of access to drives and propert}• during the progress of construction. Notification shall be made to an owner prior to his drive�ca}� being remo�•ed and/or rebuilt L� , 9G54300_Specs_PartD.wpd SC-21 Revised 12/09/98 ' � - D-69 PROTECTION OF TREES, PLr1NTS AND SOIL: r�.11 property along and adjacent to the Contractors' operations including lawns, yacds, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or e better than existed prior to start of work. �,., Any trees or other landscape features scarred or damaged by [he Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate [he work will be permitted only by esperienced workmen in an approved manner (No trimming or pruning without the property ow�ners' consent). Pruned limbs of i" diameter or larger shall be � thoroughly treated as soon as possibfe with a tree wound dressing. D-70 SITE RESTORATION: The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one-tenth (0.1) of a foot. D-71 CITY OF FORT �VORTH STAND.AAD PRODUCT LIST: Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List" for the bid to be considered responsive. Products and processes - listed in the "City of Fort �Vorth Standard Product List" shall be considered to meet City of Fort Worth minimum technical requirements. � D-72 STATE REVOLVING FUND (SRF) RCQUIREMENTS: This project, in addition to standard City of Fort Worth ^ requirements, may involve certain Scate requirements. These requirements, if applicable, are provided in the following documents and should thoroughly be reviewed and completed by the contractor. They include: At the Time of Contract Document Execution � ED-103-Contractors Actof Assurance ED-104-Resofution �4'ork required to conform to these requiremenis shall be considered subsidiary and no extra payment will be made. � The SRF requirements are included in Appendix A. D-73 TOPSOIL, SODDING AND SEEDI[VG: This item shall be performed in accordance with the City of Fort Worth Parks �" and Community Services Department Specifications for Topsoil, Sodding and Seeding. A. TOPSOIL ►� 1. DESCRIPT[OIJ: This item will consist of furnishing and placing a minimum of sir (6) inches of topsoil, free from rock and foreign m�terial, in all parkways and medians to the lines and grades as established by the � Engineer. � 'l. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to supplement material secured &om street excavation. All excavated materials from streets which is suitable for topsoil �vill be used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be stockpiled at locations approved by the Engineer, and at � completion of grading and paving operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. B. SODDING "-' 1. DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. Augustine grass in y the areas between the curbs and walks, on terraces, in median strips, on embankments or cut siopes, or in such areas as designated on the Dra�vings and in aceordance with the requirements of this Specification. Recommended Buffalo grass varieties for sodding are Prairie end 609. � 2. I�L�ITERI.4LS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass secured &om • sources �vhere the soil is fertile. Sod to be placed during the dormant state of these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense, thickly matted - roots throughout a two (2) inch minimum thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum � thickness of native soil attached to the roots. The sod shall be free &om obnoxious �veeds or other grasses and shall not contain any matter dcleterious to its gro�cih or �vhich might affect its subsistence or hardiness �vhen transplanted. Sod to be placed between � curb and «alk and on terraces shall be the same type grass as adjacent grass or existing lawn. � Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, haulino, �nd plantin�. Sod macerial shall be kept moist frum the time it is dug until planted. ��'hen so d�rected by the Engineer, the sod esisting at the source shall be �vatered to the extent required prior to � excavatin;. Sod material shall be planted �vithin three days after it is e�cavated. �" 3. CONSTRUCTION RIETHODS: After the designated areas have been completed to the lines, grades, and � cross-sections sho« n on the Dra«•ings and as provided for in other items of the contract, sodding of the type � 9G5-IdOU_Specs_PariD.wpd SC-�� Revised 13/09/9`� specified shall be performed in accordance with the requirements hereinafter described. Sodding shall be either "spot" or "block"; either Bermuda, Buffalo or St. Augustine grass. a) b) C. SEEDING 2. Dates SpotSodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the dimensions shown on the Drawings, shall be opened on areas to be sodded. In all furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch below the finished grade. Holes of equivalent depth and spacing may be uaed instead of furrows. The soil shall be 6rm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds per square inch rompression. Hand tamping may be required on terraces. Block Sodding At locations on the Dra�vings or where directed, sod blocks shall be carefully placed on the prepared areas. The sod shall be so placed that the entire designated area shall be covered, and any voids [eft in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact solid mass. Surfaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall, upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, su�ciently close to hold the block sod 6rmly in place. When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. riny excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface wili present a sightly appearance. The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. MATERI�L.S: General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis shown on•each tag shall be within nine (9) months of time of delivery� to the project. Each variety of seed sh�ll be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. The specified seed shall equal or exceed the following percentages of Purity and germination: Feb 1 to �la�• 1 Common Name Common Bermuda Grass Annual Rye Grass Tall Fescue Western Wheatgrass Buffalo Grass Varieties: Top Gun cody- Puritv Germination 95% 90% 95°/a 95% 9�°0 90% ��% �0% 9�% �0% ss�% so��o Table 120.2.(2)a. URBAti AREA ��'ARb1-SE:�SON SEEDING RATE Qbs.); Pure Live Seed (PLS) 9G54300 Specs_Yartll wpd hlixture for Clay or Tight Soils (Eastern Sections) (4Vestern Sections) Bcrmudagrass Buffalograss Total: -10 Buf£alograss GO Bermudagrass 100 Tot�l: SC-?3 hlixture for Sandy Soils (.All Sections) 80 Bermudagrass GO 20 Buf£alograss 40 100 Total: 100 Revised 12/09/98 � Table, 1'20.2.(2)b TE�IPORARY COOGSEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) w � Dates Tall Fescue (All Sections) 33 1/3 I ��estern �4'heatgrass 33 1/3 Aug 15 to blay 1 I Annual Rye 33 I/3 Total: 100 CONSTRUCTION NIETHODS: rlfter the designated areas have been compfeted to the lines, grades, and cross-sections sho�vn on the Dra�vings and as provided for in other items oF this Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. � a) �Vaterin;. Seeded areas shall be �catered as directed by ihe Engineer so as to prevent washing of the slopes or dislod�ment of the seed. b) Finishing. 4Vhere applicable, the shoulders, slopes, and ditches shali be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. -- 4. BRO.-�DCr1ST 5EEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed � over the areas shown on the Drawings and where directed. [f the sowing of seed is by hand, rather than by mechanical methods, [he seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is � obtained. "Finishing" as specified in Section D-4G, Construction Methods, is not applicable since no seed bed preparation is required. 5. D[SCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall be loosened to � a minimum depth of three (3) inches and all particles in the seed bed shail be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as speci5ed under , "Finishing" in Section D-4G, Construction I�Iethods. The seed, or seed mi�cture, specified shall then be planted at the rate required and the application shall be f made uniformly. If the sowing of seed is by hand rather than by mechanical methods, seed shall be raked L or harrowed into the soil to a depth of approximately one-eight (1/8) inch. The planted area shall be rolled with a corrugated roller of the "Cultipacker" type. All rolling of the slope areas shall be on the contour. � 6. ASPHAL,T �IULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and al! particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D•46, Construction Methods. � �;'ater shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is • thoroughl}• mois[ened. :�f'ter the �catering, when the ground has become suf£iciently dry to be loose and pliable, the seed, or seed mixture specified, shall then be planted at the rate required and the application shall be made uniformly. .r If the so���ing of seed is by hand, rather than mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer ma}• be distributed at the same time, provided the specified � uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approsimately one-quarter (1/�3) inch. The planted surface area and giving a smooth surface �cithout ruts or [racks. In between the time comp�cting is completed and the asphalt is applied, the planted area shall be watered sufficiently [o assure uniform moisture &om the surface to a minimum of six (G) inches in depth. � The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Dra�vings and shall conform to the requirements of the item 30d, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or iC Drawings are not C included, then MS•2 shall be used applications of tfie asphalt shall be at a rate of three-tenths (0.3) gallons per square � ard. It shal] be applied to the area in such a manner so that a complete film is obtained and the finished surface shall be comparativel}• smooth. �.�• � RE-SEEDI�JG OF:�RE.�S PL.1tiTCD «"ITH COOL SEASONS SPECIES: Areas where temporary cool season spe��e� have been planted ma�� be replanted beginnin; Febru�r}� 1«ith warm season species as listed in Table 1?0.'2(2)a. The re-seeding ��ill 6e achieved in the fallo«•ing manner. The cool season species shall be mo�ced do��•n to a hei;hc of onc (1) inch to insure that slit-seedin; equipment �vill be able to cut through the turf and achiece adequa�e soil penetration. ir � 9G�a300_Specs_PartD ��pd sC-��`� Revised 13/09/98 �. D ' Siit•seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cultipacker wheel. CONSTRUCTION �VITHIN PARK AREAS TURF RESTORATION OF PA.RK AREAS: Fertilizer � � 2. DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are ' designated on the Drawings and in accordance with these Specifications. 3. hIr1TERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis. . The fertilizer is subject to testing by the City of Fort Worih in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used wi[h an analysis of 16•20•0 or 1G-5-8 or having the analysis shou•n on the Dra«•ings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In ihe event it is necessary to substitute a£ertilizer of a diH'erent analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. 4. CONSTRUCTION btETHOD5: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area speciFied to be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physical condition. Fertilizer [hat is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Dra�vings, fertiLizer shall be appLied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of"Seeding". I�fEASUREh1ENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only on topsoils secured from borrow sources. Acceptable material for "Seeding" will be measured by the linear foot, complete in place. Acceptab2e material for "Sodding" will be measured by the linear foot, complete in place. Acceptable material for "Fertilizer" shall be subsidiary to the price of sodding or seeding. 6. PAYI�fENT: All µ•ork performed as ordered and measured as provided under "Measurement" shall be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. All labor, equipment, tools and incidentals necessary Co supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials, labor, equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. The «�ork performed and materials furnished and measured as provided under "bleasurement" shall be paid for at the unit price for "Sceding", or "Soddin;', of the type specified, as the case may be, «•hich price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application �vill not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. D-7�1 CO�fFiNED SPACE ENTRI PROGRA..'1I: It shall be the responsibility of the contractor to impfement and maintain a vari�ble "CONFINED SPACE ENTRl' PROCR:IAI" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active se«•er manholes, regardless of depth, are defined by OSFL4 as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SP?.CE ENTRY PROGRAIvf" for all applicable manholes and maintain an acti�•e file for these rnanholes. The cost of complvino �cith this program shall be subsidiary to the pay items in��olvin� «ork in confined spaces. 9G;i 13U0_Specs_PartU u•pd .�C-2� Revised 1?/09/98 �. D-75 SUBSTANTIAL CO�IPLETION INSPECTION/FINAL INSPECT[ON: ._ 1. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the en[ire project or a designated portion of the project is substantially complete. � 2. The inspector along with appropriate Ci[y staff and the City's consultant sha11 make an inspection of the � substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 3. The contractor shall take immediate steps to rectify the listed deficiencies a�d notify the owner in writing when all the i�ems have been completed or corrected. � 4. Yay�ment for subs[antial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies Gvhich are discovered at the time of final inspection. � 5. Final inspection shall be in conformance with general condi[ion item "CS•15.18 Final Inspection" of PART C- GENER:\L CONDITIONS. D-76 EYCAVATION NEAR TREES: 1. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunnelingltree auguring. � 2. Any and all trees located �vithin the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a"sno�v fence" along the drip line or edge of the tree root system between tree and the construction area. � 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified at least 24 hours prior to any tree trzmming work. No trimming work will be permitted within private property without written permission of �" the O�•ner. 4. Nothing shall be stored over the tree root system within the drip line area of any tree. —. 5. Before excavation (off the roadway) �vithin the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. W G. At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be � utilized. 7. Except in areas where clearing is altowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced �vith the same type and diameter tree at the con[ractor's expense. � 8. Contractor shall employ a quaLified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. 9. Short tunneling shall consist of power auguring or hand excavation. The tunnel diameter shall not be larger " than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. `'' D-77 CONCRETE ENCASEIIENT OF SEWER PIPE: Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot o£ concrete encasement as measured in place along the centerline of the pipe for each pipe diameter r� indicated. The Contract Unit Price shall include alI costs associated with installation and reinforcement of the concrete encasement. D-78 CL.AY DA3I: Cla�� dam construction shall be per£ormed in accordance wi[h the �b'astewater Clay Dam Construction, —• figure in the Dra«•ings in [hese Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed �nto undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. �r Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for work such as forming, placing and finishing shall be subsidiary to the price bid for pipe installation. ■; D-i9 E.1'PLORATORY EXCAVATIOti (D-HOLE): The Contractor shall be responsible for verifying the locations of � � ex�sting utilities prior to construcUon, in accordance �vith item D-22. AC locations idenu6ed on the draticings, contractor shall conduct an exploratory excavation (D-Hole), to loca[e and verify the � locnuon and ele��,�uon of the existing underground utility where it may be in potential conflict ���ith a proposed facility alignment. The esplorator}� escavation shall be conducced prior to construction of the entire project only at locations denoted on the � plans or as directed bp the engineer. Contractor shall submi[ a report of findings (including sun�ey�ed elevations of e�istin� con(licting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing �' utilit�• �s in conflict «ich the proposed facilit�-, the contractor shall contact the engineer immediately for appropriate design � n,odir,cacio„s. � 9f,51300_Specs_ParcD w•pd SC-�% Ravised 12/09l98 The contractor shall make the necessary repairs at the eKploratory excavation (D•Hole) to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). Payment shall not be made for verification of existing utilities per item D•22. Payment for esploratory excavation (D•Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all matecials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. D-80 INSTALLATION OF�VATER FACILITIES: A. POLYVINYL CHLORIDE (PVC) WATER PIPE: POL�vINYI, Chloride Plastic Water Pipe and fittings on this Project shall be in accordance w�ith the materia! standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). B. BLOCIiiNG: Concrete blocking on this Project �vill necessarily be required as shown on the Plans and shall be installed in accordance w�ith the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the «•ork involved for the item and all costs incurred will be considered to be included in che linear foot bid price of the pipe or the bid price of the valve. C. TYPE OF CASING PIPE: WATER: The casing pipe for open cut and bored or tunneled sectiun shall be A�ir1VA C-200 Fabricated Electricall}� ��'elded Steel Water Pipe, and shall conform to the provisions of E1-15, E1•5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follo�vs: For the inside and outside of casing pipe, coal•tar protective coaling in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. Touch-up after field �velds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade ��'aterworks hlanufacturing Company or an approved equal shall be used on all non-concrete pipes when installed in casing. Installation shall be as recommended by the manufacturer. 2. 3. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. PAYi�NT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. D- T[E•[NS: The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verif}• the esact location and elevation of the existing line tie•ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. E. CONNECTION OF EkISTING ALaINS: The Contractor shall detennine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece, Any di�erences in locations, elevation, configuration, and or angulation of existing lines between the coniract drawings and what may be encountered in the said �vork shall be considered as incidental to construction. �Vhere it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated �vith the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting down an existing main, the Coniractor shall notifr� the Nianager, Construction Services, Phone 871-7813, at least 43•hours p�ior to the required shut down time. The Contractor's attention is duected to Yaragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), P:�RT C- GENER.hL CONDITIONS OF THE WATER DEP.�RTMENT GENER.4L CONTRACT DOCUMENTS AND GENER.�.L, SPECIFICAT[ONS. The Contractor shall notify the customer both personally and in writing as to the location, time, and schedule o[ the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shalf 6e included in the linear foot price bid for the appropriate pipe size. �:aL�B CUT•INS: It may be necessary to cut-in gate valves to isolate the �vater main from which the extension and/or replacement is to be connected. This may� require closing valves in other lines and putting consumers out of service for that period of time necessary to cut in the ne« �•alve; the ��ork must be expedited to the utmost and all such cut•ins must be coordinated ���ith the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and ad���sed of the approximate length of time they may be «•ithout service. Ya��ment for «ork such as backfill, bedding, fittings, blocking and all other associated appurtenances required, shall be included �n the price of the appropriate bid items. 96.i�J00_Spec�_YartD wpd SC-� i Revised 1?/09/99 � • �. WATER SER�`ICES: The relocation, replacement, or reconnection of water services will be required as shown on the plans, andlor as described in these Special Contract Documents in addition to those located in the field and identi£�ed -- by the Engineer. � All service's shall be constructed by the contractor utilizing approved factory manufactured tap saddles (�vhen required) and corporation stops, type Ii copper «�ater tubing, curb stops with lock wings, meter bores, and if required approved � manufactured service branches. All materials used shall be as specified in the htaterial Standards (E1-17 & E1-18) contained in the General Contract Documents. r111 water services to be replaced shall be installed at a minimum depth of 3G inches below final grade. All e:cisting 3/4•inch water service lines which are to be replaced shall be replaced with 1-inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation Crom [he main line to the meter bor. r111 services which are to be replaced or relocated shall be installed with the service main tap and service line being in line 4vith the service meter unless otherwise directed by the Engineer. `" A minimum of 24 hours advance notice shall be given when service interruption n•ill be requ'ued as speci6ed in Section C3•5.15 INTEKRUPTION OF SERVICE. � A11 �vater service meters sha11 be removed, tagged, and collected by the contractor for pickup by the �Vater Department for reconditioning or replacement. After installation of [he water service in [he proposed location and receipt of a meter from the project inspector the contractor shall install the meter. The meter bos shalt be reset as necessary to be tlush with existing ground or as othera�ise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed piumber. 1. WATER SERVICE REPLACEhLENTS: �Vater service replacement or retocation is required when the existing � service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the me[er, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type I� copper tUbing, curb stop with lock wings, �'" service line adjustment, and any relocation of up to 12•inches from center line existing meter location to center line proposed meter location shall be induded in the Linear Foot price bid for Copper Service Line &om ' Ttain to &ve (5) feet behind Meter. Any vercical adjustment of customer sen•ice line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and fittings shall be � included in the price bid for Service Taps to Nfain. � 2. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap w•ith corporation stop. The contractor will be paid for one (1) Service Tap to b4ain for each service reconnected plus for any copper service � line used in excess of 6ve (5) feet from h[ain to five (5) feet behind the Meter. , 3. WATER SER�RCE nLE1'ER r1ND b1ETER BO\ RELOCATIONS: When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the centerline of the proposed meter location, separate payment will be allo�ved for the ralocation of sercice meter and meter box. � Centerl�ne is defined by a line extended from the service [ap through the meter. Only relocations made perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be padi of in feet of copper service line. � When relocation of service meter and meter bor is required, payment for all ��•ork and materials such as backfill, 5ttings, 6ve (3) feet of type K copper service and all materials, labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocaUon. All other costs will be included in other appropriate bid item(s). � This item �vill also be used to pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only the meter box and customer service line � wichin 5 feet distance behind the meter �eill not justif}� separate payment a[ any� time. Locations with multiple service branches �vill be paid for as one service meter and meter box relocation. -1. NE«' SEH�ZCE: «'hen ne��� ser�•ices are required the contractor shall install tap saddle (�vhen required), �„ corporation stop, tt•pe Ii copper service line, curb stop «�ith lock wings, and meter bos. Pacment for all �cork and materials such as backfill, fittings, type Ii copper tubing, and curb stop with lock «ings shall be included in the Linear Foot price bid for Service Line from Alain to �Ieter fi��e (5) fee[ behind the meter. � Payment for all �cork and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Sen ice Taps to blains. '� 9G�1300_Specs_PartD.w'pd SC-�$ Revised l`?/09i98 Payment for all work and materials such as furnishing and setting new meter box shall be included in the price bid for furnish and set meter box. f: 5. bIULTIPLE SERVICE BR,�NCHES: V�hen multiple service branches are required the contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). G. hfULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple service lines with taps servicing a single sen�ice meter encoun[ered during construction shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. Payment shall be made at the unit bid price in the appropriate bid item(s). 2-INCH TENfPOIZARY SERVICE LINE: The 2•inch temporary service main and 3/d-inch service lines shall be installed to provide temporary �cater service to alI buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building on�ners and the Engineer in order that the �+•ork be performed in an expeditious manner Severed water service must be reconnected within 2 hours of discontinuance of service. A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter 6tting shall be required at the temporary service point of connection to the City water supply. The 2-inch temporary service main and 3/4•inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated lime (FITH) prior to installation. A 2-inch meter will be furnished by the Water Department hleter Shop and installed by the Contractor at its point of connection to the City water supply for record keeping purposes only. The out-of-service meters shall be removed, tagged and collected by the Contractor for delivery to the Water Department bleter Shop for reconditioning or replacement. Upon restoring permanent service, the Contractor shall re-install the meters at the correct location. The meter box shall be reset as necessary to be �ush with the existing ground or as otherwise directed by the Engineer. The temporary service layout shall have a minimum available flow rate of 5 GPM at a dvnamic pressure of 35 PSI per ser�-ice tap. This criteria shall be used by the Contractor to determine the length of temporary• service allowed, number of service taps and number of feed points. �Vhen the temporary service is required for more than one location the 2-inch temporary service pipes, 3/4•inch service lines and the 2-indi meter shall be moved to the next successive project location. Payment for work such as fittings, 3/4•inch service lines, asphalt, barricades, alt service connections, removal of temporary services and all other associated appurtenances required, shall be included in the appropriate bid item. ADJLJST 1�LANHOLES, .�.I�1D VAULTS (UTILITY CUT): Contractor will be responsible for adjusting water valve boxes, manholes and vaults to match new pavement grade. The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. ADJUST W:�TER �'AL,VE BO�ES: Contractor wi11 be responsible for adjusting water valve boses to match new pavement grade. The «•ater valves themselves will be adjusted, if necessary, by City of Fort �Vorth V�iater Department forces. Prior to the beginnir�g of work, the Contractor shall make an inventory of the condition of existing water valve boxes. The Construction Engineer will field verify this inventory and provide the Contractor replacements for broken valve bores. The contractor shall replace [he valve boxes which are damaged during construction at no cost to the City. The unit price bid per each will be full compensation f'or all labor, materials, equipment, tools, and incidentals necessary to complete the u•ork. Ii. PURGING �.ND STERILIZATION OF �VATER LINES: Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance �vith E2•24 of the General Contract Documents and SpeciFcations except as modi5ed herein. The Contractor will furnish all wa[er for INITIA[, cleaning and steriliza[ion of water lines. All materials for construction of the project, including appropriatel}� sized "pipe cleaning pigs" chlorine gas or chlorina[ed lime (HTH) shall be furnished by the Coniractor. Chlonnated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50) PPIv1. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine. Chlorinated «•ater shall be disposed of in the sanitan� se«•er system. Should a sanitary se�ver not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The line may not be placed in service until ta•o successive sets of samples, taken 2-1 hours apart, have met the established standards of purit�•. Purgind and sterilization of the «ater lines shall be considered as incidental to the project and a11 costs incurred µill be considered to be included in the line�r foo[ bid price of the pipe. L «'OItI� KEaR YRESSLIRG PI �NE IIOWD:�RI�S: Contractor shail take note that the ��ater line to be replaced under thi� contract may cross oc ma�• be sn close proeimity to an e�isting pressure plane boundar} . Care shall be taken to 9Gi 1300_Specs_PartD wpd .�c-?� Revised 12/09/98 ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes ht. �t'ATER S:�I�IPLE STATION: 1 2 GENER?�L: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor &ee of charge; however, the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYb1ENT FOR FIGURE 34 INST.4LLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type Ii copper service line will be shall be included in the price bid for copper Service Line from I�fain to nfeter. C Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and iittings shall be included in the price bid for Service Taps to hfain. Payment for all work and materials necessary for the installation of the sampling station, concrete support �"' block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provEde a complete and functional w•ater sampling station shall be included in the price bid for Water Sample ' Stations. '^ 3. PAYI�IENT FOR FIGURE 33 INSTALLATtONS: Payment for all work and materials necessary for ihe � install�tion tap saddle, gate valve, a�d fitcings shall be included in the price bid for Service Taps to Nlain. Payment for all work and materials necessary for the installation of the samp6ng station, modification to the vault, fittings, and all type Ii copper service line which are required to provide a complete and functional � water sampling station shall be included in the price bid for Water Samp{e Stations. D-81 SPRINKLING FOR DUST CONTROL: r111 applicable provisions of Standard Specifications Item 200, "Sprinkling �,i, for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered to this contract. , D-82 DE�VATERING: The Contractor shatl be responsible for determining the method of dewatering operation for the water or se�cage flows from the esisting mains and ground wa[er. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. � The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. � Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. D-83 TR�NCH E}CCAVATION ON DEEP TRENCHES: Contractor to prevent any water flowing into open trench during !1 construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day o£ F excavation. No extra payment shall be allo«�ed for this special condition. D-8-� TREE PRUNING: A. R�FERENCES: National Arborist Association's "Pruning Standards for Shade Trees". B. ROOT PRUNING EQUIPti1ENT 1. Vibratory Knife 2. Vermeer V•1550RC Root Pruner C. NATUR.-�L RESOURCES PROTECTION FENCE D 1. Steel "T" = Bar stakes, 6 feet long. 'l. Smooth Horse-�Vire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge). 3. Surve}•or's Plastic Fla;ging: "Tundra" weight, International fluorescent orange or red color. -1 Combination Fence: Commercially manufacwred combination soil separator fabrrc on wire mesh backing as sho�cn on the Dra«ings. ROOT PRli�ING 1. Sun•e}• and stake location of root prunin� trenches as shown on dra«•ings. ' 9G•i 1300_Specs_PartD.�cpd SC-3� Revised 1?/09/98 E. 2. Using the approved specified equipment, make a cut a minimum of 3G inches deep in order to minimize damage to the u�disturbed root zone. 3. Backfill and compact the trench immediately after trenching. 4. Place a 3-foot wide by 4•inch deep cover of mulch over the trench as required by the Engineer. 5. Within 2�1 hours, prune flush «•ith gro�nd and backfill any esposed roots due to construction activity. Cover with «•ood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. G. Limit any grading work within conservation areas to 3•inch maximum cut or fill, with no roots over 1•inch diameter being cut unless cut by hand or cut by specified me'�.ods, equipment and protection. MULCHING: Apply 2-inches to 4-inches of «�ood chips from trimming or dearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiar}� to the project contract price. D-85 TREE REbIOVAL: Trees to be removed shall be remoced using applicable methods, including stump and root ball remo�•al, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract price and no additional payment will be allo�ved. 9G513U0_Specs_ParcD.��pd SC-31 Recised 1?/0919A ' PART DA �DDITION�L SPECI�L GONDITIONS r����:� i:3oo_s��.�., �, ud ADDITIONAL SPECIAL CONDITIONS DA•1 D:1-Z DA•3 D.�•4 DA•5 DA-G D �-7 DA•8 D,�-9 DA• 10 Da•11 DA-12 DA- I3 DA-14 DA-15 DA-16 D�-17 DA• 18 D9-19 DA-20 DA•21 DA-22 DA•23 DA-2� DA•25 DA•26 DA-27 DA•28 DA-29 DA•30 D �-31 DA-32 DA•33 DA-34 DA-35 D:�•3G PIPELINE REFL�BILITATION CURED-IN•PLACE PIPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 1 PIPE ENLARGEMENT SYSTEhi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 4 FOLD AND FORhf PIPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.SC - 9 SLIPLINING /OMITTEDj . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 11 PIPE iNSTALLED BY OTHER THAN OPEN CUT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 11 PRI�'ATE SECTOR REP.4IR5 [O�iITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 12 PROTECTIVE bZ4NHOLE COATING FOR CORROSION PROTECTION . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 13 bL�NHOLE REH.4BILITATION (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 1�4 SURFACE PREP.�.RATION FOR bLANHOLE REHABILITATION (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . ASC • 14 INTERIOR IvIANHOLE COATING - MICROSILICATE NfORTAR SYSTENI /OMITTEDJ . . . . . . . . . . . . . ASC - 14 INTERIOR hL4NHOLE COATING - QUADEX SYSTEM [OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 14 INTERIOR hL�NHOLE COATING - SPRAY �VAI,L SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 14 INTERIOR IvL�NHOLE COATING - RAVEN LINING SYSTEI�f . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 16 INTERIOR I�IAIVHOLE COATING: PERivIACAST SYSTEM WITH EPO;CY LINER (OMITTEDJ ...... ASC - 17 RIGID FIBERGLASS hLANHOLE LINERS �OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 17 P�'C LINED CONCRETE WALL RECONSTRUCTION (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 17 PRESSURE GROUTING [O1VfITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 17 �'ACUUI�1 TESTING OF REHABILITATED bLANHOLES [OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 17 FIBERGLASS NL4NHOLES [OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 17 LOCAT[ON AND E�POSURE OF NL�NHOLES A.ND �VATER VALVES . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 17 REPLACENfENT OF CONCRETE CURB AND GUTTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 18 REPI.ACE�fENT OP' 6" CONCRETE DRIVE�VAYS [OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 18 REPLACE�fENT OF H.M.A.C. PAVEbiENT AND BASE (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 18 GRADED CRUSHED STONES (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 18 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 18 BUTT JOINTS - MILLED �OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 18 2" H.nf.A.C. SURFACE COURSE (TYPE "D" NfIX) %OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 18 REPLACEbfENT OF 7" CONCRETE VALLEY GUTTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 18 NEW 7" CONCRETE VAI,LEY GUTTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 19 NEW 4" STANDARD WHEELCHAIR R�tP (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 19 S" PAVEDIENT PULVERIZATION (Od11TTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 19 REINFORCED CONCRETE PA�'ENiENT OR BaSE (iJTILITY" CUT) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 19 RAISED PAVENIENT M.ARKERS %OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC • 20 POTENTIALLY PETROLEUM CONT:1IvIINATED MATERIAL HANDLING . . . . . . . . . . . . . . . . . . . . . . . . ASC - 20 LOADING, TRANSPORTATION, AND DISPOSr1L OF CONTAMINATED SOIL . . . . . . . . . . . . . . . . . . . . ASC • 22 ROCK RIP RAP - GROUT - FILTER FABRIC (OMITTEDJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASC - 23 � 9G54300_Specs_PartDA.wpd :�SC - 1 Re�zsed 09/01/98 DA-1 PIPELINE REHA.SILITATION CURED-IN-PLACE PIPE A. «'ORK TO BE DONE: The work to be done under this contract consists of rehabilitation of existing sewer lines by the Cure-in•Place Pipe hlethod or approved equal. Cured-in-place pipe consistv of a resin impregnated Ilexible tube, coated with an elastomeric coa[ing, when inverted into an existing sewer pipe through existing access manholes, and which, under proper hydrostatic and thermal conditions, is cured-in-place, becoming a structurally sound cured-in-place pipe. The thickness of the pipe will be dictated by the structural requirements of the sewer pipe with no loss of cross sectional area other than the thickness of the resin-impregnated tube. The pipe will be impermeable to water, provide corrosion resistance, and an optimum friction factor for the sewer flow. Branch connections shall be reinstated by a remote controlled cutting devfce. The krork consists of providing all labor, equipment, transportation, materials, and supervision necessary to: 1. Thoroughly clean se�ti•ers as required for the installation of the resin-impregnated tube. 2. Inspect sewers by closed circuit color television (CCTVj, including identifying and marking the location of each service connection. Cost subsidiary to Pre-Construction TV Inspection. 3. 4� 5. G. 7 8. Notify residents at least 48 hours prior to service interruption. Install the resin-impregnated tube of the correct thickness as specified. Cut out all service connections by remote cutters and restore service within 18 hours. Reinspect by CCTV to verify satisfactory completion of work at time of lateral reinstatement. Cost subsidiary to Post•Construction TV Inspection. Pump around all dry and wet weather flows to accommodate the process at each separate installation, as required. Comply with all appropriate governmental agencies' regulations regarding traf6c, safety procedures and permits, the cost of which is the responsibility of the Contractor. B. hI.aTERIAI,S: The fiber fel[ tube shall be fabricated to a size that when installed will tightly fit the internal circumference of the conduit specified by the Owner. Allowance for circumferential siretchirtg during im•ersion shall be made and shall meet ASTh1-1216. The minimum length shall be that deemed necessary by the Contractor to e£fectively span the distance from the inlet to the outlet of the respective manholes, unless othertivise specified. The Contractor shall verify the lengths in the &eld before impregnation. Individual inversion may be made over one or more manhole sections, as determined in the fieid by the Contractor. Unless otherwise specified, the Contractor shall furnish a general purpose unsaturated polyester resin and catalyst system that meets ASTM standards and the finished cured physical strengths speci&ed. � C. REQUIRED THICIi.NESS OF CURED-IN-PLACE PIPE: The thickness of the pipe will be determined from information supplied or manufacturer's recommendation for the condition of the existing pipe. The Contractor shall submit his price proposal for the size and thickness designated in the proposal section. Should pre-installation inspections reveal the se«•ers to be in substantially different conditions than those in the design considerations, the Contractor can request such changes in pipe thickness, supporting such request with design data in accordance with the pipe manufacturer's standard design criteria as follows: Lr LINER THICKNESS Sewer Pipe Invert Diameter Depth up to 10' (also the minimum) 6" 4.5mm 8" 6.0mm 10" GAmm 1?" 6Amm 1S" 7.5mm 18" 9.0mm 21" 10.5mm 2 {" 12.0mm 30" 1 �.0m m 3G" 1G.�mm 42" 19.�mm Pipe[nvert Depth 10'-15' 4.5mm G.0mm 6.0mm 7.5mm 9.0mm. 12.0m m 13.5mm 13.0mm 18.0mm 21.0mm 2�3.0mm Pipe Invert Depth Over I5' 4.5mm 6.0mm 7.5mm 9.0mm 10.5mm 13.Smm 1b.0mm 1G.5mm 21.0mm 24Amm 28.5mm 1 9G51300_Specs_PartD.awpd ASC - 1 Revised09/0U98 LItiER THICKNESS D. E Sewer Diameter 48„ 5-4" 60" PipeInvert Depth up to 10' (also the minimum) 2'l.5mm 23.5mm 28.5mm Pipe Invert Pipe Invert Depth 10'-15' Depth Over 16' 28.5mm 33.0mm 30.0mm 36.0mm 3<1.Smm 39.0mm PREPrlR.4TOR1' �'�'ORIi: The installation procedures shall be as follows unless otherwise approved by the Department of Engineering. 1. Safety - The contcactor shall carry out his operations in strict accordance with all safety requirements. Particular attention is drawn to those safety requuements that involve working with scaffolding and entering confined spaces. 2. All easements shall be cleaned up after use and restored to their original conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the Property Owners involved for the use of additional property required. No additional pa}•ment �vill be allowed for this item. If a street must be closed to traffic because of the orientation of the sewer, the Department of Engineering shall institu[e the actions necessary to do this for the mutually agreed upon time period. 3. Before using anp water &om the City of Fort Worth, the Contractor shall be responsible for the �4•ater meter and related charges for the set up, including the water usage bill. All expenses shall be considered incidental to cleaning. 4. Cleaning of Sewer Line - It shall be the responsibility of the Contractor to remove all internal debris out of the sewer lines and flush the sewer lines clean, disposing of debris o£f-site. Debris is not to be washed downstream into other se�vers. All solids or semisolids resulting from the cleaning operations shall be removed from the site and disposed of at no additional cost to the City. It is the responsibility of the Contractor to secure a legal dump site for the disposal of this material. All materials shall be removed from the site no less often than a� the end of each work day. All cost for the above•descrrbed work shall be paid for by the price bid per linear foot for Cleaning and Television Inspection. 5. Inspection of Pipelines - Inspection of pipelines shall be performed by experienced personnel trained in locating breaks, obstacles, and service connections by closed circuit color television. Television inspection shall be in accordance �vith the specifications contained herewith for "Pre- and Post-Construction Television Inspection of Sanitary Sewer Lines". INSTALLATION OF THE RESIN Ib4PREGNATED TUBE: The Contractor shall designate a location where the uncured resin in the original containers and the unimpregnated Sber-felt tube will be vacuum impregnated prior to installation. The Contractor shall allow the Owner to inspect the materials and "�ti�et-out" procedure. A resin and catalyst system compatible with requirements of this method shall be used. The quantities of the liquid thermosetting materials shall be per manufacturer's standards to provide the wall thickness specified. All felt shall be impregnated under vacuum. 2. The wet-out fiber felt tube shall be installed through an existing manhole or other approved access by means of an inversion process and the application of a hydrostatic head sufficient to fully extend it to the next designated manhole. The impregnated tube shall generally be inserted into the vertical inversion standpipe with the impermeable plastic membrane side out. At the lower end of the inversion standpipe, the felt tube shall be turned inside out and attached to the standpipe so that a leak-proof seal is created. The inversion head will be adjusted to be of sufficient height to cause the impregnated tube to invert from manhole to manhole and hold the tube tight to the pipe wall and produce dimples at the side connections. A lubricant, if used, shal] be as approved by manufacturer's standards. Manufacturer's standards shall be close►y followed during the elevated temperature curing so as not to over•stress the felt fiber and cause damage or failure prior to cure. In certain cases, the Contractor may elect to use a top inversion. 3. Curing: After inversion is complete, the Contractor shall supply a suitable heat source and water or steam recirculation equipment. The equipment shall be capable of delivering hot �vater or steam throughout the section by means of a pre-strung hose, which has been perforated per manufacturer's recommendations, to uniformly raise the «•ater temperature above the temperature required to effect a cure of the resin. This temperature shall be determined b}• the resin/catalyst s}•stem employ�ed and shall be per manufacturer's standards. The heat source shall be fitted �cith suitable monitors to gauge the temperature of the incoming and outgoing water or steam supph•. Another such gauge shall be placed at the remote manholes to determine the temperatures during cure. Inicial cure shall be deemed to be completed «�hen inspection of the exposed 965-1'300_Specs_PartDA wpd ASC - 2 Revised 09/01/98 ' -, � portions of the cured•in-place pipe appear to be hard and sound. The cure period shall be of a duration recommended by the resin manufacturer, as modified for the inversion process, during which time the "' recirculation o£ the water and/or steam and cycling of the heat exchanger to maintain [he temperature continues. �r 5. Cool-down: The Contractor shall cool the hardened cured-in•place pipe to a temperature below 100 F before n relieving the static head in the inversion standpipe. Cool•down may be accomplished by introducing cool water into the inversion standpipe to replace water or steam being drained &om a small hole made in the • downstream end. Care shall be taken in the release of the static head so that a vacuum will not be developed that could damage the newly installed cured-in•place pipe. F. SERVICE CONNECTIONS: After the pipe has been installed, the Contractor shall reconnect the active service � connections. This shall generally be done without excavation, and, in the case of non-man entry pipes, from the interior of the pipeline by means of a television camera and a cutting device chat re-established them to not less than 90 percent � capacity. Existing services shall be reinstated within 18 hours of installation. Should internal reinstatement not be possible, the services must be reconnected ezternally by excavation immediately. Service saddles acceptable to the Engineer shaLl be utilized. Backfill at service connections shall be cement stabilized (2 sacks per cubic yard) to a point 12 inches abo��e the servue tateral to trench tntersection and shall be m accordance with these speciScations. Each reconnectiort shall be paid for separately. Six inch sewer lines shall have service connections completed by external �" means. Contractor may re-connect the 6" sewer Gne connections by interna] means in special cases with the approval of the Engineer. G. ACCEPTANCE: The finished cure•in-place pipe shall be continuous over the entire length of an inversion run between ~� manholes and be smooth and free from substantial wrinkles, as well as defects, and improper house connections. � Should any of these defect9 occur, the line shall be escavated, repaired and/or replaced and complete restoration made to the satisfaction of the Department of Engineering at no additional cost. The watertightness of the pipe shall be tested for leaks under a positive head during cure with allowances being made for end leakage and temperature effects. H. CLEAN-UP: Upon acceptance of the installation work and testing, the Contractor shall restore the project area affected � by his operations to original or better conditions. P?.TENTS: The Contractor shalt .varrant and save harmless the City and all of its officers, agents, and employees against all claims for patent infringement and any loss thereof. � J. SPECIAI. NOTES: The Contractor shall be liable for damages to the homes or basements from backups which may � result during the installation of new pipe. Ii. b1EASURENIENT AND PAYTv1ENT: � 1. Cured-in-Place Pipe (CIPP) Installation: CIPP installation will be measured for payment by the linear foot of CIPP actually installed in the various diameters of sewers measured along the centerline of the sewer &om centerline to centeri�ne of manholes. Payment will be made for the quantities measured at the unit price per � linear foot for the various sewer diame[ers listed. 2. Service Reconnection: Payment will be made for the quantities measured at the unit price per each listed in the bid proposaL Payment shall include all labor, materials, and the lateral connection, including all necessary pipe and fittings to connect the existing service line. Payment shall not include pavement replacement, which if required, shall be paid separately. u 3. Teievision Inspection and Cleaning: Special Cond�tion for Post-Construction Television Inspection applies. � 4. Se«•er Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines. The payment for such cleaning shall be included in the bid item for Pre- Construction Television Inspec[ion of Sanitary Sewer. 5. By-Pass Pumping: The Contractor shall provide diversion for the tlow of se�vage around the section or sections � of pipe designated for the inversion of the resin•impregnated tube. The pumps and by-pass lines shall be of adequate capacity and size to handle all �ows. All costs for by•pass pumping required during installation of the pipe shall be subsidiary� to the pipe reconstruction item. � G. Point Repairs: Point repairs shall be made before or after a cured•in-place pipe installation at the Contractor's option. Point repairs shall be conducted only if mutually agreed to by the Department of Ene neering and the Contractor prior to acceptance of the line for reconstruction. Before any excavation is � done for an}• purpose, it �ti•ill be the responcibility of the Contractor to check with various utility companies and determine the location of their f�icilities. Point repairs shall be measured and paid for by the linear foot � for the appropriate depth of cut. Payment shall include all labor, material and equipment for pipe replacement according to standards. i. Subsidiary ��`ork: ?�ny d�mage resulting to utili[ies and property, resulting repairs, temporary service costs, 4 etc., shall be borne b}� Contractor. Repair and/or replacement of fences, sprinkler system piping and other � 965J30U_Specs_PartD.� wpd asC - 3 Revised 09/01l98 such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. DA-2 PIPE EhLAftGED4ENT SYSTEM A. GENER.aL: Description: This specification includes requirements to rehabilitate existing sanitary sewers by the pipe enlargement system, herein called Pipe Bursting or Pipe Crushing (Pipe Bursting/Crushing). This system includes splitting or bursting the existing pipe to install a new polyethylene pipe and reconnect e!�isting sewer service connections. 2. Methods: This section specifies the approved system method or process to include all labor, materials, tools, equipment and incidentals necessary to provide for the complete rehabilitation of deteriorated gravity sewer lines by the Pipe Bursting/Crushing systems. Approved methods include: the PIM Corporation (PIM System), Piscata Way, New Jersey; D1cLat Construction (I�tcConnell System for Pipe Crushing), Houston, Texas; Trenchless Replacement Systems, (TRS System), Calgary, Canada. Refer to INSTRUCTIONS TO BIDDERS for information regarding pre-approval procedures for alternative processes. 3. Definition: The Pipe Bursting/Crushing system is defined as the reconstruction of gravity sew�er pipe by installing an approved pipe material, by means of one of the pre-approved methods set forth in Section A.2 of this specification. The process involves the use of a static, hydraulic or pneumatic hammer "moling" device, suitably sized to break out the old pipe or using modified boring "knife" with a flared plug that implodes and crushes the existing sewer pipe. Forward progress of the "mole" or the "knife" may be aided by the use of hydraulic equipment or other apparatus, as specified in the approved methods. The replacement pipe is either pulled or pushed into the bore. The method allows for replacement of pipe sizes &om $" through 21" and/or upsiaing in varying increments up to 21". This specification is based on the precedent that the Pipe Bursting/Crushing system used has been pre•approved by the City of Fort Worth Department of Engineering, and Fort �'�'orth �Vater Departmen[. 4. Quality Assurance: The Contractor shall be certified by the particular Pipe Bursting/Crushing system manufacturer that such firm is a licensed installer of their system. No other Pipe Bursting/Crushing system other than those listed in Section A.2. of these specifications is acceptable. a. Personnel directly involved with installing the new pipe shall receive training in ihe proper methods for joint fusing, handling, and installing the polyethylene pipe. Training shall be performed by a qualified representative as determi�ied by the pipe manufacturer. Personnel directly involved with installing the new pipe shall receive training in the proper methods for joint fusing, handling, and installing the polyethylene pipe. Training shall be performed by a quali£�ed representative as determined by the pipe manufacturer. 5. Submittals: Submit for review and acceptance, the following Contractor's Work Plan and Drawings to the Department of Engineering (DOE): Shop dra�vings, catalog data, and manufacturer's technical data showing complete information on material composition, physical properties, and dimensions of new pipe and fittings. Include manufacturer's recommendation for handling, storage, and repair of pipe and fittings if damaged. Location and number of insertion or access pits shall be planned by Contractor and submitted in writing prior to excavation for approval by DOE. c. blethod of construction and restoration of existing sewer service connections. This shall include: 1) Detai] drawings and �ti•ritten description of the entire construction procedure to install pipe, bypass sewage flow and reconnection of sewer service connections. 2) �i�'orking drawings for information only showing sewage IIo�v bypass, and main�enance of traffic. Contractor shall provide for continuous se�ti�erage �ow. Dewatering shall be the Contractor's responsibility. 3} Certification of ��orkmen training for installing pipe. 4) Television inspection reports anci video tapes made after new pipe installation. Delivery, Storage, and HandGng: Transport, handle, and store pipe and fittings as recommended by manufacturer. If new pipe and fittings become damaged before or during installation, it shall be repaired as recommended by the manufacturer or replaced as required by the Project �fanager at the Contractor's expense, before proceeding further. 9GS t300_Specs_PartD�a.w'pd ASC - 4 Revised 09/01/98 ' c. Deliver, store and handle other materials as required to prevent damage. � B. hL�TERIAL,S: W 1. Polyethylene Piping hlaterial: The pipe and Stting material shall be high density, extra molecular weight �.. (E�iI�1w� polyethylene pipe material conforming to ASTNi D1248, Type III, Class C, Category 5, Grade P34, and have a PPI (Plastic Pipe Institute) recommended designation of PE3408 and cell classi6cation 345434C . per ASTM D3350. The molecular weight category shal] be extra high (250,000 to 1,500,000) as per the Gel Permeation Chromatography determination procedure with a typical value of 330,000. a. The interior of the pipe shall be a light reflective color to facilitate closed circuit television � inspection. b. The pipe ma[erial shall be listed by the Plastic Pipe Institute (PPI) in PPI TR-4. The pipe material shall have as hydrostatic design basis of 1600 psi at 73 F and 800 psi at 140 F. — c. The manufacturer's certification shall state that the pipe was manufaccured &om one specific resin and shall state the resin used and its source. All pipe shall be made of virgin material. No rework, �^" except that obtained from the manufacturer's own production of the same formulation, shall be used. d. Pipe supplied under this speci5cation shall have a nominal IPS (Iron Pipe Size) outside diameter. •- The Standard Dimension Ratio (SDR) and minimum oressure ratine of the oioe shall be SDR 17 - 100 asi. Pipe with a lower SDR ratio and hsgher pressure rating may be used in lieu of the i. minimum speci5ed. Tests: The Contractor shall be required to send submittals to the City of Fort Worth on the production material. �" The pipe manufacturer shall provide certification that samples o£ the production product meets these specifications. The certification will sta[e that production product has been tested in accordance with :�STb1 D2837, and validated in accordance with the latest revision of PPI TR•3. The pipe manufacturer shall provide certification that stress regression testing has been performed on the specific product. Certi6cation shall include a stress life curve per ASTN1 D2837 and Cesting shall have been performed in accordance with ASTh1 D2837. V c. Rejection: Polyethylene plastic pipe and fittings ma}� be rejected for failure to meet any of the requirements of this specification. C. SE�L'ER SERVICE CONNECTIONS: 1 Sewer Service Connections: Sewer service connections shall be connected to the new pipe by mechanical or � fusion methods. Once the saddle is secured, a hole shall be drilled in the pipe the full inside diameter of saddle outlet. 1 2. Pipe Saddles: hlechanical saddles shal! be made of polyethylene pipe compound that meets the requirements ,,,,,� of ASTi�t D1248, Class C, have stainless steel straps and fasteners, neoprene gasket and backup plate. bfechanical saddles shall be Strap-on-Saddle Type as manufactured by Driscopipe or Tapping Saddle � manufactured by DuPont, or approved equal. Fusion saddles shall be electrofusion branch saddles as manufactured b}• Central Piastics Company, or approved equal. � 3. Connection to Eristing Service: Connections to the existing sewer service connections pipe shall be made using flexible couplings. All flexible couplings shall con£orm to ASTM C4`25 and sha[I be as manufactured � by Fernco Joint Sealer Co., DF�V Plastics, Inc. or approved equal. BackGll at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the service lateral to trench �" intersection and sha11 be in accordance with these specifications. �� � The Contractor shall, upon request, permit the Engineer to take elevations on both the e:cisting and new portions of the service connection pole to determine 5nal grade and invert elevations. Elevation changes greater than 0.10 feet £rom the house lateral piping and shall be reconnected as directed by the Engineer. Service Interruptions: Service interruptions to homes shall not exceed 18 hours. �,�, D. PI2EP:lK:1T[ON: -�. W B}•passing Se«•age: The Contrac[or shall b}-pass the se�vage around the section or sections of sewer to be rehabilitated. The b}•pass shall be made by plugging existing upstream manhole and pumping the sewage into a do« nstream manhole or ad�acent system or other method as may be approved by the Engineer. The 9GSa300_Specs_PartD.a wpd L�sC - 5 Revised 09/O1/98 � pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. 2. b. The Contractor shall be responsible for continuity of sanitary sewer service to each facility connected to the section of sewer during the execution of the work. If sewage backup occurs and enters buildings, the Contractor shall be responsible for clean-up, repair, property damage costs and claims. Line Obstructions: If pre-installation (T� inspection reveals an obstruction in the existing sewer (heary solids, dropped joints, protruding service taps or collapsed pipe) which will prevent completion of the pipe bursting/crushing process, and cannot be removed by conventional sewer cleaning equipment, then an obstruction removal shall be made by the Contractor, with the ..�proval of the Engineer. 3. Sags in Sewer Line: ALL SAGS AND GR�.DE PROBLEMS IN EYISTING SEtiVER LINES SHALL BE CORRECTED AS PART OF THIS CONTRACT. If the pre•construction teievision inspection reveals a sag in the sewer line, the Contractor shall be responsibte for bringing the proposed sewer pipe to an acceptable grade without a sag. A sa; is defined as any sewer line segment more than 3 feet in length which ponds w•ater in the absence of sewage tlow. The contractor shall take the necessary measures to eliminate the sag by the method of: pipe replacement, digging a sag elimination pit and bringing the bottom of the pipe trench to a uniform grade in line with the existing pipe invert or by other measures that shall be acceptable to the Engineer and the City. Identification of Sags: Sags shall be identified by television inspection in the absence of sewage �ow. If available, the Contractor shall be furnished teievision tapes &om the City identifying the sag location. Flow shall be biocked at an upstream manhole and diverted to another sewer line or downstream manhole below the segment of pipe to be inspected. TV inspection shall be performed in accordance with television inspection of sanitary sewer lines. Video tapes shall be submitted to the Department of Engineering for revie�v. Correction of Sags: Sags shall be corrected by open cut and by adding additional bedding material to bring the sag back to grade where access is available. For pipe enlargement methods, all sags identified on the pre-construction video tapes shall be corrected prior to commencing with pipe enlargement. In instances where sags are located under existing structures, the existing sewer line may be relocated using open cut or boring methods. The Department of Engineering shall speciScally review potential relocation's and evaluate the constructability, economics and engineering feasibility prior to construction work. c. hteasuremen[ and Payment: Nteasurement and payment to correct sags shall be per linear foot of ' pipe construction to correct the sag. For pipe bursting methods, open-cut or bore construction, the applicable bid prices in the proposal section shall apply. 4. Television Inspection: Inspection of the pipelines shall be performed by experienced personnel trained in locating breaks, obstacles and service connections by closed circuit color television. Television inspection shall be in accordance with the specifications contained herewith for "Pre• a�d Post-Construction Television Inspection of Sanitary Sewer Lines". PIPE ENLARGEMENT SYSTEM AND PIPE INSTALLATION: 1. Site Organization: � a. Insertion or access pits shall be located such that their total number shall be minimized and the ' lengih of replacement pipe installed in a single pull shall be maximized. Existing manholes shall be utilized wherever practical. Manhole inverts and bottoms may be removed to permit access for installation equipment. Equipment used to perform the work shall be located away from buildings so as not to create a noise impact. Provide silencers or other devises to reduce machine noise as needed to meet requirements. 2. Finished Pipe: The installed replacement pipe shall be continuous over the entire length of each pipe segment from manhole to manhole and shall be free &om visual defects such as foreign inclusions, concentrated ridges, discoloration, pitting, varying wall thickness, pipe separation, other deformities. Replacement pipe with gashes. nicks, abrasions, or any such physical damage which may have occurred during storage and/or handling, �vhich are larger/deeper than 10% of the w•all thickness shali �ot be used and shal{ be remoced from the construction site. The replacemen[ pipe passing through or terminating in a manhole shall be carefull}• cut out in a shape and manner approved by the Engineer. The invert and benches shall be streamlined and improved for smooth �ow. The installed pipe shall meet the leakage requirements of the pressure test specified later. � ' � 9GSa300 Spec�_PartD�l.wpd ASC -� ReVised 09/01/98 � Pipe Jointing: Sections of polyethylene replacement pipe shall be assembled and joined on the job site above the ground. Jointing shall be accomplished by the heating and butt-fusion system in strict conformance with the manufacturer's printed instructions. The butt-fusion system for pipe jointing shall be carried out in the field by operators with prior experience in fusing polyethylene pipe with similar equipment using proper jigs and tools per standard procedures outlined by the pipe manufacturer. These joints shall have a smooth, uniform, double rolled back bead made while applying the proper melt, pressure, and alignment. It shall be the sole responsibility of the Contractor to provide an acceptable butt-fusion joint. Al] joints shall be made available for inspection by the Engineer before insertion. The replacement pipe shall be joined on the site in appropriate �ti•orking lengths near the insertion pit. The maximum length of continuous replacement pipe which shall be assembled above ground and pulled on the job site at any one time shall be 600 linear feet. For situations where the replacement pipe is not pulled all the way to the manhole or if it is impossible to pull the missile all the way through, the following shall apply: At the direction of the Engineer, a 12"• 18" full circle steel clamp shall be utilized to connect segments of the HDPE pipe. 4. 5. .� Ir � I � New Pipe Installation: Thread winch cable or chain and associated lines through sewer section to be rehabilitated. Fieep lines away from pedestrian and vehicular traffic. b. Existing manholes may be used for launch and receiving access. Remove manhole invert and bottom as required. Puli winch chain through sewer section and attach to cutter and machine head. Lower into launching manhole, apply winch tension pul6ng the cutter and head into the sewer until the rear of the machine is flush with the manhole wall. Attach steel starter pipe and advance assembly untit [he rear of the stee[ starter pipe is flush with the manhole wall. Lower hydraulic jack into the manhole and align. Insert new pipe by simultaneous operation of the jack and winching the cutter and head fonvard. Anchoring New Pipe and Sealing Manholes: a. b. After the new pipe has been installed in the entire length of the sewer section, anchor the pipe at manholes. The new pipe shall protrude in the manholes for enough distance to allow sealing and trimming. Sealing the new pipe at manholes shall not begin for a minimum of ten (10) hours after installation. Provide a flexible gasket connector in the manhole wall at the end of [he new pipe, centered in the existing manhole wall. Grout �exible connector in the manhole, 6lling all voids the full thickness of the manhole wall. Restore manhole bottom and invert. Field Testing: a. Low Pressure rlir Test of Replacement Pipe: After a manhole-to-manhole sectxon of sanitary sewer main has been pipe burst/crushed and prior to any service lines being connected to the replacement pipe, the pipe shall be plugged at each manhole with pneumatic plugs. The design of the plugs shall be such that they will hold against the test pressure without requiring estzrnal blocking or bracing. One of the plugs shall have three air hose connections; one for the inflation of the plug, one for reading the air pressure in the sealed line, and one for introducing air into the sealed line. Low pressure air shall then be introduced into the sealed line until the internal air pressure reaches 4.0 psig greater than the average back pressure resulting &om any ground water that may be over the pipe. At least two minutes shall elapse to allow the pressure to s[abilize. The time required for the internal pressure to decrease from 3.5 to 2.5 psig greater than the average back pressure resulting [rom any ground water that may be over the pipe, shall no[ be less than the time shown for a given pipe diameter in the follo�ving table: Carrier Pipe Diameter (inches) 8 10 1'? l ;i �Iinimum Elapsed Time (minutes) � 9G��1300_Spec�_PartD:l.�pd 1�1.SC - % Revised 09/O1/98 Post-Construction Television Inspection of New Pipe: Refer to Special Condition for Post- Construction Television Inspection of Sanitary Sewer. F bIEASUREhfENT AND PAYI�fENT: 1. Pipe Installation: Pipe installation will be measured for payment by the linear foot of pipe actually installed in the various diameters of sewers measured along the centerline of the sewer �om centerline to centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. 2. Service fteconnections: Installation of sewer service connections wil] be measured for payment by each actually reconnected to the installed pipe. Payment will be made for the quantities measured at the unit � price per each listed. Payment shall include required excavation and backfill, saddles, flexible connections, and all other incidentals necessary to auccessfully reconnect sewer service lines to the rehabilitated sewer. Payment shall not include pavement replacement, which if required, shall be paid separately. 3. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines. The payment for such cleaning shall be included in the bid item £or Pre• Construction Television Inspectio� of Sanitary Sewer Lines. 4. By-pass Pumping: The Contractor shall provide diversion for the flow of sewage around the section or sections of pipe designa[ed for rehabilitation. The pumps and by-pass lines shall be of adequate capacity and size to handle all �ows. All costs for by•pass pumping required during installation of the pipe shall be subsidiary to pipe enlargement. 5. Subsidiary Work: Any damage to utilities and property, resulting repairs, temporary service costs, etc. shall be borne by Contractor. Repair and/or replacement of fences, sprinkler system piping and other such restoration work resulting from Contrac[or activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. 6. Testing: All cost for testing the replacement pipe by a pressure method will be incidental to pipe installation. DA-3 FOLD AND FOft11 PIPE A. GENER.4L: Description: The Contractor shall utilize the installation of polyethylene or PVC sewer lines to restore the watertight condition of sanitary sewer lines. $. bLATERI:�LS: 1. Polyethylene Liner Material: The polyethylene liner material shall be a high density polyethylene pipe compound which conforms to ASTM D•1248. The polyethylene pipe liner shall meet manufacturer's standards. The lining shall be a hard impermeable pipe which shall conform to the n�inimu�n structural standards applicable, including ASTM D-368 for 3,300 psi tensile stress, ASTM D•638 for 4,500 psi for �exural stress, and ASTh1 D-790 for 145,000 psi for modules of elasticity. The finished liner shal] incorporate materials which will withstand the corrosive effects of normal sewage. The Contractor shall provide a written guarantee of his compliance with these standards. The liner shall be light in color to facilitate closed circuit television inspection. Pol}vinyl Chloride (PVC) Liner MateriaL Polyvinyl pipe shall conform to ASTb1 D3034. The PVC compound used for the folded pipe shall conform to ASTM D1784 classification 12334-B, 12344B or 12454B or C. Compounds that have different cell classifications which are superior to those of the specified compounds are also acceptable. The lining shall conform to the minimum structural standards applicable including ASTb'[ ll-i90 for 6,000 psi flexural stress and 350,000 psi modulus of elasticity. Sizing of the Liner. The liner diameter, Iength and wall thickness shall be appropriate for each designated iocation. The Contractor shail verify the actual sewer lengths and diameters in the field prior to cutting the liner to length and sizing the diameter. The Liner shall be fabricated to a size that when installed will neatly fit the internal circumference of the se�er to be lined. Allowance for circumferential streuhing of the liner during insertion shall be made as per manufacturer's standards. b. The length of liner shall be that deemed necessary by the Contractor to effectively carry out ihe insertion and seal the liner at the inlet and outlet points. When reformed, the hardened liner should extend from end to end of the sewer segment being lined in a continuous tight fitting watertight pipe•«•ithin•a•pipe. 9G5�300_Specs PartD.�l.wpd ASC - 8 Re��ised 09/O1/98 ' � � � b. Post-Construction Television Inspection of New Pipe: Refer to Special Condition for Post- Construction Television Inspection of Sanitary Sewer. I�IE�SUREbIENT AND PA�'I�IENT: 1. Pipe Installation: Pipe installation will be measured for payment by the linear foot of pipe actually installed �+ in the various diameters of sewers measured along the centerline of the sew•er Gom centertine to centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the • various sewer diameters listed. 2. Service Reconnections: Installation of sewer service connections will be measured for payment by each actually reconnected to the ins[alled pipe. Payment will be made for the quantities measured at the unit price per each listed. Payment shall include required excavation and backfill, saddles, tlexible connections, and all other incidentals necessary to successfully reconnect sewer service lines to the rehabilitated sewer. Payment shall not include pavement replacement, which if required, shall be paid separately. 3. Sewer Cleaning by Bucket hfachine: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines. The payment for such cleaning shall be included in the bid item for Pre- Construction Television Inspection of Sanitary Sewer Lines. 4. By•pass Pumping: The Contractor shall provide diversion for the �ow of se�vage around the section or sections of pipe designated for rehabilitation. The pumps and by-pass Lines shall be of adequate capacity and size to handle all 4o�vs. rU1 costs for by-pass pumping required during installation of the pipe shall be subsidiar}� to pipe enlargement. 5. Subsidiary Wori:: My damage to utilities and property, resulting repairs, temporary service costs, etc. shall be borne by Contractor. Repair and/or replacement of fences, sprinkler system piping and other such restoration work resulting from Contractor activities shall be conszdered subsidiary to the cost of the project and no additional payment �vill be allowed. 6. Testing: All cost for testing the replacement pipe by a pressure method wil] be incidental to pipe installation. DA-3 FOLD AND FORbi PIPE A. GENER�L.: Description: The Contractor shall utilize the installation of polyethylene or PVC sewer lines to restore the watertight condition of sanitary se�ver lines. B. �L4TERIALS: Polyethylene Liner Material: The polyethylene liner material shall be a high density polyethylene pipe compound which conforms to ASTIvf D•1248. The polyethylene pipe liner shall meet manufacturer's standards. The lining shall be a hard impermeable pipe which shall conform to the minimum structural standards applicable, including ASTM D•3G8 for 3,300 psi tensile stress, ASTb1 D•638 for 4,500 psi for flexural stress, and ASTM D-790 for 145,000 psi for modules of elasticity. The finished liner shall incorporate materials which will withstand the corrosive effects of normal sewage. The Contractor shall provide a written guarantee of his compliance with these standards. The liner shall be light in color to facili[ate closed circuit television inspection. Polyvinyl Chloride (PVC) Liner Dlaterial: Polyti•inyl pipe shall conform to AST�1 D3034. The P�'C compound used for the folded pipe shall conform to AST�I D178-i classi5cation 12334-B, 1234�B or 12434B or C. Compounds that have different cell classifications which are superior to those of the speci5ed compounds are also acceptable. The lining shall conform to the minimum structural standards applicable including ASTb1 D-790 for G,000 psi Ilexural stress and 3b0,000 psi modulus of elasticity. 3. Sizing of the Lincr. The liner diameter, length and wall thickness shall be appropriate for each designa[ed location. The Contractor shall verify the actual sewer lengths and diameters in the fieid prior to cutting the liner to length and sizing the diameter. a. The liner shall be fabricated to a size that when installed Gvill neatly fit the internal circumference of the se�cer to be lined. Allowance for circumferential stretching of the Liner during insertion shall be m�de as per manufacturer's standards. b. The length of liner shall be that deemed necessary by the Contractor to effectively carry out the �'1 insertion and seal the liner at the inlet �nd outlet points. When reformed, the hardened liner should extend firom end to end of the sewer segment being lined in a continuous tight fitting �-' watertight pipe•�vithin-a-pipe. � � 9rg�300_Specs_PartD.�.wpd ASC - 8 Revised 09lOI/98 I c. C. EXECUTION: The wall thickness of the folded pipe liner shall conform to the design criteria of the manufacturer or the licensee; however, the minimum wall thickness shall conform to the following table: Existing Pipe I.D. (inches) G S 10 12 Minimum Wall Thickness (inches) 0.236 0.265 0.331 0.392 General: Liner installation shall be accomplished by pulling the liner through the existing sanitary sewer pipeline utiliaing a power winch and steel cable with an appropriate pulling head at the end of the liner. Rounding of the liner shall be accomplished by utilizing a heat source such as �vater or steam with a rounding device to reform the folded pipe into a hard, impermeable round pipe. Preliminary Cleaning and Inspection: Prior to any lining of designated sanitary sewer line segmeats, the Contractor shall remove internal deposits as necessary to assure proper liner installation. Inspection o£ pipelines shall be performed by experienced personnel trained in locating breaks, obstacles, and service connections by closed circuit television. The interior of the pipeline shall be carefully inspected to determine the location and extent of any structural failures, which may prevent proper installation of lining materials into the pipelines and location of service laterals. It s6all be the responsibility of the Contractor to clear the line of obstructions such as solids, roots, dropped joints, protruding branch connections or broken pipe that will prevent the insertion of the liner. If inspection reveals an obstruction not indicated in these speci6cations that cannot be removed by conventional cleaning equipment, then the Contractor shall notify the Engineer. The Engineer may authorize an excavation in order to remove such obstruction. 3. Documentation: Special Conditions for Pre- and Post-Construction Television inspection apply. 4. Flow Bypassing: The Contractor, �vhen required, shall provide for the transfer of flo�v around the section or sections of pipe that are to be lined. The bypass shall be made by diversion of the flow at an exssting upstream access point and pumping the flow Into a do«•nstream access point or adjacent system. The pump and bypass lines shall be of adequate capacity and size to handle the tlow. The proposed bypassing system shall be approved in advance by the Owner. All costs of flow bypassing shall be considered incidental to cost of rehabilitating the pipe. 5. Noti6cation of the Public: The Contractor shall notify all Property Owners affected by the liner installation work at least 48 hours prior to commencement of the work which w�ll [emporarily plug [he sanitary services of the Property Owners connected to the sewer line segment being ]ined. Notification shall be by written notice and, when possible, shall be verbal, alsa Customer complaints during installation shall be resolved by the Contractor. G. Liner Installation: a. The liner shall be inserted into the existing sewer line with a power winch and steel cable connected to the end of the liner by use of an appropriate pulling head. A second pulling head may be attached to the other end of the liner for attachment o£a tag line to pull the liner back out of the sewer Line, if necessary. Precautions should be taken during insertion to protect the liner pipes to prevent scoring the outside of the liner as it is being pulled into the se�ver. b. Prior to reforming the liner, "O" Ring gaskets shall be installed on the liner at each manhole connection. c. After insertion is completed, ihe installer shall supply a suitable heatlpressure source and water recirculation equipment. The equipment shall be capa6le of delivering water/pressure throughout [he section to uniformly raise the �vater temperature above the temperature required to reform the liner. d. The heat source shall be 5tted �vith su[table monitors to gauge the temperature of the incoming and ou[going water supply. 9GSa300_Specs_PartD.a wpd ASC - 9 Revised 09/O1/98 � � The installer shall cool the liner to a temperature belotiv 100 F before relieving the reforming pressure. Cool down may be accomplished by the introduction of cool w•ater or other approved method in[o the recirculation network. �" f. The 6nished lining shall be continuous over the entire length of an insertion run and be &ee &om visual defects such as foreign inclusions and pinholes. The lining shall be impervious and fiee of .R any leakage from the pipe to the surrounding ground or from the ground to the inside of the lined pipe. Any defecLs which will affect, in the foreseeable future, or warranty period, the integrity or . strength of the linings, shall be repaired at the Contractor's espense, in a manner mutually agreed by the Owner and the Contractor. Completion of Lining: a. After the liner has been reformed, the Contractor shall reconnect the existing active service _ connections. This shall be done &om ihe interior of [he pipeline by means of a television camera and a cutting device that re•establishes their operability or by ercavation. Any bypass pumping � that is required shall be provided at no additional cost for sewer lines where lining is being performed. Service interruptions to any homes tributary to this sewer line shall not exceed 1S hours. Connection of the sen-ice lateral by excavation shall be made with a Neoprene Gasket '"' Saddle which inserts into the lined pipe for a watertight fit. Back611 at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the service lateral to trench intersection and shall be in accordance with these specifications. - b. Excavation pits for externally reinstated service laterals shall remain open for 24 hours after reinstatement of the service. The Contractor shall be responsible for verifying that shzinkage of � the polye[hylene sewer liner has not occurred. � c. The water Cightness of [he liner shall be gauged while the liner is curing, and under a positive head. After the work is completed, the Contractor will provide the Owner witfi a video tape showing both the before lined and after lined conditions, including the restored connections. Upon completion of the instaLlation work after required testing indicates the lining is acceptable, the Contractor shall � reinstate the project area affected by his operations and perform any surface restoration in accordance with these SpeciGcations. ~ 8. Special Notes: The installer shall be liable for damages to the homes or basement from backups which may result during the installation of the liner. Installer will be allowed to open clean outs. .., � D. hiEASUREMENT AND PAYMENT: 1. Liner [nstallation: Liner installation will be measured for payment by the linear foot of liner actually � installed in the various diameters of sewers measured along the centertine of the sewer £rom centerline to centerline of manholes. Payment w�ill be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. � 2. Service Reconnection: Payment wifl be made for the quantities measured at the unit price per each listed in the bid proposal. Payment shall include all labor, materials, and the lateral connection, including all • necessary pipe and fittings to connect the existing service line. Payment shail not include pavement replacement, which if required, shall be paid separately. 3. Television [nspection and Cleaning: Special Conditions for Pre- and Post-Construction Television Inspection �. aPP�Y �, 4. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic jet cieaning shall be performed by bucket machines. The payment for such cleaning shall be included in [he bid i[em for Cleaning and Television Inspection of Sanitary Sewer Lines. 5. By-Pass Pumping: The Contractor shall provide diversion for the flow of sewage around the section or `� sections of pipe designated for rehabilitation. The pumps and by-pass lines shall be of adequate capacity and � size to handle all flows. All costs for by-pass pumping required during installation of the pipe shall be subsidiary to the pipe reconstruction item. � G. Point Repairs: Point repairs shall be made before or after liner installation at the Contractor's option. Point repairs are available for pa}•ment o�ly i£ mutually agreed by the Department of Engineering and the Contractor prior to accept2nce of ihe line for reconstruction. Before any eecacation is done for any purpose, it �cill be the responsibility of the Contractor to check with various utilit}� companies and determine ihe r. {ocation of their facili[ies. Point repairs shall be measured and paid for b}• the linear foot for the appropriate depch of cut. Pay�ment shall indude all labor, materials, and equipment for pipe replacement according to 4+ F«'�VD standards. � 7. Subsidiary �t'ork: �.n}� damage resulting to utilities and property, resul[ing repairs, temporary service costs, etc., shall be borne by Contractor. Repair and/or replacement of fences, sprinkler sy�stem piping and other L r 9G3-1300_Specs_PartD.a �vpd A.SC - 1� Revised 09/01/98 L such restoration work resul[ing from Contractor activities shall be considered subsidiary to the cost of the project and no addi[ional payment will be allowed. DA-4 SLIPLINING (OMITTEDJ DA-5 PIPE INSTAI,LED BY OTHER THAN OPEN CUT A. GENERaL: 1 2 3 Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, speci6ed and/or necessary to complete the work. r111 excavation shall provide an open area conforming to the outside diameter of the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as shown on the Plans and as established in the Speci5cations. �Vork shall be perfonned in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad company, as applicable. B. bWTERIALS: 1. Casing Pipe: Casing pipe shall be steel conformrng to ANSI B36.10 and the follo�ving: 2. 3. 4. a. b. c. d. Field Strength: 35,000 psi minimum. Wall thickness: 0.312 in. minimum (0.5 for railroad crossings). Diameter: As shoa�n on the drawings (minimum size requirements). Joints: Continuous circumferential weld in accordance with AWS D1.1. Carrier Pipe in Casing: Carrier pipe shall be as shown on dra�r•ings and as speci5ed in the General Contract Documents. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or as designated on the plans. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less [han I cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. C. E:�ECUTION 1. \l'here sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities In other than open cut, construction shall be performed in such a manner so as to not interfere with the operation of the railroad, street, highway, or other facility, and so as not to weaken or damage any embankment or structure. During construction operations, barricades and lights to safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 2. 3 Pits and Trenches: a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe. lVherever end trenches are cut in the sides of the embankment or beyond it, such work shal] be sheeted securel}• and braced in a manner to prevent earth from caving in. b c The location of the pit shall meet the approval of the Engineer. The pits of trenches e�cavated to facilitate these operations shall be backfilled immediately after ihe casing and carrier pipe installation has been completed. Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger � and simultaneously jacking pipe into place. a. The boring shall proceed from a pit provided for the boring equipment and «•orkmen. The holes are to be bored mechanicall}•. The boring shall be done using a pilot hole. By this method an approrimate '?•inch hole shall be bored the entire len;th of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other methods of maintaining line and grade on the casing may be approved if acceptable to the En;ineer. Escavated material shall be placed near the top of the «orking pit and disposed of as required. The use of water or other fluids in 9G:i�3U0_Specs_ParcD:�.wpd ��C - 11 Retizsed 09/01/98 1 ' � " connection with the boring operation will be permitted only to the extent required to lubricate cuttings. Jetting or sluicing will �ot be permitted. b. In unconsolidated soil formations, a gel•forming colloidal drilling fluid consisting of at least 10 �+ percent of h�gh grade carefully processed bentonite may be used to consolidate cuttings of the bit, sea! the walls of the hole, and furnish lubrication for subsequent removal of cuttings and n installation of the pipe immediately thereafter. .1.11owable variation from the line and grade shall be as specified under paragraph A.2. All voids between bore and outside of casing shall be pressure grouted. Installation of Carrier Pipe in Casing: a. Sanitary sew•er pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. b. All skids shall be treated �vith a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. • c. The Contractor shall prevent over•belling the pipe while installing it through the casing. A method of restricting the movement between the assembled bell and spigot where applicable shall be .—, provided. �'w d. At all bored, jacked, or tunneled installations, the annular space between ihe carrier pipe and casing shall be 611ed �vith grout. Care must be taken that not too much water is forced into the � casing so as not Co �oat the pipe. The backfill material will not be required unless speci5ed on the plans and specified by the Engineer. e. Closure of the casing after the pipe has been installed shal! be plugged at the ends of the casing as � show�n on the drawings or as required by the Engineer. Boring and Jacking Ductile Iron Pipe �vithout Casing: a. As indicated on drawings and as required and directed by the Engineer sewer shall be constructed of bore and jacked ductile iron pipe. +"` b. �i'hen a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe shall be provided at no additional cost and shall r+ be subsidiary to the cost bid for installation By Other than Open Cut. c. Bore and jack in accordance with paragraph C.3. above. d. Short length of sewer consisting of a single pipe section may be installed by jacking without a bore hole if permitted by ihe En;ineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted. � G. Tunneling: �Vhece the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer �vould make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be used, �cith the approval of the Engineer or railroad/highway officials. �Vhen tunneling is permitted, the lining of the tunnel shall be of sufficient strength of support the �' overburden. The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State of Texas. Approval by the � Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method. " The space between the tunnel liner and the limits of excavation shall be pressure grouted or mud-jacked. � Access holes for placing concrete shall be space at maximum intervals of 10 feet. , D. b1EASUREhfENT AND PA1 i�iENT: Installation of pipe by other than open cut will be measured by the linear foot of pipe, complete in place. Such measurement w•ill be made between the ends of the pipe along the centra] azis as installed. The «•ork performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Yipe Installed b}• Other Than Open Cut of the type, size, and class of pipe specified as shown �„� on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labor, tools, equipment and incidentals necessary� to complete the work, including _ escavation, back611ing and disposal of surplus ma[erial shall be included in the Contracc Unit Price as shown in the B�d Proposal � D�-6 PRIVATE SECTOH REPAIRS /O�fITTEDJ Iw �� 9G5�t3o0_Specs_Par[D.� K pd L�SC - 1� Revised 09/01/98 DA-7 PROTECTIVE b1ANHOLE COATING FOR CORROSION PKOTECTION A. B. GENERAI.: 1. Scope: This section governs all work, materials and testing required for the application of interior protective coating. Structures designated to received interior coating are listed on the construction drawings. The structures are to be coated, including interior wall, top and bench surfaces. Protective coating for corrosion protection shall meet the requirements of this Speci5cation (and items D?-12 and DA-13) and the Manufacturer's recommendations and specifications. 2. 3. 4. Description: The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of protective coating of structures in accordance with manufacturer's recommendations. bfanufacturer's Recommendations: Materials and procedures utilized for the lining process shall be in strict accordance with manufacturer's recommendations. Corrosion Protection: Corrosion protection may be required on all structures where high turbulence or high H�S content is expected. I�LATERIA].S: Scope: This section governs the materials required for completion of protective coating of designated structures. 2. Protective Coating: The protective coating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. or a two-part epoxy resin system using 100°�b solids based eposy binder with fibrous and flake 611ers, is manufactured by Raven Lining systems and designated as Raven 405. 3. 4 Specialty Cement (If required for leveling or 6lling): The specialty cement-based coating material shall be either Quadex QbI-ls as manufactured by Quadex, Inc. or Reliner h1SP as manufactured by Standard Cement hfaterials. Ntaterial Identification: The protective coating material sprayed onto the surface of the structure shall be a urethane or epoxy resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the minimum physical properties as follows: Property Tensile Strength Flexural Stress Flexural blodulus Standard ASTM D-638 AST1�1 D-790 ASTM D•790 Long Term Value 5,000 psi 10,000 psi 550,000 psi 5. hfixing and Handling: btixing and Handling of specialty cement material and protective coating material, which may be toxic under certain conditions shall be in accordance wzth the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the hand►ing of the coating material shall perform the spray coating operations and coating installatio�s. C. E`iECUTION: General: Protective coating shall not be installed until the structure is complete and in place. 2. Preliminary Repairs: a. b. c. 9G3 1300_Specs_PartD.�.w pd All foreign materials shall be removed &om the interior of the structure using high pressure water spra}� (3300 psi to 4000 psi at spray tip). AIl unsealed lifting holes, unsealed step holes, and voids larger than approsimately one-half (1/2) inch in thickness shall be filled �cith patching compound as recommended by the material supplier for this application. After all repairs have been completed, remove all loose material. ASC - 13 Revised 09/O1/98 ' 3. Protective Coating: a. The protective coating shall be app�ed to the structure from the bottom of the frame to the bench, down to the top of the trough. The top of the structure shail also be coated. b. The protective coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 4. The surface shall be thoroughly cleaned of all foreign materials and matter. 5. Place covers over the invert to prevent extraneous material from entering the sewers. G. If required for filling or leveling, apply specialty cement product to provide a smooth surface for the coasting material. DA-8 Spray the urethane or epoxy onto the structure wall and bench/trough to a minimum uniform thickness of 125 mils (0.125 inches). Thickness to be veri6able through the use of inethods acceptable to the Engineer. After the walls are coated, the wooden bench covers shall be removed. The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. No applications shal] be made to frozen surfaces or if freezing is expected to occur inside the structure within 24 hours after application. Testing of Rehabilitated hfanholes: Testing of rehabilitated manhotes for watertightness shall be performed by the Contractor after operations are complete in accordance with the Section D-63 • VACUUM TESTING OF 54NITARY SEWER MANHOLES. bLEASUREMENT AND PAYI�fENT: Payment shall be based on the Contract Unit Price Bid pec vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in ful] for performing the work and for furnishing all labor, supervision, materials, equipment and material testing required to complete the work. Pressure grouting, if necessary to stop active infiltration prior to application of the protective coating, shall be included in the above unit price. Grouting of the pipe seals, bench and trough, and lower por[ion of a particular structure, if required by the Engineer, shall be paid for separately, as specified in Section DA-8, MANHOLE REH:�BILITATION. bLANHOLE REH�.BILITATION �OMITTEDJ D,�-9 SURFACE PREPARATION FOR b1ANHOLE REHABILITATION [OMITTEDJ D�-10 INTERIOR �IANHOLE COATING -1VIICROSILICATE MORTAR SYSTEM (OMITTEDJ DA-I1 INTERIOR b[ANHOLE COATING - QUADEY SYSTEM (OMITTEDJ DA-12 ItiTERIOR b1ANHOLE CO,aTING - SPRAY �VALL SYSTE�t A. GENER,�L 1 2. Scope: This section governs all work, materials and testing required for the application of interior manhole coating. h[anholes designated for interior coating are listed on the Manhole Rehabilitation Schedule, listed in Part I. Interior manhole coating shall meet the requirements of this Section or of Section DA-10, DA•11, Da-13, or DA•14. Description: The Contractor shall be responsible for the iurnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. 3. h[anufacturer's Recommendations: blaterials, mixture ratios, and procedures utilized for ihe coating process shall be in accordance «•ith manufacturer's recommendations. 4. Afanholes I�[anholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one•half (1/2) inch special[y cement•based coating material (Quadex Q�1-ls or Reliner N15P) spra}-ed or tro«•eled on coating o�•er the original interior surface. B. �(�TERL-�LS 1. Scope: This section governs the materials required for completion of interior coating of manholes. 9G5�300 Specs_FartD.�.wpd ASC - 14 Revised 09/0i/98 2. Interior Coating: The interior coating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. Specialty Cement: The specialty cement•based coating material shall be either Quadex QNf-ls as manuiactured by Quadex, Inc. or Reliner N1SP as manufactured by Standard Cement Materials. I�faterial Identification: The interior manhole coating material sprayed onto the surface of the manhole shall be a urethane resin system formulated for the appLication to a sanitary sewer environment. The spray system shall exhibit the physical properties as folloGvs: C. Property Tensile Strength Flexural Stress Flexural l�fodulus Standard ASTM D-G38 ASTNf D-790 ASTM D-790 Long Term Value 5,000 psi 10,000 psi 550,000 psi hlixing and Handling: I�fising and handling of specialty cement material and interior coating material, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray coating operations and coating installations. E�ECUTION General: Nfanhole coating shall not be installed until sealing of manhole frame and grade adjustments, or partial manhole replacement when required for the manhole per the Manhole Rehabilitation Schedule, is complete. Temperature: Normal interior coating operation shall be performed at temperatures of 40°F or greater. No application shall be made when freezing is expected within 24 hours. Interior hlanhole Coating: a. The interior coating shall be applied to the manhole from the bottom of the &ame to the bench, down to the top of the irough. The interior coating shall be installed in accordance �vith the manufacturer's recommendations and the following procedure. 1) The surface shall be thoroughly cleaned of all foreign materials and ma[ter. Cleaning shall be accomplished by using high pressure water spray {minimum 3500 psi at spray tip), cleaning with muriatic acid, degreaser, or other solvents as needed in order to remove any film or residue on the surface. 2) Place covers over the invert to prevent extraneous material fiom entering the sewers. 3) Apply a minimum of one•half (1/2) inch specialty cement product (Quadex QM-ls or Reliner hISP) smooth surface for the urethane coating material. 4) Spray the urethane onto the manhole wall and bench/trough with a minimum thickness of 123 mils (0.125 inches). Thickness to be verifiable through the use of inethods acceptable to the Engineer. 5) Coat trough area with specialty cement product (Quadex Q�I-ls or Reliner MSP). �l. Testing of Rehabilitated blanholes: Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section D�1-18. D. AfE_�SUREI�IENT ?.I�1D PAFbIENT: Pay�ment shall be based on the Contract Unit Price per vertical foot, measured fi•om the bottom of the &ame [o the top of the bench. The Contract UniC Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment and material testing required to complete the �cork. Grouting, if necessary, shall be included in the above unic price. Grouting of the pipe seals, bench and trough, and lo�cer portion of a particular manhole, if required by hlanhole Rehabilitation «'ork Schedule or required to be done b� the Engineer, shall be paid for separately at the Contract Unit Price. 965-t300_Specs_PartD.�, wpd ASC - 15 Revised 09/O1/98 � ,' DA-13 INTERIOR MANHOLE COAT[NG - RAVEN LINING SYSTEM ^ A. GENERAI. 1. Scope: This section governs all work, materials and testing required for the application of interior manhole coating. hlanholes designated for interior coating are listed of the Manhole Rehabilitation Schedule, listed in Section I. Interior manhole coating shall meet the requirements of this Section, or of Section DA-10, DA- 11, DA-12, or DA-14. 2 3. 4. Description: The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. h[anufacturer's Recommendations: Nfaterials, mixture ratios, and procedures utili.zed for the coating process shall be in accordance with manufacturer's recommendations. bfanholes: Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half Q/2) specialcy cement-based coating material (Quadex Q�t-ls or Reliner MSP) sprayed or iroweled on coating o�er the original interior surface. B. I�LaTERIALS Scope: This section governs the materials required for completion of interior coating of manfioles. Interior Coating: Raven Ultra High-Build epoxy Coating, a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designa[ed as Raven 405. Specialty Cement: The specialty cement-based coating material shall be either Quadex Qb1-ls as manufactured by Quades, Inc. or Reliner b1SP as manufactured by Standard Cement Nfaterials. � 4. hlaterial Identi6cation: Contractors will completely identify the types of grout, mortar, sealant, and/or root control chemicals proposed and provide case histories of successful use or defend the choice of grouting , materials based on chemical and physica! properties, ease of application, and expected performance. These grouting materials shall be compatible with Raven 403 interior coating. The contractor shall be responsible for getting approval from Raven Lining systems and/or the grout manufacturers for the use of these grouting `� materials. �i° 5. Miring and Handling: biixing and handling of interior coating, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize � hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. Ail equipment shall be subject to the approval of the Engineer. Coating shall be performed only by certified applicators approved by the manufacturers. C. EXECUTION 1. 2. 3. 4 0 General: hlanhole coating shall not ba performed u�til sealing of manhole from £rame and grade adjustments, partiai manhole replacement, manhole grouting or sewer replacementJrepairs are complete. Temperatures: Normal interior coating operation shal! be performed at temperatures of 40°F or greater. No application shall be made when freezing is expected within 24 hours. Interior hfanhole Coating: a. b. Ntanholes scheduled for interior coating are shown on the Manhole Rehabilitation Schedule listed in Part I. The interior coating shall be applied to the manhole from the bottom of the manhole frame to the bench/trough, including the bench/trough. The interior coating shall be installed in accordance with the manufacturer's recommendations and the follo«•ing procedure. The surface preparation shall comply �vith the requirements of Section DA-9, SURFACE PREPr1FZATION FOR bL�1VHOLE RESTORATION. apply a minimum of one-half (1/2) inch specialty cement-based product (Quades QAf-ls or Reliner bISP) smooth surface for the urethane coating material. G The surface prior to application may be damp but shall not have noticeable free �cater droplets seeping or running w•ater. nlaterial shall be spray applied per manufacturer's recommendations with a minimum thickness of 1?� mils (0.123 rnch). 9GSt300_Specs_PartD.�.���pd ASC - 1G Revised 09/01/98 7. 8. 9. 10 Afcer the walls are coated, the wooden bench covers shall be removed and the bench sprayed to ihe same average and minimum thickness as required for ihe walls. The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. No applications shall be made to frozen surfaces or if &eeaing is expected to occur in side the manhole within 24 hours after application. Testing of Rehabilitated Manholes a. After the epoxy liner has set (hard to touch), all visible pinholes shall be repaired. Repairs shall be made by lightly abrading the surface and brushing the lining material over the area. All blisters and evidence of uneven cover shall be repaired according to the manufacturer's recommendations. Spot check of coating thickness may Ue made by Ow�er's Representative, and the contractor shall repair these areas as required, at no additional cost to the Owner. b. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operatzons are complete in accordance with Section DA-18 — VACUUb1 TESTING OF REHABILITATED bfANHOLE5. D. �tEASUREhfENT AI�ID PAYI�IENT: Payment shall be based on the Contract Unit Price per vertical foot, measured from the bottom of the &ame to the top of the bench. The Contract Unit Price shall be payment in fuli for performing the work and for furnishing all labor, supervision, materials, equipment all testing necessary to complete the work. Payment for grouting of pipe seals, bench and trough a�d manhole walls shall be based on the Contract Unit Price for each manhole actually grouted. DA-14 INTER[OR MANHOLE COATING: PERh1ACAST SYSTENi WITH EPOXY LINER (OMITTEDJ DA-16 RIGID FIBERGLASS N1.INHOLE LINERS (OMITTEDJ DA-16 PVC LINED CONCRETE WALL RECONSTRUCTION (OMITTEDJ DA-17 PRESSURE GROUTING (O�bfITTED% DA-18 VACUUhI TESTING OF REHABILITATED lIANHOLES (OMITTEDJ DA-19 FIBERGLASS 14L�NHOLES (OMITTEDJ DA-20 LOCATION AND EYPOSURE OF MANHOLES AND �VATER VALVES The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract bzfore the resurfacing process commences for a particular street. The contractor shall attempt to include the Construction Engineer (if he is available) in the observation and marking activity. In any event a street shall be completely marked a minimum of t«•o (2) working days before resurfacing begins on any street. i�tarking the curbs with paint is a recommended procedure. It shall be the contractors responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day) the contractor shall locate ihe covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notif,y the utilities of this completion and indicate the start of the ne�t one in order £or the utilities to adjust facilities accordinglp. The following are utility contact persons Company Southwestern Bell Telephone Te�cas Utilities Lone Star City of Fort «'orth, Street Lieht and Sienal Telephone Number 338-6275 33G-9411 33G-8381 871-8100 Contact Person "Hot Line" Mr. Roy Firuger, Ext. 2121 Mr. Jim Bennett, Est. 6982 h1r. Jim Bob Wakefield Of course, under the terms of this contrac[, the contractor shall complete adjusiment of [he storm drain and Water Department faciliues, one traffic ]ane at a time within five (�) �corking days after completing the laying of proposed H.M.A.C. overlay adjacent to said facilities. 9G5-1300_Specs_PartD.�,wpd :�SC - 17 Revised 09/01/98 ' Any deviation &om the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction Engineer. The contractor shall be responsible for all materials, equipme�t and labor to perform a most accurate job and all costs to the contractor shall be Ggured subsidiary to this contract. Dr1-21 REPLACEbIENT OF CONCRETE CURB AND GUTTER Contractor shall replace all damaged existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter, laydown curb and gutter, or in like kind, as governed by the standard City Specifications. Pay limits for laydown curb and gutter are as shown in Drawing No. S•SS of the Standard Specifications. included, and figured subsidiary to this unit price, will be the required excavation into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-o£f of the removed material to a suitable dump site. The street void shall be filled with H.Nf.A.C. "Type D" mix and compacted to standard City densities and top soil, if needed, shall be added and leveled to grade behind the curb. Existing improvements tivithin the parkway such as wa[er meters, sprinkler system, etc. damaged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion. if the contractor fails to comple[e the work within fourteen (14) calendar days, a$100 dollar liquidated damage will be assessed per block per day. The unit price bid per linear foot shal! be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-22 REPLACEI�IENT OF 6" CONCRETE DRIVE:WAYS (OMITTEDJ DA-23 REPLACE�IENT OF H.1�1.A.C. PAVEh1ENT AND BASE (OMITTEDJ DA-24 GAr�.DED CRUSHED STONES /OMITTEDJ DA-25 �VEDGE MILLING 2° TO 0" DEPTH 6.0' ��7DE �OMITTEDJ DA-26 BUTT JOINTS - MILLED /OMITTEDJ DA-27 2" H.M.A.C. SURFACE COURSE (TYPE "D" MI?n [OMITTEDJ DA-2S REPLACEMENT OF 7" CONCRETE VALLEY GUTTER This item shall include the removal and reconstruction of existing concrete valley gutters at locations to be determined in field: Removal of existing concrete valley, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gatters all shall be subsidiary to this pay item. Furnishing and piacing of 2:27 concrete base and crushed limestone to a depth as directed b}• the Engineer and necessary asphalt transitions as shown in the concrete valiey gutter details, shall be subsidiary to this Pay Item. See standard specification Item No. 31�, "Concrete Pavement", Item 312 "Hot-&fir Asphaltic Concrete", Item No. 104, "Removing Old Concrete", ltem No. lOG, "Unclassified Street Escavation" Item No. 208 "Flexible Base." hteasurement for final quantities of v�lle}� gutcer �vill be by the square yard of concrete pavement and the curb and gutter section �vill be included. Contractor ma}� substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314 "Concrete Pavement". Asphalt base material may be required at times as directed by the Engineer to expedite the wor6 at locations identified in the field. The concrete shall be designed to achie�•e a minimum compressive s[rength of 3000 pounds per square inch. Contractor shall work on one-half of �'alley Gutter at a time, and the other half shall be open to traffic. VVork shall be completed on each half within se�•en (i) calendar days. If the contractor f.�ils to complete'the «ork on each half �cithin seven (7) calendar dars, a$100 dollars liquidated damage ecill be assessed per each half of valle}• guc[er per day. 1'he unic price bid per square }•ard for Concrete �'alle}• as sho�cn on the proposal will be full compensation for materials, labor, equipment, [ools and incidentals necessary to complete the nork. 9G54300_Spec�_ParcD:1 wpd ASC - 18 Revised 09/01/98 DA-29 NEW 7" CONCRETE VALLEY GUTTER This item shall include the construction of concrete valley gutters at various locations to be determined in 6eld. Removal of existing, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gu[ters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details shall be subsidiary to this Pay Item. See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Ivlix Asphaltic Concrete", Item No. 104, "Removing OId Concrete", Item No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base." Nieasurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section wiil be included. Contractor may substitute S" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314 "Concrete Pavement". The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7) calendar da}�s. If the Contractor fails to complete the work on each half within seve�� (7) calendar days, a$100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. DA-30 NEW 4" STANDARD �VHEELCHAIR RAMP (OMITTEDJ DA-31 8" PAVEMENT PULVERIZ.4TION (O.LiITTEDJ DA-3'l REINFORCED CONCRETE PAVENiENT OR BASE (UTILITY CUT) The following specifications are for the furnishing and placing of reinforced concrete pavement or base as shown on detail and as directed by the Engineer. A. GENERAL: Reinforced concrete pavement or base shall conform to Specification Item No. 314 herein except for finishing and curing. B. FINISHING: The reinforced concrete shall be brought to a uniform surface by working with a wooden float. The surface shall be flush with the adjacent pavement and shall have a finish similar to the surrounding pavement. The surface shall be even and shall provide a smooth ride. C. CURING: The rein£orced concrete pavement surfaces shall be sprayed uniformly with a membrane curing compound conforming to the requirements of ASTh1 C•309, Type 2, white-pigmented compound, which shall not produce permanent discoloration of the concrete. Concre[e shall be allowed to cure for seven days or test cylinders reach 3000 psi before removal of barricades. D. EXECUTION: Included in this item will be the removal of the existing reinforced concrete pavement. The existing pavement shall be sawed so as to maintain an even, straight pavement cut. The existing reinforcing steel at sawed line and construction joints shall be lapped 18 inches with the new reinforced concrete pavement. The existing steel shal! be thoroughly cleaned before lapping. The follo«�ing ti��ork method will be performed on each utility cut: 1. Place safet}� signs, barricades and/or other warning devices where necessary and as required. 2. Replace pavement to nearest �oint. 3. b[ark out the dama;ed area �cith keel, chalk line or paint being sure to include all areas requiring repair. -1. Sa��� cut along marked lines a minimum of two (2) inches deep. 965J;300_Specs_PartD.a.Hpd ASC - 19 Revised 09/O1/98 �r 5. 6. 7 Remove existing concrete. Form joints and place reinforcing steel and Dowel Bars (as required) according to standard speci6cations. Place and finish concrete. � 8. Clean up job site, removing all debris. 9. Ivlaintain tra�c control devices Lo protect the area until the concrete has cured seven days or concrete reaches 3000 psi compressive strength. � E. PAYbIENT: Payment shall be made at the unit price per linear foot as shown on the proposal and shaIl be full compensation for furnishing all labor, materials, equipment tools and incidentals necessary to complete the work, �„ DA-33 RAISED PAVEMENT MARKERS �OMITTEDJ � DA-34 POTENTIALLY PETROLEUM CONTAMINATED MATERIr1L HANDLING � A. GENERAL: '" �Vhere known by the design engineer, the locations of potentially petroleum contaminated material (soil) that may be � encountered during excavation andlor construction activities will be shown on the plans. For all locations where material is excavated and suspected of being contaminated with petroleum products, whether known or not, these special conditions are to be followed. The contraccor is also [o follow all applicable Federal. State and Local regulations � when handling known or suspect contaminated materials (soils). 1. WORK INCLUDED 2 3. a. Excavation, stockpiling and testing of Potentially Petroleum Contaminated Material. b. Removal, testing, and disposal of petroleum contaminated groundwater. c. Obtaining and paying for required permits. d. Hiring oFqualified environmental professional consultant(s). Contractor will be required to submit the environmental consultanCs experience and quali5cations to the City prior to beginning work in areas of Potentially Petroleum Contaminated Material. e. Hiring of quali6ed environmental sampling professionals that will collect and submit samples to the applicable City of Fort Worth testing laboratory. The City of Fort Worih's Department of Environmental Management for coordination of laboratory testing. REFERENCES a. All applicable OSHA regulatory requirements. b. All applicable Environmental Protection Agency (EPA) regulatory requirements. c. All applicable State of Texas regulatory requiremen[s. d. All applicable City of Fort Worth (City} regulatory requirements. e. All applicable NIOSH standards. SUBhIITTALS a. The contractor shall prepare and submit to the City's Department of Environmental Management, Senior SpeciaGst in Compliance, plans tor handGng Potentially Petroleum Contaminated Material (PPCAn not less than 30 days prior to commencing excavation. b. The Contractor shall take necessary precautions while performing this project. Contractor shall not commence PPCb1 work (1) Contractor's submittal for dealing with PPCN1 is reviewed by the City and (2) the plans (i.e., dra�cing and description) for discharging any treated liquid into the storm se�cer or sanitary se«�er are reviewed b}� the City (3) and accepcable stockpile area is identified by the Contractor. c. Contractor shall submit the name of his proposed qualiSed environmental professional consultant(s) and proposed PPCI�I Handling Plan to the City. The PPCAI Handling Plan shall include the detailed sequence of construction including proposed excavation and handling methods, proposed � 9653300_Specs_PartD�.u•pd �`�1sC - `�� Re�nsed 09/01/98 carriers for contaminated materials, waste disposal site, and a]ist of any permits that may be required for PPCi�I handling or contaminated materials disposal. The above data must be compiled and arranged in a format that is acceptable to the Texas Natural Resource Conservation Commission (TNRCC). d. e. B. PRODUCTS: C. Contractor shall submit actual limits of PPCM excavation, as prepared by his qualified environmental consultant(s) and testing lab. Contractor shall submit for review [he proposed carrier pipe material to be used with the actual limits of PPCh1 excavation, including pipe gasket and carrier pipe coating or liner. PIPE GASKET bL�TERIAL. Materials used within the actual limits of PPCb1 excavation, including pipe gaskets, shall be resistant to petroleum hydrocarbon deterioration. EXECUTION: POTENTI�ILLY PETROLEUhi CONTAI�SINATED AREAS Areas suspected of having petroleum contaminated material (soils) are shown in on the engineering drawings. In areas other than those noted on the plans and where potentially petroleum contaminated materials are either detected or suspected, the City of Fort Worth and the Engineer should be ❑oti6ed immediately and the work should proceed in accordance with this section. 2. SCREENING POTENTIALLY PETROLEUb4 CONTAMINATED AREAS Care should be taken during all excavation and dewatering activities to identify areas potentially contaminated by petroleum. b. �'�'hen a petroleum odor is encountered during excavation or when there is visual evidence of potentially petroleum contaminated soil, the Contractor shall notify the Engineer without delay. The Contractor shall have retained the services of an environmental consultant who shall be present at the site to screen suspect soil with a photo-ionization detector (PID) or a flame ionization detector (FID). A reading of 20 ppm above ambient conditions or greater on PID or FID tested soil sample will be considered potentially petroleum contaminated. The soul sample should be a recent sample from the excavation face. The sample shouid be stored in a laboratory supplied glass jar with a TeIlon gasket lined lid. The City of Fort �tiorth Department of Environmental Management will be notified prior to all sample collection and submittal to the current testing laboratory identified by the City. The PID or FID tests should be performed in a confined location. Soils producing a reading of less than 20 ppm above ambient will not be considered potentially petroleum contaminated. The PID or FID shall be calibrated according to manufactures instructions. d. �Vater encountered during excavation or dewatering shall be considered to be potentially contaminated if there is a visible sheen, a hydrocarbon odor, adjacent soi] that appears visually to be contaminated by hydrocarbons or at any time the Contractor has reason to believe that hydrocarbon contamination may have occurred. The Contractor shall immediately notify the City and the TNRCC whenever contaminated �vater is encountered. The Contractor shall contact the Citv «•henever contamination from any source is suspected. H.aNDLING POT�NTIAL,LI' PETROLEUNi CONT:A1�tINATED SOIL (PYCS) Contractor shall coordinate �vith the City to determine a suitable location for the stockpiling of contaminated soil. The following procedure shall be followed in preparing che chosen site: 1) Provide a diked enclosure large enough to hold all material and prevent runoff. 2) The dil:ed area shall be lined with 20-30 mil plastic tp prevent seepage into the existing soil. 3) At the end of each �vork day, Contractor shall completely cover stockpile �t�ith 20 mil plastic. During the day, the Contractor shall keep the stockpile covered, as necessary, to prevent release of concaminated materials due to rain or wind. �t) Sampling and evaluation of materials �vill be performed at the Contractor's expense. (The City of Fort �G'orth will provide laboratory services) 9G5aJ00_Specs_PartD��.�Pa ASC - 21 Revised 09/01/98 1 ' b. PPCS shall be handled, tested, observing all standard chain-of•custody procedures and sampling preservation and analysis shall conform to published and recognized standards. c. The stockpiled PPCS shall be sampled and tested every 56 cubic yards for Total Petroleum � Hpdrocarbons (TPH) (EPA 4181) and Benzene, Toulene, Ethylbenzene and Xylene (BTEX) (EPA 8020). All test results w�ill be for�varded to the City of Fort Worth Depart�nent of Environmental �.. hlanagement. ., d. Contaminated soil identified by test results will be disposed of according to DA•27, Loading, Transportation, and Disposal of Contaminated Soil. w e. It is the intent of the City of Fort Worth that uncontaminated soils be utilized as backfill material, �y if the soils also meet the Type C or B backfill classi5cations. 4. HANDLING POTENTIAi.LY PETROL�UM CONTAMINATED �i�ATER (PPC�V) a Water pumped from the escavation or from dewatering activities that has an oily sheen, a hydrocarbon odor, or is otherw•ise suspect, shaLl be considered potentially petroleum contaminated. � b. PPCW shall be handled, tested, and discharged in accordance with the TNRCC's appropriate state regulation. PPC�V shall be tested no later than 15 days prior to extraction. PPCW shall, if • necessary, be treated in an appropriately sized oilhvater separator, air stripper or GAC canisters. Contractor shall have his testing laboratory determine ihat the oiUw�ater separator treated discharge is within the limits established by ihe TNRCC's regulations before being allowed to discharge (discharge to sanitary sewer). Contractor shall be responsibfe for furnishing the eHluent �.. test reports to the City. c. Alternatively, the Contractor may dispose of contaminated water, after appropriate pretreatment, into the sanitary sewer collection system. It shall be the responsibility of the Contractor to obtain the necessary permit(s) and to perform all tes[ing required by the City of Fort Worth Pretreatment Services Division. � d. All treated water shall be discharged into a Contractor supplied Frac Tank, sampled, and analyzed before discharge into the sewer system. e. The product that is recovered shall be disposed of in accordance with afl applicable regulations. '" Any phase separate product recovered frorri the oillwater separator and air stripper shall be � transported in accordance with Department of Transportation rules and regulations for flammable products. 4�'hen transporting product for disposal, transportation shall also be performed by a licensed carrier. The Contractor is responsible for proper manifesting of the material from the site ' to the waste disposal facility. Completed Manifests shall be returned to [he City Department of Environmental Management within 90 days of shipment. 5. H:INDLING Vr1POR CONCENTRATIONS � In order to maintain safe �vorking conditions, the vapor concentrations should not exceed 20 percent of the Lower Explosive Limit (LEL). During construction, measures should be taken to maintain LEL levels below 20 percent in all working areas. � b. To monitor vapor levels and oxygen levels a combustible gas indicator (CGI) with a LELJOZ meter y should continuously operate in the working area. The CGI should be properiy calibrated and should have an alarm that sounds if 20 percent LEL is reached. bfoni[oring data from the GCI should be recorded periodically to determine i£ ventilation or other methods are effective. In the event local � health and safety agencies require more stringent monitoring, the local regulations must be implemented. D. AIEASUREMFNT r1ND PA�`�IENT: � Payment for handling PPCS, PPC�4' and b�apor Concentrations, obtaining and paying for any permits required, hiring Lhe services of a qualified professional environmental consultant(s), environmental issues, stockpiling and all issues included and incidental [o this section will be full compensation for all labor, equipment, materials, and supervision. � Dleasurement and Payment for this section �vill be per cubic yard of trench excavated where the excavated material is handled as a contaminated material. No separate payment a�ill be made for handling of contaminated water, vapor concentrations, sampling, stockpiling, etc. � DA-3o LOADI:`G, TR,atiSPORTAT[O\, A?�D DISPOS.�.L OF CO\'TAbfINATED SOIL � A. GENER:IL� �,, This i[em has been established for the loadi�;, transportation and disposal of contaminated soils in a State of Texas appro�•ed disposal site (landfill) to handle special wastes (petroleum contaminated soils). A bid item has been �y establi.hed in the proposal for the proper loading, transportation and disposal of the material to a designated site and � 965a300_Spec�_PartD.� µpd f'�SC -��� Revised 09/01/98 the quantity established is the engineers best estimate of the quantity that may be removed. This quantity may vary depending upon actual conditions and testing results. The unit price bid will not be increased regardless of the actual amount of material disposed and may be decreased if a larger volume of material, than that listed in the bid proposal, results in a unit cost reduction for disposal. WASTE hLANIFESTS: Any and all non•hazardous liquid and petroleum substance waste removed from the site of generation and transported for treatment and/or disposal must be accompanied by a waste shipment record/manifest detailing required generator, transported, destination and waste description information. These results may not be uniform throughout the entire site. For all petroleum substance waste, the waste shipment record utilized shall be the TNRCC PETROLEUM- SUBSTANCE Wt15TE AFFIDAVIT (Form TWC-0332). The Contractor shall be responsible for obtaining, originating and maintaining manifests in accordance with federal and state laws. The Contractor shall sign the manifests forms as Independent Contractor to the Owner. AUTHORIZATION OF PAYMENT FOR REMOV.q.I, TRANSPORT AND TREATMENT/ D[SPOSAL OF WASTES IN CONTINGENT UPON RECEIPT BY THE ENGINEER OF FULLY CObiPLETED AND SIGNED bL�.NIFEST FORMS that are in agreement with regard to the type and amount of waste removed from the site and received by the tceatmenddisposal facility. The Contractor shall immediately resolve any manifest discrepancies. Completed blanifests shall be returned to the City Department of Environmental l�fanaoement «�ithin 90 days of shipment. C. IvIEASURED-fENT AND PAYI�IENT: Payment for this item shall be made per in place cubic yard of contaminated soils that are loaded, transported and disposed of in an approved special disposal site. No separate payment will be made for loading, transportation and disposal of contaminated ground waters collected; these costs considered subsidiary to D-34, POTENTIALLY PETROL.EUM CONTAMINATED biATERLaL. Ii11NDLING. The proposed land611 shall be included in the Contractor's bid submittal and approved by the City of Fort Worth Department of Environmental blanagement prior to contract award. Contractor shal] be responsible for all landfill costs, including, but not limited to land6ll fees, transportation costs and land£ll operator requested analytical testing and waste characterization. DA-36 ROCK RIP RAP - GROUT - FILTER FABRIC [OMITTEDJ 9653300_Specs_PartD.�i.«pd ASC - 23 Revised 09/01/98 ' PART E SECTION E SPECIFICATIONS SECTION E100 - M�.TER.IAL SPECIFICATIOVS ' 9G:i 1300_SpeCs.tcpd SECTION E SPECIFICATIONS (Januaiy 1, 1978) All materials, construction methods and procedures used in this project shall conform to Sections E1, E2, and E2� of the Fort Worth VVater Department General Contract Documents and General Specifications, together tivith any additional material specification(s), construction(s) or later revision('s). (See revisions listed on this sheet.) Sections E1, E2 and E2A of the Fort Worth Water Department General Contract Documents and General Specifications are hereby made a part of this contract document by reference for all purposes, the same as if copies verbatim herein, and such Sections are filed and kept in the office of the City Secretary of the City of Fort w"orth as an official record of the City of Fort Worth. INDEX E1 E2 �2A Revisions as of April 20, 1981, follow: I�4ATERIAL SPECIFICATIONS CONSTRliCTION SPECIFICATIONS GENERAL DESIGN D�TAILS F,1-2.� Backfill: (Correct minimum compaction requiremem to 95°% Proctor density and correct P.I. values as follows:) E'L-2.11 c. Additional backfill requirements when approved for use in streets: 1. Type 'B' Backfill (c) iVlatimum plastic indes (Pl) shall be $ 2. Type 'G' Backfill (a) Material meeting requii•ements and having a PI of $ or less shall be considered as suitable for compaction by jetting. (b) Material meeting requirements and having a PI of � or more shall be considered for use only with mechanical compaction. 'I'rench BackfilL (Correct Minimum compaction requirement �vherever it appears in this section to 95% Proctor density except for par•agraph a.l. where the "95% modified Proctor density" shall remain unchanged.) 9G51300. Spcc� ��pd Part E- 1 � �� C � � � � L' � � 1 C 1 1 i 1 SECTION E100 - MATERIAL SPECIFICATIONS NIATERIAL STANDARD E100-� January 1, 19r8 (Added 5/13/90) E 100--� W�TERTIGHT MANHOLE INSERTS E100--1.1 GENERAL: This standard covers the furnishing and installation of watertight gasketed manhole inserts in the Fort �'orth sanitary sewer collection system. E100--�.2 NIATERIALS AND DESIGN: a. The manhole insert shall be of corrosion-proof high density polyethelene that meets or exceeds the requirements of ASTM D 1248, Category 5, Type III. b. The minimum thickness of the manhole insert. shall be 1/8". c. The manhole insert shall have a gasket that provides positive seal in wet or di•y conditions. The gasket shall be made of closed cell neoprene rubber and meet the requirement of ASTIVI D1056, or equal. d. The manhole insert shall have a strap for removing the insert. The sti•ap shall be made of minimum 1" wide woven polypropylene or nylon webbing, with the ends treated to prevent unraveling. Stainless steel hardware shall be used to securely attach strap to the insert. e. The manhole insert shall have one or more vent holes or valves to release gasses and allow water inflow at a rate no greater than 10 gallons per 24 hours. E 100--1.3 INST:�LLATION: a. The manhole frame shall be cleaned of all dirt and debris before placing the manhole insert on the rim. b. The manhole insert shall be fully seated around the manhole frame rim to retard wat.er from seeping between the cover and the manhole frame rim. ' 9G31S00_Spec, �cpd Part E - 2 1 J , , ' 1 �I 1 � APPENDIX A DETAILS ' 1 � ' � 1 ' ' 9fi51300_Spec: �cpd NOTE: Bearing Areas shown are based on 15� P.S.I.G test pressure and 3000 ��''�� P.S.F. soil bearing value. q d, "/�, � .?,��,S ' Plug - � � I_` i � �' �'+ . r.':';�e�; �:��i :, '+'�' a� � �_�'��4�� �`"Y�,�, u •�'�1��{e'��y -1 ►�I •��'�'r�.I ' y,.�t t �':�l..r� �•�.,e � «� 7:r � r""� .�,'`� y'' �'r �� 's�F�'�•S : . ya � • ��.:�: � . �. � �.� •' � � ,.,, . � �'' ; 1 l��' � ; * ,S ia�;ti'.,.J�Lf�tfE.�t:, Y. p 1500�' Concrete �( '�� s�'i.'':%e� 2e �� : . ��.•• !' � � .+; 4 f F �. . � .A � •.a` . .� � - �`��� - I� �500K Concrete I I ., Q ��� °� � 9 S° � ��'� �p ��' ��s ,;• ; -* � �� �°'�, .�`�.'tir�:': • ��,�,�s �:�� •6 ''•+' s ' . .:.;,�R,: Y,� �� 8• '": • :.�:,.�`,�. r"�� � �%p� •��'�!'}'� � .r '• ,,• • - �*. .'� L : �� Y�� Bend `� HORIZONTAL BLOCKING TABLE r -�Dimension "X" May Vary If Necessary To Provide Bearing � _ r� . Against Undisturbed Trench Wall Pi pe X-�� 1 1° - 15' 22.° - 30' 45° 9�° Tee b Pi uq . Size Dim. rsir�. r��x. riin. Max. Min. Max. , Min. Max. Min. Max �. Ft. ��q�� Arez V�l ��R�� ArPa V�l .'�C" Area Vol. "�" Areall/�l. "F" �,�-€�a V�i 4�� 1 . .90 .8C .oS .95 •90 .05 .95 •�0 .05 .91 .82 .05 l.lb .SR .05 �6" 1•5 �.90 .�8C .D; .95 .90 .OS 1.05 1.10 .OS 1.73 1.99 .05 1.19 1.41 .05 g" I,5 .90 .8C .q5 •95 .90 .05 1.41 2.00 .05 t.86 3.47 .l 1.57 2.4E .1 lo" 1.5 .90 .80 .05., 1.26 1.60 .OS i.79 3.20 .i 2.18 S.b2j .2 1.99 3•98 .15 12" 1.5 1.10 1.20 .05 1.48 2.30 .1 2.14 4.50 .2 2.83 $.00 .3 2.38 5.65 .2 � 16" � 2 �1.41 2.00 .i 2.00 4.00 .l 2.8� 8.�0 .4 �.75 14,10 .65 3.16 10.00 .5 20" 2 . . . - - - - - - �1.77 3•10 .2 2.54 6.20 .3 �.52 12.40 .6 4.70 1.00 1.15 3.9415•55 .?S ��'24�� 2 2.14 4. o.2 �.00 .00 .S 4.25 �8.10 .g5 5.65 32.00 l.�s 4.76z2.6o t.o5 30" 2.5 2.66 7.10 .55 3•78,�4.20 l.0 5.30 28.20 1.75 7.05 �±g�o 3.4 5.9135.332.1 6" 2• 5 3• 33 to . oo . 7� 4. Sn 2n.4o 1.4 6. 36 4a8o 2. 65 8. 50 72.0o S• 1 7. 20 51 . 00 2.95 _� 42" 3 '�, �2 l�. f3p l. 2 S.�27.E,n 2.? �.41 ��n 4. 1 4. �o ��, Sn 7. 4 8. 30 E�3• 00 4.75 �+$" 3 4. 38 18. 0 1.6 b. 00 36.00 2. q 8.48 7Z0� S. 4 1 t. t 4 1�.5n to. 4 . 0 9�.03 6. t S �'54" 4.0 4.00 '_2.��a,o0 6.70 4�00 ].00 _ 9.40 8$00 0.�0 1'�.(1� �2oclt6_n 10.7 115Do�12.oC � I�OTE5; h4inimum areas shown are in square feet. Volumes shown are in cubec yards. Vertica� dimensions of all block bearing areas shall be ldentical to the horizontal dimension shown. � w �— �—,—,� HORf ZON�"�L BLOCK ING FIGURE 9 DETAIL E-1- 20 Ma[eriai E-2-20 Construction � .' � / � . \,�:� ���. `,� ',','�1" � . �';���:•.::,���.- � �;�;-�ti:�'��;��{;� � i' ;0�` Concreee��� � � N0TE: Trench width; � 1. Pipe 24" i.d, and smaller = 24" or Q` o.d. + 12" whichever is greater. p• 2. Pipe larger than 24" = o.d, of Pipe + 18". � 3. Cradle shall extend a min, of 6'' beyond each side of pipe. a" _ :D.��"' � " � f ,�=-.'rs_. \ ' ���:�r��' ��:,, ,,e �.. � B e l ) B e l 1 B e n d '' ; : . �..�y .: � �;=�'�.t � � •. ,: fi��i�:-.. _;; .� ' *`, s. , �y y �r.�� � ��SK!1'�_�,� .. • iY�,'.`I' 'S •-\ A"').._ 'f:'��.j+4� ��'`�:; • r.-s.:: � �.� � �`P^r, .. ..aw.� .-_ .� 1 i ��y� � �y�, � � RUBBER GASKET J0INT -- M. J. - M. J. �e�d � � �_ � . ei - C� c �a • �,r �„ . ��� i .�a . :. . ; tQ'� � ' ' . r� �f � � �•,�� 1 - . • .',+�ti„ Tr, .•' .���r� '� i, �. �,' %5� . ��i \�f'+l„ �L`' � � f � �. � � � • : .* r , `�ro���`��: ;� .t �ti—'".�'"�, ;� 4.F;��,iC, . 'S:�ti ! I�l � ' i � \ �l� `���►.'St'�� �' 'S,•eti..��.'• _ . �+��-��� �,��� \ — ,� �':,.��� \� �� I o(�11 . �.�,, TYP• ♦ �, , :.'. � . p.-.,�;o � ,; %�.��� r� �S� � •..'�;`°" ���=,a'• . ,, Ma i s� i500� Concrete �'� '' MECHANICAL J0INT Bell-Bell Bend � � 1500n Concrete ... r- Keep a min. of 1'-0'' clearance between � conc. and joints or bolts on C.I. Pipe. or in excess of 1'-0" �• as detailed. �' 1-1-78 I� � Main cy � � �A y `��p P' I � ���R�.(�.flf� I _ ? • � �' `�., � � �,.s .`� R � r ��,,, . � , �� s''"'`:�.1h��= x a�,� �' �''w� a, rd�`oih }.: ". '� � ��`;�•�� -� ��1,�� ,-��, �.'� .Y,,•�'r .�+��. • ''�' .+ � 6' � � � .� �'i'r '' 4 v �'��t~ � �„� ^,-C; � �/`�'� +�, * +-� V �;�'� ~ � F `� .ti: t' r:��'"M1:•.�'. : 4. e. , i . 1 !4'.��'L ��� � 2 1 �,Q11 � � TYP• 6ELL AND SPIGOT JOINT ��ote: when cr�dle is CRADLE DETAIL FIGURE io shown or specifiec for instailation on concrete p�Pe the full joint length of the piP or fitting shal i i cradled. E 1-20 Materials E 2-20 Construction C�853 �r�l�� �,��'0'Q�� �f3�1�fGCC �4 S[ee� �ae � ' � I �� � � • t�; � � -�.- � � �M � I � ��,,�, � .a� . :o. '�y� . � j'��`S .__� � /� `'�� . .�� , � �` �rap pRpe wit�h .� 15�t roof r�rg f�l t �� ^ F�rc� �s rac�cssa�y �_� � .�� ���4 e�; s � f � �'` ; p '. ��<� � .�� �� I �,� � �. .�� f • .� � ���. � �,,o� �a �,��,.: Keep concrete clear of pipe joints and bolts BENDS 90° 45° 221/2° 11 1/4° *Vol. Req'd. C.F. 39.99 21.64 11.03 5.54 A Ft. 2.50 1.42 1.0 �.15 6 6 Ft. 4.0 3.�38 3.36 2.)5 C Ft. 4.0 3.88 3.36 2.75 *Vol. Req'd. C.F. 71.Q9 38.47 19.6i 9.85 A Ft. 2.83 1.67 1.5 1.0 8 B Ft. 5.0 4.8 3.66 3.2 C Ft, 5.0 4.8 3.66 3.2 *Vol. Req'd. C.F. 111.07 60.11 �30.65 15.40 A Ft. 3.25 1.92 1.75 1.5 10 B Ft. 5.9 5.6 4.25 3.25 C Ft. 5.9 5.6 4.25 3.25 *Voi. Req'd. C.F. 159.94 86.56 44.13 22.17 A Ft. 4.17 2.42 1.42 1.25 12 8 Ft. 6.2 6.0 5.54 4.2 C Ft. fi.2 6.0 5.54 4.2 *Volume calculated on the basis of cancrete reacting thrust on the respective bends under an internal pressure of 150 psig at the rate of 150 lb. wt. per cu. ft. of concrete. e � EXAM PLE A - VERTiCAL TIE- �OWN 6LOCK DETAIL �-�-�8 F I G U R E � � E�-20 Material = E2-20 Const�uction _ i "7 L�J L'=� �'1 �' � �'a i�� !'�7 t'�'� Er"� �"�i E'°""7 [' ' , �� � l*v'� �"'1 E� , PMS 167 (Copper} ,_ PMS 288 (Blue) ,,._. PMS 288 (Blue) . , ., - . . �� „ ��� , d � r r � . � . - �r �. i e y . a i e � ��r � 3� P �.J�ea a ���� � � �� ` �.�ri �ii , , r i � s r � a i� i � r � e J W r ' ,r l � � J � y' � � � 2.25" . i ,, ; �; . , t - 3.75�"' 4 l � - 1 } � , Y �--� � _ 1 _ � _ — — � �S' �� � �� � . , M �, � � �� �� rl t � � r, 1 . ._..�� � �-� - - � - �� =,— ��� ��----- � � �,,r �O 1 _ .. .�,,� �,(�� ,�,,._.:�� . ���� � ��e� � � �. � � �_ _ .R' .'-"' _,►. 'L'..s_:�- ry � � 1 ^.7J�� — — -- -- _—_- . .. . ... .. ,.-_ �---.. _ ... __.. �. - -. .,_ .��. --__ .... .._ ,..__- - • �'•I�'J � — — 4.5" �� V�h��� , � � 4y �� l f t � % /�" i�adit�s , � *� � ', ��"fS 2�� (�it��� � � _-` --�.' .. ������� ���� �9��.9�`� �� /T��fl L} Scale 7" =1' 09/18/96 E2-1 Construction � i s���.��1 / �` �� �� i � � t � +� i � �� � � � w + � � k� '� ;��` � �� / / � ��` � � / � . � � � � �� a.� '-� .� . .� � � � � Mi�imum 2 �ows !�'far�t�d bvjumasric ja % � Sea,�r�t (Ram -Nek or c{pp� epuQ/�. �iaa li�.E+C 6�iP�.�rs�r+E'�� t�+^ " - .�f'. ✓F. �:'�'!. G'� OTB �av�sr'vs'� i'�c�nv�b�ctd w+w..�Solt saclro�.s or iy�wl, �t�:`-E-2 �I� n�.«�ialt f'.�r..+t �.rd ��f v�".�. c`o�`r ty��r! �,a .t�`.�f��.'� �!s�v , .*_ tr��r. /lVcav-,�!' , � � i aV � .4%..I�+�O.�'.rv,.r-n�'d concea/edpick . �ar;;°�: - :�. S/o fs a� pickbQ�s, Ref: E 2-/4,.�'� .�°y��►~ '-� •- _ %: �� ' �,'.�,� - ' � I y r - ' �: �'��� �I � � I �..L— --1 � '": ��_����' 'R••. •�x 'Y ,fi � ��� � , �» • � '.{Y —� � +,'C I � � � I � �' *w �' I �l' '�' -,� � , , .-. :�. : y. .�� C; �".: �h �' . _ �; -� �.�,}: �� , a � - T �..�v4 �►'.i �' ' f GN c'. c/✓d/a . , ¢X�l�1d f0 '� .M" I �' �t�[ �Z� ;�; ::. .! � � , � �a i � � �'Ylre s� �rY.4 I"'��rf�r � � ���� �� � c `.wl.u. � ; �� :.� . . _ �r�, - .�� p�� u i u p � •�"�� � �,I' '�I _�`�Y;'=''�r rf. :x•�••� .� r�+•�./. % �• �,�+.". C'„e��'�j' f��'�U"4 �l C�c�a�" tr� � � Q"�I/l/� � F/GU/3E M, �r.v.�`��.�� .y�.t��ot�'" `" ,(�.-�c��'�' r�f.,w�} � El-ik Matcriai E2-l� Gonst�uctlon MANHOLE FRAME AND 24"DIA. COVER� EQUAL T0 McK1NLEY lRON _ WORKS NO,A24AM: (REF. E2-14). TOP OF CONCRETE CONE ,�� SECTION 15" BELOW _� FlNISH RIM ELEVATION:'�L . (REF. FIGS. 103 & 104). G a � �� �yI' �4. ! �+ �• � �[/,� y,1 �� 4J" 1�4I IY ♦ p �';j� � "�'�� '• ���� v��� ��'�i+}'� �I� �4 0 � 2'�.� � `'I �µ� ���,'•a�.� .=,; -, �-.�- � ; -�,,.�. .;-. _;,,.-.� . , , , , . . _ . • . �' . ,�. $„ � �`�CLASS F(4000`') CONC NOTE: 1. PRECAST 4'pIA. CONE WITH 57ANDARD 300# MANNOLE COVER AND RING IN LIEU OF 24"x40" SHALLOW MANHOLE(REF. FIG i06). 2. r�A�1HOLE To sE u5Eo wHERE SEWER LINES ARE LESS THAN 6' DEEP. SHALLOW IVIANH�LE PRECAST CONE FiGURE 105 E1-14 riATERIAL E2-14 CONSTRUCTIOti � � Where M.H.'s are In street install two or more courses of brick or concrete grade rings between casting and top of brick - cone, or concrete slab. Use Cast Iron Pipe to First Joint Behind Limit of Excavation � � �� 14"'�.,/ =- .1—.� 2�� � tr,� �a I 4�� .'�i'' �I� �j Where M.H.'s are built in sireets to be paved� H.H. rrm to be set to proposed paving grade Use standard HcKinley, No. A24 AM. or Equa) M.H. Fra;, ?^d Cover -1'u�; 1�r� Set in Nor�ar �� M.J. Cast i ll� -`��' Push-on Pluo � Iron�Tee I �Y� � � � � � I �r � I � M1 _ ���1$�YI � �/ � ��v � �� �� �. J Lonc. Collar�lu, " e�_\"- � ��" ��� Install Nuts � Away from M.H. '` � � � Wall on M.J. ��� � - � � � 4'-0" /� Fittin9 COR-TE� ��° o � � � Bol ts �+ f -•If Required -Pr�ovide � Concrete �°+� � u � Stub Extension AC � Linit of - � � � � - See Excevatio�--�11�� ` �, � �a��oT P.E. in H.N. f Standard 4' Dia � ` ._ � li�� `� ` ' � H. H. Detall � � Fiaure � � — � S 1 ope 1''"/ 1" � � �U , -- ; f ,� -� ! � , . / 41 �( � � � '�� I ` Vertical to 3/4 ��i� a.• I I ,a *�� � Point of Pipe ,J O � $ � � Pl�� � . . . . . • , � . . . � . , � ' � '� - , � ' ' i'.�, ♦ . ,• . .. •�•�� • . . � •♦- ' a � � � • 4. �yIE4 Thrust Block to " Extend 6" In till ^ Directions fron Outsid� Dia„�ter ,,,., o` F i p e ... � �' I-1-78 Grouted Invert� Use �+OQO�' Concrete � ��� 4' dia. for sewe TYPICAL S�CTION SiANDARD �OUR FOOT DROP pipe up to 21" dia. S' dia. fo sewer pipe 21" t 39" oia. �4CCESS MANHOLE �I G URE I 0? E 1-i4 Material E 2-14 Construction IC E: �+• Sta�da�d p;pe Fitttngs shall be used to form i�verts ot junct,ion mar�holes r�'�cn ' possible, with ins[allation as tollows; l. Pipe fi[ting. 2. Pour manhole 11oor to spriny line ot titting. i. 3. Break out top ol fitting to spring line. . 4. Pour remainder of manhole in�ert to provide vertica) invert ��,all up to �" 3/4 point ot the larger pipe invol�ed, as detailed. , � 5. 5;ee1 trowe) iinish invert of manhole. g. When special situations prohibit use o� standard pipe fittings as above �u!lir'�EG� the invert shall be forned of concrete ana stee) tro�,el tinished co proviue si:�ilar - functiona) characceristics to those alfiorded by the above installation. invert: thus formed shali be accor�plished to the Enqineer's satisfaction. � �, .�-. � n � 1 _ �'� � C� ��� �1 -�� � oi hS.H. BCatton �r, �unc[3o� M��'��les � � o � -� . . ..4,. { .I � � , �, , • T � �J ..� � • � pa � .'bp � o' r1. •�,Ea. 1r �� '�.'-. , , .; i. � ' •� .�. „ '6 . .�.�.� �! �� �p , i � 'ir • �, . , : � . ' ' • - ' • Cancrete '• ' ' •,��� •�: , .. ,;�� . �', , • �� : �; • . . 51 a b --�' ►� � �'• •'' y" .' a �.' � . . . • • , ' � , �" . •.. Section A-A JUNCTION MANHOLE BOTTOM FIG URE 148 N�aCeri�� E�-�� Constructron EZ-D�- _--_.r— _� � I'IA�',�11"�1'+Y��l �'11� �rrl� �t111�ti�'/, Minimum Depth After Compaction Natural G�ound -'��\j,W'1?WYJG�'I:�1�11 �'%i7'.�11 � �^','%].+�1 � � � � � � � � � v �.'FD i mens i on �'' " � � � �. v � Sewer Pipe - 12 " ol � � c i � � ti � � � u. �I e �� . u �� �i •{ �c' i= �I � � �o � •. �c � i / �� ' . • • .. •� .' G�r.a-n��'lar` �mbedr�errt ��Z . • . . . �, , ,' .' � • - . . ' i ,f � ', , � � . . . • �` .,.', 1.. . ,'' s • ,, � �, • ' . ,�. • '. • � �. .' _ ' "` . • ' � : � �-b" �4 i n . . ��++�.'' . , .. ' � f • �' . {��rP.) � � � .� • � • '',� . ; �. � . _' . • � � • •'� • • .• r Crushed Limestone to • - ��' �• "r'` • '- �Extend from 6" Below ' ' ''.� �' Pipe to Springl ine e � • ` � ' �� _13�'►���`o� � � ,� •' � " (Excavate for Bel 1 s) ra�5�h,ed ���er�e��fort� :l/�(�1' I I��l�!�J / � ��'(J TYPICAL SECTI0N ="'-�-'� Cost of Granular �`�'�'��"��, �`;'�� Embedment and Crushed Limestone Bedding Included in Price Sid Per Foot of Sewer Pipe STANDARD EMBEDMENT FiGURE 109 � El-2 Material E2-2 Construct�on ,►i.���v�r��r^�v�,�.t�r4�*ra�mY�r.�t�rrvsr.%�,�,^��^�'���v�i��ct�r��r�c���,v����wr,�,s���vri,���.�r.�w�v��i���,pr..� a— � . . p Variahle Diameter Bore To Be Large Enough To Permit `�',� Design Type Pipe To Be Pulled Or Jacked Through. a� � � �''' _ ,� .` ro � 5 �'I�lAvtir��Evrl�car�v�ri��tV�l�ntiv+p�c��av,rfi�uy�,n�����,�rrv�rir�t��vr��h�l�'It�1,���I�UvrI�,ME�v�r�ca�'�ri���ri�,�,�,tu�r,� ' TYPICAL BORED SECTION Longitudinal View //.Pressure Grout . /I/t1111U'/Ih11111Y�f�'t11��V1//rf1�t11Ylf/�4\4V"'!/,l�11W///l�\IY, 1�'//�AllvifAl�1IY/f/,A11\Y///A115V�/I,���11ivOfA�1�1v�^i�t�� � . � Q �� f � ��! L ' Q � At � � [p L CJ v � N y ..r C! �.��+► G� .+^ E � E � �o ro �J — �ti 0 � � � �i. 0 �0 � � > � ulq�\\Y///,(��\�r/. //��i'//n\V'//,�\U'//,(�\�Y///�(\�Y////� !//1�,\W+I/I/.C.��`^�ilfl4ti�Wl///,�.�� �'////�tl\\1V'/�//hk"�+• � R.R. or obstacle of similar nature requiring . TYPICAL BORE WITH PIPE INSTALLEO bored installation of Longitudinal View sewer. � �_ � q(,f����-�•.i�l `L'��=y'i���_.l�'�`_=�,1` I;� '�=s•2'�- -�: _�:=. � - � � � . � � `i � '' �,� �' +� - � - y ��^� �� �' � � �.,� �� s� � Y � ..�� � . � �_ - ��� �.,,�,_� � Carrier Pipe Perimeter of Bore t Pressure Grout Around Pipe. Grout shall be proportioned as 1 Cu. Ft. of cement, 3• S Cu. Ft. of clean fine sand with 'suff�cient water added to provi de a f ree f lotivi ng � thick slurry TYPICAL END VIEW NOTE: l. Compression type joints to be used if possible. 2. If compression type joint is not available, MJ tYpe,shall be used ar�d 60RED CROSSING DETA!LStP�bl'ngdPbPeo'�° place �� FIGURE If0 Material E 1-15 Construction E 2-15 � I 1 a Existing surfaee Ba�kfi�� as s�c��fied { ¢ . k � Irrr�;r� ar� -Jl+--��"�"—, r,hd;. � • • � • + • Ir�fl�lf�'rre�'�'' � • � � • i �r . , . � � , r * � � i � . . M � � ` � �- + � . + � " • y .. • ,� a 1j • !4 . ` � � • � r I�ll E � • � 4 � � ♦ . ' • � � • � � , � . • � �'J � F ' � � w � • 1 I , � +�• ♦ ^ '/�''�,~���,� �• � �.�y � � e +� e , rx'.•: ,' � . `. r i �.,`'�,.� �- f e•'�.��.iL � 1 � !'�' .. � '•. �` ,' .�- . �;'�;:',::���, � . . . . ..• � '�. �.�\t f7T:ti;` ��I � ''�.� ' . . �''J.�.it,�� • `J'y..y y r. � . � . � .. r'� d` � �'�s�! �Rx!1`., •�•,•.�4'��lyy�f`ry. � �.'�'� �1� ,..� � •�+' � ��� _ �; �'�: ';� :�� q�4 +f t=' � , � � J. � : �:: ' , + C�£ '-_ _ a, � ..::. -.-j Q, /.�•:���JJ !; � '';(/..J.� }/']• _1 • • e *f ••" � + • �• ' " '�� .:j� �1 � `�� . ti �' . *� �`+*•` '�� F *��W .�'� � ' ��! �� �rr a' � ,'`t':' ••�* `�.���P �:f c��\'�.' - : ,'. , ,�.� ' �,�(�'��:�l�r - � � ,�Tj ♦�•;�..�,:R'" � � � '". � • ,'� � i �'�'� ` •^ � '• •''•4 y {`.� 1. � • ���' � f . , �! , • a � • � �Y •x ■ � 1 ����' . �i �� ....pt �-• �'• ,5��,+•„'` � '",'+��.''ti��,'J' ` \�, �, 1 �• � • • ' ` ` ' � J• �C�I+'j�'1� t=i�d+�.�ll�ii�f;�1;1lG,;';���1y�1'��;�+f,_��l� � � � � '�.=J" � � 6" min. dimension. 6" max. for pay purpvses when bid per cubic yard. O6" min. dimension. Max. for pay purposes snall be 6" on mai�s 24" and smaller, 9" on mains 30" and�{arger, when bid per cubic yard. ���' mi n, d imens i on. �I"' max. for pay purposes when bid per cubic yard. QClass "E" 15�(2� concrete. C0NCRETE ENCASEMENT DETAIL �-�-�8 F i G U R E I i 3 E�-� Mater iai E 2-7 Construction , i� . . �•., �/ r�`� ql Y � ��i �d�i'�1Wc_lV �I �+e � � J!' I t � � �� St a �nd a � d _ _ •i' • =al��r►ur�,,��r��'� , �urb L �s�tter� 4 � ,� � � ; . '� � ��'. � - �� � �;' •_ . a" nr � � �� �;� :•� . r: .��= � �•� �+ ll� m � ti�• .. � ! s :' �:��`•'` • � � •'• - � ' .; ., �► � �' �� ��_��� . .. �, � � '� e > _, � � � �� � � � '- �- / '1 . �� � � �� � � ' ,�` � �� � �� � � �� � � �r Roadwa� ..� _r � ..,.T�-�_� ��n. �a'��rtight �P'��r� � � � � � ,�r ,�• �' '� � � �\ �" � Graci� I xy tI r�oncServi � i�e, t�S ra. 2°I � �� ` � . . � � � �� �1 t C. 1, Mi n. �rade I6,� TY�� CAL SEC744�J Note• Embedrrses�t ar�d back'E i 6 I ��� a5 requ i Ped f�ar ad j acent sewer main shall be rncluded J� zt�e pr'rc� bid per sewer _ , _ se�-v�ce compl�te �n �piace. �ta�dard Cur�� � I / I G�tter Secticn ,.—/!� � �� /� � �... �� � -. �I . �Servi ce Li �rte ,...�----- NOTE: Tees Will Be Used On A1l Service Li�es Constructed At Same Time As Public Sewer. 1-1-78 (, y, ,� Sewer service line Iocation �`` � to be marked with rsd vinyl tape at least �" wide and I0 mil thick attached to the end of the service and extending through the back- fill a�i the point of house service connection behind the proposed curb. SERVICE LINE DETAILS FiGURE t 15 E,-9 Material E2-9 Construction � 24"D/A MA NHOL E F RAHE �� � �IND C0V£R E�U�IL� r NG 1' � �` � M�KlN�EY 1RONW0RK5 / y� KO. A 24AM �� �' j � �� ,� �_ _ _ �" __ t � �_ � „� /�r _ 1;A � � �� _ ���.. � -- , �-- , .� � - -�- 1 r � � r � � • _'.. ��_A, / O' M/N. -�'�'"�-�" `' `�3��� tv t'�'fir1'� �� .�`' . � � 1 5r�nro�t� �• o�A . * MMINOLE W/TN `�` �' ' COVER. '.' � �� ii �*sti l; 1• n/�• ` a. —. - _ rry: ► �" • -�� F � � � � 4 , � 1 F � 4 I �, . � � 0 �. _ � e i w ' — � � � �, e• � i I a � . � � 1.' Slope of interconnecting �r � ' .� � pipe to be not less than 1� ,� ;. �` � ( � , 2. Fitting will be cast or .�a' Ductile Iron with mech- , 1 _! * � anical joint . `. .� � , 3. If bend is used. bend +, •�' ° shall �ot exceed 22.5° �� , ,y .I M�CNANr�+��, •° "�, � L' �'r, ++�INY � ` � '` " •\ � . � � . � � �' � � .� �'V7' "" . �. .• _� • �,; F . a .. � ;' � , .�• •►� '•� �vac ,�' , , � i � � ; . i i.= .` '' • . •w ' ���� � . . ^nw�� — ;�.I.i� �Lf�4 "��'fc dl I� +L f !iV � �. � � � pRrctED F+"t�� [ � (C4R��i r ,� � '�.�- ��..�. 1�C.4 �! N �C �C �1�,'C}U�►d�7 T�P �" �rt �A�R���F? QFF.�� T' 1� �+d ►4"�C7L � aFr,��c. FOR cavNFCT- �� TO SEWER MAINLARG � Tk� N 24 r � � �, FI G. � 2O E l-/�f MATER/AL �- E2•/4 CONSTRUCT/ON 6•l6-$3 AME/JD ��-z"83 .� -, S TREE T p,Iiq T � .� � . � Q.o �j " _. T , ! �: ,� � ``�-' • � s _� 8--�4 AEBAaS TYP. ' \� ,'` USE 3000f C�ASS / � � �--� .,�m\ . �; - _ 3" TYP. A CONCRETE . �� � � , • � . � � y ` � 1�, � / - � � -., " �, . ,1 . � r''' '`, - � - � � � � �� � . _ � ` ` � ,� 1 / - �, � o �-� � � , �� � . � � �,, - `� � �--� . 1- ,� - a \ � `' - � _ / , .� • ,�'�-`- � � / I� A � `' �" • - - . • ` �"` +� ' ' � "� . � CONC . COLI.AR HEIGHT YARIES� � /4" CHAMFER TYP. {� � � � � * �. � � P�KT. PVxT. "� .. , +� � � ` �— GRDUND � "� �' 27, �''+. � ♦ . �� , \� t ` � %cl l �III%cl ll��ul �� - � �� . � �R�IDE RINGJ 1 ,' ��� , � � _ � -+ • � ` ` � _ _ _ _ _ 1 6' MIN. �� --- C.tSE J � C�tSE 2 ` ' ' T � - RAM NECK •' t�' 3" MINIMUM C.tSE ! ` i HEIGHT VARIES COLC.IR S/�ALL EXTEND TO � � TDo OF 2.- 27 CONCRETE , IREBAR REO.i SECTION A � .. � C�SE 2 . � COCL.[R SHALL EXTENO 3' BELOI+' BOTTOX OF LOXEST GRADE RING � . , (REBAR REO. J � � -� F IGURE 12 3. . — CONCRETE MANHOLE COLLAR °� � D E T A I L E1-2o.21 MATEAIAL - E2-20.21 CONS7RUCTION =� 5/18/90 , 31�sJ,� 3 , - -� � - - - - �.>:.�— _.� � - � ����� � -� �� / � n : � 1. . . � � � � � - � � i � � '� a � • � (tltl CU�� IRHf M�iI.LC ! auf t t ■� au���C[ . `�, l+r11 Q01`� r , , �„ . T � . * •• � � � � �/ /f •f � / /J .!!��! (� t.27 COMt11[T[ �i�LL �[ MQT1LlI0 A YNi 0I �" KlD7r �OTTOY Of [KAT. N.M.�C. N�vtM[/R, � ALL [�tlT. A!/7MLT MMLL K 1K►I,AC[D TO TMC dlt�aNL D[1J/L Frl�t�l �MT �[RA�Ii$T SM�LI OE 2 OF TtMC G11A SVRFAC C V11Sf. t�t M0T[ O �[L0r M M � C �[�LK[11iMT 1 t ' Ir1M I � �[0CIN� O/ III[ T0 lIATCN ADJ+IC�MT �[CiI0M � 0� Mfd/ICATI0if ��l� IfNICIKV[II t/ Y0Af ' lTRMKNT. � O dl Y�.iOltMlO�Ti„M IROiCT [Mwca a ar�c� �u+r . , [YW1TT[ M IVLL"11bTN f� [M�TiN KILAL MYililf[ 4• T0 T1fG0�t�C010R1pU � I�.JTT T0 �ITqTA1O C0MIFI1NCTq11 LA+IDN�, t/ AI�0IIIIATt�TI� ►ULL wb'TM 0I 1l11rMCt Ml�l �- • .• K RiM0V[G� It1'LAQD rITM AI/*0/MAT[ TR[ATibtT T0 ' ' ' -• [7[ttT1M• �A�C 0R 1lJ/MA� rAT[114AL. i1IM " C-3229 . � �-;ti4T wYAC •h �UR/�CI 3aN (� [n3t Cull� 1 / •�1T3�� �+ . r R �� ♦ � # • �� � �_ i * y �� �� i � °'� ` r��Mr co,�r � ��•� i•I7COMC1ICTE � �ll t�[MCM MCR/ILl i1Mll IK[? f A(OV��(M(Ntf lOll 1RAOATIpA ♦MO coti►�ct�oM •� •1�Cf/t�D �� �TtY IOt OI iM[ �TAMGMO •I[Ct/!C�• TIOIM /OA C0M�TRt1CTOM, ►U�IIC IIOA1f• 0[►T , C�T♦ 0I sp11T D011T�1 T[lfl� pA {ACIli1lL AS S�'EGFICO IM S[CTqMS [ � 2 AMO E2- 2 0/ TM[ f1[G/�C�i�ON� �OA •A1(� 0[►�T• 1t[wT /RO�(CT�,IORT �OAtr ��T(R O[►T,Cit► OI fOR� NOR7M� T[=L• ��' ��0►O�CG /�CWT♦ ultf�1111011 "��► V f � , '+- (riTCN �tAti4 TYPICAI. S�CTlQN-TRENCH REP�41R • TYPICAL H. M. A. C."SURFACE WITH SOf� BASE C1T1' Of fORT It7KTN S�t MI A��tA�T�C CdCMT[ aEv •e -7 , ••2 TRAN`f'�,pTA'1. N/f t FI . V:. RF.S OEPT. R[v-u-i-T� E�/KEER� �/Y/�/�N R[V'II•�6-�O [t�lT •�![ �I�1'. �I 0 e � .f i� - �� - ` r� - � - -�--�'� _ - �'--�- -f--� - � � � t �C1i�G'+� �'A��M'i ry r fi0 1G r� �+, �5i L �., � .1� � � f { SEE LONGITUDINAL JOINT SPACINC I ( No..3 BARS ON 24 " CENTERS BOTN WAYS EXIST. CONC. PA�EMENT - l�'!TH MIN. 2 BARS LONGITUDINAL lN OlTCH CLASS � ' RErNFORCED EXl`'T CURI3 & GUTTE!' � CONCRE7E PAVEMENT 1 ', , ' , 1 � t l 1 l 1 � . � -' \ �r \ � � EXIST. JO/NT � ` � � � � EXIST. JOINT ---�� cm � �� s ��— �� * � �_ . . . . , . - � ' � . . . . � - .. �, �� cx�sr. su� a�sE (1F ANY) , �//, �.. � - . .. . � - - — �'`Jl:.`•*�,�1„�. �. .� — '��� • �� :2 .�•� e�'• -, �'..l�p i, :.y �� �.. .�;:.�`�. w' 12'— ;: '•r : '• :: �±' ,`�•' .` ' «� ' 2:27 CONCRETE ,:,.'° •' t''4'�;' �. � � ' :.:?t~"`�;: .».:`".; ;.i. �•'.; .,�.K' �� '��"' ��•' a• � ALL TRENCH £JACKFiLL SHALL MEfT R£QUIREMENTS FOR . •t:►. �'.+•: : ?r� -r CRADATiDN AND COMPACrlON AS SPECIFI£D IN llEM 402 OF � �+`:: THE STANDARD SPECIFlCATIONS FOR CONSTRUCr10N, PUQLlC 'f' � ��` WORKS DEPr, CIIY OF FORr WORTN, TEXAS OR i3ACKFlLL CRUSHED UMESTONE TO E,YTEND �o �' I a� AS SPECIFIED lN S£C�IONS E7-2 & E2-2 OF THE F(�OM 6" BEL0W PIPE TO SPRINGUNE � �� SP£GFICATIONS FOR WATER DEPT. PR0JECT5, F0RT W0RTN nd�� I �� WATER DEPr, CITY OF FORT WORTH, TEXAS. ��� 6 "' CRUSHED LIMESTONE NOTES: ��PROPOSED PIPE DITCH WALL � REINFORCED CONCR£TE PAVEMENT WlLL BE REPLAC£D TO ORIGINAL DEP7H OR TO A MlNlMUM DEPTH OF 5"; WHlCHEVER lS CREATER. +�2,� !F ST£EL EXISTS !N CONCREfE PAV£MENT TO BE CUT. THE STEEL SNALL BE CUT AND SALUAGED AS POSSIBLE. A MlNIMUM LAP SPUCE DISTANCE OF 12"' �VILL �E PROVIDED. � REINFORCED CONCR£TE PrIVCMENr IVILL !3E REPUICED AS SHOWN OVfR TRENCH lN THE El/ENT NON-REINFORCEO CONCRETE PAVEMENT lS REMOV£D. a QEDDING OF PIPE TO b�ATCH ADJACENT SECTONS OR SP£C!FlCA710N 402, WHICHEV£R !S GRA7ER. FIGURE 1 7YPJCAL SECTION - TRENCH REPAIR CONCRETE PA�EMENT CRY OF FORT WDRAt TR.WSPORTAPON/PUOUC WORKS DCPT. ENCIN££RlNG DMSlON N:1! 7;J SGLf LOCITUDINAL JOWT SPAClNG STREET SPAGNC VYIDTH ?8' R 30' ON C/L 36' & 40' ON C/L d� 8' FROM f1ACK UF CURB ON C/L dr 11' 44 OFF C/L 4B, ON C/L 6r 12' OFF C/L 60' 6' & 18' OFF C/L L''�"� F��___�-..7 �---_� . . � , . F2�1'�'1�G�1�'�1�+M�� �`�? N�Mai���` J��,�,�� � 1 i � e ' � 1 ? � ' , ' r � . 3 � � � � SEE LONGITUDIN�IL JDIM' SPAClNG i i No.3 BARS ON 24 " CENTER� BOTH W�YS WITH MIN. 2 BARS LONGITUDINAL (N DITCH _ CLf1 SS A " REINFORCED F_,YIST. CURl3 �fr GUTTER� CONCRETE PAVEMENT EXIST. CONC. PAVEMENT EXIST. JOINT - , � � EXIST. JOINT . , � � �_ � to �� � * � . . . , . • . * . . .. ... , � . .. � � � ��`�.~ �����/f:'�/�i��.%,��%•;''�ij�����.��/ �`'"� _ �� ���!' �.. �: , • . . ,� �, ":7�. � �,. +':f � .lr,�,e �• �R�.�e. � � � '` '�'' �' •' ' 2:27 CONCRETE ';'; :, �.'� �:.,..�: � ,?•— � ,�;..,���: ���;��:;,::'�::'4..`--_ EXIST. SUB BASE ��=; o+;—�•;.�: ���� ��1; ;�' ���—ALL rRENCH BACKFILL SHALL ME£T REDUIREM�NTS FOR (/F ANY� CRUSHED LIMESTONE '"` '•}� ��`• ``�'�' CRADATION AND COMPACTION AS SPECIFIED lN ITEM 402 OF ��Li;tt::` �";': ,•«. TO EXTLND FROM 6� - ,•�''�' : i•� ; THE STRNOARD SPEClFICATIONS FOR CONSTRUCTION, PUBLIC QELOW PIPE TO •�q�' "' � WORKS DEPL, CITY OF FORT WORT'H, TEXAS OR E3ACKF2L ''' AS SPECIFIEO !N SECTIONS E1-2 & E2-2 OF rHE SPRlNG LINE ��� �� �`�`� SPECIFlCA7JONS FOR WAT£R DEPT. PROJECTS, FORr WORTN „� , ,[,,�, W�TER DEPr, CITY OF FORr WORTH, TEXAS. NOTES: � � °����° ¢�' � ��o� ���� �� �a ��'-�p � �PROPOSED PIPE �ary DITCH WALL 6 "' C1'USHED LIMESTONE REINFORCED CONCRE?'£ PA�EMENT WILL BE REPLACEO TO ORIGINAL DEPTH OR TO �t bfINIMUM DEPrH OF 5'; WHICHEVER IS CRF�iTER. lF SrEEL EXISTS lN CONCRETE PAV�bfENT TO BE CUT. THE STEEL SNALL BE CUT AND SALVAGED AS POSSl6LE. A MINIMUM LAP SPUCE DISTi1NCE OF 12" wILL DE PROVIDED. ...r REINFORCED CONCRETE PAVE6iENT WILL BE REPL4CE0 AS SHO�f'N OVER TRENCH IN THE EVENT NON-REINfORCED CONCRETE PAVEMENT lS REMOVED. O4 BEDDING OF PIPE 1'0 MATCN ADJACENT SECTIONS OR SPECIFlCATION 402, WHICHEVER IS CR/I TER. FIGURE J B TYPIC�iL SECTiON - TRENCH REPAIR CONCRETE PAVEMENT CT' OF FORf 15ORM IILif/SPORTAIION KURKS Df'Pr ENL7NfFR/NC DMSION J10T TO SGLE LONClTUDINAL JOlNT SPACINC STR£ET SPACINC W1DTN 28" dc JO' ON C/L 36' dr 40' ON C/L �r 8' FROM 13ACK OF CURB 44 , ON C/L dc l 1" OFF C/L 48' ON C/L & 12' OFF C/L 60' 6' &• 18' OFF C/L � � w L � I �O�r�T DEPTH I �PAV��.tENT JOWT pEPTH I THICKPlESS ( T/4 ) T= 5" t t/a" � � T= 6" 1 1/2" I � T= 7" 1 3/4" I T- g.. 2�. � sl I ` � '�s�, �i `;. ;1�— ' . 5sL1C6tJE J4fN� 5£AU1`ifi c+y kL , ~ � � 4 � � • �o�r�-rr�.eNe so�� �, - � , ` ��'— y BR�A;cER 4A,�f b S�v100�i�1 � �� RED'NOQ� EXPA�iSIQN �k � l�i�� /",,��, , J41NT �ILI£R fr � � � � � � I 1 � 1�,1 �I� 1 � 1 �X • �: •r � � • d.� . "'_'__��_�"__'..'_'_" ��}w�l, aUPF�RE BASKEi� J(ll�lT DEGAJI, N4. "! SEAL FOR IXPANSION JOINT NOT TO SCALE r��4�i : ��SIUCONE JOINT � 5 EALANT C R � 4 `� �rSAWED JOINT FACE � w � \ r . � � • � � � � 3/�" Ot�1. �LQS£� � � '.�`��.�/�~CELL EXPANDED � ' � ,, ' POIYETHYLENE FOA'd » , BACKER ROD ' • ._ 'COLD' JOIrJT CONSTRUCTION FIP.ST POUR SECON� POUR JOIKT DETAIL N0. 2 SEAL FOR LONGffUDINAL AND TRANSVERSE CONSTRUCTION BUT J01?J7 r�or ro sca�E � fl %4 =- � I��SlLICON� JQIN� � I S£AI�4NT � '�^� ��$A'N:D J�IN7 FA�E \ � � � � 3/8" OIA. C�OSED ' � ` CELI EXPANDED ' , ' PO�YEI'HYLENE FOA41 _ , 8ACKER ROD , � JOINT DETAIL N0. 3 SEAL FOR SAWED DUMh(Y JOINT NOT TO SCALE SUPPLE�{�P�T TO Tb:PW FICUR"c 1: WHcN EXISTING CO�CR�TE IS CUT, SUCH CUTS SHALL Ec I.UDE lh'ITH A CONCR=TE 5.4'N. ,� A�L SA'NINC Si.ALL 9c SUBSIQI?.RY TO Tii= UNIT COST OF THE fTEM FOrZ Yi41CH SA'NING IS R=OUIREO. JQ�;lT D�TAILS N0. 1,? & 3 0� THc T&?W PAVING OcfA1LS 5H;,LL B= po�i irAa� c r, � , n r� � �- EXISTING STREET PAVEMENT -7 � � �//////� � � L� � � w TEMPORARY PAVEMENT REPAIR SHALL BE HOT MlX ASPHALT, ROLLED 2" MlNIMUM .����„6„�„Q„�,,.Q_�.�0„�„�„p„-�„A„Q,,,�_0-r�„�„�uQ O p Q 4 G O 6 O Q O O C O O O O Q 6 �O O O 1 O�_S>J`Q„O_�U.,6�0„d„O„Q>O�G�9„O„O O.O„d.CS�O/s I Y / / / / / ' / � `// // I � M / // // �/ f �,//.. ♦ /� , ,�/ . //�': .� , �1 �M1N: 6� CG:N.�,�Gx�p A » .+� �tflr-�s� ,u,�r,aa.ac �1 1�� 1 �1 ��"��11 �� �� � �� �� 4 � �, �• . ��� �1 �t�rr�v.�r�a �c.+���rr�r. sKu� corvsrsr � ¢s�' Mwr.-a�� �€� oF rH1�v oR =,;^� fr.0h�f�recr Pr�cE'5'. ROCks� t+JnrPS Of _ CU`: 5�JC. IOM�' CdR VEG�a�49�.E Ad.i �R. J '� 6 �ftXJM UM, �= �i�hf� 1�9A, �,�Rff�L �R CR,�N'UI,�R �EMf3�El�MENT , ,�1,�� � � �\� � �` P ��� � ',' ���. � ';�/1` • �ti:y 1 f` `��� �#�,��� ',\iit��\1,_ �`INCLUDED lN LINEAR FOOT BID PRlCE OF PIPE EXC,�I/ATION, BACK�ILL �1 ND PAVEMENT REPA lR UNDER EXI S TING S TREETS CASE 3: EXlSTING PAVED STREET TO BE RECONSTRUCTED FIGURE A (N�ATER SIZES UP TO & I,VCLUDING 12') NTS sNcEr � o.= ? Rc-v. tiwr �. �: .. _ , EXISTING SrREET TEMPORARY PAVEMENT REPAIR PAVEMENT - SHALL BE HOT MlX ASPHALT, ROLLED 2" MlNIMU�y a00000aoo�oQoaG�00000�oQaAo�e+aopoov��+000a�o' o_o_o.o_a_o.c�_o_4_c.,,o_o_o.,a_o_o_a_o_o_o_ ��������/�;,/ i � / � � // � ' ,i i ����� � `• • 4 a , .4� 1 / /��//!' / //� / /�; • � ,� ," e � �� �M/N. 6" COAIPAC�D ,1� � • l�f� fZfX-9'LSf AIATcR�L 1� � �+� e . . 1� �� `� `11 � 4 Exrsr. easE ��� �� � � ;�-� * e�ca��ArFo �rERuc sr�ac� coNsisr �`M�', ' J��Y OF M,;T£R1AL FREE OF THlN OR ��,. ELONG.+TED PlECES, ROCXS, LUM?S OF � CLAY. SO/L, L0.4M 0,4 VECETAdLE MA7TcP, 1'-6 it44X/MUM. � SAND MATERIAL OR GRANULAR � � EMBEDMtNT � � � � � CRUSf�EO SiONE �INCLUDED lN LINEAR FOOT BlD PRICE OF PIPE EXCAI/�TION, BACKFILL AND PAVEMENT P, EPA I R Ul�l D ER EXI S Tll�l G S I REETS CASE 3: EY,I517NG PAVED STREET TO BE RECONSTRUCTED FIGURE B (SE�'/ER: ALL SIZES) (U/ArER: SIZES 16" & L4RGER) NTS sH�Er 2 0: ? R��v ti�a r a, �' �- e�'� c� E"�� E-� � E� ��'-'� �"� �� �� �� �--� �'"-s r-7 �-� i"� r� r� �VEJi TJCAL T!E D€�WEV fjLOCKJIVG (1YP� DIP 4t'ATER bfAlN 1�� T✓�GRl�S1 -s� �r�°� o.o. f •_G� �1N. M!!v. ,171P ��W�17 PIPE (PfFE SlZ� YAi71�5) Q�' ���� , ` (t)'P} `� �'� I ' �� I I I I' , . • '. I • C0NC �'{'1 s � �h'tiRL� INATER LINE ADJUSTMENT DETAIL N. r.s. � � � C��AJI�OU7 14"f FP�' 8f�� ANf) '�lf1 5�1� GGJe.J�I�+JN'G F�Y� F]Nf5�hl�`I7 GR�D£ � 'I �f� ( �" , � ~ _ � - I � �•!'���� SEWER A�P� PLUG �` I' �' - �.. .. �� . . ,. �-LT _ _ � �. . • t�r� �'o�t sl��ae�' � � � • ` �. 1�- 4 w � �_� - , . _I i� ti w � �� O � � � � �JNISME'D CF�q11�' � a���%����"i��� �a�«�__--_�� � � �,• � :,:� ��xisr�ivc s��v,e� u�v� � / _ .. . . ... . . . . ." _ .�h-- . 1 I � .; �. , ,� �i��L"f� � 6" �4fFN A1" l�OiT}M' ONLY . .. ���� '"° �s ` e�'1wa ,` �;,• .�. ° ?�• _ _�: �' �G� TYP£ C'" DR B" ,Bi4CKFILL fVEi�Y SAlVIT,4FrY SEWER LPNE W17N 5TANP�V!?1T �MB�E�M�NJ� f'ER f!G �49 an�a,�re� �cauPc��r� CROSS-SECTION OF SEWER AT SERVICE CONNECTION P I ��' � - • o�� r�e �rr�rnrc � _ -i I i� -:� . . , � �.�.� I ;�'' � � I � . ` - - - ! .. �'�.�� � � , -.'' '•�• c' ' -- . . _., —. -.�, ���`. �------•r� - �---�-�` - — — ------- � -� .. _ � '-,�l � �,� ,�f--�-� i1 - --------,_a�� _ :t�� ��.; :'f:.. I�', 1 4 r. . � . � � � - . , . ' . . - ���.�^ I � .. � . � o N � �V � I'' � `- � i � i �;, , � � w _ -.i i a �� i � �. , �,�� �I� o i PLAN VIEW CH MNEY SERVICE (NOT TO SCALE) i 2� i I I � � � � � � � � � � � coM��cr,�o eF�v�o�v,r� cr�r � — — — �,,, I.� 0R 2':27 C�1NCR4TE � � � � � w f — ___._a �, .�� � � � � �� � � j� — —. .— — — � SE�'Ic"R 1,=��dl �-----�+, � !� — — — — — — �s � ,�-�------�, � ►"G • • • 1 _ - - _ - _ _ � i ■ a , ,� �. � � ��'''� ���r�.� � � � � C+�+�IraACie� i�'�MI�'C7PJlT� CLJ4Y L7F2 2:2T CDM�F?cTE ��1IG�lII�ll�i�'�'—' Sl-141� �'— k' I !TI d E- �'' I P�-1i,— .�� , U�`l�lSFt1REED S�alL � � .r^J?� � !�7!'�i � ,►,fINI�A�+'h.! �R€1^J�1-f �','�pT,�i r F"IP� �IA + J' (�..� � ��f �' ���1 '7l �l �� ���� ��� ������������ NOT TO SCALE ''�� DU\TAtivAY ASSOCIATES, Inc. e�c���e�s - Pu`�ees - suftvevoss iso� Ei?R�:�UC CIRGLe. SUIT6 ioo FO?T A'OR':F:. TEXx5 7d107 PH.(B:7)��5-ll2l S!E'fR0(�t7)426-21J5 FA.'(�di7)7]5-7i97 APPENDIX B EASEMENT DOCUMENTS TEMPORARY RIGHT-OF-ENTRY AGREEMENT s ' ' L�' 1 '"' 9654300_Specs wpd � � EASEMENT DOCUMENTS � Three copies (in 3-ring binders) of all the right-of-entry forms and all easements (temporary construction and permanent) obtained for this project are available for examination at the plans desk of the � Department of Engineering. Bidders shall be provided with copies of any right-of-entry or easements upon request. The terms of all Special Provisions or Conditions for easements shall be applicable. The � responsive low bidder(s) will be furnished with a copy of Appendix B after award of contract. Bidders shall not remove any of the three copies from the plans desk. ' 1 1 ' L�� C 1 1 � 1 ! 1 1 ' 9GSa300_Specs.wpd Appendix B - 1 Sanitary Sewer System Rehabilitation and Improvements Contract XLV (45) Water Department Project No. PS 46-070460172890 DOE Nos. 0798, 2348, and 2349 Parcel # Address: LOT _, BLOCK , Subdivision: TEMPORARY RIGHT-OF-ENTRY AGREEMENT Owner: herewith grants permission tot he City o£ Fort Worth and its independent contractor, to enter upon the Owner's property located at LOT _, BLOCK , Subdivision: , also described as (premises), for cleaning, rehabilitation, replacing, or constructing a sanitary sewer or sanitary sewer manhole. Any entry and use of the premises by the City of Fort Worth or its independent contractor under the Right-of-Entry agreement shall be permissive and shall not constitute a trespass to the property by the City or its independent contractor. The City of Fort Worth further agrees to restore the premises to the same condition that existed prior to entry. If restoration is required, the work shall be performed in a timely manner, weather permitting. This agreement is executed this day of , 19 , by Owner: OWNER: 9654300_Specs wpd Appendix B- 2 APPENDIX C GEOTECHNICAL REPORT 1 9654300_Specs.wpd � � FUGRO SOUTH, INC. � ��, I� SUBSURFACE EXPLORATION STUDY � CITY OF FORT WORTH SANITARY SEWER REHIBILITATION - �-� CONTRACT XLV (45) - WATER PROJECT NO. PS46-070460172890, _. DOE NO. 0789 �. FORT WORTH, TEXAS � � J � � � �` +,.1 for CITY OF FORT WORTH, TEXAS � �4'e r`� r � �r,�:��'"�~ �".: � 'r .� �_ .. , t _� � � �� , ' r—• � _r'�' :3�� . ,,,,� �`' ,�,; '" _�� » �. , � ra as � ��M � � �� 7 � k �r �, ' �- � rt,,�:. �_—� " �--'--_ —� H�,7JGRO ��;.. _ 7 ti• - �\ _�;:1"•� ;.�,. a `�� FUGRO SOUTH, INC. P�oposal No. 1401-0124 July 8, 1998 Dunaway Associates, Inc. 1501 Merrimac Circle, Suite 100 Fort Worth, Texas 76107-6512 Attention: Mr. Rich DeOtte, P.E. -- Subsurface Exploration Study � City of Fort Worth Sanitary Sewer Rehabilitation - Contract XLV (45) � Water Project No. PS46-070460172890, DOE No. 0789 Fort Worth, Texas 2517 East Loop 820 North Fort Worth, Texas 76118 Tel : (817) 284-9595 Fax: (817) 284-4480 Submitted here is the subsurface exploration data report for the above project. This data report was conducted in general accordance with the scope of services described in our Proposal No. 1401- 0124 dated January 15, 1998. The services were authonzed by Mr. Rich DeOtte on June 17, 1998. Subsurface exploration field data and laboratory data, are presented in the data report. We appreciate the opportunity to provide professional services to Dunaway Associates, Inc. and the City of Fort Worth. Please contact us if you have any questions or if we may be of further service at this time. Sincerely, FUGRO SOUTH, INC. �� � Michael T. Taylor Project Manager � ����''``��►� �OF�r 1 8C1f . ��bI�C�,��. Branch Manager Texas No. 73399 SSA:pmg Copies submitted: (2) Dunaway Associates, Inc. (1) Mr. John Boyer, City of Fort Worth, DOE �,�,��•�' •• �-�4..►1 r ,R+��' � R � ��* �� � •���.���������• ���� STA�LY SCOTT ALFORO % ..... .......e..� �a : 73399 �,�'� ��°��� �, s�� � �� �� �_� � Gr �P . � • �► � �� o+�A �,.r. A member of ihe Fugro group of companies with offices throughout the world. � _ _ __ __ _ __ � � � � � � � � � t , SUBSURFACE EXPLORATION STUDY CITY OF FORT WORTH SANITARY SEWER REHIBILITATION - CONTRACT XLV (45) WATER PROJECT NO. PS46-070460172890, DOE NO. 0789 FORT WORTH, TEXAS for CITY OF FORT WORTH, TEXAS �aiRD � �• �� Fugro South, Inc. 2517 E. Loop 820 North Fort Worth, Texas 76118 PhonP 817/284-9595 Fax 817/284-4480 C Report No. 1401-0124 TABLE OF CONTENTS - - - --- — - ��'sR0 ��� � r�� 1.0 I NTRODUCTI ON ................................................................................................... 2.0 FIELD EXPLORATION .......................................................................................... 3.0 LABORATORY TESTING ...................................................................................... 4.0 SUBSURFACE CONDITIONS ............................................................................... 5.0 CONSTRUCTION OBSERVATIONS ..................................................................... 6.0 REPORT CLOSURE ............................................................................................. REFERENCES...................................................................................................... APPENDIX A Paqe 1 2 3 3 5 5 R.1 Plate PLANOF BORINGS ........................................................................................................ A.1 BORING LOG TERMS AND SYMBOLS ........................................................................... A.2 BORING LOG GENERAL NOTES .................................................................................... A.3 LOGS OF BORINGS ........................................................................................................A.4 - A.10 APPENDIX B Plate LABORATORY TEST RESULTS ...................................................................................... 6.1 UNCONFINED COMPRESSION TEST RESULTS ........................................................... B.2-B.5 w Report No. 1401-0124 1.0 INTRODUCTION �LGRO ��� � 1.1 Project Description �` This data report presents the results of the subsurface exploration for sanitary sewer rehabilitation � and pavement repairs (Water Project No. PS46-070460172890, DOE No. 0789) in Fort Worth, Texas. The project is locatad at two separate locations. One site is located east of the intersection of Briardale Road and Business Highway 287 in southeast Fort Worth (Borings B-1, B-2, and B-3). R" The other site is located near the intersection of Forest Park Boulevard and Park Hill Drive in southwest Fort Worth (Borings B-4, B-5, B-6, and B-7). � The overall project will consist basically of new construction of a gravity flow sewer line. This subsurface exploration data report addresses a section of L-5125 for a proposed 8-inch sanitary � sewer (Borings B-1, through B-3) and a section of M-74R for a proposed 10-inch sanitary sewer (Borings B-4 through B-7), as shown on the attached Plan of Borings, Plate A.1. � During the time of our field exploration, the Briardale Road site consisted of mainly a neighborhood ' setting (near Borings B-1 through B-3) and the Forest Park Boulevard site consisted mainly of small �. retail and apartments (near Borings B-4 through B-7). All the borings were drilled on asphalt paved 4, roads. 1.2 Purpose and Scope The purpose of this subsurface exploration data report has been to determine the general subsurface soil and ground water conditions and present laboratory test results of the subsurFace materials encountered. It was recognized at the start of the data report that the scope of services was not intended to fully define the variability of the soil types and conditions which could be present over the entire site area or provide geotechnical engineering recommendations for the sewerline, manholes, or any other structures. To accomplish its intended purposes, the data report has been conducted in the following phases: (1) drilling sample borings to determine the general subsurface conditions and to obtain samples for testing; and (2) performing laboratory tests on selected samples to determine pertinent engineering properties of the subsurface materials. The design is currently in progress and the locations and/or elevations of sewerline and structures associated with the sewerline could change. 1 Report No. 1401-0124 1.3 Data Report Format The text of the data report is contained in Sections 1.0 through 6.0. A list of references is presented immediately following the end of the data report text. The reference list contains general references which were used during this data report, but are not specifically cited in the text. All plates and large tables are contained in Appendices A and B. The alpha-numeric plate and table numbers identify the appendix in which they appear. Small tables of less than one page in length may appear in the body of the text and are numbered according to the section in which they occur. Units used in the data report are based on the U.S. Customary (foot-pound-second) system and may include tons per square foot (tsfl, kips (1 kip = 1,000 pounds), kips per square foot (ksfl, pounds per square foot (psfl, pounds per cubic foot (pcfl, and pounds per square inch (psi). 2.0 FIELD EXPLORATION Subsurface materials at the project site were explored by 7 borings drilled to depths of 15 to 25 feet in the area of the proposed sewerlines. The borings were drilled June 22 and 24, 1998, at the approximate locations shown on the Plan of Borings, Plate A.1. The boring locations were selected by Dunaway Associates, inc. The boring logs are included on Plates A.4 through A.10 and boring log terms, symbols, and general notes are provided on Plates A.2 and A.3. � Undisturbed samples of cohesive soils were obtained with nominal 3-inch diameter thin-walled (Shelby) tube samplers at selected depths. The tube is hydraulically pushed into the soil by the drilling rig. The soil samples were extruded from the tube in the field, logged, and packaged to limit � loss of moisture. � The unconfined compressive strength of cohesive soil samples was estimated in the field using a � calibrated hand (pocket) penetrometer. The results of these tests, in tsf, are listed at the various " sample depths in the appropriate column on the logs. The maximum capacity of the penetrometer is -- 4.5 tsf. When the capacity is exceeded, the value is listed as 4.5+. � � � � To evaluate the relative density and consistency of the harder formations, a modified version of the Texas Cone Penetration test was performed at selected locations. Texas Department of Transportation (Tx-Dot) Test Method Tex-132-E specifies driving a 3-inch diameter cone with a 170- pound hammer with a free fall of 24 inches. This results in 340-foot pounds of energy for each blow. This method was modified by utilizing a 140-pound hammer with a free fall of 30 inches. This results in 350-foot pounds of energy for each hammer blow. In relatively soft (soil) materials, the 2 � �� t� � Report No. 1401-0124 GRO � penetrometer cone is driven 12 inches and the number of blows is shown at the various test depths on the boring log. In hard materials (rock or rock-like), the penetrometer cone is driven a total of 100 blows. The penetration in inches for the 100 blows is shown at the various test depths on the boring logs. Disturbed samples of noncohesive granular or stiff to hard cohesive materials were obtained at selected depths utilizing a nominal 2-inch O.D. split-barrel sampler in conjunction with the Standard Penetration Test (SPT). The SPT utilizes a 140-pound hammer with a free fall of 30 inches, to drive the split-barrel sampler. The number of blows required for 12 inches of penetration after an initial seating interval of 6 inches, is shown as the SPT "N" value at the appropriate depth on the logs of borings. If less than 6 inches of penetration is achieved, either during or following the seating interval, the test is terminated and the number of inches achieved during the 50 blows is shown on the boring log. Ground-water observations during and upon completion of drilling of the borings are shown on the �'• boring log. Upon completion of the borings, the boreholes were backfilled with soil cuttings and ' plugged at the surface by hand tamping and the existing asphalt pavement was patched with pre- -, mixed asphalt. 3.0 LABORATORY TESTING Routine laboratory tests were performed on specimens from selected samples recovered from the borings. These tests included moisture content, liquid and plastic limits, percent passing the No. 200 sieve, unit dry weight, Torvane shear, and unconfined compressive strength The results of these tests are shown at the respective depths in the appropriate columns on the boring logs. The results of the unconfined compressive strength tests, along with stress-strain curves, are also presented on Plates 6.2 through 6.5 The above laboratory tests were performed in general accordance with applicable ASTM or U.S. Army Corps of Engineers procedures, or generally accepted practice. 4.0 SUBSURFACE EXPLORATION 4.1 Geology Based on available geological maps and field observations, the Briardale Road site (Borings B-1 1 through B-3) is located within the Pawpaw Formation, Weno Limestone, and Denton Clay undivided and the Grayson Marl and Mainstreet Limstone undivided geological formations. The Forest Park �. 3 � Report No. 1401-0124 GRO � Boulevard site (Borings B-4 through B-7) is located within the Fort Worth Limestone and Duck Creek Formation undivided and the Pawpaw Formation, Weno Limestone, and Denton Clay undivided geologic formations. 4.2 Subsurface Stratigraphy Specific types and depths of subsurface strata encountered at the boring locations are shown on the boring logs in Appendix A. The generalized subsurface stratigraphy encountered in the borings is discussed below. Overburden soils encounte�ed in the borings consist of lean clay, lean clay with sand, clayey sand with gravel, and sandy lean clay. The thickness of the overburden soils at the boring locations at the Briardale site ranges from approximately 6.0 to 25.0 feet. The thickness of the overburden soils at the Forest Park site ranges from approximately 2.0 to 22.0 feet. The clayey soils are generally stiff to hard (soil basis) with pocket penetrometer readings of 1.75 to over 4.5 tsf and torvane shear strength values ranging from 0.5 to 2.2 tsf. Liquid limit and plasticity index values ranged from 20 to 59, and 10 to 36, respectively. Percent passing the number 200 mesh sieve ranged from 25 to 86. Unit dry weight values ranged from 97 to 122, and moisture contents ranged from 8 to 26. The tan weathered limestone at both sites was hard to very hard (sedimentary rock basis) with THD cone penetrometer values ranging from 0.125 inches to 1 inch per 100 blows. The gray limestone at both sites was very hard (sedimentary rock basis) with THD cone penetrometer values ranging from 0 inches to 0.167 inches per 100 blows. 4.3 Ground-Water Observations � Ground water was not observed in the borings at the time of the field exploration on June 22 and 24, ` 1998. It is not uncommon, however, to find ground water (perched water tables) along the surface of —. the limestone encountered in the borings with the amount dependent upon area rainfall. Fluctuations of the ground-water level can occur due to seasonal variations in the amount of rainfall; site topography and runoff; hydraulic cond�ctivity of soil strata; and other factors not evident at the time the borings were performed. The possibility of ground-water level fluctuations should be considered when developing the design and construction plans for the project. 4 � - - -- --- -- - ---- Report No. 1401-0124 ;;Rp .�` � � r" . Water traveling through the soil (subsurface water) is often unpredictable. This could be due to seasonal changes in ground water and due to the unpredictable nature of ground-water paths. � Therefore, it is necessary during construction for the contractor to be obsenrant for ground-water a�" seepage in excavations in order to assess the situation and take appropriate action. 5.0 CONSTRUCTION OBSERVATIONS In any subsurface exploration data report, the recommendations are based on a limited amount of -- information about the subsurface conditions. The engineer must assume the subsurface conditions _ are similar to the conditions encountered in the borings. However, quite often during construction, � anomalies in the subsurface conditions are revealed. Therefore, rt is recommended that Fugro be retained to observe actual subsurface conditions in the excavations and perform materials evaluation � and testing during the construction phase of the project. This enables Fugro to be available to evaluate unanticipated conditions, to conduct additional tests if required and, when necessary, to recommend solutions to unanticipated conditions. It is proposed that construction phase observation and materials testing commence by Fugro at the outset of the project. Experience has shown that the most suitable method for procuring these services is for the owner or the owner's design engineers to contract directly for these services, rather than requiring the contractor to contract for construction matenals testing services. � 6.0 REPORT CLOSURE � The borings for this data ��port were staked by Fugro, using approximate taping methods from existing topographic features. The actual boreholes were placed as close as practical to the staked � locations. The elevations of the borings were taken off the preliminary construction plans and profiles provided by Dunaway Associates, Inc., dated October 3, 1997. The locations and elevations of the borings should be considered accurate only to the degree implied by the methods used in their � determination. The boring logs shown in this data report contain information related to the types of y soil encountered at specific locations and times and show lines delineating the interface between these materials. The logs also contain our field representative's interpretation of conditions that are � believed to exist in those depth intervals between the actual samples taken. Therefore, these boring `` logs contain both factual and interpretive information. Laboratory soil classification tests were also � performed on samples from selected depths in the borings. The results of these tests, along with visual-manual procedures were used to generally classify each stratum. Therefore, it should be ' � 5 � i A - -- - - --- -- - ---------- ------- ---- ---- Report No. 1401-0124 �p�p � - � id- — ----- -- _ __ I � _ understood that the classification data on the logs of borings represent visual estimates of classifications for those portions of each stratum on which the full range of laboratory soil classification tests were not performed. It is not implied that these logs are representative of �" subsurface conditions at other locations and times. � With regard to ground-water conditions, this data report presents data on ground-water levels as they were observed during the course of the field work. In particular, water level readings have been �"" made in the borings at the times and under conditions stated in the text of the data report and on the boring logs. It should be noted that fluctuations in the level of the ground-water table can occur with passage of time due to variations in rainfall, temperature and other factors. Also, this data report � does not include quantitative rnformation on rates of flow of ground water into excavations, on pumping capacities necessary to dewater the excavations, or on methods of dewatering excavations. I� Unanticipated soil conditions at a construction site are commonly encountered and cannot be fully predicted by mere soil samples, test borings or test pits. Such unexpected conditions frequently require that additional expenditures be made by the owner to attain a properly designed and I�' constructed project. Therefore, provision for some contingency fund is recommended to ' accommodate such potentio! extra cost. � The information contained in this data report is based on site conditions as they existed at the time of our field exploration. If, during construction, different subsurface conditions from those encountered � in our borings are observed, or appear to be present in excavations, we must be advised promptly so that we can review these conditions. If there is a substantial lapse of time between submission of this data report and the start of the work at the site, if conditions have changed due either to natural � causes or to construction operations at or adjacent to the site, or if finish grades are changed, we urge that we be promptly informed and retained to review our data report considering the changed � conditions and/or time lapse. The scope of our services did not include any environmental assessment or investigation for the � presence or absence of wetlands or hazardous or toxic materials in the soil, surface water, ground water or air, on or below or around the site. The scope of our seniices also did not include any � geotechnical recommendations, evaluation of the site for suitability for the intended construction or use, other than those items specifically addressed in this data report. ' � � � — ----- --- - - ---- - - - - - ----------- -- - — RepoR No. 1401-0124 1 ___ __ _ _ _ _ _ _ __ ______ _ � This data report has been prepared for use in developing an overall design concept. Paragraphs, statements, test results, boring logs, diagrams, etc., should not be taken out of context, nor utilized without a knowledge and awareness of their intent within the overall concept of this data report. The reproduction of this data report, or any part thereof, supplied to persons other than the owner, should indicate that this data report was made for verification of the subsurface conditions at the time of drilling and that for other purposes including, but not limited to determining difficulty of excavation, trafficability, etc., is the responsibility of others. This data report has been prepared for the exclusive use of the City of Fort Worth and Dunaway Associates, Inc. for specific application of this project. The only warranty made by us in connection with the services provided is that we have used that degree of care and skill ordinarily exercised under similar conditions by reputable members of our profession practicing in the same or similar locality. No other warranty, expressed or implied, is made or intended. * � * * 7 Report No. 1401-0124 1 2 3 4 5 6 7 E:3 ------- -- G RO �� �a�✓i1� REFERENCES American HeritaQe Dictionarv, Second College Edition, Hougton Mifflin Company, Boston, 1985. Dictionary of Scientific and Technical Terms, Parker, Sybil P., Editor in Chief, McGraw-Hill Book Company, Third Edition, 1984. Dictionary of Geoloaical Terms, Bates, Robert L. and Jackson, Julia A., Editors, American Geological Society, Anchor Press/Doubleday, Third Edition, 1984. American Society for Testing and Materials (ASTM), 1997 Annual Book of Standards, �!olume 4.08, Soil and Rock (I). American Society for Testing and Materials (ASTM), 1997 Annual Book of Standards, Volume 4.09, Soil and Rock (II); Geosvnthetics. Fisher, W. L. , Director (1972), Bureau of Economic Geology, The University of Texas at Austin, GeoloQic Atlas of Texas - Dallas Sheet. Department of the Army, Office of the Chief of Engineers, Corps of Engineers, Laboraton+ Soils Testinq, EM 1110-2-1906, 30 November 1970, with change 2 dated 20 August 1986. Texas Highway Department (TEX-DOT), Bridge Division, Foundation Exploration and Desian Manual, July 1972, Revised June 1974. I�� � Q X � � Z W a a Q � ,�, r .."' .. �" r �'' - - � � � �. r � Report No. - 1401-0124 SR�P,�rR�,�LE R�,�� _ ��� � �{�� _ /� � ► � R;I G>��� l �l�^�i �TR��T � . �-� � �� � �L,�N o� �o�► �t�s (NOT TO SG�L�) . ,��: , _ �+pprax��ra� P�I Boring Locatlone . P1�4o G 1 Report No. - 1401-0124 �'��K �J�� '���1/ B-� � � �_� . . rc . , �l-�i �� '�"l� ��l �� �C� � I �1�� ��a-� `�a ��,�1��� LE6END: _ ,4pproxlmate �-� Boring Locatlone Plata A 1 � � Report No.1401-0124 a Sand Silty .' Sand ' Clayey �� Sand � Asphalt SOIL / MATERIAL TYPES � Silt � Ciay Sandy � Sandy ��� - Silt ''� Clay �Clayey � Silty � Silt Clay �Concrete �: n . °'o'. � Gravel �Peat or Highly Organic Debris or � Mixed Fill . SOIL GRAIN SIZE � U. S. Standard Sieve 6" �"' 3/4" 4 10 40 200 I Boulders I Cobbles � Gravel I Sand � Silt Clay � � Coarse � Fine Coarse � Medium I Fine � 152 76.2 19.1 4.76 2.00 0.420 0.074 0.002 (mm) � PLASTICITY CHART sa � � I .�. / � so �. ^ � �� r firl � a4 �/� / � �� 'F�5 � � � � � •O' � 5 �ClAYSC � �Q �� a SANCMcr �� '� 91LTYGLAYsto �'� �� � � � CLAYEY 9fLT&� �� j � �� ��6 NIC SfLi9 / OR CLAYEV SCLP9 9ANDY gIlT9 I I 81k.Tp ° o i a 20 �� 4a so sa �a aa so � o0 � LI{�U4� LIMIT SOIL STRUCTURE � Slickensided Having planes of weakness that appear slick and glossy. .,, Fissured Containing shrinkage or relief cracks, often filled with fine sand or silt, usually more or less vertical. Pocket Inclusion of material of different texture that is smaller than the diameter of the sample. --� � Parting Inclusion less than 1/8 inch thick extending through the sample. -n- Seam Inclusion 1/8 inch to 3 inches thick extending through the sample. ' �ayer - - Inclusion greater than 3 inches thick extending through the sample. Laminated Soil sample composed of elternating partings or seams of different soil type. Interlayered Soil sample composed of alternating layers of different soil type. � tntermixed Soil sample composed of pockets of different soil type and layered or laminated structure is not evident Calcareous Having appreciable quantities of carbonate. (12 to 49%) Carbonate Having more than 50% carbonate content. � � Plate A.2 1 ReporiNo 1401-0124 -- ----- ----- - -- --------- ------ GRO �� r� `� - _ _ -__�'_____'.-.._ _ _ _.__ ___-. � STANDARD PENETRATION TEST (SPT) A 2-in.-OD, 1-3/8-in.-ID split spoon sampler is driven 1.5 ft into undisturbed soil with a 140 - pound hammer free falling 30 in. After the sampler is seated 6 in. into undisturbed soil, the number of blows required to drive the sampler the last 12 in. is the Standard Penetration Resistance of "N" value, which is recorded as blows per foot as described below. � � , Blows Per Foot Description 25 ------------------------25 blows drive sampler 12 inches, after initial 6 inches of seating. 50/7"-----------------------50 blows drive sampler 7 inches, after initial 6 inch seating. Ref/3" ---------------------50 blows drive sampler 3 inches, during initial 6 inches of seating interval. NOTE: To avoid damage to sampling tools, driving is limited to 50 blows during or after seating interval. DENSITY OF GRANULAR SOILS STRENGTH OF COHESIVE SOILS Undrained Descriptive 'Relative Shear Strength, Blows Per Foot (SPT) Term Density, % *'Blows Per Foot (SPT) Term ksf (approximate) Very Loose------------------ < 15------------------ 0 to 4 Very Soft----------------------- <0.25---------------- � to 2 Loose-------------------- 15 to 35---------------- 5 to 10 Soft--------------------- 0.25 to 0.50 --------------- 2 to 4 Medium Dense------- 35 to 65------------- 11 to 30 Firm-------------------- 0.50 to 1.00---------------- 4 to 8 Dense------------------ 65 to 85-------------- 31 to 50 Stiff--------------------- 1.00 to 2.00 ------------- 8 to 16 Very Dense----------------- > 85------------------- > 50 Very Stiff-------------- 2.00 to 4.00------------ 16 to 32 'Estimated from sampler driving record. Hard--------------------------- > 4.00----------------- > 32 ""Requires correction for depth, groundwater level, and grain size. SHEAR STRENGTH TEST METHOD �^ U= Unconfined Q= Unconsolidated - Undrained Triaxial P= Pocket Penetrometer T= Torvane V= Miniature Vane Information on each boring log is a compilation of subsurface conditions and soil or rock classifications obtained from the field as well as from laboratory testing of samples. Strata have been interpreted by commonly accepted procedures. The stratum lines on the logs may be transitional and approximate in nature. Water level measurements refer only to those observed at the time and places indicated, and can vary with time, geologic condition, or construction activity. TERMS AND SYMBOLS USED ON BORING LOGS SOIL CL4SSfFICATION (2 OF 2) Jw Plate A.3 � REPORT NO.: 1401-0124 START DATE: 6-22-98 END DATE: 6-22•98 COMPLETION DEPTH IFT): 25.00 TYPE: Auger LL (%� S � � � o m NO WATER OBSERVED IN BOREHOLE LOG OF BORING NO. B- 1 Sanitary Sewer Rehabilitation Fort Worth, Texas LOCATION: See Plate A.1 z � �p Qr 3e T a°` y_ Q� ��` V7 �- ti - z�o o,L o SOIL / ROCK >LL ¢� p= U� a ZW ¢ � LL x a3" ¢ ii m � J� Q"' �� �Qna �'w ?"' �= Z Y a ~ m a � t � CLASSIFICATION = Q a 3 z �� � Nc p fn ipn Q 0 O Z V¢ �n y ¢ p O � a� a? a o = 3 O 7 a EXISTING GRr.DE ELEVATION: 628+/- w 4.5+ 50/7' 100/0.5' ;— 5 — 7.75 ; � b � � Q Q ,�15— 3.s „ �100/0.125" —2�— �' - tooio- •-25— ASPIiALT SURFACE WffH GRANUTAA BASE I I CLAY, light brown, with weathered tan limestone seams and ��� I \.� iraces of gravel, hard I 'A � I I I I I /' ' I I I I '' :' LEAN CLAY (CU, light gray to gray with traces of gray 7.0 19 34 15 19 86 0.5 - ������`r'�/�; limestone fragments, stitf to hard - �' %�; _ :!:�ri! .� . _ I I I I I %' /• _ I I I I I � � 26I 59 23I 36I 97I 2.2I — ,i � LIMESTONE, gray, interlayered with shaley marl, vei� hard 17•0 I I I I � i 0 .. T I I I I I � � � � � � � � � � ._ � � � � ------------•-------•--•-------•--•---------------� � 25.0 KEY: THIN WA�LED TUBE = ROCK BIT THD CONE Q SEEPAGE LEVEL AUGER ;� SPLIT BARREL � ROCK CORE = WATER LEVEL �IPLATE A. 4 � ` 3.75 ! �' a a.s+ � 10611' ' �lau�a, t �a• —1O— - - r�sio' _rs- _ s �oaro- — �4 — REPORT NO.: 1401-0124 STAp7 F3A r E: 6-F2-98 €Nb tDATE; 6-22-38 COMPLETI4N DEPTH' (FT�: �p.00 TYPE: Auger � un � r �' � y} � � W J W 3 � � y � = 4 O pC � � � W is� c"'. v � � 4 V Z � ¢ EXISTING GRA�E ELEYATI4N: f>13+h � hsr�w�r su�nce wrrt� ��Aar+uun eASE :%ie;' SAWOY Lfl4H CLAY fCd.F, If�ht bvown� wi1Po limest�one iraganan[s and sand seanna, very atsff ;;i; j" � ( CLAY�If SANi7 {5+L'�, light 6rown, s.hdey 3�1am6, hard � YYFJ!�71fERFD 1dME570NE. tan and gray, haid td very haM � l7MESTONE, gray, in;erfayareQ witV� aha�ey maA. �ery hard �tO WVATER Q9SERVEb �N eQ��NULE ��I� � ���� CLASSI�ICATIt]N LOC QF BC3RING N�. B- 2 5an14a�y Sewer Rehe�llitatran For3 Worth, T�exas Li}�ATIpN: 8ee '�axe A.1 z 0 � � � � � � � � LL � Q � V � � � � � � � � � 0 � � � �y ,�x r- � 3 Ih� F X Zw �"' � Y � �8 �q �� �� �Z Q� jw � 7 � 3 0 � _ � � � � � � � _ 1.4 32 35 1S 2� 59 t22 1.6 4.3 I I I I I I ' a'a � � � � � I� � zol tol tol 2sl 6.+4 I I I I � I „ �al � � � � � - , � � � � � � � ^ � � � � � � � ----- ----------••---•----•-------------------------------� zd.a � I�EY: TNIN WALLED TUBE = ROCK BiT THD CdIV€ � SEEPAGE IEVEI. a���� I;� s��i� e����� �ocK ��R� X WJATER �LEVEL PLA�T� A, 5 REPORT NO.: 1401 •0124 STA�iT DAi�: 6-22-�8 1+IQ WATER �t78SERVE�] fiV BQREHOLE EMI7 DAiE: 6-22-9$ Cf]MP��T6O1� DEPTH ;F1'�: 25.{Da TYPE: Aoagsr � uo ap � � � ��� � � � � � U Ct � � � �ma d Y 9 V 2 W y � � � _ . 4.5+ � f 4.5+ — � ` 4.5+ _ T 4.5+ � � � � 4.25 � 15 — �.�s � 3.?5 _ g,� _ � } T.75 —25 SOIL ! Ft�CK CLASSIFICAT�flN EXISTING GftAf3E ELEYATICIN: 6$7 �1- ASPFIAL7 S'UFeFACE W'ffFl GRAN1}lAR HASE CLAY. 6rown, wiih lfaces of sand', h�r� l.{.1G +�� B�RING N4. 8- 3 Sanitsry Sewer Niehab�ticativn Fort Worth. Texas L{�CA�9Qi+1: See F'fate A.1 z 0 � � aR � > p a� "� m }� �� �e: U FiT �-'W ¢� ''~ '� � Wr Q'� L7� �� tl5W ?� 6i � Y �o �Q �� 4? �� a8 '3 0 � � �} .l J 6 y'/ H � v� �/ l/ . LFAN CLAY IMTFp SkND CCRl. brawn, wrth limestane - }ranmwnre. u ei�iff rn harr! � I a3l 42I m7 25 l�4I I t.2 � � � � � � = � � � � � � = CFJUV fiLAY WRH SAND (CA.F. YghT brown [a hrctwn, vary snt'R 17.C5I I I I I I „ I I I I I I I 2� I 42 I 13 29 i8 I I i.d I 6.3 � � � � � � �, � � � � � � � I,�.�- -------------•------------------------------------- — � ' zs.� . ICEY� TWIN WALLED TU�� AC}CK Bli TFSD CONE � SE�PAGE LEVEL AI�G€R ��PLIT �ARi4EL A0CK CCYR£ � WATER LEVEL PLATE A. 5 REPORT NO.: 1401-0124 START DATE: 6-22-98 END DATE: 6-22-98 COMPLETION DEPTH IFTI: 22.00 TYPE: Auger � C N lL H F- N � w�� a wma w O U Z S _ _ 6.5 i 4. 5 i — 5 a.s+ 4,5+ '-��- 4.5+ _15- 4.5+ -2�- 4.5 + � KEY O � W � o a ¢ a m � � � U tan y ¢ NO WATER OBSERVED IN BOREHOLE SOIL / ROCK CLASSIFICATION LOG OF BORING NO. B- 4 Sanitary Sewer Rehabilitation Fort Worth, Texas z O H r_ J LL � O W H = a � w ¢� � EXISTING GRADE ELEVATION: 596+/- v~i � ASRiALT SURFACE WfTH GRANULAR BASE . �- CLAY, ligh[ brown to brown with sand and gravel Ipossible filll, hard � SANDY LEAN CLAY (CLJ, light brown fo brown, with some limestone fragments, very stiff to hard �� . � CLAYEY SAND Wf1H GRAVEL (SCI, hrown, hard THIN WALLED TUBE � ROCK BIT � THD CONE AUGER �y� SPUT BARREL ITI ROCK CORE LOCATION: See Piate A.1 � � � y � � LLU N ¢F p: U_ Fa Z W ¢a ~ fi �,� �� �a fv-.,x z„�, �� z Y 3 Z O~ g� N � N N z l7 � U O ? a? �? ao � S � u � aN 3 O � I I I I I I I I 1.0I I I �� 1 I I I I 7.0 1 1 40 14 26 68 7 7 8 7.6 I I I I I I I � 12 I 29 78 I 11 I 62 I I 1.5I 18.0� I I I I I I I I � � � � 12 I I I 42 I I 22.0 � SEEPAGE LEVEL 1 WATER LEVEL PLATE A. % I ' . REPORT NO.: 1401-0124 S4ART �ATE. 6-24-98 E4Yd DATE: 6•24-J8 COAIlFL�3�C}N REPTH jFTj: 35.�� TYP�: Auger LL ua � � N � (} � V7 fJL� WATER {34�ERV�p iM BQREHOILE i�+�}G �� �C]FiING IVO. E3- 5 5anitan,r Sewer Rahabilrt�t�an Fart W4Kh, 7exas LOCATI�N: See Plate A,1 x 1�1 I C� V a � � :R > Q 8� �c� f/! Z cr� � a `u O .�I�1'�i. J f7QCiM1 � � � H e � '� �� ~ � � ui G 4L :v �i � w� ua � p�, m Y] � S {- � 3� V�1 '[L V tC S7 ] �� u+ Y _ °'"¢ _ � � CLASSfFlC�ITICMi� � w� �� �� ,. �W �� -_ � � � m � � SA � �� �q J� ��S �Z �O ' W � 7 LJ y* � V J ..F � �d N � O �� E3iP5iING GRAq� ELEVATI'L'�N: 6i6+f- � - - 10010.6" � 0010,1� 33' � 5 � ~ �1QQ1�1.725' � �7f}010.1�5" —10— ' �1dOf4,125" —15— p5P►ilAlT 5URFAiCE YYf11! CiiFL4NUlAR BASE -- , C.iAY WRFI SAND, 6rawn. �vard _. t,E� _ -- ! — � VY�d�FHERFSJ �qYlESTONE, ten, with Craces o1 clay seams, very � ��� � � � hard - - s �� � � - �' - - — ~ LJME57'L}SPlE, gray, inteHayered wfth �3h�IgV r�aN, v4ry nartl 7.0 `_ , ��^�'----------------------•------------ — --------------•— as.a K�Y: THI'�M WALLED TUBE _�a0C�f BI� THD G4NE �� SEEPAGE LEVEL i AUG�R I`�_� SPLiT €�ARREL � ROCK CORE i WA,TEW LEVEL �R��T� �• � i � � t � � � ' _ � 2.0 } ` 4.5+ — 5 — z.s � ' 50/0.25" � �100/0.125 -,o- � ' ,oao�• —15— _ _ too�o- —20- -� KEY REPORT NO.: 1401-0124 START DATE: 6-24-98 NO WATER OBSERVED IN BOREHOLE LOG OF BORING NO. B- G END DATE: 6-24-98 Sanitary Sewer Rehabilitation COMPLETION DEPTH (FT): 20.00 Fort Worth, Texas TYPE: Auger � � � � � 2 ry� � a "' J � „�� � a � � ��a � Q � O �, Y w � g � EXISTING GRADE ELEVATION: 620+/- cn ASPIiALT SURFACE WfTH GRANULAH BASE I I I SANDY LEAN CUY (W, lipht hrawn with limestone 1.6 I I I tragments, very stiff to ha�d 13 I 30 I 16 14 59 116I 1.2 I 3.a .' 17I 34I 14I 20 85 0.9I -�� �'E WEATHERED LIMESTONE, tan 6.0 I I I � I �! {� I I I I I UMESTONE, gray, i�terlayered with shaley mad, very hard 8•0 I I I I I I I I I I = I I i I I � � _ � � � � '� . - • I _ ----- ---------------------•--•----- --•------ - ,� Zo.o LOCATION: See Plate A.1 x �... aR aR ae _ Q ae '� ui SOIL / ROCK p w� w� o� � J �a Z W ¢k ~ N Z W :J � � = W CLASSIFICATION =�� 3 o s� g� g= �, � j 3 0 � � V J � a '' a _ °a' $ � F THIN WALLED TUBE ROCK 81T THO CONE Q SEEPAGE LEVEL AUGER � SPUT BARREL ROCK CORE i WATER LEVEL PLATE A. 9 REPORT NO.: 1401 •0124 5TART �ATE: 6-22-98 END DATE: 6-22-98 COMPLETION DEPTH (FTI: 15.00 4.0 3.25 � 5 - 4.5+ 78 100/0' � � � _ - _ 100/0" -S5- NO WATER OBSERVED IN BOREHOIE - _ �GiRa � � LOG OF BORING NO. B- 7 Sanitary Sewer Rehabilitation Fort Worth, Texas TYPE: Auger LOCATION: See Plate A.1 � . Z . . . . . �, � o �'_' � �_ '� 2e de r p 22 LL N � v�� O iu "� ≥ri ¢ ' V.; ra Z' >� F` C�i � d o¢ ¢ .� � � uJi= Qu, �� ya F� W z W �= Z Y a ;�� V t� N �� 3a J� g� 3z Ny �W ¢ � � u Z ¢ �� c� � � a a$ 3 0 a EXISTING GRADE ELEVATION: 618+/- v~i ASPFIALT SURFACE WITH GRANULAR BASE %i; '� LEAN CLAY WITH SAND (CU, orangish brow� to light 6rown. 1.4 ,�; . :'��j�� very still to hard ,; ;%'; i %ij � � 15 34 14 20 83 � , ,+; - LEAN CLAY WffH SAND (CU, light brown, with waa[hered tan 6.0 15 31 15 16 78 _ { limestone seams, hard I T l � WEATHERED LIMESTONE, tan ��� LIMESTONE, gray, intedayered with shaley mail, very hard � — 9.0 i!� . ` - --- ---••--•-•------•--•---•--------------- - --------- � 15.0 a KEY: THIN WAILED TUBE AUGER SOIL / ROCK CLASSIFICATION ROCK BIT �� SPLIT BARREL �THD CONE ROCKCORE 1.1 1.4 6.6 S? SEEPAGE LEVEL 1 WATER LEVEL �IPLATE A. � 0 V . AppENp�X B / , � _ - - -- _---- - ----- � - - SUMMARY OF LABORATORY TESTS � Sanitary Sewer Rehabilitation-Contract XLV (45) Water Project No. PS46-07046U172890, DOE No. 0789 � Fort Worth, Texas Report No. 1401-0124 � Water % Passing Unit Dry Torvane Depth Content LL PL PI No. 200 Sieve Weight, PCF (TSF) � B-1 1.0-2.0 2.0-3.5 7.0-8.0 19 34 15 19 86 0.5 � 10.0-11.0 15.0-16.0 26 59 23 36 9� 2•2 B-2 � 2.0-3.0 12 35 15 20 59 122 1.6 L 5.0-6.0 8 20 10 10 25 B-3 I' 1.0-3.0 5.0-6.0 7.0-8.0 10.0-11.0 22 42 17 25 84 12 � 15.0-16.0 �_. 19.0-20.0 20 42 13 29 78 1.4 24.0-25.0 �' B-4 � 1.0-3.0 5.0-6.0 7.0-8.0 11 40 14 26 68 � � 8 �•6 � 10.0-11.0 15.0-16.0 12 29 18 11 62 1.5 � 21.0-22.0 12 42 -"" B-6 1.0-3.0 13 30 16 14 59 1 �6 ��2 �'� 5.0-6.0 17 34 14 20 85 0.9 � B-7 1.0-3.0 -- 5.0-6.0 15 34 14 20 83 �• � 6.0-7.5 15 31 15 16 78 �•4 � � 1 1 r � UC f KSF) 4.3 5.3 3.4 6.6 Plate 6.1 UNCONFINED COMPRESSION TEST a000 6000 4000 _ �� � � � 2000 ` C3 � O 2 4 6 8 Axial Strain, % Specimen No.: Unconfined strength, psf Undrained shear strength, psf Foilure siroin, � Strain rate, in/min Water content. � (cuttinqs before test) wet density, pcf Dry density, pcf ' Soturation, 7 Void ratio Specimen diameter, in Specimen height, in Heiqht/diometer ratio Description: 1 4321 2160 6.9 0.0610 12.1 136.8 122.0 85.5 0.3812 2.67 5.69 2.13 I I � ASS. GS= 2.7 I Type: UNDISTURBED Project No.:'1401-0124 Client: r Date: 7-1-98 Remorks: Project: SEWER REHABILITATION Location: B-2; 2-3' Piote: B.2 UNC0NFINED COMPRESSION TEST FUGRO_ McCLELLAND U�ICQN�Ih��D �C3MF��E�SI�� T�S� sooa Specimen No : I 1 Unconfined strength, psf 5333 Undroined shear strength, psf I 2667 Fa�lure stro�n, % I 18.4 I Strain rate, in/min 0.0610 I water content, �(cuttinqs before test) 20.1 I Wet density, pcf I 140.0 I Dry density, pcf ' I 116.6 I Saturation, �' I 121•8 I Void ratio I 0.4454 I 5pecimen diameter, in � 2.61 I Specimen height, in I 5.43 I 1 Heiqht/diameter rotio I 2.08 I Descript�on: I I I ASS. GS= 2.7 Project No.: '1401-0124 Client: r Dote: 7-1-98 , 2 C} I Type: UNDISTURBED Remorks: Project: SEwER REHABILITATION Locotion: B-3; 19-20' Plote: 8.3 UNCONFINED COMPRESSION TEST FUGRO-McCLELLAND UNCONFINED COMPRESSION TEST 4000 i � 3000 a � � v L � ���Q � � i .� � a� � a 0 1000 U n V O 2 4 6 8 Axial Strain, % SpeCimen No.: 1 Unconfined strength, psf 3398 Undrained shear strength, psf 1699 Fa�lure stra�n, � I 4.4 I Strain rate, in/m�n I 0.0610 I Water content, �(cuttinqs before test)� 12.5 � Wet density, pcf I 132.3 I I Ory dens�ty, pcf ' I 117.6 � I Saturation, 7' I 77•8 I I Vo�d rotio � 0.4336 � Specimen diameter, in � 2-09 � Specimen he�gnt, �n I 4.28 I I Heiqht/diameter rotio � 2.04 I I Description: I I I ASS. GS= 2.7 � Type: UNOISTURBED Project No.: T401-0124 Client: w Oate: 7-1-98 Project: SEWER REHABILITATION Remorks: Location: B-6; 2-3' UNCONFINEO COMPRESSION TEST P l o te : 8. 4 FUGRO-McCLELLAND ��CO�F�NE� ��MPRE���O� T��7 soo� � sa�� a N N � � .-� �' 4c�aQ v 3 .� � � � � � 0 2dC}CD c� � Q 3 6 9 1� Axicl Strain, % Specimen No : 1 I Unconfined strength, psf 6595 Undrained sheor strenqth, psf 3297 I Fa;lure stroin, � I 6•6 I I Stra�n rate, in/min I 0.0610 I � water content. 7(cutt�nqs before test)I 15.3 I I Wet density, pcf I 125.8 I I Dry density, pcf • I 109.1 I I Soturation, % I 75•8 I I Void rotio I 0.5445 I I Specimen diometer, in � 1.40 I I Specimen height, in � 3.35 I � Heiqht/diometer ratio � 2.40 � � Description: .I I I ASS. GS= 2.7 � Type: UNDISTURBED Project No.� 1�01-Q124 Ctient: �ate: 7-1-98 Remorks: Project: SEWER REHABILITATION Location: B-7; 6-7.5' UNCONFINED COMPRESSION TEST Plote: B.5 FUGRO-McCLELLAND , CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A Labor Code Section 406.096, Contractor certifies that it provides workers' compensation insurance coverage for all its employees employed on city of Fort Worth Project Number PS46- 070460172890 DAVILA CONSTRUCTION, INC. NTRACTOF� t .� �. .� a� ,% � _n . . „ _ _ R �� IT1e ,���'•��� � Date � ` STATE OF TEXAS COUNTY OF TARRANT � BEFORE ME, the undersigned authority, on this day personally appeared �,r� MQZ C� �d U� � known to me be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN LINDER MY HAND AND SEAL OF OFFICE this (� day of . �9�y �, �+. OSCAR DE JESUS RESTREPO � f��.T,� �:otary Pub!!c, State of Ter.as �� �� ��',�J !�y Commfsslon Expirea � �r+i% 05-01-00 a , � , �y Notary Public�in and�for the State of Texas �. CERTIFICATE OF 1NSURANCE TO: C[TY OF FORT WORTH Date_ NAME OF PROJECT: PROJECT NUMBER: IS TO CERTIFY THAT : is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for the type of insurance and accordance with provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Limits of Liability Worker's Compensation Comprehensive General LiabiliTy Insurance (Public Liability) Blasting Collapse of Building or structures adjacent to excavations Damage to Underground Utilities Builder's Risk Comprehensive Automobile Liability Contractual Liability Other Bodily Injury: Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ Ea.Occurrence: $ Ea.Occurrence: $ Ea.Occurrence: $ Bodily Injury: Ea. Person: $ Ea. Occurrence: $ Property Damage: Ea. Occurrence: $ Bodily Injury: Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ Locations covered: Description of operations covered: The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five (5) days after the insured has received written notice of such change/or cancel lation. Where applicable local laws or regulations require more than five (5) days actual notice of change or cancellation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. A�encv Fort Worth Agent By Address Title 1 � PERFORMANCE BOND KO-6157026 , THE STATE OF TEXAS � COUNTY OF TARRANT KNOW ALL MEN BY THESE PRESENTS: That we (1) DAVILA CONSTRUCTION, INC,a (2)CORPORATION of TEXAS, hereinafter call Principal, and (3)INDEMNITY INSURANCE COMPANY OF �,+ NORTH AMERICA a corporation organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a � municipal corporation organized and existing under the laws of the State of Texas, hereinafter called Owner, in the penal sum of: THREE HUNDRED EIGHTY-EIGHT THOUSAND EIGHTY-ONE AND 25/100 .................................... (388,081Z5) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. THE CONDITION OF T'HIS of: OBLIGATION is such that Whereas, the Principal entered into a certain � contract with the City of Fort Worth, the Owner, dated the _ i1�i �. R u`'b���- � , a copy of which is hereto attached and made a part hereof, for the construction of: SANITARY SEWER REHABILITATION, CONTRACT XLV (45), UNIT 1 � Designated as Project No. (s) PS46-070460172890, a copy of which contract is hereby attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being !! hereinafter referred to as the "work". � NOW THEREFORE, if the Principal shall well, truly, and faithfully perform the �vork in accorda�ce with the plans, specifications, and contract documents during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and e�:pense I� which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. � ' � � F1 ' 1 .� PROV[DED FURTHER, that if any legal action filed upon this bond, venue shall lie in Tarrant County, State of Texas. � AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it � does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. � N WITNESS WHEREOF, this inshvment is executed in 8 counterparts each one of which shall be deemed � an original, this the of ��„�.; ; ;- , , : ;�� , 1999. ATTEST: � (Principal) Secretary (SEAL) Witness as to Principal Address EST: _�! �'— Tanya Miro ( rety) Secretary (SEAL) � � ��� ��� wit�,es s to su�e • �, $1 [ Lam te. 3] f}, F�rt Worth, 7'x 7& l�1? {Acidress) � � DAVILA CONSTRUCTION, INC. P�DdCIPAL (4) �% �Y: �C�l���9,�Y' /�d r7 � if /��id'C�' � - _ - - -. Titte: �/� ��,^��.��/.i,/" � "3325 P�OLA `' FORT WORTH , TX 76103 INDEMNITY INSURANCE COMPANY OF NORTH AMERICA Su ety I'' � . B�: �a`�t� h�,� f -� ! a�ri A. Prisant c � -in-faet) (S) . 811 Lamar Ste 310, Fort Worth, Tx 76102 (Address) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as case may be (3) Correct name of Surety (4) If contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact.. F2 � � 'ower o� � �ttorne,y � � INDEMNITY INSURANCE COMPANY OF NORTH AMERICA Bond Na. KO-6157026 795740 �� C1GNA Know all men by these presents: T'hac INDE.�INITY INSURANCE COMPANY OF NORTH AMERICA , a corporation of che Commonwealth of Pennsylvania , having iu principal office in the Ciry of Philadelphia , Pennsylvania , pursuant to the following Resolution, adopted by the Boazd of Directon of 7ihe said Company on December 5, 1983, to wit . � ��� 'RESOLVED, That pursuant ro Artidei 3.1 B end 5 I of the By-Lawe, ihe following Ruln shill govem ihe eacecuuon for iht Company of bonde, undertakings, recognizencLs, cono-acU and other wriungs in the oemre thereof Tha[ �he Prnident, eny Srnior Vite Prpiden� any Vice Prdiden4 and P.ssistent Vice Prdidrnt, or eny Attomey-in-Fatt, may ezaute for and on behelf of the Compeny eny md s1i bonds, underteking�, rxngnvancn, convecu and other writings in th� nawre ehereof, the samt tn be anested when nectseary by the Coryorete Secretary, or any Assistant Corporate Secretary, and the seel of the Company affixed theran; and that the President, my Smior Vice Prniden� eny Vice President or eny Assistan� Vice Preaident may appoint end euthorize eny other OfFcer (ekcud or appointed) of lhe Company, ant Aunmeys-In-Fact m so exeate or attest tn the execution of all such writings on behalf of the Company and tn ef'fix ihe seal of the Company theretu. My such writing �auted in accordence with iheve Rula shall be a� binding upon the Compaoy in any case m though signed by the Presidcnt end etwted m by ihe Coryorate Secretary The signawre of the Praident, or a Senior Viu President, or a Viu Presiden4 or an Assistant Vice President and the seal of the Company mey be �xed by fawimile on any powa of attnrnry granted punuant m thia Resolution, end the signsuue of e ceniCying Officer and the seal of ihe Company may be �xed by feteimile to any certifi�att of any auch power, and any such power or cenificau bearing �uch fadimile signau,re end seal ehall be vnlid nnd binding on Ne Compmy Such other O�cen of tlie Company, and Attnrneys-In-Fect shell have ewhority w certify or verify copica of ihis Resolution, the By-Lavn of the Company, and any �davit or record of ihe Company necessery w the dischargc of their duoes The passage of this Reaoluuon does not revoke any esrlier authority granisd by Resolutions of the Bosrd of Direcmn edoptcd on lune 9, 1951, May 28, 19�5, end March 23, 1977.' � does hereby nominate, constitute and appoint MARTIN A. PRISANT of the City of Miami, State of Florida , each individually if there be more than one �"" named, its true and lawful attomey-in-fact, to make, execute, sea! and deliver on its behalf, and as iu act and deed any and all bonds, undertakings, i` recognizances, contracu and other writings in the nature ihereof in penalties not exceeding Five Hundred Thousand Dollars ($500,000) and the execution of such writings in pursuance of these presents shall be as binding upon said Company, as fully and amply as if they had been duly executed and �'� ackowledged by the regularly elected officers of the Company at iu principal office. � O n. �� '�] � � � � '�} C � � C33 + U , 8 � ' � c� ' ei� � � Q 4� � :' � .� �= p Q� �~ � ' a� o �4 � :� � �� i L�6 � � a.�+ E'� L � � (� � �J+ � � � � Q! � � t? �' � C�? IN WITNESS WHEREOF, ihe said William Jungreis , Vice-President, has hereunto subscribed his name and �xed the corporate seal ofihe said INDEMNITY INSURAI�'CE COMPANI' OF NORTH AMERICA this 19th day of August 1998 . � Ilr'DEMNITY INSURANCE COMPANY OF NORTH AMERICA ,g,! ��'�i� �,� v r,�`;.� f �n �r �}� . a ����Js . `'�r ';_ r�,{` `��� WiCli�e[n.Fassrgre�s, Viee Pres9dent COMMONWEALTH OF PENNSYLVANIA COUNTY OF PHILADELPHIA ss. On This 19th day of August , A.D. 1998 , before me, a Notary Public of the Commonwealth of Pennsylvania in and for the County of Philadelphia came William Jungreis , Vice-President of the INDEMNITY I1VSl7RANCE COMPANY OF NORTH AMERICA to me personally known to be the individual and officer who executed the preceding instrument, and he acknowledged that he executed ihe same, and that the seal affixed to the preceding instrument is the corporate seal of said Company; that the said corporate seal and his signature were duly af£ixed by the authoriry and direction of the said corporation, and that Resolution, adopted by the Board of Directors of said Company, referred to in the preceding inswment, is now in force. IN TESTIMONY WHEREOF, I have hereunto set my hand and �xed my official seal at the City of Philadelphia the day and year fi�st above written. NOTARIAL SEAL DEBRA M. MARANO, Notary PuEIIc Gty of Philadelphia, Phila. Courtty My Commission Explres Dec 20,1999 � r!► Notary Public �'��-.�.� I, the undersigned Secretary of INDEMIVITY INSURANCE COMPANY OF NORTH AMERICA , do hereby certify that the original POWER OF ATTORNEY, of which the foregoing is a substantially true and correct copy, is in full force and effect. In wimess whereof, I have hereunto subscribed my name as Secretary, and �xed the corporate seal of the Corporation, this 2 4 t�sy of M a r r� h 1 Q�_. �. i- ���`�� f �j�- � �� ��"�S vs: ��'l �� �r� 1 �� r It.`s,/� �, a,a r- ij� �' �.,���'� Debra H. P,tizicrra . Sectel�y �r.rt� ��. i'HIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPTION DATE AFTER August 19, 2000 . NOT VALID UNLESS PRINTED ON TEAL BACKGROUND ��� � � � _ � ._ . - - ,_. . ���� �„�„�����. � THE STATE OF TEXAS COUNTY OFTARRANT PAYMENT BOND KO-6157026 � KNOW ALL MEN BY THESE PRESENTS: That we (1)DAVILA CONSTRUCTION, INC, a(2) Corporation of Texas, hereinafrer call Principal, and (3) INDEMNITY INSURANCE COMPANY OF IYORTH AMERICA a corporation organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a �municipal corporation organized and existing under the ]aws of the State of Texas, hereinafter called Owner, and � unto all person, firms, and corporations who may furnish materials, for or perform labor upon the building or improvements hereinafter referred to in the penal sum of : ' THREE HUNDRED EIGHTY-EIGHT THOUSAND EIGHTY-ONE AND 25/100 .................................... ($388,081.25) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for �t the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. , THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the n,�. -, d�y�,of A.D. , 19, a copy of which is r- hereto attached and made a part thereof, for the construction of::" "'' ``` ; i�— SANITARY SEWER REHABILITATION, CONTRACT XLV (45), UNIT 1 �''' Designated as Project No. (s) PS46-070460172890, a copy of which contract is hereby attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being � hereinafter referred to as the "work". NOW THEREFORE, the condition of this obligation is such that, if the Principal shall promptly make payment to all claimants as defined in Article 5160, Revised Civil Statutes of Texas, supplying labor and materials � in the prosecution of the work provided for in said Contract, then this obligation shall be null and void, otherwise it shall remain in full force and effect. FI0 �� THE BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying labor and � material in the prosecution of the work provided for in said Contract, as claimants are defined in said Article 5160, and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of the Revised Civil Statutes. PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tarrant County, State of Texas, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration of addition to the terms of the contract or to the work to be performed thereunder or the specification s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work to the specifications. PROV[DED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied. IN WITNESS WHEREOF, this instrument is executed in � counterparts each one of which shall be deemed an original, this the day of ;� _; ;,;'-J A.D., 1999. ATTEST: � + I�,- �P �j�-A? (Principal) $ecretary (SEAL) DAVIL!#C�NSTRUCTION, INC.j � �'' PRINGlF,6rL (d} /,�` � � �-."! BY: !`.1�;�".%��'�'.A' / .�f"�+ t �,�.�t.�'�' �l' { � ` ` � v " / Title: �l�� %��1�.r' '�,' _ �'3��NC)L�A FO T W'f�RTH, TX 7�103 (Address) 1NI)E1VlNIT1� �N5lJRAI�E CQMPA►PJY F(1�1U'�TH AM�ERICA Witness as to Principal aurety �,�'� �`K'���_���i�Y1'r1��i�.� ' ""T�lh�PQ �� M�n A�. Fr�sant tt�ia�y-�n-fact) { ) Address _/ � -ST� ���'� Tanya �ro (5'wrety) Secretary � (SEAL) � ■ r� . ,� � �Is nes o urety � 811 Lamar Ste. 310, Fort Worth, Tx. 76109 � 8] 1 Lamar Ste., 310 Fort Worth, Tx. 76102 (Address) NOTE: Date of Bond must not be prior to date of contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as case may be (3) Correct name of Surery (4) If contractor is Parmership all Partners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact.. � '�'o wer o f '-4ttorney � ti w � � � ` � � � � � � � � � ' INDENINITY L�ISURANCE COMPAM' OF NORTH AMERICA Bond No. KO-6157026 795740 - Know all men by these presents: Tha[ L�1DE�INTTY INSURA,'YCE CO:�IPA,�1Y OF NORTH A�IERICA , a corporation of the Commonwealth of Pennsylvania , having its principal office in the City of Philadelphia , Pennsylvania , pursuant to the following Resolution, adopted by the Board of Directors of � the said Company on December 5, 1983, to wit: 'RESOL VED, That punuan[ tn Anicln 3. I S and 5.1 of �he By-Lawf, �he Collowing Ruln ehall govem the ezeavon for Ne Compmy of bonda, undertalcing�, rao�izmca, contraeu and other writinga in the nanue thereof �(I) Thei'he Praiden� my Smior Vice Praidm4 �Y Vice Prnidrnt, and Pa�istant Vice Prciden� or my Attomry-in-Facr, mey execute for and on behalFof the Company eny end all bonds, undertakin�, «zogn'vancn, conveces and oeha writing� in [he nawrc thereof, the eeme m be attesied whm necessary by Ne Corponm Secretary, or any .4�sis`ent Corporate Secrceary, and the sesl of dte Company aflixed therew; and Nat the Preidrn4 �Y Srnior Vice Prnidenr, any Vice Prdidmt or any Assietant Vice Prdident mey appoint and authonze any other Of5cer (elected or eppointed) of the Company, nnt At�meye-In-Fee to so exewte or annt in the �ecvtion of all �uch writings on bchalf of the Company and tn efTix the seal of ihe Company theretn �(2) Any �uch wri[ing ezecuted in accordance with th'se Ruln �hall be a� binding upon the Company in any rau as though signed by �he Pr�sidmt and attnte� tn by the Corponte Secrnary �(3) The eignemrc oFihe Presiden4 or a Senior Vice Praidmr, or a Vice Proiden4 or an Assistant Vice Praident and the seal of the Company may be atiixed by facsimile ort any power of attnmty g:anted punumt io thie = Rnofution, and �e signawre of e cenifying Offica end the seal of the Compeny may be �xed by (an�nik tn nny certifi�ate of any such powc, and any such power or urtificam beering �uch facsimile signanire and s'al �hall be vslid and binding on the Compeny. (4) Such ocha Ofticen of ihe Compmy, and Attnmeys-In-Faa shall have euthoriry tu cutify or verify copie of thi� Resoluuo4 the By-Law� of the Company, and any �davit or record of the Company necnsary m the dietharge of `heir duoe �(5) The pacsage of this Rewlution don not revoke any �arlier eutliority granted by Rtsoluuons of ihe Board of Direcmn adopted on June 9, 195J, �tay 28, 1975, and'.vlarch 27, 1977' does hereby nominate, constitute and appoint MARTIN A. PRISANT of the City of Miami, State of Florida , each individually if there be more than one named, its true and lawful attomey-in-fact, to make, execute, seal and deliver on its behalf, and as its act and deed any and all bonds, undertakings, recognizances, convacts and other writings in the nature thereof in penalties not exceeding Five Hundred Thousand Dollars ($500,000) and the execution of such writings in pursuance of these presents shali be as binding upon said Company, as fully and amply as if they had been duly executed and '� ackowledged by the regularty elected officers of the Company at its principa! office. O a �13 � � Gl3 - � � � � � � � � � � Q3 O � z� � aQ3 ? � � �� � v(l3 u) _�Q � -� � � � , `C� 4J aC � � ti i v �, � [S3 cll - [3� � _ �' +�+ O C _ � � L � Q ('� � � [� � � � � � �U IN WITNESS WHEREOF, the said William Iungreis , Vice-President, has hereunto subscribed his name and �xed the corporate seal of the said L�IDEM'�i'ITY INSUR�u\CE COYIPANY OF rORTH AMERICA this 19th day ofAugust 1998 . .,,,,�� TiYilEIVIiHITY L�ISURAIV�E CG:4IPA."'� dF Ni'lltT'H A4i��tICA ���;"� ��a�1`�+"��,V.`efo�"� 3, ..,y':'�'�'J •t«�i� ` �, . ��3�* �{� �[ �'��'�'M� . �aAJti•-,•«�'+� `'��`.: Wrlliam Jungre� s, Vice Pr�sident COMMONWEALTH OF PENNSYLVAMA COLINTY OF PHILADELPHIA ss. On This 19th day of August , A.D. 1998 , before me, a Notary Public of the Commonwealth of Pennsy{vania in and for the County of Philadelphia came William Jungreis , V ice-President of the INDENIIV117' INSURANCE COMPA,ti"Y OF tiORTH AMERICA to me personally known to be the individual and officer who executed the preceding instrument, and he acknowledged that he executed the same, and that ihe seal affixed to the preceding instrument is the corporate seal of said Company; that the said corporate seal and his signature were duly �xed by the authority and direction of the said corporation, and that Resolution, adopted by the Board of Directors of said Company, referted to in the preceding inswment, is now in force. IN TESTIMONY WHEREOF, I have hereunto set my hand and �xed my official seal at the Ciry of Philadelphia the day and year ficst above written. NOTARIAL SEAL DEBRA M. MARANO, Notary Public Cfty o( Pfiiladelphn, Phila. Courrty My Commissbn Expires Dac Z0, 1999 �jG�'L�r� � Notary Public ��.t�t.�t..v I, the undersigned Secretary of IlYDEMIVITY INSURANCE CONiPANY OF NORTH AMERICA , do hereby certify that the original POWER OF ATTORNEY, of which ihe foregoing is a substantially we and correct copy, is in full force and effect. In witness whereof, I have hereunto subscribed my name as Secretary, and affexed the corporate seal of the Corporation, this 2 4 t}I&y of jKa r r-h 1 ra �C1 . �J�- �� Debra 'H. Paciara . Sec¢� THIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN iNCEPTION DATE AFTER August 19, 2000 . NO'i VALI� UNLESS PRiNTED ON T�AL $ACK,GR�UVD i� i � THE STATE OF TEXAS COUNTY OF TARRANT MAINTENANCE BOND KO-6157026 I�, KNOW ALL MEN BY THESE PRESENTS: That (1) DAVILA CONSTRUCTION, INC., as Principal, acting herein by and through (2) Alma Davila its duly authorized Vice-President and (3) INDEMNITY - INSUAIVCE COMPANY OF IVORTH AMERICA a corporation organized under the laws of the State of TEXAS, as surety, do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, A Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at Fort Worth, in Tarrant �„ County, Texas the sum of THREE HUNDRED EIGHTY-EIGHT THOUSAND EIGHTY-ONE AIVD 25/100 .................................... '�" ($388,081.25) in lawful money of the United States, for the payment of which sum well and truly be made unto said City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs, executors, I� administrators, assigns and successors, jointly and severally. This obligation is conditioned, however; that, ,, ,'° , .--��, WHEREAS, the Principal has entered into a certain contract with the Ciry of Fort Wo�;� �°'' 'J "'` `', 19 the performance of the following described public work and the construction of the following described public improvements: SANITARY SEWER REHABILITATION, CONTRACT XLV (45), UNIT 1 � Of same being referred to herein and in said contract as the Work and being designated as Project No. (s) PS46- 070460172890 and said contract, including all of the specifications, conditions and written instruments referred to therein as contract documents being hereby incorporated herein by reference for all purposes and made a part � hereof, the same as if set out verbatim herein; and , �' WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during the period One (1') Year after the date of the final � acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of One (1) Year; and, � WNEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be necessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefor to repair or reconstruct said work as herein provided. � ' FS NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and said City shall have and recover from the said Contractor and its surety damages in the premises prescribed by said Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas; and, 1N WITNESS WNEREOF, this instrument is executed in 8 counterparts, each one of which shall be deemed an original, dated ; ATTEST: (Principal) Secretary (Seal) DAVILA CONSTRUCTION, INC. P�IN�I �43 BY: J '`�� �%/�9'. � r� � T�c��: �'' ��. ; ,�,Gr � 332 PAN�OLA FORT WORTH, TX 76103 (Address) Wimess as to Principal (Address) AT[� ' ��' i��.r�' �/ {Surety) Secretar_y (SEAL) � � ���� . ' f ,i' Witness as t'� S� / � 811 Lamar Ste. 310 Fort Worth, Tx 76102 � Address � Indemnity Insurancg Com a�`�Nc� t}► America Sue ��" BYi Ma� n A. Prisant (A{��a y�fact 5} ~ �. . 811 Lamar Ste. 310, Fort Wonh, Tx 76102 (Address) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation, a partnership or an Individual, as case may be (3) Correct name of Surety (4) If Contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact. F6 � �ower of ttorney INDEMNITY INSURANCE COMPANY OF NORTH AMERICA Bond No. KO-6157026 795740 �� CIGNA � Know all men by these presents: That INDE�LYTTY INSURA��ICE CO�IPA:ti1' OF NORTH AMERICA , a corporation of the Commonwealth of Pennsylvania , having its principal office in the Ciry of Philadelphia , Pennsylvania , pursuant to the following Resolution, adopted by the Board of Directors of the said Company on December 5, 1983, to wit: - 'RESOLVFD, 1'hat punuant tn Articln S.IB and 5. I of the By-Law�, che following Rulcs �hnll govem ihe exeanon for the Company af bondc, undutakinga, recogni�cn, convecv end other wnungs in the newre i thereof (1) That rhe Praidm4 eny Smior Vice Praidmt, sny Vice Presidmr, end Assistant Viu Pra�denS or eny Atturney-in-Fac4 may execute for and on behalf of the Compeny eny and all bonds, undertakinge, rxagnizanca, cono-ecu and other wnung� in �he nanire tk�ereof, the sarne tn be awted when nxneary by che Corporate Secrc[ary, or any A�si�unt Corporare Sarctary, and che seal of Ne Compeny affixed thereto, and Nat the Prmdrnt any Smior Vice Presidm4 �Y Viee Pruidrnt or any ,4esisnnt Vice Preident msy appoint and euehonze sny oNer Of5cu (elxted or appoimed) oC the Company, ant A¢omeye-In-Fact rn so ezxu[e or attest m the acecution of all such wntinga on behelf of the Compeny and m af}iz the �eal of the Compeny thereru. (2) My suth wriung executed in ac�rdence wiN thne Rules shall 6e at 6inding upon the Company in any �e a� though sign�d by tl�e Prcidrnt end atwted m 6y the Corporate Secretary. (J) The signau�rc of the Prnidm4 or a Senior Vice ProidenC or a Vice Praidmt or an As�istant Vice Proident and the s'al of the Compmy may be �xed by factimile on eny power of annmey Banted pursuent ru thia Resoluuoq and the signawre of a certifying O�cu and fhe seeall of Ne Compeny may be �xeA by fanimile tn any cerv6cate of eny such power, and any wch power or cemficam 6eanng such fanimile signemre and seal shall be valid snd binding on the Company. (4) Such other OtTcm of ihe Company, and Anomey�-[n-Fact shall have eu[horiry tn cvtify or verify topin of Utie RetolutioR the By-Law� of the Company, and any aftidavit or recnrd of the Compnny necneary W the discherge of rheir dutia (5) ihe pntsage of thie Rnoluuon don not moke any earlier authoriry gramed by Resoluuom of the Boud of Directon adopced on lune 9, 1951, May 28, 1975, and March 23, 1977 ' does hereby nominate, constitute and appoint MARTIN A. PRISANT oi the City of Miami, State of Florida , each individually if there be more than one named, its true and lawful attomey-in-fact, to make, execute, seal and deliver on iu behalf, and as its act and deed any and all bonds, undertakings, recognizances, contracts and other writings in the nature thereof in penalties not exceeding Five Hundred Thousand Dollars ($500,000) and the execution I of such writings in pursuance of these presenu shall be as binding upon said Company, as fully and amply as if they had been duly executed and � ackowledged by the regularly elected officers of the Company at its principal office. � O C}. EU � �� _ � U3 � � _ � ` � � � � 4�? � .� � _� � - �4 � '� � -�� � -�C� �O d�L] � Q �� � _ Y� � �� - za� .� (� � � L � - O C E �- i `� �� � � �� U r� � ,y� L � L Z U i � 3S-3R449d IN WITNESS WHEREOF, the said William Jungreis , Vice-President, has hereunto subscribed his name and affixed the corporate seal of the said [�iDEA1NITY INSURANCE COMPANY OF NOR7'H AMERICA this 19th day of August 1998 . INDEVIlVITY LtiSLRANCE CONIPA��`1' OF VORTH AVIERICA '�: �"�:�'��. � �,�� �t":tr;� . YT"� ! i: ��" � � ;���g • �'��...`,�x William Jungre�is , �ce President COMMONWEALTH OF PENNSYLVAN[A COUNI'Y OF PHILADELPHIA ss. On This 19th day of August , A.D. 1998 , before me, a Notary Public of the Commonwealth of Pennsylvania in and for the County of Philadelphia came William Jungreis , Vice-President of the INDENIIVITY IN5URANCE COMPANY OF NORTH AMERICA to me personally known to be the individual and officer who executed the preceding instrument, and he acknowledged that he executed the same, and thac the seal affixed to ihe preceding instrument is the corporate seal of said Company; that the said corporate seal and his signature were duly �xed by the authority and direction of the said corporation, and that Resoluuon, adopted by the Boud of Directors of said Company, referred to in the preceding inswment, is now in force. IN TESTIMOiv'Y WHEREOF, I have hereunto set my hand and affuced my official seal at the City of Philadelphia the day and yeaz first above written. NOTARIAI SEAL DEBRA M. MARANO, Notary Public City of Philadelphia, Phlla. Courrty My Commission Expiras Dx 20.1999 i# , Notary Public i, the undersigned Secretary of INDEVI�fITY INSURANCE COMPANY OF NORTH ANIERICA , do hereby certify that the original POWER OF ATTORNEY, of which the foregoing is a substantially true and correct copy, is in full force and effect. In wimess whereof, I have hereunto subscribed my name as Secretary, and affixed the corporate seal of the Corporation, this 2 4 t URv of M a r r-h 1 Q�_. �� �� �I�ebra H. Pa�irara . Secr�t�ijr THIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPTION DATE AFTER August 19, 2000 . NOT VALID UNI.E.SS PRi[�iTED ON T�AL BACK�1tOL�fD 'I � 1 1 � PART G - CUNTRACT THE STATE OF TEXAS � � COUNTY OF TARRANT § � P,,!� ^ r? a 3 1� �� THIS CONTRACT, made and entered into '' by and between the City of Fort � Worth, a home-rule municipal corporation located in Tarrant County, Texas, acting through its City Manager thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER", and � DAVILA CONSTRUCTION, INC. of the City of FORT WORTH County of TARRANT and State of TEXAS, Party of the Second Part, hereinafter termed "CONTRACTOR". � W[TNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second � Part (Coniractor) hereby agrees with the said party of the First Part (Owner) to commence and complete certain improvements described as follows: SANITARY SEWER REHABILITATION, CONTRACT XLV f45), UN1T 1 And all extra work connected therewith, under the terms as stated in the Contract Documents, and at his R,, (their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendent, labor, bonds, insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirements of the Contract Documents, which include all maps, plats, blueprints and other drawings and printed or written explanatory matter thereof, and the specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been �'' identified by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's r,,, Written Proposal and the other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contractor pocuments and General Specifications, all of which are made a part hereof and collectively and constitute the entire contract. '� 1 � � The Contractor hereby agrecs to commence worh within ten (10) days after the date written notice to do so shall have been given to him, and to substantially complete same within the time stated in the proposal. The Owner agrees to pay the contractor in current funds for the performance of the contract in � accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the Contract Documents and all approved modifications thereof, and to make payment on account thereof as provided therein. �I.� IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in 8cowrterparts in the year and say first above written. � � � ,►"� `'�`� t � �� C,r� �E� .<<��l �" A. Douglas Rademaker, P.E. Director � Department of Engineering CW Citv of Fort Worth, Texas (Ownerl Party of the First part B��A' .. . � +� -- - . � � � � • - - ASST. City Manager CW DAVILA CONSTRUCTION, INC. Contractor . By: � � Title: �,�/;� �. l / APPROVED: � 1 � ' ATTEST: �' � �A��, � ,_ �, C6ty Secre�ry (Seal) WITNESSES: , �� � ��''` �� ,t;�(.��s< 4j �,�'--'�- . � Approved as to Form and Legality: �e�� `!_� : �� Gary Steinberger, Asst. City Attorney � l � ��� `f' � Contract Authorization 3 - ,�.�- 99 Date �1