Loading...
HomeMy WebLinkAbout024793 - Construction-Related - Contract - Carter & Burgess, Inc.L� AMENDMENT NO. 5 STATE OF TEXAS COUNTY OF TARFtANT S CITY SECRETARY CONTRACT NO.��y � (No M&C Needed) WHEREAS, the City of Fort Worth (City� and Carter & Burgess, Inc., (Engineer) made and entered into City Secretary Contract No. 20821, (the Contract) which was authorized by the City Council by M&C C-14608 on the 13th day of December 1994; and subsequently revised by four previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Sanitary Sewer Main 42 and 54 Drainage Psea I/I Evaluation Study and Sewer System Improvements (Group 4, Contract 1). WfiEREAS , i t to said Contract maximum fee; has become necessary to execute Amendment No. 5 to include an increased scope of work and revised NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 24, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $3,510.00. 2. Article III, Section D of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the svm of $442,030.75. ������� �i� °'���°G`��, �� ���{�� +t �� � �� � �:'��, ��.r�`�� � 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. �, ,�� . .- � • ,,. EXECUTED on this the , day of �=��1j'�,,,r :-�� , 1999, in Fort Worth, Tarrant County, Texas. :� J ATTEST. ��"i �-���, n� � ��.�_,� � Gl�oria Pearsan, City Secretary APPROVAL RECOI�II�NDED : ��.�i � � � A. Douglas Rademaker , P. E. ,r'�y � Director, Department of Engineering CARTER & BURGESS, INC. By: : � Name:'John H. Cook, P.E. � Vice President 3880 Hulen Street Fort Worth, TX 76107 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney 2os2i APPROVED: . i /� Mike Groomer "`'� � � Assistant City Manager -2- `" +`�'� �) '-`i''Y� �` �'_', l �� �'L� 1"li� �`� Contract Authorization Uate Carter �� Burgess Consultants in Planning, Engineering, Architecture, Construction Management, and Related Services March 24, 1999 Mr. Tony Sholola, P.E. City of Fort Worth Department of Engineering 811 Lamar Street, Suite 310 Fort Worth, Texas 76102 Reference: Main 42&54 Drainage Area Sanitary Sewer System Rehabilitation & Improvements (Group 4, Contract 1), Part 9 Dear Tony: We are providing this letter as our request for additional compensation to address design modifications requested by the City during the most recent review of the final plans. The requested modifications primarily reflect recent revisions to Water Department and Department of Engineering standards. As you know, this design was completed under the Part 3 designation and being constructed, but was discontinued because of the delay associated with the Railroad utility crossing permit. The comments made during the last review of the plans have been summarized in the attached table along with our response. We propose to complete this work in accordance with the attached response table and listing of hours for a lump sum amount of $3,510. Please see the Contract Fee Summary below. CONTRACT FEE SUMMARY Amendment No. 5 Basic Fee Address Additional Review comments as indicated in Engineer's Response Revise Specifications Expenses Total Proposed Amendment No. 5 Fee PROJECT FEE SUMMARY Contract Item Description Original Contract Basin 42&54 SSES Amendment No. 1 Main B Realignment Amendment No. 2 Add'I Flow Monitoring, Smoke & Dye Testing, TV Insp Amendment No. 3 Main A Realign. & Env. Site Assessment Amendment No. 4 Additional Legal Desc./Easements for RR Crossings Amendment No. 5 Additional revisions to final plans TOTALPROJECT $ 1,840 $1,180 $490 $3,510 Fee $343,454.00 $28,057,.00 $18,014.75 $48,145.00 $850.00 $3,510 $442,030.75 Carter & Burgess, Inc. 38tSU Hulen Street Fort Worth, Texas 76107 7254 Mui6ng uddrex: PO Box 985006 Fort Wo�tn, Texas 76185-5006 (817j 735-6000 Metro 429-p170 Fax (817; 735 til4&' i Mr. Tony Sholola, P.E. March 24, 1999 Page 2 If you have any questions, please call me at (817) 735-6151 or Mr. Sam Zabaneh, P.E. at (817) 735-6150. Sincerely, CARTER & BURGESS, INC. �l �� ohn H. Cacak, P.�. Vice Presid�nt JHC/mds Attachments 94147401. L99 cc: Correspondence John Boyer - FWDOE JHC, DMS, SMZ CARTER & BURGESS, INC. ��-- Sam M. Zabaneh, P.E. Associate Main 428�54 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 4, Contract 1), Part 9 Additional Services Listing of Hours Scope of Work Address Additional Comments Revise Specifications Expenses (Plotting, Printing) PIC PE TECH 130 75 70 2 8 14 1 10 3 18 14 Summary of Hours Pt9rsps2.xls WP Project 50 Total ($) $1,840 6 $1,180 $490 6 $3,510� Basin 42&54 Part 9 Additional Plan 8 Specification Review Comments Summary of Comments & Engineer's Response Comment Sheet No. No. 1 2 3 4 5 6 7 - 6- — 9- 10 _. -11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3� _32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 Comment 1 Have Overlay determinations been madel 1 Have Easements/Permits been Obtained 1 Add "(Group 4, Contract 1), PaR 9" 2 Update General Notes 2 Reference previous project title info on layout 2 Show existing sewer map base information 2 Show which lines to be abandoned on layout 2 Where is L-628 as indicated on Sheet 16 6 Provide project name for prevlously constr. Line 6 Indicate Clay Dam on Drawings 6 Use Fig. B, Case 3& Figure 4 for Pvmt Repalr 6 Show Qreq, Qcap for lines 12" & larger 6 Provide pay item for replacement of WL 6 CuUPlug subsidiary b MH Abandonment 6 Extend DIP to manhole irom WL crossing 6 Indicate exist. line size in plan view 6 Indicate proposed line size in plan view 6 Indicate ROW dimension 6 Indicate pavement fype on all streets 6 Indicate cuUplugs as subsidiary 6 Show drop connection & blocking m profile 6 Show property ownership outside of ROW 7 Indicate Clay Dam on Drawings 71/erify and indicate Ownership of RR ROW 7 Use DIP inside casfng pipe 7 Match crowns where possible 7 Change "Bore" ro By other than Open Cut 7 Is 30" casing large enough for 18" SS 7 Indicate cuUplugs as subsidiary to MH Aband. 7 RR CL Sta 7 Show Qreq, Qcap for lines 12" & larger 7 Indicate SS MH Inserts for 18" & larger 7 Show Cut & Plug on MH to be abandoned 7 Have we obtained all easements on this project 7 Change Concrete PR to Concrete Parking lot repair 7 Show flow arrows 7 Use diHerent pattem for pavement repair in plan (all sheets) 7 Show existing sewer pipe in profile 7 Pattern Ilnes to be abandoned 7 Use Fig. B, Case 3 for backfill 7 Indicate size of M54 in plan 7 CuUPlug existing MB at crossing with new M54 e Indicate Property Names (Ownership) 6 Stainless Steel MH Inserts _ 8 Venry WL Size in Plan/Profile 8 Show Qreq, Qcap for lines 12" & larger 8 Indicate flow direction 8 Change backfill to Fig B, Case 3, Pvmt Repair per Fig 4 B Indicate size of L621A in plan 8 Require Contractor to protect exist. WL 8 Show Drop connection in profile 9 Pattern lines to be abandoned 9 Change backfill to Fig B, Case 3, Pvmt Repair per Fig 4 9 Indicate CuVPlug Subsidiary to MH Abandonment 9 Show Match Line 9 Show ordinance number for closed street 9 Stainless Steel MH Inserts 9 Indicate flow direction 10 Change Shallow MH to Std MH 10 Note to Abandon MH 10 Change backfill to Fig B, Case 3, Pvmt Repair per Fig 4 10 Add "Cone" designation on shallow MH note 10 Indicate size of L629 m plan Response C8B Provided locations for review 2/18/99 Checking w/ Real Property Will add w/ stickyback Will replace with new standard notes Will modiry Will add Will do Will Clarify Will do Will do Will do Will do Will do Will revise note Will do Will do Will do Will do — — — __ _ Will add additional note. Type already indicated __ Will do Will do Will do _ --- . Will do _ __ ___ __ Will do Will do Will do Wilido -- -- �les Will revise note �Tracks already shown in profile Will do Will do wii do __ Easements were obtained for this project under Part 3 Will do Will do _ Wdl do _ New pipe on this sheet replaces pipe in other trenches Wiil do _ Will do _ Will do Will do (already indicated on M54 Plan/Profile) 1Nill do Will do Will do Will do _ Will do -- --- - -- ll�fill do � Will do �/Vill add note _ _ Will do Will do Will do l/�lII do Location of remaming design wl different stationing already shown Not needed for construction. Wdl modiry Will do _ _ Will do _ _ _ Will do (already indicated on other sheet) Will do Will do Will do — — — - - -- Summary of Comments Pt9rsps2.xls Page 1 Basin 42&54 Part 9 Additional Plan & Specification Review Comments Summary of Comments & Engineer's Response Comment Sheet No. No. Comment 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 . 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 Response 10 Change pattern for abandoned SS Will do (City needs to indicate which pattern it prefers) 11 Change "Shallow MH" to "Std Shallow Cone MH" Will do - -- - - --- -- 11 Indicate pavement type in plan view Will do (already indicated in profile by pvmt repair note) 11 Change pattern for abandoned SS Will do (City needs to indicate which pattern it prefers) 11 Casing needed? No room for casing. Class 53 DIP being used at crossing 11 RR CL Sta Tracks already shown in profile —.. _ _ — ---- — - — - 11 Veriy ownership of RR and indicate m plan Wiil indicate probable owner (which City has been unable to verify) 11 Change backfill to Fig B, Case 3, Pvmt Repair per Fig 3 or 4 Wdl do 12 Should MH remain or be replaced9 MH to be rehabilitated 12 Indicate Property Names (Ownership) Will do 121/eriy ownership of RR and indicate in plan Will do 12 Construct Clay Dam This line is befng rehabilitated, not open cut 12 Change "Other than Open CuY' Rehab to "Rehab by CIPP" Will do 12 Provide contact information for Gas Company WII do 12 Show Qreq, Qcap for lines 12" & larger �his line is being rehabiiitated, not open cut (will indicate where known) --- _ _. _ _ ---- 13 Change "Other than Open CuY' Rehab to "Rehab by CIPP" Will do - — ---- — _ _ 13 Show Qreq, Qcap for lines 12" & larger Will indicate where known 13�Where is connection shown in profile? Will Clarify 13 Match crowns where possible Can't match crowns at this location 13 Change pattem for abandoned SS Will do (City needs to mdfcate which pattem it prefers) 13 Use 20" OIP at Other than Open Cut locatfon Will do 13 RR CL Sta �racks already shown in profile 13 Show ordinance number for closed street Not needed for construction. 13 Verify ownership of RR and indicate in plan Will do 13 Revise construction note in profile for Bore Will do — — --- 13 Install new MH @ north end of RR tracks Will do __ 14 Indicate flow direction Will do 14 Pattern lines to be abandoned Will do 14 Match crowns where possible Will do 14 Indicate recent project names completed near construction area Ciry needs to provide this information 14 RR CL Sta Design info on this line shown on sheet 7 14 Pattern lines to be abandoned Will do 14 Show ordinance number for closed street Not needed for construction. 14 Stainless Steel MH Inserts Will do 14 Interior coat manhole Will do _ 15 Change "Other than Open CuY' Rehab to "Rehab by CIPP" Will do 15 Show Qreq, Qcap for lines 12" & larger Will indicate where known 15 Construct Clay Dam Will do 15 Verify ownership of RR and indicate in plan Will do 15 Is MH on old M298 to be abandoned? Abandon note shown on sheet 7 15 Pattern lines to be abandoned Will do 15 Is MH to be replacetl? �his is a new MH (Sta 0-15.51) 15 Indicate flow direction __ Will do _ 16�Verify ownership of RR and indicate in plan Will do 16 Insert word "Service" next to stubout note Will do 16 6" Future Service? Yes 16 Change "Other than Open Cut" Rehab to "Rehab by CIPP" Will do 16 Where is 1316 N. Jones? Will Clarify 17 Change "Other than Open CuP' Rehab to "Rehab by CIPP" Will do 17 Verify ownership of RR and indicate in plan Will do 17 Pattern lines to be abandoned Will do Summary of Comments P19rsps2.xls Page 2 FOT OTH R_ R. �-� �; ��� � � MEMORANDUM TO: ��31]� DATE : A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager f Tony Sholola � " � March 31, 1999 RE: DESIGN FEE AMENDMENT NO. 5 TO SANITARY SEWER MAIN 42 AND 54 DRAINAGE AREA I/I EVALUATION STUDY AND SEWER SYSTEM IMPROVEMENTS (GROUP 4, CONTRACT 1), SEWER PROJ- ECT NO. PS46-070460410180 The proposed amendment will reimburse Carter & Burgess, Inc., for the additional design serv- ices that were provided on the project as requested by City. During construction of Part 3 of this project in 1997, it was determined that a railroad permit was needed on Fort Worth and Western Railroad in order to construct a project sewer line. Due to the very long delay in obtaining this permit, the construction contract was terminated and the project was placed on hold until the permit was obtained. The railroad permit was finally obtained in February 1999. However, before the remainder of the project can be re-advertised for bids, it is necessary to revise the previously approved plans and specifications so that they conform with current City standards. Carter & Burgess, Inc., has requested a fee of $3,510.00 for the additional services to be pro- vided thereby increasing the contract fee from $438,520.75 to $442,030.75. I believe this fee is fair and reasonable for the additional services. Please authorize the additional design fee by your signatures on the attached contract amendment form. Tony Sholola Attachment cc: John Boyer, Project Manager Berdena Hamilton, Water Department Dan Pepon, Water Department Mi:M011 � ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * IOOO THROCKMORTON S'1'REET * FORT WORTH, Teacns 76 1 02-63 1 1 (817) 871-7941 * Fnx (817) 871-7854 �'} Printed on recyded paper