WHEREAS, the City of Fort Worth (City) and Carter & Burgess,
Inc., (Engineer) made and entered into City Secretary Contract No.
22064, (the Contract) which was authorized by the City Council by
M&C C-15447 on the 7th day of May 6, 1996; and subsequently
revised by one previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Main 42 And 54 Drainage Area Sanitary System
Rehabilitation and Improvements (Group 4, Contract 1), Part
5.
WHEREAS, it has become necessary to execute Amendment No. 2
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated March 24, 1999, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services
to be performed by Engineer total $4,490.00.
2.
Article III, Section D, of the Contract is amended to provide
for an increase in the maximum fee to be paid to Engineer for all
work and services performed under the Contract, as amended, so
that the total fee paid by the City for all work and services
shall not exceed the sum of $201,400.00.
CIW
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the __________ __________
1999, in Fort Worth, Tarrant County, Texas,
day of _______________
ATTEST: .
Gloria Pearsim, City Secretary
APPROVAL RECOMMENDED:
<P^CgAAAKl£^--X
A. Douglas Rademaker, P.E.^^
Director, Department of
Engineering
APPROVED:
MA-J,
Mike Groomer
Assistant City Manager
-2-
CARTER & BURGESS, INC. ______
ENGINE £^7
By: _______________
Name: /John H. Cook, P.E.______________
_______Vice President___________________
_______3880 Hulen Street_______________
_______Fort Worth, TX 76107__________
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
22064
Tin W<t
Contract Authorization
Date
Carter - Burgess
Consultants in Planning, Engineering, Architecture,
Construction Management, and Related Services
March 24, 1999
Mr. Tony Sholola, P.E.
City of Fort Worth
Department of Engineering
811 Lamar Street, Suite 310
Fort Worth, Texas 76102
Reference: Main 42&54 Drainage Area
Sanitary Sewer System Rehabilitation & Improvements
(Group 4, Contract 1), Part 5
Dear Tony:
We are providing this letter as our request for additional compensation to address
design modifications requested by the City during the most recent review of the final
plans. The requested modifications primarily reflect recent revisions to Water
Department and Department of Engineering standards. As you know, this design was
completed in 1997 and the cover sheet signed last year prior to the additional review
being conducted.
The comments made during the last review of the plans have been summarized in the
attached table along with our response. We propose to complete this work in
accordance with the attached response table and listing of hours for a lump sum amount
of $4,490. Please see the Contract Fee Summary below.
CONTRACT FEE SUMMARY
Amendment No. 2
Basic Fee
Address Additional Review comments as indicated in Engineer’s Response
Revise Specifications
$ 2,990
$1,500
Total Proposed Amendment No. 2 Fee $4,490
PROJECT FEE SUMMARY
Contract Item Description Fee
Original Contract (See Letter Reference)
Amendment No. 1 Additional Surveying & Specification Preparation
$182,060
$14,850
Subtotal $196,910
Amendment No. 2 Additional Revisions to Final Plans $4,490
TOTAL PROJECT $201,400
Carter & Burgess, Inc. 3880 Hulen Street Fort Worth, Texas 76107-7254
Mailing address: PO Box 985006 Fort Worth, Texas 76185-5006 (817) 735-6000 Metro 429-0170 Fax (817) 735-6148
Mr. Tony Sholola, P.E.
March 24, 1999
Page 2
If you have any questions, please call me at (817) 735-6151 or Mr. Sam Zabaneh, P.E.
at (817) 735-6150.
Sincerely,
CARTER & BURGESS, INC.CARTER & BURGESS, INC.
Sam M. Zabaneh, P.E.
Associate
JHC/mds
Attachments
96104701.L61
cc: Correspondence
John Boyer - FWDOE
JHC, DMS, SMZ
Main 42&54 Drainage Area
Sanitary Sewer System Rehabilitation and Improvements
(Group 4, Contract 1), Part 5
Final Plan Revisions
Listing of Hours
Scope of Work
PIC
130
PE
75
TECH
70
WP
50
Project
Total ($)
Address Additional Plan Review Comments
Revise Specifications
2 14
16
24
6
$2,990
$1,500
2 30 24 6 $4,490
Summary of Hours
Basin 42&54 Part 5
Additional Plan & Specification Review Comments
Summary of Comments Engineer's Response
Comment
No.
Sheet
No.Comment Response
1 2 Is the person that sealed the drawings still at C&B?No.
2 2 Need a layout sheet showing abandoned lines Not necessary for contractor, but can provide
3 2 Change Part V in title to Part 5 Can do, but this will require replotting of every sheet but the cover.
4 3 Tree symbols or drip lines appear too large This doesn't impact construction on this sheet.
5 3 Show CL Station @ RR Railroad location already indicated in profile
6 3 Construct Clay Dam Will do
7 3 Verify ownership of RR and indicate in plan/profile Will do
8 3 Are we removing the existing MH on M54?No, the line stays in service
9 3 Change Figure A, Case 2 to Figure B, Case 3 Will do
10 3 Remove existing MH?No. There is no existing MH at PI Sta 4+15
11 3 Provide Stainless Steel Inserts for lines 18" and larger Will do
12 3 Indicate Pavement Type Will do, but pavement repair type is already indicated.
13 3 Separate payment not to be made for steel casing, only 18" SS Will modify
14 4 Is Commerce Street new concrete pavement? If so, no open cut Don't believe it is. City should let us know if it doesn't want open cut.
15 4 Indicate Pavement Type on N. Main St.Will do, but pavement repair type is already indicated in profile
16 4 Add the words "ground typical" in grade line note.Will clarify
17 4 Was N. Main here recently reconstructed?We believe the area in question is north of here by the Stockyards.
18 4 Provide Stainless Steel Inserts for lines 18" and larger Will do
19 5 8" WL shown as 12" on previous sheet.Water maps indicate a change from 8" to 12" in this vicinity
20 5 Are capacities shown correct.Capacities shown were based on FL's, Stations & n=0.013.
21 5 Provide Stainless Steel Inserts for lines 18" and larger Will do
22 5 Pavement repair recommendations need to be verified Request for confirmation of needs provided to City for review.
23 5 Match Crown to Crown Matching crowns w/ existing 6" will cause downstream conflict with SD
24 5 Shade pavement to indicate limits of mill/overlay or Pulv./OL Will clarify, limits of repair and quants were indicated in the specifications
25 6 Indicate property owner names Will do. Construction is within existing City street ROW
26 6 Is the WL alignment correct?Not 100% certain. Location shown based on survey and Water maps.
27 6 Provide Stainless Steel Inserts for lines 18" and larger Will do.
28 6 Indicate Pavement type Pavement type was indicated in plan, pavement repair note in profile.
29 6 Change Figure A, Case 2 to Figure B, Case 3 Will do.
30 6 Provide for exploratory d-hole of storm sewer Will do, but this was previously deleted @ City's request
31 6 Note contractor to protect existing WL Will do, but contractor is already required to protect utilities by specs.
32 6 If slope from Sta 4+16 to here is evened out, capacity is increased Yes, but so are conflicts with existing utilities
33 7 14" Boadark Tree?Tree indicated bears what some call ''horseapples". (Should be Bois D'arc)
34 7 Construct Clay Dam Will do.
35 7 Show MH's to remain as dashed Will do, but there was no construction note indicating a new MH contr.
36 7 What about pavement type in center of street?There is no pavement here. This is a median
37 7 Consider pipe bursting in lieu of open cut because of trees.Pipe bursting could be an option here. Has forrester seen this site?
38 7 Change Figure A, Case 2 to Figure B, Case 3 Will do.
39 7 Gas line shown off profile Will delete
40 7 Indicate Property Owner names Will do. Lot/Block already indicated.
41 8 Insert words "Ground (typical)" on existing @ CL note Will do.
42 8 Proposed sewer is very close to SD.Line is shallow and is in same alignment as existing SS.
43 9 Match Crown to Crown Can't lower MH's due to downstream utility conflicts
44 9 Bore short distances near trees This is in the same alignment as existing and needs to be open cut or burst.
45 9 Indicate pavement type in plan Will do. However, pavement repair note already included in profile
46 9 Add hydraulic slide to MH connection @ Sta 11 +87 Will do.
47 9 Change Figure A, Case 2 to Figure B, Case 3 Will do.
48 9 May need to move WL away from MH Will provide notes for contractor to relocate WL
49 9 Make conflict structures with SD's subsidiary Will do.
50 9 Show MH's to remain as dashed Will do, but there was no construction note indicating a new MH contr.
51 10 Delete "Shallow” MH callout Will do
52 11 Check drip line of trees Line to be replaced is relatively shallow and in the middle of the street.
53 11 Change Figure A, Case 2 to Figure B, Case 3 Will do
54 11 Was line replaced within the last 15 years Don't know. Line designed in accordance w/ SSES recommendations.
55 12 Line shown for M3 as solid is designed on a different sheet Will modify, but there are not constr. notes for that portion on this street.
56 12 Change Figure A, Case 2 to Figure B, Case 3 Will modify.
57 12 Insert words "Ground (typical)" on existing @ CL note Will do.
58 12 Use flat top barrel on shallow manhole Is it necessary to say "flat top barrel" on plans or will shallow MH suffice?
59 13 Indicate pavement type Pavement repair note was indicated in profile
60 13 Add word "cone" to shallow MH callout Will do
61 13 Install upstream 20' of L-650 BOTOC The bore pit will not avoid trees any more than a shallow trench.
62 13 Change Figure A, Case 2 to Figure B, Case 3 Will do
63 13 Show MH's to remain as dashed Will do, but construction requirements here are already clear.
64 13 Provide more information on Part 1 project referenced.Part 1 project is defined in general notes.
65 13 Why extend end of line to Sta 6+00 (L-651)Existing pipe apparently extends beyond existing MH.
66 13 Indicate pavement type Pavement repair notewas indicated in profile. City to confirm type.
67 13 Indicate existing 6" size in plan Will do. Size clearly indicated in profile.
68 13 Install downstream 30' of L-651 BOTOC Pipe bursting could be an option here. Has forrester seen this site?
69 15 Show drop pipe in profile Will do. Drop manhole already clearly indicated in plan and profile.
Summary of Comments
Basin 42&54 Part 5
Additional Plan & Specification Review Comments
Summary of Comments Engineer's Response
Comment
No.
Sheet
No.Comment Response
70 15 Change Figure A, Case 2 to Figure B, Case 3 Will do.
71 16 What is 8" dropping into It should be dropping into a drop constructed during Part 1. Will clarify
72 16 If MH is to be replaced, call out as double drop MH is to remain
7?16 8" Gas line?8" Gas crossing is shown in both plan and profile
74 16 Change Figure A, Case 2 to Figure B, Case 3 Will do
75 17 Change Figure A, Case 2 to Figure B, Case 3 Will do
Summary of Comments
FortWoRth
MEMORANDUM
TO:A. Douglas Rademaker, Director DOE and
Mike Groomer, Assistant City Manager
FROM:Tony Sholola
date:March 31, 1999
RE:DESIGN FEE AMENDMENT NO. 2 TO SANITARY SEWER MAIN 42
AND 54 DRAINAGE AREA SANITARY SYSTEM REHABILITATION
AND IMPROVEMENTS (GROUP 4, CONTRACT 1), PART 5. DOE NO.
1435, SEWER PROJECT NO. PS46-070460410180
The proposed amendment will reimburse Carter & Burgess, Inc., for the additional design serv
ices that were provided on the project as requested by City.
The plans for this project were approved and ready for advertisement in April 1998. However,
the project could not be advertised for bids without a railroad permit which was finally obtained
in February 1999. Prior to advertising the project for bids, it is necessary to revise the previously
approved plans and specifications so that they conform with cunent city standards.
Carter & Burgess, Inc., has requested a fee of $4,490.00 for the additional services to be pro
vided thereby increasing the contract fee from $196,910.00 to $201,400.00. I believe this fee is
fair and reasonable for the additional services to be provided.
Please authorize the additional design fee by your signatures on the attached contract amendment
form.
Tony Sholola
Attachment
cc: John Boyer, Project Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
MEMO 1435
_________________________ENGINEERING DEPARTMENT_________________________
The City of Fort Worth ★ 1000 Throckmorton Street ★ Fort Worth, Texas 76102-6311
(817) 871-7941 ★ Fax (817) 871-7854
Printed on recycled paper