HomeMy WebLinkAbout024791 - Construction-Related - Contract - Carter & Burgess, Inc.04-06-99P03:17 RCVD 04-06-99P03:20 RCVDAMENDMENT NO. 2 STATE OF TEXAS 8 CITY SECRTARY CONTRACT NO. ^77/ (No M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and Carter & Burgess, Inc., (Engineer) made and entered into City Secretary Contract No. 22064, (the Contract) which was authorized by the City Council by M&C C-15447 on the 7th day of May 6, 1996; and subsequently revised by one previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Main 42 And 54 Drainage Area Sanitary System Rehabilitation and Improvements (Group 4, Contract 1), Part 5. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 24, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $4,490.00. 2. Article III, Section D, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $201,400.00. CIW 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the __________ __________ 1999, in Fort Worth, Tarrant County, Texas, day of _______________ ATTEST: . Gloria Pearsim, City Secretary APPROVAL RECOMMENDED: <P^CgAAAKl£^--X A. Douglas Rademaker, P.E.^^ Director, Department of Engineering APPROVED: MA-J, Mike Groomer Assistant City Manager -2- CARTER & BURGESS, INC. ______ ENGINE £^7 By: _______________ Name: /John H. Cook, P.E.______________ _______Vice President___________________ _______3880 Hulen Street_______________ _______Fort Worth, TX 76107__________ APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney 22064 Tin W<t Contract Authorization Date Carter - Burgess Consultants in Planning, Engineering, Architecture, Construction Management, and Related Services March 24, 1999 Mr. Tony Sholola, P.E. City of Fort Worth Department of Engineering 811 Lamar Street, Suite 310 Fort Worth, Texas 76102 Reference: Main 42&54 Drainage Area Sanitary Sewer System Rehabilitation & Improvements (Group 4, Contract 1), Part 5 Dear Tony: We are providing this letter as our request for additional compensation to address design modifications requested by the City during the most recent review of the final plans. The requested modifications primarily reflect recent revisions to Water Department and Department of Engineering standards. As you know, this design was completed in 1997 and the cover sheet signed last year prior to the additional review being conducted. The comments made during the last review of the plans have been summarized in the attached table along with our response. We propose to complete this work in accordance with the attached response table and listing of hours for a lump sum amount of $4,490. Please see the Contract Fee Summary below. CONTRACT FEE SUMMARY Amendment No. 2 Basic Fee Address Additional Review comments as indicated in Engineer’s Response Revise Specifications $ 2,990 $1,500 Total Proposed Amendment No. 2 Fee $4,490 PROJECT FEE SUMMARY Contract Item Description Fee Original Contract (See Letter Reference) Amendment No. 1 Additional Surveying & Specification Preparation $182,060 $14,850 Subtotal $196,910 Amendment No. 2 Additional Revisions to Final Plans $4,490 TOTAL PROJECT $201,400 Carter & Burgess, Inc. 3880 Hulen Street Fort Worth, Texas 76107-7254 Mailing address: PO Box 985006 Fort Worth, Texas 76185-5006 (817) 735-6000 Metro 429-0170 Fax (817) 735-6148 Mr. Tony Sholola, P.E. March 24, 1999 Page 2 If you have any questions, please call me at (817) 735-6151 or Mr. Sam Zabaneh, P.E. at (817) 735-6150. Sincerely, CARTER & BURGESS, INC.CARTER & BURGESS, INC. Sam M. Zabaneh, P.E. Associate JHC/mds Attachments 96104701.L61 cc: Correspondence John Boyer - FWDOE JHC, DMS, SMZ Main 42&54 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 4, Contract 1), Part 5 Final Plan Revisions Listing of Hours Scope of Work PIC 130 PE 75 TECH 70 WP 50 Project Total ($) Address Additional Plan Review Comments Revise Specifications 2 14 16 24 6 $2,990 $1,500 2 30 24 6 $4,490 Summary of Hours Basin 42&54 Part 5 Additional Plan & Specification Review Comments Summary of Comments Engineer's Response Comment No. Sheet No.Comment Response 1 2 Is the person that sealed the drawings still at C&B?No. 2 2 Need a layout sheet showing abandoned lines Not necessary for contractor, but can provide 3 2 Change Part V in title to Part 5 Can do, but this will require replotting of every sheet but the cover. 4 3 Tree symbols or drip lines appear too large This doesn't impact construction on this sheet. 5 3 Show CL Station @ RR Railroad location already indicated in profile 6 3 Construct Clay Dam Will do 7 3 Verify ownership of RR and indicate in plan/profile Will do 8 3 Are we removing the existing MH on M54?No, the line stays in service 9 3 Change Figure A, Case 2 to Figure B, Case 3 Will do 10 3 Remove existing MH?No. There is no existing MH at PI Sta 4+15 11 3 Provide Stainless Steel Inserts for lines 18" and larger Will do 12 3 Indicate Pavement Type Will do, but pavement repair type is already indicated. 13 3 Separate payment not to be made for steel casing, only 18" SS Will modify 14 4 Is Commerce Street new concrete pavement? If so, no open cut Don't believe it is. City should let us know if it doesn't want open cut. 15 4 Indicate Pavement Type on N. Main St.Will do, but pavement repair type is already indicated in profile 16 4 Add the words "ground typical" in grade line note.Will clarify 17 4 Was N. Main here recently reconstructed?We believe the area in question is north of here by the Stockyards. 18 4 Provide Stainless Steel Inserts for lines 18" and larger Will do 19 5 8" WL shown as 12" on previous sheet.Water maps indicate a change from 8" to 12" in this vicinity 20 5 Are capacities shown correct.Capacities shown were based on FL's, Stations & n=0.013. 21 5 Provide Stainless Steel Inserts for lines 18" and larger Will do 22 5 Pavement repair recommendations need to be verified Request for confirmation of needs provided to City for review. 23 5 Match Crown to Crown Matching crowns w/ existing 6" will cause downstream conflict with SD 24 5 Shade pavement to indicate limits of mill/overlay or Pulv./OL Will clarify, limits of repair and quants were indicated in the specifications 25 6 Indicate property owner names Will do. Construction is within existing City street ROW 26 6 Is the WL alignment correct?Not 100% certain. Location shown based on survey and Water maps. 27 6 Provide Stainless Steel Inserts for lines 18" and larger Will do. 28 6 Indicate Pavement type Pavement type was indicated in plan, pavement repair note in profile. 29 6 Change Figure A, Case 2 to Figure B, Case 3 Will do. 30 6 Provide for exploratory d-hole of storm sewer Will do, but this was previously deleted @ City's request 31 6 Note contractor to protect existing WL Will do, but contractor is already required to protect utilities by specs. 32 6 If slope from Sta 4+16 to here is evened out, capacity is increased Yes, but so are conflicts with existing utilities 33 7 14" Boadark Tree?Tree indicated bears what some call ''horseapples". (Should be Bois D'arc) 34 7 Construct Clay Dam Will do. 35 7 Show MH's to remain as dashed Will do, but there was no construction note indicating a new MH contr. 36 7 What about pavement type in center of street?There is no pavement here. This is a median 37 7 Consider pipe bursting in lieu of open cut because of trees.Pipe bursting could be an option here. Has forrester seen this site? 38 7 Change Figure A, Case 2 to Figure B, Case 3 Will do. 39 7 Gas line shown off profile Will delete 40 7 Indicate Property Owner names Will do. Lot/Block already indicated. 41 8 Insert words "Ground (typical)" on existing @ CL note Will do. 42 8 Proposed sewer is very close to SD.Line is shallow and is in same alignment as existing SS. 43 9 Match Crown to Crown Can't lower MH's due to downstream utility conflicts 44 9 Bore short distances near trees This is in the same alignment as existing and needs to be open cut or burst. 45 9 Indicate pavement type in plan Will do. However, pavement repair note already included in profile 46 9 Add hydraulic slide to MH connection @ Sta 11 +87 Will do. 47 9 Change Figure A, Case 2 to Figure B, Case 3 Will do. 48 9 May need to move WL away from MH Will provide notes for contractor to relocate WL 49 9 Make conflict structures with SD's subsidiary Will do. 50 9 Show MH's to remain as dashed Will do, but there was no construction note indicating a new MH contr. 51 10 Delete "Shallow” MH callout Will do 52 11 Check drip line of trees Line to be replaced is relatively shallow and in the middle of the street. 53 11 Change Figure A, Case 2 to Figure B, Case 3 Will do 54 11 Was line replaced within the last 15 years Don't know. Line designed in accordance w/ SSES recommendations. 55 12 Line shown for M3 as solid is designed on a different sheet Will modify, but there are not constr. notes for that portion on this street. 56 12 Change Figure A, Case 2 to Figure B, Case 3 Will modify. 57 12 Insert words "Ground (typical)" on existing @ CL note Will do. 58 12 Use flat top barrel on shallow manhole Is it necessary to say "flat top barrel" on plans or will shallow MH suffice? 59 13 Indicate pavement type Pavement repair note was indicated in profile 60 13 Add word "cone" to shallow MH callout Will do 61 13 Install upstream 20' of L-650 BOTOC The bore pit will not avoid trees any more than a shallow trench. 62 13 Change Figure A, Case 2 to Figure B, Case 3 Will do 63 13 Show MH's to remain as dashed Will do, but construction requirements here are already clear. 64 13 Provide more information on Part 1 project referenced.Part 1 project is defined in general notes. 65 13 Why extend end of line to Sta 6+00 (L-651)Existing pipe apparently extends beyond existing MH. 66 13 Indicate pavement type Pavement repair notewas indicated in profile. City to confirm type. 67 13 Indicate existing 6" size in plan Will do. Size clearly indicated in profile. 68 13 Install downstream 30' of L-651 BOTOC Pipe bursting could be an option here. Has forrester seen this site? 69 15 Show drop pipe in profile Will do. Drop manhole already clearly indicated in plan and profile. Summary of Comments Basin 42&54 Part 5 Additional Plan & Specification Review Comments Summary of Comments Engineer's Response Comment No. Sheet No.Comment Response 70 15 Change Figure A, Case 2 to Figure B, Case 3 Will do. 71 16 What is 8" dropping into It should be dropping into a drop constructed during Part 1. Will clarify 72 16 If MH is to be replaced, call out as double drop MH is to remain 7?16 8" Gas line?8" Gas crossing is shown in both plan and profile 74 16 Change Figure A, Case 2 to Figure B, Case 3 Will do 75 17 Change Figure A, Case 2 to Figure B, Case 3 Will do Summary of Comments FortWoRth MEMORANDUM TO:A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager FROM:Tony Sholola date:March 31, 1999 RE:DESIGN FEE AMENDMENT NO. 2 TO SANITARY SEWER MAIN 42 AND 54 DRAINAGE AREA SANITARY SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 4, CONTRACT 1), PART 5. DOE NO. 1435, SEWER PROJECT NO. PS46-070460410180 The proposed amendment will reimburse Carter & Burgess, Inc., for the additional design serv­ ices that were provided on the project as requested by City. The plans for this project were approved and ready for advertisement in April 1998. However, the project could not be advertised for bids without a railroad permit which was finally obtained in February 1999. Prior to advertising the project for bids, it is necessary to revise the previously approved plans and specifications so that they conform with cunent city standards. Carter & Burgess, Inc., has requested a fee of $4,490.00 for the additional services to be pro­ vided thereby increasing the contract fee from $196,910.00 to $201,400.00. I believe this fee is fair and reasonable for the additional services to be provided. Please authorize the additional design fee by your signatures on the attached contract amendment form. Tony Sholola Attachment cc: John Boyer, Project Manager Berdena Hamilton, Water Department Dan Pepon, Water Department MEMO 1435 _________________________ENGINEERING DEPARTMENT_________________________ The City of Fort Worth ★ 1000 Throckmorton Street ★ Fort Worth, Texas 76102-6311 (817) 871-7941 ★ Fax (817) 871-7854 Printed on recycled paper