WHEREAS, the City of Fort Worth (City) and Matyastik & Phillips Investments LLC
(Developer) entered into a Community Facilities Agreement, City Secretary Contract No. 41-�ZLI
("CFA"); and
WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA to add City
participation in an amount not to exceed $18,742.11 for the City's portion of costs associated with
the 8-inch water main construction contemplated by the CFA; and
WHEREAS, the City Council authorized execution of Amendment No. 1 to the CFA on the
day of pm�, , 2011 via M&C C,-,q L}$a7 .
NOW THEREFORE, City and Developer, acting herein by and through their duly authorized
representatives, enter into the following agreement, which amends the CFA:
1.
Cost Summary Table is amended to be and read:
Developer's
Cost City's Cost Total Cost
A. Water and Sewer Construction
1. Water $ 22,834.00 $ 14,417.00 $ 37,251.00
2. Sewer $ 1,781.00 $ 1,781.00
Construction Cost Sub-Total $ 24,615.00 $ 14,417.00 $ 39,032.00
Plus 25% Contingency $ 24,615.00 $ 18,021.25 $ 42,636.25
Construction Fees:
B. Inspection Fee (2%) $ 492.30 $ 360.43 $ 852.73
C. Material Testing Fee(2%) $ 492.30 $ 360.43 $ 852.73
Construction Fees Sub-Total $ 984.60 $ 720.86 $ 1,705.46
Total Water and Sewer Project
Cost $ 25,599.60 $ 18,742.11 $ 44,341.71
The costs stated herein may be based upon construction estimates rather than actual cost. The
City's portion of inspection and material testing fees are directly allocated to the City's accounts for
charges and does not reimburse the Water Inspection and Material Testing Fes to the developer. The
City's participation estimate shall be based upon unit prices contained in City f Fort Wort r in e
No. 19192 (or by public bid). The City's cost participation shall be in a 99"&RBC d
$18,742.11 ("Participation"), but the reimbursement of the Participation ( Afto d
AMENDMENT NO.1 FT. WO"••y �A
Matyastik Addition#2
Page 1 of 3
material testing fees) is not a lump sum amount and may be less than stated above depending upon
actual quantities from the Notice of Final Completion package (`Green sheet') and unit prices from the
construction contract document and Green sheet but not to exceed the unit prices contained in the City
of Fort Worth Ordinance No. 19192;
City pays for 8"waterline from station 4+52.58 to Irish Glen Trail, station 8+40.24
Item Unit Quantity City unit Private Lower City
price bid unit price participation
price
8"waterline LF 408 $30.00 $30.00 $30.00 $12,240.00
8"gate valve EA 1 $935.00 $3,400.00 $935.00 $935.00
Fittin s TN 0.35 1 $3,600.00 $2,000.00 $2,000.00 1 $1,242.00
Total $14,417.00
Contingency 25% $3,604.25
Plus contingency $18,021.25
Inspection $360.43
Material testing $360.43
Grand total $18,742.11
Note: The fittings are calculated by percentage: total length of an 8"waterline is
862'=100%. The length of an 8"waterline that city pays for is 408'=47%, hence 0.75 TN
47% = 0.35 TN.
2.
All other provisions of the CFA, which are not expressly amended herein, shall remain in
full force and effect.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
!PPIC/44 RFCO
SF�RFTq� D
AMENDMENT NO. 1 WOmni TJr
Matyastik Addition#2
Page 2 of 3
EXECUTED on this the 1-1 day of , 2011, in Fort
Worth, Tarrant County, Texas.
o>j FOOP4
�0 %0 0
°
P o 0
ri
ATTEST: �� °°°°0000°°°°°* Acy CITY OF FORT WORTH:
Many Hendrix Fernando Costa,
City Secretary Assistant City Manager
APPROVAL RECOMMENDED:
Con traci. huthoriaatiox
14 - V
pate S. Frank Crumb, Director
Water Department
APPROVED AS TO FORM
AND LEGALITY:
z A"e4a::� y/0--
Marcia Wise
-grp� pttty City Attorney
stwaa A-'S'Srrw
DEVELOPER
Matyastik& Phillips Investments LLC
By:
alter E. Matyastik
Managing Member
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
AMENDMENT NO. 1
Matyastik Addition#2
Page 3 of 3
FORT WORTH N
Matyastik #2 Wa E
WATER S
- G LDEN TRIAN E
m
8 RIDS HICKS Aug �_
' v m
O e{; C)
�o TAR ANT
r O . o
Z 0
BAILEY BOSWELL
r 4 ,` Q } + ! ASS OD
Q 3
1 TER CENT R n
MCLE Y
v�E � LON ORN 2 F k 'ELL' o
��
O V
o ti w
T3 Q
X
* ; ,
,
�. MEA A i
F 1
oZ Q� Z�F
�
. S� LONG y m
E .
g� qsa, 2 T
E � ✓9� '183 ,I Q 183
n 8 r'
Z5 Ap"
- r
o �- -
r U)
s.
S �
r a F ,
\� i
CCC 6 ST
O
-6-8 7T N
t9
i
E + ;'E a� x* NCAS-T
+ f ms`s tw
r t c
3°
RC) ED
r m ,-
LL W
y
OD
cc
Legend
� w
U,
U Z x
S8 Waterline w o RRY
R - - -
z I
County Land eke
N
0 5,000 10,000 15,000 20,000 NAD-1983_StatePlane_Texas—North_Central_FIPS_4202_Feet 1 inch equals 10,000 feet
Feet
M&C,Review Page 1 of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA Foe_ T�ii
COUNCIL ACTION: Approved on 4/5/2011
DATE: 4/5/2011 REFERENCE NO.: **C-24827 LOG NAME: 60MATYASTIK#2
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Approve Amended Community Facilities Agreement, City Contract No. 41224, with
Matyastik & Phillips Investments LLC and Authorize City Participation in the Amount of
$18,742.11 for Construction of an Eight-Inch Water Main to Serve Matyastik Addition No.
2 a Development Located in Fort Worth Extraterritorial Jurisdiction (COUNCIL DISTRICT
7)
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to amend the Community Facilities
Agreement with Matyastik & Phillips Investments LLC and authorize City participation in the amount of
$18,742.11 for the construction of the eight-inch water main to serve Matyastik Addition No. 2, a
development, located in Fort Worth Extraterritorial Jurisdiction.
DISCUSSION:
Matyastik & Phillips Investments LLC, the developer of Matyastik Addition No. 2 has executed a
proposed contract for community facilities to serve a development located in Fort Worth Extraterritorial
Jurisdiction (ETJ) (see attached map). The application for outside city water and sewer services was
approved on November 9, 2010 as M&C C-24568.
Total construction cost for water and sewer improvements for this development is $44,341.71. There will
be City participation for the construction of eight-inch water main that will improve the service to the
Matyastik Addition No. 2 and surrounding area. The Developer estimated costs for water and sewer
improvements are subject to construction inspection fees.
Cost summary table:
Developer's Cost 11 City's Cost Total Cost
A. Water and Sewer Construction
1. Water $ 22,834.00 $ 14,417.00 $37,251.00
2. Sewer 11 $ 1,781.00 $ - $ 1,781.00
Construction Cost Sub-Total $ 24,615.00 11 $ 14,417.00 $ 39,032.00
25 Percent Contingency $ - 11 $ 3,604.25 $ 3,604.25
Plus Contingency $ 24,615.00 $ 18,021.25 $42,636.25
Construction Fees:
B. inspection Fee 2 Percent $ 492.30 $ 360.43 $ 852.73
C. Material Testing Fee 2 Percent $ 492.30 $ 360.43 $ 852.73
Construction Fees Sub-Total $ 984.60 $ 720.86 $ 1,705.46
Total Water and Sewer Project Cost $ 25,599.60 $ 18,742.11 11 $44,341.71
The developer's contractor, Cleburne Utility Construction, Inc., proposes to construct water and sewer
for $44,341.71. Upon Council's approval, City staff will execute an amended Community Facilities
Agreement to include city participation for water between the City and the Developer.
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=14740&councildate=4/5/2011 04/22/2011
'M&C,Review Page 2 of 2
This project is located adjacent to COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Water Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
P265 539140 600150162583 $18.021.25
P265 531350 600150162585 $360.43
P265 531200 600150162584 $360.43
Submitted for City Manager's Office by: Fernando Costa (6122)
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: Viesha Kaminska (8428)
ATTACHMENTS
Matyastik No 2 CFA exhibit.pdf
Matyastik No 2 M&C approved.mht
http://apps.cfwnet.org/council_packet/mc review.asp?ID=14740&councildate=4/5/2011 04/22/2011