Loading...
HomeMy WebLinkAboutContract 41253-CO2 y DISTRIBUTI$IQ: CITY OF FORT WORTH C s�CRETARY, ` CAHNARY FICONSTRUCT16N SERVICES CHANGE ORDER REQUEST CONTRA"NO.,A` a53-(b PINK—PROJECT MANAGER GOLDENROD-CONTZACTOR CHANGE ORDER NO. DATE D.O.E.NO PROJECT NO. 2 01/31/2012 6507 GR74/541600/080--t475231830 PROJECT DESCRIPTION CITY SECRETARY CONTRACT NO. PHASE I IMPROVEMENTS AT COBB PARK-ADDITIONAL WORK 41253 ORIGINAL CONTRACT AMOUNT......................................$ 2,698,784.15 EXTRAS TO DATE............................................$ 571,986.73 I CREDITS TO DATE..............................................$ 0.00 CONTRACTCOST TO DATE.........................................................................................................................................$ 3,270,770.88 AMOUNTOF PROPOSED CHANGE ORDER.............................................................................................................................$ 23,109.95 i REVISEDCONTRACT AMOUNT...................................................................................................................................................$ 3,293,880.83 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS......................................................................................$ 600,000.00 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS...............................................................................$ 4,903.32 ADDITIONALFUNDING(IF NECESSARY)......................................................................................................................$ 0.00 IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL: SEE ATTACHMENT. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents Payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order CONTRACTOR'S NAME: THE FAIN GROUP,INC. ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACT TIME TO DATE ADDITIONAL TIME FOR THIS CHANGE ORDER 200 WD 80 28OWD 10 WD CONTRACTO DAT PROJECT MANAGER / DATE 4 t�- 7 A \� MANAGER/ NST. DA / CTOR/MANA ING DEPT DATE 1 Oyi/ NTRA �Z ATE Z , , CITY ATTORNE DATE AS CITY MANAGE L ♦0000 p COUNCIL ACTION(IF REQUIRED) DATE 9 APPROVED 9 DISAPPROVED 9 OTHER AUefted by, w-0 o O AL � ORIGINAL IN M o� ,� AL, '"""� J. � S a11�TEX Pale � ; t1A1ZV., DATE 01/31/2012 PARKS AND COMMUNITY SERVICES DEPARTMENT CHANGE ORDER JUSTIFICATION RECORD PROJECT NAME: PHASE I IMPROVEMENTS AT COBB PARK—ADDITIONAL WORK CHANGE ORDER: 2 DOE NO. 6507 CLIENT PROJECT NO GR74/541600/080475231830 INSPECTOR: MARK OWEN PHONE NO: (817)223-2267 PROJECT MANAGER: SCOTT E.PENN PHONE NO: (817)392-5750 REASON(S)FOR CHANGE: PURPOSE OF THIS CHANGE ORDER IS TO REMOVE TREE REMOVAL LINE ITEM FROM CO#1,ADJUST CO#1 LINE ITEM QUANTITIES FOR ASPHALT AND CONCRETE PAVING,ADJUST FOR CALCULATION ERROR IN CO#1,ALLOW FOR SPOILING OF EXCAVATED MATERIAL ON SITE IN THE FORM OF BERMS TO CONTROL STORM WATER RUNOFF FROM LARGE OPEN SPACE; BERMUDA SOD ALSO TO BE PROVIDED FOR IMMEDIATE VEGETATIVE COVER OF BERMS,AND TO COVER GAPS IN ENTRY MONUMENTS WHERE TRANSITIONING FROM STONE VENEER TO CEDAR PLANKING AT THE TOP PORTION-- IT BECAME NECESSARY TO MITER THE CEDAR TRIM TO CLOSE THIS GAP BETWEEN THE PLANKING AND STONE VENEER—THIS WILL ELIMINATE ANY TYPE OF NESTING PROBLEMS ALSO INCLUDED IN THIS CHANGE ORDER IS THE PULVERIZATION& STABILIZATION OF THE EXISTING ASPHALT PARKING LOT IN LIEU OF MILLING. UPON INVESTIGATION OF THE EXISTING PARKING LOT,NOT ENOUGH MATERIAL WAS PRESENT TO MILL AND OVERLAY. - -------------------------------------------------------------- ---------------------------- ------------ --------- --------------- INSPECTOR DATE i PROJECT MANAGER DATE 31 le 01 CTOR OF MANAGING DEPT. DATE MANAGER OF CON .SE VICE DATE i IR.OF CONTRAi D TF. Gf t lL Page 2 ORIGINAL No. PAY ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL UNIT THIRTEEN—ALTERNATE ITEMS 1. Delete Line Item#7 Tree Removal(CO#1) 2 EA <$100.00> <$200.00> 2. Delete Line Item#40 Mill Existing Parking Lot (CO#1) 11420 SF <$0.51> <$5,824.20> 3. Increase Line Item#3 Clearing&Grubbing(CO#1) 1.23 AC $2,500.00 $3,075.00 CO 41 Miscalculation 4. Increase Line Item#14 ADA Space Striping(CO#1) 1 EA $65.19 $65.19 CO#1 Miscalculation Type`D'Asphalt—Roadway& 5. Decrease Line Item#10 Parking Lot(4"depth)(CO#1) 2886 SF <$1.22> <$3,520.92> Type`B'Asphalt—Roadway& 6. Decrease Line Item#I I Parking Lot(4"depth)(CO#1) 2886 SF <$2.15> <$6,204.90> Concrete Basketball Courts/Plaza 7. Decrease Line Item#26 (includes jointing)(CO#1) 152.85 CY <$288.00> <$44,020.80> 8. Add- Line Item#45 5 Earthen Mounds w/sod(PCO#8) 1 LS $18,757.58 $18,757.58 Storm Water control/Spoil Mat. 9. Add- Line Item#46 Cedar Trim on Entry Monuments 1 LS $2,417.00 $2,417.00 (PCO#10)prevent nesting Pulverization&Stabilization in Lieu of Milling—Existing Asphalt 10. Add- Line Item#47 parking lot 1 LS $58,566.00 $58,566.00 Total $23,109.95 ORIGINAL Page 3 PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME: Cobb Park Phase I BuySpeed No: PO-11-00064511 Contract No: CS41253 City Project No: GR74-541600-08047523830 D.O.E. No: 6507 Attachment to Change Order No: 2 Today's Date: 2/15/12 TOTAL Original Contract Amount: $ 2,698,784.15 Extras to Date: $ 571,986.73 Credits to Date: $ - Contract Amount to Date: $ 3,270,770.88 Amount of Proposed Change Order: $ 23,109.95 Revised Contract Amount: $ 3,293,880.83 Contingency Funds Avail. for Admin. Change Orders: $ 600,000.00 Remaining Funds Available for Change Orders: $ 28,013.27 Additional Funding (if necessary): $ - Prepared By: Christy Ezemack T/PW Construction