HomeMy WebLinkAboutContract 41262-CO1 FORT WORTH City of Fort Worth CITY SECRETARY O i
Change Order RequestCMTRACT NO.
Project Narnal Water and Sanitary Sewer Replacements Contract 2009-B City Sec No. 41262
PmiectNo.(sJ P25 M170139783 and P258-706170139783 DOE No. 6275 City".No. 001,397
pm Water and Sewer Replacements on Ashford Avenue,Ashford Court,Bett xt Street,Morley Avenue,Westhaven Drive,
and Wosle Drive.
Conaster Construction TX,LP Change Order# Date: 40011
City Project Mgr.1 John Underwood City Inspector I Richard Salazar
Phone Number: 817-392-2629 Phone Number: 817-223-2261
Dept. Water sewer Totals Contract Time
Calerhdar d
Orihal Contract Amount 210
Extras to Dale k,
Credits to Dale y= y
Pending Change Orders(in M&C Process)
Contract Cost to Dale
nt of Proposal Chanp Order u z µµ. i ` bt
Revised Contract Anxxmt
.<:
Original Funds Available for Change Orders $29673 $31,567.001
Remaining Fwxls Available for this CO
Additional Funding(N necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT(OItK3INAL CONTRACT COST+2M)
4_
The change order will provide for the following:
• Increased pay item quantities of permanent asphalt pavement repair,curb and gutter and
concrete driveway that are needed to complete the project. ;n
• The deletion of pay item quantities that are no longer needed on the project.
nested by: O�p•F�°°�,�f►a�
°ada
arty Hen x, City S tatty °
Q, °o 0 ci
P o°oo oo°o*�
K is under*od and agreed that the acceptenoe of this phtactDr aonsWdes an accord and satisfaction and represents payment
lent
in full(both time and money)for all costs arising out of,or Change Order.
Conas COnslrucllorr TX,LP Jesse Martinez 9
I Al 29 J 4�2q 1
C
MbC Number NO M&C R UIR);T Dale Appr°ved ��
• • • all • 1
/ : • . : .r.1 1;
P253-606170139783 and P258-706170139783
1':+'h 1'I•
Ddw &W Wosley 1
OEM a- li
77 MEL M- 1 I
MEEL'. Out
c 1 11
FO m-r WORTH City of Fort Worth
W 000w, Change Order Deletions
Project Name Water and Sanitary Sewer Replacements Contract 2009-B City Sec No. 1 41262
Project No.(s) P253-606170139783 and P258-706170139783 DOE No. 6275 City Proj.No. 01397
Project Description Water and Sewer Replamnents on Ashford Avenue,Ashford Court,BettW Street,Morley Avenue,Westhaven
Drive,and Wosley Drive.
Contractor Conaster Construction TX,LP Change Order#= Data 4/29/2011
City Project Mgr. John Underwood City Inspector Richard Salazar
DELETIONS
ITEM DESCRIPTION DEPT Qty jUnit Unit Cost Total
24 Concrete Type B Install Water 30.00 CY $5. $150.00
25 Concrete Type E Instal Water 20.00 CY $5. $100.00
26 Subgrade Crushed Limestone for Misc Placement Water 20.00 CY $1.00. $20.00
1 Pipe Sewer 8 Inch SDR 26 PVC Instal Sewer 7.00 LF $30.001 $210.00
2 Pipe Sewer 8 Inch SDR 35 PVC Instal Sewer 60.00 LF $26.501 $1,590.00
4 Pipe Sewer 12 Inch SDR 26 PVC Instal Sewer 5.00 LF $36. $180.00
5 PIpi Sewer 12 Inch SDR 35 PVC Instal Sewer 7.00 LF $34. $238.00
6 Manhole Std.4 Foot Diameter 30'Clear Opening&32'Cover to 6 Fo Sewer 1.00 EA $2,300.00 $2,300.00
7 Additional Depth Over 6 Foot Std.4 Foot Diameter Manhole Instal Sewer 8.50 VF $130.00 $1,105.00
9 Watertight Insert Sewer Manhole Instal Sewer 32.00 EA $40.00 $1,280.00
11 Manhole Remove Sewer 1.00 EA $200.00 $200.00
12 Sewer Service 4'Tap Instal Sewer 5.00 EA $150.00 $750.00
14 Sewer Service 4'SDR 26 PVC Service Line Instal Sewer 277.00 LF $30.00 $8,310.00
15 Sewer Service 4'2 Way Cleanait Instal Sewer 5.00 EA $125.00 $625.00
16 Pavement 21nch HMAC on 6 Inch Flex Base Temporary Instal Sewer 62.00 LF $7.00 $434.00
20 Concrete Type B Instal Sewer 30.00 CY $5.00 $150.00
20 Concrete Type E Instal Sewer 20.00 CY $5.00 $100.00
22 Subgrade Crushed Limestone for Misc Placement Instal Sewer 20.00 CY $1. $20.00
24 Inspectim Pre-Conatnrctbn Cleaning&TV Sewer 2,492.00 LF $2.00 $4,984.00
30 Trench Safety System Over 5Foot Depth Instal Sewer 1,142.001 LF $1.25 $1,427.50
WSW $270.
Sft r $23,903.
Page 3 of 4
Deletions Sub Total $24,171
MMBE Breakdown for this Change Order
MWB S'� of Servic e u.
Mn
X9 Rnt,ft thi Ct�
Total ;�� �
Prevkous Change Orders
Total
Page 4 of 4
°o Co v°l L°rl
V) M 1� � �
all ti N
M N CI ti ti
Cl) N t0 t0 t0
ti
tC 69 to to to to to to to
v
N
V O O O O O O
i
L � N CD v r- ti
' till It V tty t0 t0
co coi e
0 0) N N N
Ci/! V3 to to EN tr4 to tq U)
CL
O O W to O O CO
~ O O C C C o
0
W oa a ti tiaM NC4 t5
01 aci m ~ N N N v0 to C 2
c'p C' N N
� L
Q 3 o 40 40 4, 40 4, 40 a, 4* w
LO) °o 0
0 r
U rn w
tco 000 O
W t U o w m m
' cr in °1 'v
O U � �' '` r- v� c�o0 v
m C4
a S a o U C m
m .5 tco
z° 0
Q L m
L 0 o o N a
m
O m m m U o _m m
cm o 0 .o Q w
tc0 Q 0 o m Q m Q
t
cm
ii t � tbo :q o c c
Z Z Z p W U E a 0 v " ii
U m mZZ mo V Q oV m .c �
m o 'i •- v c
Ora w c .90 = mo
<IUam000 < F- 0r XQ