HomeMy WebLinkAboutContract 41263-CO3 P CITY SECRETARY CON TRACT NO. 2 3 FORT WORTH. City of Fort Worth Change Order Request ProjectNamel OAKRIDGE TERRACE 8 LINDA LANE DRAINAGE IMPROVEMENTS A City Sec# 1 41263 Client Project#{s P253-541200-60817 00474 83 P258-541200-70817-00474083 P- 541200-20828 00474 83 Project Descriptiorl Water,Sewer,Storm Drain Improvements with Pavement Improvements. Contractorl Conatser Construction Change Order# 0 Date 8/10/2011 City Project Mgr.J Michael Owen City Inspector I Douglas Jackson Dept. TPW Water Sewer Contract Time Totals D Original Contract Amount ,124. 5 $352,258.00 .25 1,21 .50 175 Extras to Date $48,341.37 $31,120.13 $38,598.50 $118,060.00 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $577,465.62 $383,378.13 $375,498.75 $1,336,342.50 175 JAmount of Proposed Change $14,7KOG. -'-WX- $G.W- $14,780.00 10 Revised Contract Amount $69Z245.62 37813 $375,498.75 1, ,1 185 Original Funds Available for Change Orders $25,000.00 $17,600.00 $16,800.00 $59,400.00 Remaining Funds Avaika"for this CO $0.00 $0.00r $0.00 Additional Funding(if necessary) $14,780.00 $14,780.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 10.90%'. MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1 $1,522,853.13 This change order is required to provide additional bank stabilization on each end of the gabion outlet structure to avoid erosion along the creek in this City Park. This was not included in the original scope but should be considered in future design of gabion protected outfalls to protect the edges of the structure from rising fast moving waters in the channel during storm events,as well as localized run-off drainage from the top of banks. 4a'oobnnn "p, rc °Rro�� /y v.1 0 _ Attested by: OFFICIAL RECORD o CITY SECRETARY FT. WORTH, TX * 4aaoo°00000 ,Cy � n r oXA, a'O' Many H1Md.1 !1+ 1•on1W tt`i�au'o. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Conatser Construction s. 1 TAM IL z i z ri M&C Number I kJAr M&C Date Approved 09-30-11 A11 .05 IN 9 0 rr rr q cc co � S A § K _0 CD £ 9 CA E 2 q _ � � o _ cif e E $ m a a S m § g @ k » o A O 7 m go -4 r- 00 J 2 q 2 2 z 0 n CA C.) O CD -4 m O � CL » 3 2 £ a-n 2 2 2 \ M � p (A Ll 2 - =r co on � 7 co co _ g c CD 0 o @ 4 2 E o % t cn c =3 § C� O 0 � § (A , a 12i 4q � 7 @8 v 0 o _v O o v co n N O co 7 4t CD n.] m &�? C, CD v = o g 0 m o o o -4 0 v CD m m R Qo r Z W D CD `+ Ca+ S ? v °O cu = n :3 N Z m CD D 0 m m 0 � m (D ao r- a -4 0 � N y z = � CD o CIO m N N CD Q p O C Cb N N 00 CA 0 L A v Cypl C > O GJ o 0 m 0 W o J N OO N O _A N O W O O O S O MIWBE Breakdown for this Change Order MWBE Sub, Type of Service: Amount for this M,, Total ,0 Previous Change Orders c© DATE AMOtlNT; Total Off '