Loading...
HomeMy WebLinkAboutContract 41271-A1 AMENDMENT NO. 1 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES EAST MULTI-PURPOSE FACILITY AT THE WILL ROGERS MEMORIAL CENTER STATE OF TEXAS CITY SECRETARY CONTRACT NO. IoZ —M COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Hahnfeld Hoffer Stanford, Inc. (Architect) made and entered into City Secretary Contract No. 41271 (The Contract) which was authorized by the City Council by M&C C- 24664,the 14th day of December, 2010;and WHEREAS, further amendment is necessary to reimburse the Architect as part of the design services agreement for additional design services for integration of the public art murals. NOW THEREFORE, City and Architect, acting herein by and through their duly authorized representatives,enter into the following agreement which amends the Contract: 1. Article 1.1, SECTION I —SERVICES OF THE ARCHITECT, the following paragraphs are added to read as follows: Provide additional design services for integration of the public art murals. The cost of this additional service is $25,215.00 plus up to $100.00 in reimbursable expenses. The scope of services is described more fully in the Hahnfeld Hoffer Stanford letter dated April 28, 2011, subject: Additional Construction Administration Services which is attached hereto as Attachment "A"and made a part of this Agreement." 2. Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of$423, 665.00 plus up to$9,000.00 in reimbursable expenses. 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. (The remainder of this page is intentionally left blank.) E L RECORD CRETARY RTH, TX _� I EXECUTED this the Lhay of I A 2011, in Fort Worth,Tarrant County,Texas. HAHNFELD R S NF RD, INC. APPROVED: By: By: Eric L. H n Id Fernando Costa President Assistant City Manager APPROVAL ECOMMENDED: RECORDED: By: , B y: / 0 � IA`\ IA Douglas#.Weirsig, Director Marty Hendrix Transportation&Public Works Department City Secretary oo�4bA� a Fonr a� ooccc,c�o v 00 0,p° oAPPRO =WBflack D LEGALITY: M&C Not Required v o�- A Contract Authorization C f'o By: o Assistant City Atoney C 0000000000 P �G aaa��U.11ti1O4�fi OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX r y 2, A � Al , Halhnfeld In � e n e fr Hotter S7Wnfor d April 28,2011 Mr, Ronald Clements Project Manager Facilities Management Group Transportation and Public Works Department City of Fort Worth 401 West 13th Street Fort Worth, Texas 78102 Re: Additional Construction Administration Services Dear Ronnie: The following is a request for additional service charges for continued Construction Administration services beyond the original contract,on the part of our office and that of our consultants. The Contract (No. 41271), dated 12-14-2010,Section IV, states that"If authorized in writing by the City, Architect shall furnish or obtain from others special services necessary to complete the Projects. These special services are not included as part of the Basic Services outlined in Section I-Services of the Architect and Attachment"A'. As we have moved into the construction phase,discussions have been held regarding the proposed public art as to location, size, lighting, detailing for the best durability of the artwork panels, and the impact of required trees on the visibility of the artwork. As a result, some artwork locations must be adjusted in size, brick "picture frames" must be added around the artwork to provide additional depth for the artwork mounting system, the internal wall drainage system must be modified behind the artwork panels to allow free drainage, and trees must be relocated to allow long-term visibility of the artwork. This additional services proposal takes all these changes into account and provides the City with the necessary design services to accomplish the required adjustments. In response to your call requesting a review of the fees proposed for this scope of work on April 1, I have visited with Dunaway and Baird Hampton Brown. Both have informed me that they are unable to adjust their fees,and stated that they accurately reflect the level of effort that will be required to complete the work, In addition, I have reviewed the proposed scope and fee for Hahnfeld Hoffer Stanford,and offer a reduction in our project architect's labor estimate by four hours. COMPENSATION Total compensation for professional services is a lump sum fee of $25,215 as detailed in the attached documents and consists of $15,915 for architectural services, $1,800 for electrical engineering services, and $7,500 for landscape, irrigation and civil engineering services. In addition,we estimate a maximum of $100 in reimbursable expenses. Please contact our office if you have any questions. Sincerely, HAHNFELD HOFFER STANFORD architects planners interiors r, Gary A. Ryan,Al) idCARB Senior Project Manager Enclosures \\ Hahnfell Hoffer Overall �\;' 0�' Stanfor) Project Manager: Gary Ryan Date: 4/28/2011 Owner: City of Fort Worth Fee Type: Lump Sum Project Description: WRMC-Multi-Purpose Facilitity Modifications for Public Art FEE SUMMARY Job Number: 07015-07 Architectural Fee $15,915 Consultants Fee $ 9,300 Support Services $ - Total Fee $25,215 Reimbursables $ 100 Total+Reimb $ 25,315 Discipline No. Est. Burdened Total Fee %of Dwgs. Hours Hourly Rate Fee Per Discipline Total Fee Management $8,235 32.66% Principal in Charge PIC 8 $190 $1,520 Sr Project Architect Sr PA 43 $158 $6,715 $0 $0 $0 Architectural 0 .1 1 $6,900 27.36% Project Architect PA 60 $115 $6,900 $0 $0 $0 $0 Administrative Support $780 3.09% Clerical Cler 0 $82 $0 Construction Admin Const Admin 6 S130 $780 $0 $0 $0 Electrical 0 $1,800 7.140 Principal in Charge PIC 0 $175 $0 Project Manager PM 1 $150 $150 Sr Engineer Sr Engr 3 $125 $350 Engineer-EIT EIT 4 $85 $340 CADD/Drafting CADD 16 $60 $960 Civil/Landscape 0 $7,500 29.74% Project Manager PM 5 $156 $819 Design Engineer DE 2 $124 $247 Landscape Architect L Arch 18 $129 $2,322 CADD Technician CADD 46 $86 $3,956 Administrative Admin 2 $78 $156 Support Services(Intl.In Total Fee) Support Services(not included) Reimbursables Other $ - Other S Travel/Subsistance $0 Other $ - Other $ Postage/Shipping $0 Other $ - Other $ Reproductions $100 Other $ - Other S Other $0 Other $ Other S Subtotal $100 Other $ Otherl S Markup 0% $0 Total I $ Total $ I Total $100 Page 1 of 5 +r _ - . Architectural "Ciffer 0+� Startford Date: 4/2812011 Owner.Event Facilities Fort Worth,Inc. PIC 8 Labor$: $ 1,520 Project Description:WRMC-Mufti-Purpose Facilitity Sr PA 43 Labor$: $ 6,715 Public Art Modifications PA 60 Labor$: $ 6,900 Job Number:07015-07 Cler - Labor$: $ - ConstAdmin 6 Labor$: $ 780 Total Hm: 117 Total$: $ 15,915 Sheet % Const No. Project Activity - Comp PIC Sr PA PA Cler Admin Hours Cost Subtotal Total Tasks Public Artwork Mounting/Location Revisions Study alternative locations on buiidinq for public art 1 2 4 $578 Meet to discuss artist's 2 uremenis behind arwork panels i 1 1 3 $463 Study ways to accomplish desired recess detail for artwork 1 2 1 6 1 1 11 $1,426 Meet with brick technical engineer to discuss recess detail 2 2 4 $546 Prepare preliminary details for brick recess 2 8 10 $1,236 Modiiv locations and sizes of artwork per artist's input 0.5 3 4.5 $614 Study reinforcement options for increasing recess for art 1 2 3 $388 Review deiailina probzems for requested 1.75"recess 1 1 3 $463 Contact MAPE€represemaiive reoardin mountinc details 2 2 $230 Meet with local MAPEI rep to review mounting detail options 1 1 2 $273 Document research and recommendations 3 1 4 $589 Cons-It with artists Ve consultant regarding mounting detail 2 2 $316 Develop ictu.-e frame elevations and details for artwork 1 4 5 $618 Study ssibili of removing insulation to open drain cavil 1 1 $115 Conference call with artist,61e consultant to settle on detail 0.5 1 1.5 $253 Incorporate decisions in:o construction document revisions 1 8 20 29 $3,754 Coordinate h h+tinq revisions for revised panel sizes,,'locations 1 1 1 2 1 $273 Issue revised construction documents to GC 1 1 1 2 $273 Prepare work change proposal request to GC 1 1 $130 Reviewiprocess submittals on ar,panel backups stem 1 1 1 3 $403 Preconstmctior.meeting with art panel bacuiup installer 1 1 2 $288 inspect art panel backup Installation 1 1 2 $288 Coordinate protective cover graphics and installation 2 1 3 $446 SUBTOTAL $13,983 Tree Relocation for Public Artwork Visibility Meet with Corner to evaluate the impact of trees on art panels 1 2 $348 Meet:iith Landscape Architect to request relocation of trees 1 1 $158 Coordinate tree relocation discussions 2 2 $316 Prepare final recommendation on tree relocation 0.5 1 1 2.5 $368 fvteetinc with City staff to determine relocation site 1 1 1 1 $158 Coordinate revision of drawings,for Use relocation 2 2 $316 Issue revised construction documents to GC 1 1 $158 Issue work Chan a proposal request to GC for tree relocation 1 1 $130 SUBTOTAL $1,952 TOTALI $15,915 Page 2 of 5 Electrical Date: 4/28/2011 Owner:Event Facilities Fort Worth,Inc. PIC Labor$: $ - Project Description:WRIVIC-Multi-Purpose Facilitity PM I Labor$: $ 150 Public Art Modifications Sr Engr 3 Labor$: $ 350 Job Number:07015-07 :.. Project Activity - ---------- - ---------- - ---------- - ---------- - ---------- - ---------- - ---------- - ---------- - ---------- - ---------- - ---------- - ---------- C11 UANDSCAPE .. . Owner: Event Facilities Fort Worth,Inc. PM 5 Labor$: $ 81 Public Art Modifications L Arch 18 Labor$: $ 2,322 Job Number:07015-07 CADD 46 Labor$: $ 3,956 Project Activity Env".11011.1 .. Hahnfeld Reimbursables Hoffer 0 Stanford Date 4/28/2011 Project Manager. Gary Ryan Travel/Subsistance: $0 Owner: Event Facilities Fort Worth,Inc. Postage/Shipping: $0 %Comp: 0.0% Project Description:WRMC-Multi-Purpose Facilitity Reproduclon: $100 $Remain: $100 Public Art Modifications Other: $0 Job Number: 07015-07 Total Reimbursable Cost: $100 Budgeted % $ %of % Cost Comp Remain Budget Comp Travel/Subsistence Mileage: 0 miles x cents/mile $0.00 0% $0.00 0.0% 0.0% Airfare: 0 round trips x cost/tdp $0.00 U%) $0.00 0.0% 0.0% Parking: 0 days x $/day $0.00 0% $0.00 0.0% 0.0% Auto Rental: 0 days x $/day $0.00 0% $0.00 0.0% 0.0% Taxi: 0 days x $/day $0.00 0% $0.00 0.0% 0.0% Mass Transit: 0 days x $/day $0.00 0% $0.00 0.0% 0.0% Other: 0 days x $/day $0.00 0% $0.00 0.0% 0.0% Travel Subtotal $0 0.0% Hotel: 0 days x $/day $0.00 0% $0.00 0.0% 0.0% Meals: 0 days x $/day $0.00 0% $0.00 0.0% 0.0% Other. 0 days x $/day $0.00 0% $0.00 0.0% 0.0% Subsistence Subtotal $0 0.0% Travel/Subsistence Total $0 0.0 Id a„!*�+kb:i,i�" '.CHS" i.Y k^m'r r a.2.-- -.k"t"ir OLRiX9!IY4''IOC,MO/'?li 94T 'k'.f-...�:, M1 G:,713Ren4-kitltlP w.Mldnk+ 9R'..1iG ¢Rrt Postage/Shipping Overnight Shipments: 0 shipments $/shipment $0.00 0% $0.00 0.0% 0.0% U.S.Mail Postage: 0 shipments $/shipment $0.00 0% $0.00 0.0% 0.0% Other 0 days x $/day $0.00 0% $0,001 0.0% 0.0% Postage/Shipping $0 0.0% T1'.'GYi^4., v....•..-,••9� I %A:Y'mh 14A'!.C•`1.••^'+.'^i �'CF. CiWmiA`M'FGC -. -:i1G-:-..y.„''.-RM,,. S'4^'-?X; 'al Reproduction Drawings: 60 drawings $1.50$/dwq $90.00 0% $90.00 90.0% 0.0% Specification Pages: 100 copies $0.10$/copy $10.00 0% $10.00 10.0% 0.0% Other: copies $/copy $0.00 0°. $0.00 0.0% 0.0% Reproduction $100 100.0% 4,b+Ri'm C-0 L, b9 =yatLYa^,ana.'y+.m :wrcr...rra>. CI41:w YC xc". ,-- '1-,. lIwrGe.: !urCOO e'¢gb..Cq{gl k Other 0 item $/item $0.00 0% $0.00 0.0% 0.0% 0 Rem $/item $0.00 0% $0.00 0.0% 0.0% 0 Rem $/item $0.00 0% $0.00 0.0% 0.0 0 Rem $/Rem $0.00 0% $0.00 0.0% 0.0% 0 Rem $/Rem $0.00 0% $0.00 0.0% 0.0% 0 Rem $/item $0.00 0% $0.00 0.0% 0.0% 0 Rem $/Rem $0.00 0% $0.00 0.0% 0.0 Other, $0 0.0% Page 5 of 5