WHEREAS, The City of Fort Worth and Hahnfeld Hoffer Stanford, Inc. (Architect) made and entered into
City Secretary Contract No. 41271 (The Contract) which was authorized by the City Council by M&C C-
24664,the 14th day of December, 2010;and
WHEREAS, further amendment is necessary to reimburse the Architect as part of the design services
agreement for additional design services.
NOW THEREFORE, City and Architect, acting herein by and through their duly authorized
representatives, enter into the following agreement which amends the Contract:
1.
Article 1.1, SECTION I — SERVICES OF THE ARCHITECT, the following paragraphs are added to read
as follows:
Provide additional design services for the design and of various items.
1. Construction Administration Services for the addition of the East Multi-Purpose Parking Lot
Facility Adjacent to East Equestrian Facility to the scope of work for the Equestrian
Multipurpose Center. The cost of these additional services is $7,416.00. The scope of
services is described more fully in the Hahnfeld Hoffer Stanford letter dated March 23, 2012,
subject: Additional Construction Administration Services— Project No. 07015-08, East Multi-
Purpose Parking Lot Facility Adjacent to East Equestrian Facility which is attached hereto as
Attachment"A"and made a part of this agreement. /
2.
Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows:
"The total compensation for all of the assignments to be performed by Architect as described in
CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of
$450,999.00 plus up to$9,000.00 in reimbursable expenses.°
3.
All other provisions of this Contract which are not expressly amended herein shall remain in full force and
effect.
(The remainder of this page is intentionally left blank.)
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
EXECUTED this the ZI day of , 2012, in Fort Worth, Tarrant County,Texas.
HAHNFELD HOFFER ST RD, INC. APPRQVFQ-
By: r- /
Eric L. ah id By Fernando Costa
President Assistant City Manager .doQFo oF00j),�4a
p` o ��Y
QO %0
APPROVAL . COMMENDED: RECORDED: _ Q0 c 4
f o arE
By: By: *o o°
Douglas .Wiersig, P. E. Directo IQ dryV K 00
Transpo tion&Public Works De rtment City Sec a �o000 Goo o *4a
anAX� �
APPROV O F R AND LEGALITY: M&C Not Required
Contract Authorization
Do6dias,W. Blac
Assistant City Attorney
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
i
far
Ma"u i 2 3, 2012
Mr. Ronald Clements
Pr oJect Manager
Facilities management Group
Transportation and Public Works Department
City of Fort Worth
401 West 13th Street
Fort Worth, Texas 76102
Re: Additional Construction Administration Services- Project No. 07015-08
East multi-Purpose Parking Lot Facility Adjacent to East Equestrian Facility
Dear Ronnie:
The following is a request for additional service charges for continued Construction
Administration services beyond the original contract, on the part of our office and that of our
consultants.
i
• The Contract (No. 41271), dated 12-14-2010, Section IV, states that "if authorized in
writing by the City, Architect shall furnish or obtain from others special services
necessary to complete the Projects. These special services are not included as part of
the Basic Services outlined in Section I -Services of the Architect and Attachment"A".
DESCRIPTION OF CHANGES
Under separate agreement with the City of Fort Worth, Dunaway has prepared construction
documents for the East Multi-Purpose Parking Lot Facility located north of the Richardson Bass
Building, This additional services proposal is for Hahnfeld Hoffer Stanford's construction
administration services for the construction phase of this project.
SCOPE OF WORK
The scope of work includes a 1) site inspections 2) owner/contractor,,'architect/consultant
meetings; 3) administration of RFIs related to the East Multi-Purpose Parking Lot Facility; and 4)
issuance of an ASI to the general contractor.
COMPENSATION
Total compensation for additional professional services related to the above-noted scope of
work is a lumQ sum fee of $7,416 as detailed in the attached document. No additional
compensation beyond the amount stated above is anticipated.
Please contact our office if you have any questions.
Sincerely,
HAHNFELD HOFFER STANFORD
architects planners interiors
i
Gary A.'Ryan, AIA,-N ARB
Senior Project Manager
1C i'c C.:'ej
'Architect Fee Summary and Fy _ — •
;� - •
:- s s
Project Manager. Gary Ryan Date: 3/23/2012
Owner: City of Fort Worth Fee Type: Lump Sum
Project Description: East Multi-Purpose Parking Lot Facility
Adjacent to East Equestrian Facility WSUMMARY SUMMARY Job Number: 07015-08 Fee $7,256
Fee ices $ -
abor $7,256
bles $ 160
otal $ 7,416
Architectural Team No. Est Burdened Arch Total %of Total
Dwgs. Hours Hourly Rate Fee Arch Fee Arch Fee
Management $948 13.07%
Principal in Charge PIC 0 $190 $0
Sr Project Manager Sr PM 6 $158 $948
$0
$0
$0
Architectural 0 $0 0.00%
Project Architect PA 0 $115 $0
$0
$0
$0
$0
Administrative Support $6,308 86.93%
Clerical Cier 4 $82 $328
Construction Admin Const Admin 46 $130 $5,980
$0
$0
$0
TOTALS $7,256 1 100.00%°
Page 1 of 3
Architectural �."' y a
'
a s
Owner.City of Fort Worth Date: 3232012
PIC - Labor$: $ -
Project Description:East Mulfi-Purpose Parking Lot Facility Sr PM 6 Labor$: $ 948
Adjacent to East Equestnan Facility PA - Labor$: $
Job Number.07015-08 Cler 4 Labor$: $ 328
Const Admin 46 Labor$: $ 5,980
Sheet %
Total Hrs: 56 Total$: $ 7,255
Const
No. I Project Activity Comp PIC Sr PM PA Cler Admin Hours I Cost Subtotal Total
Tasks
Sita"',.+field repo'Preparation 1 30 31 $4,058
.Attend ov.T:eNarctuiecb'contractor meefinas 1 4 5 $678
Review and process RFfs 2 2 4 $576
Review and orocess submittals and shop dra vings 2 4 10 16 - $1,944
TOTAL
$7,256 S7,256
Page 2 of 3
Reimbursables x - -
HkOter
r:.0 _ • •
Project Manager. Gary Ryan Date 3/2312012
Travel/Subsistence: $0
Owner. City of Fort Worth Postage/Shipping: $0 %Comp: 0.0%
Project Description: East Mu1t�Purpose Parking Lot Facility Reproducion: $160 $Remain: $160
Adjacent to East Equestrian Facility Other. $0
Job Number: 07015-06 Total Reimbursable Cost: $160
Budgeted % $ %of %
Travel/Subsistence Cost Comp Remain Budget Comp
Mileage: 0 miles x cents/mile $0.00 0"r. $0.00 0.0% 0.0%
Airtare: 0 round trips x cost/trip $0.00 0';6 $0.00 0.0% 0.0
Parking: 0 days x $/day $0.00 0"/., $0.00 0.0% 0.0%
Auto Rental: 0 days x $/day $0.00 0% $0.D0 0.0% 0.0%
Taxi: 0 days x $/d ay $0.00 0% $0.00
Mass Transit: 0 days x $/day $0.00 0%;
Other. 0 days x $/day $0.00 0S
Travel Subtotal $0 0.0%
Hotel:. 0 days x
Meals: 0 days x $/day $0.00 Dox $0.00 0.0% 0.0%
Other: 0 days x $/day $0.00 0% $0.00 0.0% 0.0%
Subsistence Subtotal $0 0.0%
Travel/Subsistence Total SO 0.0%
Postage/Shipping..
Overnight Shipments: 0 shipments $/shipment $0.00 0% $0.00 0.0% 0.0
U.S.Mail Postage: 0 shipments $/shipment $0.00 0?0 $0.00 . %
Other: 0 days $/day $0.00 0% $0.00 0.0% 00°0
age/Shipping $O 0.0%
Reproduction
Drawings: 50 drawings $3.00$/dwg $150.00
Specification Pages'l 100 copies $0.10$/copy $10.00
Other: copies $/copy
Reproduction $160 100.0%
Other
0 item $/item
0 hem $/hem $0.00 0% $0.00 0.0% 0.0
0 item $!item $0.00 0°/ $0.D0 0.0% 0.0
0 item $«em $0.00 0% $0.00 0.0% 0.0%
0 hem $/Item $0.00 0% $0.D0 0.0% 0.0%
0 item
0 hem $«em $0.00 0% $0.00
$/item $0.00 0% $0.00 0.0°/ 0.0
Other $01 1 0.0%
Page 3 of 3