HomeMy WebLinkAboutContract 41326-A1 AMENDMENT NO. 1 to
q AGREEMENT for ENGINEERING SERVICES for the
PARKING ACCESS and REVENUE CONTROL SYSTEM (PARCS) PROJECT at WRMC
STATE OF TEXAS §
§ CITY SECRETARY CONTRACT NO. -413a( -h
COUNTY OF TARRANT §
WHEREAS, The City of Fort Worth and Dunaway Associates, L.P., a Texas Limited Partnership
(Engineer) made and entered into City Secretary Contract No. 41326 (The Contract) which was executed
on (M&C Was Not Required) the 6th day of January, 2011; and
WHEREAS, further amendment is necessary for additional Engineer's design services to coordinate the
PARCS Project with a separate project identified as the Gendy Street Beautification Project at the Will
Rogers Memorial Center(WRMC).
NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized
representatives, enter into the following agreement which amends the Contract:
1.
Article I, SCOPE OF SERVICES, of the Agreement is amended for additional coordination meetings and
construction document modifications by $5,540.00 total as specified in letter from the Engineer dated May
23, 2011, attached hereto as Attachment"A".
2.
Article II, COMPENSATION, of the Agreement is amended for the total Agreement price of$45,715.00 for
fees.
3.
All other provisions of this Contract which are not expressly amended herein shall remain in full force and
effect.
EXECUTED this the a day of l�Y� 2011, in Fort Worth, Tarrant County, Texas.
Dunawa As P APPROVED-
'r By:
0o s aca, P Fernando Costa
Ass Senio Project Manager Assistant City Manager
APPROVA CO ENDED: RECORDED:
Douglas VV Wiersig, PE, Director Martha"Mart Hendrix
Transportation & Public Works Dept. City Secretary
APPRO=glasW. AND LEGALITY: M&C (M&C Is Not Reguir da
By
Contract Authorization paw QRr�4s�4n
Date: p ao oo(�
Assistant City Attorney p� °�•��d
o ax
01 00 OFFICIAL RECORD
a °� Xu04A�5
4 o
CITY SECRETARY T o000
�
F WORTN, TX
f `�GIJNAWA �-tT�ct�M�N� tin
v
May 23, 2011
Mr. James D. Horner
City of Fort Worth
Public Events Department
1201 Houston St.
Fort Worth,Texas 76102
Reference: Will Rogers Memorial Center— Paid Parking Equipment
Dear Mr. Horner:
Dunaway Associates, L.P. and the City of Fort Worth Public Events Department have a
contract in place to complete the P.A.R.C.S. projects to serve WRMC. Services were
authorized in a contract signed and dated November 19, 2010. The following additional tasks
shall be provided by a sub-consultant:
• Five additional coordination meetings and subsequent drawing modifications will be
completed by Baird Hampton Brown for the electric design construction documents.
• The electric design drawings by Baird Hampton Brown will be modified by removing
the pay booth information from the WRMC project and placing them in the Gendy
Street Beautification project. The deliverables will include the original drawings,
specifications prepared for binding separately and an estimate of probable cost. The
drawings will be signed and sealed by a registered/licensed professional engineer.
The additional effort will be a lump sum fee of $2,790 and $2,750 respectively for the two
tasks. The original contract amount of $40,175 will have a revised amount of $45,715.
Please feel free to contact me should you have any questions or comments.
Sincerely,
DUNAWAY A OCIATES, L.P.
a Texas ' ite pa ership
OF IAI, �!� ®Rp
CITY SECRETARY
/ I:T WORTR1 TX
Broo s I. Bac , P.E.
A ociates, r. Project Manager
:U�UI b qv,.rut:,.i.dh 11 its .rnl •,cnl'i. u.,. -h1'.:- 'F I.'I !il t.i', 1 1. I i. I i I . �-rlunnc.0 yi i6,. in�n,