Loading...
HomeMy WebLinkAboutContract 41332-CO5 OFFICIAL RECORD CITY MCRETARY _ �� CITY SECRETARY City of Fort Worth CONTRACT No. FT, WORTH, TX Allowance Allocation NO Allowance Allocation No. Date TPW Project No. 5 (five) 12/15/2011 C234 541200 207060162780 Facility and Project Description City Secretary Contract No. East Multi- Purpose Facility WRMC CS41332 ORIGINAL CONTRACT AMOUNT................................................................ $15,443,305 OWNER ALLOWANCE INCLUDED IN CONTRACT AMOUNT.............. $ 449,805 ORIGINAL CONTRACT AMOUNT LESS ALLOWANCE................................ $14,993,500 EXTRASTO DATE..................................................................... $ 213,767 CREDITSTO DATE.................................................................... $ 0 CONTRACTCOST TO DATE.................................................................................................. $ 15,207,267 AMOUNT OF PROPOSED ALLOCATION............................................................................ $ 98,045 REVISEDCONTRACT AMOUNT............................................................................................. $ 15,305,312 ALLOWANCE FUNDS AVAILABLE FOR ALLOCATION...................................................... $ 449,805 REMAINING ALLOWANCE FUNDS AVAILABLE FOR ALLOCATION.................................... $ 137,993 ADDITIONAL FUNDING (IF NECESSARY)................................................................................ $ 0 IN ACCORDANCE WITH THIS ALLOWANCE ALLOCATION, THE CONTRACTOR SHALL: Furnish all labor and material as per the attached Proposed Allowance Requests to the Allowance Allocation: PCR's 29, 30, 39, 42, 43, 44, 48, 54, 59, 60, 62, 63, 68, 73, 77, 78 and 79 ----------------------------------------------------------------------------------------------------------------------------- Total Add This Allocation ADD $ 98,045 It is understood and agreed that the acceptance of this Allowance Allocation by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Allowance Allocation Contractor's Name Rogers—O'Brien Construction Company, Ltd. Original Contract Time Additional Approved Time To Date Approved Contract Time To Date Additional Time For This Allocation 590 cd 0 cd 590 cd 0 cd Contractor-Rogers qBrien Construction Date Construction ana r Date ff f9 /'Q/r f Chief,Arc 15—r ectural Servi es Division Date tr r,T nsportatio�n and Public works Date " &—AAM=2 Iry� p 11 -L�' /2�z� Il GFd Project Architect— nfeld-Hoffer-S rd D to it Manager Date As i t A rney Date quired) Date br. ove pproved • - ,o Distribution t o File 1, b b � �r y _. n d ^gd P. GonzaConstruct M es,Asst C +/ oOpo oProiect Manager, Contractor TPW Facilities Manag Change Order Form(12if91d"h' 4 Allowance Allocation 5 East Multi-Purpose Facility WRMC PCR 29- Additional concrete and site work to revise finish grades at Northwest drive approach ADD $ 7,781 PCR 30—Revise Building B accessible parking layout as Per RFI 27 ADD $ 1,259 PCR 39- Add AW vent at northwest corner Building B No Change PCR 42- Add 2 hr fire rated expansion joints as per RFI 63 ADD $ 12,081 PCR 43- Additional Landscape demo Building B No Change PCR 44- Add saw contraction joints at Building A As per RFI-72 ADD $ 5,243 PCR 48-Add structural double tee repair at Building B as per ASI 11 ADD $ 21,777 PCR 54- Add concrete column SW corner Stair IA As per RFI 75 ADD $ 765 PCR 59- Revise concrete beam @ grid line U 2-3 as Per RFI 86 ADD $ 4,083 PCR 60- Revise concrete beam North Ramp Building A as per RFI 88 ADD $ 2,880 PCR 62- Relocate 6 inch Fire Line as per ASI 17 ADD $ 19,426 PCR 63- Revise beams 67 and 68 grid U as per RFI 91 ADD $ 1,956 PCR 68- Replace and rework existing AW piping at Building C ADD $ 3,827 PCR 73- Revise signage as per marked up submittal ADD $ 11,612 PCR 77- Revise vent/weep holes at top of masonry as per ASI 24 ADD $ 1,714 PCR 78- Add additional conduits for fiber optic service ADD $ 1,620 PCR 79- Add concrete columns as Building A as per RFI 76 ADD $ 2,021 ------------------------------------------------------------------------------------------------------------ Total This Change ADD $ 98,045 Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation &Public Works Dept. Facilities Management Division / Architectural Services 401 West 13th Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project#TPW-01627 Contract # 41332 Fort Worth,Texas SUBJECT: Change Request# 29—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $7,781.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request: Dallas,Texas 75235 Main 214.962.3000 Grace Construction Co. Inc. Fax 214.962.3001 $3,812.00 4 Total Cost included In Change Request Austin,Texas 7887704 3901 S.Lamar Blvd. 00 $3,812.00 / $7,781.00= 48.9% Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Request www.rogers-obrien.com $3,812.00 / $7,781.00 = 48.9 % Total M/WBE Participation for this Change Request is 48.9%. Please let me know should you need any additional information. Sincerely, Rogers-O'Brien Construction CZ Trey Carroll Project Manager CC: Master File 10022 Dallas I Austin Y• Rogers-O'Brien Construction November 22,2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:WCPR#06-Revised Conc.Approach @ NW Ent. Garage'B' 10022 Will Rogers Memorial Cntr East Change Request#29 Dear Jack: Per WCPR#06 documents,grades at Northwest entrance to Garage B were revised after concrete approach was poured. Grades were revised to increase clearance height at entry. Cost of work includes saw-cut and removal of existing approach as well as re-working of subgrade for revised grades, re-forming of approach, rebar installation and place&finish of new approach. Attached please find our pricing for the above referenced revision item. 1901 Regal Row Dallas,Texas 75235The total amount to provide this work is: $7,781.00 Main 214.962.3000 Fax 214.962.3001 3901 S.Lamar Blvd.#200 Please note the attached exclusions/qualifications. Austin,Texas 78704 Main 512.486.38001f you have any questions or need further clarification,please contact me at(214)962-3000. Fax 512.486.3701 www.rogers-obrien.com Sincerely, 5�-- Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 29 Price Breakdown Job Name: Will Rogers Memorial Cntr East Description: WCPR#06-Revised Conc.Approach @ NW Ent. Garage'13' Date: 11/22/2011 Change Request#:29 No Labor Material Description QTY Unit Unit Total Unit Total Equipment Subcontract Oth 1 Misc Site Demolition Other Price 2 Formwork/Concrete Subcontract0 2,925.00 $2,925.00 ****EXCLUSIONS AND *'** Subtotal: QUALIFICATIONS 3,812.00 $3,812.00 See attached backup for labor, material and subcontractor and $6,737.00 supplier detail. Overhead 1000% Price excludes all federal,state and local fees. Fee $673.70 5 Price does include sales and/or remodel taxes. 00% $370.30 Written authorization and/or signature on this PC required prior to performing the above described work. Total: $7,781.00 Hahnfeld f �i Hof er Stanford --WORK-CHANGES-PROP-OSAL-REQUEST- -Prolect-Name. WeEft Na-7 OW ewner:jxj-- East-Mulli-Flurpese+aewl AFehiteet; [m] Will Rogers Memorial Center Fort Worth,Texas Issue Date:05.19.11 Consultant: Contractor: Ex Qcaner: Prolect No.:07015-01 Field: City of Fort Worth Other: 401 West 13'h Street Contract For:General Construction File: Fort Worth Texas,76102 pontractor: Contract Date:January 6,2011 Rogers-O'Brien Construction Co. 1901 Regal Row Dallas,Texas 75235 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the contract documents described herein. Within fourteen (14) days, the Contractor must submit the proposal or notify Hahnfeld Hoffer Stanford, in writing, of the date which the proposal will be submitted. THIS IS NOT A CHANGE ORDER,A CONSTRUCTION CHANGE DIRECTIVE,OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. Description: PME alld-od for mv%iorw lo poding ad the MXWAMWt achnnoe Qs"1)al Lh*ti Attachments: Civil: Architectural: Shoats A.61.1 aid A.81.3 Issued by Hahnfeld Hoffer Stanford: w1wWiNlarnWesftff/PA (Pdnw N&,m/TA4) r' SVX317H180M1804 !! H1HOM 1803 30 A113 r URN39 MHOW3W SH390H 111M f C° A11110tld 3SOd80d-11161 1SV3 i iI-.l 11-I j d tiF iz Il j': :i jil t- .E 7 tif7 i 1 1: �4 �,� �'• ]�ffiii;fSj );'�y, S, ! ltnj�il!l!111liilil , 10 it i 1 7 ;;�i !� ii 1� ;}�ii'•1 ��1q! � Ili I i . . ji�� i1� +ilt•! t t 111� �I�ll �Si1 � `� `e�c a I � ;':'o... ,i. � ,� wc, iRt iil. i i ar - a s SEE SHEET C6.0 Grace Construction Co.. Concrete Construction 11325 Tantor Rd. Ste 200 Dallas, Texas 75229 CHANGE ORDER REQUEST To: Rogers - O'Brian Construction Tuesday, September 20, 2011 1901 Regal Row Dallas, TX 75235 Attn: Trey Carroll Project: Will Rogers Memorial Center 1401 W.R. Watt Drive Fort Worth, TX 76107 Subject: Pour Back of Drive Approach at Existing Garage - Change Order Request 11007-004R WCPR 4 006 Trey: See below for a breakdown of the work to be performed to pour back the drive approach that was poured at the wrong elevation at the existing garage. Labor with Burden $ 1,560.00 Material $ 1,755.00 Equipment $ - Subtotal $ 3,315.00 Overhead & Profit 15% $ 497.00 Total Cost: $ 3,812.00 This work has been performed. We request that the Change Order to our contract be issued as soon as possible. Should you have any questions, feel free to contact me. Sincerely, John 'Duncan', Jr. Grace Construction Co. Estimator/Project Manager 214-930-8194 Phone: (972)432 -0800 Fax (972)432 - 0810 1 of 1 r' Grace Construction Co. Concrete Construction 11325 Tanto Rd. Ste 200 Dallas, TX 75229 DETAILED BREAKDOWN OF COSTS FOR WCPR # 006 Burden @ # Category Time Rate 40% Cost 1 Foreman 3.0 Hrs $22.50 $9.00 $94.50 3 Carpenter 8.0 Hrs $17.00 $6.80 $571.20 4 Laborer 5.0 Hrs $14.75 $5.90 $413.00 3 Iron Worker 4.0 Hrs $17.00 $6.80 $285.60 2 Cement Mason 4.0 Hrs $17.50 $7.00 $196.00 $1,560.00 Material Item QTY Price Cost Formwork 80 LF $0.55 $44.00 Concrete 22.5 CY $60.00 $1,350.00 Reinforcing 9 CWT $45.00 $405.00 $1,755.00 Equipment Item QTY Price Cost $0.00 $0.00 $0.00 $0.00 $3,315.00 CWAQZCP TO PQA-M «D>< o` -2� 44194 CONCRETE PENETRATING COMPANY INVOICE A DIVISION OF SMITH CONSTRUCTION GROUP,INC. oiioEf�p 13Y..`. �+,v.FroMERji 2303 SHORECREST DRIVE DALLAS,TEXAS 75235 STEVE MUNO E 266341 (214)634-2990 • (800)842-7292 PUfkCfj*$r-0kWR'#7 CU TOMERJab# WA 149777 e -(x SOLD To: ROGERS-O'BR1EN 09-06 JOB LOCATION: 2110039 WILL ROGERS 1901 REGAL ROW 3401 W LANCASTER AVE FT WORTH,TX DALLAS TX 75235-2309 ��Nl1M8ER' TAX, 7 SAtE$;TEftRFl`ORY 7AJi S�fi4TtJ$ ;; DATE , 2 H R 05/2512011 ., t7ESCFtIPTiON. ''QUA NTI I Y : .. U<yrf' "NIT 1. AMgIJNT SLAB SAW 11"CONCRETE DRIVEWAY APPROACH AND PROVIDE GROSS WATER CONTROL. CROSS CUT INTO PIECES,PULL PIECES AND DISPOSE OF RUBBLE, ALL WORK AS DIRECTED 342 LF OF 11"DEEP SAWING 478 SF OF 11"DEEP REMOVAL TOTAL BILLING 1 $2,925.00 $2,925.00 GRAND TOTAL $2,925.00 Received JUN - 3 2011 PLEASE PAY BY INVOICE. B^-ors-O'Brien STATEMENT SENT BY REQUEST ONLY. TERMS- NET DUE 30 DAYS TERMS: It Is understood and agreed that payment of all accounts shall be Due and Payable at our corporate office in Dallas, Dallas County, Texas and interest may be charged on past due balances at the maximum rate allowed by law. Further, if the account is placed with an attorney for collection, customer agrees to pay reasonable attomey fees. ORIGINAL WE APPRECIATE YOUR BUSINESS Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation&Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`h Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project#TPW-01627 Contract # 41332 Fort Worth,Texas SUBJECT: Change Request#30—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $1,259.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request : Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Total M/WBE Participation for this change request is 0%. Please let me know Austin,Texas 7887704 you 3901 S.Lamar Blvd. 00 should ou need an additional information. Main 512.486.3800 Fax 512.486.3701 Sincerely, www.rogers-obrien.com Rogers-O'Brien Construction Trey Carroll Project Manager CC: Master File 10022 Dallas Austin Rogers-O'Brien Construction November 22, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#27-Garage'B'Revised Handicap Parking 10022 Will Rogers Memorial Cntr East Change Request#30 Dear Jack: Per RFI#27 response,delete all accessible parking striping from Level 1 per revised Sheet A.B1.1 and add accessible parking striping to Level 2 per revised Sheet A.131.2. Cost of work includes added wheel stops and additional striping per revised handicap parking layout at second level. Attached please find our pricing for the above referenced revision item. 1901 Regal RowThe total amount to provide this work is: $1,259.00 Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Please note the attached exclusions/qualifications. 3901 S.Lamar Blvd. 87001f you have an questions or need further clarification, lease contact me at 214 962-3000. Austin,Texas 78704 Y Y q P ( ) Main 512.486.3800 Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 30 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/22/2011 Description: RFI#27-Garage'13'Revised Handicap Parking Change Request#:30 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Reproduction Services 16.32 $16.32 2 Pavement Marking Subcontractor 1,073.88 $1,073.88 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $1,090.20 See attached backup for labor, material and subcontractor and Overhead 10.00% $109.02 supplier detail. Fee 4.98% $59.78 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $1,259.00 Hahnfeld Hoffer Stanford Hahnfeld Hoffer Stanford 1 200 Bailey .Avenue, Suite 200 Fort Worth, Te::as 76107 RFI Response Transmittal ID: 00316 Date Sent: 5/17/2011 Project: 07015-01 WRMC East Multi-Purpose Building Jdumber: 07015-01 To: Brent MacDonald Rogers-O'Brien Construction Co. 1901 Regal Row Dallas, TX 75235 214-962-3000 (Phone) 214-962-3001 (Fax) From: Gary Ryan Hahnfeld Hoffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth, Texas 76107 (817) 921-5928 (Phone) (817) 302-0692 (Fax) Subject: ADA Accessibility Issues Sent Via: Info Exchange RFI ID: 00027 Discipline: Received: 4/26/2011 Question: Based on discussions between Steve Munoz (Rogers-O'Brien Construction), Brooks Baca (Dunaway &Assoc.) and Jeff Westhoff (Hahnfeld) there appears to be some ADA issues regarding locations of handicap parking and accessibility from Garage V to the adjoining sidewalks. Please review current contract documents and advise should any modifications be required. Suggestion: Answer: Reference attached for modifications to Unit B parking which include deleting all accessible parking striping from level 1 per revised sheet A.B1.1 and adding accessible parking striping to level 2 per revised sheet A.B1.2. CC: Jeff Westhoff(Hahnfeld Hoffer Stanford) Tommy Deeds(Hahnfeld Hoffer Stanford) Contents Quantity Dated Description 1 5/16/2011 RFI0027 WRMC_MP_Central - Sheet -A-B1-1 - FLOOR PLAN - LEVEL 1 UNIT 'B (1).pdf 1 5/16/2011 RFI0027 WRMC_MP_Central - Sheet -A-B1-1 - FLOOR PLAN - LEVEL 1 UNIT 'B .pdf o f �0 I a w LL N s N N � I �( 24 W L-,L G .O,bZ .0-X .0-Z .O,YZ .d 8 G .0-Z LU � LL I _ � \Q� I b 4 U � LLLL I CO Q Q" T d I m — — — — — — — — 0 b I I � w III IIII I � Iln I w CO z m b Q a ° —jI• w v I O I LL U W LL I I I 1 I 1 I 1 I I x I I � 1 1 ' 1 I 1 1 I 1 U LL m I I LL I I I I / I I I 1 _ I I b I I I I � I I -- - - - - - - - - - - - - - -- - - - - - --- ------- -- - - --- --- ------ - Q -- 0 - ---- --- -- --- oi J- - - - -- - --- --- - - - - -- - -- - - - - - - - - - - - - - - - - - Cleaner Image CkaW IMge, Change Order 104 E Pioneer WhemfirstUVremimu make adifferr"! Irving, TX 75061 Date Estimate# 10/11/2011 60682 Billing/Customer Name Service Address Rogers O'Brien Will Rogers 1901 Regal Rowe 3401 W Lancaster Ave Dallas,TX 75235 � �� Fort Worth,TX PO Number Terms Rep Project Project Net 30 RRA Will Rogers Item Description Qty Changes incurred by moving handicap signs and striping from first floor to second floor HC Sign... Install Accessible Parking Signage per TAS Requirements on 2 3/8"Galvanized post with epoxy anchors-Signage to 8 be provided and installed by general contractor Wheel S... Install 6'concrete wheel stop 13 Stripe Layout and stripe cross hatch areas 4"white 1,375 Notes: 1)Paint shall be one coat chlorinated rubber traffic marking paint Thank you for the opportunity. Subtotal $1,073.88 I HEREBY ACCEPT THE TERMS OF THIS PROPOSAL AND AUTHORIZE THE 25% SERVICES TO BE PERFORMED. THE SCOPE OF WORK HEREIN TO BE Sales Tax (8.25%) $0.00 COMPLETED IN-_1_ TRIP(S). I UNDERSTAND ADDITIONAL TRIP(S) NECESSITATE BY OBSTRUCTIONS,LACK OF PREPAREDNESS,WATER,CARS Total $1,073.88 OR OTHER OBSTRUCTIONS THAT WOULD INHIBIT THE SERVICE FROM BEING COMPLETE WILL RESULT IN A RESCHEDULING FEE OF$250.00 PER TRIP. "PAYMENT:NET DUE UPON COMPLETION UNLESS OTHER ARRANGEMENTS uA\/F RFFT( APPPOVPr) Signature&Date Phone# Fax# 972-721-9796 972-721-1755 II REMIT TO: P.O.BOX 740967 INVOICE DALLAS,TEXAS 75374-0967 TERMS: Net 10th prox.Interest charged at 1.5%per NO 0608186 THOMAS month(18%per annum)will be added to accounts over 30 days past due.Invoice due 126/2011 R E P ROG RAP H I CS and payable in Dallas County,TX. DATES Phone: 817-336-0565 Delivery Due: 5/26/2011 2:00:00 PM D SOLDTOCUSTOMER## 1027531 SHIP TO ROGERS—OBRIEN CONST CO ROGERS—OBRIEN CONST CO 1901 REGAL ROW 811 UNIVERSITY DR DALLAS, TX 75235-2309 FORT WORTH, TX 76107-2935 NOTES SOLD BY PERE2830 SALE CHARGE 0007-01 ORDERED BY CUSTOMER PO## CUSTOMER JOB IDENTIFICATION BRENT MACDONALD RFI027 WILL ROGERS PRODUCT CODE QUANTITY DESCRIPTION ORIGINALS/ UNIT PRICE AMOUNT COPIES 0404002 18 OND PRINT FROM PDF 0.50 9.00 (1 Sets 2 Orig 30in X 42in) 0424110 90 IGITAL BOND ADD'L PRINTS 0.052 4. 68 ! (5 Sets 2 Orig 30in X 42in) 0424010 18 OND ADD'L PRINTS 1/2 SZ 0.078 1.40 ! (3 Sets 2 Orig 15in X 22in) Go paperless: ask about "eStatements". TR TRACK# Before signing,see reverse side for $15.08 trade customs and limited warranty $1.24 Customer Copy $16. 32 DATE TIME RECD BY IIIIIIII I IIII IIII VIII IIII III IIIIIIII VIII IIIIIIII II III III IIII VIII I I III II IIII III VIII II IIII 2011052600007010608186 Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation&Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`" Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project#TPW-01627 Contract # 41332 Fort Worth, Texas SUBJECT: Change Request#42—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $12,081.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request: Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Total M/WBE Participation for this change request is 0%. Please let me know Austin,Texas 7887704 3901 S.Lamar Blvd. 00 should you need any additional information. Main 512.486.3800 Fax 512.486.3701 Sincerely, www.rogers-obrien.com Rogers-O'Brien Construction Trey Carroll Project Manager CC: Master File 10022 Dallas Austin Rogers-O'Brien Construction November 22,2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#63-Rated Exp.Jts. @ East Face of Richardson-Bass Building 10022 Will Rogers Memorial Cntr East Change Request#42 Dear Jack: Per RFI#63 response, remove and replace existing vertical expansion joints at(2) interior locations on the East side of Richardson-Bass Building. New expansion joints shall be(2)hour fire-rated joints. Cost of work includes removal of the interior portion of the expansion joint assembly with the exterior face to remain. Attached please find our pricing for the above referenced revision item. 1901 Regal Row Dallas,Texas 75235The total amount to provide this work is: $12,081.00 Main 214.962.3000 Fax 214.962.3001 Please note the attached exclusions/qualifications. 3901 S.Lamar Blvd.#200 Austin,Texas 78704 Main 512.486.380df you have any questions or need further clarification, please contact me at(214)962-3000. Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 42 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/22/2011 Description: RFI#63-Rated Exp. Jts.@ East Face of Richardson-Bass Building Change Request#:42 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Replace Expansion Joints 10,460.00 $10,460.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $10,460.00 See attached backup for labor,material and subcontractor and Overhead 10.00% $1,046.00 supplier detail. Fee 5.00% $575.00 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $12,081.00 Hahnfeld Hoffer >' Stanford Eole _ ?tie _ •t _._ F,rt -r:h RE Response Transmittal ID: 00406 Date Sent: 6/13/2011 Project: 07015-01 WRMC East Multi-Purpose Building Number: 07015-01 To: Brent MacDonald Rogers-O'Brien Construction Co. 1901 Regal Row Dallas,TX 75235 214-962-3000 (Phone) 214-962-3001 (Fax) From: Gary Ryan Hahnfeld Hoffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth,Texas 76107 (817) 921-5928 (Phone) (817) 302-0692 (Fax) Subject: Rated Expansion Joints at East Face of Richardson-Bass Building Sent Via: Info Exchange RFI ID: 00063 Discipline: Received: 6/8/20].1 Question: Please confirm that the two expansion joints on the East vertical face of the Richardson-Bass Building will need to be rated expansion assemblies. Please provide details for the assembly. Suggestion: Answer: The two expansion joints on the East vertical face of the Richardson-eass Building will need to be rated expansion assemblies; Remove and Replace existing joint material with the appropriate firestopping as specified to achieve the same rating (2 hour) as required for the fire barrier waH. Place the firestopping in the joint between the P/C panel and/or column from interior side of P/C panel and seal. Firestopping to be limited to the depth of the existing P/C panel. The exterior expansion joint assembly within the existing brick veneer to remain. CC: F-7. _.7_�-__'.- '____77�_. CHAMBERLIN October 18,2011 Rogers O'Brien Attention: Trey Carroll Will Rogers Memorial Coliseum Project RE: WRMC—RFI 063—Fire Rated Expansion Joints ROOFING&SHEETMETAL Dear Trey: Modified Bitumen BUR Please see the cost below to fumish all labor,materials,tools,equipment,and insurance necessary to fully perform and EPDM complete the following scope of work: TPO/PVC • Install Emseai WFR2 fire rated expansion joint assembly at the existing complex per RFI 063.Removal of interior Metal existing expansion Included.Exterior joint to remain.Approx(2)joints—40 LF each. WATERPROOFING& CAULKING Total .••___-$10,460.00 Joint Sealants Expansion Joints We propose to complete the waterproofing as described above,forthe sum listed above;excluding 8.25%sates tax. Incorporated Notes: Membrane Waterproofing • This offer is good for thirty(30)days Elastomeric Coatings All work to be performed during normal business hours Owner/Contractor agrees to furnish:complete access to work areas,dumpster,toilet facilities,potable water,and an electrical power,as required,at no Water Repellents additional cost to Chamberlin • All surfaces to be given to Chamberlin in a smooth,broom dean condition,free of contaminants,forth oils,release agents,voids,fns,and projections Waterblasting Chamberlin is not responsible for recognibng,locating,or removing asbestos,PCB's,or other hazardous materials. Concrete/Masonry Repair Chamberlin is licensed,certified or approved to install the systems described above Unforeseen conditions or circumstances are not assumed nor anticipated In the scope of work proposed above and w81 be brought to your attention Damproofing Immediately upon discovery by Chamberlin personnel for a prompt resolution • Chamberlin's standard warranty excludes: failures caused by failure of the substrate,moisture vapor transmission or hydrostatic pressure,abuse,conditions Flashing that exceed the limitations of the materials,sufficiency of the design;removal and replacement of overburden materials;incidental and consequential damages Traffic Coatings All colors are to be selected from the manufacturers standard colors Pricintg Is contingent on mutually agreeable contract terms,conditions,and proper coordination of the work • Time and material work will be completed at$48.00/man-hour with 20%mark-up on materials • Samples of products or systems presented for review are Intended only to provide a general representation and riot necessarily an exact replica of the ROOF MAINTENANCE& products or systems to be famished or Installed LEAK REPAIR Please be advised that the products and methods outlined In this proposal are based on our visual survey,plans,specifications,or our practical experience In resolving similar problems for our customers;we are not design professionals,architects,or registered engineers,and ere not responsible for determining Building Surveys building code compliance and do not perform design services For CIP,not withstanding anything to the contrary the CIP deduction,contract reduction,Is limited to the amount of Insurance premium that wi8 be saved by Leak Repair Chamberlin due to the provision of Insurance by General Contractor to Owner.Specifically,but not limited to,excess-umbrella coverage,on which Chamberlin Roof Maintenance has a flat fixed prerdum where there will be no deduct provide as there is no savings to benefit Chamberlin. • The proposal Is not for the sale of goods,but rather a service contract for Ile Installation or application of products,systems or materials.Therefore,THE IMPLIED WARRANTIES OR MERCHANTIBILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE HEREBY EXCLUDED. • Excludes bu8dng perniL P 8 P Bonds,overtime,window cleaning,accelerated schedules,field or laboratory testing,mockups,liquidated damages,temporary facilities or ublity hook-ups or night or weekend work • This proposal EXCLUDES any reference that Chamberlin has fully examined and analyzed all site conditions that may affect performance and to affirm no conditions exist that may affect the progress,performance or price of the work If physical conditions are of an unusual nature that dffer materially from those ordinarily found to exist and generally recognized as Inherent In construction activitles of that type,Chamberlin will Immediately stop working in the area and provide written notice promptly end before the conditions are disturbed,In addition Chamberlin may be entitled to an equitable adjustment In the contract sum, contract time or both. We appreciate the opportunity to submit our proposal for this project.Chamberlin has been In business over 100 years.We would Ake to be your"Single Source" contractor for everything from waterproofing to caulking to traffic coatings to roofing.We are financially sound and professionally capable and will perform the work right—the first time.We would Ike the opportunity to review the scope of this proposal with you soon.Please call rl you have any questions. Sincerely, CHAMBERLIN ROOFING 8r WATERPROOFING Ryan Grigsby Project Manager DALLAS FT.WORTH LOCATION 2346 Glenda Lane Accepted by(signature): Dallas,Tx 75229 Printed Name&Title: Date 214.273.9110/817.237.1927 -YOUR FAXED SIGNATURE ABOVE WILL BE TREATED AS A FULLY EXECUTED ORIGINAL CONTRACT- 214.273.9120/817.237.2676 fax OTHER LOCATIONS Houston Austin San Antonlo Oklahoma City PENDING CHANGE ORDER ESTIMATE SHEET PAGE NO: JOB NANIE: Will Rogers Memorial Coliseum CONTRACTOR: RO BONDED: NO LOCATION: University Drive,Dort Worth,TX ARCHITECT: Hahnfeld DATE: 18-Oct-11 EST.: CHECKED BY: RG BID DATE: DESCRIPT: Fire Rated Expansion Joint RFI 063 BURDEN RATE: 65% TAX ON NIATEMALS: NO FOOTAGE DESCRIPTION(LABOR)-PRODUCT NAME PRODDUUC ION QUANTTTY COST PER NED LABOR BURDEN SUPERMBSC. TOTAL LABOR TE 80 Emseal WFR2-2 1/2" 20 $130 FOOTAGE DESCRIPTION(MATERIAL)-PRODUCT NAME COVERAGE QUANTITY COST PER UNTT MATERIAL MISC.MATERIAL TAX TOTAL MATERIALS RATE/UMT 1 89.23 TOTAL COST MISC.JOB EXPENSES QTY. UNIT COSTI AMOUNT COST W/MISC. EQUIPMENT/TOOLS-RENTAL OR PURCHASE 1 $300 MARGIN 1 15% HOTEL $0 GRAND TOTAL PER DIEM $0 BOND ADD TRAVEL $0 SHIPPING/FREIGHT $0 TOTAL WATERPROOFING QUOTE SUpp'(} 10802 N.STEMMONS FRWY. DALLAS,TX 75220 Q PHONE:(214)357-6646 L FAX:(214)357-6645 ` W W W.ALL-TEXSU PP LY.COM COMPANY: Chamberlin FROM: Don ATTN: Ryan Grigsby DATE: October 18,2011 JOB NAME: Will Rogers Project EXP.DATE: December 31,2011 LOCATION: Fort Worth,TX BID DATE: Emseal WFR2 System2 1/2" LF 80 $89.23 THIS QUOTE 15 ALL OR NONE FREIGHT CHARGES MAY APPLY NOTES: EMSHIELD WFR SYSTEM TECH DATA www.emseal.com FEBRUARY 2011, PAGE 1 OF 2 j EMSHIELD WFR2 SYSTEM TECHD A T Fire/Water /Movement/Sound A Uses C UL us For expansion joints In exterior and interior walls where a combination of watertightness,fire-rating,sound attenuation 01, EMSHIELD and thermal-efficiency are required. It can be used alone or In typical substrate. y under any other expansion joint cover, plate or filler where depth of substrate allows.Because it is coated on both sides Product Description it can face In either direction from the wall and maintain Its EMSHIELD WFR2 and EMSHIELD WFR3 feature two water- performance characteristics within that wall. This Increases repellant silicone sealing surfaces each adhered to fire-retardant the number of vertical applications in which it can be installed. impregnated foam backing and Intumescent bellows.Because of the Features symmetrical design,either side can face out from an exterior or interior wall and maintain a 2 or 3-hour fire-rating.When either(or both)faces Watertight— EMSHIELD WFR2 and WFR3 are Installed have a field-applied band of silicone that face Is watertight. with tensionless bellows,which when installed with an optional silicone bead on the weather face,maintain a Each system is Installed Into epoxy adhesive field-applied to watertight seal. the sides of the foam and on the joint faces.An optional Fire-Rated—The fire-retardant-impregnated foam and field-injected silicone sealant band seals the bellows to the substrate intumescent bellows,when properly installed, ensure a at the Installation surface providing watertightness.Joins between each stick are executed using a field-applied silicone sealant at the 2 or 3 hour fire protection In accordance with UL-2079. bellows'edge of the join and field-applied intumescent sealant on the Sound Attenuation — EMSHIELD WFR2 and WFR3 adjoining faces to the silicone. minimize sound transfer which often occurs at the expansion gap.The tested results for 11/2"WFR2 and WFR3 in an Watertight,2-Hour Fire-Rated,Sound Attenuating STC 68/OITC 51 wall are an STC value of 64 and an Energy-Efficient Wall Expansion Joint OITC value of 52. Non-Invasive Anchoring—There are no hard metal-to- EMSHIELD WFR2 and WFR3 are fire-rated, watertight, sound- substrate connections with EMSHIELD WFR2 or WFR3. attenuating,energy-efficient primary seals for both retrofit and new This includes embedded pins,anchors,screws,bolts or tracks, structural expansion joints in vertical-plane applications. trays or rails,flanges or coverplates.The system Is locked to EMSHIELD WFR2 and WFR3 eliminate the need for additional fire the joint faces by means of the 1)backpressure of the foam; blankets,mineral wools,liquid sealants,cover plates,or other fire 2)the epoxy adhesive,and 3)the injected sealant bands at the stopping materials. joint face. Forjoints from 1/2-inch (12mm)up to 6-Inches(150mm)where Movement Capability+25%and-25%(50%total)of nominal +25%and-25%(total 50%)of nominal material size joint movement material size. Is expected. JolntSlze Variation—Uniform bellows appearance,and the EMSHIELD WFR2 (Wall, Fire-Rated 2-Hours) and EMSHIELD ability to handle variations in joint size through size-switching, WFR3 (Wall, Fire-Rated 3-Hours) continue the EMSHIELD compre- are among other system features. hensive line of breakthrough, multifunction, structural expansion Factory-Fabricated Transitions—as in all EMSEAL expan- joint materials being released by EMSEAL.Tested and certified by sion joint systems,continuity of seal through changes in Underwriters Laboratories(UL),to the rigors of UL 2079,each can plane and direction is an essential performance differentiator. work in conjunction with the EMSHIELD horizontal fire-rated deck EMSHIELD WFR2 and WFR3 are manufactured In straight- expansion joints,DFR2 and DFR3. run sticks which can be joined in the field to EMSEAL's patent- Fire-retardant-impregnated foam is factory pre-coated on both facing pending factory-fabricated "Universal-90"Transitions.These sides with an intumescent fireproofing material. Each side then are factory-fabricated single-piece 90° units which are coated receives a top coat of waterproof silicone.The resulting composite is on both sides with both luminescent and silicone coating then factory compressed to less than its nominal size for installation allowing them to be installed as an upturn or downturn into structural or other openings. transition. Each has a 6-inch long horizontal leg and a 12-Inch vertical EMSHIELD WFR2 and WFR3 provide a watertight, clean handling, leg.Transitions end in an uncoated 90° cut to be adhered UV stable, nonstaining,low-temperature-flexible, high-temperature- to another transition piece as used In walls-to-decks,treads stable,sound-attenuating, energy-efficient and fire-rated joint seal and risers,parapets,curbs and other applications. in a single installation process. In addition to guaranteeing watertightness, EMSEAL's EMSHIELD WFR2 and WFR3 build on EMSEAL's track record of Universal-90 transitions allow for much faster and secure over 30 years of innovation in sealing structural expansion joints installation by eliminating field cutting at angles. with impregnated foam sealants. EMSEAL JOINT SYSTEMS,LTD 25 Bridle Lane,Westborough, MA 01581 Toll Free: 1.800-526.8365 PH:508.836.0280 FX:508.836.0281 EMSEAL,LLC 120 Carrier Drive,Toronto,ON,Canada M9W 5R1 PH:416.740.2090 FX:416.740.0233 Copyrlghl 02011 by EMSEAL JOINT SYSTEMS,LTD.All Rl9ht3 Reserved EMSHIELD WFR SYSTEM TECH DATA wwW.emseaLCOm JANUARY 2011, PAGE 2 OF 2 Colors Sizing The two silicone faces of EMSHIELD WFR2 and WFR3 can Size Depth Supplied Nominal Material be manufactured of different colors to blend with their Stick Length (Joint Sue ig Mean Temp WFR2 WFR3 respective wall surfaces. EMSHIELD WFR2 and WFR3 are available in 26 standard colors which match the EMSEAL 1/2 " (12mm) COLORSEAL line of products. Other custom silicone colors are 5/8' (15mm) available after consulting with EMSEAL. 3/4" (20mm) Performance 1" (25mm) Capable of movements of +25%, -25% (50% total) of nominal 1 1/4'(30mm) material size. 11/2'(40mm) Standard sizes from 1/2"(12mm)to 6"(150mm). 13/4"(45mm) Depth of Seal for all sizes=WFR2:4"(100mm) WFR3:5"(125mm). 2" (50mm) Substrates must be solid,parallel and plumb. 2 1/4'(55mm) 21/2'(65 m m) Deslgn/System/Construction/Assembly 2 3/4"(70mm) This material has been tested to UL/ULC 2079 and is 3" (75mm) manufactured under UL's Follow-Up Service.The material is 6.56 LF(2M) 4"(100mm) 5"(100mm) being supplied as a fire-rated component of a wall assembly. 3 1/4'(85mm) It has been tested to UL 2079 in assemblies as depicted in 3 1/27.(92mm) EMSEAL's various listings in the UL Online Certifications 3 3/4"(95mm) Directory.Use of this material in assembly configurations 4' (SOOmm) other than depicted In the named UL listings will not encumber 4 1/4"(105mm) or lower the resistance of the deck or wall assembly but is done so at the designers'discretion and responsibility for 41%2 (115rnm) designing substrates as part of a fire rated assembly that meet 4 3/4'(120mm) applicable standards for the project.Similarly,the published 5" (125mrn) Information In the UL Listings cannot always address every 5 1/4"(130mm) construction nuance encountered in the field. Authorities 5 1/2 (1Orhm) Having Jurisdiction should be consulted in all cases as to the particular requirements covering the installation and use of UL 53,/4"(145mm) Listed or Classified products or materials.Authorities Having s° ..JArnm) Jurisdiction should be consulted before construction to ensure that specific adjacent substrates and assemblies are detailed Testing and Standards and constructed to meet local fire-rating requirements. EMSHIELD WFR2 and WFR3 have been tested and certified under UL 2079.Both meet the requirements of ASTM E1966,ASTM E119 Fire Retardant and ASTM E1399. EMSHIELD WFR Impregnated Foam UL 2079,like ASTM E1966,was developed to encompass the fire testing of ASTM E119 and movement cycling regime of ASTM E1399, Warranty Standard or project-specific warranties are available from EMSEAL on request. This product can only perform its designed function if it,and the joint-gap Into which it is SlIcone4aced installed, Is sized to suit anticipated joint movements in 911111cooefaeed IatumersentBelow$ consideration of the movement capability of the product tihrnescentBellows (AvagaNe`,N,coWs) and in consideration of the temperature at time of Installation, (Shown lnanaltematecoke) and if it is installed in strict accordance with EMSEAL's installation instructions. Availability&Price EMSHIELD WFR2 and WFR3 are available for shipment domestically and internationally.Prices are available from local representatives and/or directly from the manufacturer.The product range Is continually being updated,and accordingly EMSEAL reserves the right to modify or withdraw any product ULSystems WW-D-0091 WW-D-0092 without prior notice. WW-D-1079 WW-D-1081 CU$ WW D-0099 WW-D-1087 ULC Systems JF131 JF132 JF145 HW77 EMSEAL JOINT SYSTEMS, LTD 25 Bridle Lane, Westborough, MA 01581 PH:508.836.0280 FX:508.836.0281 EMSEAL,LLC 120 Carrier Drive,Toronto,ON,Canada M9W 5R1 Toll Free: 1-800-526-8365 PH:416.740.2090 FX:416.740.0233 Copyright 02011 by EMSEAL JOINT SYSTEMS,LTD.All Rights Reserved 2 01 11-11 Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation& Public Works Dept. Facilities Management Division /Architectural Services 401 West 13th Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project# TPW-01627 Contract # 41332 Fort Worth,Texas SUBJECT: Change Request#44—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $5,243.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request: Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Fax Construction Co., Inc. $4,540.00 -> Total Cost included In Change Request Austin,Texas 7887704 3901 S.Lamar Blvd. 00 $4,540.00 / $5,243.00— 86.6% Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Request www.rogers-obrien.com $4,540.00 / $5,243.00= 86.6% Total M/WBE Participation for this Change Request is 86.6%. Please let me know should you need any additional information. Sincerely, Rogers-O'Brien Construction Trey Carroll Project Manager CC: Master File 10022 Dallas I Austin Rogers-O'Brien Construction November 22,2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#72-Added Saw-Joints& Diamond Leav-Outs @ Bldg. 'A' 10022 Will Rogers Memorial Cntr East Change Request#44 Dear Jack: Per RFI#72 response, add saw-joints at first level of Bldg. 'A'centered between the column lines on bays greater than 20'-0", but not more than 30'-0",as well as add saw-joints at each column line. Diamond slab leave-outs added to all columns located at perimeter of the slab. Cost includes forming added blockouts and removal of forms for added diamond leave-outs at columns. Attached please find our pricing for the above referenced revision item. 1901 Regal Row Dallas,Texas 75235fhe total amount to provide this work is:. $5,243.00 Main 214.962.3000 Fax 214.962.3001 Please note the attached exclusions/qualifications. 3901 S.Lamar Blvd.#200 Austin,Texas 78704 Main 512.486.380df you have any questions or need further clarification, please contact me at(214)962-3000. Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 44 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/22/2011 Description: RFI#72-Added Saw-Joints&Diamond Leav-Outs @ Bldg. 'A' Change Request#:44 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Saw-Joints&Diamond Leav-Outs 4,540.00 $4,540.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $4,540.00 See attached backup for labor, material and subcontractor and Overhead 10.00% $454.00 supplier detail. Fee 4.99% $249.00 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: 1 $5,243.00 Ha "affer d #fdrr Stanford N_=h ==1:; HQFr_r sr_-:` ,rd 1 2-:0 cane; -.enue Suit= ---, F-art ',. r TC .a=_ 76107 RE Response Transmittal ID: 00422 Date Sent: 6/16/2011 Project: 07015-01 WRMC East Multi-Purpose Building Number: 07015-01 To: Brent MacDonald Rogers-O'Brien Construction Co. 1901 Regal Row Dallas, TX 75235 214-962-3000 (Phone) 214-962-3001 (Fax) From: Gary Ryan Hahnfeld Hoffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth, Texas 76107 (817) 921-5928 (Phone) (817) 302-0692 (Fax) Subject: Unit 'A' First Floor Slab Saw-joint Coordination ­HIGH PRIORITY" Sent Via: Info Exchange RF1 ID: 00072 Discipline: Received: 6/15/2011 Question: S.A1.1 does not depict saw joints for the first floor slab. As discussed with rylahendra Yajnik on 6/15/2011 Rogers-O'Brien Construction is to provide a saw joint centered between the column lines on bays greater than 20'-0" but not more than 30'-0" as well as, at each column, tine. Additionally, Rogers-O'Brien Construction is to add a diamond slab leave-out to ail corumns at the perimeter of the slab. Suggestion: Answer: ACCEPTABLE AS DISCUSSED AND SUBMITTED IN THIS RFI 00072. CC: Grace Construction Co.. Concrete Construction 11325 Tantor Rd. Ste 200 Dallas, Texas 75229 CHANGE ORDER REQUEST To: Rogers - O'Brian Construction Tuesday, October 25,2011 1901 Regal Row Dallas, TX 75235 Attn: Trey Carroll Project: Will Rogers Memorial Center 1401 W.R. Watt Drive Fort Worth, TX 76107 Subject: See the additional costs for additional block outs Change Order Request 11007-011R and pour back per RFI 00072. Labor with Burden $ 3,569.00 Subcontract $ - Material $ 154.00 Equipment $ 225.00 Subtotal $ 3,948.00 Overhead &Profit 15% $ 592.00 Total Cost: $ 4,540.00 This work has been performed. We request that the Change Order to our contract be issued as soon as possible. Should you have any questions, feel free to contact me. Sincerely, Alan J. Haynes, Sr. Grace Construction Company Phone: (972) 432 - 0800 Fax: (972) 432 - 0810 1of1 Grace Construction Co. Concrete Construction 11325 Tanto Rd. Ste 200 Dallas, TX 75229 DETAILED BREAKDOWN OF COSTS FOR RFI 00072 Labor Burden @ # Category Time Rate 40% Cost 1 Foreman 4.0 Hrs $22.50 $9.00 $126.00 4 Carpenter 13.0 Hrs $17.00 $6.80 $1,237.60 6 Laborer 12.0 Hrs $14.75 $5.90 $1,486.80 4 Iron Worker 6.0 Hrs $17.00 $6.80 $571.20 1 Cement Mason 6 Hrs $17.50 $7.00 $147.00 $3,569.00 Material Item QTY Price Cost Formwork 280 LF $0.55 $154.00 Concrete CY $60.00 $0.00 Reinforcing CWT $45.00 $0.00 $0.00 $154.00 Equipment Item QTY Price Cost 1 Concrete Buggy 1 DY $225.00 $225.00 $0.00 $0.00 $225.00 Subcontract Item QTY Price Cost 1 0 LS $ - $ $3,948.00 Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation&Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`h Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project #TPW-01627 Contract # 41332 Fort Worth,Texas SUBJECT: Change Request# 48—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $21,777.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request : Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Total M/WBE Participation for this change request is 0%. Please let me know Austin,Texas 7887704 Y Y 3901 S.Lamar Blvd. 00 should you need an additional information. Main 512.486.3800 Fax 512.486.3701 Sincerely, www.rogers-obrien.com Rogers 'Brien C struction Trey Carroll Project Manager CC: Master File 10022 Dallas Austin Rogers-O'Brien Construction November 15, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:ASI# 11 -Garage'B'&Pedestrian Walkway Structural Repairs 10022 Will Rogers Memorial Cntr East Change Request#48 Dear Jack: Per ASI# 11, provide miscellaneous materials to perform structural repairs to existing concrete structures. Cost includes required shoring for loads as noted in ASI#11, pre-cast inspection for location of existing reinforcing and PT cables, saw-cutting and crack repairs as shown on ASI# 11 documents and miscellaneous steel including epoxy and anchors for repairs as shown. Existing gutter and vertical expansion joint at connection of pedestrian bridge at R-B Building to be removed. Existing expansion joint to be replaced with C/S VF-200 expansion joint in color as selected by architect/owner. 1901 Regal Row Dallas,Texas 75239Attached please find our pricing for the above referenced revision item. Main 214.962.3000 Fax 214.962.3001.I.he total amount to provide this work is: $21,777.00 3901 S.Lamar Blvd.#200 Austin,Texas 78704PIease note the attached exclusions/qualifications. Main 512.486.3800 Fax 512.486.3701 If you have any questions or need further clarification, please contact me at(214)962-3000. www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 48 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/15/2011 Description: ASI#11 -Garage'B'& Pedestrian Walkway Structural Repairs Change Request#:48 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Misc.Steel 2,131.73 $2,131.73 2 Structural Repairs 16,723.00 $16,723.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $18,854.73 See attached backup for labor, material and subcontractor and Overhead 10.00% $1,885.4 7 supplier detail. Fee 5.00% $1,036.80 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: 1 $21,777.00 1-1 Raid Haffer stanftwd wCtflter.ts/Planners f interior; ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS P d�t�amab A81 No.:011 Owrwr: N EAST MULTI-PURPOK FACILITY AT A ahbod: IX7 WILL ROGEFIS M L CENTER Issue Date:07/11/11 0ron&j1*x: I l MY OF FORT WORTH Conkwotorr: [X] FORT WORTH,TEXAS Proled No.:07016-01 Fleid:[XI Otty of Fort Worth Olhar: [ I 401 Weet it Street Oonlrad For:General Corwtruclion Flo: [XI Fort Worth,Toms 76102 :.lerxnry 6,2011 O'BRIEN CONSTRUCTION 1901 Rsgai Row Dan as,Texas 766 The Work shall be carried out in accordanos with the following supplemental Iretructlone hsued in accordance with the Oontract Documents without change In Contract Sum or Oorrtract'Pima. Prooeeding whh the Work In accordance with these Instructions Indicates the Contractor's aoknowledgemerd that there will be no change In the Contract Sum or Oontraot Time, Description: Rol: attached for repairs/modifications to existing Unit B level 2 structure,northeast comer and existing connector bridge where bridge Intersects the south face of existing'Richardson Bass'bullding. Attachments: Supplementary drawings"PLAN DETAIL of"WALK BRIDGE",81,82 and related photographs(8 QTY). Issued by Hahnfeld{�Hoffer Stanford: 0)1 W William Westhoff/PA (SOnntwv) rr*Wod Name/71W) Redbud Glass Inc. Oklahoma C4325 S.W. ity, O 31811 K 9 Insulated Glass • Flat Glass Distributor (406) 686-3331 Storefront Metal Fax (405) 685-3134 (800)945-0683 Fax (800) 813-7991 CALCULATION SHEET SHEET OF TITLE DATE PRODUCT PFOPARED BY CHMKW BY EXTEND VERTICAL PLATE (INSIDE FACE) TO WITHIN 2" OF THE WALKING SURFACE. ., ,4411- AoX a Pi5.57' ?$Ya 15oJ-f1 N62X71-1 � 64VP-r11 1<41L1., MY-D STRUCTURAL ENGINEERS, LLC 305 N.E.LOOP 820 SUITE 507 HURST,TEXAS 76053 817-284-8833 FAX 817-284-5075 af W 0 o < N Z� o.T Z 0 Q C) o z t`- o uW CL < 6. o • ajC> W cv UU a J LL {- J 5i 0 W a 0 j F- F- � W m ® Z op d OW QN � 3 o Q z prv� Wv ����� LL I11 N • O y 111 1- W N F- <C � �1 o = V _ Q~W �wm ~ t- W ifl cY L! i F- UJI Z )-= F- x W gaIL ® "Ili c~n W � w= 4p "�o-~ao • (W�� < oNcn� gc��Ca. -A f— N Z .= N L6 %6 r- 'CE.OF .rR p P.T.L DSTROM, ..r................ V. moo, ,Q 59965 . .. ON#,L MYD STRUCTURAL.ENGINEERS LLC F-5317 Project Name: Wll RO(ERS PARIM GARAGE WARS Date: JUNE 13, 2011 Skctcb No: C l Project Number. 09507 Modifies: J St ''UGtUR�4�. �NC�Ii�l���iING� • s a•� .d y i .414 l+ s f 4 ' LL CO w 1 c IL t t r X .•° { � ink{ ' t a t�« y r LU f a n • LLJ �• �• • a • z El • • • • CO Lu Jr AL va _r ti t i I i 1 - I • I / Cr LLJ Z r / w col / // LL 10 CJ 0 Q Z Z Q = Q cc W ~ fU-- � c9oaIr z m O w � � 00 U O = z zovF- ::D — - Z Cl) 0 >- co QXD LU —11— Oww Ir > � OUJ cCcr 0 0 Q E5 � �W a o wc/) :Dwww _ U) Ir cc: Ir MY-D S much__RAL ENGINEERS, LLC 305 N.E.LOOP 810 SUITE 507 HURST,TEXAS 76053 817-284-8833 FAX 817-2845075 BEARING PAD EXISTING BEAM TO REMAIN MC6X12 X 3'-0" CNTR UNDER TEE LEG, COPE TOP REPAIR SPALLED OR CHAN'L FLANGE UNDER TEE, CRACKED CONC. AREA. PROVIDE �110 X7" EMBED HILTI HAS SUPER RODS 0 10" O.C. W/ HILTI HIT-HY 150 MAX EPDXY B q O 6 0BRDGE TEE BEAR'G REPAIR 11�L1'-0" TT-2 NOTES; 1. SHORE EACH TEE LEG FOR 18,000# LOAD. 2. CLEAN CRACKED OR LOOSE CONCRETE FROM AREA. DO NOT CUT OR REMOVE EXISTING TEE REINFORCING 3. CLEAN EXPOSED REINFORCING TO ACCEPT NEW CONC. PATCH. 4. APPLY BONDING AGENT TO REINF. AND CONCRETE, 5. PATCH AREA WITH SIKA REPAIR MORTAR AS REQUIRED. rye IRF r P.T.L N TROM, o:.................tiir .P*. 59965 , TONAL MYD-STRUCTURAL ENGINEERS LLC F-5317 Project Name: V&ROGEKS PARO1C GARAGE MAC Date: JUNE 13, 20T1 Skctcb No: �� Project Number. 09507 Modifies: STRUCTURAL. �NC�IN��R INCA W O LL O z C'i Q C ° /) w ° QQ LLJ= zCl) U W = W W � W cl: Q IW— O ' Z I— � O °COC l I t DZa-0 O W � � Zwww If � booEw Nod � z ° w � Q II �`) w wJ � � w Q i } Boa ¢ m w = p w Q U I I I UQ W wCoDzQO � (n OCQCO < a F- ; j I j ¢ J � Ali : a a 1= L IL W = W CCcor C� C Z CO O X aow a- wcr � � IL Z � 0 � � z () m U Q F- Cl)Z = C Q mCLOCQ Z W U) 0zO � 1 0:c):c):0: 04 co 04 Q o o O:(c) (63 cl 60 w 69 lo cl�:Lc) 6'> 76 ..........o. o: :I. o:o!o:a:o: O:(D: c):c,: 0:C):C4:C):C):0:C): 04 So4 6":w (r):to:'I.: %: %: 12 1 O 1 It 11 1 ............................. 2-1 .C-4:. . . . . C LL O --4- 1- 4-E- d) E Lq: ol q L) cn O U� Ni i iii In 2 04 i io: W cr U i ..I.....4.....:......:.....i.....i.... uj . ................ ------ O a 4 � UI M o Cy) LL IT I lol U) 04 . . . . Z E col) Q j m of j of o:of o of NCL ............ LO: O of G. .......................................................... . . . . . . Cli o"t: CR >: -6 . .......................... o:o: ai c); L8 ai a. to:to: .............................. -j6 2 7E Z;: O:: ID:LL 2: ............ E:: o 0 cl. E 0 ............................. .EL o: 0 CD m! U) (.) : cl U) =: c 0: 0 cr 0 LLJ E cl 0 0 > LL tm 0 0 0 CL 0 4t: L) U) U) (n CHAMBERLIN October 12,2011 Rogers O'Brien Attention: Trey Carroll Will Rogers Memorial Coliseum Project RE: WRMC—ASI#111 Structural Repairs ROOFING 6c SHEET METAL Dear Trey: Modifled Bitumen We are providing This proposal to furnish all labor,materials,tools,equipment,and Insurance necessary to fully perform and complete the work described below. BUR • EPDM • Structural repairs outlined in ASI No.011 by Hahnfeld Hoffer Stanford. TPO/PVC Structural shoring/bracing as required by Safeway Services. • Metal . Precast beam Inspection/location of reinforcing by Wood Inspection. • Hydraulic lifting at beams as required to Insert new steel plates as shown on S1 by MY-D. WATERPROOFING& CAULKING Saw cutting as required. Joint Sealants o Concrete/Crack repair and patching Including Sika 224 repair mortar as shown on S1 and S2 by MY-D. Expansion Joints o Installation/labor for attaching new steel plates as shown on S1 and S2 by MY-D Structural Engineers.Steel with predrllied bolt Membrane Waterproofing patterns to be provided by others.Welding as required to be provided by others.Fasteners/Bolts to be provided by others. Elastomeric Coatings o Includes gutter removal as shown. Water Repellents Includes removal/replacement of vertical expansion joint at pedestrian bridge as shown.C/S VF-200 expansion Joint to be Waterblasting installed. • Concrete/Masonry Repair . Allowance for epoxy as required. • Damproofing - Flashing Total.........................................................................................................................$16,723.00 Traffic Coatings We propose to complete the waterproofing as described above,for the sum listed above;excluding 8.25%sales tax. ROOF MAINTENANCE& incorporated Notes; LEAK REPAIR This offer is good for thirty(30)days All work to be performed during normal business hours Building Surveys Owner/Contractor agrees to fumish:complete access to work areas,dumpster,toilet facilities,potable water,and all electrical power,as required,at no additional cost to Chamberlin Leak Repair All surfaces to be given to Chamberlin in a smooth,broom dean condition,tree of contaminants,forth oils,release agents,voids,fns,and projections Roof Maintenance Chamberlin Is not responsible for recognizing,locating,or removing asbestos,PCB's,or other hazardous materials. • Chamberlin Is licensed,certified or approved to Install the systems described above • Unforeseen conditions or circumstances are not assumed nor anticipated In the scope of work proposed above and will be brought to your attention Immediately upon discovery by Chamberlin personnel for a prompt resolution • Chamberlin's standard warranty excludes: failures caused by failure of the substrate,moisture vapor transmission or hydrostatic pressure,abuse,conditions that exceed the limitations of the materials,sufficiency of the design;removal and replacement of overburden materials;Inddental and consequential damages • All colors are to be selected from the manufacturer's standard colors • Pricing Is contingent on mutually agreeable contract terns,conditions,and proper coordination of the work • Time and material work will be completed at$48.00/man-tour with 20%mark-up on materials • Samples of products or systems presented for review are Intended only to provide a general representation and not necessarily an exact replica of the products or systems to be furnished or Installed • Please be advised that the products and methods outlined in this proposal are based on our visual survey,plans,specifications,or our practical experience In resolving similar problems for our customers;we are not design professionals,architects,or registered engineers,and are not responsible for determining building code compliance and do not perform design services • The proposal Is not for the sale of goods,but rather a service contract for the installation or application of products,systems or materials.Therefore,THE IMPLIED WARRANTIES OR MERCHANTIBILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE HEREBY EXCLUDED. • Excludes building permit,P&P Bonds,overtime,window cleaning,accelerated schedules,field or laboratory testing,mockups,liquidated damages,temporary facilities or utility,hook-ups or night or weekend work • This proposal EXCLUDES any reference that Chamberlin has fully examined and analyzed all site conditions that may affect performance and to affirm no conditions exist that may affect the progress,performance or price of the work.if physical conditions are of an unusual nature that differ malerially from those ordinarily found to exist and generally recognized as Inherent in construction activities of that type,Chamberlin will Immediately stop working In the area and provide written notice promptly and before the conditions are disturbed,in addition Chamberlin may be enfitied to an equitable adjustment In the contract sum, DALLAS/FT.WORTH LOCATION contract time or both. 2346 Glenda Lane We appreciate the opportunity to submit our proposal for this project.Chamberlin has been In business over 100 years.We would like to be your"Single Source" Deltas,TX 75229 contractor for everything from waterproofing to caulking to traffic coatings to roofing.We are financially sound and professionally capable and will perform the work right—the first time.We would like the opportunity to review the scope of this proposal with you soon.Please call if you have any questions. 214.273.9110/817.237.1927 214.273.9120/017.237.2676 fax Sincerely, CHAMBERLIN ROOFING fS WATERPROOFING OTHER LOCATIONS Ryan Grigsby Houston Project Manager Austin Accepted by(signature): San Ant—a Printed Name 8 Title Date Oklahoma City -YOUR FAXED SIGNATURE ABOVE WILL BE TREATED AS A FULLY EXECUTED ORIGINAL CONTRACT- PENDING CHANGE ORDER ESTIMATE SHEET PAGE NO: JOB NAME: Will Rogers Memorial Complex CONTRACTOR: RO BONDED: NO LOCATION: Universitv Drive,Fort Worth,TX ARCHITECT: Hahnfeld DATE: 11-Oct-11 EST.: CHECKED BY: RG BID DATE: DESCRIPT: AS I I Structural Repairs BURDEN RATE: 65% TAX ON MATERIALS: NO FOOTAGE DESCRIPTION(LABOR)-PRODUCT NAME RRODDUCTION QUANTITY COST PER MD LABOR BURDEN SUPER/IvfISC. TOTAL LABOR Inspection Shoring Hydraulic Jacks/Poles 1 $130 Sika 224 Repair 1 $130 Steel Labor Repair 1 $130 Gutter Removal 1 $130 EJ Remove/Replace-C/S VF Model 1 $130 Epoxy Allowance 1 $130 FOOTAGE DESCRIPTION(MATERIAL)-PRODUCT NAME COVERAGE QUANTITY COST PER UNIT MATERIAL. MISC.MATERIAL TAX TOTAL NATERIALS RATV 500.00 45.00 210.00 250.00 TOTAL COST MISC.JOB EXPENSES QTY, UNIT COSTI AMOUNT COST W/MISC. EQUIPMENT/I'OOLS-RENTAL OR PURCHASE $0 MARGIN 1 15% HOTEL $0 GRAND TOTAL PER DIEM $0 BOND ADD TRAVEL $0 SHIPPING/FREIGHT $0 TOTAL CS FWAX scaffolding & Access solutions 2621 WILLOWBROOK ROAD DALLAS,TX 75220 Phone: (214) 352-3500 Fax: (214) 352-3572 Quotation No: 30210 Freight. . . . . : PPD Quote Date: 10/11/2011 Opportunity#: 136865 Sales Rep: JEFF PETTY Customer Number: 166324 Jobsite CHAMBERLIN WATERPROOFING AND WILL ROGERS PARKING GARAGE ROOFING SYSTEMS INC UNIVERSITY @ LANCASTER 2346 GLENDA LANE FORT WORTH, TX DALLAS, TX 75229 Contact: RYAN GRIGSBY Phone: (972) 241-0934 Phone: (972)241-0934 Fax: (972)241-0311 Equipment Listing Quantity Item Extended Part Number Part Description Ordered Weight Weight VMUDSI LL MUDSILL 2"X 10"X 3'-6' 8 13.50 108.00 STSJ1 SYS SCREW JACK 8 8.30 66.40 SVP8 SYS VERT POST 87 8 29.70 237.60 Si SH SCREW JACK 8 13.80 110.40 U8 SH U HEAD 4"X 8" 8 4.20 33.60 SBR2 SYS BEARER/RUNNER 2' 20 6.70 134.00 SBR5 SYS BEARER/RUNNER 5' 20 14.70 294.00 ALJ6 ALUM JOIST 6' 8 26.10 208.80 VSBW8X10X3 I BEAM STL 8"H X 10#X 3'L 4 30.00 120.00 VSBW8X10X6 I BEAM STL 8"H X 10#X 6'L 4 60.00 240.00 JBC CLAMP JUNIOR BEAM (#204-100) 24 0.40 9.60 SSP5 SYS STL PLANK 9"W X 5'L 4 24.90 99.60 CSA19 TC CLAMP SWIVEL 1.69"OR 1.9" 40 3.50 140.00 CRA19 TC CLAMP RIGID 1.69 OR 1.9" 8 3.00 24.00 ST6SG TC STL TUBE 6'W/FTG 8 14.60 116.80 ST8SG TC STL TUBE 8'W/FTG 8 18.50 148.00 STC3 TC STL TUBEX T MISC TUBE 4 5.80 23.20 Total Pieces: 192 Total Weight: 2,114.00 Two reshore towers @ approximately 2'x 5'x 12'4"tall. One tower will support the T, and the other tower will serve as a platform for lifting the T. Each scaffold will be capable of supporting 20 kps. One reshore tower @ approximately 3' x 5'x 13' 8"tall with an outrigger bay for stability. The tower will be capable of supporting 18 kps Page 1 of 2 10/11/11 CS FWAX scaffolding & Access solutions 2621 WILLOWBROOK ROAD DALLAS, TX 75220 Phone: (214) 352-3500 Fax: (214) 352-3572 Quotation No: 30210 Freight. . . . . : PPD Quote Date: 10/11/2011 Opportunity#: 136865 Sales Rep: JEFF PETTY Customer Number: 166324 Jobsite CHAMBERLIN WATERPROOFING AND WILL ROGERS PARKING GARAGE ROOFING SYSTEMS INC UNIVERSITY @ LANCASTER 2346 GLENDA LANE FORT WORTH, TX DALLAS,TX 75229 Contact: RYAN GRIGSBY Phone: (972)241-0934 Phone: (972)241-0934 Fax: (972) 241-0311 Equipment Listing Labor: $ 1,890.00 Includes erection and dismantle. Rental: $ 850.00 Per 28 Days. (for all three towers). Freight: $ 300.00 Includes freight in and out. Engineering: $ 450.00 Subtotal: $ 3,490.00 Taxes: $ 287.93 Total: $3,777.93 *Material for the 18 kp tower is not in the material list. Page 2 of 2 10/11/11 4N :, WOOD Inspection Services, Inc Estimate 165 Highview Drive OQ Double Oak, TX 75077 Date Estimate # N SERVICES, INC. 10/11/2011 20111011-1 Name / Address Chamberlin Ltd Project 2346 Glenda Lane Garage Beam Repair Dallas, TX 75229 P.O.No. Terms Net 30 Item Description Unit$ Qty Total Mark&Go Initial Site service charge for GPR Services 500.00 l 500.00 Clear holes for pinning a steel plate to two overhead beams. Plans call for drilling through the beam to bolt the plates to the beam.If the PT cables are two inches or closer we will not be able to discriminate from the PT rows,and will the thickness of the beam it's dangerous to try to Drill between them. I recommend not drilling through overhead beams with PT cable drapes. Site Location:Unknown Location-Fort Worth TX Date of Service-TBD Site Contact-Ryan Grigsby No reporting.Marks provided on Slab or Ground. All work to be conducted during normal working hours. Trip Fee-DFW... Trip fee for delivering Services 50.00 1 50.00 Mark Holes Mark Holes for coring or drilling.@$25 per hole 25.00 2 1,300.00 Please have areas marked prior to arrival.Failure to do so may result in having to reschedule and cost an additional trip fee. Net 30 WOOD Inspection Services,Inc is outsourcing our Accounts Receivables to Riviera Finance of 0.00 0.00 Bedford TX.Net 30 terms are contingent on credit approval.Otherwise terms will be COD, unless specifically agreed to by WOOD Inspection Services,Inc.prior to the services being performed. We DO NOT OPERATE on a Paid when Paid basis. Payments made after the due date will incur late charges of an additional 15% per 30 day, period Approval Signature Total $1,850.00 Phone # Fax# E-mail Web Site 972-724-5550 972-355-1592 Sales @WelnspeetTexas.com www.WelnspectTexas.com Product Data Sheet Edition 8.2003 Identification no. 556-500 SikaRepair 224 SikaRepair® 224 One-component, cementitious, sprayable mortar for structural repairs Description SikaRepair 224 is a one-component,pre-packaged,ready-to-use,cementitious,silica fume,fiber reinforced,high strength shrinkage-compensated mortar.Formulated for application by trowel or low pressure spray. It is designed especially for repair of overhead and vertical surfaces. Whereto Use A high performance repair mortar for wet spray application.Suitable for new construction,repairs,and maintenance work.Typical applications include: ■ Use on grade,above,and belowgrade on concrete and mortar. ■ Use on vertical and overhead surfaces. ■ Structural repairmaterial for parking structures,industrial plants,walkways,bridges,tunnels,ramps,and dams,etc. ■ Potable water tank.(NSF approved in Marion,OH and Santa Fe Springs,CA) Advantages ■ Ready-for-use,one-component material. ■ Easy touse;just add water. ■ Sprayable system. ■ Potable waterapproved. ■ Superiorworkability.Can be trowelled and screeded after application. ■ Labor-saving system. ■ Superior abrasion resistance overconventional Portland Cement mortar. ■ Bond strength ensures superior adhesion. ■ Not a vapor barrier. ■ Compatible with coefficient of thermal expansion ofconcrete. ■ Increased resistance to de-icing salts. ■ Good freeze/thaw resistance. ■ High early strengths. in Very low shrinkage. ■ Silica Fume enhanced. in Fiber reinforced. Yield Yield in service will vary.Average yield is approximately 0.40 cu.ft./bag.Estimating should be based on prior experience or actual field evaluation. Packaging 50-Ib.(22.7kg)multi-wall bags. Typical Data(Material and curing conditions @73°Fand100%R.H.) Shelf Life 1 year in original,unopened bags. Storage Conditions Store dry at 40°-95°F(4°-35°C).Condition material to 65°-75°F before using. Color Dark gray. Mixing Ratio 3/4 gal.to 1 gal.liquid per 50 lb.bag of material Density(wetmix) 125 lbs./cu.ft. (2.0 kg./I.) Compressive Strength(ASTMC-109) 73oF 1 day 4,500 psi(31 MPa) 7day 8,000 psi(55 MPa) 28day 10,000 psi(69 MPa) Flexural Strength(ASTM C-348) 28 day 1,100 psi(7.6 MPa) Tensile Strength(ASTM C-496) 28 day 735 psi(5.0 MPa) Direct Tensile Pull off(ACI 503) 28 day greaterthan 350 psi (Failurein substrate.Substrate prepared with 20,000 psi hydroblasting) SlantShear(ASTM C-882 modified) 28 day 3,500 psi(24.1 MPa) Chloride Permeability(ASTM C1202/AASHTO T277) 28 day less than 500 coulombs Sulfate Resistance(ASTM C-1012) 1 year less than 0.06% Setting Time (ASTM C 266) Initial:2 to 3 hours. Final:5 to 6.5 hours. How to Use Concrete/Mortar:Substrate must be sound,clean,and free from oil,grease,loose material,surface Surface Preparation contaminants and olherbond-inhibiting materials.Steel reinforcement must be clean and free from any rust.Be sure repair area is not less than 3/8 in.in depth.Preparation work should be done by high pressure water blast,orolherappropriale mechanical means,to obtain an exposed aggregate surface(CSP-6).Saturate C, surface with clean water Substrate should be saturated surface dry(SSD)with no standing water during applicalion Reinforcing Steel. Steel reinforcement should be thoroughly prepared by mechanical cleaning to remove all traces of rust. Where corrosion has occurred due to the presence of chlorides,the steel should be high- pressure washed with clean water after mechanical cleaning For priming of reinforcing steel,use Sika Armalec 110 EpoCem(consult Technical Data Sheet). Priming Concrete Substrate:Prime the prepared substrate with a brush or sprayed applied coat of SlkaArmalec 110 EpoCem (consult Tech nicai Data Sheet).Alternately,a scrub coat of Sika Repair 224 can be applied prior to placement of the mortar. The repair mortar has to be applied into the wet scrub coat before it dries Mixing With water:Add the water(approx.3/4 gal.)directly into mixer.Start the mixer in motion and add the Sika Repair 224 mortar while continuing to mix.Mix to uniform con sistencyusing a maximum of 7/8 gallons of water per 50ib.(22.7 kg.)bag(approx. 3 minutes). With Latex R: Pour 6-7 pints of Sika Latex R Into the mixing container. Slowly add powder and mix as above. With diluted Latex R:Sika Latex R may be diluted up to 5:1 (water:Sika Latex R)for projects requiring minimal polymer-modification.Pour6-7 pints of the mixture into the mixing container.Slowly add powderand mixes above SikaRepalr 224 Concrete:Forhorizontal applications greaterthan 1 inch deep,add 3/8 inch coarse aggregate.Aggregate must be non-reactive(reference ASTMC1260,C227 and C289),clean,weli-graded,saturated surface dry(SSD),have low absorption and high density,and comply with ASTM C33 size number8 perTabie 2.Addition rate must not exceed 25 ibs.of aggregate/bag of SikaRepair224(25 ibs.of 3/8 in.aggregate is approximately 2.0 to 2.5 gal.by loose volume of aggregate). If the placement is vertical or overhead,temporary support of the material is required.Contact Sika Technical Service for application details. App ieatlon Conventional wet-process shotcreting equipment such as a low or high pressure machine should be used.Altime of application,surfaces should be saturated surface dry but hold no standing water.Apply SikaRepair 224 mortar by low pressure spraying or trowelling for repairing vertical oroverhead surfaces. Shoot the shotcrete perpendicular to the surface.This minimizes rebound,creates the smoothest pattern(reduces 'bumps')and properly encases the rebars.The velocity of the shotcrete Is sufficient If,at a distance of 18 to 24 In.,the shotcrete pattern flattens out on contact with the surface and the rebars are encased.After applying the shotcrete, allow it to stiffen for about 10 minutes before removing bumpy areas with a trowel. Before applying the next layer,allow the shotcrete to reach Initial set.This will lake anywhere from 45 minutes to several hours,depending on mix consis- tency,mix and ambient temperature,wind conditions and humidity.Begin and finish a given patch on the same day. Curing As perACi recommendations forportiand cement mortar,curing is required when jobsite conditions warrant.Moist curewith wet buriap and polyethylene,a 6 ne mist of water or a water based*compatible curing compound.Curingcompounds adversely affect the adhesion of following layers of mortar,leveling mortar or protective coatings.Moist curing should commence immediately after finishing.Protect newly applied material from direct sunlight,wind,rain and frost. 'Pretesting of wring compound Is recommended. Limitations Application thickness: ■ Minimum 3/8 Inch (9 mm). Vertical applications: ■ SikaRepair 224 can be spray applied up to 2"thickness in one lift. Overhead applications: ■ The thickness should be no more than 1 to 1.5"per pass.If repair requires several lifts(over 1.5"),each Iiftshouid be applied as soon as the previous Ilftwili supportit. General: ■ For additional Information,consult Technical Service. ■ Minimum ambient and surface temperatures 40°F(4'C)and rising at the time of application. ■ As with all cement based materials,avoid contact with aluminum to prevent adverse chemical reaction and possible product failure.Insulate potential areas of contact by coating aluminum bars,rails,posts etc.with an appropriate epoxy such as Sikadur Hi-Mod 32. Caution Suspect carcinogen-Contains portiand cement and sand(crystalline silica).Skin and eye irritant. Irritant Avoid contact.Dust may cause respiratory tract Irritation.Avoid breathing dust.Use only with adequate ventilation.May cause delayed lung injury(silicosis).IARC lids crystalline silica as having sufficient evidence of carcinogenicity to laboratory animals and limited evidence of carcinogenicity In humans.NTP also lids crystalline silica as a suspect carcinogen.Use of safety goggles and chemical resistant gloves is recommended.if PELs are exceeded,an appropriate NIOSH approved respiratoris required.Remove contaminated clothing. First Aid In case of skin contact,wash thoroughly with soap and water.For eye contact,flush Immediately with plenty of water for at least 15 minutes,and contact a physician.For respiratory problems,remove person to fresh air. In case of spillage,scoop or vacuum into appropriate container,and dispose of In accordance with current,applicable local,state and federal regulations.Keep container tightly closed and in an upright position to prevent spillage and leakage.Mixed components: Uncured material can be removed with water.Cured material can only be removed mechanically. KEEP CONTAINER TIGHTLY CLOSED KEEP OUT OF REACH OF CHILDREN NOT FOR INTERNAL CONSUMPTION FOR INDUSTRIAL USE ONLY CONSULT MATERIAL SAFETY DATA SHEET FOR MORE INFORMATION Sika warrants this product for one year from date of Installation to be free from manufacturing defects and to meet the technical properties on the current technical data sheet If used as directed within shelf life.User determines suitability of product for intended use and assumes all risks.Buyer's sole remedy shall be limited to the purchase price or replacement of product exclusive of labor or cost of labor. NO OTHER WARRANTIES EXPRESSED OR IMPLIED SHALL APPLY INCLUDING ANY WARRANTY OF MERCHANTABILITY OR FITNESS FORA PARTICULAR PURPOSE.SIKA SHALL NOT BE LIABLE UNDERANY LEGAL THEORY FOR SPECIAL OR CONSEQUENTIAL DAMAGES. Visit our webslte at www.sikausa.com 1.800-933-SIKA NATIONWIDE Regional Information and Sales Centers.For the location of your nearest Sika sales office,contact your regional center. Sika Corporation Slka Canada Inc. Sika Mexican:S.A.deC.V. Q IT'S' UA 201 Polito Avenue 601 Delmar Avenue Carretera Libre Ceiaya Km.8.5 Lyndhurst,NJ 07071 Pointe Claire Corregidora,Queretaro Phone.800-933-7452 QuebecH9R4A9 C.P.76920A.P.136 P,: Fax 201-933-6225 Phone 514-697-2610 Phone.52 42 25 0122 Fax 514-694-2792 Fax 52 42 25 0537 wt.,Mo Sika end SikaRepalr an regmlemd Trademarks Made In USA Prinled In USA Construction Specialties, Inc. VF Joint Sealant PRIMARY USES Pre-compressed Joint Sealant, Primary Construction Joints Silicone Coated, Polyurethane Foam, W Vertical/Horizontal Movement Joints Waterproofs Vertical Applications. Exterior Panel Systems PRODUCT DESCRIPTION ■ VF Joint Sealant is a premium Field quality joint sealant composed of a applied, Factory applied, open micro-cell polyurethane foam silicone - colorized ' ,layer '(astomerlc layer impregnated with a hydrophobic, polymer sealing compound. optional:. es Coated with a colorized, pplie applied elastomeric layer of silicone. sllicone be ■Developed to waterproof most larger vertical and horizontal construction movementjoints or joints anticipating seismic movement. •Provides a watertight,dustproof, airtight, UV stable,chemically resistant,sound-proof, and insulated urethane primary seal. •Works under its own constant internal pressure to provide a 'VF Joint Sealant does not rely on the external fillet bead to provide a watertdght seal. permanent,watertight seal ADVANTAGES PRIMARY APPLICATIONS eliminating costly water damage, as well as allowing for a greater ■Can accommodate rapid rates of es Primary construction joints degree of joint movement. joint movement ■Vertical or horizontal movement— ■Once VF Joint Sealant is ■Supplied in pre-compressed state Expansion, control,and isolation installed in the joint,the material for ease of installation joints expands depending on ■Does not rely on the silicone ■Retrofit joints temperature, adapting to the width coating or on the adhesion of a field ■Pre-cast concrete walls—Tilt-up of the joint and the irregularities applied bead of sealant to provide a walls of the substrate provided such watertight seal profile changes are not sudden or es Exterior Panel Systems—Masonry, extreme. ■Consistent depth of product granite, metal, EIFS, and curtain ■Developed to meet all applicable ■Excellent compression recovery walls standards for pre-compressed ■Permanently elastic and ■Other joint requiring a resilient, sealants. weather-tight waterproof seal. ■Permanently resilient.The ■Used for joints up to 8"wide ■Ideal for larger joints that require an material will expand and contract architectural finish. with the movement of the joint ■Allows for up to 100%(t50%) under any weather condition. movement ■Standard Colors: Dow Corning® ■Not based on asphaltic or 790 Custom colors available upon bitumastic impregnation request. is Available Sizes(Joint Width) *Sticks: 1/2"to 8" Black Limestone Dusty Rose '(Custom sizes avauable upon requesi) -- DOW CORNING®790 Bronze Precast White Rustic Brick Actual colors may vary. See Dow Sandstone Natural Stone Blue Spruce Corning®790 Color Chart for exact color match. Adobe an Gray Charcoal VF Joint Sealant VF Joint SPECIFICATION INSTALLATION Sealant shall be VF joint sealant as manufactured by Construction PREPARATION Specialties Inc, 800-233-8493. Sealant shall be a polyurethane foam impreg- ■Verify that the joint is clean, nated with a waterproof polymer sealing compound. VF joint sealant shall sound, and will provide an be installed in the joint in a pre-compressed state with a silicone coating on the appropriate surface for exposed face. When compressed to 50%of its fully expanded size, VF installation of the joint sealant. joint selant must provide a watertight joint. The manufacturer shall furnish a ■Check material for the Certificate of Compliance with these requirements. appropriate lengths,widths, and TEST DATA depths. Density 10 lb/cu.ft.(160kg/m') ■Prepare the material for seams Thermal Conductivity 0.05 W/m.°C and proper lengths. Temperature Stability Range -40°F(-40°C)to 185°F(85°C) INSTALLATION Tensile Strength ASTM 3574 21 psi min. ■Run a'/:' bead of the supplied Ultimate Elongation ASTM 3574 125%±20% silicone adhesive along both Resistance to Compression Set Max 2.5% sides of the joint approximately Shear Strength Min 8N/cm' 1/"—'/4"back from the substrate Mildew Resistance Excellent surface. Staining None Flammability UL 94VO Self Extinguishing ■When fully prepared to install, Meets CAL 117 open the sealant material by Flash Point 590°F(310°C) removing the shrink packaging Durometer Hardness 1ASTM D2240 I Shore A 15 ts. and masonite strapping. ■Remove the white release liner LIMITATIONS NOT INTENDED FOR on both sides of the material. •Joints must be sized by measuring ■Joints submerged in water ■Insert the material into the joint every 5-7ft. (1.524—2.137 meters)to ■Joints in contact with harsh chemicals while pressing the material ensure gap opening is uniform and against the side of the joint depth is sufficient for the supplied ■Joints in roofing applications activating the PSA(Pressure sensitive material. ■Joints requiring pick resistance Adhesive). •Do not install when substrate or ■Cross joints in copings and ■Tool the silicone over all seams ambient temperatures are below projecting stone work and transitions to allow for a -14°F(-25°C)or above 95°F(35°C). clean,aesthetic finish. •Will not adhere to surfaces CLEAN UP contaminated by oil or grease. ■Remove any excess silicone left on the surface of the material or • If ambient storage temperatures are substrate. below 50°F(10°C), store material at ■Remove all waste materials a minimum of 68°F(20°C)for a from the jobsite. minimum of 24 hours prior to installation, regardless of ■Do not reuse waste material. temperature at location of ■Leave site to the satisfaction of installation. the owner/architect. • Store material in a dry, enclosed area, off the ground, and out of direct sunlight. Do not install when raining or snowing. For complete Installation Instructions and product information,contact Technical Support:800.233.8493 or visit us on the web at www.c-sgroup.com Construction Siq3ecialties, Inc. • 6696 Route 405•Munc •Pa 17756 ADDRESS Dow Corning® 790 Silicone Building Sealant Sealant Color Selection Guide • Please check the availability of the different colors. • Custom colors are available on request. • Please refer to product literature for applications and technical information. The colors shown are a close approximation of the actual sealant colors. However,for best results, submit color samples or swatches to our lab for color testing and matching. Precast White Limestone Gray Black Bronze Sandstone Adobe Tan Dusty Rose Rustic Brick Blue Spruce Charcoal Natural Stone Construct ion Corning is a registered trademark of[hrc Corning Corporaboa _. sOl1121OI1S C)2003 D .Corning Corporation All rights reserved reserved nGP6 GP6m617-: Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation &Public Works Dept. Facilities Management Division / Architectural Services 401 West 13"' Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project #TPW-01627 Contract# 41332 Fort Worth,Texas SUBJECT: Change Request#54—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $765.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request: Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Grace Construction Co., Inc. 3901 S.Lamar Blvd.#200 $662.00 --> Total Cost included In Change Request 00 Austin,Texas 78704 $662. / $765.00= 86.5% Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Request www.rogers-obrien.com $662.00 / $765.00= 86.5% Total M/WBE Participation for this Change Request is 86.5%. Please let me know should you need any additional information. Sincerely, Rogers-O'Brien Construction Trey Carroll Project Manager CC: Master File 10022 Dallas I Austin Rogers-O'Brien Construction November 22,2011 City of Forth Worth 401 West 13th Street Fort Worth, TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#75-Bldg. 'A' Cantilevered Beam Near Stair 1A 10022 Will Rogers Memorial Cntr East Change Request#54 Dear Jack: Per RFI#75 response, added 8"x 24"concrete column at Sw corner of Stair 1A to support cantilevered concrete beam. Cost of work includes added reinforcing,forming of column and concrete for new column. Attached please find our pricing for the above referenced revision item. 1901 Regal Rovwrhe total amount to provide this work is: $765.00 Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3ooPlease note the attached exclusions/qualifications. 3901 S.Lamar Blvd.#200 Austin,Texas 787041f you have any questions or need further clarification,please contact me at(214)962-3000. Main 512.486.3800 Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 54 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/22/2011 Description: RFI#75-Bldg. 'A' Cantilevered Beam Near Stair 1 A Change Request#:54 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Added Concrete Column 1 662.00 $662.00 ****EXCLUSIONS AND QUALIFICATIONS`* Subtotal: $662.00 See attached backup for labor, material and subcontractor and Overhead 10.00% $66.20 supplier detail. Fee 5.05% $36.80 Price excludes all federal,state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $765.00 Hoffer tl l H�►ff�r Stanford z r 5`c i.�rd 1 21i;;,, E -Uit= Fort To „_ 07 RE Response Transmittal ID: 00454 Date Sent: 6/24/2011 Project: 07015-01 WRMC East Multi-Purpose Building Number: 07015-01 To: Brent NlacDonald Rogers-O'Brien Construction Co. 1901 Regal Row Dallas,TX 75235 214-952-3000 (Rhone) 214-962-3001 (Fax) From= Gary Ryan Halinfeld Hoffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth, Texas 76107 (817) 921-5928 (Phone) (817) 302-0692 (Fax) Subject: Unit'A' Cantilevered Beam Near Stair 1A Sent Via: Info Exchange RFI ID: 00075 Discipline: Received: 6/23/2011 Question: Detail 12/S.A.2,5 depicts 8,F CMU supporting both sides of the cantilevered second floor beam at the South side of stair 1A, As discussed with Tommy Deeds, Rogers-O'Brien Construction is to provide a e" x 24" concrete column (the 24" leg parallel with North and South) at the Southwest corner of stair 1A to support the cantilevered beam above, Please provide reinforcement details for connection to existing ~gall below and beam above as well as stirrup requirements. Suggestion: Answer: PROVIDE 8"X24" CONCRETE COLUMN REQUESTED BY G.C. TO ACCC0MODATE CONSTRUCTION SEQUENCE WITH 16-#6 VERTICAL AND 2-#3 TIES AT 8" O,C.. THIS IS ALREADY DISCUSSED WITH TOMP44Y W/HHS AND BRENT W/ R.O. CSC: �Sw� k (3doln x(411 00 OP7 Grace Construction Co.. Concrete Construction 11325 Tantor Rd. Ste 200 Dallas, Texas 75229 CHANGE ORDER REQUEST To: Rogers- O'Brian Construction Tuesday, October 25, 2011 1901 Regal Row Dallas, TX 75235 Attn: Trey Carroll Project: Will Rogers Memorial Center 1401 W.R. Watt Drive Fort Worth, TX 76107 Subject: See the additional costs for 8" x 24" concrete Change Order Request 11007-012R column per RFI 00075. Labor with Burden $ 331.00 Subcontract $ - Material $ 245.00 Equipment $ - Subtotal $ 576.00 Overhead & Profit 15% $ 86.00 Total Cost: $ 662.00 This work has been performed. We request that the Change Order to our contract be issued as soon as possible. Should you have any questions, feel free to contact me. Sincerely, Alan J. Haynes, Sr. Grace Construction Company Phone: (972) 432 - 0800 Fax (972) 432 - 0810 1 of 1 Grace Construction Co. Concrete Construction 11325 Tanto Rd. Ste 200 Dallas, TX 75229 DETAILED BREAKDOWN OF COSTS FOR RFI 00075 Labor Burden @ # Category Time Rate 40% Cost 1 Foreman 1.0 Hrs $22.50 $9.00 $31.50 2 Carpenter 3.0 Hrs $17.00 $6.80 $142.80 1 Laborer 3.5 Hrs $14.75 $5.90 $72.28 1 Iron Worker 1.5 Hrs $17.00 $6.80 $35.70 1 Cement Finisher 2.0 Hrs $17.50 $7.00 $49.00 $331.00 Material Item QTY Price Cost Formwork 72 SF $0.70 $50.40 Concrete 1 CY $60.00 $60.00 Reinforcing 3 CWT $45.00 $135.00 $245.00 Equipment Item QTY Price Cost $0.00 $0.00 $0.00 $0.00 Subcontract Item QTY Price Cost $576.00 Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation&Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`h Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project#TPW-01627 Contract# 41332 Fort Worth,Texas SUBJECT: Change Request# 59—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $4,083.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Grace Construction Co., Inc. 3901 S.Lamar Blvd.#200 $3,535.00 —> Total Cost included In Change Request Austin,Texas 78704 $3,535.00 / $4,083.00= 86.5% Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Request www.rogers-obrien.com $3,535.00 / $4,083.00= 86.5% Total M/WBE Participation for this Change Request is 86.5%. Please let me know should you need any additional information. Sincerely, Rogers-O'B en Construction Trey Carroll Project Manager CC: Master File 10022 Dallas I Austin Rogers-O'Brien Construction November 22, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#86- Revised Rebar For Beam B33 @ Grid Line U 10022 Will Rogers Memorial Cntr East Change Request#59 Dear Jack: Per RFI#86 response, revised rebar for concrete beam along grid line U between grid lines 2&3. Original reinforcing for Beam B33 at this location was re-made per revised details provided. Attached please find our pricing for the above referenced revision item. The total amount to provide this work is: $4,083.00 1901 Regal Row Dallas,Texas 75235 Main 214.962.3000Please note the attached exclusions/qualifications. Fax 214.962.3001 3901 S.Lamar Blvd.#20df you have any questions or need further clarification, please contact me at(214)962-3000. Austin,Texas 78704 Main 512.486.3800 Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 59 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/22/2011 Description: RFI#86-Revised Rebar For Beam B33 @ Grid Line U Change Request#:59 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Revised Rebar @ Beam B33 3,535.00 $3,535.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $3,535.00 See attached backup for labor, material and subcontractor and Overhead 10.00% $353.50 supplier detail. Fee 5.00% $194.50 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $4,083.00 0 Hatter Hatter Stanford Hahnfeld Hoffer Stanford 1 200 Bailey Avenue, Suite 200 Fort Worth, Texas 76107 RFI Response Transmittal ID: 00541 Date Sent: 8/9/2011 Project: 07015-01 WRMC East Mull-Purpose Buiking Number: 07015-01 To: Brent Mac Don aid Ro0ers-Olrien Construction Co. 1401 Regal Row Dalas,7X 73x35 214-952-3000(Phone) 214-962-3W k (Fax) From: 0 NoMw Starford 200 A ,�• 20Q F is ]6b7 (837 (FAX) ) Su61ea: Uri'A,'Bwn 33 Confirmation •*MON PPJOPJTY" 3mt Yin: U4 ftdawgis RrI ID: 00486 Di&dpl In e: fiftowtvad: 8 a . ac: rontants ilvandty Dated n i �f2Pb� n �hy� ��� ALT. NO 2 i TUNNEL Du V-2" '6'-0" 29.;$" 6 " ' 5 "' 5 S.A2.7 S.A2.9 S.A2.2 2" E.J. L 1 '_0" iii EXIST. o0 BLDG. - li _/----------- — — — ------------- �. ni in 1 i ---- -------------- - ----------- -- -- ------ -- ---� -------------- - -- 2 1 w I I 00 X2.3 I o Zv i —— —� o N --------------� _610— -- -- 2 3911 1 1 1i i2 30"PAN II in Ilm _1 -�j 1 2.4 A_I1IA 1 I 11 EF.A oo 3 —ir r —Ir — _ =1L =� _� _ 2/SS-4 -IF ) —IL ( j I A --3 arj-- - 1 4 , 1/SS-4 N J' T.O.C. = 582'-8" 0'3 PIN JI_ JI_ _IL 1 - - - - - ------= -w - --- -------------------- - -- 3 —1 1�1 11 1iQ11 m _ 11 11 1 1 OI I N I I _ �t co co l r �I I —--------- ------� .A7.8 -------------- -1 ---- ------- ---- E2 1 1 W 6 11 2'141" 1'-2" °o h Q W3 I S.A2.8 11 1�'-011 1 j I 3 `- JLJL _ — ---- ----r } , ------------S_- -- PARTIAL UNIT -A t 1 SECOND LEVEL FRAMING PLAN REF. SA1.2 A HtNEMMA YAJNIK Lw r TY OF FORT EAST MULTI-PURPOSE FACILITY WILL ROGERS MEMORIAL CENTER OFORT WORTHWOTEXAS 37 11.IPAL ENONIERS tuor"m 'urtr5es 9507 "15PONM To Dmvm BY 8/9/2011 ��- 073 E��1N Fil�iyQ RFI#00036 MY-D- -- t T.O. CONC. TOPPING - SEE U EL. 582'-8" ARCH. DWG. 18" 1114M. CONC, COL. BEYOND Lo _w Of 649 TOP 1'-10" Q 2-#4@11"O.C. 1-f8 CONT. T a B Lo .I I I I _ I N I 145 HORIZ. • • a0 AT MIDDLE BM EDGE BEYOND I� 7-t11 BOT 1'-0" 1'-2' 8" l'-111E.J. 0 SECTION SCALE: 4" 09507-Al-CBSS T.O. CONC. TOPPING - SEE EL. 5821-8" ARCH. DWG. N _W < 6-119 TOP 1-10" Q � 2-#4Ls11"O.C. BM EDGE BEYOND N N 145 HOR1Z. • AT MIDDLE • • •J. 7411 BOT 8-9611 1'-0" 1'-2' 8„ 1"E.J, 2 SE TON SCALE; =1'-0" 09507-A1-C6 IAW RA YAJM< EAST MULTI-PURPOSE FACILITY ��• WILL ROGERS M=RIAL CENTER _ °W OFFORTw°Rh' pi WQRT7l TLXA.5 pa7lTS�w - }tit TO Wwv'n 7�4 - 9607 R�i,i,;oeoaa MY-D � 1 Grace Construction Co.. Concrete Construction 11325 Tantor Rd. Ste 200 Dallas, Texas 75229 CHANGE ORDER REQUEST To: Rogers - O'Brian Construction Friday, June 10, 2011 1901 Regal Row Dallas, TX 75235 Attn: Trey Carroll Project: Will Rogers Memorial Center 1401 W.R. Watt Drive Fort Worth, TX 76107 Subject: RFI# 86 - Revised Reinforcing For Beam B33 At Change Order Request 11007-009 Grid Line U Trey: See below for the additional costs for additional steel for Beam B33 at grid line U b/t grid lines 2 & 3. The additional weight due to structural change is 4,548 pounds. Labor with Burden $ - Subcontract $ 200.00 Material $ 2,274.00 Equipment $ 600.00 Subtotal $ 3,074.00 Overhead & Profit 15% $ 461.00 Total Cost: $ 3,535.00 This work has been performed. We request that the Change Order to our contract be issued as soon as possible. Should you have any questions, feel free to contact me. Sincerely, Bud Vore Grace Construction Company Phone: (972) 432 -0800 Fax: (972)432 - 0810 1 of 1 Grace Construction Co. Concrete Construction 11325 Tanto Rd. Ste 200 Dallas, TX 75229 DETAILED BREAKDOWN OF COSTS FOR RFI # 86 Burden @ # Category Time Rate 40% Cost 0 Foreman 0.0 Hrs $22.50 $9.00 $0.00 0 Carpenter 0.0 Hrs $17.00 $6.80 $0.00 0 Laborer 0.0 Hrs $14.75 $5.90 $0.00 0 Iron Worker 0.0 Hrs $17.00 $6.80 $0.00 0 Cement Mason 0.0 Hrs $17.50 $7.00 $0.00 $0.00 Material Item QTY Price Cost Reinforcing Steel 4,548 LBS $0.50 $2,274.00 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $2,274.00 Equipment Item QTY Price Cost 1 Crane 1 Days $600.00 $600.00 0 0 Days $0.00 $0.00 $0.00 $600.00 Subcontract Item QTY Price Cost 1 Rojas 1 Tons $ 200.00 $ 200.00 $ 200.00 $3,074.00 DANIEL STEEL INDUSTRIES, INC. 4640 N. BELTLINE RD. SUNNYVALE,TEXAS 75182 PHONE: (972)226-7656 FAX: (972)203-1597 Mr. Trey Carroll Rogers O'Brien Construction RE: Will Rogers Center Change Order Fort Worth, Texas Hahnfeld Hoffer Stanford, Architects Contract Drawings: RFI #86 (revised B33 on -grid U): $2,274.00 Approximate quantity of material for labor purposes only: 2.28 tons of reinforcing steel DAN/fL sTffL/NBOMI,fs Nate Orrick Sales Reii:jorciug Steel Fabricators Committed to Superior Service Siuce 1971 � Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation& Public Works Dept. Facilities Management Division /Architectural Services 401 West 13`''Street Fort Worth,Tx 76102 RE: WRMC—East Multi-Purpose DOE/Project#TPW- 162 Facility Project Contract# 41332 Fort Worth, Texas SUBJECT: Change Request#60—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above includin and overhead is $2,880.00. Below is the breakdown for the M g profit 1s,T Regal Row related to this change /WBE Participation Dallas,Texas 75235 g request: p Main 214.962.3000 Fax 214.962.3001 Grace Construction Co. Inc. 3901 S.Lamar Blvd.#200 $2,493.00 -> Total Cost included In Change Request Austin,Texas 78704 $2,493.00 / $2,880.00= 86.5% Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Re uest www.rogers-obrien.com $2,493.00 / $2,880.00= 86.5% Total M/WBE Participation for this Change Request is 86.5%. Please let me know should you need any additional information. Sincerely, Rogers-O'Brien Construction Trey Carroll Project Manager CC: Master File 10022 Rogers-O'Brien Construction November 22,2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#88-Bldg. 'A' North Ramp Rebar Requirements 10022 Will Rogers Memorial Cntr East Change Request#60 Dear Jack: Per RFI#88 response, specified rebar requirements for the beam running East to West along South side of the North ramp along grid line T b/t grid lines 4&7. Ramp beam rebar to have(4)#7's top and (4)#8 bottom continuous with 36"diameter lap at support for bottom bars and at mid span for top reinforcement with#3's @ 10"o.c.stirrups. Attached please find our pricing for the above referenced revision item. 1901 Regal Row Dallas,Texas 75235rhe total amount to provide this work is: $2,880.00 Main 214.962.3000 Fax 214.962.3001 Please note the attached exclusions/qualifications. 3901 S.Lamar Blvd.#200 Austin,Texas 78704 Main 512.486.38odf you have any questions or need further clarification, please contact me at(214)962-3000. Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 60 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/22/2011 Description: RFI#88-Bldg. 'A'North Ramp Rebar Requirements Change Request 9:60 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Ramp Rebar Added 2,493.00 $2,493.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $2,493.00 See attached backup for labor, material and subcontractor and Overhead 10.00% $249.30 supplier detail. Fee 5.02% $137.70 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: 1 $2,880.00 ® Hahniold Hoffer Stanford Hehnfeld Hoffer Stanford 1 200 Easley avenue, Suite 3G0 Fort %6/crtn. Texas 76107 RFI Response Transmittal ID: 00601 Date Sent: 9/6/2011 Project: 07015-01 WRMC East Multi-Purpose Building Number: 07015-01 To: Brent MacDonald Rogers-O'Brien Construction Co. 1901 Regal Row Dallas,TX 75235 214-902-3000 (Phone) 214-962-3001 (Fax) From: Gary Ryan Hahnfeld Haffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth,Texas 76 10 7 (817) 921-5928 (Phone) (817) 302-0692 (Fax) Subject: Unit 'A.' North Ramp Rebar Requirements Sent Ilia: Info Exchange RFI ID: 00088 Discipline: Received: 8/15/2011 Question: Sheet S.A1.2 does not depict :rebar for the beam running East to West along the South saide of the North ramp along grid one T between grid fines 4 and 7 in unit W. Please provide rebar requirements. Suggestion: Answer: Ref-below for robar regoircments.: 3/S.A.2-8 - Wal reinf.below ramp slab and abo-,re AewdSon 568'-4" between T&U to f'olow 3/S_A.2.1 for typical.w a r6dorccnxnt,and ramp i cam above wal parAJ- to grid lip T to have 44:7 Top and.4-4!8 bottom continuous Nvith 3 6" diameter lap at srpport for boito t bars axd at Enid spas for top rsinforcentent with" 3 at 10" o.c.. s6n-ups gpicat CC: ar 0/1 C� Grace Construction Co.. Concrete Construction 11325 Tantor Rd. Ste 200 Dallas, Texas 75229 CHANGE ORDER REQUEST To: Rogers - O'Brian Construction Friday, June 10, 2011 1901 Regal Row Dallas, TX 75235 Attn: Trey Carroll Project: Will Rogers Memorial Center 1401 W.R. Watt Drive Fort Worth, TX 76107 Subject: Additional Cost Due to Rebar Revisions at Change Order Request 11007-010 Gridline 7-4 on Gridline T Ramp Portion Trey: See below for the additional costs for additional steel at Gridline T Ramp Portion. The additional weight due to structural change is 2,612 pounds. Labor with Burden $ - Subcontract $ 262.00 Material $ 1,306.00 Equipment $ 600.00 Subtotal $ 2,168.00 Overhead & Profit 15% $ 325.00 Total Cost: $ 2,493.00 This work has been performed. We request that the Change Order to our contract be issued as soon as possible. Should you have any questions, feel free to contact me. Sincerely, Bud Vore Grace Construction Company Phone: (972) 432 -0800 Fax: (972) 432 - 0810 1 of 1 Grace Construction Co. Concrete Construction 11325 Tanto Rd. Ste 200 Dallas, TX 75229 DETAILED BREAKDOWN OF COSTS FOR RFI # 88 Labor # Category Time Rate Cost $0.00 Material Item QTY Price Cost Reinforcing Steel 2,612 LBS $0.50 $1,306.00 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $1,306.00 Equipment Item QTY Price Cost 1 Crane 1 Days $600.00 $600.00 0 0 Days $0.00 $0.00 $0.00 $600.00 Subcontract Item QTY Price Cost 1 Rojas 1.31 Tons $ 200.00 $ 262.00 $ 262.00 $2,168.00 DANIEL STEEL INDUSTRIES, INC. 4640 N. BELTLINE RD. SUNNYVALE,TEXAS 75182 PHONE: (972)226-7656 FAX: (972)203-1597 Mr. Trey Carroll Rogers O'Brien Construction RE: Will Rogers Center Change Order Fort Worth, Texas Hahnfeld Hoffer Stanford, Architects Contract Drawings: RFI #88 (revised beam/wall at north ramp): $1,306.00 Approximate quantity of material for labor purposes only: 1.31 tons of reinforcing steel DAN/EL slEfl/NDUSTR/fs Nate Orrick Sales Reinforcing Steel Fabricators Committed to Superior Service Since 1971 Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation &Public Works Dept. Facilities Management Division /Architectural Services 401 West 13'h Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project#TPW-01627 Contract# 41332 Fort Worth,Texas SUBJECT: Change Request# 62—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $19,426.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request: Dallas,Texas 75235 Main 214.962.001 Grace Construction nc. Fax 214.962.3001 Co.,s 3901 S.Lamar Blvd.#200 $1,879.00 4 Total Cost included In Change Request Austin,Texas 78704 $1,879.00 / $19,426.00= 9.6% Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Request www.rogers-obrien.com $1,879.00 / $19,426.00= 9.6% Total M/WBE Participation for this Change Request is 9.6%. Please let me know should you need any additional information. Sincerely, Rogers-O'Brien Construction Trey Carroll Project Manager CC: Master File 10022 Dallas I Austin Rogers-O'Brien Construction November 22, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:ASI#17-Fireline Revisions At Richardson-Bass Building 10022 Will Rogers Memorial Cntr East Change Request#62 Dear Jack: Per ASI# 17 revisions,tie-in to existing fire line and extend fire line to existing riser location for Richardson-Bass Building. Cost of work inicudes removal and replacement of existing sidewalk for extension of fire riser, excavation, installation and backfill of new underground fire line to existing riser location,final connections along with thrust blocks as required as well as removal of existing overhead fire line in Richardson-Bass Building. As directed by owner, portion of new fire line extending over top of concrete tunnel was installed in steel casing. 1 Regal Row Dallass,,T exas 75235A ttached please find our pricing for the above referenced revision item. T Main 214.962.3000 Fax 214.962.30O'The total amount to provide this work is: $19,426.00 3901 S.Lamar Blvd.#200 Austin,Texas 78704Please note the attached exclusions/qualifications. Main 512.486.3800 Fax 512.486.3701 If you have any questions or need further clarification, please contact me at (214)962-3000. www.rogers-obrien.com Sincerely, li'' Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 62 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/22/2011 Description: ASI#17-Fireline Revisions At Richardson-Bass Building Change Request#:62 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Sidewalk Demo/Removal 3,703.00 $3,703.00 2 Fire Line Extension 9,415.17 $9,415.17 3 Sidewalk Replacement 1,879.00 $1,879.00 4 Fire Protection Subcontractor 1,822.00 $1,822.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $16,819.17 See attached backup for labor, material and subcontractor and Overhead 10.00% $1,681.92 supplier detail. Fee 5.00% $924.91 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $19,426.00 Hahnfeld Hoffer Stanford arcniler!s/orerrmers/interiorec ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS Prolect Name: ASI No.: 017 Owner: [X] FAST MULTI-PURPOSE FACILITY AT Architect: [X] WILL ROGERS MEMEORIAL CENTER Issue Date:09101/11 Consultant: [X] CITY OF FORT WORTH Contractor: [X] FORT WORTH,TEXAS Owner: Prolect No.:07015-01 Field: [X] City of Fort Worth Other: [ ] 401 West 131h Street Contract For:General Construction File: [X] Fort Worth,Texas 76102 Contractor: Contract Date:January 6,2011 ROGERS-O'BRIEN CONSTRUCTION 1901 Regal Row Dallas,Texas 75235 The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change In Contract Sum or Contract Time, Proceeding with the Work in accordance with these instructions Indicates the Contractor's acknowledgement that there will be no change in the Contract Sum or Contract Time. Description: Ref:Attached revised full size F.D1.1 for revisions to the fire line south of the existing Richardson Bass Building. Attachments: F.D1.1 Issued by Ha)h�nf�eld Hoffer Stanford: V'' W WILLIAM WESTHOFF/PA (Srgnalurq (Printed Nome/Tide) PR • • Interior,Selective& Wrecking Demolition (972)434-0300 Fax(972)434-0303 TITLE: ASI 17-Sidewalk Demolition CHANGE ORDER NO. 2 PROJECT: PD10097 DATE: 10/12/2011 WRMC - East Multi-Purpose Facility JOB: PD10097 CONTRACT/PO: 10022-02-01S TO: Attn: Trey Carroll Rogers-O'Brien Construction Co., LTD. CONTRACT DATE: 1901 Regal Row STARTED: Dallas, TX 75235 COMPLETED: REQUIRED: DESCRIPTION Saw-cut, removal and disposal of concrete sidewalk per ASI 17. Labor: $1,475.00 Equipment& Materials: $1,745.00 10% Overhead &5% Profit: $483.00 $3,703.00 Change order-Tlme&Materlal PD10097 WRMC East Multi-Purpose 10/11/2011 - Description of Work Performed: Saw-cut,removal and disposal of concrete sidewalk per ASI 17. Cost 8r of labors Sub Total Hours TOTAL Superintendent Base pay $ 25.00 Labor Burden 11.20 Benefits 7.90 Total Hourly Rate $ 44.10 2 $ 88.20 8 661.50 Foreman I Base pay 21.00 Labor Burden 9.40 Benefits 5.40 Total Hourly Rate $ 35.80 1 $ 35.80 8 268.50 Leadman Base pay 17.20 Labor Burden 8.51 Benefits 5.05 Total Hourly Rate $ 30.76 0 $ 0 Laborer I Base pay $ 12.00 Labor Burden 5.37 Benefits 0.79 Total Hourly Rate $ 18.16 4 $ 72.64 8 544.80 Labor Total 1,474.80 Equipment L Supplies Amt. Cost per day Total Skid Steer w/grapple 1 $ 225.00 $ 225.00 Hammer attachment 1 $ 185.00 $ 185.00 65hp Concrete Saw 1 $ 175.00 $ 175.00 Diesel 40 $ 4.00 $ 160.00 TAX $ Equipment L Supplies Total $ 745.00 Disposal L Dellvery Amt. Cost per Unit Total 20yd Containers 4 $ 250.00 $ 1,000.00 0 $ $ 0 $ $ 0 $ $ TAX $ - Dlsposal L Dellvery Total $ 1,000.00 Equipment&Material Total $ 1,745.00 Labor Total 1,474.80 Sub total $ 3.219.80 5%for Overhead 160.99 10%for Profit 321.98 Grand Total $ 3,702.77 Precision Demolition, LLC 1125 East State Highway 121 ISIRO Lewisville, TX 75057-4406 Office: 972-434-0800 Fax: 972-434-0803 : ELF}17flORIGAICLH0.Ri�TI.ON Project tt: . . Project Name: . .W( e f -.. J 10043 Date Work Requested: General Contractor: 0'em-on Work Requested by: Print Name Signature Demo Superintendent: Description of Work At✓G [� r e . .v'h s rl �n � � �h Ste.✓ �. 7 _. ft _ _ . . Area of Work/Sheet#on Plans: / / ✓0�1 .f�il�' 'S`� VA'I (hY�(/���,'.- Rersorinel Quantity'. Hours . :: Total Hours !`N s j Superintendent:rL n;1 r s 2vn;ii(�,.a •e Z 1• 5 Foreman: + vCyvi� vsc�l�✓ ti 7. S Lead Man: Labor: 4 •1- 30 "Equipment:(please:ch'eck all:that apply.If not listed;please write It In and..be'specific) Equipment: Torch Set-up Chipping Hammer Dingo Power Washer Jackhammer Rivet Buster II-P-S, aw Air Compressor Air Hoses Chainsaw Negative Air Machine Hammer Bits Concrete Saw Concrete Blades) Machinery; St er Excavator H mer 200 Series E_]Skytrack Grapple 300 Series Size: Floor Machine 400 Series F]Boom lift Backhoe Hammer Size; Grapple Scissor Lift Other: Thumb Disposal - Dumpsters: y>l r f►n Trucks: Accepted El �� Date: �Zo U') r- Cl) N (0 CD 0c) C) C.4 0) t- OD M:r_:0 (o:6,>: w: c": 66:w:w:w: 69: 69 H ............. ........................ u) u):6:o:o:o:o:o: a):w.): Go�:W�:vD,vD, a) ........... ..... ........... 0: W 1 1 Fl im o, W . . . LL ......i : i i.... ........... r= 0: > 101 ci ............................ i o. co 1 i lol 0 43 F"1 o) iCi o. -5 3: in! i i. 1 i co: 12 39 O Z HI I Al ............ cD:M:w (3): u):u): u): C�:(D:C4:V:'Ir:04: o C,$ C4::Cll:: CN: M. .......... .................. o:o:o:0:o: 11: o:1:u):6:u): M: C,):c-4: 0j:4 w o) W N: E: E N O cL a-::7@:: a 1 W. W: o: o: (D: -. 61 ui: ci. . . .• -1 91 1 1 1 W co H:1g: -E P,:U�:O: N;:(3): a: v): (o: O O: :O: C4:N:N: ........... Lj LL . . ..... . . . . . 0 CL >. . . . . . a_ E:: 2-11 > o: 20 ——----- L) .................... -- -------- CO W W: rL 0 L)rr 0 . . . LU L 0 a) U- tm o LL o 0 OtiU d): La 0 2! 1 1 i i i L) I u) U) V) < 0FERGU501YL__ Waterworks = 1 2650 SOUTH PIPELINE ROAD 0515798 21018 L—`J EULESS, TX 76040-6633 PLEASE REFER TO INVOICE NUMBER WHEN MAKING PAYMENT AND REMIT TO: Please contact with Questions: 817-858-0714 FE — DALLAS WATERWORKS jV788 PO BOX 847411 DALLAS, TX 75284-7411 (ra►rirn..n....irir�rru.iii,rri,nrirri,i,rnrr�r,riiririri 00000107 01 AB 0.368 01 TR 003 FRIDDR01 000000 �--= ;._ WRIGHT CONSTRUCTION COUNTER PICK UP 10048 — WILL ROGERS MULTI 2650 SOUTH PIPELINE ROAD ATTN: ACCOUNTS PAYABLE EULESS, TX 76040-6633 601 WEST WALL STREET GRAPEVINE, TX 76051 jr N SHIP SELL TAX�COOE CUSTOMER ORDER NUMBER SALESMAN � JOB NAME �INVOICE DATE � BATCH WHSE. WHSE. 788 788 TX788 10048 CJI 110048 — WILL ROGERS MULTI 10/12/11 24293 i 1 Use FERGUSONONLINE.COM, need help? Call (888) 222-1785 LEAVE OUTSIDE FOR MIKE P. 6" C900 THRU 12" DUCTILE (2) RF41 (1) RG41 1 20 LF -> (4) CIRCLES I 2 2 IMJCBBGPU 6 MJ CORTEN BLUE BOLT & GSKT PK 21.760 EA 43.52. 8 8 RF41 RACI CASING SPACER ELEM 10.950 EA 87.60 4 4 RG41 RACI CASING SPACER ELEM 9.840 EA 39.3 8 8 RCSTP 4 WIDE CASING SPACER TAPE 1.750 FT 14.0 1 1 PSNBGZIRF8U 6 ZN 1501/ RR FF 1/8 FLG PKG 10.120 EA 10. 12 1 1 IBR9F 3/4 BRS 90 ELL 5.040 EA 5.0 q 1 1 BRNFK 3/4X2 BRS NIP 5.230 EA 5.23 1 1 MJ9LAU 6 MJ C153 90 BEND L/A 64.260 EA 64.26 2 2 SSLC6 6 PVC WDG REST GLND *ONELOK 35.940 EA 71.8$ 1 t1 SZF2C6 6 DI STD DUTY REST ZIP FLG 42.000 EA 42.00 i1 1 A1067AA 10 N12 HOPE COR SNAP END CAP 16.610 EA 16.61 INVOICE SUB-TOTAL 399.62 TAX uless ' UIE? Pa: 1 SOS GL CC: Appr: 'a RECEIVED: 10/18/2011 I TERMS: NET 10TH PROX ORIGINAL INVOICE t�' ( ?= 432.60 All acCOUMS are due and payable per the Invoiced terms All past due amounts are subject to a service charge at the maximum rate allowed by stale law plus wu+rtanrr vROVrsiors SEE REVERSE 71-DE costs of collection including anomey fees d incurred.Freight femur are FOB our dock unless otherwise specified above. A f$ FERGUSON" nT!!1=t!n Waterworks 2650 SOUTH PIPELINE ROAD EULESS, TX 76040-6633 PLEASE REFER TO INVOICE NUMBER WHEN MAKING PAYMENT AND REMIT TO: Please contact with Questions: 817-858-0714 FEI - DALLAS WATERWORKS #788 Po BOX 847411 DALLAS, TX 75284-7411 COUNTER PICK UP WRIGHT CONSTRUCTION 2650 SOUTH PIPELINE ROAD 10048 - WILL ROGERS MULTI EULESS, TX 76040-6633 ATTN: ACCOUNTS PAYABLE 601 WEST WALL STREET GRAPEVINE, TX 76051 .JOB NAME INVOICE DATE BATCH SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN 10 WHSE. WHSE. 788 788 TX788 CJI 10048 - WILL ROGERS MULTI 10/12/11 24293 10048 _ Use FERGUSONONLINE.COM, need help? Call (888) 222-1785 6 MJ C153 BOLT GSKT PK L/ GLAND 13.750 EA 13•�S 1 1 IMJBGPU 6 DI MJ WDG REST GLND *ONELOK 28.440 EA 28• 1 1 SSLD6 10 M SOIL TITS 45 ELL 39.770 EA 39• , 1 1 A1094ST INVOICE SUB-TOTAL 81.96 TAX uless i I it f EC PO: GL: CC: Roll Appr: RECEIVED: 1 /18/2011 ORIGINAL INVOICE - tT�111 "" 88.72 TERMS: NET 1OTH PROX WARRANTY PROVISIONS sEE REVERSE SIDE A — _ due amounts are subject b a service charge at the ma lk rate N owed try state law lus . . , ,, FERGUSON zu5o sou/n r/pcL/wc nnAo cuLcys^ rx 76040-e633 �--------� PLEASE REFER TO |DJV0CE0UKx$EH WHEN MAKING pAYxxEruTAND nExxrT TO: p��u���w�ou���� 817-858-0714 rc/ - DALLAS wArcnwuxxs #788 po uox 8*7411 DALLAS, rx 7*28*-7411 00000azp 01 MB 0,390 01 Tn 005 rn/oow01 000000 WRIGHT cowsTnooT|on WRIGHT onwuTnucT|ow 10048 - WILL nuucnn muLr| 10048 - WILL noosnu wuLr| ArTw: An000wTs PAYABLE wc onwn ow|vcnu|Tv & HxnLcv e01 WEST WALL srxccT ronr wonrx' rx 76102 unxpcv/wc^ rx 76051 SHIP j SELL TM CODE dU�STOMER 50DEA 1`40P�ibER SALiESMAN Job NAM'E :,11NIV010E DATE BATCH 12 1241 TXE 10048 Cil 10048 WILL ROGERS MULTI 10/11/11 24284 Use FERGUSONONLINE.COM, need help? Call (888) 222-1785 1 1 W9767096 2-1/2 SS/BR LFI GA 0-300 1/4 LM 28.940 EA 200 200 DR14BPU 6 C900 DR14 PVC GJ BLUE PIPE 5.350 FT 1070, INVOICE SUB—TOTAL 1501.3f RECEIVED: 10/18/2011 TERMS: NET 10TH PROX ORIGINAL INVOICE �accountsare duearod PAY-1ble per the invoiced terins.AJI past due a[TOOL11ALS are SUbfCt IID a Service Charge at Ille maxemirn r&tg aitowed by state law pius �ma�" INVOICE REMIT TO: IERRA P.O.BOX 50787 Number: 5-56927 OODPIPE, INC. HOUSTON,TX 77245 Date: 10/13/201 1 _ (713)434-1114 Sold To: 922495 Ship To: Wright Construction Vath Ch f Cierra Yard 601 W. Wall St. *C i) erford, TX Grapevine TX 76051 FREIGHT TERMS: FOB SHIPPING POINT F_ DATE ORDERED SALESMAN CUSTOMER POi DATE SHIPPED PPD&ALLOW PPD&ADD L _ 10/11/11 Barton PO 10048 10/12/11 --- --- r QUANTITY QUANTITY ORDERED SHIPPED DESCRIPTION UNIT PRICE U/iJ, TOTAL 20.0 20.0 12 3/4"OD x .250'W x 33.41 Ib. New Limited Service $ 15.9 5 ft. $ 319.00 Pipe, Fusion Bond Coated on OD I I ' r Equip/Job I Db , GL CC APP ° i i I I FREIGHT: $ Terms: Net 30 Days SUBTOTAL: $ 319.00 1- SALES TAX: 8.25 % LIMITED SERVICE,REJECT.OR USED MATERIALS ARE SOLD j AMOUNT DUE: $ 'AS IS'AND ARE NOT COVERED BY ANY TYPE OF WARRANTY OR GUARANTEE. ANY MATERIAL RETURNED MAY BE SUBJECT TO A RESTOCKING FEE I We appreciate your business. Thank you for your order. NEW PRIME PIPE NEW LIMITED SERVICE PIPE • USED PIPE HOUSTON, TX WEATHERFORD, TX SEGUIN, TX Elias S. Bathish P.E. dba Invoice Excel Consultants 5205 Tacoma drive DATE INVOICE# Arlington Texas 76017 11/5/2011 237 BILL TO Wright Construction Company, Inc. 601 N.Wall St. Grapevine,TX 76051 DUE DATE P.O.NUMBER 11/12/2011 ITEM DESCRIPTION AMOUNT Engineering Site plan for FireLine for Will Rogers? 600.00 k1000 e0o NO �� ,11711 Thank you for your business! Total 600.00 HOURLY WORK JOB LOCATION: _ � 1 &",3 1 o bHs DATE: FOREMAN: / ci m4,.S WORK PERFORMED: lire kne QG1oCC� 0�1: Lnc,,4-,— e, F'1�iiC1 TU W' i5 Proposta C/1, 64�- Nec.j 6' -Kre,L;n 1- � �c IKou� 1 ' -away a b11 Due- C4 4ht (Of 5-t chd 64: Zob 5:6r4,46 c4- rtscr man. l.A _ So' aa' �h� o�ns. n3�ale, roo-+fJ 6(r- -far Cler�rc�, o� ��� �-�► EMPLOYEE HOURS MATERIALS QTY at)6 o i 1 - EQUIPMENT HOURS RENTAL EQUIPMENT IaSCr CT- '10g1 I l i COMMENTS: HOURLY WORK JOB LOCATION: �,(�; (� �aacr5 ID of 6 DATE: FOREMAN: Ml c, a.e l WORK PERFORMED: m-e r\ 1.t7 k Pr5cr 00-in 4-o erc J c� V.T RTSR-Y . 1) r eQ c54- a' CJYni EMPLOYEE HOURS MATERIALS QTY s I r EQUIPMENT HOURS RENTAL EQUIPMENT I COMMENTS: h d tZooey1 Ae, Pica 4-0 �rr�klrrr -G/ qwo 4G. kkau HOURLY WORK JOB LOCATION: (�1, 1"� Ka,ws /oafs DATE: 10 - 1'3- I I FOREMAN: WORK PERFORMED: vd- 0, p-, 74yv Cag:h rC 5 i-.y� 6'� W.rd '706. r u 5 4' I a c.K Z y-rYi �a6 �i S.rc � � P QeK � ��I � C' ��. jlh 1) "e)� a,�- IS lo 5�f� 3 d „9-m �oY a r5 ��P� 6� w t t , -!'�s {. EMPLOYEE HOURS MATERIALS QTY MiChgAd (ut tlaaa q.s' c iyc z. '�13 6 �P s Va 1 i r EQUIPMENT HOURS RENTAL EQUIPMENT -'7 a Cf oSG Bala COMMENTS: HOURLY WORK JOB LOCATION: 1 0 b LtS DATE: Iii-11 FOREMAN: WORK PERFORMED: T^-,4- -rllrl /Vt--rs k.-t r -Te3 'Loc L's I-le k O,f e,%". (15 r--4 SO Cu r o F Ia5 c +z) 04 _V"05 cq,( c ",&Z45 EMPLOYEE HOURS MATERIALS QTY AIts C4,"mob- Y Ra en-rez, "27 3 0,4 0-e - 1 3 23 va EQUIPMENT HOURS RENTAL EQUIPMENT 3r s-1 -0 9 C-r— 701-7 Po me COMMENTS: Grace Construction Co.. Concrete Construction 11325 Tantor Rd. Ste 200 Dallas, Texas 75229 CHANGE ORDER REQUEST To: Rogers - O'Brian Construction Friday, October 14, 2011 1901 Regal Row Dallas, TX 75235 Attn: Trey Carroll Project: Will Rogers Memorial Center 1401 W.R. Watt Drive Fort Worth, TX 76107 Subject: ASI# 17 Revisions -Replace Sidewalk Change Order Request 11007-016 Trey: See below for a breakdown of the work to be performed to replace sidewalk removed for ASI#17 changes. Labor with Burden $ 824.00 Material $ 810.00 Equipment $ - Subtotal $ 1,634.00 Overhead& Profit 15% $ 245.00 Total Cost: $ 1,879.00 This work has been performed. We request that the Change Order to our contract be issued as soon as possible. Should you have any questions, feel free to contact me. Sincerely, John'Duncan', Jr. Grace Construction Co. Estimator/Project Manager 214-930-8194 Phone: (972) 432 -0800 Fax: (972)432 - 0810 1 of 1 Grace Construction Co. Concrete Construction 11325 Tanto Rd. Ste 200 Dallas, TX 75229 DETAILED BREAKDOWN OF COSTS FOR ASI # 17 Burden @ # Category Time Rate 40% Cost 1 Foreman 1.0 Hrs $22.50 $9.00 $31.50 2 Carpenter 3.0 Hrs $17.00 $6.80 $142.80 2 Laborer 4.0 Hrs $14.75 $5.90 $165.20 2 Iron Worker 4.0 Hrs $17.00 $6.80 $190.40 3 Cement Mason 4.0 Hrs $17.50 $7.00 $294.00 $824.00 Material Item QTY Price Cost Formwork 30 LF $0.55 $16.50 Concrete 12.0 CY $60.00 $720.00 Reinforcing 2 CWT $45.00 $90.00 $810.00 Equipment Item QTY Price Cost $0.00 $0.00 $0.00 $0.00 $1,634.00 TS September 19, 2011 Mr. Trey Carroll Rogers O'Brien 1901 Regal Row Dallas, Texas 75235 Re: Will Rogers Demo existing 6" dry pipe Ayr#17 Via: E-mail: tcarroll @rogers-obrien.com Trey: We are requesting a change order in the amount of $1,822.00 (one thousand, eight hundred twenty-two dollars and no/100). This is due to the demo of existing 6" pipe and reconnection of existing fire riser. Labor 40 hours @ $ 28.00 /hour $ 1,120.00 Material (Break-out below) $ 286.00 Equipment $ 250.00 Tax (exempt) $ 0.00 Sub Total $ 1,656.00 OH&P 10% $ 166.00 Total $ 1,822.00 Material Break-out: Fabricated spool piece 5CH40 Galvanized $ 176.16 Grooved Flanges X 2 $ 109.60 $ 286.00 Please sign and fax back for directions to proceed. If you have any questions, please do not hesitate to contact me Sincerely, � Part' Jpiy9 Project Manager Trey Carroll Date Rogers O'Brien TEXAS SPRINKLER 609 INDUSTRIAL BLVD • GRAPEVINE, TEXAS 76051 (817) 416-0160 • FAX: (817)416-0862 . f Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation &Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`h Street Fort Worth,TX 76102 RE: WRMC —East Multi-Purpose Facility Project DOE/Project#TPW-01627 Contract# 41332 Fort Worth, Texas SUBJECT: Change Request# 63—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $1,956.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request: Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Grace Construction Co., Inc. $1,694.00 4 Total Cost included In Change Request Austin,Texas 7887704 $ 3901 S.Lamar Blvd. 00 $1,694.00 / $1,956.00= 86.6% Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Request www.rogers-obrien.com $1,694.00 / $1,956.00= 86.6% Total M/WBE Participation for this Change Request is 86.6%. Please let me know should you need any additional information. Sincerely, Rogers-O'Brien Construction CZgel Trey Carroll Project Manager CC: Master He 10022 Dallas I Austin Rogers-O'Brien Construction November 23, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#91 - Bldg. 'A' Beam 67&68 Reinforcement Details 10022 Will Rogers Memorial Cntr East Change Request#63 Dear Jack: Per RFI#91 response, revised rebar requirements and sizes of concrete beams 67&68 along grid line U. Concrete beams extended to the North to expansion joint between Garage B and Bldg A with additional rebar added for increased size of beams. Attached please find our pricing for the above referenced revision item. 1 Regal Ro Dallass,,T exas 7523 he total amount to provide this work is: $1,956.00 T Main 214.962.3000 Fax 214.962.300PIease note the attached exclusions/qualifications. 3901 S.Lamar Blvd.#200 Austin,Texas 78704f you have any questions or need further clarification, please contact me at(214)962-3000. Main 512.486.3800 Fax 512.486.3701 www.rogers-obrien.com Sincerely, �f Trey Carroll Rogers-O'Brien Construction Co _ OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 63 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/23/2011 Description: RFI#91 - Bldg.'A' Beam 67&68 Reinforcement Details Change Request#:63 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Revised Beams B67&668 1,694.00 $1,694.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $1,694.00 See attached backup for labor, material and subcontractor and Overhead 10.00% $169.40 supplier detail. Fee 4.97% $92.60 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $1,956.00 Hoffer Stanford Hahn/-Id Hoffer StanFord 1 200 Earle-, AvEnus, Suite 2C0 Fort 1Vo,t', Te)eas 76107 RFI Response Transmittal ID: 00594 Date Sent: 9/2/2011 Project: 07015-01 WRMC East Multi-Purpose Building Number: 07015-01 To: Brent MacDonald Rogers-O'Brien Construction Co. 1901 Regal Row Dallas,TX 75235 214-952-3000 (Phone) 214-962-3001 (Fax) From: Gary Ryan HaWeid Hoffer Start€ord 20C Barley Avenue, Suite 200 Fort Worth,Texas 76107 (817) 921-5923 (Phone) (817) 302-0692 (Fax) Subject: Unit 'A' Beam 67 & 68 Reinforcement Details Sent Via: Info Exchange RFI ID: 00091 Discipline: Received: 8/15/2011 Question: As discus-sed with Mahendra YajNk and Tommy Deeds on 8/10/11, please provide revised details for beam 68 & 67 --Yestion: A' _aver: Reference attached for requested details. CC: ]eff Westhof(Hahnfeld Hoffer Stanford) hahendra Yajn&,CMYD Structural Engineers) Tommy Deeds,(Hahnfeid Hoffer Stanford) Contents Quantity Dated Description 1 9/2/2011 SS-3.p df 15 33 1 9/212011 SS-S.pdf 1 9/2/2011 SS-8.p df 1 9J2/20LI SS-6.pdf 1 9/2/2011 SS-4.p df /SSIt,,YJ Ffl,e P- #rb' Y3 CA�-n 5 1 119/2/201-1 SS-7.p cif t-O GOv�v do 9'10 T.O. CONC. TOPPING - SEE U I EL. 582'-8" ARCH. DWG, 18" DIAM. CONC. COL. BEYOND Q 649 TOP 11-101, 15E-A 1333 ��v1IkaV1 1 #8 CO NT. T d B I I I I I - I N 1-#5 HORIZ. 00 AT MIDDLE • • j • BM EDGE BEYOND I� II • •�J I 7-#11 BOT 1'-0" 1 8" t-l"E.J. (D SECTION Il SCALE: "=1'-0" 09507-A,-CBSS T.O. CONC. TOPPING - SEE EL. 582'-8" ARCH, DWG, N w Q 649 TOP 1'-10" > 2-#4011"O.C. I 1 BM EDGE BEYOND N N 1-#5 HORIZ. • • cO AT MIDDLE 7-#1, BOT 8-9-11 11-0" 11-2' 8" L"E.J. r \` SECTION .........r. :........ .M:P.YAJNIK SCALE: 4"=1'-0" 09507-A1-CB o= 43432 w VIAHENaRA YAJN K S ONAt-��G,� MYD-STRUCTURAL ENGINEERS LLC EAST MULTI-PURPOSE FACILITY FZ317 • CITY OF FORT WORTH WILL ROGERS MEMORIAL CENTER FORT WORTH,TEXAS 05 NE LOOP 820 SUITE 505 RESPONSE TO Drawn By 8/9/2011 IURST,TX 76053 (817)284-8056 9507 RFI#00086 MY-D _ 4 W-D JOB#9507 ENGINEER MPY __ ALT. NO2iii iii TUNNEL T U V-2° F ,(3�AM B 3 3 flEy/SIo,�J 6 iii 5 iii 5 2" E.J. S.A2.7 iii S.A2.9 iii S. 2.2 k L 1'-0" iii EXIST. eo 1 -0 BLDG. �. -- ----------- — — -- ---- — — — — -- ----- --------------- - ---- ------ I -- -- -- ---- -- ---�- -------------- - -- 72.3 w a o °' N 3911 I 1 1IT2 30"PAN II o� LID --I I- I---__ — Imo- - - -� -i----------- — — — I -D, -r - - - JI I 00 A14.1 I I I I EF.A J L - _ _ _IL 2/55-4 H ¢ _ - _ I o _IL 0- _II < - _ - N I I I I I I I 1/55-4 i T.O.C. = 582'-8" IL ------- —W $2�— --- ---------- ----- — -- -I r -1 r -I rz I 1�1 II II¢� c �- II II Ila t` N I I I I I I o I I m co: I d II II ¢ to' E2 .AFB r -II m --------- I c 6 _ II 2'111" I 1'-2" ¢ m i S.A2.8 II I�-III I I I 3 J L J L ---------- —S_A�. ------ — --n $�4— ---- --- PARTIAL UNIT -A SECOND LEVEL FRAMING PLAN ��'� 1/16"=1'-0" REF. SA1.2 M.P.YAJNIK .........V. PLAN P'. 43432 NORTH • pFG/STAR,_ ��' VIAHIENDRA YAJNIK /ON'LE�G \ MYD-STRUCTURAL ENGINEERS LLC EAST MULTI-PURPOSE FACILITY F-6317 • CITY OF FORT WORTH WILL ROGERS MEMORIAL CENTER FORT WORTH.TEXAS STRUCTURAL EN("ER: - __ 05 NE LOOP 820 SUITE 505 RESPONSE TO Drawn By 9507 8/9/2011 IURST,TX 76053 (817)284-8056 RFI#00086 MY-D 1Y-D JOB#9507 ENGINEER MPY - -- Ei o L---- �____� I > J --- i ------- � ' i T i i I W I to/SS-6 Z i I 2"!E.J. J i 1 I h _1 V-10.1 11"I Z I W/ J c a i-lzi o- c, � U U co i Z Z I 1/SS-7 J I Q I I i 8„ 11" E.J. E , 2 ..! W UNIT V z W i I 1/ss-6 J � N j 2-#5 T& 11 _I [� V) I ADD'L AT 511 Q z w STRIP °G i o c I ' 1/SS-7 Q W i ! r) to ' I I I I � — ' i I I i I 1A/SS-6 I I I I I 3 PLAN S.A2.8 NORTH -------------- `'---r---— 8-10-11 ' I �P ------------- M•P.YAJN1 ..r. i I p .....43432 AAHHNDRA YAJNIK U ass/DN�I�E \ MYD-STRUCTURAL ENGINEERS LLC I EAST MULTI-PURPOSE FACILITY F-5317 • CITY OF FORT WORTH WILL ROGERS MEMORIAL CENTER FORT WORTH,TEXAS ITRUCTIJRAL E117E"S - - 05 NE LOOP 820 SUITE 505 RESPONSE TO Drawn By 8/10/2011 -- 5 ILJRST,TX76053 (817)284-8056 9507 RF1#00086 MY-D 1Y-D JOB#9507 ENGINEER MPY U E � T-11" 2" E.J. I REF. 6/S.A2.8 lu C #4#12"O.0-X 2'-8" TIE TO VERT. RCINF. TOPPING t7l8"O.0 TOP DARS -� W/ #5#12"0.0 TEMP. RCINF, :r EL. VARIES N o I I o I N SCHU. SLAB 4,_0" #5012 110. BOT BAF 5 E.W. B67 OR B68 2" E.J. 1'_10" AT IA coSECTION SCALE: 4" 1'-0" 09507-CBC 8-10-11 Cpl% ......s. ........i. M.P.YAJNIK p43432 , lz VIAHKNMA YAJNK MYD STRUCTURAL EAST MULTI-PURPOSE FACILITY - �NGR�IEERSLLC WILL ROGERS MEMORIAL CENTER FOOR WORTHWO�S - _ - - OS NE LOOP 820 SUITE 505 RESPONSE TO Drawn By 8/10/2011 IURST,TX 76053 (817)284-8056 9507 RPI#00086 MY-D _ W-D JOB#9507 ENGINEER MPY Fl 3'-n" try I � REF. 6/S.A2.8 mi < Q t4l12"O.C.X 2'-8" > TIE TO VERT. REINF. 2-! ADD'L TOPPING T6B FOR REINF. SEE PLAN CL. VARICS N'G o I o I CO W/ _ C H. N CV SCH'D. SLAB t5l72"O. BOT BAF S E.W. I 567 OR 566 1' 6n t'-t" 1'-10° 2" E.J. SECTION 1 SCALE: " 1'-0" 09507-CBC 8-10-11 c ......... . ........ :. M.P.YAJNIK ,,,,,,,,,,,,,,,,,,,, Q43432 GIST MAHENORA YAJNK SSIONAL�t' MYD-STRUCTURAL ENGINEERS LLC EAST MULTI-PURPOSE FACILITY F-5317 • CITY OF FORT WORTH WILL ROGERS MEMORIAL CENTER FORT WORTH,TEXAS-__lb J1 D 05 NE LOOP 820 SUITE 505 RESPONSE TO Drawn By 8/10/2011 SS - 7 IURST,TX 76053 (817)284-8056 9507 RFI#00086 MY-D W-D JOB#9507 ENGINEER MPY _ —_ z O U z I O O O 0 z O >- W m m Lo z u _ 0 `n o 0 0 0 ° 0 o O F m w LE O m - zit u -iZ "Z-.6 _j ' a co �o z F- a Q 0 0 _ t x z o w o z WO W �w W m a m3 O N N N a z o W W z—' J a CL f-,l n w 0 O W V � W O U \ 6_ u z \ W io }. x W Q N Z yF U p O !� N t LL U a Q o 0 r m m Q z O J m J N 0 LLj O O O O U U O ~ D W F- J C(-) W O ri w 'D a0-,L a -ibl a 8-10-11 Z-,L 0 co a O d ?{ u' -........t::......... M.P.YAJNIK 43432 FG/STr;C,�,��;�� AAHENDRA YAJNIK sIONAX \ MYD-STRUCTURAL ENGINEERS LLC EAST MULTI-PURPOSE FACILITY F-5317 • CITY OF FORT WORTH WILL ROGERS MEMORIAL CENTER FORT WORTH,TEXAS 3TRLFCTURAL ENGE�ERS -- - - - —- - - - OS NE LOOP 820 SUITE 55 Drawn By 8/10/2011 — 8 IURST,TX 76053 (817)284-8056 9507 MY-D 1Y-D JOB#9507 ENGINEER MPY r Grace Construction Co.. Concrete Construction 11325 Tantor Rd. Ste 200 Dallas, Texas 75229 CHANGE ORDER REQUEST To: Rogers - O'Brian Construction Tuesday, October 25, 2011 1901 Regal Row Dallas, TX 75235 Attn: Trey Carroll Project: Will Rogers Memorial Center 1401 W.R. Watt Drive Fort Worth, TX 76107 Subject: See the additional costs for beam per RFI 00091. Change Order Request 11007-015R Labor with Burden $ 848.00 Material $ 580.00 Equipment $ 45.00 Subcontract $ - Subtotal $ 1,473.00 Overhead & Profit 15% $ 221.00 Total Cost: $ 1,694.00 This work has been performed. We request that the Change Order to our contract be issued as soon as possible. Should you have any questions, feel free to contact me. Sincerely, Alan J. Haynes, Sr. Grace Construction Company Phone: (972) 432 - 0800 Fax (972) 432 - 0810 1 of 1 Grace Construction Co. Concrete Construction 11325 Tanto Rd. Ste 200 Dallas, TX 75229 DETAILED BREAKDOWN OF COSTS FOR RFI 00091 Labor Burden @ # Category Time Rate 40% Cost 1 Foreman 2.0 Hrs $22.50 $9.00 $63.00 2 Carpenter 6.0 Hrs $17.00 $6.80 $285.60 2 Laborer 4.0 Hrs $14.75 $5.90 $165.20 3 Iron Worker 4.0 Hrs $17.00 $6.80 $285.60 1 Cement Mason 2.0 Hrs $17.50 $7.00 $49.00 $848.00 Material Item QTY Price Cost Formwork 120 SF $1.50 $180.00 Reinforcing 5 CWT $45.00 $219.60 Concrete 3 CY $60.00 $180.00 $580.00 Equipment Item QTY Price Cost 1 Concrete Pump 3 CY $15.00 $45.00 $45.00 Subcontract Item QTY Price Cost $1,473.00 Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation & Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`h Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project #TPW-01627 Contract # 41332 Fort Worth,Texas SUBJECT: Change Request# 68—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $3,827.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request : Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Total M/WBE Participation for this change request is 0%. Please let me know Austin,Texas 7887704 you 3901 S.Lamar Blvd. 00 should ou need an additional information. Main 512.486.3800 Fax 512.486.3701 Sincerely, www.rogers-obrien.com Rogers-O'Bri n Construction Trey Carroll Project Manager CC: Master File 10022 Dallas Austin Rogers-O'Brien Construction November 23, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#105-Unit'C'Sedimentation Tank T&M Repairs 10022 Will Rogers Memorial Cntr East Change Request#68 Dear Jack: As directed by Jack Durham, removed and replaced crushed section of animal waste piping at South side of Unit'C'sedimentation tank and replaced "multiple-bend"structure with a new drainage pipe constructed with minimal bends and added(2)clean-outs as detailed in attached sketch 105A. As directed,work proceeded on a time and material basis. Attached please find our pricing for the above referenced revision item. 1901 Regal Row Dallas,Texas 7523khe total amount to provide this work is: $3,827.00 Main 214.962.3000 Fax 214.962.3001 Please note the attached exclusions/qualifications. 3901 S.Lamar Blvd.#200 Austin,Texas 78704 Main 512.486.380df you have any questions or need further clarification, please contact me at(214)962-3000. Fax 512.486.3701 www.rogers-obrien.com Sincerely, � l Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 68 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/23/2011 Description: RFI#105-Unit'C'Sedimentation Tank T&M Repairs Change Request#:68 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Unit'C'T&M Repairs 3,313.45 $3,313.45 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $3,313.45 See attached backup for labor, material and subcontractor and Overhead 10.00% $331.35 supplier detail. Fee 5.00% $182.20 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $3,827.00 0 Hffe eld Hoffer Stanford Nah <_Id Hcir_r St a-,'c rd I 700 Ea.le, _ ,3f'J°_ _. ,te _ Fort 7 5.07 RFI Response Transmittal ID: 00650 Date Sent: 9/22/2011 Project: 07015-01 WRMC East Multi-Purpose Buildina Number: 07015-01 To: Brent MacDonald Rogers-O'Brien Construction Co. 1901 Regal Row Dallas, TX 75235 214-962-0000 (Phone) 214-962-3001 (Fax) From: Gary Ryan Hahnfeld Hoffer Stanford 200 Bailey avenue, Suite 200 Fort tiVorth,Texas 76107 (817) 921-5923 (Phone) (817) 302-0692 (Fax) Subject: Unit'C' Sedimentation Tank Replacement of Existing Structure Sent via: Info Exchange RFI ID: 00105 Discipline: Received: 9/12/2011 Question: Per direction from Jack Durham, Rogers-O'Brien Construction is to proceed on a time and material basis to remove a crushed section of existing animal waste at the Socith side of the unit 'C' sedimentation tank and replace the "multiple- bend" structure with a new drainage pipe constructed with minimal bends and adding 2 cleanouts, as detailed in the attached sketch RFI-105A, Suggestion: Answer: Response:Jeff Taylor(Dunaway Assodates,,Inc.) I agree the lines need to be replaced to the upstream end of the existing sedimentation tank per the IPC requirements, CC: Jeff Westhoff(Hahnfeld Hoffer Stanford) Jack Durham(City of Fort Worth) Jeff Taylor(Dunaway Associates, Inc.) Contents Quantity Dated Description 1 9/12/2011 RFI 105A.pdf 0 U m m C. O 4J •0 rj 0 V (0 O W u v, C6 M r Go r-� H � t0 (N J (a U a> o � II II II A � zE: LLJ wv II it II oMo �jT Y O - - L6 O O 00 0 0 W to i Nai � Q) � ►� V / It Or CV ;I:c' 0:2: 1W (2 L) a): c4: &4 c=!: IR (6 cD (D 0 0:CD: 0 A .),cq:E�:�: �:�: M. r.. t I cli: 060;0! 6 C) CL; LL cu O 75 3: cn: : . . . . 10 tr i iii U3 . . . . . . . . . .............. ...... 0: E2 . . . 0!M: °E I I ICI 0 2 0- CD w Mi 0, 1 C) D en .. ....................... ........... ........... i"', - __ - —Z;:.:o:n:8: '0 W N: �0: M: N:N: C-4: ...........I.................................. C:,:cD t cD: (3):(3): C): ........... 3: Ei N! mi w, mi 1 Z? : —M LM: L,: m' CD: ..... .......... ........ .................. — - — cR:q: 'ra :v o i � � r _j { I 1 0 LL E! i ..... ....z.......................... U) 0 C: CL r ID% ca E 0 ............ 41 CL U) r U) V) CL: t cu O 0 a) ;pt M CZ : LL C 0 0 0 0 o Jul 1 1 En (n r U)o r HOURLY WORK D JOB LOCATION: DATE: ^ 1� l (� FOREMAN: /V I,L�at'� I' 1'1 I WORK PERFORMED: k� A,-r�cra � ��-�btu_ G 1 d's ��. k`f•I I Coy-,�cd-�. �1�-vP I EMPLOYEE HOURS MATERIALS QTY Ste.- �a oil 130 `-�- A 60 AcrPa,n ►3`13 ft Gqps 5� i I i EQUIPMENT HOURS RENTAL EQUIPMENT i - I COMMENTS: r Price Quotation#B182583 Ferguson Waterworks#788 2650 South Pipeline Drive Euless,Tx 76040 Phone:254-699-0347 Fax:254699-1769 Bid No.......: 8182583 Bid Date...: 11/2/2011 Cust Phone: 817-481-2594 Quoted By: CJI Terms.........: NET 10TH PROX Customer.: WRIGHT CONSTRUCTION Ship To.......:WRIGHT CONSTRUCTION 10048-WILL ROGERS 10048-WILL ROGERS ATTN:ACCOUNTS PAYABLE ATTN:ACCOUNTS PAYABLE 601 WEST WALL STREET 601 WEST WALL STREET GRAPEVINE,TX 76051 GRAPEVINE,TX 76051 Cust PO#..: QUOTE Job Name.: i Item Description Quantity Net Price UM Total WILL ROGERS SDR35PP 14 4X14 SDR35 PVC GJ SWR PIPE 112 2.1 LF 235.2 PSG4P 4 PVC SWR GXG 45 BEND 4 12.89 EA 51.56 PSGYP 4 PVC SWR GXGXG WYE 4 19.68 EA 78.72 PSSCAP 4 PVC SWR CAP 5 7.95 EA 39.75 Net Total: 405.23 Tax: 0 Total: 405.23 I i Quoted prices are based upon receipt of the total quantity for immediate shipment(48 hours).SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control,and/or based upon Local,State and Federal laws governing type of products that can be sold or put into commerce.This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions,which are incorporated by reference and found either following this document,or on the web at http://woIseleyna.com/terms_conditionsSale.html. Govt Buyers: All Items quoted are open market unless noted otherwise. I Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager— City of Fort Worth Transportation&Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`h Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project# TPW-01627 Contract# 41332 Fort Worth,Texas SUBJECT: Change Request# 73 —M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $11,612.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request: Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Total M/WBE Participation for this change request is 0%. Please let me know 3901 S.Lamar Blvd.#200 should you need any additional information. Austin,Texas 78704 Main 512.486.3800 Fax 512.486.3701 Sincerely, www.rogers-obrien.com Rogers-O'Brien Construction Trey Carroll Project Manager CC: Master He 10022 Dallas Austin r ' Rogers-O'Brien Construction November 23, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:Exterior Signage Submittal-Additional Signage Requirements 10022 Will Rogers Memorial Cntr East Change Request#73 Dear Jack: Per architect's review of exterior signage submittal, additional signage added per attached breakdown from signage subcontractor. Attached please find our pricing for the above referenced revision item. The total amount to provide this work is: $11,612.00 1901 Regal Row Dallas,Texas 75235 Main 214.962.300(P lease note the attached exclusions/qualifications. Fax 214.962.3001 3901 S.Lamar Blvd.#206f you have any questions or need further clarification, please contact me at(214)962-3000. Austin,Texas 78704 Main 512.486.3800 Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 73 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/23/2011 Description: Exterior Signage Submittal-Additional Signage Requirements Change Request#:73 Labor Material No Description JQTYUnit Unit Total Unit Total Equipment Subcontract Other Price 1 Added Exterior Signage 10,054.00 $10,054.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $10,054.00 See attached backup for labor, material and subcontractor and Overhead 10.00% $1,005.4 supplier detail. Fee 5.00% $552.60 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $11,612.00 Quote No. DALL-14550 Page 1 of 3 * asi Signage Innovations Company Rogers-O'Brien Construction October 28,2011 Location Primary Location Reference Bill to Rogers-O'Brien Construction Ship to Rogers-O'Brien Construction 1901 Regal Row 1901 Regal Row Dallas,TX 75235 Dallas,TX 75235 u5 us Valid Until Revision Date 1012812011 Terms SR David Esh F.O.B. N/A Revision No ship Method PM Janice McMillen Lead Time TXMAS Number- No. Item Description Qty UOM Unit Price Extension 1. S/T I added letters per achilecl Cast aluminum bronze anodized letters 12^ 1 Each 8,829.00 8,829.00 (1)one set to read:"EQUESTRIAN MULTI-PURPOSE BUILDING" (5)Five sets to read:"EQUESTRIAN" 2. deduct to remove one-S/T J 16"x 10'-0"panel sign -1 Each 350.00 •350.00 3. Installation Signage Installation 1 Each 1,200.00 1,200.00 4. Shipping 8 Crating Shipping b Crating 1 Each 375.00 375.00 Subtotal 10,054.00 Sales Tax(8.25%) 0.00 Total 10,054.00 By signing below, I approve and authorize this quote and acknowledge that I have read and agree to the attached terms and conditions. E4,1 2011.11.01 _ Su mitre by Date Approved by Date Print Name conlinued on next page Environmental Signage Solutions Inc.1 DBA ASI 18181)etslai Di suite 110 Irving TX 75063 1 T:(972)9153800 1 F (972)915 3810 1 asisignage.com ou000l w a t Quote No. DALL-14550 Page 2 of 3asi vations Company Rogers-Hrien Construction October 28,2011 Location Primary location Reference Conditions General By accepting this order in any manner,purchaser agrees to the terms and conditions notes in the quotation.These terms and conditions supersede all others and therefore are made an integral part of any contract between the customer and ASI-Modulex.Terms and conditions contrary to those shown in the quotation must be agreed to in writing.all pricing is based on quantities orderED and may not apply to reorders. Purchaser agrees that the date of invoicing will commence when the producl(s)has been received by purchaser,whether or not installation is required or complete. Lead time is approximate and is based upon production and installation time alter receipt of the lollowing:1.Deposit 2.Purchase order and/or Signed Quotation 3. Approved Artwork 4.Approved Message Schedules 5.AII final specifications,color selections and approvals Client agrees to provide ASI-Modulex with a complete message schedule(names,room names,room numbers,build locations,etc.)for all signage ordered unless client places their orders online.Client will ensure that all messages are accurate and final,and ASI-Modulex will not be responsible for items that were misspelled when submitted.ASI-Modulex is not responsible for the translation of messages into foreign languages,but may do so at an additional charge.All message schedules will be submitted to ASI-Modulex in a Microsoft Excel Document(.XLS)or CSV file.All message schedules must be approved in writing prior to production.Client acknowledges that incomplete message schedules could compromise lead times and delivery dates. Customer is responsible for all return shipping charges.All returned items should be properly insured when shipped.ASI-Modulex will be held harmless in the event that returns are lost in transit.Client is responsible for inspecting all shipments for any shortage or damage before items leave their dock.Purchaser will note all loss or damage on the delivery receipt before signing for the shipment.If concealed damage is discovered,client must save all cartons and packaging and request an inspection from UPS,Federal Express,or the appropriate trucking carrier immediately.DAMAGE MUST BE REPORTED WITHIN SEVENTY-TWO(72)HOURS. Installation and Delivery Electrical Signage: Electrical runs and hook-ups by others.ASI to provide power requirements in shop drawing phase. Access panels to be provided by client to the location where the signage is to be installed. Please note this installation assumes no penetrations through the roofing water barrier or any material used to seal the building against weather,moisture,or any undesired elements. ASI recommends that the submittal drawing be reviewed by any relevent parties to ensure that the installation as illustrated in this document does not impact the building sealant system. ASI assumes no liability for any penetrations through the roof water barrier or any other building sealant. Regulated by the Texas Department of licensing and Regulation.For complaints please contact the following:Texas Department of licensing and Regulation PO Box 12157,Austin,TX 78711 1.800-803-9202-(512)463-6599 http://www.license.state.lx.us license#18428 EXTERIOR INSTALLATIONS: Installation is based on installing all signage in one phase.If installation is phased over a period of time additional charges will incur. Installation does not include removal of existing signage. Installation price does not include permits unless noted above.If permits are required the actual costs of permits and procurement will be added to the invoice. At time of purchase order,customer is to supply ASI-Modulex installation staff with blueprints or diagrams noting sign locations and elevations.Also,job site contact name and telephone number. Customer to provide knowledgeable contact on day of installation in order to provide locations/elevations and any other questions that may arise. Price does not include sign base. Core Drilling for installation of post-mounted signs is not included. ASt-Modulex assumes no responsibility for damage to stone substrates when installing stud mounted signage elements. continued on next page Environmental signage Solutions Inc.I DBA A51 18181 Jetstar Dr.suite 110 Irving TX 750631 T;(972)915-380D I F (972)915-38101 asisignage cam Quote No. DALL-14550 Page 3 of 3 �� as, signage Innovations Company Rogers-O'Brien Construction October 28,2011 Location Primary Location Reference Conditions Clearing for utilities at sign locations by others. Installation of exterior signs based on direct embedment and excavation in natural native soils.If rock is encountered,installation price would then be based on time and material basis. INTERIOR INSTALLATIONS: Installation is based on installing all signage in one phase.If installation is phased over a period of time additional charges will incur. Installation does not include removal of existing signage. Installation price does not include permits unless noted above.If permits are required they will be quoted upon request. At time of purchase order,customer is to supply ASI-Modulex installation staff with blueprints or diagrams noting sign locations and elevations.Also,job site contact name and telephone number. -Customer to provide knowledgeable contact on day of installation in order to provide locations/elevations and any other questions that may arise. Client is responsible for checking that the order was delivered or installed as per approved drawings.You have 7 days to submit a claim for any inaccuracies. Client agrees to authorize any person receiving delivery to sign delivery receipt for purchases If purchaser is unable to accept delivery,then an additional delivery surcharge will be added before redelivery.Shipping and crating charges are estimates only.Actual and/or additional shipping,crating and expedite charges will appear on final invoice. This quote includes a single installation trip charge,during regular hours of operation,unless otherwise specified.Penalties and other charges may result if additional trips are required due to premises not being ready for install and/or additional work or equipment being required to complete installation.Installation over weekends, holidays and non-standard hours are also subject to additional charges. Payment Terms Purchaser agrees that the date of invoicing will commence when the product(s)has been delivered and/or installed by ASI-Modulex. Payment is due NEf 30 days from dale of invoice,unless otherwise specified.All payments are considered past due 31 days from the date of invoice and a finance charge will be due on the balance at an annual rate of 18%(or 1-112%per month).purchaser agrees to pay costs incurred by liquidating damages and/or related attorney fees.AS]-Modulex reserves the right to bill for products that were delivered ontime,even if client site is not ready.final installation charges will appear On additional invoices. Purchaser must supply a tax exempt certificate,otherwise sales tax will be added to the final invoice.State and local sales taxes will be included where applicable. Environmental signage Solulions hic l DEA ASI 18181 Jetstar Dr.Suite 110 Irving TX 75003 1 1 (972)915-3800 1 F.(972)9153810 l as signage com W-co 11 ICE) Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation &Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`" Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project#TPW-01627 Contract# 41332 Fort Worth, Texas SUBJECT: Change Request # 77—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $1,714.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Total M/WBE Participation for this change request is 0%. Please let me know 3901 S.Lamar Blvd.#200 should you need any additional information. Austin,Texas 78704 Main 512.486.3800 Fax 512.486.3701 Sincerely, www.rogers-obrien.com Rogers-O'Brien Construction C� � Trey Carroll Project Manager CC: Master He 10022 Dallas Austin Rogers-O'Brien Construction November 23, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:ASI#24-Revised Venting/Weepeing @ Top of Masonry Walls 10022 Will Rogers Memorial Cntr East Change Request#77 Dear Jack: Per ASI#24, revised TWF detail at top of all masonry walls adding weeps. Additional cost for installation of WR Meadows TWF at the capstone and thru-wall condition for Detail 07/A.A5.8. Attached please find our pricing for the above referenced revision item. The total amount to provide this work is: $1,714.00 1901 Regal Row Dallas,Texas 75235 Main 214.962.3000Please note the attached exclusions/qualifications. Fax 214.962.3001 39015.Lamar Blvd.#20df you have any questions or need further clarification, please contact me at(214)962-3000. Austin,Texas 78704 Main 512.486.3800 Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co — OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 77 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/23/2011 Description: AS]#24- Revised Venting/Weepeing @ Top of Masonry Walls Change Request#:77 Labor Material No Description QTY ]Unit Unit E Total Unit Total Equipment Subcontract Other Price 1 Added TWF 1 1,484.00 $1,484.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $1,484.00 See attached backup for labor, material and subcontractor and Overhead 10.00% $148.40 supplier detail. Fee 5.00% $81.60 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $1,714.00 Hahnfeld Hoffer Stanford ,irchitr•_cts/planners(interiors ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS Project Name; S31 No.:024 Owner: [X] EAST MULTI-PURPOSE FACILITY AT Architect: [X] WILL ROGERS MEMEORIAL CENTER Issue Date: 10/18/11 Consultant: [ ] CITY OF FORT WORTH Contractor: [X] FORT WORTH,TEXAS Owner: Protect No.:07015-01 Field: [X] City of Fort Worth Other: [ ] 401 West 13''Street Contract For: General Construction File: [X] Fort Worth,Texas 76102 Contractor: Contract Date:January 6,2011 ROGERS-O'BRIEN CONSTRUCTION 1901 Regal Row Dallas,Texas 75235 The Work shall be carried out In accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions Indicates the Contractor's acknowledgement that there will be no change in the Contract Sum or Contract Time. Description: Ref:attached supplementary drawing for typical venting and weeping of the top of all exterior masonry walls. Attachments: AX-14 Issued by Hahnfeld Hoffer Stanford: W I W William Westhoff/PA (signature) (Printed Name/Trtre) , `. 0 FL LU uj LU LLLL cc CM OD 7777-q-4 CHAMBERLIN t October 24,2011 Rogers O'Brien Attention: Trey Carroll Will Rogers Memorial Coliseum Project RE: WRMC—Flashing at Cap Stone—Detail#7/A_AS.8 ROOFING&SHEET METAL Dear Trey: Modified Bitumen BUR Please see the cost below to furnish all labor,materials,tools,equipment,and insurance necessary to fully perform and EPDM complete the following scope of work: TPO/PVC • Install WR Meadows TWF at the capstone and thru-wail condition as shown in attached sketch.For detail#7 on Metal sheets A.A5.8. WATERPROOFING& Detail on plans doesn't call for flashing. CAULKING Joint Sealants Total $1,484.00 ............................................. Expansion Joints Membrane Waterproofing We propose to complete the waterproofing as described above,for the sum listed above;excluding 8.25%sales tax. Elastomeric Coatings incorporated Notes: This offer Is good for thirty(30)days Water Repellents All work to be performed during normal business hours • Owner/Contractor agrees to fumish:complete access to work areas,dumpster,toilet facililles,potable water,and all electrical power,as required,at no Waterblasting additional cost to Chamberlin Concrete/Masonry Repair All surfaces to be given to Chamberlin in a smooth,broom clean condition,free of contaminants,form oils,release agents,voids,fns,and projections • Chamberlin is not responsible for recognizing,locating,or removing asbestos,PCB's,or other hazardous materials. Damproofing Chamberlin Is licensed,certified or approved to Install the systems described above • Unforeseen conditions or circumstances are not assumed nor anticipated in the scope of work proposed above and will be brought to your attention Flashing Immediately upon discovery by Chamberlin personnel for a prompt resolution Traffic Coatings Chamberlin's standard warranty excludes: failures caused by failure of the substrate,moisture vapor transmission or hydrostatic pressure,abuse,conditions that exceed the limitations of the materials,sufficiency of the design;removal and replacement of overburden materials;incidental and consequential damages • Ni colors are to be selected from the manufacturers standard colors ROOF MAINTENANCE be Pricing Is contingent on mutually agreeable contract terms,conditions,and proper coordination of the work Time and material work will be completed at E4B.001 man-hour with 20%mark-up on materials LEAK REPAIR Samples of products or systems presented for review are Intended only to provide a general representation and not necessarily an exact replica of the products or systems to be furnished or installed Building Surveys Please be advised that the products and methods outlined In this proposal are based on our visual survey,plans,specifications,or our practical experience In Leak Re air resolving similar problems for our customers;we are not design professionals,architects,or registered engineers,and are not responsible for determining P building code compliance and do not perform design services Roof Maintenance For CIP,notwithstanding anything to the contrary the CIP deduction,contract reduction,Is limited to the amount of insurance premium that will be saved by Chamberlin due to the provision of insurance by General Contractor to Owner.Specifically,but not limited to,excess-umbrella coverage,on which Chamberlin has a flat fixed premium where there will be no deduct provide as there is no savings to benefit Chamberlin. • The proposal is not for the sale of goods,but rather a service contract for the installation or application of products,systems or materials.Therefore,THE IMPLIED WARRANTIES OR MERCHANTIBILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE HEREBY EXCLUDED. • Excludes building permit,P&P Bonds,overtime,window cleaning,accelerated schedules,field or laboratory testing,mockups,liquidated damages,temporary facilities or utility hook-ups or night or weekend work. • This proposal EXCLUDES any reference that Chamberlin has fully examined and analyzed all site conditions that may affect performance and to affirm no conditions exist that may affect the progress,performance or price of the work.if physical conditions are of an unusual nature that differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of that type,Chamberlin will Immedlately stop working in the area and provide written notice promptly and before the conditions are disturbed,in addition Chamberlin may be entitled to an equitable adjustment In the contract sum, contract time or both. We appreciate the opportunity to submit our proposal for this project.Chamberlin has been In business over 100 years.We would like to be your"Single Source" contractor for everything from waterproofing to caulking to traffic coatings to roofing.We are financially sound and professionally capable and will perform the work right—the rirsi fime.We would like the opportunity to review the scope of this proposal with you soon.Please call if you have any questions. Sincerely, CHAMBERLIN ROOFING&WATERPROOFING DALLAS/FT.WORTH LOCATION Ryan Grigsby 2346 Glenda Lane Project Manager Dallas,TX 75229 Accepted by(signature): 214.273,9110/817.237.1927 214.273.9120/817.237.2676 fax Printed Name&Title: Date -YOUR FAXED SIGNATURE ABOVE WILL BE TREATED AS A FULLY EXECUTED ORIGINAL CONTRACT- OTHER LOCATIONS Houston Aurtln - San Anton Okiahoma City PENDING CHANGE ORDER ESTIMATE SHEET PAGE NO: JOB NAME: Will Rogers Memorial Center CONTRACTOR: Rogers 0 Brien BONDED: NO LOCATION: University Dr.,Fort Worth,TX ARCHITECT: Hahnfeld DATE: 24-Oct-11 EST.: CHECKED BY: BID DATE: DESCRIPT: Thru Wall FlasWn at 7/A.A5.8 IBURDEN RATE: 65% TAX ON MATERIALS: NO 77 FOOTAGE DESCRIPTION(LABOR)-PRODUCT NAME PRODUCTION RATE QUANTITY COST PER NID LABOR BURDEN SUPER/MSC. TOTAL LA80R 210 Meadows 18"TWF 150 $130 210 Meadows 12"TWF 150 $130 210 Primer 0 $0 210 Mastic 210 $130 FOOTAGE DESCRIPTION(hATERIAL)-PRODUCT NA hIE COVERAGE QUANTITY COST PER UNIT hATERIAL MISC.MATERIAL TAX TOTAL MATERIALS RATFI UMT 75 60.55 75 40.45 500 130.80 250 119.12 TOTAL COST MISC.JOB EXPENSES QTY. UNIT COST AMOUNT COST W/MISC. EQUIPMENT/TOOLS-RENTAL OR PURCHASE 1 $300 MARGIN 10% HOTEL $0 GRAND TOTAL PER DIEM $0 BOND ADD TRAVEL $0 SHIPPING/FREIGHT $0 TOTAL j Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager—City of Fort Worth Transportation &Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`" Street Fort Worth,TX 76102 RE: WRMC—East Multi-Purpose Facility Project DOE/Project #TPW-01627 Contract# 41332 Fort Worth,Texas SUBJECT: Change Request# 78—M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $1,620.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request : Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.3001 Basecom, Inc. $1,402.67 4 Total Cost included In Change Request Austin,Texas 7887704 � 3901 S.Lamar Blvd. 00 $1 402.67 / $1,620.00= 86.6% Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Request www.rogers-obrien.com $1,402.67 / $1,620.00= 86.6% Total M/WBE Participation for this Change Request is 86.6%. Please let me know should you need any additional information. Sincerely, Rogers-O'Brien Construction Trey Carroll Project Manager CC: piaster He 10022 Dallas I Austin Rogers-O'Brien Construction November 23, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATfN: Jack Durham RE:RFI#154- Installation of(4)4" Conduits As Directed By Owner 10022 Will Rogers Memorial Cntr East Change Request#78 Dear Jack: As directed by Alarj(Bagamery, installed (4)4"conduits underneath the tunnel near the intersection of the Moncrief Building for relocation of existing utilities that could not be routed on top of the tunnel due to clearance issues. Three of the(4)4"conduits were stubbed up(total of six stub-ups)with long sweep 90's and capped for future use. Attached please find our pricing for the above referenced revision item. 1901 Regal Row Dallas,Texas 752351-he total amount to provide this work is: $1,620.00 Main 214.962.3000 Fax 214.962.3001 Please note the attached exclusions/qualifications. 3901 S.Lamar Blvd.#200 Austin,Texas 78704 Main 512.486.380gf you have any questions or need further clarification, please contact me at(214)962-3000. Fax 512.486.3701 www.rogers-obrien.com Sincerely, gr Trey Carroll Rogers-O'Brien Construction Co --- OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 78 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/23/2011 Description: RFI#154-Installation of(4)4"Conduits As Directed By Owner Change Request#:78 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Install(4)4'Conduits 1,402.67 $1,402.67 ***"EXCLUSIONS AND QUALIFICATIONS""*" Subtotal: $1,402.67 See attached backup for labor, material and subcontractor and Overhead 10.00% $140.27 supplier detail. Fee 4.99% $77.06 Price excludes all federal, state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $1,620.00 ` .. Page lofl Trey Carroll ---��� ��`��������� � From: Nowfonna@hmhnfedd.com Sent: Tueoday, November 22, 2011 7:50 AM To: Trey Carroll Subject: Project: 07015-01 WRMC East Multi-Purpose Building - RFI Received - Unit'D' Conduit at Moncrief Building Confirmation Note: You have been CC'don this notification. An RFl has arrived through Hahnfe|d Hoffer Stanford Info Exchange. Select the link below to view the | Note: This RFI is in pending state and has not been officially logged by Mahnfe|d Hoffer Stanford. Click here to login to the Hahnfeld Hoffer Stanford Info Exchange site Project Name: O7015'O1VVRMC East Multi-Purpose Building Project Number: 07015'01 From: Brent MacDonald (Rogers-O'Bhen Construction [o.) To: Gary Ryan (Hahnfe|d Hoffer Stanford) CC: Trey Carroll (Rogers-O'Brien Construction Co.), Tommy Deeds (Hahnfeld Hoff Stanford), Jack Durham (City of Fort Worth), Alan Bagannery (City of Fort Worth), Susan Foxworth (Hahnfe|d Hoffer Stanford), Jeff Westhoff(Hahnfe|d Hoffer Stanford), Steve Munoz (Rogecs-O'Brien Construction Co.) Subject: Unit 'D' Conduit at MoncriefBui|ding Confirmation Transmittal ID: SeoderID: KFl OO154 Remarks: Per owner direction, Rogers-O'Brien Construction installed 4 - 4"conduits underneath the tunnel near the intersection of the Moncrief building for relocation of existing utilities that could not be routed on top of the tunnel du to clearance issues. Please confirm. To share and learn more about Newforma Info Exchange visit ll/23/20) l Request For Change Basecom Inc 5209 Vesta Farley Rd Status: Pending Fort Worth,TX 76119 Date: 10/06/11 Respond By Date: 10/13/11 Internal RFC No: 6 Rogers-O'Brien Internal Job No: 11-001 Rog Rog Regal Row Customer Job No: 10022 1901 Dallas,TX 75235 Will Rogers Multi Purpose Cntr 1901 Regal Row Dallas,TX 75235 Attn: Owner Doc No: Labor&Material to perform T&M work 8-5,8-12 and 9-14. Tunnel change West. 0.00 Labor-see attached service worksheets&job cost detail report 437.84 Material-see attached CESCO invoices&job cost detail report 781.87 Overhead&Profit(15%) 182.96 Total RFC: 1,402.67 Approved Change Order No. Accepted Date: Accepted By: Please sign and return a copy as soon as possible 1 of 1 �N N E Locations to se ve y--u: • •• • Alice,TX 08!05!11 6606 ��.. CRAWFORD ELECTR!C SUPPLE' Austin,TX 108 EAST INDUSTRIAL Bryan/�Ilege station.TX = ER FORT WORTH TX 76104 Conroe,TX S000755671.001 CcawEord Electric Supply 817-338-1480 Fax 811-429-1373 Coppell,TX Corpus Christi,TX • Dallas,TX Fort Worth.TX CRAWFORD ELECTRIC SUPPLY Houston,TX P.O.BOX 847160 New Braunfels,TX DALLAS TX 75284-7160 New Orleans,LA San Antonio,TX SOLD TO: SHIPPED TO:31103 WILL ROGERS EAST MULTI PURPOSE CENT BASECOM, INC. C/O BASECOM,INC 5209 VESTA FARLEY RD 1601 W R WATTS DRIVE FORT WORTH TX 76119-6479 FORT WORTH TX 76107 6606 TUNNELL WEST MARK SHIPVIA SALESMAN INVOICE NUMBER SHIPPING BRANCH SHIP DATE I CHAD VIA S000755671.001 RFTW 08/05/11 OT OUR-TRUCK DESCRIPTION SKU 98006006738 PVCFIT 40OP40 90D 36R SCH40 ELB 16 16 24.36 ea 389.76 4 IN 90DEG 36RAD SCH40 PVC ELBOW 98006006010 PVC 400P 41N SCH40 PVC PIPE 200 200 151.77 c 303.54 2 2 656.38 c 13.13 78006006981 PVCFIT 1QT GLUE CLR 40 QT GLUE REG BDY CLR SCH40 30336S OR PR32 66238170686 NSI EWDT-8 2 2 3.97 ea 7.94 ECON DCT TAPE CJ Contract Documents ❑Insurance ❑Release of Lien ❑Certified Payroll A \� ❑O&MlWarranty �\ M 7' Approved By ti -OD Job Number 12 THANK YOU FOR YOUR BUSINESS! If paid by 09/10/11 you may deduct S14.29. SUBTOTAL 714.37 All payments are due by 09/25/11. S&H CHARGES SALES TAX 0.00 For complete terms and conditions please visit hllo//wwwcescoltdcom/Customers/CESCO CrediLAoelication 0209.0df (Y/t� TOTAL DUE 714.37 •.^• su r,E Ne r Page 1 of 1 r• INVOICE Locations to serve you: lkiftel 171-111 • .�.� .� CRAWFORD ELECTRIC SUPPLY Alice,TX 09/14/11 6606 C'L 108 EAST INDUSTRIAL Austin,TX FORT WORTH TX 76104 Bryan/College Station,TX INVOICE Crawford Electric Supply 817338-1480 Fax 817-429-1373 CCooppell,TX 5000825992.002 Corpus Christi,TX PLEASE REMIT PAYMENT TO. Dallas,TX Fort Worth.TX CRAWFORD ELECTRIC SUPPLY Houston,TX P.O.BOX 847160 New Braunfels,TX New Orleans,LA DALLAS TX 75284-7160 San Antonio,TX SOLD TO: SHIPPED TO:31103 BASECOM,INC. WILL ROGERS EAST MULTI PURPOSE CENT 5209 VESTA FARLEY RD 160 B 1 W R WAT R WATTS D, D RIVE FORT WORTH TX 76119-6479 160 FORT WORTH TX 76107 CUSTOMER ORDERED 6606 11001 MARK SALESMAN INVOICE NUMBER SHIPPING BRANCH SHIP DATE SHIPVIA CHAD VIA S000825992.002 RFTW 09/14/2011 OT OUR-TRUCK SKU DESCRIPTION OR13ER. CITY UNIT PRICE UOM 98006006172 PVCFIT 400P CA 6 6 1,125.01 c 67.50 4 IN PVC COND CAP F000Certified ontract Documents surance elease of Lien Payroll XWairranty Approved By Job Number C•C• [Wk THANK YOU FOR YOUR BUSINESS! If paid by 10/10/11 you may deduct$1.35. SUBTOTAL 67.50 All payments are due by 10/25/11. S 8r H CHARGES SALES TAX 0.00 For complete terms and conditions please visit htto//v^^r cescoltd com/Cuslomers/CESCO CreditAOOlication 0209.odf T 4-Ze- o,nvu TOTAL DUE 67.50 •typae- sore P ar Page 1 of 1 w 10106/2011 02:34:50 PM Basecom Inc Job History Detail Report 08/01/11 To 09/30/11 11-001-Will Rogers Multi Purpose Cntr 08/01/11 To 09/30/11 Cost Code Description Source Date Class Category Dollars Hours/Units Comment 1120 TEMPORARY SERVICES-JOBSITE 1129 MISC OTHER JOBSITE SERVICE P/R 08/12/11 LAB 5190B OT 17.96 1.000 THU9794 Thurlow,David P/R 08/12/11 LAB 5190B REG 47.88 4.000 THU9794 Thurlow,David P/R 08/12/11 LAB 5190F REG 65.32 4.000 LOP6895 Lopez,Pablo P/R 08/12/11 LAB 5190W OT 22.98 1.000 SCO8512 Scott,David I P/R 08/12/11 LAB 5190Z OT 32.66 1.000 FLE6106 Fletcher,Curtis P/R 08/12/11 LAB 5190Z SAL 60.09 3.000 TOS9255 Tosh,Mark P/R 08/19/11 LAB 5190B REG 23.94 2.000 THU9794 Thurlow,David P/R 08/19/11 LAB 5190Z REG 43.54 2.000 FLE6106 Fletcher,Curtis P/R 08/19/11 LAB 5190Z SAL 48.08 2.000 TOS9255 Tosh,Mark A/P 08/05/11 MAT 714.37 CRA0000 CRAWFORD ELECT A/P 09/14/11 MAT 67.50 CRA0000 CRAWFORD ELECT P/R 08/12/11 BUR 4.38 1.000 SCO8512 Scott,David I P/R 08/12/11 BUR 5.57 1.000 FLE6106 Fletcher,Curtis P/R 08/12/11 BUR 10.86 3.000 TOS9255 Tosh,Mark P/R 08/12/11 BUR 17.31 4.000 LOP6895 Lopez,Pablo P/R 08/12/11 BUR 14.89 5.000 THU9794 Thurlow,David P/R 08/19/11 BUR 5.55 2.000 THU9794 Thurlow,David P/R 08/19/11 BUR 8.14 2.000 FLE6106 Fletcher,Curtis P/R 08/19/11 BUR 8.69 2.000 TOS9255 Tosh,Mark Cost Code 1129 Total: LAB 362.45 20.000 MAT 781.87 BUR 75.39 20.000 Totals: 1,219.71 Cost Code Group 1120 Total: LAB 362.45 20.000 MAT 781.87 BUR 75.39 20.000 Totals: 1,219.71 Job 11-001 Total: LAB 362.45 20.000 MAT 781.87 BUR 75.39 20.000 Totals: 1,219.71 Service Worksheet FRM-160-A , Customer Contact: i ) Date: - � I ! Work Ticket# T Location: T1}�(lL: �� � ontact Ph m er: Service Required: ft '! �I / I iN:t A- a I I (� I] ) Vtc l Employee Name: time in break time out total hrs time must be noted in military time format 12:00 AM = 0:00 12:00 PM = 12:00 1:00 AM = 1:00 1:00 PM = 13:00 �'• 2:00 AM = 2:00 2:00 PM = 14:00 1,/T 3:00 AM = 3:00 3:00 PM = 15:00 t � � � `�� /• �S i 4;00 AM = 4:00 4:00 PM = 16:00 `? :00 AM = 5:00 5:00 PM = 17:00 R , ' `3b,,----*' 13 7:00 AM = 7:00 7:00 PM = 19:00 8:00 AM = 8:00 8:00 PM = 20:00 In, •' 9:00 AM = 9:00 9:00 PM = 21:00 10:00 AM = 10:00 10:00 PM = 22:00 11:00 AM = 11:00 11:00 PM = 23:00 Material Used: Quantity Item / rt OW Where did you obtain material from: Was this Material an after hours call: ❑ YES NO After hours fee: ATTACH PACKING SLIPS OR INVOICES Customer Representative(print name) Customer Representative Signature Basecom Representative Signature. Service Worksheet FRM-160-A Date: .112 — I I Customer Contact: xL J A d Work Ticket# Location: ►�I We-,--k Co hone r. Service Required: C (A I 1 Yl ' Y- , -- bber u er nE l o r. Employee Name: time in break time out total hrs time must be noted in military time format t� 12:00 AM = 0:00 12:00 PM = 12:00 1:00 AM = 1:00 1:00 PM = 13:00 /� j� 2:00 AM = 2:00 2:00 PM = 14:00 U r - i �✓ • LJ 2 3:00 AM = 3:00 3:00 PM = 15:00 r� Y, I 4:00 AM = 4:00 4:00 PM = 16:00 r+i V— 1 l , v { 5:00 AM = 5:00 5:00 PM = 17:00 6:00 AM = 6:00 6:00 PM = 18:00 7:00 AM = 7:00 7:00 PM = 19:00 8:00 AM = 8:00 8:00 PM = 20:00 9:00 AM = 9:00 9:00 PM = 21:00 10:00 AM = 10:00 10:00 PM = 22:00 11:00 AM = 11:00 11:00 PM = 23:00 Material Used: Quantity Item 1 Where did you obtain material from: Was this Material an after hours call: ❑ YES ❑ NO After hours fee: ATTACH PACKING SLIPS OR INVOICES Customer Representative(print name) Customer Representative Signature J Basecom Representative Signature' Service Worksheet FIRMA 60-A Date: - Customer Contact: Work Ticket# Location: o Contact Phone Nu r: Service Required: b - s Employee Name: time in break time out total hrs time must be noted in military time format �( 12:00 AM = 0:00 12:00 PM = 12:00 Y , 3 9 1:00 AM = 1:00 1:00 PM = 13:00 2:00 AM = 2:00 2:00 PM = 14:00 3:00 AM = 3:00 3:00 PM = 15:00 TefA Caycr [ 4:00 AM = 4:00 4:00 PM = 16:00 w i ` 5:00 AM = 5:00 5:00 PM = 17:00 6:00 AM = 6:00 6:00 PM = 18:00 7:00 AM = 7:00 7:00 PM = 19:00 8:00 AM = 8:00 8:00 PM = 20:00 9:00 AM = 9:00 9:00 PM = 21:00 10:00 AM = 10:00 10:00 PM = 22:00 11:00 AM = 11:00 11:00 PM = 23:00 Material Used: Quantity Item i i V. O 9 . OD Where did you obtain material from: L")TD P� Was this Material an after hours call: ❑ YES [ZI->QO After hours fee: ATTACH PACKING SLIPS OR INVOICES Customer Representative(print name) Customer Representative Signature, Basecom Representative Signature: Rogers-O'Brien Construction November 30, 2011 Jack Durham Senior Construction Manager-City of Fort Worth Transportation &Public Works Dept. Facilities Management Division / Architectural Services 401 West 13`h Street Fort Worth,TX 76102 RE: WRMC-East Multi-Purpose Facility Project DOE/Project #TPW-01627 Contract # 41332 Fort Worth,Texas SUBJECT: Change Request# 79-M/WBE Participation Mr. Durham: The total amount of the approved change request referenced above including profit and overhead is $2,021.00. Below is the breakdown for the M/WBE Participation 1901 Regal Row related to this change request : Dallas,Texas 75235 Main 214.962.3000 Fax 214.9623001 Grace Construction Co., Inc. $1,750.00 -> Total Cost included In Change Request 3901 S.Lamar Blvd.#200 $1,750.00 / $2,021.00= 86.6% Austin,Texas 78704 Main 512.486.3800 Fax 512.486.3701 Total M/WBE Participation For Change Request www.rogers-obrien.com $1,750.00 / $2,021.00= 86.6% Total M/WBE Participation for this Change Request is 86.6%. Please let me know should you need any additional information. Sincerely, Rogers-O'Brien Construction �?�_ v5f 0 Trey Carroll Project Manager CC: Master He 10022 Dallas I Austin a . Rogers-O'Brien Construction November 23, 2011 City of Forth Worth 401 West 13th Street Fort Worth,TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN: Jack Durham RE:RFI#76-Addiiton of(4) Concrete Columns @ Bldg. 'A'SW Pedestrian Ramp 10022 Will Rogers Memorial Cntr East Change Request#79 Dear Jack: Per RFI#76 response, added (4) 12"x 24"concrete columns along Bldg. 'A'Southwest pedestrian ramp for support of elevated concrete structure above. Cost of work includes rebar, forming of columns and place/finish of concrete. Attached please find our pricing for the above referenced revision item. 1901 Regal Rovthe total amount to provide this work is: $2,021.00 Dallas,Texas 75235 Main 214.962.3000 Fax 214.962.30 OP lease note the attached exclusions/qualifications. 3901 S.Lamar Blvd.#200 Austin,Texas 78704f you have any questions or need further clarification, please contact me at(214)962-3000. Main 512.486.3800 Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas Austin Change Request 79 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 11/23/2011 Description: RFI#76-Addiiton of(4)Concrete Columns @ Bldg. 'A'SW Pedestrian Ramp Change Request#:79 Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 (4)Concrete Columns 1,750.00 $1,750.00 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $1,750.00 See attached backup for labor, material and subcontractor and Overhead 10.00% $175.00 supplier detail. Fee 4.99% $96.00 Price excludes all federal,state and local fees. Price does include sales and/or remodel taxes. Written authorization and/or signature on this PC required prior to performing the above described work. Total: $2,021.00 0 Hahnfeld Hoffer Stanford Hahnfeld Hoffer Stanford 1 200 2ailev Avenue, Suite 200 Fart 4YUrth. Texas 76107 RE Response Transmittal ID: 00455 Date Sent: 6/24/2011 Project: 07015-01 WRMC East Multi-Purpose Building Number: 07015-01 To: Brent MacDonald Rogers-O'Brien Construction Co. 1901 Regal Row Dalas,TX 75235 214-962-3000 (Phone) 214-962-3001 (Fax) From: Gary Ryan Hal-nnfeld Hoffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth, Texas 76107 (817) 921-5928 (Phone) (817) 302-0692 (Fax) Subject: Unit'A' Southwest Pedestrian Ramp Column Confirmation Sera Via: Info Exchange RF1 ID: 00076 Discipline: Received: 6/23/2011 Question: Colunwis near the intersectiim of 1/D, 1/D.S, 1/F and 1 1H.2 are depicted as CMJ in details 4/S.A2.4 and 101S.A2.9. As discussed with Tommy !Seeds, these cokrnns are to be constructed as concrete cok ms. Please provide dWiwtsions and reinforcement detaiis for connector to existing waf below and beam above. Suggestion: Answer: THE ABOVE COLUMMS AT THE REQUEST BY G.C. AND TOMMY DEEDS NEED TO BE CONSTRUCTED AS PER DETAIL II/S.A2.9 IN LIEU OF IO/S.A2.9 OWY BETWEEN FIRST AND SECOND LEVEL. USE DETAIL 8/S.A2.9 ABOVE SECOM LEVEL. CC: Grace Construction Co.. Concrete Construction 11325 Tantor Rd. Ste 200 Dallas, Texas 75229 CHANGE ORDER REQUEST To: Rogers - O'Brian Construction Tuesday, October 25, 2011 1901 Regal Row Dallas, TX 75235 Attn: Trey Carroll Project: Will Rogers Memorial Center 1401 W.R. Watt Drive Fort Worth, TX 76107 Subject: See the additional costs for 4 ea-8" x 24" Change Order Request 11007-013R concrete columns per RFI 00076. Labor with Burden $ 910.00 Material $ 612.00 Equipment $ - Subcontract $ - Subtotal $ 1,522.00 Overhead& Profit 15% $ 228.00 Total Cost: $ 1,750.00 This work has been performed. We request that the Change Order to our contract be issued as soon as possible. Should you have any questions, feel free to contact me. Sincerely, Alan J. Haynes, Sr. Grace Constriction Company Phone. (972) 432 - 0800 Fax (972) 432 - 0810 1 of 1 Grace Construction Co. Concrete Construction 11325 Tanto Rd. Ste 200 Dallas, TX 75229 DETAILED BREAKDOWN OF COSTS FOR RFI 00076 Labor Burden @ # Category Time Rate 40% Cost 1 Foreman 2.0 Hrs $22.50 $9.00 $63.00 2 Carpenter 6.5 Hrs $17.00 $6.80 $309.40 2 Laborer 4.5 Hrs $14.75 $5.90 $185.85 1 Iron Worker 4.5 Hrs $17.00 $6.80 $107.10 1 Cement Mason 10.0 Hrs $17.50 $7.00 $245.00 $910.00 Material Item QTY Price Cost Formwork 240 SF $0.55 $132.00 Concrete 2 CY $60.00 $120.00 Reinforcing 8 CWT $45.00 $360.00 $612.00 Equipment Item QTY Price Cost $0.00 $0.00 $0.00 $0.00 Subcontract Item QTY Price Cost $1,522.00