Change Order Request
Project Name Ydlage Creek Reclaimed Water Quat ty Improvements UV System City Sec p 1 41358
Client Project=(s)l CFW 00213; APAI 00318-042,Archer Western 210138
Project De r tton
contractor Archer Wstem Contractors,Ltd Change Order C� Date 7;1812011
City Project Mgr I Farida S Goderya PhD PE City Inspector FMWHal
Dept. Water Totata SeW Day Type
Original Contract Amount S1,793.000 00 $1,793,000.00
Ex bras to Date $19.652.00 $19,652.00
Credits to Dale
Pending Change Orders(In M&C Process)
Contact Cost to Dale $18i 652.00 $1.812.652.00
Amount of ProFesed Change Order ;41.910.00
Revised Contract Amount S1. 00 $1,854,562.00
Orioud Futtds Available for Change Orders $0.00
Rernairang Funds Available for this CO low
Additional Funding(0 necessary) $41910.00 $41.910.00
CHANGE ORDERS to DATE(WAUMG THIS ONE)AS%OF OMGIMAL CONTRACT 3.43%
MAX ALLOWABLE CONTRACT AMOUNT(ORKMM CONTRACT COST r 23%) 241,25000
cnat,ge order 1Vo.2 covets ft following: '�°F �O�i�tors
-CMR 001—Sidewak on East Side of UV Structure ,d 6°o°°°°°p00
•PCM 002-Energy Usage Monitoring �'�o°
�o a
(io o
0 o d
This Charge Order No.2 is for a combined sum amount of$41,910.00 and 0 Calendar Days.
: °��°XA�4a���
See ataced pages for more details '7!! ?
�Zl11Qb�
old P. G1es, City 3ecrot�Iry
it is understood and agreed that the acceptance of On Change order by the contraclor corrMi ales an accord and satisfaction and represents payment
in U(both time and money)for as costs arising out of,or incidental to,the above change order
AA
>0
Archer WMem Contactors Llo z,•� T - %ten�!J -: i
D*
8,u 84-*06 ,/ �, �.. �,� ' ;. Fanda S.Goderya,PhD,PE
Andrew T Cronber PE i/ S.Frank Crumb PE
,� Abadient
Doug Blanc 1-t,r 5' i ( Femando Costa e
C*lnd 460 tif
M&C Number (—C-25152 M&C Date Approved 9J 1 1 V
JYI
t
F°'T. WORTH, TX
@ @\ �
k7 G a
J q
�
co 7
Ln
cn
%
k @ @
t G C-0 % n
# R
/
3 f \ \
2 /
5 / \
/
\ f
J > � �
® I
/
\ e
« ° y
= U \
C) / e
3 a-
�. g & $ \
0 � \ —
@ / / \
« \� J C/) ¥ <
LL Z) C
/
t \ O
o E & \
� a) ° E _
) $
Um E f
U /
/ / f
\ . ± f
\ S \ ± f
\ / \ � \ 2
$ m \ 0
/ \ ƒ / / /
E a .2 E E
\ \ \ / \
co
/ \
§ & & a LU
CD
� � / \
= 'E k / $ L)
_ o E
±� � . � a)
»
V V
0318-042-24
t..
June 20,2011
Cyr. Farida Goderya, PE, PhD
Project Manager
City of Fort Worth Water Department
1000 Throckrnorton Street
_:- Fort Worth, Texas 76102
Re: City of Fort Werth
` Village Creek Reclaimed Water Eastern Delivery System
UV plater Quality Improvements
Contractor Modification Request No. 1: Sidewalk on Fast Side of UV Structure
Dear Dr. Goderya:
This is a letter of recommendation for approval of CMR-001 for the above-referenced project.
CMI R-001 concerns the 4-foc.)t wide concrete sidewalk referenced in the response to RFl-16. Per
RFI-16, the existing ductbank under the slab conflicted with the location of the new ductbank
feeding the new panels east of the UV outlet box. To resolve the conflict, the new panels were
shifted west, resr.tlting it9 a less than ideal clearance between the electrical panels and edge of
slab. It was determined that gadding a sidewalk that runs along the east side of the l.lV slab would
allow for better access and arability around the panels. The contractor's cost estimate for this
v,;ork is x`,4,2.46.04 with no additional tinge:requested.
If you should have any questions regarding this proposed change, please contact n'le.
^incerely,
ALAN 1='t.Ulr>lMER ASSOCIATES, INC.
Jej,r y . CC ey, F'.E.
P.ojcsct Manager
J FC/vlw
Enclosures
f pjrojects1O358t 442-24i;onstradminlr..cnstruetion modifiaationslcmrVecomn-iendation letters)icrnr 009 recornmendation_doc
CMR1
Village Creek W WTP
Village Creek Reclaimed Water Eastern Delivery System
OWNER: City of Fort Worth Texas WORK DESCRIPTION:
All sidewalk to the east side of the UV slab
and to the South per RFI 16 response.
ENGINEER: Alan Plummer Associates,Inc.
1320 South University Drive,Suite 300
Fort Worth,TX 76107
CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD
2121 AVENUE J,SUITE#103
ARLINGTON,TEXAS 76006
Bid Item Desc ption I City Unit I Uni rice Labor I Material Equipment Subcontractor I Totals
LABOR Ex bottom of Select Fill 7.00 MH 19.0 133.00 133.00
cavate to
ac ill Select Material 5.0 MH 19.00 95.00 5.00
Fine Grade and Compact Select ill 6.00 MH 19.00 114.00 114.00
Form Sidewalk/Strip 27.00 M 19. 513.00 513.00
Install Ex ansion Board 6. MH 19.00 114.00 114.00
Pour Sidewa 15.0 MH 19.00 2 5.00 5.00 bT
Finish Sidewalk 11.00 1 0 209.0 209.
MH $19.00 0.00 0.00
MH $19.00 $0.00 $0.00
H
$19.00 $0.00 0
M 19.0 0.00 O.0
MH 19.00 .00 0.00
MH $19.00 0.00 $0.00
H sio.00 0. 0 0
0.00 TO-OT.
$0.00 0.00
MATERIAL
onaete, Materials Re ar and Form Materials 4.00 CY 11.00 844. .00
ansion Board 1.00 LS 100.00 $100.00 100.00
0.00 $0.00
00 0.0
p_ 0.00
00 0.00
430 Backhoe 0.50 jDa (J(J.U(J $200.00
00 $0.00
0.00 $u.uu
0.00 0. 0
0.00 F I su.uu
0.00 $0.00
0.00 $0.00
$0.00 $0.0u,
0.00 W.00
0.0
AL S: 1,4 3.00 44.00 2 07
Labor Burden @ 48%of Labor 702.24 T7-02.24
Small Tools @ 15%of Labor 219.45 19'45
Sa44 u lies 7.5%of Labor 1 .7
OH&P @ 15%
Subcontractor Cost
OH&P for Subcontractor @ 10%
Insurance and Bond @1.5
Subtotal:
TOTAL AMOUNT H 4. 4 . 4
n I Tr l T1 Tl I w gg 3 o
J rL J J J T�JTJT
JIJ J J JiJ
ee�
IL L tF -4-- 4f
oil �` �P;
R
I,
€ im 3 8i`<
go
Ow
g ® ® 4 g .i
I
CJ
I g 1
f150-J
' I �NO-
dl. � bs
.w,d CNn
Om5yw j,
Ld
o
g a
9L F INI I - W x I
N
o�<z
N
1 U LL g
L ° IN
y rpq I S
s
Or/M+�fl +42-O�E+0 �Y'W.M-6\RYIOLO\a�f\`!w�.✓'.J
r j
IN v� Z
ENVIRONMENTAL
ENGINEERS AND SCIENTISTS
ROBUCT P.nnAns.DE,PE D318-042-24
JWMES LAUSTAT aPE July 12,2011
-TZMTN J.COONAI t Pc
P4N K D•A,1TJN:M.PE
PEG G(W.GInSS PlW,,
DAVID kZ;ULi4L,PE Dr. Farida Goderya, PE,PhD
REX K'AUNT,PE Project Manager
UM L.,QFEMN,PE City of Fort Worth Water Department
ELLENT.t'kDONAL^.P S3 PT- 1000 Throckmorton Street
J7HN R,MINAHAN,PE Fort Worth,Texas 76102
nMGTHY J.NOACr,PE Re: City of Fort Worth
ALAN FL FLUMMERJk.,P--6UE Village Creek Reclaimed Water Eastern Defivery System
wIuA".`.F"'Im-ty"E UV Water Quality Improvements
ALAN P TUCK.M'.+ Proposed Contract Modification No.2: Energy Usage Monitoring
Dear Dr.Goderya:
This is a letter of recommendation for approval of PCM-002 for the above-referenced project.
PCM-002 addresses the City's request to have the capability,of monitoring energy usage related
to the UV disinfection system. The scope of this PCM includes conduit, wiring, switchgear, a
Multilin converter, cable, fiber, panels, receivers, and the labor associated with installing and
programming those various components. The contractor's cost estimate for this work is
$37,663.24 with no additional time requested.
If you should have any questions regarding this proposed change, please contact me.
Sincerely,
ALAN PLUMMERA°S�SOCIATES, INC.
J y E. affey, P. .
reject Manager
JEC/vlw
Enclosures
F:lpro;sds 0319109b2t1CimWAtlrttin%ConMpjctwn ModdkmHm mMCA4{ReamnffmnaafiDn LetWStPCM 002 Recwruner%a6on.dx
il]U soUTH UNNERS,T1'DF3v2
SUFTE JIM
��WOPMHXIYAS Ulu?
-Hork et 'WkOoo
FAX 817.670.2536
YN-E F.—Na t] rA�
`.f7
CITY OF FORT WORTH
PROPOSED CONTRACT MODIFICATION(PCM)
Project Village Creek Reclaim—UV System Project No. P275-70530423183
Fund: Account Center
Contractor Archer Western Contractor's Project No.
Engineer Alan Plummer Associates, Inc. Engineer's Project Number CFW08085
Construction Farida Goderya,Ph.D.,P.E. Construction Manager's 00213
Manager Project Number Cont.41358
PCN1 Description Energy Usage Monitoring PCM No. 002AW
NOTIFICATION TO CONTRACTOR:
We are considering making the change to the contract described in the attached materials,and
request that you take the following action:
Notify us that you concur that this change does not require a change in contract time or amount.
A field order will be issued..
X Submit a price proposal with detailed cost breakdown of labor,materials,equipment,and all
other costs associated with this change,and a revised schedule for perfonning the described
change.
Proceed�writh the change order under time and materials provisions of the contract.
BY: Date: -7
CON'TRACTOR'S RESPONSE:
We respond to your request as follows'
"Ale concur that this is a no cost or time change.See attached field order.
X We submit the attached price proposal with detailed cost breakdown and revised schedule for.
Performing the described change..
We are proceeding,with change under time and materials provisions of the contract. f
BY: Date: /
ACTION TAKEN:
Proposed Contract Modification rejected.Contractor notified not to respond.
BY: Date
Field Order Issued: No. Date By
Change Order Issued: No. Date By
Page 1 of 2
CITY OF FORT WORTH
PROPOSED CONTRACT MODIFICATION(PCM)
Project Village Creek Reclaim—UV System Project No. P275-70530023183
Fund: Account Center
Contractor Archer Western Contractor's Project No.
Engineer Alan Plummer Associates, Inc. Engineer's Project Number CFW08085
Construction Farida Goderya,Ph.D.,P.E Construction Manager's 00213
Manager Project Number Cont.41358
PCM Description Energy Usage Monitoring PCM No. 002AW
The Owner proposes to make the following additions,modifications or deletions to the work
described in the Contract Documents.Authorization to proceed with these changes must be
approved by Field Order or Change Order in accordance with the Contract Documents.
The goal of this PCM is to enable plant DCS to monitor the reclaim UV system energy usage. There will
be one new PQMII added for the UV system."
n kmergy usage monitor:
One new PQMII as part of this PCM will be install at the UV system power feed at MCC SWP,for the
remaining of the document the following abbreviation will be use:
• RCUV PQM—Reclaim UV system PQMII
Provide the following cable run and equipment:
• Provide PCUV—PQM,associated CT's,PT's and MultiNet serial-to-Ethernet converter at the UV
system MCC SWP. The PQM shall monitor the branch circuit that feeds the UV Panel only.
Mount PQM on the door of the MCC.
• Run a CAT.6 Ethernet cable between the UV remote I/O panel and MCC SWP and connect the
Multilin MultiNet serial to-Etbemet converter.Use the 2"spare conduit between the Remote 1/0
Panel and communication pull box CPB-002. Provide new 2-2"conduits(1-spare)from CPB-002
to MCC SWP.
• Run twelve strands multimode fiber optic cable between the reclaim pump station and the UV
system RIO panel in the same conduit as the Belden 9463 RIO cable from the Remote 1/0 Panel
up to CBP-002 and then run in spare conduit back to PLC-REP.
Minimum equipment configuration steps are listed below:
• Program I.P.address into the MultiNet, obtain I.P.addresses assignment from the CITY per plant
SCADA system I.P.standard
• Program MODBUS serial addresses to the PQMII
• Program the AB SLC Prosoft MODBUS TCP/IP module to poll the PQM energy usage register
every five seconds. Energy registers information are listed at the end of this document
• In the AB SLC convert the energy usage register raw value to an engineering unit in floating point
or real number format and display the energy usage value RCUV_PQM_KW at the PLC-REP's
OIT. Totalize the energy usage in a similar fashion as the discharge flow reading detail of the
energy usage totalization is listed at the end of this document. The engineering scale for the
energy usage shall be adjustable by operators via the OIT and initially set at 0-300 KW for the
UV. Transmit RCUV_PQM value via a spare 4-20 ma analog output channel.
• Terminate fiber optic on patch panel at both ends. Provide two fiber optic patch panel,patch panel
shall be SNAP Compact Fiber Optic Patch Panel SNAP-I2SC-MM. Provide two DIN Rail
100Base-TX/FX Transceiver,Multimode Hirschmann RT2-TX/FX 943 658-002 one on each end.
Provide all fiber optic patch cable as needed Twelve strands fiber optic cable shall be Corning
Altos outdoor dielectric gel-free cable. Provide 24 VDC power supply as needed.
PQMII energy registers information:
02FO(hex)3 Phase Real Power(high)
02F1 (hex)3 Phase Real Power(low)
0.01 x kW
F4 Signed Long Integer-Numerical Data FFFFFFFF
Programming requirement of each energy usage totalization:
• Current Reading
• Energy Usage Communication Alarm
• Energy Usage Totalization—Today
• Energy Usage Totalization—Yesterday
• Energy Usage TotaIization—Since Last Reset
• Energy Usage TotalizatioD Reset
• Energy Usage Totalization Last Reset Date and Time
I have reviewed the construction documents with the Contractor and the proposed Time and Material
estimates provided by the Contractor.The estimated costs appear reasonable for the proposed work_The
work has also been coordinated with plant staff as well as oar design team.No additional contract time is
requested by the Contractpr for his cndmen
Reviewed By: —""r— Date:
BY: \ra.ri (;J�� Date.
Page 2 of 2
PCM I#2
Village Creek WWTP
Village Creek Redeirned Water Esslem Delivery System
OWNER city Of Fon Worth Taxas WORKDESCRIPTION:
EINEER Alan Plummer Assocaies,Inc.
1320 South Universsy Drive,Suae'J00 -
Fort Worth,TX 7610?
CONTRACTOR: ARS:HER WESTERN WN I FACTORS,LTD
2121 AVENUE A SUFTE#703
ARUNGTON,TEXAS 76006
T y
MH MEW
m" 511LUU
SUFUD
3Uvu au
WWI *U.WW
Labor Burden(@ 48%of Labor
Small Tool;@ 15%of Labor WOU
Safety Supplies @ 7.5%of Labor
TOTAL DIRECT COSTS OF CONTRACTOR: $0.00
DN&P Q 15% 50.0
Subcontractor Cost _... _ $31733.31 533:733.1
OH&P Subcordrador C 10% x3,373.33
Insurance and Bond @1.5%
Subtotal: 537,6634
TOTAL AL40LWT THIS COST PROPOSAL SUMMARY................_...........
.. ;643 24
page 2
WHF ELECTRICAL CONTRACTORS-801 JUPITER RD.STE.104,PLANO,7X.75074
ADJUSTMENT FOR CHANGES IN WORK
PROJECT NO. 253 REVISION NO. 2R2
PROJECT NAME: Villaae Creek WWTP DATE: 611 312 01 1
DESC.OF CHANGES Energy Usage Monitoring
QNT'Y LABOR MIE M/E Equipment/
DESCRIPTION REQ'D UNIT UNIT LABOR UNIT TOTAL SUBCONTRACT
2"Alum Conduit 10 LF $4.00 $40.00 $4.40 $44,00
2"Expansion Joint 2 EA $25.00 550.00 $135.00 $270.00
2"Alum LB 2 EA $18.75 $37.50 $35.00 $70.00
2"Hubs 2 EA $10.00 $20.00 $12.50 $25.00
2"PVC Adaptor 2 LF $1.50 $3.00 $0.75 $1.50
2"PVC Conduit 40 EA $0.60 $24.00 $0.62 $24.80
2"PVC Coated Alum 90's E LF $42.000 $210.00 $198.00 $990.00
Sand 7 CY $45.00 $315.00 $25.00 $175.00
Concrete 3.5 CY $37.50 $13125 $125.00 $437.50
Instrumentation 1 LS $0.00 $0.00 $0.00 $0.00 $14,599.97
Switchgear 1 LS $0.00 $0,00 $0.00 $0.00 $10,130.00
unistrut 4 LF $2.25 $9.00 $15.00 $60.00
Ground Wire 80 LF $0.50 $40.00 $6.50 $520.00
Caldweld 1 EA $15.00 $15.00 $8.50 $8.50
$0.00 $0.00
$894.75 $4626.30 $24,729.97
SUBTOTAL(LABOR,MAT.,EQUIP.,SUB.) $28,251.02
LABOR BURDEN 36%OF LABOR $322.11
FRINGE BENIFITS 5%OF LABOR $44.74
PLUS OH&P 15%-0E-NNE-f-,B7C - - -- $4,292.68
SALES TAX $0.00
BOND ADDER $822.76
TOTAL(A+B+C+D+E+F) $33,733.31
PRIME
�coMOIB
815 OFFICE PARK CIRCLE LEWISVILLE, TX 75057
PHONE 972-221.4849 Q FAX 972.420-4642
June 16, 2011
To: WHF Electric
Attn: Greg Miller
Ref: Energy Usage Monitoring COR
Prime Controls Quote No.: VC_CORl_061610McM
Greg,
The following is an explanation/justification for the costs associated with the Energy
Usage Monitoring additions.
In response to the fiber optic Cable cost,we have found a mistake in the quote from our vendor
who quoted a gel-filled cable in ens. I have updated the quote to Include the proper cable,and
the quote is attached.
The following is justification of the Project Engineering hours included in this proposal.
Engineering Task #of Hours
Specify System Components 8
Configure Multinet IP address 4
PLC Programming 16
OIT Programming 12
Drawing Modifications Additions 8
Testing 8
Total Hours 56 Hours T
We sincerely appreciate this opportunity and look forward to being of service for this
work.
Thanks again and please feel free to call if there are any questions.
Sincerely,
Prime Controls, LP
James McMillon
Prime Controls Proposal Page 1 of 1
PRIME CONTROLS
CHANGE ORDER REQUEST
Data Sufimittad:.._........_................................«..................................... SM621a11
PCChange Drder Requast(COR)Number:.-...._................................._........... COR.1 r2
Contract or Subcontract Bumbat:................................_.........................
.».....
projaet Kim;................._......................................«.................................. City of Ft Worth,Village Creak We7tP
tier O."dotlam
PCM-O=W Energy Moog.Monitoring
R►ason for Chance
Rsgtraesd by 3cnc el
DESCRIPTION QTY UNIT PRICE EXT.PRICE
Material
MW4Sn MuNnu aural:0 eoom:4onvarter 1 859.98 BS9.30
eato cable 1 SB.75 88.75
12 strandmullinideBoor(Altos) 700 2.60 1,112MM
finer connectam 24 16.94 382 bL
finer patch partels(SNAF-IZSC-AIM) 2 201125 412.19
ficar franscievam(I lir=meM RT2-TXIFX) 2 720.OD t.440.m
24wk Ib Ili imegr aio 29 3984 0) 2 131.25 26250
0 000 0..00
D 000 oleo
0 0.00 am
0 0.00 0.00
O 0.00 0.00
0 0.00 000
0 0.00 0.00
Subtalat 5,245.63
Sake Tax On Matodal 0 0.0825 D yO
Mntorial Cask Subtotal 5,245.83
Labat(Hourly Ratae Indus Pa)Tmil Taxes IN Insurance)
A=.rt Ma.TU9et 1 14&40 143,00
Prajeal Manager S 811.00 520.00
OArQClSSlaty Suponrizar 0 64.0 0,00
Sr.Syctoln Annlyal 0 136,00 0.0
Pro)scl Engineaf .511 81.00 4,536.00
Field Engineer W 68.00 1.08640
CadlDreltsman 4 42.00 160.00
Coelro:'Toehnlcian 0 B4.OG 11.00
Project Srgrenirdow 0 87.00 D.00
Journeymen Inemllers 8 41.DO 328.00
Hopor Instaflors 0 21.00 040
Pant Shoo Manager 6 44.00 0.00
Pans1 Assembly Labor 0 27.00 D 00
Clericat Labor 2 27.00 54.00
Labor Costs Subtotal 6,850.0
Tmval F.noermez
Kr Fore(Yhll Detain D 500,00 0.00
Lacialrg Charges(Par Day/Per Man) D. 150.00 0.00
For pion Chagas(Par Day/Pot Mon) 0 100.00 0.00
LaborTraw)Expanses Subtotal 0.00
Subeonlrattor Chorata
Da¢ldtal Subcontractor(XYI Contractor) 0 000 0.00
M.achaical Satxmttactor a 000 0.00
Ctvll Subcordraclo, 0 0.00 0.00
Omer Subcontractor: 0 0.00 0.00
Submntraclorcosls Subtotal 0.00
olraet Jobiito t.oek(AppkraMa for Exlanded SUrodule andlor Special Coca)
Office Tmller(Rer Week Cterlge) 0 35040 080
Generator R"W(Per Week Charge) 0 400.00 0,611
G-. color Fuel(Par Weak Cho go) 0 3c0.W 0:60
Storage Trailer Rental(Per Week Chrugn) D 100.00 0:00
Part-A.John Rental(Per Weak Charge) D 5000 (LOD
OnStta dumpmr Rental(Por t1'oek Charge) 0 0040 O.D
Ptwna 8 Utilities(Per Wook Cnuge) t 20040 2GOD0
Tna:k d.Got(Par Meek Charge) 1 400.00 LtX1.Da
Spacial Tozr=quip Rental(Per We&Charge) 0 SW.OD 000
Direct Josit.Costs Subtotal 0110,00
Coat Ratao 12,50669
Tual 0--.1 Coati
Ovehoad 6.Profit Charge(15%for Adds-10 A far Crooks) 15% 1.00434
TDMI COR Amourd 314,9aa.l7
eba.ae A.wer t 2 sea.�al 1
Gr%4 aR.
4601 CAMBRIDGE RD_
FORT WORTH TX 76156
Phone:817-213-1300
Fax: 617.2134339
To: PRIME CONTROLS LP Date: 06/15/2011
PRIME CONTROLS LP Proj Name:
815 OFFICE PARK CIRCLE GB Quote#: 213294603
LEWISVILLE TX 75057 Valid From: 06/15/2011
Attn: Lyle Grisso
Phone: 972-221-4849 Valid To: 07/15/2011
Fax: 972-420-4842 Contact: DENA LOVICK
Email: dena.lovick@graybar.com Email: dena.1ovick @graybar.com
Proposal
We Appreciate Your Request and Take Pleasure in Responding As Follows
Item Quantitv Supplier Catalog Nbr Descri.gtion Price Unit Ext,Price
200 700 EA CORNING CBL. M-013-I24LT-A-L-13K- 012KU4-T4130D20 $2,600.00 1000 $1.820.00
SIC-5
GB Part P 22120064 UPC tk
"Item Note"• STock in Houston
non-returnable
Total in USD(Tax not included): $1,820.00
7rl e.u•�^aN,rn-,assc:,��i�:s���ic^:har�•:s may bo*iarcua 1:r a rch norinly payrrc�.h�upt:Gmy;ar•-inan;gl yeni;r.;.!;,+uieU wa_7i ac;rwe�J.'o�nr,•n iR'ormal:a,�c�fi 1-EUG25 M1-7SQP.
U.apeak w:th o!r—iq spnc;;9 s,
To loam more about Graybsr,visit our website at www.graybar.00m 24-hour Emsrgancy Phone#:l-800-9RAYBAR
fubjed b rha standard boos and eondltkm ast Imh in thk daeumarR Wins othowI a noted fr tht bnne en F.o,a.shlpptoe pabd prepaid and blll.
unlan noted the astbuLd ship do*w0l be Wsrmbnd at use arm of ordsr pkeawnt.
Pace 1 of 2
,ttfJ/ THE REYNOLDS COMPANY
ELECTRICAL SUPPLY
11W
May 12,2011
Quotation- Village Creek Reclaim UV System
Energy Usage Monitoring
Qty 1-Add to Existing MCC Bucket w'PQM meter,CT's, PT's
Cost: $8,750.00
Qty 1- One Day of Field Services to program PQM meter by manufacturer's
trained representative
Cost:$1,380.00
Total Cost: $10,130.00
•This quote is valid for 30 days from date of origin.
Prepared by Chris Conmy
Switchgear Dept.
214-560-2662 direct
214-560-5376 fax
cmconmy @reynco.com
nv�ir.+-:.h;'mr-U�wc fo:g-8uue:rt- Lila-F.1 W.M- !faunae-L tj,,W-Uk C-d—lc a:n-�c..3k•.u-;ldrn:-n.l.-9hw.r-ipk.-Weo-h'c}d.
F.E.
City of Fort Worth, Texas
Mayor and Council Communication
• COUNCIL ACTION: Approved on 9/13/2011
DATE: Tuesday, September 13, 2011 REFERENCE NO.: **C-25152
LOG NAME: 60RECLAIMED WATER QUALITY IMP(UV SYSTEM)CO2
SUBJECT:
Authorize Change Order No. 2 in the Amount of$41,910.00 for a Total Contract Amount of$1,854,562.00 to
City Secretary Contract No.41358 with Archer Western Contractors,Ltd.,for the Village Creek Reclaimed
Water Quality Improvements Located at the Village Creek Wastewater Treatment Plant(COUNCIL
DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Change Order No. 2 in the amount of
$41,910.00 to City Secretary Contract No.41358 with Archer Western Contractors, Ltd., for the Village
Creek Reclaimed Water Quality Improvements located at the Village Creek Wastewater Treatment Plant,
thereby revising the total contract to$1,854,562.00.
DISCUSSION:
On January 4, 2011, (M&C C-24678)the City Council authorized the City Manager to execute a
construction contract in the amount of$1,793,000.00 with Archer Western Contractors,Ltd., for the Village
Creek Reclaimed Water Quality Improvements (UV System). Change Order No. 1 in the amount of
$19,652.00 was authorized to re—route existing utilities, which were found during the excavation of UV
foundation. Change Order No. 2 includes an installation of energy usage monitors for the Reclaim UV
Disinfection System and a small sidewalk addition around UV structure.
Staff has reviewed this change order and is in agreement with the scope of work and costs associated with the
work.
This project serves the eastern and northern parts of the City and is located in COUNCIL DISTRICT 5,
MAPSCO 68N.
FISCAL INFORMATION:
The Financial Management Services Director certifies that funds are available in the current capital budget,
as appropriated, of the Sewer Capital Projects Fund.
FUND CENTERS:
TO Fund/Account/Center FROM Fund/Account/Centers
P170 541200 070170290010 $41,910.00
CERTIFICATIONS:
Submitted for City Manager's Office by_ Fernando Costa (6122)
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: Farida S. Goderya (82 14)
ATTACHMENTS
1. 60Reclaim Water Quality Imp (UV System)CO2 BFT ndf
2. 60RECLAIMED WATER QUALITY IMP(UV SYSTEM)CO2 mau.ndf
3. 60RE LAIMED Water Quality IMP (UV SYSTEM)CO2 FAR.ndf
4. P170-541200-070170290010.doc