HomeMy WebLinkAboutContract 41405 I CITY SECRETARY CONTRACT NOa i u- FORTWORTH f3 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 2007 CRITICAL CAPITAL PROJECT (COUNCIL DISTRICT 7), PART 3 Pavement Reconstruction and Water & Sanitary Sewer Replacement CONTRACT NO. 7F CITY PROJECT NO.00934, DOE NO. 5859 CRESTLINE ROAD (FROM CAMP BOWIE BLVD.TO MONTGOMERY STREET) r FREDERICK STREET -, (FROM CRESTLINE RD.TO LAFAYETTE AVE.) DEXTER AVENUE (FROM CLOVER LN.TO SUTTER ST.) SUTTER STREET (FROM LAFAYETTE AVE.TO BYERS AVE.) TP&W NO. C295-541200-207400093483 WATER NO. P253-541200-6071700093483 SEWER NO. P258-541200-7071700093483 File No. X-20965, K-2066 ' L� SEPTEMBER 2010 L DALE A. FISSELER, P.E. MIKE MONCRIEF CITY MANAGER MAYOR WILLIAM A. VERKEST, P.E. S. FRANK CRUMB, P.E. DIRECTOR, TRANSPORTATION DIRECTOR, AND PUBLIC WORKS WATER DEPARTMENT 1 FERNANDO COSTA ASST. CITY MANA OF F T fx�s l l { OFFICIAL RECORD l CITY SacRlr1'ARY FT. " TIC ,.......... ................:..! �.,MD SHAMSUL AREFM i Prepared By: 83867 STREAM WATER GROUP, INC. f I li < %vo ' . . 6737 Brentwood Stair Road,Suite 230a1VAl �\ E Fort Worth,Texas 76112 —Phone:817-446-4171- Texas Registration No. F-005488 CITY OF FORT WORTH,TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT ' This Contract made and entered into this the d4MA 5 2 01 1 A.D., 20_, by and between the CITY OF FORT WORTH, a home-rule municipal corporation situated in Tarrant County, Denton, Parker, and Wise Counties, Texas, by an through its duly authorized Assistant City Manager, ("Owner"), and Conatser Construction TX, LP, ("Contractor"). Owner and Contractor may be referred to herein individually as a"Party"or collectively as the"Parties." WITNESSETH: That said parties have agreed as follows: NJ 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: 2007 Critical Capital Project(Council District 7)Part III: Pavement Reconstruction and Water&Sanitary Sewer Replacement 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 3. IIRR�� C ' O The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Department of Engineering of the City of Fort Worth. 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 300 Calendar days. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of$630 Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof,the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in Part, by the negligence or alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused L. in whole or in Part by the negligence or alleged negligence of Owner, its officers servants or employees.. E In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either(a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. ' 7. The Contractor agrees, upon the execution of this Contract, and before beginning work, to make, execute and deliver to City of Fort Worth the following bonds in the name of the City of Fort Worth in a sum equal to the amount of the Contract. All bonds furnish hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code, as amended. A. If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the Owner. B. If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the Contract, solely for the protection of all claimants supplying labor and material in the prosecution of the work. C. If the Contract amount is in excess of $100,000, a Performance Bond shall be executed, in the amount of the Contract conditioned on the faithful performance of the work in accordance with the Plans, Specifications, and Contract Documents. Said bond shall solely be for the protection of the Owner. ' D. A Two-year Maintenance Bond in the Name of the Owner is required for all projects to insure the prompt, full and faithful performance of the general guarantee contained in the Contract Documents. 8. The Owner agrees and binds itself to pay, and the Contractor agrees to receive, for all of the foresaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates n/a, shall be Two Million Two Hundred Eighty-nine Thousand,Two Hundred Twenty-nine and 10/100.......................Dollars,($2,289,229.10). 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this ' instrument through its duly authorized officers in 8 counterparts with its corporate seal attached. JAN 2 5 2011 ' Done in Fort Worth, Texas,this the day of A.D., 20_ i J APPROVAL RECOMMENDED: CITY OF FORT WORTH William A. Verkest, P. . -- Director Transportation Public Works FERNANDO COSTA,ASST CITY MANAGER ' ATTEST: Conatser Construction TX,LP P.O.Box 15448 Fort Worth,TX 76119 A d by: CONTRA Ali / Jerry Conatser, President of Mart Conatser Management Group,Inc,G.P. C�l tC�1 T acreKO .000000,,Ok' a °(S E A L) ��o° o% BY: 0 °a z� TITLE a����Q APPROVED AS TO FORM AND L GALITY: ADDRESS ASST. CITY ATTORNEY November 1960 Revised May 1986 Revised September 1992 M&C Review Page 1 of 3 Official site of the City of Fort Worth,Texas CITY COUNCIt. AGENDA F+oRTor COUNCIL ACTION: Approved on 1/25/2011 -Ordinance No. 19534-01-2011 DATE: 1/25/2011 REFERENCE NO.: C-24715 LOG NAME: 202007 CCP CD7 PT3 CODE: C TYPE: NON-CONSENT PUBLIC NO HEARING: SUBJECT: Authorize the Execution of a Contract in the Amount of$2,289,229.10 with Conatser Construction TX, LP, for Pavement Reconstruction and Water and Sanitary Sewer Main Replacement on Crestline Road, Dexter Avenue, Fredrick Street and Sutter Street and .Adopt Appropriation Ordinance (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$1,174,339.00 from the Water and Sewer Fund to the Water Capital Projects Fund in the amount of$477,882.00 and Sewer Capital Projects Fund in the amount of $696,457.00 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund, in the amount of$477,882.00 and the Sewer Capital Projects Fund in the amount of$696,457.00 from available funds; and 3. Authorize the City Manager to execute a contract with Conatser Construction TX, LP, in the amount of$2,289,229.10 for pavement reconstruction and water and sanitary sewer main replacement for the streets listed below. DISCUSSION: On March 6, 2007, (M&C G-15621) the City Council authorized the sale of$42,325,000.00 in Certificates of Obligation for the purpose of funding part of the Critical Capital Needs Program. That amount included funds for pavement reconstruction of neighborhood streets at various locations. On April 01, 2007, (M&C C-22744)the City Council authorized the City Manager to execute an engineering agreement with Stream Water Group, Inc., for the design of Crestline Road, Dexter Avenue, Fredrick Street and Sutter Street. Street improvements will include pavement reconstruction, construction of standard concrete curb and gutter, driveway approaches and sidewalks. The Water Department has determined that severely deteriorated water and sanitary sewer mains should be replaced prior to street reconstruction. Construction Contract Part 3: (Promect No. 00934) Crestline JMlontgomery Street to Camp Bowie Boulevard Dexter Avenue Sutter Street to Clover Lane Fredrick Street Crestline Road to Lafayette Avenue Sutter Street Lafayette Avenue to Byers Avenue This contract was advertised on September 23, 2010 and September 30, 2010 in the Fort Worth Star- Telegram. On October 28, 2010 the following bids were received: http://apps.cfwnet.org/council_packet/mc review.asp?ID=14629&councildate=1/25/2011 1/25/2011 M&C Review Page 2 of 3 (Bidders II Bid Amount Conatser Construction TX, LIP $2,289,229.10 CPS Civil, LLC $2,585,962.50 Stabile & Winn, Inc. $2,719,355.89 McClendon Construction, Inc. $2,840,025.05 JLB Contracting, LP $2,942,978.76 Time of completion: 300 calendar days Staff recommends that the base plus alternate option submitted by Conatser Construction TX, LP, be selected, and that the contract be awarded to Conatser Construction TX, LP. The new pavement will consist of seven inch concrete, over six inch lime stabilized sub grade with a seven inch curb. All existing sidewalks, steps and lead walks will be removed and reconstructed. In addition to the contract cost, funding in the amount of$111,150.00 is included for water and sanitary sewer construction survey, project management, material testing, field inspection and project close out(water: $46,750.00 and sewer: $64,400.00). The contingency funds to cover change orders totals $45,530.00 (water: $20,530.00 and sewer: $25,000.00). In addition to the contract cost, funding in the amount of$130,993.00 is included for TPW associated costs for survey, project management, material testing, field inspection and project close out. The contingency fund to cover change orders for pavement reconstruction work total $38,147.00. Conatser Construction TX, LP, is in compliance with the City's M/WBE Ordinance by committing to 23 percent M/WBE participation in this combined project. The City's M/WBE goal on this combined project is 23 percent. This project is located in COUNCIL DISTRICT 7, MAPSCO 75H FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations, and the adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Water Capital Projects Fund, the Sewer Capital Projects Fund, and the 2007 Critical Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P253 476045 6071700934ZZ $477,882.00 253 541200 607170093483 $410,602.00 2) P253 531350 607170093452 $10.000.00 2) P253 531350 607170093480 750.00 P258 541200 707170093483 $607,057.00 1 2) P253 531350 607170093482 500.00 )PE45 538340 0609020 $477.882.00 2)P253 541200 607170093483 $431,132.00 1) PE45 538340 0709020 $696,457.00 2) P253 531350 607170093484 5 000.00 C $1.271,570.10 ) C295 541200 207400093483 2) P253 531350 607170093485 $30,000.00 2)P253 531350 607170093491 $500.00 1&J2 $696.457.00 P258 476045 7071700934ZZ 2) P258 531350 707170093452 $15,000.00 2)P258 _53.1.350 707170093480 $1,000.00 2)P258 531350 707170093482 $100_0_.00 2)P258__541200_707170093483 $632,057.00 http://apps.cfwnet.org/council_packet/mc review.asp?ID=14629&councildate=1/25/2011 1/25/2011 M&C Review Page 3 of 3 2)P258 531350 707170093484 $7,000.00 2)P258 531350 707170093485 $40.000.00 2)P258 531350 707170093491 $400.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: William Verkest(7801) Additional Information Contact: Gopal Sahu (7949) ATTACHMENTS 20.2007_CCP.._..C..D7_PT3-AO.1 d.oc 202007 CCP CD7 PRT3 MAP.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=14629&councildate=1/25/2011 1/25/2011