Loading...
HomeMy WebLinkAboutContract 29110-CO1A8 City of Fort Worth co;"ilFc RK Change Order Request y ; ) --.- 10 khan Order No. Date TPW IlPr 'ect No, F� 1 (0 n e) 5l/1 4 FE 72 5131200 2 Facility and Project Description City Secretary Contract No, Energy Savings Performance Contract 1 V11 291 O- ORIGINAL NT ACT AMOUNT........................ ...,................. .......ti.. $110,95,511452 EXTRAS TO, DATE....... ...... ..... ..... ....... ... 1 CR DITS T DATE...................... ................. ....."... CONTRACTCOST TO DATE................................................"....................................,,............ $110119551452 AMOUNT OF PROPOSED, CHANGE ORDER,........................................................................... $ 26110010 REVISED CONTRACT AMOUNT........... .................".".................................................. .... $ 10,981,452 ORIGINAL. FUNDS AVAILABLE FOR CHANGE PD PS................................................ , $ 1 REMAINING DS AVAILABLE FOR CHANGE ORDERS...... .. ..............................."............... $ 7410 ADDITIONAL FDN'DING 1'F NEC ESPY ... .................."........... . .................... ........... IAA IN ACCORDANCE WITH THIS CHANGE ORDER THE CONTRACTOR SHALL- Provide all labor and materials as per attached' Proposed Change Requests- Add Interior Light Fixtures and tro C,or r issiio ii ng at So t sI e Service Center add $26,100,01 OFFICIAL RECORD ------------ -------------- ---------- --------------------------- CITY SECRETARY TOTAL ADD $ 26,000, no WORTH,TX T nderstr d r d agreed that acre �� r r � contractor constitutes an accord and satisfaction and represents payment in .ill otti time and money)for all costs arising out of,or incidental to,the above Change Order Contractor's Name Johnson Controls Inc. Original Contract Time Additional Approved Time To Date, Approved Contract Time To e Additional Time For This Change Order Contractor-Johnson Controls Inc Date Co r an g (Date Arc rte t raf Services Manager Date Transportation and Public works Date CJ C' Project Architect Date Asia laut-0ty Manager Date All ___.... Assq' a ney Date in if Required Date r i d ... ��� wwwwww Distribution, low 0 9604 At 1 0 File Construction Mana� � Frctct Manager ,� elol 10 00 Contractor <> � 0 4( V I, RECEIVED MAR 0 6 Change order ,. �"1 Johnson Controls,Inc, 7461 Aijport Freeway Richland 11ills,Texas 76118 Johnson Tel.:(817)548--2200(Office) Controls (8 17)5148-2201 (1,`�ax) January 21, 2014 Mr. Slam Gunderson City of Fort Worth Transportation & Public Works 401 W 13 th Street Fort Worth, TX 761012 Ref.- JC1 ESC Phase VIII Subject.- Southside Service Center— Additional Lightin Improvements Dear Sam, it ICU is pleased to provide a proposal for additional lighting improvements at the Southside Service Center. Lighting improvements will be implemented in the areas that were originally planned for renovation on the Code Compliance Renovation drawings dated 04-20-2012. The total price for this work is $15,650., Estimated annual energy savings is $1 X750. See of work is shown on the following page. -F Fixture ixture Watts Existing Light Fixture Fixture Retrofit After Watts, Retrofit Qty 2x4 4-l'amp fixture, T1 2 iConveil a 2x4 fixture to 2 F32T8 28w lamps lamps, magnetic ba,llasts 144 and electronic ballast by installing a reflector 48, kit. 31 2x4 4-lamp fixture delamped Comert a 2x4 fixture to 2 F32T8 28w lamps to 2 lam�ps, T12 lamps,, 72 and electronic ballast by installing a reflector 42 magnetic biallas,t kit. 61 2x4 4-lamp fixture, T8 Convert a 2x4 fixture to 2 F32T8 28w lamps 112 and'electronic ballast by installing a reflector 48 lamps, electronic ballast kit. 9 �-2x4 2-lamp fixture, T12 72 Install 2 F3 2T8,28,w lamps and electronic 42, lamps, magnetic ballast ballast,., 19, 2x4 2-lamp fixture, T8 5,8 Install 2 F32T8 28w lamps and electronic 42 lamps, electronic ballast ballast. 51 2x4 3-lamp fixture,, T12 Convert a 2x4 fixture to 2 F32T8 28w lamps 1 lamps, magnetic ballast 15 and electronic ballast by installing a reflector 48 kit. 12 2-lamp 4"strip fixture, T12 72 Install 2 F321T8 2,8w lamps and electronic 42 lamps,, magnetic ballast --,ballast. 4 2-lamp 8'strip fixture, TI 2 123 Convert a 8'fixture to 4 F3 mps and 83 lamps, magnetic ballast electronic ballast by installing a retrofit kit. 1611 U4 2-lamp recessed Install 2 F32T8 28w lamips and ele,ctroinic fixture, T12 lamps, 72 42 ballast. magnetic ballast 101 Recessed can fixture with 23 Do, not retrofit. 23 compact fluorescent lamp 3 Recessed can fixture with 30 Do not retrofit. 30 compact fluorescent lamp 2 LED exit sign 3 Do not retrofit. 3 4 1 Total 1211 If you have any questions, please give me a call' at 817-4180-6953. Regards, Harry Romine, P.E. Account Manager Johnson Controls, Inc. Page 2 Johnson Controls,Inc, 7461 Airport Freeway Richland Hills,Texas 76118 Johnson r,ei.:(817)548-2200(Office) Controls (817)548.2201(Fax) January 21, 2014 Mr. Sam i Giund'erson City of Fort Worth Transportation & Public Works 401 W 13th Street Fort Worth, TX 76102 Ref� JCI ESPC Phase VII Slubject: Retro-Commissioning of Southside Service Center blear Sam,, J is, pleased to provide a proposal for HV'AC retro-co m mission i ng of the Southside Service Center. the total price for this work is$103350. Estimated annual ener,gy savings is $1,710. Scope of Work- Verification of all control point functionality and reporting at operator workstation. Functional performance testing of VAV boxes to include sequence, of opeira,tio n, calibration of airflow sensor, air valve function, heating function, and fan function. 0 Functional performance testing of air handlers to include sequence of operation, total performance measurement, chilled water valve, heating water valve, sensors, safeties, and VF'D performance wheire applic,able. 01 Functional performance testing of hydronic distribution pumps to include sequence of operation, total performance measurement, alarm reporting, and VF D performance where applicable. Functional performance testing of boiler and heating water heat exchang:er systems to include sequence of operation, total performance measurement, and alarm reporting. Functional performance testing of chilled water systems to include sequence of operation, total performance measurement, and alarms reporting. Verification of all operator workstation graphics. Rework of sequences of operation to, reduce operating costs. Provide condition assessment of all commissioned equipment., If you have any questions, please gigs me a call at 817--480-6953.. Regards, Harry Rana, P.E. ,account Manager Johnson Controls, Inc. Page ge