HomeMy WebLinkAboutContract 29110-CO1A8 City of Fort Worth co;"ilFc RK
Change Order Request
y ; ) --.- 10
khan Order No. Date TPW IlPr 'ect No, F�
1 (0 n e) 5l/1 4 FE 72 5131200
2
Facility and Project Description City Secretary Contract No,
Energy Savings Performance Contract 1 V11 291 O-
ORIGINAL NT ACT AMOUNT........................ ...,................. .......ti.. $110,95,511452
EXTRAS TO, DATE....... ...... ..... ..... ....... ... 1
CR DITS T DATE...................... ................. ....."...
CONTRACTCOST TO DATE................................................"....................................,,............ $110119551452
AMOUNT OF PROPOSED, CHANGE ORDER,........................................................................... $ 26110010
REVISED CONTRACT AMOUNT........... .................".".................................................. .... $ 10,981,452
ORIGINAL. FUNDS AVAILABLE FOR CHANGE PD PS................................................ , $ 1
REMAINING DS AVAILABLE FOR CHANGE ORDERS...... .. ..............................."............... $ 7410
ADDITIONAL FDN'DING 1'F NEC ESPY ... .................."........... . .................... ........... IAA
IN ACCORDANCE WITH THIS CHANGE ORDER THE CONTRACTOR SHALL-
Provide all labor and materials as per attached' Proposed Change Requests-
Add
Interior Light Fixtures and tro C,or r issiio ii ng at So t sI e Service Center add $26,100,01
OFFICIAL RECORD
------------ -------------- ---------- ---------------------------
CITY SECRETARY TOTAL ADD $ 26,000,
no WORTH,TX
T nderstr d r d agreed that acre �� r r � contractor constitutes an accord and satisfaction and represents payment in .ill otti time
and money)for all costs arising out of,or incidental to,the above Change Order
Contractor's Name
Johnson Controls Inc.
Original Contract Time Additional Approved Time To Date, Approved Contract Time To e Additional Time For This Change Order
Contractor-Johnson Controls Inc Date Co r an g (Date
Arc rte t raf Services Manager Date Transportation and Public works Date
CJ C'
Project Architect Date Asia laut-0ty Manager Date
All
___....
Assq' a
ney Date in if Required Date
r i
d
... ��� wwwwww
Distribution, low 0 9604
At 1 0
File
Construction Mana� �
Frctct Manager ,� elol 10
00
Contractor <> �
0 4(
V I, RECEIVED MAR 0 6
Change order ,. �"1
Johnson Controls,Inc,
7461 Aijport Freeway
Richland 11ills,Texas 76118
Johnson Tel.:(817)548--2200(Office)
Controls (8 17)5148-2201 (1,`�ax)
January 21, 2014
Mr. Slam Gunderson
City of Fort Worth
Transportation & Public Works
401 W 13 th Street
Fort Worth, TX 761012
Ref.- JC1 ESC Phase VIII
Subject.- Southside Service Center— Additional Lightin Improvements
Dear Sam,
it
ICU is pleased to provide a proposal for additional lighting improvements at the Southside
Service Center. Lighting improvements will be implemented in the areas that were originally
planned for renovation on the Code Compliance Renovation drawings dated 04-20-2012.
The total price for this work is $15,650.,
Estimated annual energy savings is $1 X750.
See of work is shown on the following page.
-F Fixture
ixture Watts
Existing Light Fixture Fixture Retrofit After
Watts, Retrofit Qty
2x4 4-l'amp fixture, T1 2 iConveil a 2x4 fixture to 2 F32T8 28w lamps
lamps, magnetic ba,llasts 144 and electronic ballast by installing a reflector 48,
kit. 31
2x4 4-lamp fixture delamped Comert a 2x4 fixture to 2 F32T8 28w lamps
to 2 lam�ps, T12 lamps,, 72 and electronic ballast by installing a reflector 42
magnetic biallas,t kit. 61
2x4 4-lamp fixture, T8 Convert a 2x4 fixture to 2 F32T8 28w lamps
112 and'electronic ballast by installing a reflector 48
lamps, electronic ballast
kit. 9
�-2x4 2-lamp fixture, T12 72 Install 2 F3 2T8,28,w lamps and electronic 42,
lamps, magnetic ballast ballast,., 19,
2x4 2-lamp fixture, T8 5,8 Install 2 F32T8 28w lamps and electronic 42
lamps, electronic ballast ballast. 51
2x4 3-lamp fixture,, T12 Convert a 2x4 fixture to 2 F32T8 28w lamps
1
lamps, magnetic ballast 15 and electronic ballast by installing a reflector 48
kit. 12
2-lamp 4"strip fixture, T12 72 Install 2 F321T8 2,8w lamps and electronic 42
lamps,, magnetic ballast --,ballast. 4
2-lamp 8'strip fixture, TI 2 123 Convert a 8'fixture to 4 F3 mps and 83
lamps, magnetic ballast electronic ballast by installing a retrofit kit. 1611
U4 2-lamp recessed Install 2 F32T8 28w lamips and ele,ctroinic
fixture, T12 lamps, 72 42
ballast.
magnetic ballast 101
Recessed can fixture with 23 Do, not retrofit. 23
compact fluorescent lamp 3
Recessed can fixture with 30 Do not retrofit. 30
compact fluorescent lamp 2
LED exit sign 3 Do not retrofit. 3 4
1
Total 1211
If you have any questions, please give me a call' at 817-4180-6953.
Regards,
Harry Romine, P.E.
Account Manager
Johnson Controls, Inc.
Page 2
Johnson Controls,Inc,
7461 Airport Freeway
Richland Hills,Texas 76118
Johnson r,ei.:(817)548-2200(Office)
Controls (817)548.2201(Fax)
January 21, 2014
Mr. Sam i Giund'erson
City of Fort Worth
Transportation & Public Works
401 W 13th Street
Fort Worth, TX 76102
Ref� JCI ESPC Phase VII
Slubject: Retro-Commissioning of Southside Service Center
blear Sam,,
J is, pleased to provide a proposal for HV'AC retro-co m mission i ng of the Southside Service
Center.
the total price for this work is$103350.
Estimated annual ener,gy savings is $1,710.
Scope of Work-
Verification of all control point functionality and reporting at operator workstation.
Functional performance testing of VAV boxes to include sequence, of opeira,tio n,
calibration of airflow sensor, air valve function, heating function, and fan function.
0 Functional performance testing of air handlers to include sequence of operation, total
performance measurement, chilled water valve, heating water valve, sensors, safeties,
and VF'D performance wheire applic,able.
01 Functional performance testing of hydronic distribution pumps to include sequence of
operation, total performance measurement, alarm reporting, and VF D performance where
applicable.
Functional performance testing of boiler and heating water heat exchang:er systems to
include sequence of operation, total performance measurement, and alarm reporting.
Functional performance testing of chilled water systems to include sequence of operation,
total performance measurement, and alarms reporting.
Verification of all operator workstation graphics.
Rework of sequences of operation to, reduce operating costs.
Provide condition assessment of all commissioned equipment.,
If you have any questions, please gigs me a call at 817--480-6953..