HomeMy WebLinkAboutContract 41470-A1 AMENDMENT NO. 1 CiTY SECRETARY (No M&C Needed) CONTMCTNQ, �__ ,.__ ...Q"!kk STATE OF TEXAS S COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dunaway Associates, L.P. , (Engineer) made and entered into City Secretary Contract No. 41470, (the Contract) which was executed by the City Manager on the Twenty-first day of February 2011; and WHEREAS, the Contract involves engineering services for the following project: Wesleyan Hills Drainage Improvements, Project No. 01608 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August, Twenty-four, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $29, 420. 00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and s shall not exceed the sum of $158, 377 .00 . (`,ORS OFFICIA TARY CST'( SE RE City of Fort Worth,Texas FT WORTH+TX Amendment to Engineering Agreement PMO Official Release Date 10 01 2010 Page 1 of 2 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 2011, in Fort Worth, Tarrant County, Texas. ATTEST: ;l A7 ��00 F 00 000000 rNr-\\ � ,� °°°0� 1�'�f p�:� ..A.06, o °o Marty Hendrix V o 0 City Secretary °�0000°oo° q NO M&C REQUIREED APPROVAL RECOMMENDED: e AP� D: Douglas . Wiersig, P.Y. , Director, Fernando Costa Transportation/Public Works Assistant City Manager Department Dunaway Associates, L.P. ENGINEER By: Name: Stephen James, P.E. Director, Public Sector Services with Dunaway 550 Bailey Avenue, Suite 400 Fort Worth, Texas 76107 APPROVED S TO FORM AND LEGALITY: r - Assistant City Attorney City of Fort Worth,Texas D Amendment to Engineering Agreement f1C�A�REGOR PMO Official Release Date 6 18 2010 Page 2 of 2 0 �RETpRY CITY WORTH,TX FT NW DUNAWA y DA No. 2010108 August 24, 2011 Mr. Vibhuti Pandey, Ph.D., P.E., CFM Project Manager Stormwater-Transportation & Public Works Integrated Program Management(IPM) 900 Monroe Street, Suite 201 Fort Worth, TX 76102 Reference: City Project No. 01608 Wesleyan Hills Drainage Improvements Amendment No.1 Mr. Pandey: At our July 13, 2011 meeting at the project site, Dunaway was asked to evaluate the option of installing a new parallel storm drain pipe on the west side of the existing structure at 2909 Mitchell Boulevard (Exhibit A). This letter constitutes our request for supplemental authorization for tasks outside the scope of services of our current contract. The following describes the anticipated tasks and our assumptions to provide these additional analyses. TASK 1 —PROJECT MANAGEMENT 1. Attend a site visit to determine additional alignment and constructability options with the CITY. 2. Attend additional design review meeting with the CITY at the end of conceptual analysis for alternate alignment. TASK 2—CONCEPTUAL DESIGN 130 PERCENT) ENGINEER will modify the storm drain hydraulic model to include a new storm drain pipe to provide added capacity from the sump at the intersection of Wesleyan Drive and Strong Avenue to the existing 8'x5' box crossing Mitchell Boulevard. The intent of additional storm drain evaluation is to provide a new storm drain pipe parallel to the existing 60-inch storm drain behind (east of) the existing structure at 2909 Mitchell Boulevard. The new parallel pipe would be located in the access road and parking lot on the west side of the structure at 2909 Mitchell Boulevard and would have capacity approximately equal to the difference in capacities of the existing 8'x5' box and the existing 60-inch pipe. Amendment No. 1 August 24, 2011 Page 2 3. Determine the initial size of new storm drain as the difference in capacities of the existing storm drain pipe/box at each end of the proposed new pipe. 4. Add the new parallel storm drain pipe to the hydraulic model of the existing storm drain pipe network and verify that the initial size provides adequate capacity to convey the 100-year peak discharge from the sump at Wesleyan Drive and Strong Avenue. 5. Prepare a letter report summarizing the analysis of the parallel storm drain pipe. The letter report will include a summary of the assumptions made, modeling approach, and the conclusions reached regarding the parallel storm drain pipe. In addition, the letter report will include an opinion of probable construction cost for the parallel storm drain pipe and a comparison to the opinion of probable construction costs for the two options developed per the original AGREEMENT. 6. Conduct one (1) project status meeting with CITY upon completion of the analysis of the parallel storm drain pipe to review the findings of the analysis and discuss the storm drain improvement option to pursue in subsequent phases of the Project. 7. Conduct one (1) field meeting with CITY to come up with possible alignment alternatives after original conceptual plan submittal. TASK 3—PRELIMINARY DESIGN 8. Structural design of up to two(2)storm drain junction structures. TASK 7— ROW/EASEMENT SERVICES In addition to the right-of-way and easement documents described for Task 7 of Attachment A of the original AGREEMENT, ENGINEER shall prepare of one (1) drainage easement for the property located at 2909 Mitchell Boulevard. The purpose of this easement will be to abandon the existing easement and prepare a more accurate easement on the existing storm drain line based on the latest survey and SUE findings. The easement will be prepared in accordance with the procedures outlined in Attachment A of the original AGREEMENT. TASK 8 —SURVEY ENGINEER will perform an additional field survey to collect horizontal locations and vertical elevations and other information needed by ENGINEER in the design and preparation of construction drawings for a parallel storm drain line on the west side of the existing structure at 2909 Mitchell Boulevard. The limits of the additional field survey generally include the properties at 2909 Mitchell Boulevard and 2604 Strong Avenue and are identified in Exhibit A. This scope of services does not include the following services: 1) Additional subsurface utility investigation Arnendment No. 1 August 24, 2011 Page 3 2) Design of sanitary sewer and storm drain conflict structures or utility crossing adjustments. If special conflict structures or utility crossing adjustments are required, I design of these will be added by contract amendment at a later date. COMPENSATION A summary of the proposed budget for this contract amendment is as follows.See Exhibit"A- 1"for a detailed man-hour estimate of these tasks: Amendment#1 Fee Fee 1 Task 1-Project Man ement 2,710.00 2 Task 2-Conce tual Design 17 335.00 3 Task 3-Preliminary Desi n 3,850.00 4 Task 7-Easement and ROW Services $ 2.640.00 5 Task 8-Desion Survey $ 2,885. 0 i TOTAL PROPOSED AMENDMENT 29 420.00 A summary of the total project is as follows: Contract Description Fee Original Contract Storm Drain Design $128,957.00 Amendment No. 1 Additional Storm Drain Design $29,420.00 i TOTAL PROJECT $158,377.00 M/WBE Participation Gorrondona & Associates, Inc. will be providing surveying and easement preparation services as a part of this amendment. M/WBE Goal—21% I M/WBE Goal Provided: Original Contract— 21% ($26,450/$128,957) Amendment No. 1 — 17% ($4,900/$29,420) Revised M/WBE%(Original contract+Amendments)—20%($31,350/$158,377) Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, L.P. Kervin Campbell, P.E. Project Manager-Public Sector Services 01608-Amendment 1_2011-0801 doc Enclosure Exhibit"A-1'