WHEREAS, the City of Fort Worth (City) and Dunaway
Associates, L.P. , (Engineer) made and entered into City Secretary
Contract No. 41470, (the Contract) which was executed by the City
Manager on the Twenty-first day of February 2011; and
WHEREAS, the Contract involves engineering services for the
following project:
Wesleyan Hills Drainage Improvements, Project No. 01608
WHEREAS, it has become necessary to execute Amendment No. 1
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated August, Twenty-four, 2011, a copy of which is attached
hereto and incorporated herein. The cost to City for the
additional design services to be performed by Engineer total
$29, 420. 00 .
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and s shall not
exceed the sum of $158, 377 .00 . (`,ORS
OFFICIA TARY
CST'( SE RE
City of Fort Worth,Texas FT WORTH+TX
Amendment to Engineering Agreement
PMO Official Release Date 10 01 2010
Page 1 of 2
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the day of 2011, in Fort Worth,
Tarrant County, Texas.
ATTEST: ;l A7 ��00 F 00 000000
rNr-\\ � ,� °°°0�
1�'�f p�:� ..A.06,
o °o
Marty Hendrix V o
0
City Secretary
°�0000°oo° q
NO M&C REQUIREED
APPROVAL RECOMMENDED: e AP� D:
Douglas . Wiersig, P.Y. , Director, Fernando Costa
Transportation/Public Works Assistant City Manager
Department
Dunaway Associates, L.P.
ENGINEER
By:
Name: Stephen James, P.E.
Director, Public Sector Services with Dunaway
550 Bailey Avenue, Suite 400
Fort Worth, Texas 76107
APPROVED S TO FORM AND LEGALITY:
r -
Assistant City Attorney
City of Fort Worth,Texas D
Amendment to Engineering Agreement f1C�A�REGOR
PMO Official Release Date 6 18 2010
Page 2 of 2 0 �RETpRY
CITY WORTH,TX
FT
NW DUNAWA
y
DA No. 2010108
August 24, 2011
Mr. Vibhuti Pandey, Ph.D., P.E., CFM
Project Manager
Stormwater-Transportation & Public Works
Integrated Program Management(IPM)
900 Monroe Street, Suite 201
Fort Worth, TX 76102
Reference: City Project No. 01608
Wesleyan Hills Drainage Improvements
Amendment No.1
Mr. Pandey:
At our July 13, 2011 meeting at the project site, Dunaway was asked to evaluate the
option of installing a new parallel storm drain pipe on the west side of the existing
structure at 2909 Mitchell Boulevard (Exhibit A). This letter constitutes our request for
supplemental authorization for tasks outside the scope of services of our current
contract.
The following describes the anticipated tasks and our assumptions to provide these
additional analyses.
TASK 1 —PROJECT MANAGEMENT
1. Attend a site visit to determine additional alignment and constructability options with
the CITY.
2. Attend additional design review meeting with the CITY at the end of conceptual
analysis for alternate alignment.
TASK 2—CONCEPTUAL DESIGN 130 PERCENT)
ENGINEER will modify the storm drain hydraulic model to include a new storm drain
pipe to provide added capacity from the sump at the intersection of Wesleyan Drive and
Strong Avenue to the existing 8'x5' box crossing Mitchell Boulevard. The intent of
additional storm drain evaluation is to provide a new storm drain pipe parallel to the
existing 60-inch storm drain behind (east of) the existing structure at 2909 Mitchell
Boulevard. The new parallel pipe would be located in the access road and parking lot on
the west side of the structure at 2909 Mitchell Boulevard and would have capacity
approximately equal to the difference in capacities of the existing 8'x5' box and the
existing 60-inch pipe.
Amendment No. 1
August 24, 2011
Page 2
3. Determine the initial size of new storm drain as the difference in capacities of the
existing storm drain pipe/box at each end of the proposed new pipe.
4. Add the new parallel storm drain pipe to the hydraulic model of the existing storm
drain pipe network and verify that the initial size provides adequate capacity to
convey the 100-year peak discharge from the sump at Wesleyan Drive and Strong
Avenue.
5. Prepare a letter report summarizing the analysis of the parallel storm drain pipe. The
letter report will include a summary of the assumptions made, modeling approach,
and the conclusions reached regarding the parallel storm drain pipe. In addition, the
letter report will include an opinion of probable construction cost for the parallel storm
drain pipe and a comparison to the opinion of probable construction costs for the two
options developed per the original AGREEMENT.
6. Conduct one (1) project status meeting with CITY upon completion of the analysis of
the parallel storm drain pipe to review the findings of the analysis and discuss the
storm drain improvement option to pursue in subsequent phases of the Project.
7. Conduct one (1) field meeting with CITY to come up with possible alignment
alternatives after original conceptual plan submittal.
TASK 3—PRELIMINARY DESIGN
8. Structural design of up to two(2)storm drain junction structures.
TASK 7— ROW/EASEMENT SERVICES
In addition to the right-of-way and easement documents described for Task 7 of
Attachment A of the original AGREEMENT, ENGINEER shall prepare of one (1)
drainage easement for the property located at 2909 Mitchell Boulevard. The purpose of
this easement will be to abandon the existing easement and prepare a more accurate
easement on the existing storm drain line based on the latest survey and SUE findings.
The easement will be prepared in accordance with the procedures outlined in
Attachment A of the original AGREEMENT.
TASK 8 —SURVEY
ENGINEER will perform an additional field survey to collect horizontal locations and
vertical elevations and other information needed by ENGINEER in the design and
preparation of construction drawings for a parallel storm drain line on the west side of
the existing structure at 2909 Mitchell Boulevard. The limits of the additional field survey
generally include the properties at 2909 Mitchell Boulevard and 2604 Strong Avenue and
are identified in Exhibit A.
This scope of services does not include the following services:
1) Additional subsurface utility investigation
Arnendment No. 1
August 24, 2011
Page 3
2) Design of sanitary sewer and storm drain conflict structures or utility crossing
adjustments. If special conflict structures or utility crossing adjustments are required, I
design of these will be added by contract amendment at a later date.
COMPENSATION
A summary of the proposed budget for this contract amendment is as follows.See Exhibit"A-
1"for a detailed man-hour estimate of these tasks:
Amendment#1 Fee Fee
1 Task 1-Project Man ement 2,710.00
2 Task 2-Conce tual Design 17 335.00
3 Task 3-Preliminary Desi n 3,850.00
4 Task 7-Easement and ROW Services $ 2.640.00
5 Task 8-Desion Survey $ 2,885. 0
i
TOTAL PROPOSED AMENDMENT 29 420.00
A summary of the total project is as follows:
Contract Description Fee
Original Contract Storm Drain Design $128,957.00
Amendment No. 1 Additional Storm Drain Design $29,420.00
i
TOTAL PROJECT $158,377.00
M/WBE Participation
Gorrondona & Associates, Inc. will be providing surveying and easement preparation
services as a part of this amendment.
M/WBE Goal—21%
I
M/WBE Goal Provided:
Original Contract— 21% ($26,450/$128,957)
Amendment No. 1 — 17% ($4,900/$29,420)
Revised M/WBE%(Original contract+Amendments)—20%($31,350/$158,377)
Please review the enclosed information and do not hesitate to call me if you have any
questions or require additional information regarding this proposal.
Sincerely,
DUNAWAY ASSOCIATES, L.P.
Kervin Campbell, P.E.
Project Manager-Public Sector Services
01608-Amendment 1_2011-0801 doc
Enclosure Exhibit"A-1'