Contract 41478-CO1
CITY SECRETARY FORT WORTH. City of Fort Worth CONTRACT NO. q 1 -h 64- Change Order Request Project Namel Kermit-Bonnie Drainage Improvements City Sec# 1 41478 Client Project#(s P227-541200-2032800484 83-/Doe 5424 Project DescriptioifDrainage Improvements @ Kermit-Bonnie,Merida Ave.,&Waverly Park Contractor Conatser Construction Change Order# Date 5/17/2011 City Project Mgr. Rids Shaffer City 1 Inspector Jerry Taliafemo Dept. TPW Water Sewer t$738,560.00 Contract Time Original Contract Amount $738,560. .00 350 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders(in M&C Process) $0,00 Contract Cost to Date .lift f 350 cunt Proposed ange er Revised Contract Amount 7�, UU Original Funds Available for Change Orders $25, 350 000.00 $25,000.00 Remaining Funds Available for this CO 25,000.0 $25,000.00 Additional Funding(if nary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1. MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) .OEIr This change order is to request an additional line item for%R, tic line over the existing/proposed storm drain boxes.During ooQ9 excavation of the existing storm drain,it was discovered" r o fic o R ted directly on top of the existing storm drain.After consulting with AT&T,it was determined that Conatsercti uld rai � ber optic line so that it would be located directly on top of the proposed storm drain boxes. p o o PPP d o Vx Attested by: 0o0 o00 ap OFFICIAL RECORD 4tL b44 CITY SECRETARY FT. WORTH,TX Marty Mendd) ty Mwomy It is understood and agreed that the acceptance of this Change Order by the contractor constihrtes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Conatser Construc,•tion - 2o#I Is M&C Number Approved �� ma Alm C- n o y CD m o CD a � m 0 °• z C v' 4t m n O ;u n v N _ N - O N a =3 V (D C1 CD CD _ r y CD O O y y O CA 2 W O CD 0 d :COD x a w 3 O (d CD W O 0 3 O O _ n = N � � (D A m o �q 0 CL CL n O � M, v°D � �o CL 1:; o CL CL 0 v (D a � y � D (� O.0 CD N N d ar cr C O C J VJ = N O A r A O Co pO J4� j c7 0 = N C/3 m v m m CD c 3 0 > > o m CD W 0 C.) o v n O ' n D A m � � n mq 0 CL �. 03 0 D O a a -n r QD ; �. so a) n R 7 tD fA CO � O h i"' O m O a m (D m J d C 3 0 of Li O 'A V N O J t V O Go O pO S O r MIWBE Breakdown for this Change Order MWBE Sufi Type of Sew! Amount for this CO Total S0.00, Previous Change Orders Co C DATE'- AM©t1NT'.. Total : - D ( 0 D0 O > 000mv ap • c ? o m : ' ` o 3 � w p 7 ` ON > > m m v, co a m m o z 7 j � '+ a 0 (� (D Z O z aQc n� -o am n cyu, Dm o .. $ D m m - m m m c � S m c 0 (A (D m 0 C- A) D M (7 o ° a q 0 m :7 3 m CD m oao 0 0 �. 0 0 'D 7C � C ``• � � t� 44h 3 � � 0 am 0 Ca M. m m 03 406 ab o D A 0° o° .� O m 0 m c °' o 3 rn m as a► tr► b► b► �,► as OP a► 0 3 v w y 0 n CA CA co co a 0 3 m o o vs -& cx o ,o° ,o° o 0 0 o r n c o000 o0 coo o m 0 O N v n m 3 w � w a 3 m 3 N