Loading...
HomeMy WebLinkAboutContract 41532-CO1 CITY*AVTARY Fc�RT WO RT H City of Fort Worth ,_ Change Order RequestCOWTRACT W0._ OnT ProjectName:J Sanitary Sewer Replacement Contract 65, Part 1 City Sec No.: 41532 Project No.(s): P38-704170073087 DOE No. 3570 City Proj.No.: 00730 Project Description: Sanitary Sewer Rehabilitation on Sylvania Avenue,Brentwood Stair Blvd.and Stratford Park Drive Contractor: Utilitex Construction,LLP Change Order# Date: 121712011 City Project Mgr. Roberto C.Sauceda City Inspector I Phil Teague -1 Phone Number. 817-392-2387 Phone Number 817-223-2245 Dept. geWW Totals Contract Time Calendar Original Contract Amount 1,107,520.00 t,107,520.00 180 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date '- $t,107,5&00 $1,107,520.00 180•_. JAmount of Proposed Change Order 1 Q4 .14 19 t; 030 Revised Contract Amount t,126,53t`14 _ M26,53t.14 21a Original Funds Available for Change Orders $33,226.00 $33�220,00 Remaining Funds Available for this CO •;_ ... Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.72% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) -:; $4,,38,¢, QO The change order will provide for the following: • Sewer rehabilitation of 6 and 12-inch sanitary sewer mains by cured in place method in lieu of pipe enlargement in order to minimize damage(from the pipe enlargement process)to several large mature trees located within easement. • Additional pay item quantity for removal and replacement of a 42-inch reinforced concrete storm drain pipe segment that was encountered in direct conflict with a project sanitary sewer. • Additional pay item quantity of bermuda and hydromulch within Stratford Park in accordance with the recent PACS specifications. �.O,po 'Q:4 AW�onr'S c with the contractoF's reque °a°0 p0 dar days on the project. 1 �p o OFFICIAL RECORD o"° o CITY SECRETARY ° °° d FT.WORTH,TX is understood and ag that a acce o is a er b n constitutes an accord and nt in full(both time and money)for all costs arising out of,or i ' en ° hange Order. psw=al %A Utilitex Construction,LLP Gabriel Carrizales 5 F _ N) Cal : R µ. _ a M&C Number M&C Date Approved~ --� r F40 ut T Wo RT H City of Fort Worth AV Change Order Additions Project dame Sanitary Sewer Replacement Contract 65 Part 1 City Sec No.: 41532 Project No.(s): P258-704170073087 DOE No. 3570 City Proj.No.: 00730 Project Description Sanitary Sewer Rehabilitation on Sylvania Avenue Brentwood Stair Blvd.and Stratford Park Drive Contractor Utilitex Construction,LLP Change Order: I� Date: 12/7/2011 City Project Mgr. Roberto C.Sauceda City Inspector Phil Tea ue ADDITIONS UESCRIFTM DEPT nth'— UnItCost. Totals Sewer Service Minch SEWER 28.00 EA $350.00 $9,800 55 12 Inch CIPP—Instal SEWER 230.00 LF $87.75 $20,182 55 6-Inch CIPP—Install SEWER 1098.00 LF $48.78 $53,560 56 2 Inch Water line repiar at Stratford Park Dr SEWER 1.00 LS $2,900.00 $2,900 57 Bermuda and H dromuk:h at Stratford Park SEWER 760.00 Sy $1.25 $950. 58 4-Inch Top Soil SEWER 760.00 Sy $4.52 $3,435, 59 Water for Bermuda and Hydromuk:h at Stratford Park SEWER 1.00 LS $4,800.00 $4,800, 60 42-Inch RC storm drain pipe removal and replace with fiowable fill SEWER 1.00 LS $3,920.00 $3,920, 61 Contaminated soil lab testin at Sylvania Ave. SEWER 1.00 LS $4,200.00 $4,200. Sewer $103,748.14 Page 2 of 4 itions Sub Total $103,748.14 FC3 R x WO R-FYI City of Fort Worth Change Order Deletions Project Name Sanitary Sewer Replacement Contract 65, Part 1 City Sec No.: 41532 Project No.(s): P258-704170073087 DOE No. 3570 City Proj.No.: 00730 Project Description Sanitary Sewer Rehabilitation on Sylvania Avenue Brentwood Stair Blvd.and Stratford Park Drive Contractor Utilitex Construction, LLP Change Order. FTI Date L 1217/2011 City Project Mgr. Roberto C. Sauceda City Inspector. F Phil Teague DELETIONS ITEIY DESCRIETtO( - DEFF, t =- Unite; UniitCostr Toff 2 PIPE 12 TO 15 INCH HDPE BY PIPE ENLARGEME SEWER 230.00 LF $77.00 $17,710 9 PIPE 6 INCH TO 8 INCH ENLARGEMENT HDPE SEWER 1271.00 LF $37.00 $47,027 15 SEWER SERVICE 4'INCH TAP TO HDPE SEWER 40.00 EA $500.00 $20,000 Sewer $84,737.0 Page 3 of 4 Deletions Sub Total $84,737.0 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this C(3>_ Total Previous Change Orders co ©AT<± AME1l1N . Total Page 4 of 4 L cu 4.+ U) O C3 i.� L L 7 CL 0 0 j LO O N N N Clq N �L.rrj w N � M f) O O l cv" ass ass v� W3, ass ea o > U J N • , N v- M N N , ia O a!! N N C Z Q O O V- N M M U r t: � � �" F- W ?., V- V- � d W a _ o 4s v9. 40 v► 40s sA 40 4040 � t/) m m >- c U N N Q to L W 2 Q U ° a m ° O L o V- N O U to o w a m NtU/3pt� M c7• U � a W ID O U o a t a` z O ° U 2!� Q L d (D C) O m N CD c N j N = 3 N A o � U O > -13 m Q ° ° N Q v Q rn W U V C O V c II C Q O c Z O m �x m D O li j C Z Z c N c0 V Q n' O U LL LL 1— v mZ c V o V c rn C) ro o i Z rn 6 - a m e 0 (n Q. NLL. v _cco c co N r O O a >, c 0 m a m c o > c E v a m U U Q ~ O U Q w U w Q