Loading...
HomeMy WebLinkAboutContract 39975-A1 C17Y SECRETARY AMENDMENT' No . 1 CONTRACT NO, 1MW TO CITY S C Y CONTRACT the City, of Fort, Worth CITY and Kamley-Horn and Associates, Inc , (ENGINEER) mad and entered into City Secretary Contract No. 39975, (the CONTRACT) whic was authorized by M C C--24094 on the 2nd, day of September, 2010 in the amount of $1 ,072,2,50. 00 - and WHEREAS, the CONTRACT involves engineering services for the following project, Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements; and it has become necessary to execute Amendment No.1 to the CONTRACT to include an increased scope of work and reva.s ed fee. NOW THEREF'ORE, CITY and ENGINEER, acting herein by and through tear Oulu authorized, rrep resentatives, enter into the following agreement, which amends the CONTRACT.- 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 2 5, 2014, a copy of which is attached hereto and incorporated rate herein. The cost to City for the additional design se r ices to be performed by Engineer totals $46, 001 . 2' Article II of the CONTRACT CT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the y y for all work and services shall be an amount of $1,119.2,45 . 00 . OFFICIAL RECORD teal �a paid � the City 3 Re WORTHs TX All other provs s w�Coax s of the Contract, expressly amended herein, shall remain in full force and effect Page RECEIVED MA,R 19 2014 z"'XECUTED and EFFECTIVE as of the date last written by a s�Lgnatory, belo!w. APPROVED., ENGINEER City of Fort, Worth Kimley-Horn andAssoci aces, Inc. .................. 01- Fernando Costa Glenn Gary, P,.E . Assistant City Manager Senior Vice-President A0% V7 DATE AOOOOO) )PI -- .- DATE. 0�7 Ir APR REC NDED• S. Frank Crumb, P.E. Director, Water Department APPROVED, AS TO FORM AND LEGALITY.-, M&C' N/A Date: N/A HxewL-z- Assistant City Attorney ATTEST: 0010 °A SCIT % Mary J. 0 Cil ty Secretary 11, OFFICIAL RECORD CITY SECRETARY FT WORTHi TX Page i coley-Horn and Associates, I' c. February 25,2014 � nuke CheiTy Street,Unit 11 Fort Worth,Texas Mr.John Kasavich, P.E. 76102 City of Fort Worth Water Department 000 Throckmorton Street Fort Worth, TX 76102 Re: Cultural,DistrictlWill,Rogers Area Water and Sanitary Sewer Improvements Additional Services—Amendment No. 1 KTIA No.061018069 Dear ln: Kimley orn and Associates,Inc. i ley-Hom or ENGINEER)is pleased to prov'de the City of Fort Worth C1 with Amendment No. 1 for the Cultural. District/Will Rogers Area Water and Sanitary Sewer Improvements contract. The CITY has asked Kml y-Hom to perform additional services under t its contract for the extension of 2 -inch water line. "art 3.5—Watonza St. Construction,Pans will he prepared for a 24-m* ch water prove tints along; Wa.t n a St. This Part will be added to an existig,TPW pr ► ect Lor advertisement together as one Project. As such,preparation of a project manual 1s not included,and,bidding services have been limited to the answering of questions and preparation of conformance ance plans.The following relocations and extensions e anticipr t d Replacement of"the existing 20-Inch water lime with a 24-inch Water :dine along Wa,ton,ga St from Montgomery St.to the West Side Pump Station at Camp Bowie Blvd.(1,000,,000 L F ENGINEER will perform the work descri"hed in the items above for this Amendment in accordance with the Original Contract: Task I(Deslign Management)-$8,,725 ENCIMER will complete Design Management task for Part 3. ... Watonga St. for a.period not to exceed four months. TEL 817 335 6511 FAX 817 335 5070 Klmley-Horn Mr,John Kasavich,P.E.,Feb 25,20,14,Page 3 and Associates, Inc, The followlIng table summarizes our recommended budget revisions and shows the revised contract amount,: De en on Ongrinal Amend No. I Revised Contract Contract Task I —Design $10251,500 $,81,725 $1111225 Management Task 2--Conceptual Design $125,100 $6)440 $131,540 Task 3—Preliminary $178.1900 $12,810 $19 1 1710 Desi*2 Task 4- m* al Design $2691600 $15,750 $28533,50 Task 5—Bid Phase $3511200 $3)270 $383470 Services Task 6--Construction $72)100 $72,100 Phase Services Task 7—ROW/Easement $303300 $0 $303300 Services Task 8--Serve Services $202,250 —$'0 $2027250 Task 9— $ 1M56O $0 $56M0 51 Total Project 81�0721250 h 461995 $1.91.1 4]i ........................ The ENGINEER will subcontract a portion of these services to the following consultants: . .......... Non-S Sul consultant Service Fee Corr2ro Companies Inc. Cathodic Protection $1,500 Fp Total $1,500 Now The fol[owing table summarized the water and sewer design fees.- Contract/Amendment WaterFee Sewer Fee Survey Fee Total Fee A' opt 1 0 n :an, Or4� i�nal Contract $,6115625 $2625125 $19835010 $130727250 i in C m t Amendment No. 1 $461995 $0 $0 $461,995; TM $6589620 $262,125 $198,500 $1,1119-1245:1 P.E.,February 25,2014,,Page 4 Kimley-Horn Mr.John Kasavich,W M and Associates, Inc. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, I KIMLEY-HORN AND ASSOCIATES,,INC. Glenn A. Gary,P.E. Sr. Vice President GAG/JRT:srm Attachment: Amendment Level of'Effort K-.UIIV—UtilititskO61018O69\PPP\Ajiicndaict0I MrafiAAmcnd I-CD-Ur.doc EXHI Sri ITB-2 Level of Effort,Spreadsheet TASKMOUR BREAKDOWN Des,ign Services for Cultural District/Will Rogers Water and Sanitary Sewer improvements-Amendlment#1 Ci!y Project No.01468 ...... Labe lhours), —1 Task No. Task Descirlpflon Principal Projoct Project EIT CA,DD Administrative Total Labor Subc�onsultant Total!Expense Task Sub�Total Manager E�nglneer i cost Travel Reproduction Cost aal $250 $200 $135 $11011 $So X65 MWBE Nera-MWSE I'0 Project Management 7 1111 is 2fl 0 01, $8725 $0 TO Sol $8 7,21's m $0 the Tea, 1A2 CWQC 162511 $() $1,250 1.2 Communications and Reporting $0 $0 21 Pre. n CoordinationYeeb —------- $44S..— $0 $445 '7 Design Subirldlail Review(*e(ings(4 122 tfts 1,.. I. a 8 8 $4,06J 11 ma 2 6 16 $,2,,970 Colmd'O' bon Wth,ANA .......... $u! $2.9701 Prepare Monthly Progress,Reports,wilhi 1 1,2.4 SclheduW $01 1,2,5 Prepare Monthly VII Euorts $0 $0—$01� 2.0 —Egnaptual Design J3NIP er2LnJt 11 101 34 tt 6 so $4,00 $500, $6:w 2.1 Data Coflection L 3 6 $1 MS.-- $G $1,,065 2-2_Comeetal Des ni Pac�Ne $0 22,11 Cover Sheet LANA) $0 $0 $0 22.2 SRe Visit V 2 $8901 I I I� 1 $0 $890 22.3 Review Geotachnicaf ReE2rt 2 $355� so $365 $0 $890 2L2A Su=a up, 8 1 $01 $t015' 225 Exhbts,yawl Sumim I 1 2 12 $2,040 $2,040 2.2 1,6 PIw!Lnq .''_ $0 $01 $10 2,77 0P'CC 1 4 $57'5 so $575 ............. 310 Prellminm 01 In J60 Perceng 1 9 20 56 01 0 $10,660 $,10 $5010 $2,,000 $12,660 $1150N 111 PreliminaLry D�esigin,PackaLe --------— $0, $5001 $500 500 3,1 I Cover kNA'l 50 $0 so 3.1,2 Overall Layout(ANA) so $0 0 Npr�qgjle Sheets 4 5 18 $3,4515 $0 l' 31A Deta Wale( ils 1 2 61 $1,130 $0 $1"13;01 3,1,5 Restraint Calmilations 1 2 61 $1,,1;30 $0 $1,1130 3,1'6 Specifi cafions Coordination 2 4 $710 $0 $710 311 Quanfifies/Pri��OPCC 1 3 10 $1,70 so $'Vm ..........- --Y 1-8 bW—wir.Protection 2, 4 $7,10 $1,500 $11.500 .......... 3,2 Consinictabili!y Review 2 2 4 $1110 so $1.110 13 U(Ility Clearance 2 4 $710 t1 10 4,0 F I I"I na I Geslon 21 131, 3,0 66 01 4 $14,,750 $0 $0 $0 $1 AD $1,000 $15,750 Fina,l Draft(90%)Construction Plans and 4,1 §p�mcalioffi' $0 $1,0010, $1,0100 $1,000 4.'1.1 PlanIPmfile Sheets 1 3! 12, $2.845 $0 $ZM6 41.2 Restraint Calculabons, 1 r- 2 $1 12� $2,645 $0 $2645 4.1.3 Palau Details ...... ..... 1 6i $1,130 $1,130 $0 Sequencing Sheet and Meetirgs,wl field 4.1.4 O,e 4 a 10 $2.980 $0 $2'9801 $01 411,51 Traffic ConlroLLANAI t $0 41 F nal�100'!j)�Ians and ificafions 16 4, $3,3101 L 3017 $3,310 ................. CAy of Fort'Worth,Texas AtlachmerA 8-Level of Effort Supplement Typicati Watat arxi Sewer Replamment FWWTR Official Ref ease Dale 8,092012 ---------- Labol(hours) pense Task No. Task Description PrIncipal project Project EIT CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total Manager__fDjineer — Cost Travel Reproduction Cost $250 $200 $1135 $11 D $80 $85 MW—SE Non-MWBE 1 $01 110 E!!�p Ct m—nn�rnent T 0 a 23 $8,725 $0 $0 $0 $01 43 Quantl1es1Ph6inq/OPCC 0%and 100%) 1 4 i 10 $1,840 $o' $1,8401 SA Bid Phase 2 3 3 01 $30710 so, $o $1001 $'1001 $3,2701, $.11 Bid Suppicri $0 4 5 U r red[>OC.Uments to Euzz.saw $0 $0 to 5A11 Answer Bidders QuestionstAddiendo 2 2 6 21 ............. $1,9301 $1,930 513 Issue Addenda $0 $0 $0, 5.1.4 Attend told alan"y' $245 $0 51.5 PreaEe conformane documents 1 1 4 $775 I LJ,2 M)4,ar Drawl 2s 2 $2,20 $100 $100 $320, .......... 0­7Constructionl Phase ServIces 0 _0 0 a 0 01 $0 $0 $'0 $0 $0 $0 6.1 lConstruction Support 6,11 L A rM -�I!tand Preconstruction Confere $o SO $0 6A,2 Attend Public Mating $0 $0 61,3 Cons r tlu n Cocrdinalion Mile xs(3) $0 $0 611,14 $(JI $01 6,1,5 Site Vi!sits(2,) $0 62 Rewrd DrawfUdAs Bull $0 $10 T�O—1 1 1 lEasernent Services 01 2 L 0 0 0 $01, $01 $'0 so $0 7.1 Kog"Int-at-L, ry Documergs $0 1 $0 $0 8.0 Survey, 0 0 iD ID 0—, ", so: $01 $01 $11,1 $0 $0 survey 0 $0 Tows, 12 9F.... ..............�83 1"I ...... $43,24S i JD=$1,500; 1001 SZ000 $3�,60, A11 11001% Pr2ject Sumima 0% Total Hours 328 100% ToW,Labor $43„2415 Total 2s e f!jw $3�,6 ._ (A) Total Fee $46,995 MBE/SBE Suboonsuflant so (B) Survey IF ea so Non-MBF-J'SBE Subconsullant $1,1%01 (C i Total re�e survey Fee $46,9195 'l Cr/a Sub Mark up $150 Wait f'oe(60%of C) Sewer Fee( MBEJSBE Particie2tion 0,0% $46,995,00 $O'M Total Project Costl -r46—,99-SO*O- Descriptiara WI P l Water Sewer Conceptual Design QMAJ 31 $1 ,OW50 $0.00 Preliminary Desi n�60na 32 __$2$197M $0.00 Final Design(10%) 33 $4,699,60 $0,00 Sun'Ley 51 $0.00 $0A0— Subtotal 4 n, .WWt1 s41.00 Total $46,91,00 C lty of Fort Worth,Texas Attachment 8-Level of Efod Sup*aiwA Ty&al Walei aW Sewer Replacemed FW'WTR Official IFte sse DaW a,09,2012