Loading...
HomeMy WebLinkAboutContract 43018-A3 tc I T Y S E CMAN, AN[ENDNENT No. 3 16X)111, d X119 TO CITY SECRETARY CONTRACT No. 43018 WHEREAS,, the City of Fort Worth (CITY) and Half Halff Associates, Inc. , (ENGINEER) made and entered Into City Secretary Contract . 43018, (the CONTRACT) which was authorized by M&C C25490 on the 20th day of March, 2012 in the amount of $125, 002 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $2,, 100 . 001 which was administratively authorized on November 2 , 2012 ; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 2 in the amount of $2, 500 . 00 which was administratively authorized can Fbru r 22, 2013: and WHEREAS, the CONTRACT involves engineering services for the following project: 2011 11 INTERSEC TTON IMPROVEMENTS - PHASE 2 and WHEREAS, It has become necessary to execute Amendment No. 3 to the CONTRACT t include an increased scope of work and .revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives. enter into the following agreement, which amends the CONTRACT . 1 . Article I of the ONTRAC'T is amended to include the additional engineering services specified in a proposal dated February 19, 2014, a copy of which is attached hereto and incorporated herein. The Cost to City for the additional design services to be performed by Engineer totals $12, 000 . 00 . See Attached Funding Breakdown Sheet, Page 3 2 . City o Fort Worth Professional Services Agreement Amendinent Template OFFICIAL, RECORD PMO Official Release 8/1/2012 Page 1 o 4. CITY SECRM'Ry FT.WORTH,TX Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $141, 602 . 0101. 3 . All other provision,s' of the Contract, which are not expressly amended herein, shall remain in full- force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City cif Fort Worth ENGINEER Halff Associates, Inc. 0.00 Fernando Costa Benjamin L. McGahey I Assistant City Manager Senior P,ro�ject Manager DATE: DATE 28/2.'Qlq APPROVAL RECOMMENDED: Douglas WJ Wiersig, P. E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY M&C: Date : Douglas W. Black Assistant City Attorney 0 0400000111, ATTEST: 0. by: 0 le, er,--Icity Secretwy 3�9000r)000111111:::0 OFFICIAL RECORD City of Fort Worth AS ITY SEMETARY Professional Services Agreement Amendment Template C PM0 Official Release 8/1/2012 WORTHi TX Page 2 of 4 ,Mary J. Ka er C:i t y S:e .r et ca ir yy City of Foil Worth Profes,sional Services,Agreement Amen6ment Template, PMO Official Release 8/1/20'12 Page 3 of 4 FUNDING O HEE City Secretary No. 43018 er dmen : No . 3 Department TPW C2 531200 201390185630 $12 0001 . Total : $121000 - 00 City of Fort Worth Professional Services agreement Amendn ent Template P O Official Release 8/1/2012 Page 4 of 4 ATTACHMENT "A319 Plan Revis,ioinsi- The ENGINEER revi'sed the contract documents with changes requested by the CITY. These revisions occurred after award of the construction contract. Construction Administration Services: • The ENGINEER shall attend one preconstruction conference prior to construction. • The, ENGIINI EER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performanice in accordance with the contract for construction, nor is such review a, guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in Buz,zs,aw'. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and' make recommendations as to the acceptability of the work. The ENGINEER shall attend the "Final"' project walk through and assist with preparation offinal punch Iist- The ENGINEER shall prepare record drawings -from information submitted by the inspector and/or Contractor.: The drawings shall be submitted, as full size (221; x 3,4,"), mylour drawings. N N E�� ALFF mom February 19, 2014 AVO 28750 Ms. Lis,sette Acevedo, P.E. Transportation and Public li c Work City of Fort Worth 1000 Throckmorton'. 2nd Floor Ford Worth, texas 76102 Re: 2011 Intersection Improvements—Phase 2 Engineering Amendment No. 3 Dear Ms. Acevedo. "lease accept this letter proposal for additional engineering services that are necessary to complete the 2011 Intersection Improvements — Phase 2 prnject. Our proposal provides for additional engineering services, as requested, to replace the Gran lhury Road traffic signal poles, mast arms,. span wires and heads at the S. Huber Street intersection. Additional construction administration services are also included. We are requesting payrnentfor these additional , rvi es in the amount of$12, d * i �i' , r fl ' strati r services). w `Yhc original contract amount for this project was $125,002. ith approval of Engineering Amendment . I the contract amount t increased to $127,102. With approval o1� ��' �ngrccrin Amendment No�. 2 the contract amount increased to $1 29,602. With approval of Engineering Amendment No. 3 the contract amount will increase to $141 X602. The original BE :sec leer this project was $23, 68 (19.01%). With approval of Engineering, Amendment No. I the M/WBE fee increased to, $25,768 increasing the M/WBE percentage t 20.27%. With approval of Engineering eerin en .meat No. 2 the E fee remained $25,768 reducing,the M/WBE percentage to 19.88%. With approval o1'Er ineen' g Amendment No. 3 the M/WB,E fee will remain $25,768 resulting in an M/ BE percentage o f t 8.2 %. The goal for this project is 19%. If you have any questions regarding this project, please call me at 817-764-7471. inccreh, HALFF1 ASSOCIATES, INC. Benjamin L. 1"' cGahe , P.E. HALFF ASSOCIATES,INC. 4000 FOSSIL CRFFK BLVD. 1F't- (817) 142" W W W NCI.�=� w1'1)C` FORT WORTH', T X/6137-2720 �!A X (83 7)2 3 2-')-7 b," RECLIAD MAR 19 1014