WHEREAS, the City of Fort Worth (City) and Garver, LLC, (Engineer) made and entered into City
Secretary Contract No. 41703, (the Contract) which was authorized by the City Council by M&C G-17254 on
the 5th day of April 2011; and
WHEREAS, the Contract involves engineering services for the following project:
51S Apron and Taxilane Improvements, Project No. 1663
WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include
an increased scope of work and revised maximum fee for design of Taxilane improvements
extending from the proposed Hangar 51 S apron to Taxiway B in the project;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized
representatives, enter into the following agreement, which amends the Contract:
1.
Article I of the Contract is amended to include the additional engineering services specified in
the proposal letter dated April 22, 2011, a copy of which is attached hereto and incorporated
herein. The cost to City for the additional services to be performed by ENGINEER shall not exceed
$11,516.00.
2.
Article II of the Contract is amended to provide for an increase in the fee to be paid to
ENGINEER for all work and services performed under the Contract, as amended, so that the total
fee paid by the City for all work and services shall not exceed the sum of$93,633.00.
OFFICIAL RECORD
CIY SCR
TARY
T, 0R'T1 X
Page W
3.
All other provisions of the Contract, which are not expressly amended herein, shall remain in full
force and effect.
EXECUTED on this the o�(today of Mam 2011 in Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: APPROVED:
enneth L. Penney, Jr., A.A.E. Fernando Costa
Aviation Director Assistant City Manager
Garver, LLC ATTEST: �
Engineer a'°' foot 40
i/ 0 00k
By: - � iG� `� FyjO�o° oo�d
0
Name: Frank Mclllwain Authorization: , o �ZQ
Title: Senior Project Manager S��0 *��
Date: � 00 0
000000000 o .a
APPROVED AS TO FORM AND LEGALITY: Attested by'
Many HQW64 Ity SomoMm
Doug Black
Assistant City Attorney
NEOMM, �Ux>I� fl
OFFICIAL RECORD
Page -2- CITY SECRETARY
FT. WORTH, TX
3010 Gaylord Parkway
suite 190
Frisco,TX 75034
TEL 972.377.7480
FAX 972.377.8380
• - www.GarverUSA com
April 22,2011
Bill Welstead,A.A.E.
Airport Manager
Meacham International Airport
4201 Main Street
Suite 200
Fort Worth,TX 76106
Re: Hangar 51 S apron and access improvements
Proposal for Amendment No. 1
Dear Bill:
With this letter, we (Garver, LLC—"Engineer") are pleased to propose our services to you (City of
Fort Worth — "Owner") related to Hangar 51 S apron and access improvements. This letter will
describe our proposed scope of services,performance schedule,and payment terms.
Scope of Services
We understand that you want us to provide services for taxilane improvements extending from the
proposed Hangar 51 S apron to Taxiway B in the project. More specifically, we are expanding the
scope of Preliminary Design, Final Design, Construction Phase Services, and Survey to include the
taxilane improvements. The conceptual layout for the taxilane is shown in the attached exhibit.
Payment Terms
For the work described under Scope of Services we propose the following changes to the fee amounts.
PHASE ORIGINAL AMENDMENT REVISED
CONTRACT NO.1 CONTRACT
Preliminary Design 75% $6,900.00 $1,288.00 $8,188.00
Final Construction Documents $13,300.00 $1,288.00 $14,588.00
100%
Bid Phase $5,000.00 $0.0 $5,000.00
Construction Phase Services $46,488.00 $7,440.00 $53,928.00
Survey $3,500.00 $1,500.00 $5,000.00
Geotechnical Investigation $6,959.00 $0.00 $6,959.00
Total S82,147.00 $11,516.00 $93,663.00
We appreciate the opportunity to provide our services to you.
Sincerely,
GAR LL�C�
rank Mcillwain
Senior Project Manager
M Var�poeaW201a I O091225P FTW 515 Apr—and TaxM m improuemems JCG ApmKunae 9V-'*8 MVl WxJmam No I�5t5 Amwn&nwl 01 aropovM Lu 2011-04-22 doc
SINS
a3NY- vl =L
fl
I
14 I
g
i6 14 IIIIIII�VV
Exhibit B-2 Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
Design Services for Hangar 51S apron and access improvements
Amendment No.1(Taxilane Extending from the apron to Taxiway B)
City Project No.1663
Labor hours Ex ense
Task No. Task Description Project Project Project EIT CADD RPR Administrative Total Labor Subconsultant Total Expense
Task Sub Total
Director Mana er En sneer Cost Travel Reproduction Cost
Rate A. 125 8 $91 MWBE Non-MWBE
10 Preliminary Design 75% 1 0 3 0 9 0 0 $1,288 $0 $0 $0 $0 $0 $1,288
Civil Engineering
Preliminary Plans $0 $0
Typical Section Taxilane 1 1 $190 $0 $190
Plan and Profile Sheets Taxilane 1 1 4 $635 $0 $635
Cross Sections(Taxilane 1 4 $463 $0 $463
4.0 Final Construction Documents 100% 1 0 3 0 9 0 0 $1,268 $0 $0 $0 $0 $0 $1,288
Civil En ineedn
Final Plans
0 0
Typical Section Taxilane 1 1 $190 $0 $190
Plan and Profile Sheets Taxilane 1 1 4 $635 $0 $635
Cross Sections Taxilane 1 4 $463 $0 $463
6.0 Construction Phase Services 0 0 0 0 0 92 0 $7,360 $0 $0 $80 $0 $80 $7,4401
6.1 Construction Support
Attend Proconshuction Conference $0 $0 $0
Project Site Visits $0 $0 $0
Progress Meetings with Contractor/City $0 $0 $0
Submittal Review $0 $0 $0
Request for information/Change Order
Review $0 $0 $0
Full-Time Resident Project Representative 92 $7,360 $80 $80 $7,440
Final We Through and Punch List $0 1 $0 $0
6.2 Record Drawings $0 1 $01 0
7.0 survey Of 01 al 01 01 01 0 SO $1 500 $O $O $O $1600 -$1,500
7.1 MWBE Subconsultant-Design Surve $0 $1,500 $1,500 $1,500
Totals 2 0 51 01 101 01 at $2,5761 $1,5001 ol 0 1,500 11,518
Project Summary
Total Hours 26
Total Labor $2,576
Total Expense $1,500
MWBE Subconsultant $1,500
Nan-MWBE Subconsultant $0
0% Sub Markup $0
MWBE Participation 13.0%
Total Project Cost $11,518
City of Fort Worth,Texas
Attachment B-Level of Effort Supplement
PMO Official Release Date:5.19.2010