Loading...
HomeMy WebLinkAboutContract 41703-A1 AMENDMENT NUMBER 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.14 VUG-At COUNTY OF TARRANT 6 WHEREAS, the City of Fort Worth (City) and Garver, LLC, (Engineer) made and entered into City Secretary Contract No. 41703, (the Contract) which was authorized by the City Council by M&C G-17254 on the 5th day of April 2011; and WHEREAS, the Contract involves engineering services for the following project: 51S Apron and Taxilane Improvements, Project No. 1663 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee for design of Taxilane improvements extending from the proposed Hangar 51 S apron to Taxiway B in the project; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated April 22, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by ENGINEER shall not exceed $11,516.00. 2. Article II of the Contract is amended to provide for an increase in the fee to be paid to ENGINEER for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$93,633.00. OFFICIAL RECORD CIY SCR TARY T, 0R'T1 X Page W 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the o�(today of Mam 2011 in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: enneth L. Penney, Jr., A.A.E. Fernando Costa Aviation Director Assistant City Manager Garver, LLC ATTEST: � Engineer a'°' foot 40 i/ 0 00k By: - � iG� `� FyjO�o° oo�d 0 Name: Frank Mclllwain Authorization: , o �ZQ Title: Senior Project Manager S��0 *�� Date: � 00 0 000000000 o .a APPROVED AS TO FORM AND LEGALITY: Attested by' Many HQW64 Ity SomoMm Doug Black Assistant City Attorney NEOMM, �Ux>I� fl OFFICIAL RECORD Page -2- CITY SECRETARY FT. WORTH, TX 3010 Gaylord Parkway suite 190 Frisco,TX 75034 TEL 972.377.7480 FAX 972.377.8380 • - www.GarverUSA com April 22,2011 Bill Welstead,A.A.E. Airport Manager Meacham International Airport 4201 Main Street Suite 200 Fort Worth,TX 76106 Re: Hangar 51 S apron and access improvements Proposal for Amendment No. 1 Dear Bill: With this letter, we (Garver, LLC—"Engineer") are pleased to propose our services to you (City of Fort Worth — "Owner") related to Hangar 51 S apron and access improvements. This letter will describe our proposed scope of services,performance schedule,and payment terms. Scope of Services We understand that you want us to provide services for taxilane improvements extending from the proposed Hangar 51 S apron to Taxiway B in the project. More specifically, we are expanding the scope of Preliminary Design, Final Design, Construction Phase Services, and Survey to include the taxilane improvements. The conceptual layout for the taxilane is shown in the attached exhibit. Payment Terms For the work described under Scope of Services we propose the following changes to the fee amounts. PHASE ORIGINAL AMENDMENT REVISED CONTRACT NO.1 CONTRACT Preliminary Design 75% $6,900.00 $1,288.00 $8,188.00 Final Construction Documents $13,300.00 $1,288.00 $14,588.00 100% Bid Phase $5,000.00 $0.0 $5,000.00 Construction Phase Services $46,488.00 $7,440.00 $53,928.00 Survey $3,500.00 $1,500.00 $5,000.00 Geotechnical Investigation $6,959.00 $0.00 $6,959.00 Total S82,147.00 $11,516.00 $93,663.00 We appreciate the opportunity to provide our services to you. Sincerely, GAR LL�C� rank Mcillwain Senior Project Manager M Var�poeaW201a I O091225P FTW 515 Apr—and TaxM m improuemems JCG ApmKunae 9V-'*8 MVl WxJmam No I�5t5 Amwn&nwl 01 aropovM Lu 2011-04-22 doc SINS a3NY- vl =L fl I 14 I g i6 14 IIIIIII�VV Exhibit B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Hangar 51S apron and access improvements Amendment No.1(Taxilane Extending from the apron to Taxiway B) City Project No.1663 Labor hours Ex ense Task No. Task Description Project Project Project EIT CADD RPR Administrative Total Labor Subconsultant Total Expense Task Sub Total Director Mana er En sneer Cost Travel Reproduction Cost Rate A. 125 8 $91 MWBE Non-MWBE 10 Preliminary Design 75% 1 0 3 0 9 0 0 $1,288 $0 $0 $0 $0 $0 $1,288 Civil Engineering Preliminary Plans $0 $0 Typical Section Taxilane 1 1 $190 $0 $190 Plan and Profile Sheets Taxilane 1 1 4 $635 $0 $635 Cross Sections(Taxilane 1 4 $463 $0 $463 4.0 Final Construction Documents 100% 1 0 3 0 9 0 0 $1,268 $0 $0 $0 $0 $0 $1,288 Civil En ineedn Final Plans 0 0 Typical Section Taxilane 1 1 $190 $0 $190 Plan and Profile Sheets Taxilane 1 1 4 $635 $0 $635 Cross Sections Taxilane 1 4 $463 $0 $463 6.0 Construction Phase Services 0 0 0 0 0 92 0 $7,360 $0 $0 $80 $0 $80 $7,4401 6.1 Construction Support Attend Proconshuction Conference $0 $0 $0 Project Site Visits $0 $0 $0 Progress Meetings with Contractor/City $0 $0 $0 Submittal Review $0 $0 $0 Request for information/Change Order Review $0 $0 $0 Full-Time Resident Project Representative 92 $7,360 $80 $80 $7,440 Final We Through and Punch List $0 1 $0 $0 6.2 Record Drawings $0 1 $01 0 7.0 survey Of 01 al 01 01 01 0 SO $1 500 $O $O $O $1600 -$1,500 7.1 MWBE Subconsultant-Design Surve $0 $1,500 $1,500 $1,500 Totals 2 0 51 01 101 01 at $2,5761 $1,5001 ol 0 1,500 11,518 Project Summary Total Hours 26 Total Labor $2,576 Total Expense $1,500 MWBE Subconsultant $1,500 Nan-MWBE Subconsultant $0 0% Sub Markup $0 MWBE Participation 13.0% Total Project Cost $11,518 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Date:5.19.2010 l oft