HomeMy WebLinkAboutContract 41807-CO1 F'(I R-r Wq R r ul City of Fort Worth CITY SECRET Y-v CONTRA( :71 I I Change Order Request Project Namel Sanitary Sewer Rehabilitation Contract,LVI(56)Part 2 ICity Sec No. 41807 Project No.(s) P258-709170102983 I DOE No. 1 6019 JCityProj.No. 01029 Project Description Sanitary Sewer Rehabilitation on portions of W. Peter Smith Street W.Cannon Street,W. Leuda Street,W.Terrell Avenue College Avenue,Alston Avenue and Lipscomb Street Contractorl Conatser Construction TX,LP Change Order# Date: 8/15/2011 City Project Mgr.I Susan Schwinger City Inspector I Billy(Mark)Owen Phone Number: 817-392-6529 Phone Number. 817-223-2267 Dept. Water Sewer Totals Contract Time Calendar days) Original Contract Amount $696,387.00 $696,387.001 150 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $696,387.00 : $696,387.00 150 Amount of roposed Change Order 0 - ,9 Revised Contract Amount $69Z435.00 $692,435.00 150= Original Funds Available for Change Orders $25,000.00 $25,000.00 Remaining Funds Available for this CO $25,000.00 $25,000.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -0.57% MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST;25%) $870,483.75 "'JUSTIFICATION(REASONS)FOR CHANGE ORDE . The change order will provide additional pay item quantities for the following: • Service pipe installation by other than open-cut in lieu of trench excavation in order to minimize disruption to patients, employees and customers at two health care facilities and a convenient store whose access would be impacted by open cut installation. • 10-inch ductile iron sewer pipe installation by other than open-cut in lieu oft r--nc-T—excavRMF7ff-5!dq to avoid a previously unknown gas line and manhole that�ig4�� n�flict wit l ®F ffteelR • 10-inch ductile iron sewer pipe installation from ma e i c m0ft;Wbrder toCAhUttf`t A e material onflict identified above. �'`��o*ql-000, FT. WORTH, TX The change order 11 a deletion of pa i e� no longer needed in the project. °. Ka , City 5etetary jK d 00000QOO It is understood and agreed that the acceptance of this Change Order by the con rd and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change er. Contracton Comm Name Contractor Narr>ei Contactor StgnattiM Date. Conatser Construction TX,LP Jesse Martinez Inspector Date:. Pro' art ek Date , zt - It S-lsa+J •�, S -i6-�� -�,>,1 AssiUmt o e t a Constructlat sot JPW De Date. T s. e 31 /i ,l i Ae- A—Svstw ity DaW Assistant Cl Date ' Council Action it r uired M&C Number M&C Date Approved i Fc�R-r NVO R-r H City of Fort Worth Change Order Additions Project Name Sanitary Sewer Rehabilitation Contract,LVI(56)Part 2 City Sec No. 41807 Project No.(s) P258-709170102983 DOE No. 6019 City Proj.No. 01029 Project Sanitary Sewer Rehabilitation on portions of W.Peter Smith Street W.Cannon Street,W.Leuda Street,W.Terrell Avenue College Description Avenue,Alston Avenue and Lipscomb Street Contractor Conatser Construction TX,LP Change Order# 0 Date: 8/15/2011 City Project Mgr. Susan Schwin er City Inspector Billy Mark Owen ADDITIUNS nit Unit Cost Total Pipe-Pressure-8 Inch-C900 ( (Sanitary Sewer)(All Depths)—Install Sewer 1 10.00 LF $38.00 $4,180.( 51 Sewer Service-4 Inch—BOTC Install Sewer 198.00 LF $85.00 $16,830.( 52 Pipe-Pressure 4 Inch—Install(sheet 24:DIP SS Service No.6 thru ex 6'x5'SD) Sewer 26.00 LF $45.00 $1,170.( 53 Structure-Core Ex 6'x5'Storm Drain for 4 inch SS Service—Install Sewer 1.00 LS $1,050.00 $1,050.( 54 Pipe-Pressure-10 Inch-Pressure Class 350 DIP w/Protecto 401 Lining(All Depths)—Install Sewer 207.00 LF $72.001 $14,904.( 55 Pipe-Sewer-10-inch BOTC wiPressure Grout—Install Sewer 45.00 LF $180.001 $8,100.( 56 Water Service-Cut and Cap(unused services) Sewer 9.00 EA $300.001 $2,700.( Water Sewer 348.934 00 Additions Sub Total 48.934.00 Page 2 of 4 FO R-r NVO R-r H City of Fort Worth Change Order Deletions Project Name Sanitary Sewer Rehabilitation Contract,LVI(56)Part 2 City Sec No. 41807 Project No.(s) P258-709170102983 DOE No. 1 6019 City Proj.No. 01029 Project Description Sanitary Sewer Rehabilitation on portions of W.Peter Smith Street W.Cannon Street,W.Leuda Street,W.Terrell Avenue College Avenue,Alston Avenue and Lipscomb Street Contractor Conatser Construction TX,LP Change Order#= Date 8/15/2011 City roject r. Susan Schwi er -� ty 1 �'t9 n9 City Inspector Billy(Mark)Owen DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 4 Pipe-Sewer-8-inch PVC(All Depths) Sewer 110.0011-F $32.00 $3,520 6 Pipe-Sewer-10-inch PVC(AN Depths) Sewer 214.00 1 LF $40.00 $8,560 7 Pipe-Sewer-10-inch-SOR 26(All Depths)Install with cement stabilized sand embedment Sewer 18.0011-F $42.00 $756 9 Pipe-Casing-16 Inch-Casing Pipe Open Cut(Steelpinstal Sewer 20.00 LF $70.00 $1,400 11 Plumbing Service 4-Inch Schedule 40 Sewer 198.00 LF $40.00 $7,920. 27 Manhole-32"Diameter Watertight Insert,Tethered,Stainless Steel-Install Sewer 30.00 EA $300.00 $9,000. 35 Pavement-2-Inch Min HMAC Replacement on Existing Base(and on 2/27 Concrete Base(STR-029)-Instal Sewer 1079.00 LF $20.00 $21,580. 50 Fill Material-Type B BackfiN-Install Sewer 10.00 Cy' $15.00 $150. i Water Sewer $52,886.0( Deletions Sub Total $52,886 01 Page 3 of 4 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders coy DATE AMOUNT Total $0.0a Page 4 of 4 m m N O a = � v � . z w w � 3 2 cn aci m , N N V -j Q M M Q c O m N M(D N N W a) R O ~ ca ca C3 C v Cl) 0 44 601, to 4A 4A 40 EA 4A 4A c H U N ca W U m C a U O 3 cn co CL O m L r- m _ a�a (D a� a)CD caU 0 ! vo v cv co N L c � UoL) oo U Q Q) S m o P E t . z 0 Q U L- 0 L- o c) c c O u�i O c m m ai M c = .- t co a) a a 0 Q U o > ; c cA Q 0 ° o (D Q v, Q Lll F- c U CO � 0 V C N C C Z Z Z UO m c`9 .�. m c`9 U F- F- U Z c p W U a p V Li U U m Z m 0 U Q p U C � - C M W W 0 o 0 E �n m c OOU) a - w v c c`o � N c°' m o �, C _ aam00d �tF°- O UQaf Ux Q