Change Order Request
Project Namel Sanitary Sewer Rehabilitation Contract,LVI(56)Part 2 ICity Sec No. 41807
Project No.(s) P258-709170102983 I DOE No. 1 6019 JCityProj.No. 01029
Project Description Sanitary Sewer Rehabilitation on portions of W. Peter Smith Street W.Cannon Street,W. Leuda Street,W.Terrell Avenue
College Avenue,Alston Avenue and Lipscomb Street
Contractorl Conatser Construction TX,LP Change Order# Date: 8/15/2011
City Project Mgr.I Susan Schwinger City Inspector I Billy(Mark)Owen
Phone Number: 817-392-6529 Phone Number. 817-223-2267
Dept. Water Sewer Totals Contract Time
Calendar days)
Original Contract Amount $696,387.00 $696,387.001 150
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $696,387.00 : $696,387.00 150
Amount of roposed Change Order 0 - ,9
Revised Contract Amount $69Z435.00 $692,435.00 150=
Original Funds Available for Change Orders $25,000.00 $25,000.00
Remaining Funds Available for this CO $25,000.00 $25,000.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -0.57%
MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST;25%) $870,483.75
"'JUSTIFICATION(REASONS)FOR CHANGE ORDE .
The change order will provide additional pay item quantities for the following:
• Service pipe installation by other than open-cut in lieu of trench excavation in order to minimize
disruption to patients, employees and customers at two health care facilities and a convenient store whose
access would be impacted by open cut installation.
• 10-inch ductile iron sewer pipe installation by other than open-cut in lieu oft r--nc-T—excavRMF7ff-5!dq to
avoid a previously unknown gas line and manhole that�ig4�� n�flict wit l
®F ffteelR
• 10-inch ductile iron sewer pipe installation from ma e i c m0ft;Wbrder toCAhUttf`t A e
material onflict identified above. �'`��o*ql-000, FT. WORTH, TX
The change order 11 a deletion of pa i e� no longer needed in the
project. °. Ka , City 5etetary jK d
00000QOO
It is understood and agreed that the acceptance of this Change Order by the con rd and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change er.
Contracton Comm Name Contractor Narr>ei Contactor StgnattiM Date.
Conatser Construction TX,LP Jesse Martinez
Inspector Date:. Pro' art ek Date ,
zt - It S-lsa+J •�, S -i6-�� -�,>,1
AssiUmt o e t a Constructlat sot JPW De Date.
T s. e 31 /i ,l i Ae-
A—Svstw ity DaW Assistant Cl Date
' Council Action it r uired
M&C Number M&C Date Approved i
Fc�R-r NVO R-r H City of Fort Worth
Change Order Additions
Project Name Sanitary Sewer Rehabilitation Contract,LVI(56)Part 2 City Sec No. 41807
Project No.(s) P258-709170102983 DOE No. 6019 City Proj.No. 01029
Project Sanitary Sewer Rehabilitation on portions of W.Peter Smith Street W.Cannon Street,W.Leuda Street,W.Terrell Avenue College
Description Avenue,Alston Avenue and Lipscomb Street
Contractor Conatser Construction TX,LP Change Order# 0 Date: 8/15/2011
City Project Mgr. Susan Schwin er City Inspector Billy Mark Owen
ADDITIUNS
nit Unit Cost Total
Pipe-Pressure-8 Inch-C900 ( (Sanitary Sewer)(All Depths)—Install Sewer 1 10.00 LF $38.00 $4,180.(
51 Sewer Service-4 Inch—BOTC Install Sewer 198.00 LF $85.00 $16,830.(
52 Pipe-Pressure 4 Inch—Install(sheet 24:DIP SS Service No.6 thru ex 6'x5'SD) Sewer 26.00 LF $45.00 $1,170.(
53 Structure-Core Ex 6'x5'Storm Drain for 4 inch SS Service—Install Sewer 1.00 LS $1,050.00 $1,050.(
54 Pipe-Pressure-10 Inch-Pressure Class 350 DIP w/Protecto 401 Lining(All Depths)—Install Sewer 207.00 LF $72.001 $14,904.(
55 Pipe-Sewer-10-inch BOTC wiPressure Grout—Install Sewer 45.00 LF $180.001 $8,100.(
56 Water Service-Cut and Cap(unused services) Sewer 9.00 EA $300.001 $2,700.(
Water
Sewer 348.934 00
Additions Sub Total 48.934.00
Page 2 of 4
FO R-r NVO R-r H City of Fort Worth
Change Order Deletions
Project Name Sanitary Sewer Rehabilitation Contract,LVI(56)Part 2 City Sec No. 41807
Project No.(s) P258-709170102983 DOE No. 1 6019 City Proj.No. 01029
Project Description Sanitary Sewer Rehabilitation on portions of W.Peter Smith Street W.Cannon Street,W.Leuda Street,W.Terrell Avenue College Avenue,Alston Avenue
and Lipscomb Street
Contractor Conatser Construction TX,LP Change Order#= Date 8/15/2011
City roject r. Susan Schwi er -�
ty 1 �'t9 n9 City Inspector Billy(Mark)Owen
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
4 Pipe-Sewer-8-inch PVC(All Depths) Sewer 110.0011-F $32.00 $3,520
6 Pipe-Sewer-10-inch PVC(AN Depths) Sewer 214.00 1 LF $40.00 $8,560
7 Pipe-Sewer-10-inch-SOR 26(All Depths)Install with cement stabilized sand embedment Sewer 18.0011-F $42.00 $756
9 Pipe-Casing-16 Inch-Casing Pipe Open Cut(Steelpinstal Sewer 20.00 LF $70.00 $1,400
11 Plumbing Service 4-Inch Schedule 40 Sewer 198.00 LF $40.00 $7,920.
27 Manhole-32"Diameter Watertight Insert,Tethered,Stainless Steel-Install Sewer 30.00 EA $300.00 $9,000.
35 Pavement-2-Inch Min HMAC Replacement on Existing Base(and on 2/27 Concrete Base(STR-029)-Instal Sewer 1079.00 LF $20.00 $21,580.
50 Fill Material-Type B BackfiN-Install Sewer 10.00 Cy' $15.00 $150.
i
Water
Sewer $52,886.0(
Deletions Sub Total $52,886 01
Page 3 of 4
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
coy DATE AMOUNT
Total $0.0a
Page 4 of 4
m
m
N
O
a = �
v � .
z
w
w � 3
2
cn aci
m , N
N V -j Q M M
Q c O m N M(D N N
W
a)
R O ~ ca ca C3
C v
Cl) 0 44 601, to 4A 4A 40 EA 4A 4A c
H U N
ca
W
U m C a U
O 3
cn co
CL
O m
L r-
m
_ a�a (D a� a)CD
caU 0
! vo v cv co
N
L
c � UoL) oo U Q
Q)
S m
o P E t .
z 0 Q U
L- 0 L- o c)
c c O u�i
O c m m ai M c =
.- t co a)
a a 0 Q U o > ; c
cA Q 0 ° o (D Q v, Q
Lll F- c U CO � 0 V C N C
C
Z Z Z UO m c`9 .�. m c`9 U
F- F- U Z c p W U a p V Li
U U m Z m 0 U Q p U C � -
C M
W W 0 o 0 E �n m c
OOU) a - w v c c`o � N c°' m o
�, C _
aam00d �tF°- O UQaf Ux Q