Loading...
HomeMy WebLinkAboutContract 41807-CO2 FORT WORTH City of Fort Worth mgm. ry Copy Change Order Request Project Name I Sanitary Sewer Rehabilitation, Contract LVI(56), Part 2 City Sec No. 41807 Project No.(s) P258-709170102983 DOE No. 1 6019 City Proj. No. 01029 Project Description Sanitary Sewer Rehabilitation on portions of W.Peter Smith Street,W.Cannon Street,W. Leuda Street,W.Terrell Avenue,College Avenue,Alston Avenue and Lipscomb Street ContractorF Conatser Construction, TX, LP Change Order# Date: 3/28/2012 City Project Mgr.I Susan Schwin er City Inspector I Bill (Mark)Owen Phone Number: 817-392-6529 Phone Number: 817-223-2267 Dept. Water Sewer Totals Contract Time I J Calendar da s Original Contract Amount $696,387.00 $06,387-0? 150 Extras to Date Credits to Date $3,952.00 $3,962. Pending Change Orders(in M&C Process) Contract Cost to Date $692,43&00 $692.436.0011 150 Amount of Proposed Change Order ;( ► $ 75, ,75 17 .7 Revised Contract Amount W,088.75 150 Original Funds Available for Change Orders $25,000.00 Remaining Funds Available for this CO $28,g62,pp Additional Funding(if necessary) $146,701,75 " .75 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT j2ffl,11� MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $870 During sewer installation, existing wet soil subgrade was encountered on project streets that caused backfill material to fail density testing. In addition, City standard permanent pavement repair could not be conducted because the wet soil condition would cause the pavement to fail. This change order will provide compensation for the installation of geogrid material in conjunction with permanent pavement repairs in order to strengthen the soil as well as the installation of temporary pavement pending permanent pavement repairs. The change order will also allow for the de�leti��a� p �, �d �a t are no longer needed on the oo 0000, u oproject. 1 QO a A d by: OFFICIAL RECORD 0 0,o �g o d , SECRETARY FT. WORTH, TX Mary 7. city Sammy 00 0 0 o y r00000 p 4,1,` It is understood and agreed that the acceptance of this Change Order by th constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. IMConaMtserCorstruction,TX, LP Jesse Martinez .�` )t-5 3'LP"�L M&C Number_ _ C-25529 M&C Date Approved 3/27/2012 FORT ;NORTH City of Fort Worth Change Order Additions Project Name Sanitary Sewer Rehabilitation,Contract LVI(56),Part 2 City Sec No. 41807 Project No.(s) P258-709170102983 DOE No. 6019 City Proj.No. 01029 Project Sanitary Sewer Rehabilitation on portions of W.Peter Smith Street,W.Cannon Street,W.Leuda Street,W.Terrell Avenue,College Description Avenue,Alston Avenue and Lipscomb Street Contractor Conatser Construction,TX LP Change Order# E= Date: 3/28/2012 City Project Mgr. Susan Schwin er City Inspector Bill Mark Owen ADDITIONS ITEM DESCRIPTION DEPT Q Unit Unit Cost Total 57 Pavement-8-inch Flex Base(Temporary Pvmt Repair for Streets w/Wet Backfill)-Install Sewer 4587.00 LF $18.25 $83,712.75 Pavement-2 Inch Type an -inc ex Base over nax x eogn (Temporary Sewer 2280.00 LF $38.50 $87,780.00 58 Pvmt Repair,Modified STR-030)-Install Pavement-2 Inch Type Type an d 8-inch Flex Base over 7n—ax Tx140 Geogrid w/12-inch Flex Base in Throat of Trench(Permanent Pvmt Repair Modified STR-028) Sewer 1526.00 LF $65.00 $99,190.00 59 -Install Water $0.00 Sewer $270,682.75 Page 2 of 4 Additions Sub Total $270,682.75 FORT WORTH City of Fort Worth Change Order Deletions Project Name Sanitary Sewer Rehabilitation,Contract LVI(56),Part 2 City Sec No. 41807 Project No.(s) P258-709170102983 DOE No. 6019 City Proj.No. 01029 Project Sanitary Sewer Rehabilitation on portions of W.Peter Smith Street,W.Cannon Street,W.Leuda Street,W.Terrell Avenue,College Avenue,Alston Description Avenue and Lipscomb Street Contractor Conatser Construction,TX,LP Change Order#=1 Date 3/2812012 City Project Mgr. Susan Schwinger City Inspector Billy(Mark)Owen DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 28 Collar-Manhole-32 Inch-Frame&Cover-Install Sewer 23.00 EA $400.00 $9,200.00 33 Pavement-2 Inch Min HMAC on 2/27 Concrete Base(STR-028)-Install Sewer 1594.00 LF $34.00 $54,196.00 36 Pavement-Concrete Replacement on Existing Base(and on 2/27 Concrete Base(STR-031)-Install Sewer 44.00 SY $28.00 $1,232.00 37 Pavement-Valley Gutter-Install Sewer 14.62 1 SY $50.001 $731.00 38 Curb&Gutter-Install Sewer 1534.0011-F $18.001 $27,612.00 43 TopsoiHnstall Sewer 49.00 CY $15.00 $735.00 45 Inspection-Preconstruction Cleaning&TV-Study Sewer 41.0011-F $3.00 $123.00 47 Fill Material-Flowable Fill(Cement)-Install Sewer 16.00 CY $75.00 $1,200.00 Water $0.00 Sewer $95,029.00 Deletions Sub Total $95.02900 Page 3 of 4 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders c0i DATE AMOUNT Total $4•00 Page 4 of 4 r f ^M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRo�r}� COUNCIL ACTION: Approved on 3/27/2012 -Ordinance No. 20139-03-2012 DATE: 3/27/2012 REFERENCE NO.: **C-25529 LOG NAME: 60SS56P2CO2- CONATSER CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 2 in the Amount of$175,653.75 for a Total Contract Amount of$868,088.75 to City Secretary Contract No. 41807 with Conatser Construction TX, LP, for Sanitary Sewer Rehabilitation Contract 56, Part 2 on Portions of West Peter Smith Street, West Cannon Street, West Leuda Street, West Terrell Avenue, College Avenue, Alston Avenue and Lipscomb Street and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 8 and 9) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$175,653.75 from the Water and Sewer Operating Fund to the Sewer Capital Projects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund by the amount of$175,653.75 from available funds; and 3. Authorize the execution of Change Order No. 2 in the amount of$175,653.75 to City Secretary Contract No. 41807 with Conatser Construction TX, LP, for Sanitary Sewer Rehabilitation Contract 56, Part 2, thereby increasing the contract amount to $868,088.75. DISCUSSION: On May 17, 2011, (M&C C-24912) City Council authorized the execution of a contract in the amount of$696,387.00 with Conatser Construction TX, LP, for Sanitary Sewer Rehabilitation Contract 56, Part 2. The contract was subsequently revised by one change order with a credit of$3,952.00 administratively approved by the City Manager on September 6, 2011. During sewer installation, existing wet soil subgrade was encountered on the project streets that caused backfill material to fail density testing. In addition, City standard pavement repair could not be conducted because the wet soil condition would cause the pavement to fail. This change order will provide compensation for the installation of geogrid material in conjunction with permanent pavement repairs in order to strengthen the soil as well as the installation of temporary pavement pending permanent pavement repair. The total cost of work under this change order is $175,653.75. Taking into account the previous credit of$3,952.00, the total contract amount will be increased by $171,701.75, or 24.66 percent. Staff considers the change order amount to be fair and reasonable and recommends approval. M/WBE—Conatser Construction TX, LP, is in compliance with the City's M/WBE Ordinance by committing to an additional 18 percent M/WBE participation on this Change Order No. 2. The City's goal on this Change Order No. 2 is 18 percent. This project, Part 2, is located in COUNCIL DISTRICTS 8 and 9, Mapsco 76H and 76M. http://apps.cfwnet.org/council_packet/mc_review.asp?ID=16527&councildate=3/27/2012 3/29/2012 "M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 2) P258 541200 709170102983 $175.653.75 3) P258 541200 709170102983 $175.653.75 1&2) $175.653.75 1) PE45 538040 0709020 $175.653.75 P258 476045 709170102983 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: Susan Schwinger (6529) ATTACHMENTS 60SS56P2CO2-CONASTER MAP pdf 60SS56P2CO2-CONATSER A012.doc http://apps.cfwnet.org/council_packet/mc_review.asp?ID=16527&counciidate=3/27/2012 3/29/2012 CD N N = O cc U a — n ) w C, o W J m 0 c i 0 �L.• m ti N Cn M CO O N N O J Q Q oar! m CO) w Co O 4m U Q N U L' H CD M N s CO V CO W L N H � L a o "', " 7E CN cu 40 40 40 40 40 40 40 40 40 U N N U Cn W W L t~O N L 'L 0 U +�•, O L 7E U Ncn9 O vi m C L li °± CO o c 0 � N T tV r cu O N CL cc cn cA � UoU L a E z p Q U L L Q II m rn o U) m (D cu c a� O m r- : cc cc a rn O � E Q > cc Q ° ° cn Q Q 0) til o •- cn c U cu a- � c v O Z o ai `��° X o ° U- � c c �, u- c'a owU Ea o U- U U a a Z Z 4) U Q ° U m .� Fu O O U E to U �' O p) C C >, >, C Q cu- p 01 C O > C E v Q Q O '_' O : O C O E N O N -0 a a m U U o Q O U Q af U af Q