WHEREAS, the City of Fort Worth (City) and W.S. Mineral Holdings, LLC (Developer)' entered into a
Community Facilities Agreement, City Secretary Contract No. 44709 ("CFA" ; and
WHEREAS it has become necessary to execute Amendment No. I to the CFA to allow City
participation up to an amount of$324,309.64 for the City's portion of costs associated with the construction of
two eastbound lanes of Sendera Ranch Boulevard and associated storm drain infrastructure contemplated by
the CFA; and
WHEREAS, the City Council authorized execution of Amendment No. I to the CFA on the
day of 2014 via M&C
NOW THEREFORE, City and Developer, acting herein by and through their duly authorized
representatives, enter into the!following agreement, which amends the CFA.-
Cost Summary Table is amended to be and read:
Developer's Cost City's Cost Total Cost
A. Water and Sewer Construction
1. Water $ $
Water Construction Cost Total' $
B. T Construction
1- Street $ 70,090.00 $ 2191847-37 $ 2893937-37
IJ
2. Storm Drain $ 3441 910.00 $ 104;462.27 $ 44913 72.2 7
3. Street Lights Installed by Developer $ 23260.00 1126
20.010
TPW Construction Cost Total $ 417,260.00 $ 324,309.64 741;569.64
Construction Fees.-
C. Water/Sewer Inspection Fee (2%) $
D. Water/Sewer Material Testing Fee (2%) $ - $
E,. T Inspeciton Fee (4%) $ 29,572.39 $ $ 29,572-39
F. TPIW Material Testing Fee (2%) $ 14,786.19 $ $ 14,786.19
G. Street Light Inspection Fee (4%) 90.40 910.40
Total Construction Fees $ 44,448.98 443448.98
TOTAL PROJECT COST $ 461,708-98 $ 3249309-64 $ 786,0118-62
2.
All other provisions of the CFA, which are not expressly amended herein, shall remain in fall force and �`
effect
AMENDMENT NO.I 0,1[' F,
Project:Sendera Ranch,Boulevard,Section Ill
Page 1 of 2 qti
RECEIVED MAR 2 7 f
IfIN011f,"a wo 11/11T No TX
�;,,rragj gg
monom.................
M&C Review Page 1 of 2
Official site of the City of Fort Worth,Texas
FoRTWORTII,.
AW
L y %Ihlouu L" I At"E'DA
NA L Am
T
....rv...,._ _.. x,_.;. .
b......�.................�x....-.........'y.�...w.r..._„...�....._..�-................M_,...........,.,L.,.......
._ . _ . . .. .. .. ....._ .... ... ...... . . .. .. .. . ......_..- ....... . . ..... . ..__>..._ ....._ �L^r-'•M�w;�...,.........,;�';,:..•:a�.,.r..k,,...�:'.'>�:_`;:,
COUNCIL ACTION: Approved on 3118/2014 -Ordinance No. 21161-43-2014
u..::....:.-. _ r.., - - -
> .:y�,...-
............... .r..r.................�....................,, ..................................w.. ww.,....,s„,..^,«^c:•,r.:� ;•:�: :::z*". "�::: �r.�i..'.'" ..^�� .�v'&.,r3... ��:�•.a^`�;::,..�..� �?�.a:.;"�,,.:: :�:?'�.rv..-,. ..;ya.,r..
........_..�..,.. r.✓..._.........................,....._..-.......-._._..........i...........-...s...........•�.✓.•�-`-_..,......._..._.x.....-....�..-.. ..... �:��rt...�,r_......�� „..v......�n x--�„'^:�""•:h"�:._.s..�...........'�r..M.."`"=�u::�........x..._...._.�......-..--......,.�.;3°._.......,.tiaS:.<.o-�'-'x::':<->�.._..........-."'��..v..._-...............,.-._.......,...x.. _k....�.........-�......a_....�.a".�.�.H�,e
DATE: 3/1812014 REFERENCE NO.: **C-26706 LOG NAME: 061009 SENDERA
RANCH BLVD BRIDGE
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of an Amendment to the Community Facilities Agreement, City
Contract No. 44709, with W.S. Mineral Holdings, LLC, Authorize City Participation in an
Amount Not to Exceed $324,309.64 for the Construction of Sendera Ranch Boulevard from
Bronc Pen Lane to Mustang Ridge Drive and Adapt Appropriation Ordinance (COUNCIL
DISTRICT 7)
r.�..a�.
. ..zl.. .....',g�'.;.'� � �....:... ...] ... �:i.::....:;.�•5 xx:F'v k?�^:.•;,'".-�.r�i�"�•">� "i4.�'. 5"� :.-.,r':Tj.?:. :nA w :s:�•:,,;...e.;
.r:.....� x, ...��'::........�::..:.�...... �•.. .].-.:.:.:.....:..r..,,...(: ..�.� 1.?�X✓'T °may" h,":� :j%:.^„v�:'l.Y.m.>..��....,,.
....,,........-...✓.'-.�... .....A... ...-,..............-.�.....n,'k�,:.T,'....:....�.....-...a....:.-„.. .v..✓.- ;:Y'r''Y`'✓a'�, u-.ry !'.v�l.:i...� ""�/..".s,P.'.,r��:5�. �i�„"_ �.'YZ'.°-r ..>✓•.:.... hl::firi:wa'y
�................._..............�....a................u..-.........,..............�.._.........,...........>.-.................�...............�..,3?'a�....�.-...,,.u,-�.-�.___,s......._...a,?"���..,...,...:.�................��.......:.�_...........<.a..�..�.'�.....����a�i:?��:?'M._.�..�_..._�.2.......-�."'�.....,..._..��:�....._._ti.�rc��_,.............:.��.�::�':...�u�'{:.........................._.....,..:,�...-x.....,......:....,........�;:.�:�•w��:�.,:=::;r�::r.._:r.„m rns:�'>......�.......a<�r�
RECOMMENDATION:
It is recommended that the City Council:
1, Authorize the execution of an amendment to the community facilities Agreement, City Secretary
No. 44709, with W.S. Mineral Holdings, LLC, for City participation in,an-•amount not to exceed
$324,309.64 for the construction of two eastbound lanes of Seridera,,Ra.rrch'.-Boulevard including
associated storm drainage infrastructure; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and:appropriations in
the Transportation Impact Fund in the amount of$324,309.64 from available funds.
DISCUSSION:
Sendera Ranch Boulevard is classified as a principal arterial per the City;-of Fort Worth Master
Thoroughfare Plan. Currently, the portion of the arterial between B�rancc pen Lane and Mustang Ridge
Drive is an improved two-lane roadway. The Developer, W.S. Mineral Holdings, LLC, and the City
desire to construct an additional two lanes, thus creating a four-lane divided arterial. This added
capacity is not required of the Developer, but the Developer desires to participate in making cert1n Y 1
street, storm drainage and street light improvements to Sendera Ranch.Boulevard. The total cost of
the improvements and related support services, including construction, engineering, surveying an"d
inspection is estimated to be $786,018.62, The Developer and the''City:of.'Fort-Worth will share in-1he
cost of this project as reflected by the table below.
TEM TOTAL DEVELOPER'S'CoST CITY'S COST.......
Paving $289,937.37 $ 70,090.00 $219,847.37
Storm Drain $449,372.27 $344,910,0 462.271
r
Street Lights 11 $ 2,260.0_0 E 21260 $ 0.00
Total Construction Costs 1 $741,569.64 $417,260.00 X324,309.64
inspection Fee (four percent) $ 29,572.39 $ 29=572,39 $ 0.00
Material Testing (two percent) $ 14,786.19 $ 14,785.;1 J� F $ 0.00
Street Light inspection Cost $ 90.40 $ :9 $ 0.00 .
Total Fees $44,448.98 $'441r 44 .' '0.00
Total
Total Project Cost $786,018.62 $46'1;7p$g3 $324,309.64 y 4-
http://apps.cfwnet.org/council packet/rnc review.asp?ID=17437&cotunci date=3118/2014 03/21/2914
r
M&C Review s Page 2 of 2
Because of the significant need in this area, the City of Fort Worth desires to have this portion of
Sendera Ranch Boulevard completed as soon as possible. This project was competitively, publicly
bid by the developer in accordance with City procurement policy and state law.
This project is located in COUNCIL DISTRICT 7, Mapsco 5L.
FISCAL INFORMATIONXERTIFICATION:
The Financial Management Services Director certifies that, upon approval of the above
recommendations and adoption of the attached appropriation ordinance, funds will be available in the
current capital budget, as appropriated, of the Transportation Impact Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
0206 488139 005'1249991200 3 4,309.64
C206 54'-126&;-.202230116183 $324,309.54
0206 541204 0061 249991 200 324,309,64
.....__.,_........ ._._-- ......._..........._...�.. ._K._.._.....__...� ...,,._... _�.,..,. n..._; __.w._
Submitted for City Manager's office b : i-'
Fernando Cosfa���61�2
Originating Department Head: Randle Harwood (6101)
Additional Information Contact: David Schroeder(2239)
ATTACHMENTS
061000 SENDERA RANCH BLVD BRIDGE AC] Rev 3.06. 4 .dOc- .;:
t
Sendera Ranch Blvd Bridge Location Ma . df
http://apps.cfwnet.org/council packet/mc review.asp?III=17437&counciIdate=311812014 03/21/2014
IN TESTIMONY WHERE OF,the City of Foil Worth has caused this instrument to be executed in
quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the
corporate seal of the City affixed, and said Developer has executed this 'Instrument in quad ruplicate, at Fort
Worth, Texas this 1901 day of 20JN
CITY OF FORT WORTH-Recomniended by:
Water Department uansportation &Public Works Department
'7sp,
J. CJ
Wendy Chi-Babulal,EMBA,,P.E. Dough 0W. Wiersig,P.E.,
14
Development Engineering Manager Director
Appromd as to Forin &Legality: Approved by City Manager's Office
.............
10 010
.................
DOU, hls-V.Black Fernando Costa
9
Assistant City Attorney Assistant City Manager
M&C No.
Date-,
FO
ATTEST:
41
01/ R
00
0 0
Mary J.Kayser,
City Secretary
DEVELOPER.-
W.S. MINERAL HOLDINGS, LLC
a Texas limited liability company
By.- Centamtar Terras, LLC
Its Manager
By: CTMGT, LLC
a Texas, limited liability company
Its: Manager
1
f
By 110
.............
Name-,
Its: OFFICIAL RECORD
'0'
?%RY
AMENDMENT Cl"'ff 3,1ECRE'
Project:Sendara Ranch Boulevard,Section III