HomeMy WebLinkAboutContract 41831 CITY SECRETARY
CONTRACT NO. I
NATURAL GAS PIPELINE LICENSE AGREEMENT
This PIPELINE LICENSE AGREEMENT ("Agreement") is hereby made and
entered into by and between the CITY OF FORT WORTH ("City"), a home rule municipal
corporation organized under the laws of the State of Texas and acting by and through Fernando
Costa its duly authorized Assistant City Manager, and TEXAS MIDSTREAM GAS
SERVICES, L.L.C., ("Company"), an Oklahoma limited liability company, acting by and
through Dave Johns as Manager,Property Rights.
The following statements are true and correct and constitute the basis upon which the
City of Fort Worth has executed Agreement.
A. Texas Midstream Gas Services, L.L.C., an Oklahoma limited liability
company("Company"), wishes to construct a Twelve (20") nominal diameter pipeline for an
approximate total distance of 805.46 linear feet within a twenty (20') foot wide right of way
corridor for the transportation of Natural Gas through the portion of property described in
Exhibit "A", hereinafter referred to as "City Property". Because Company is not a public
Utility, as that term is used in the City Charter and City Code, and because Company will not be
providing services to end user customers in the City, Company is not required to obtain a
franchise from the City, but is required to obtain the City's consent pursuant to a license
agreement that sets forth the terms and conditions under which Company may use the City
Property.
B. The City has reviewed Company's request and agrees to grant Company a license
to use a portion of the surface and subsurface of the City Property as described in Section 6.4 and
as further set out in Exhibit(s)"A". in order to construct,operate and maintain a pipeline,on the
terms and conditions set forth herein, solely for the transportation of Natural Gas and solely in
accordance with the terms and conditions of this Agreement. For initial construction, a
temporary construction workspace as described in Exhibit(s)"A" is also granted as part of this
agreement.
Agreement
1. DEFINITIONS.
Capitalized terms used in this Agreement and not otherwise defined within this
Agreement shall have the following meanings:
Affiliate shall mean any individual,partnership,association,joint stock company,limited
liability company,trust,corporation,or other person or entity who owns or controls, or is
owned or controlled by, or is under comm wnership or control with, the entity in
question.
OFFICIAL RECORD
CITY SECRETARY
Natural Gas Pipeline License Agreement-Trin ty Ri J„� RTHI 1" Pagc 1 of 20
F7.YY��
Agreement shall mean the authorization issued to Company hereunder to use a portion of
the City Property in the location as set out in Exhibit(s) "A". for (i) the construction,
installation,maintenance and repair of Company's Pipeline; (ii)the use of such Pipeline
for the transportation of Natural Gas; and (iii) any other directly related uses of the City
Property,pursuant to and in accordance with this Agreement.
City shall mean the area within the corporate limits of the City of Fort Worth,Texas and
the governing body of the City of Fort Worth,Texas.
City Facility shall mean all incidental underground and aboveground attachments,
equipment and appurtenances,including,but not limited to manholes,manhole vents,
lateral line connections,valves,pipelines,junction boxes,fire hydrants,meter vaults,lift
stations in,upon,under and across a portion of the City Property.
City Property shall mean that property as limited to and described in Exhibit(s)"A".
Commission shall mean the Railroad Commission of the State of Texas or other
authority succeeding to the regulatory powers of the Commission.
Company shall mean Texas Midstream Gas Services,an Oklahoma limited liability
company,only and shall not include any Affiliate or third party.
Customer shall mean any Person located,in whole or in part,within the City.
Director shall mean the Director of the City's Planning and Development Department or
authorized representative.
Gas shall mean gaseous fuels,such as natural gas,artificial gas,synthetic gas,liquefied
natural gas,manufactured gas,or any mixture thereof.
Person shall mean,without limitation,an individual,a corporation,a limited liability
company,a general or limited partnership,a sole proprietorship,a joint venture,a
business trust or any other form or business entity or association.
Pipeline shall mean that certain Twenty(20")inch nominal diameter steel pipeline for an
approximate total distance of 805.46 total linear feet and other facility locations as
approved by the Director that are installed by Company in the City Property in
accordance with this Agreement and pursuant to the rules and regulations as promulgated
by the U.S. Department of Transportation, Office of Pipeline Safety, as set out in the
Code of Federal Regulations,Section 192 as adopted and modified by the Texas Railroad
Commission.
Natural Gas Pipeline License Agreement-Trinity River Levee
Page 2 of 2U
2. GRANT OF RIGHTS.
2.1. General Use of The City Property for Provision of Gas.
Subject to the terms and conditions set forth in this Agreement and the City
Charter and ordinances, the City hereby grants Company a license to(i)erect,construct,
install and maintain the Pipeline consisting in, over, under, along and across the City
Property at a depth of no less than 36"and(ii)transport Gas through the portions of its
Pipeline in, over, under, along and across City Property as depicted in Exhibit "A".
Company hereby acknowledges and agrees that this Agreement allows only the
transportation of Gas through the City and does not allow Company to distribute, sell or
otherwise provide Gas to any Customer.
2.2. Nonexclusive.
This Agreement and all rights granted to Company herein are strictly
nonexclusive. The City reserves the right to enter into and grant other and future licenses
and other authorizations for use of the City Property to other Persons and entities in
accordance with applicable law and as the City deems appropriate; provided, however,
that as to the grant of subsequent licenses for use of the City Property that is solely within
the discretion of the City,if a dispute arises as to priority of the use of the City Property,
the City will resolve such dispute in a manner that does not result in unreasonable
interference with Company's operation of the Pipeline for the purposes provided for
herein. This Agreement does not establish any priority for the use of the City Property by
Company or by any present or future licensees or other permit holders. In the event of
any dispute as to the priority of use of the City Property, the first priority shall be to the
public generally, the second priority to the City in the performance of its various
functions,and thereafter,as between licensees and other permit holders,as determined by
the City in the exercise of its powers, including the police power and other powers
reserved to and conferred on it by the State of Texas.
2.3. Other Permits.
This Agreement does not relieve Company of any obligation to obtain permits,
licenses and other approvals from the City or other regulatory agency necessary for the
construction, installation, maintenance or repair of Company's Pipeline or the
transportation of Natural Gas through such Pipeline.
2.4. Bonds.
Prior to the commencement of any construction work in the City Property, that
requires a cut, opening or other excavation, Company shall deliver to the City bonds
executed by a corporate surety authorized to do business in the State of Texas and
acceptable to the City in the proportional amount of the cost of work under the
construction contract or construction project that will be performed in the City Property.
Natural Gas Pipeline License Agreement-Trinity River Levee Page 3 of 20
The bonds shall guarantee(i)satisfactory compliance by Company with all requirements,
terms and conditions of this Agreement and (ii) full payments to all persons, firms,
corporations or other entities with whom Company has a direct relationship for the
performance of such construction,maintenance or repairs.
If any such construction, maintenance and repair work is undertaken by a
contractor of Company, Company shall also require such contractor to deliver to
Company bonds executed by a corporate surety authorized to do business in the State of
Texas and acceptable to the City in the proportional amount of the cost of work under the
construction contract or construction project that will be performed by the contractor in
the City Property. The bonds shall guarantee(i)the faithful performance and completion
of all construction,maintenance or repair work in accordance with the contract between
Company and the contractor and(ii)full payment for all wages for labor and services and
of all bills for materials,supplies and equipment used in the performance of that contract.
Such bonds shall name both the City and Company as dual obligees.
3. TERM
This Agreement shall become effective on the date as of which both parties have
executed it("Effective Date")and shall expire at 11:59 P.M.CST twenty(20)years
from the last date of notarial acknowledgement unless terminated earlier as provided
herein.
4. FEES AND PAYMENTS TO CITY.
4.1. License Use Fee.
On or prior to the Effective Date, Company shall pay the City as compensation
for its use of the City Property for the Term of this Agreement the sum of Thirty-eight
thousand fifty-seven dollars Ninety-nine cents ($38,057.99) ("License Fee"). Company
hereby acknowledges and agrees that the amount of this License Fee is non-refundable
and constitutes just and reasonable compensation to the City for Company's use of the
City Property.
4.2. Other Payments.
In addition to the License Fee,Company shall pay the City all sums which may be
due the City for property taxes, license fees,permit fees, or other taxes, charges or fees
that the City may from time to time impose on all other similarly situated entities within
the City.
4.3. Interest.
All sums not paid when due shall bear interest at the rate of ten percent(10%)per
annum or the maximum amount allowed by law,whichever is less,computed monthly. If
such outstanding sums are paid with interest within thirty (30) days following their
Natural Gas Pipeline License Agreement-Trinity River Levee Page 4 of 20
respective due dates, Company's failure to pay such sums by their respective due dates
shall not, in and of itself, constitute an Event of Default under Section 9 of this
Agreement.
5. REGULATORY AUTHORITY OF THE CITY.
Company's property and operations hereunder shall be subject to such regulation
by the City as may be reasonably necessary for the protection or benefit of the general
public. In this connection, Company shall be subject to, governed by and shall comply
with all applicable federal, state and local laws, including all ordinances, rules and
regulations of the City,as same may be adopted and amended from time to time.
6. USE OF THE CITY PROPERTY.
6.1. Compliance with Laws,Ordinances Rules and Regulations.
The City has the right to control and regulate the use of the City Property,Public
Rights of Way, public places and other City-owned property and the spaces above and
beneath them. Company shall comply with all applicable laws, ordinances, rules and
regulations, including, but not limited to, City ordinances, rules and policies related to
construction permits, construction bonds, pennissible hours of construction, operations
during peak traffic hours, barricading requirements and any other construction rules or
regulations that may be promulgated from time to time.
6.2. No Undue Burden.
The Pipeline shall not be erected, installed, constructed, repaired, replaced or
maintained in any manner that places an undue burden on the present or future use of the
City Property by the City and the public. If the City reasonably determines that the
Pipeline does place an undue burden on any portion of the City Property, Company, at
Company's sole cost and expense and within a reasonable time period specified by the
City, shall modify the Pipeline or take other actions determined by the City to be in the
public interest to remove or alleviate the burden.
6.3. Notice
Prior to the undertaking of any kind of construction, installation, maintenance,
repairs or other work that requires the excavation, lane closure or other physical use of
the City Property, Company shall, except for work required to address an emergency,
provide at least twenty-four(24)hours'advance written notice to the City and the owners
of property adjacent to the City Property that will be affected. In the case of emergencies
Company shall provide notice to the affected landowners within twenty-four (24) hours
after commencement of work.In addition,during any such work,Company shall provide
construction and maintenance signs and sufficient barricades at work sites to protect the
public.
Natural Gas Pipeline License Agreement-Trinity River Levee Page 5 of 20
6.4 MinimalInterfcrence.
Company will take all reasonable planning to minimize harm to the City Property
and shall comply with conditions as set forth below:
6.4.1.Company shall coordinate and participate in a preconstruction meeting with
City of Fort Worth Planning and Development staff to evaluate and address any issues or
concerns at least seven calendar days prior to the start of construction. Company must
provide video media of the Property to document the condition of the Property prior to
installation of the Pipeline at the time of the preconstruction meeting. Within thirty(30)
days of completion of the installation of the Pipeline Company shall provide video media
of the Property documenting the condition of the Property..
6.4.2. No closure of Trinity Trail is shall be allowed. Trail must be re-routed
using compacted 3/8"minus flex base or asphalt.
6.4.3 Company shall not have the right to place permanent above ground
facilities on City Property.
6.4.4. Company shall have the right to bore and open trench as shown in
Exhibit"A".
6.4.5. Appropriate erosion control measures must be implemented during
construction.
6.4.6. Company shall have right from time to time to cut undergrowth and other
obstruction on City Property. Company shall also have the ability to remove any trees in
the City Property tract with the written approval of the City.
6.4.7. The use of traffic control devices shall be consistent with the standards
and provisions of Part VI of the Texas Manual on Uniform Traffic Control Devices.
Company shall utilize appropriate warning lights at all construction and maintenance
sites where one or more traffic lanes are closed or obstructed during nighttime conditions.
6.4.8 No use of the Property is permitted for storage or any other purpose
outside of the temporary work space.
6.4.9 Company agrees to repair and restore any damage to the Trinity River Trail
based on the paving details attached in Exhibit`B".
6.4.10 Company shall install orange mesh fencing around the temporary
construction area during initial construction.
6.4.11 Company shall backfill and compact soil in the license tract and all
affected areas to 95%. All backfill must consist of impervious materials. Company shall
reestablish vegetation to its original condition or better. A seed injected compost blanket
Natural Gas Pipeline License Agreement-Trinity River Levee Page 6 of 20
minimum 2"depth shall be used on any slopes greater than 6:1. Seed composition for re-
seeding shall be Japanese Millet and Common Burmuda.
6.4.12 Company shall post signs on the property referencing the upcoming
construction at least one week in advance of the initiation of work in the area.
6.4.13 Company shall post a flagman at the crossing during periods that the
access is being made across the trail section.
6.4.14 Company shall always give trail users the primary right of way.
6.5. "As-Built"Plans and Maps.
Company, at Company's sole cost and expense, shall provide the City with as-
built plans of all portions of the Pipeline located in the City and the City's extraterritorial
jurisdiction and maps showing such Pipeline within ninety (90) calendar days following
the completion of such Pipeline. Company shall supply the textual documentation of
such as-built plans and maps in computer format as requested in writing by the City and
shall otherwise fully cooperate with the City in ensuring that the Pipeline is accurately
reflected in the City's mapping system.
6.6. Specifications of the Pipeline
The Company shall erect, install, construct, repair, replace and maintain the
Pipeline pursuant to this Agreement, Chapter 15 of the City Code and all other state and
federal laws. The Pipeline shall not exceed the size and specifications stated herein and
further set out in Exhibit "A" and be placed at a depth of no less than 36 inches
throughout the entire length of the City Property, however, if the Pipeline within City
Property will be crossing any existing City Facility, the Pipeline must cross the City
Facility at a not less than a 70 degree angle and be buried at a minimum of 60 inches
below the bottom of the lowest City Facility.Notwithstanding the foregoing statements,
should Company require varying from the above requirements, such variance shall
require City evaluation of the respective variance to depth or proposed angle of crossing
to determine the practicability of such request. Furthermore, if the Pipeline within the
City Property crosses a 16-inch or greater water or sanitary sewer facility,an emergency
response plan must be included. The emergency response plan shall be submitted to the
City of Fort Worth Water Department prior to the commencement of the installation of
the Pipeline and shall establish written procedures subject to the approval of the City of
Fort Worth Water Department to minimize any hazard resulting to any City Facility.
6.7. Marking of Pipeline.
The Pipeline shall be marked,in a manner that is acceptable to the Director and in
compliance with Federal Regulations, to show conspicuously Company's name and a
toll-free telephone number of Company that a Person may call for assistance.
Natural Gas Pipeline License Agreement-Trinity River Levee Page 7 of 20
6.8. Surface Excavation.
The City shall have the right to coordinate all excavation work in the City
Property in a manner that is consistent with and convenient for the implementation of the
City's program for property management in order to preserve the integrity of the City
Property.
6.9. Relocation of Pipeline.
Within forty-five (45) calendar days following a written request by the City,
Company, at Company's sole cost and expense, shall protect, support, disconnect or
relocate to another portion of the City Property all or any portion of its Pipeline due to
street or other public excavation, construction, repair, grading, regrading or traffic
conditions;the installation of sewers,drains,water pipes or municipally-owned facilities
of any kind; the vacation, construction or relocation of streets or any other type of
structure or improvement of a public agency; any public work; or any other type of
improvement necessary, in the City's sole discretion, for the public health, safety or
welfare. If Company reasonably requires more than forty-five(45)days to comply with
the City's written request, it shall notify the director of the City's Planning and
Development Department in writing and the City will work in good faith with Company
to negotiate a workable time frame.
6.10. Restoration of the City Property, Public Rights-of-Way and Public/Private
Property.
Company, at Company's sole cost and expense,and in a manner approved by the
City,shall promptly restore any portion of the City Property,Public Rights of Way,other
City-owned property or other privately-owned property that are in any way disturbed or
damaged by the construction, operation, maintenance or removal of any of the Pipeline
to, at Company's option, as good or better a condition as such property was in
immediately prior to the disturbance or damage. Company shall diligently commence
such restoration within thirty (30) calendar days following the date that Company first
became aware of the disturbance or damage or, if the Pipeline is being removed,within
thirty(30)calendar days following such removal.
6.11. Emergency Procedures
6.11.1. For purposes of this Section, a public emergency shall be any condition
which, in the opinion of the officials specified herein, poses an immediate threat
to life, health or property and is caused by any natural or man-made disaster,
including, but not limited to, storms, floods, fires, accidents, explosion, water
main breaks and hazardous materials spills. In the event of a public emergency,
the City shall have the right to take whatever action is deemed appropriate by the
City Manager, Mayor, Police Chief or Fire Chief, or their authorized
representatives, including,but not limited to, action that may result in damage to
Natural Gas Pipeline License Agreement-Trinity River Levee Page 8 of 20
the Pipeline, and Company hereby (i) releases the City, its officers, agents,
servants, employees and subcontractors from liability or responsibility for any
Damages, as defined in this Agreement, that may occur to the Pipeline or that
Company may otherwise incur as a result of such a response,and(ii) agrees that
Company,at Company's sole cost and expense,shall be responsible for the repair,
relocation or reconstruction of all or any of its Pipeline that is affected by such
action of the City.
In responding to a public emergency, the City agrees to comply with all
local, state and federal laws, including any requirements to notify the Texas One
Call System,to the extent that they apply at the time and under the circumstances.
In addition,if the City takes any action that it believes will affect the Pipeline,the
City will notify Company as soon as practicable so that Company may advise and
work with the City with respect to such action.
6.11.2.The Company shall maintain written procedures to minimize the hazards
resulting from an emergency. These procedures shall at a minimum provide for
the prompt and effective response to emergencies, including, but not limited to,
leaks or releases that can impact public health safety or welfare;fire or explosions
at or in the vicinity of the Pipeline,natural disaster;effective means to notify and
communicate required and pertinent information to local fire, police and public
officials during an emergency;the availability of personnel, equipment,tools and
materials as necessary at the scene of an emergency; measures to be taken to
reduce public exposure to injury and probability of accidental death or
dismemberment; emergency shut down and pressure reduction of a Pipeline; the
safe restoration of service following an emergency or incident; and follow-up
incident investigation to determine the cause of the incident and require the
implementation of corrective measures.
6.11.3.Upon the discovery of an emergency, the Company shall immediately
communicate to the City's 911 system and the Planning and Development
Department designee the following information:
a. A general description of the emergency;
b. The location of the emergency or incident;
C. The name and telephone number of the person reporting the
emergency;
d. Whether or not any hazardous material is involved and
identification of the hazardous material so involved;and
e. Any other information as requested by the emergency dispatcher or other
such official at the time of reporting the emergency or incident
6.12. Removal of Pipeline.
Upon the revocation, termination or expiration without extension or renewal of
this Agreement, Company's right to use the City Property under this Agreement shall
Natural Gas Pipeline License Agreement-Trinity River Levee Page 9 of 20
cease and Company shall immediately discontinue the transportation of Gas in or through
the City. Within six(6)months following such revocation,termination or expiration and
if the City requests, Company, at Company's sole cost and expense, shall remove the
Pipeline from the City Property (or cap the Pipeline, if consented to by the City), in
accordance with applicable laws and regulations. If Company has not removed all of the
Pipeline from the City Property, (or capped the Pipeline, if consented to by the City)
within six (6)months following revocation,termination or expiration of this Agreement,
the City may deem any portion of the Pipeline remaining in the City Property abandoned
and, at the City's sole option, (i)take possession of and title to such property or(ii)take
any and all legal action necessary to compel Company to remove such property;
provided, however, that Company may not abandon its facilities or discontinue its
services within the City without the approval of the Commission or successor agency or
any other regulatory authority with such jurisdiction.
Within six (6) months following revocation, termination or expiration of this
Agreement and in accordance with Section 6.10 of this Agreement, Company shall also
restore any property, public or private, that is disturbed or damaged by removal (or, if
consented to by the City,capping)of the Pipeline. If Company has not restored all such
property within this time, the City, at the City's sole option, may perform or have
performed any necessary restoration work, in which case Company shall immediately
reimburse the City for any and all costs incurred in performing or having performed such
restoration work.
7. LIABILITY AND INDEMNIFICATION.
7.1. Liability of Company.
Company shall be liable and responsible for any and all damages, losses,
liabilities (joint or several),payments, obligations,penalties, claims, litigation, demands,
defenses,judgments, lawsuits,proceedings, costs,disbursements or expenses(including,
without limitation,fees,disbursements and reasonable expenses of attorneys,accountants
and other professional advisors and of expert witnesses and costs of investigation and
preparation) of any kind or nature whatsoever (collectively "Damages"), which may
arise out of or be in any way connected with (i) the construction, installation, operation,
maintenance or condition of the Pipeline or any related facilities or appurtenances;(ii)the
transportation of Gas through the Pipeline; (iii) any claim or lien arising out of work,
labor, materials or supplies provided or supplied to Company, its contractors or
subcontractors; or(iv) Company's failure to comply with any federal, state or local law,
ordinance, rule or regulation, except to the extent directly caused by the negligent or
grossly negligent act(s)or omission(s)or intentional misconduct of the City.
COMPANY HEREBY ASSUMES ALL LIABILITY AND RESPONSIBILITY
FOR PROPERTY LOSS,PROPERTY DAMAGE AND/OR PERSONAL INJURY OF
ANY KIND,INCLUDING DEATH, TO ANY AND ALL PERSONS, OF ANY KIND
OR CHARACTER, WHETHER REAL OR ASSERTED,ARISING OUT OF OR IN
CONNECTION WITH ITS USE OF THE PREMISES UNDER THIS AGREEMENT
Natural Gas Pipeline License Agreement-Trinity River Levee Page 10 of 20
OR WITH THE USE, MAINTENANCE, OCCUPANCY, EXISTENCE OR
LOCATION OF THE PREMISES, EXCEPT TO THE EXTENT CAUSED SOLELY
BY THE NEGLIGENCE OR INTENTIONAL MISCONDUCT OF THE CITY.
7.2 Indemnification.
COMPANY, AT COMPANY'S SOLE COST AND EXPENSE, SHALL
INDEMNIFY AND HOLD HARMLESS THE CITY, ITS OFFICERS, BOARDS,
COMMISSIONS, AGENTS, EMPLOYEES AND VOLUNTEERS
("INDEMNITEES'), FROM AND AGAINST ANY AND ALL DAMAGES WHICH
MAY ARISE OUT OF OR BE IN ANY WAY CONNECTED WITH (I) THE
CONSTRUCTION, INSTALLATION, OPERATION, MAINTENANCE OR
CONDITION OF THE PIPELINE OR ANY RELATED FACILITIES OR
APPURTENANCES; (II) THE TRANSPORTATION OF GAS THROUGH THE
PIPELINE; (III) ANY CLAIM OR LIEN ARISING OUT OF WORK, LABOR,
MATERIALS OR SUPPLIES PROVIDED OR SUPPLIED TO COMPANY, ITS
CONTRACTORS OR SUBCONTRACTORS; OR (IV) COMPANY'S FAILURE TO
COMPLY WITH ANY FEDERAL, STATE OR LOCAL LAW, ORDINANCE, RULE
OR REGULATION, EXCEPT TO THE EXTENT DIRECTLY CAUSED BY THE
NEGLIGENT ACT(S) OR OMISSION(S) OR INTENTIONAL MISCONDUCT OF
THE CITY.
7.3 Assumption of Risk and Environmental Remediation.
COMPANY HEREBY REPRESENTS TO THE CITY THAT (i) COMPANY
HAS FULLY INSPECTED THE PREMISES, (ii) COMPANY IS SATISFIED WITH
THE CONDITION OF THE PREMISES,AND(iii) COMPANY HAS BEEN FULLY
ADVISED OF ITS OWN RIGHTS WITHOUT RELIANCE UPON ANY
REPRESENTATION MADE BY THE CITY, ITS OFFICERS, AGENTS,
SERVANTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS,
COMMISSIONS, BOARDS OR VOLUNTEERS. COMPANY HEREBY
UNDERTAKES AND ASSUMES, FOR AND ON BEHALF OF COMPANY, ITS
OFFICERS,AGENTS, CONTRACTORS,SUBCONTRACTORS AND EMPLOYEES,
ALL RISK OF DANGEROUS CONDITIONS, IF ANY, ON OR ABOUT THE
PREMISES.
ALTHOUGH, TO THE BEST OF THE CITY'S KNOWLEDGE, THE
PREMISES COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND
LOCAL ENVIRONMENTAL LAWS AND REGULATIONS (COLLECTIVELY
"ENVIRONMENTAL LAWS'), TIM CITY DOES NOT WARRANT SUCH
COMPANY HEREBY COVENANTS AND AGREES THAT COMPANY,AT ITS SOLE
COST AND EXPENSE,SHALL BE FULLY RESPONSIBLE FOR THE VIOLATION
OF ANY ENVIRONMENTAL LAWS CAUSED, IN WHOLE OR IN PART, BY
COMPANY,ITS OFFICERS,AGENTS,SERVANTS,EMPLOYEES,CONTRACTORS,
SUBCONTRACTORS OR INVITEES, AND ANY REMEDIATION THAT MAY BE
REQUIRED AS A RESULT OF SUCH VIOLATION, EXCEPT TO THE EXTENT
CAUSED BY THE CITY.
Natural Gas Pipeline License Agreement-Trinity River Levee Page 11 of 20
7.4. Defense of Indemnitees.
In the event any action, lawsuit or other proceeding is brought against any
Indemnitee by reason of any matter for which the Indemnitees are indemnified hereunder,
the City shall give Company prompt written notice of the making of any claim or
commencement of any such action, lawsuit or other proceeding, and Company, at
Company's sole cost and expense, shall resist and defend the same with reasonable
participation by the City and with legal counsel selected by Company and specifically
approved by the City. In such an event, Company shall not admit liability in any matter
on behalf of any Indemnitee without the advance written consent of the City.
8. INSURANCE.
Company shall procure and maintain at all times,in full force and effect,a policy or
policies of insurance to provide coverages as specified herein, naming the City as an
additional insured and covering all public risks related to the use, occupancy, condition,
maintenance, existence or location of the City Property and the construction, installation,
operation, maintenance or condition of the Pipeline, including the transportation of Gas
through the Pipeline. The insurance required hereunder may be met by a combination of
self-insurance,primary and excess policies.
8.1. Primary Liability Insurance Coveraee.
• Commercial General Liability:
$1,000,000 per occurrence, including coverage for the following: (i) Premises
Liability; (ii) independent contractors; (iii)products/completed operations; (iv)
personal injury; (v) contractual liability; (vi) explosion, collapse and
underground property damage.
• Property Damame Liability:
$10,000,000 per occurrence
• Automobile Liability:
$1,000,000 per accident,including,but not limited to,all owned,leased,hired or
non-owned motor vehicles used in conjunction with the rights granted under this
Agreement
• Worker's Compensation:
As required by law;and,Employer's Liability as follows:
$1,000,000 per accident.
Natural Gas Pipeline License Agreemcnt-Trinity River Levee Page 12 of 20
8.2. Revisions to Required Coverage.
At the reasonable recommendation of the City's Risk Manager,the City may at any
time revise insurance coverage requirements and limits required by this Agreement.
Company agrees that within thirty (30) days of receipt of written notice from the City,
Company will implement all such revisions requested by the City. The policy or policies of
insurance shall be endorsed to provide that no material changes in coverage,including,but
not limited to,cancellation,termination,non-renewal or amendment,shall be made without
thirty(30)days'prior written notice to the City.
8.3. Underwriters and Certificates.
Company shall procure and maintain its insurance with underwriters authorized to
do business in the State of Texas and who are acceptable to the City in terms of solvency
and financial strength. Within thirty(30)days following adoption of this Agreement by the
City Council, Company shall furnish the City with certificates of insurance signed by the
respective companies as proof that it has obtained the types and amounts of insurance
coverage required herein. in addition, Company shall, on demand, provide the City with
evidence that it has maintained such coverage in full force and effect.
8.4. Deductibles.
Deductible or self-insured retention limits on any line of coverage required herein
shall not exceed$1,000,000 in the annual aggregate unless the limit per occurrence,or per
line of coverage,or aggregate is otherwise approved by the City.
8.5. No Limitation of Liability.
The insurance requirements set forth in this Section 8 and any recovery by the City
of any sum by reason of any insurance policy required under this Agreement shall in no way
be construed or effected to limit or in any way affect Company's liability to the City or other
persons as provided by this Agreement or law.
9. DEFAULTS.
The occurrence at any time during the term of this Agreement of one or more of
the following events shall constitute an"Event of Default"under this Agreement:
9.1. Failure to Pay License Fee
An Event of Default shall occur if Company fails to pay any License Fee on or
before the respective due date.
Natural Gas Pipeline License Agreement-Trinity River Levee Page 13 of 20
9.2. Breach.
An Event of Default shall occur if Company materially breaches or violates any
of the terms, covenants,representations or warranties set forth in this Agreement or fails
to perform any obligation required by this Agreement.
9.3. Bankruptcy,Insolvency or Receivership.
An Event of Default shall occur if Company (i) files a voluntary petition in
bankruptcy; (ii) is adjudicated insolvent; (iii) files any petition or fails to contest any
petition filed against it seeking any reorganization, arrangement, composition,
readjustment,liquidation, dissolution or similar relief for itself under any laws relating to
bankruptcy,insolvency or other relief for debtors;(iv)seeks,consents to or acquiesces in
the appointment of any trustee,receiver,master,custodian or liquidator of Company,any
of Company's property or any revenues, issues, earnings or profits thereof; (v)makes an
assignment for the benefit of creditors; or(vi)fails to pay Company's debts generally as
they become due.
9.4. Violations of the Law.
An Event of Default shall occur if Company violates any existing or future federal,
state or local laws or any existing or future ordinances,rules and regulations of the City.
9.5 Failure to Complete Construction
An Event of Default shall occur if Company fails to complete construction of the
Pipeline within one(1)calendar year from the execution of this Agreement.
10. UNCURED DEFAULTS AND REMEDIES.
10.1. Notice of Default and Opportunity to Cure.
If an Event of Default occurs on account of Company's failure to pay the License
Fee in accordance with Section 9.1 or failure to complete construction of the Pipeline in
accordance with Section 9.5, such Event of Default shall be deemed an Uncured Default
and the City shall have the right to terminate this Agreement immediately upon provision
of written notice to Company. If an Event of Default occurs for a reason other than for
failure to pay the License Fee, the City shall provide Company with written notice and
shall give Company the opportunity to cure such Event of Default. For an Event of
Default which can be cured by the immediate payment of money to the City, Company
shall have thirty (30) days from the date it receives written notice from the City to cure
the Event of Default. For any other Event of Default, Company shall have sixty (60)
days from the date it receives written notice from the City to cure the Event of Default. If
any Event of Default is not cured within the time period specified herein, such Event of
Default shall, without further notice from the City, become an "Uncured Default" and
the City immediately may exercise the remedies provided in Section 10.2.
Natural Gas Pipeline License Agreement-Trinity River Levee Page 14 of 20
10.2. Remedies for Uncured Defaults.
Upon the occurrence of an Uncured Default,the City shall be entitled to exercise,
at the same time or at different times,any of the following remedies,all of which shall be
cumulative of and without limitation to any other rights or remedies the City may have:
10.2.1.Termination of Agreement.
Upon the occurrence of an Uncured Default, the City may terminate this
Agreement. Upon such termination,Company shall forfeit all rights granted to it
under this Agreement, and, except as to Company's unperformed obligations and
existing liabilities as of the date of termination, this Agreement shall
automatically be deemed null and void and shall have no further force or effect.
Company shall remain obligated to pay and the City shall retain the right to
receive License Fees and any other payments due up to the date of termination.
Company shall remove the Pipeline from and restore the City Property as and
when requested by the City. The City's right to terminate this Agreement under
this Section 10.2.1 does not and shall not be construed to constitute any kind of
limitation on the City's right to terminate this Agreement for other reasons as
provided by and in accordance with this Agreement; provided, however, that
Company may not abandon the Pipeline without the approval of the Commission
or successor agency or other regulatory authority with jurisdiction, if such action
without such approval is prohibited at the time by applicable federal or state law
or regulation.
10.2.2.Legal Action Against Company.
Upon the occurrence of an Uncured Default, the City may commence
against Company an action at law for monetary damages or in equity, for
injunctive relief or specific performance of any of the provisions of this
Agreement which,as a matter of equity,are specifically enforceable.
11. PROVISION OF INFORMATION
11.1. Filings with the Commission.
Company shall provide upon request copies to the City of all documents which
Company files with or sends to the Commission concerning or related to its
transportation of Gas through or other operations in the City, including, but not limited
to, filings related to (i) tariffs; (ii) rules, regulations and policies requested, under
consideration or approved by the Commission; and (iii) applications and any supporting
pre-filed testimony and exhibits filed by Company or third parties on behalf of Company,
on the same date as such filings are made with the Commission. In addition, Company
shall provide the City upon request with copies of records, documents and other filings
that Company is required to maintain or supply to the Commission under any applicable
Natural Gas Pipeline License Agreement-Trinity River Levee Page 15 of 20
state or federal law, rule or regulation concerning or related to its transportation of Gas
through or other operations in the City.
11.2. Lawsuits.
Company shall provide the City with copies of all pleadings in all lawsuits to
which Company is a party and that pertain to the granting of this Agreement and/or the
transportation of Gas through the City within thirty (30) days of Company's receipt of
same.
12. COMPANY AS INDEPENDENT CONTRACTOR.
It is expressly understood and agreed that Company shall operate as an independent
contractor as to all rights and privileges granted by this Agreement, and not as an agent,
representative or employee of the City. Company shall have the exclusive right to control
the details of its business and other operations necessary or appurtenant to the transportation
of Gas in accordance with the terms and conditions of this Agreement, and shall be solely
responsible for the acts and omissions of its officers, agents, servants, employees,
contractors and subcontractors. Company acknowledges that the doctrine of respondent
superior shall not apply as between the City and Company,its officers,agents,employees,
contractors and subcontractors. Company further agrees that nothing herein shall be
construed as the creation of a partnership or joint enterprise between the City and Company.
13. ASSIGNMENT PROHIBITED.
Company may not assign or otherwise transfer any of its rights or obligations under
this Agreement unless specifically authorized in writing by the City, which authorization
shall not be unreasonably withheld; provided, however, that Company may make such an
assignment of its rights to an affiliated company without the consent of City,provided,that
upon such assignment, Company shall notify City within sixty (60) days of said
assignment. An`affiliated company' shall mean any parent,subsidiary or sister company or
other legal entity that controls,is controlled by,or is under common control with Company.
For purposes of this clause, `control' means direct or indirect ownership of fifty percent
(50%) or more of the voting rights of the subject entity. Notwithstanding such an
assignment to an affiliated company, Company shall remain liable to City for any failure to
perform hereunder by the affiliated assignee,and this provision shall thereafter be applicable
to Company and such affiliated assignee.
14. NOTICES.
Notices required pursuant to the provisions of this Agreement shall be conclusively
determined to have been delivered when (i) hand-delivered to the other party, its agents,
employees, servants or representatives, or(ii)received by the other party by United States
Mail,postage prepaid,return receipt requested,addressed as follows:
Natural Gas Pipeline License Agreement-Trinity River Levee Page 16 of 20
To THE CITY: To THE COMPANY:
City of Fort Worth Texas Midstream Gas Services,L.L.C.
D.J.Harrell,Gas Lease Program,Land Agent Dave Johns
1000 Throckmorton Manager-Property Rights
Fort Worth,TX 76102 100 Energy Way
Fort Worth,Texas 76102
with a copy to: with a copy to:
City of Fort Worth Texas Midstream Gas Services,L.L.C.
Department of Law c/o CT Corporation
Attn:Attorney for Real Property 350 North St.Paul Street,Suite 2900
1000 Throckmorton Dallas,TX 75201
15. NON-DISCRINIINATION COVENANT.
Company shall not discriminate against any person on the basis of race, color,
national origin,religion,handicap,sex,sexual orientation or familial status in the receipt of
benefits from Company's business operations, in any opportunities for employment with
Company or in the construction or installation of the Pipeline.
16. NO WAIVER.
The failure of the City to insist upon the performance of any tern or provision of
this Agreement or to exercise any rights that the City may have,either under this Agreement
or the law, shall not constitute a waiver of the City's right to insist upon appropriate
performance or to assert any such right on any future occasion.
17. GOVERNING LAW AND VENUE.
This Agreement shall be construed pursuant to and in accordance with the laws of
the United States of America and the State of Texas. If any action,whether real or asserted,
at law or in equity, arise out of the terms of this Agreement, Company's transportation of
Natural Gas or Company's use of the City Property, venue for such action shall lie
exclusively in state courts located in Tarrant County, Texas or the United States District
Court for the Northern District of Texas,Fort Worth Division.
18. CONFERENCES.
At the request of either the City or Company, the City and Company shall meet at
reasonable times and upon reasonable notice to discuss any aspect of this Agreement,
Company's Pipeline, Company's operations in the City, Company's transportation of
Natural Gas or Company's use of the City Property.
Natural Gas Pipeline License Agreement-Trinity River Levee Page 17 of 20
19. SEVERABILITY.
If any provision of this Agreement is held to be invalid,illegal or unenforceable by a
final order entered by a court of competent jurisdiction, the validity, legality and
enforceability of the remaining provisions shall not in any way be affected or impaired. For
purposes of this Agreement,a court order shall be final only to the extent that all available
legal rights and remedies pertaining to such order,including,without limitation all available
appeals,have been exhausted. In such an event,the City and Company agree that they shall
amend or have amended this Agreement to comply with such final order entered by a court
of competent jurisdiction.
20. FORCE MAJEURE.
In the event Company's performance of any of the terms, conditions or obligations
required by this Agreement is prevented by a cause or event that is not within Company's
reasonable control,Company's non-performance shall be deemed excused for the period of
such inability. Causes or events that are not within the Company's control shall include,but
not be limited to,acts of God,strikes,sabotage,riots or civil disturbances,failure or loss of
utilities,explosions and natural disasters.
21. HEADINGS NOT CONTROLLING.
Headings and titles, other than those captions in Section 1, that are used in this
Agreement are for reference purposes only and shall not be deemed a part of this
Agreement.
22. ENTIRETY OF AGREEMENT.
This Agreement, including the schedule of exhibits attached hereto and any
documents incorporated herein by reference, contains the entire understanding and
agreement between the City and Company as to the matters contained herein. Any prior or
contemporaneous oral or written agreement is hereby declared null and void to the extent in
conflict with the terms and conditions of this Agreement. This Agreement shall not be
amended unless agreed to in writing by both parties and approved by the City Council of the
City.
[INTENTIONALLY LEFT BLANK,SIGNATURES ON FOLLOWING PAGE]
Natural Gas Pipeline License Agreement-Trinity River Levee Page 18 of 20
EXECUTED as of the later date below:
CITY OF FORT WORTH: TEXAS MIDSTREAM GAS SERVICES L.L.C.
By: By:
Assistant City Manager 4avoManager—Property Rights
Date:/6111 Date:
APPROVED AS TO FORM AND LEGALITY:
By: o
Assistant City Attorney
M&C: (,-gAgp 51a41)1
�,�aoanitgQfl
Attested by: �► o° 0000
d
Marty Hendrix, SeQre PPPPP�� D°Oa�a°c °o a�
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Natural Gas Pipeline License Agreement-Trinity River Levee Page 19 of 20
ACKNOWLEDGEMENTS
THE STATE OF TEXAS §
COUNTY OF TARRANT §
BEFORE ME,the undersigned,a Notary Public,on this day personally appeared Fernando Costa,
Assistant City Manager of the City of Fort Worth, a home-rule municipal corporation of the State of
Texas,known to me to be the person whose name is subscribed to the foregoing instrument and,that(s)hc
has executed the same for the purposes and consideration therein expressed.
GIVEN UNDER MY HAND AND SEAL,OF OFFICE this day of 2011.
I
I
Notary Public in and for the
State of Texas ' EVONIA DAMELS
MY COMMISSION EXPIRES
sx+••••• °•`
Jigy 10,2013
My Commission Expires:
J� Print Name of Notary Public Here
THE STATE OF TEXAS §
COUNTY OF TARRANT §
BEFORE ME, the undersigned, a Notary Public, on this day personally appeared
Dave Johns, Manager—Property Rights„ on behalf of Texas Midstream Gas Services L..L.C., an
Oklahoma limited liability company„ known to me to be the person whose name is subscribed to the
foregoing instrument and, that he has executed the same for the purposes and consideration therein
expressed.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this 2.5 day of 12011.
*•. JEANETTE MICHELLE HILL
q....�
Notary Public in and for the Notary Public,State of Texas
State of Tex My Commission Expires
as
..i February 21,2015
` My Commission Expires:_V-ebN X)L{l� 2_l t ZOAs
Print Name of Notary Public Here
Ofp1C1A�RECORD
C1TY SECRETARY
YrpRTHI TX
Natural Gas Pipeline License Agreement-Trinity River Levee Page 20 of 20
EXHIBIT "A" \
bCK TARRANT BCOUNTY WATER CONT OL
AND IMPROVEMENT DISTRICT NO. 1
llllll 9 TRACTS TX—TARR—MEAP-042.O7.03
10\ lfT—TARR—MEAP-042.07.03.03
TX—TARR—M EAP-042.07.03.O4
u \ 1 BLOCKS 3, 4. 5. 7, 9, 1O, 11, 12 AND A PORTION OF 5
WATSONS ADD111ON VOL 204A PG 83
\ 12 Y VOL 2214 PG 248
(-1 45290)
/ 5
\ F`'
/
<13L OCK 12 4 \ \/
/ 3 /
i\ TARRANT COUNTY WATER CONROL
AND IMPROVEMENT
FORT WORTH INDEPENDENT SCHOOL DISTRICT NO 1
TRACT TX—TARR—MEAP-042.07.04 VOL 2195 PG 578
BLOCK A do (SUSID 05290)
,y0-A 0.��{ NORTH CHAMBERS ADDITION B
P 4Q. VOL 388-10 PG 130
�JQ• VOLE�G0 54
CITY OF FORT WORTH -
--- —--- -- --- - ---- TRACT TX—TARR—MEAP-042.07.05 —-
REMAINDER BLOCK B
do ALL OF BLOCK C
CHAMBERS ADDITION
VOL 388-10 PG 130
VOL 873 PG 611
IPA SUSO,47—)
�9
A�
9S
g0+ ?y FORT WORTH
6�'G� 9I• INDEPENDENT SCHOOL
TRACT TX—TARR—MEAP-042.07.06
CHAMBERS ADDITION
y�yyJ� VOL 388-10 PG 130
O VOL 1346 PG 54
(SUeO/low)
r� o.T
••i""• F1••, •. ••' BASIS OF BEARING: BEARINGS SHOWN HEREON ARE BASED ON US STATE PLANE
,rt••- ' Q NAD 83 COORDINATES STATE OF TEXAS NORTH CENTRAL 4202 ZONE.
suA� (CM) CONTROL MONUMENT
(ASSESSOR'S DATA)
APPROXIMATE ABSTRACT LINE
V:\52871\ACTIVE\187107355\DRAVANG\285-HEAP\EXHIBITS\07355V-285-EXHIBIT-042.07.O5.DWG
TEXAS MIDSTREAM GAS SERVICES
PROPOSED PIPELINE CROSSING
TRACT TX—TARR—MEAP-042.07.05
CITY OF FORT WORTH
���� ♦i s 05/25/11 sJTM TF REVISED CLIENT COMMENTS COUNTY OF TARRANT, STATE OF TEXAS
4 10/27/10 ass TF REV SED MERCADO TO ARC PARK
DOWNTOWN DESIGN SERVICES. INC. 3 05/10/10 JMM PEM LICENSE AREA EAPPROWD SJTM 03/25/09 SCALE: 1'-100'
2333 MINNIS DRIVE, SUITE F 2 01/22/10 JDM PEM REVISED LICENSE AREA PEM 03/25/09
By
HALTOM CITY. TX 76117 U 50' 1OO
I O3/25/09 SJTA PEM REVISED LICENSE AREA ENGINEER
Tel: 817-744-7927 05/27/08 JC WBB MUSTANG ORIGINAL EXHIB
Fax: 817-744-792.9
www.downtown—desi(in.com REV. DATE BY APP. DESCRIPTION SHEET 1 OF 3
N EXHIBIT "A"
N5553'08"E
20.73'
8.10'
FORT WORTH INDEPENDENT SCHOOL S4437'34"E
TRACT TX—TARR—MEAP-04207.04 t 7.97'
BLOCK A &
NORTH 90' OF BLOCK B F9 11 ^
CHAMBERS ADDITION �R
VOL 388-10 PG 130 /
4 �S
VOL 1346 PG 54 / POINT
`` BEGINNING
'.
"� VV (SUBD,j'7030)
,y0 O�
v ,;P) /a 20' LICENSE AREA Nw
y1�(b//h�ry1 REMAINDER 0.058 AC / a'•
BLOCK B
NN
/ \ CITY OF FORT WORTH
/ TRACT TX—TARR—MEAP-042.07.05 /
/ REMAINDER BLOCK B BLOCK C
/ \ & ALL OF BLOCK C /
/ \ CHAMBERS ADDITION /
/ VOL 388-10 PG 130 /
��- --- ------\----- VOL 873 PG 611 --- ---
(CM) \ (SUBD 070JO) /
FOUND 5/8" \
IRON ROD
\ 20' PIPELINE EASEMENT
/ \ VOL 9322 PG 1556
A'/
�6 5v. ^/
gyp'JQ` /
\ 5 /
FO ND SROD //
FORT WORTH
/ INDEPENDENT SCHOOL
/ TRACT TX-TARR-MEAP-042.07.06
BLOCK D
(CM) CHAMBERS ADDITION
VOL 388-10 PG 130
Spq
• ....w.1 O�F/SI C f 4.?'3 VOL(S BD 6 PG 54
».. ... ..F (ROjV t' pG 'R H F eeq�3j'S
581,..• QQ lt'ri. 8 Ng (CM)
--�`�U IRO
R%J (CM) CONTROL MONUMENT FOUND
(ASSESSORS DATA) N ROD
APPROXIMATE ABSTRACT LINE COMBINED SCALE FACTOR:1.0001391
V:\52871\ACTIVE\187107355\DRAWING\2851 MEAP\EXHIBITS\07355V-285—EXHIBIT-042.07.05.DWG
LICENSE AREA TABLE
CENTERLINE LENCIH 125.32 FT 7.80 RDS TEXAS MIDSTREAM GAS SERVICES
UCENSE AREA 2,505 SF 0.058 AC PROPOSED PIPEUNE CROSSING
TEMP. WORKSPACE N/A N/A TRACT TX—TARR—MEAP—042.07.05
ADD'L. WORKSPACE N/A N/A CITY OF FORT WORTH
[�^♦i W10/27/10 SJTM 7F REVISED CLIENT COMMENTS COUNTY OF TARRANT, STATE OF TEXAS
JSS TF REND LICENSE AREA
MERCADO TO ARC PARK
DOWNTOWN DESIGN SERVICES, INC. 3 05/10/10 JAM PEM LICENSE AREA DRAW sJn1 03/23/09 SCALE, 1-X50•
By 23u331 MINNIS DRIVE, SUITE F 2 01/22/10 JOM PEM REVISED LICENSE AREA CHECKED PEM 0]/25/09
BY
WALTOM CITY, TX 76117 1 03/25/09 SJTM PEM REVISED LICENSE AREA PROJECT O 25' 50'
Tel: 817-744-7927 ENQNEER
/27/08 Jc WBB MUSTANG ORIGINAL EXHIBIT XCT
FOX' 817-744-7929 ON
www.downtown-design.com REV DATE BY APP, DESCRIPTION APPROVED
SHEET 2 OF 3
N EXHIBIT "A"
PROPERTY DESCRIPTION OF LICENSE AREA
A LICENSE AREA ACROSS A PORTION OF BLOCK B AND BLOCK C CHAMBERS ADDITION FILED IN
VOLUME 388-10 AT PAGE 130 ALSO DESCRIBED IN VOLUME 873 AT PAGE 611 OF THE RECORDS OF
THE COUNTY OF TARRANT, STATE OF TEXAS, IN THE BEN T CROWLEY SURVEY, ABSTRACT 307, AND
IN THE MOSES A JACKSON SURVEY, ABSTRACT 362, DESCRIBED AS FOLLOWS:
BEGINNING ON THE NORTHWESTERLY BOUNDARY OF SAID PARCEL FROM WHICH AN ANGLE POINT IN
THE EASTERLY RIGHT OF WAY LINE OF HIGHWAY 287 AS DESCRIBED IN VOLUME 3533 AT PAGE 171
MONUMENTED BY A FOUND 5/8" IRON ROD BEARS S54"57'41"W 312.14 FEET;
THENCE ALONG SAID NORTHWESTERLY BOUNDARY N55'53'08"E 20.73 FEET;
THENCE S49'24'15'E 95.56 FEET TO THE NORTHEASTERLY BOUNDARY OF SAID PARCEL;
THENCE ALONG SAID NORTHEASTERLY BOUNDARY THE FOLLOWING TWO (2) COURSES:
1. THENCE 544'37'34"E 7.97 FEET;
2. THENCE S23'23'46"E 44.10 FEET FROM WHICH AN ANGLE POINT IN THE EASTERLY RIGHT OF
WAY LINE OF HIGHWAY 287 AS DESCRIBED IN VOLUME 3360 AT PAGE 198 MONUMENTED BY A
FOUND 5/8" IRON ROD BEARS S25-38.27"W 337.47 FEET;
THENCE N49'24'15"W 148.59 FEET TO THE POINT OF BEGINNING;
CONTAINING 2,505 SQUARE FEET OR 0.058 ACRES.
BASIS OF BEARING: BEARINGS SHOWN HEREON ARE BASED ON US STATE PLANE NAD 83
COORDINATES STATE OF TEXAS NORTH CENTRAL 4202 ZONE.
SURVEYOR'S CERTIFICATE
TO PARTIES INTERESTED IN TITLE TO THE PREMISES SURVEYED, I DO HEREBY CERTIFY
THAT THE ATTACHED LEGAL DESCRIPTION WAS PREPARED FROM PUBLIC RECORDS
w ST WITHOUT THE BENEFIT OF A COMMITMENT FOR TITLE INSURANCE AND FROM AN ACTUAL
P NO ACCURATE SURVEY UPON THE GROUND AND THAT SAME IS TRUE AND CORRECT.
. .. ... .......
T F NE ATE OF SURVEY: TODD FINCHER
... .. '" f." 3/05/09-03/12/09 R.P.L.S. NO. 5633
r r?
(CM) CONTROL MONUMENT DATE OF SIGNATURE: 05/25/11
1 asp .••'O
+ �
S1JFtV� (ASSESSORS DATA)
APPROXIMATE ABSTRACT LINE
V:\52871\ACTIVE\187107355\DRAWING\255-HEAP\EXHIBITS\07355V-285-EXHIBIT-042.07.05.OWG
TEXAS MIDSTREAM GAS SERVICES
SEE SHEET 2 FOR
LICENSE AREA INFORMATION PROPOSED PIPELINE CROSSING
TRACT TX—TARR—MEAP-042.07.05
CITY OF FORT WORTH
^^ ♦i 5 05/25/11 SJTM TF REVISED CLIENT COMMEN75 COUNTY OF TARRANT, STATE OF TEXAS
■ 1■--I( DESCRIPTION
♦ 10/27/10 Jss 1F REVISED MERCADO TO ARC PARK
DOWNTOWN DESIGN SERVICES, INC. 3 05/10/10 JMM PEM LICENSE AREA O9Y� SOM 03/25/09 SCALE: 1"-N/A
2333 MINNIS DRIVE. SUITE F 2 01/22/10 JDM PEM REVISED UCENSE AREA CHECKED PEM 03/25/09
HALTOM CITY, TX 76117 1 03/25/09 SJTM PEM REVISED LICENSE AREA PROJECT
Tel: 817-744-7927
FOX• 817-744-7929 05/27 'C WBB MUSTANG ORIGINAL EXHIBIT NEMN
www.downtown—desion.com REV. DATE BY APP. DESCRIPTION APPROVED SHEET 3 OF 3
N EXHIBIT "A"
u
O?
^4 -k
TARRANT TARRANT COUNTY Q'gPQJ�
WATER CONTROL
AND IMPROVEMENT
m DISTRICT NO. 1 )P
N CAUSE NO. 42810
„ TARRANT WA REGIONAL
#v TRACT
`y TX-TARR-MEAP-042.07.11
VOL 3106 PG 32
, .
ti TARRANT REGIONAL
1 I
WATER DISTRICT
TRACT TX-TARR-MEAP-042.07.10
CITY OF FORT WORTH W VOL 2182 PG 87 TRACT 10
TRACT TX-TARR-MEAD-042.07.08 VOL 2313 PG 509
VOL 2605 PG 605K.:
:_ry alp a
EMAINDER
BLOCK E
CHAMBERS t+
ADDITION "z
VOL 388-10 PG 130
(SU-I 7030)
r4
(40 IV 1 f&V
O+
bti G+y
05 5 �I
to TEXAS
TURNPIKE
AUTHORITY
TRACT
TX-TARR-MEAP-042.08
VOL 2965 PG 133
o.. ASIS OF BEARING: BEARINGS SHOWN HEREON ARE BASED ON US STATE PLANE
IN NAD 83 COORDINATES STATE OF TEXAS NORTH CENTRAL 4202 ZONE.
... ....... .
•O ......•v�`� (CM) CONTROL MONUMENT
SUR (ASSESSORS DATA)
_.... _._._APPROXIMATE ABSTRACT LINE
V:\5 71\ACTIVE\187107355\DRAWNG\285—MEAP\EXHIBITS\07355V-285—EXHIBIT-062.07.O8.DWG
TEXAS MIDSTREAM GAS SERVICES
PROPOSED PIPELINE CROSSING
TRACT TX-TARR-MEAP-042.07.08
CITY OF FORT WORTH
C3O /i COUNTY TARRANT, STATE OF TEXAS
� / MER CADO TO ARC PARK
DOWNTOWN DESIGN SERVICES, INC. DRAW SJTM 01/22/10 SCALE: r-I DO'
By
2333 MINNIS DRIVE, SUITE F 2 05/25/11 SJTM TF REVISED CLIENT COMMENTS CHECKED PEM 01/22/10
HALTOM CiI1Y, TX 76117 2 06/16/10 JDM TF REVISE ADD WORKSPACE PROJECT � �
Tel: 817-744-7927 ENGINEER
Fox: 817-741•-7929 1 OS/ID/10 JMM PEM REVISE ADD WORKSPACE HEAD
www.downtown—doorign.com REV. DATE BY APP. DESCRIPTION APPROVED SHEET 1 OF 5
EXHIBIT "A"
�,Q';Ity TARRANT COUNTY WATER CONTROL p P��tQ`.�
AND IMPROVEMENT DISTRICT NO. 1
CAUSE NO. 42810
\K`X10' FIBER OPTIC EASEMENT C?
VOL 11310 PG 438 PARCEL 7 ^��O�QS
(` 4
N3710'11"E \ CITY OF FORT WORTH Q'yQ�Jp
20.04' \ TRACT TX—TARR—MEAP-042.07.08
J
VOL 2605 PG 605
POINT OF \\
BEGINNING ADDITIONAL
WORKSPACE# 1
8,830 SF
0.203 AC
�0�rLro A9•* � �
/ ?y 20' LICENSE
AREA TARRANT REGIONAL
13,602 SF WATER DISTRICT
0.312 AC TRACT
\ \
TX—TARR—MEAP-042.07.11
\ VOL 3106 PG 32
\ \\ \ TMS 3p3 TARRANT REGIONA
\ \ N6�• SF ` WATER DISTRICT
\ I \ 3p 476 `\ TRACT
\ 3S zy �TX—TARR—MEAP-042.07.10
VOL 2182 PG
0) TRACT 10
�\ `\ VOL 2313 G 509
a /
REMAINDER BLOCK E \ ;_ EFERENCE
CHAMBERS ADDITION \
VOL 388-10 PG 130 BEARING
(SUED/7030) 245'29"E
68'34'38"E
ADDITIONAL WORKSPACE# 2 20' CHEVRON \ �. 1539.13'
IPELINE EASEMENT ' �� " .
0.685 AC VOL 9322 PG 1556
550'59'31"E
AT 109.56' S50.59'31"E
T
(RpwV 45.23'
TEXAS
TURNPIKE
0+
6ti Gig AUTHORITY
TRACT
. �P�y TX—TARR—MEAP-042.08
VOL 2965 PG 133
O
A, 1S�E Fti41
TO IN
i....
s4 6 �fQ FOUND 1/2"
$� y� IRON ROD
• sUP (CM) CONTROL MONUMENT
(ASSESSORS DATA)
--APPROXIMATE ABSTRACT LINE COMBINED SCALE FACTOR:1.0001391
V:\52871\ACTIVE\187107355\DRAWING\285—MEAP\EXHIBITS\07355V-285—EXHIBIT-042.07.08.DWG
LICENSE AREA TABLE TEXAS MIDSTREAM GAS SERVICES
CENTERLINE LENGTH 680.10' 41.22 R
LICENSE AREA 13,602 SF 0.312 AC PROPOSED PIPELINE CROSSING
TEMP. WORKSPACE N/A N/A TRACT TX—TARR—MEAP-042.07.08
ADD'L. WORKSPACE 38,6B1 SF 0.888 AC CITY OF FORT WORTH
COUNTY OF TARRANT, STATE OF TEXAS
LICENSE AREA
MERCADO TO ARC PARK
DOWNTOWN DESIGN SERVICES, INC. D a;1M1 sJ,L1 01/22/10 SCALE; r_Tao
2333 MINNIS DRIVE, SUITE F 2 x5/25/11 SJTd TF REVISED CD ENT COMMENTS CHECKED PEM 01/22/10
BY HALTOM CRY, TX 76117 ENGINEER
0— 5�0'
Tel: 817-744-7927 ITY, TX 61 2 08/16/10 JDM TF REVISE ADD WORKSPACE ENGINEER
Fax: 817-744-7929 1 05/10/10 JMM PEM REVISE ADO WORKSPACE HEAD
www.downtown—design.com REV. DAIS BY APP. DESCRIPTION APPROVED SHEET 2 OF 5
EXHIBIT "A"
PROPERTY DESCRIPTION OF LICENSE AREA
A 20.00 FOOT LICENSE AREA ACROSS A PORTION OF THE PARCEL DESCRIBED IN VOLUME 2605
AT PAGE 605 AND ACROSS A PORTION THE 10—FOOT FIBER OPTIC EASEMENT DESCRIBED AS
PARCEL 7 IN VOLUME 11310 AT PAGE 438 AND ACROSS A PORTION OF THE 20—FOOT CHEVRON
PIPELINE EASEMENT DESCRIBED IN VOLUME 9322 AT PAGE 1556 OF THE RECORDS OF THE
COUNTY OF TARRANT, STATE OF TEXAS, IN THE MOSES A JACKSON SURVEY, ABSTRACT 862,
AND JAMES SANDERSON SURVEY, ABSTRACT 1430, DESCRIBED AS FOLLOWS:
BEGINNING ON THE NORTHWESTERLY BOUNDARY OF THE PARCEL DESCRIBED IN VOLUME 2605 AT
PAGE 605 FROM WHICH A FOUND 1/2- IRON ROD BEARS S40.38-55"W 262.25 FEET;
THENCE ALONG SAID NORTHWESTERLY BOUNDARY N37'10'11"E 20.04 FEET;
THENCE S49'24'15"E 208.49 FEET;
THENCE S61'30'35'E 416.22 FEET TO ITS NORTHEASTERLY BOUNDARY;
THENCE ALONG SAID NORTHEASTERLY BOUNDARY S50'59'31"E 109.56 FEET FROM WHICH A
FOUND 1/2" IRON ROD BEARS N58.34.38"E 1539.13 FEET;
THENCE N61.30'35"W 526.07 FEET;
THENCE N4924'15"W 209.42 FEET TO THE POINT OF BEGINNING;
CONTAINING 13,602 SQUARE FEET OR 0.312 ACRES.
Q�01STEq G�9�T
�t
...... N.
TO .. .. .......
3
�•' ..ESS�4••'y�
SUFN (CM) CONTROL MONUMENT
(ASSESSORS DATA)
�/ I .. ......APPROXDIATE ABSTRACT LINE
V:\52871\ACTIVE\187107355\DRAWING\285-HEAP\EXHIBITS\07355V185-EXHIBIT-042.07.08.DWG
TEXAS MIDSTREAM GAS SERVICES
SEE SHEET 2 FOR
LICENSE AREA INFORMATION PROPOSED PIPELINE CROSSING
TRACT TX—TARR—MEAP-042.07.08
CITY OF FORT WORTH
COUNTY OF TARRANT, STATE TEXAS
LICENSE AREA DESCRIPTION
MERCADO TO ARC PARK
DOWNTOWN DESIGN SERVICES, INC. MAW s�1w ("122110 sCA�E: r-N/A
2333 MINNIS DRNE, SUITE F 2 05/25/11 SJTM TF RENSEO CLIENT COMMENTS CHECKED PEM m/22/10
Ely
HALTOM CITY, TX 76117 2 08/16/10 ,1DM TF REVISE ADD WORKSPACE �IO'EOT
Tel: 817-744-7927 ENGINEER
Fax: 817-744-7929 1 05/10/10 IMM PEM REVISE ADD WORKSPACE SECTION
HM
www.downtown—doWan.co REV. DATE BY APP. DESCRIPTION APPROVED SHEET 3 OF 5
EXHIBIT "A"
' �� J TARRANT COUNTY WATER CONTROL J�J
AND IMPROVEMENT DISTRICT NO. 1
CAUSE NO. 42810
\\ 10' FIBER OPTIC EASEMENT t�
\4( VOL 11310 PG 438 PARCEL 7 yb
CITY OF FORT WORTH P yP��1�{
TRACT TX-TARR-MEAP-042.07.08
\ VOL 2605 PG 605 P�
\\ N90'00'00"E 58.51'
ADDITIONAL
WORKSPACE# 1
N40'35'45"E' 8,830 SF
27.26' 0.203 AC
POINT OF \ \ \ 20' LICENSE
BEGINNING \ AREA TARRANT REGIONAL
#1 \ 'I'A 13,602 SF WATER DISTRICT
7O> 0.312 AC TRACT
TX-TARR-MEAP-042.07.11
\ 56 3�1\O "°o- sr X \C6 VOL 3106 PG 32
\ 0 Dp i�
\ \ po o '6<9. F 9g D. 4 ry�O �- TARRANT REGIONA
\ \ Z \ S6 k y^y"�� ` WATER DISTRICT
TRACT
\ \
TX-TARR-MEAP-042.07.10
/y VOL 2182 PG 87`
693 1\ / I TRACT 10
92, 9`3 W �ti�\ /VOL 2313 G 5Q9,_
REMAINDER BLOCK E �i�Y� ao, y�
CHAMBER VOL 388 S 0 POT730 '� —j
VOL SF S2 \ EFERENCE
(SUBD/7030) S23'14'13"W 8?)?S°y 03• ? 45'29"E
34.90'
S761 1'39"W 20' CHEVRON 6��45• _
23.58' PIPELINE EASEMENT
VOL 9322 PG 1556
?7 )
ADDITIONAL
WORKSPACE# 2 �4j3g "4
29,851 SF SE W08'37"W POINT OF
sTq� 0.685 AC 19,62' BEGINNING #2
(R�w114 RwA-28j N68�S50 59'31"E
TEXAS 44.38'
O+ TURNPIKE
AUTHORITY
lb TRACT
�P -1 TX-TARR-MEAP-042.08
yPQ•,� VOL 2965 PG 133
Oyu yJ
0 F. E �.
A,ra
:TQOo F1NC.. R r
C .� -� IRON ROD 2.
.........
(CM) CONTROL MONUMENT
I (ASSESSORS DATA)
- APPROXIMATE ABSTRACT LINE COMBINED SCALE FACTOR: 1.0001391
V:\52871\ACTIVE\187107355\DRAWING\285-MEAP\EXHIBITS\07355V185-EXHIBIT-042.07.OB.DWG
SEE SHEET 2 FOR TEXAS MIDSTREAM GAS SERVICES
LICENSE AREA INFORMATION PROPOSED PIPELINE CROSSING
TRACT TX-TARR-MEAP-042.07.08
CITY OF FORT WORTH
r��� ♦i COUNTY T, STATE TEXAS
ADDITIONAL WORKSPACE
MERCADO TO ARC PARK
DOWNTOWN DESIGN SERVICES, INC. °BYN SJTM 01/22/10 SCALE; 1•-loo•
23u33'MINNI/S���yDRIVE, SUITE F 2 05/25/11 SJTM TF REVISED CLIENT COMMENTS CHECKED PEM 01/22/10
fWLTOM W , TX 78117 PROJECT 0 50' 1OO'
Tel: 817-744-7927 2 08/18/10 JDM TF REVISE ADD WORKSPACE ENGINEER
HEAD
Fax: 817-744-7929 1 05/10/10 WM PEM REVISE ADD WORKSPACE SECTT
www.downtown—doeian.com REV. DATE BY APP, DESCRIPTON APPROVED SHEET 4 OF 5
EXHIBIT "A"
PROPERTY DESCRIPTION OF ADDITIONAL W(1RKCOerc 1
A PORTION OF A PARCEL DESCRIBED IN VOLUME 2605 AT PAGE 605 AND ACROSS A 10-FOOT FIBER OPTIC
EASEMENT DESCRIBED AS PARCEL 7 VOLUME 11310 AT PAGE 438 OF THE RECORDS OF THE COUNTY OF
TARRANT, STATE OF TEXAS, IN THE MOSES A JACKSON SURVEY, ABSTRACT 862, DESCRIBED AS FOLLOWS:
BEGINNING IN THE SAID PARCEL FROM WHICH A FOUND 1/2" IRON ROD BEARS S67.57'30"W 317.10 FEET;
THENCE N40'35'45"E 27.26 FEET,
THENCE N9O'00'00"E 58.51 FEET
THENCE S53'56'24"E 107.14 FEET;
THENCE S32 26'39"W 53.47 FEET;
THENCE N61'30'35"W 99.56 FEET;
THENCE N4924'15"W 61.47 FEET TO THE POINT OF BEGINNING;
CONTAINING 8,830 SQUARE FEET OR 0.203 ACRES.
PROPERTY DESCRIPTION OF ADDITIONAL WORKSPACFJ Z
A PORTION OF THE PARCEL DESCRIBED IN VOLUME 2605 AT PAGE 605 AND ACROSS 20—FOOT CHEVRON
PIPELINE EASEMENT DESCRIBED IN VOLUME 9322 AT PAGE 1556 OF THE RECORDS OF THE COUNTY OF
TARRANT, STATE OF TEXAS, IN THE MOSES A JACKSON SURVEY, ABSTRACT 862, DESCRIBED AS FOLLOWS:
BEGINNING ON THE NORTHEASTERLY BOUNDARY OF SAID PARCEL FROM WHICH A FOUND 1/2- IRON ROD BEARS
N68'34'38"E 1539.13 FEET;
THENCE ALONG SAID NORTHEASTERLY BOUNDARY S50.59'31"E 44.38 FEET TO THE EAST CORNER OF SAID
PARCEL;
THENCE ALONG THE NORTHERLY BOUNDARY OF THE PARCEL DESCRIBED IN VOLUME 2965 AT PAGE 133
N71'20'31"W 147.33 FEET,
THENCE N71'06'48"W 75.21 FEET,
THENCE S60'08'37"W 19.62 FEET,
THENCE N65'27'45"W 69.10 FEET;
THENCE N60'05'25"W 82.72 FEET;
THENCE N36'43'40"W 117.74 FEET;
THENCE S76'1 1'39"W 23.58 FEET;
THENCE 523'14'13"W 34.90 FEET;
THENCE N6937'13"W 92.09 FEET;
THENCE N00'00'00"E 108.91 FEET;
THENCE S49.24'15"E 76.68 FEET;
THENCE S61'30'35"E 526.07 FEET THE POINT OF BEGINNING;
CONTAINING 29,851 SQUARE FEET OR 0.685 ACRES.
BASIS OF BEARING: BEARINGS SHOWN HEREON ARE BASED ON US STATE PLANE NAD 83 COORDINATES
STATE OF TEXAS NORTH CENTRAL 4202 ZONE.
TO PARTIES INTERESTED IN TITLE TO THE PREMISES SURVEYED, I DO HEREBY CERTIFY
THAT THE ATTACHED LEGAL DESCRIPTION WAS PREPARED FROM PUBLIC RECORDS
WITHOUT THE BENEFIT OF A COMMITMENT FOR TITLE INSURANCE AND FROM AN ACTUAL
ii7i
AND ACCURATE SURVEY UPON THE GROUND AND THAT SAME IS TRUE AND CORRECT.
p�p qF Y
N DATE OF SURVEY- TODD FINCHER
"i".... ••• /29/09 — 01/04/10
TOOU FI CH R...• R.P.L.S. N0. 5633
t•....•• " ""' DATE OF SIGNATURE: 05/25/11
(CM) CONTROL MONUMENT
:�•'.� (ASSESSOR$"DATA)
SUR%j _ APPROXIMATE ABSTRACT LINE
CTI VE\187107355\DRA VBNG\285-HEAP\EXHI BITS\07355V-285-EXHIBIT-042.07.08.DVYG
SEE SHEET 2 FOR TEXAS MIDSTREAM GAS SERVICES
LICENSE AREA INFORMATION PROPOSED PIPELINE CROSSING
TRACT TX-TARR-MEAP-042.07.08
CITY OF FORT WORTH
n^�i COUNTY OF TARRANT, STATE OF TEXAS
ADDITIONAL DESCRIPTION
DOWNTOWN DESIGN SERVICES, INC. MERCADO 175 ARC PARK
BY DRAWN som A
BY 2333 MINNIS DRIVE, SUITE F 2 05/25/11 SJTM TF REVISED CLIENT COMMENTS CHECKED PEM
HALTOM CITY, TX 78117
Tel: 817-744-7927 2 08/16/10 JDM TF REVISE ADD WORKSPACE PROJECT
ENOINEER
Fax: 817-744-7929 1 05/10/10 AM PEM REVISE ADO VORKSPACE SECTION
MEAD
WWW.downtown—desi n.COM REV. DATE BY APP. DESCRIP110H APPROVED
Exhibit "Buy
r A
ml
J
0
z
N.
izm
e5
M 2
Ain
T14
---------------
Z--z ---
--m"M
iH
-4
.2i 9
-Oz
N lh
HE -
4 Nk
-A
,RGR;i PRIX 1!g 7V
ION �Nqo �4 5,
49�
WN A"..
Ht p
AR �p
Natural Gas Pipeline License Agreement Trinity L—evlee
M&C Review Pagel of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA Fo- H
COUNCIL ACTION: Approved on 5/24/2011
DATE: 5/24/2011 REFERENCE C-24920 LOG NAME: 062050PIPELINE MARTIN
NO.: LUTHER
CODE: C TYPE: NON- PUBLIC NO
CONSENT HEARING:
SUBJECT: Authorize Execution of an Underground Pipeline License Agreement with Texas Midstream
Gas Services,LLC.,in the Amount of$38,057.99 for a Natural Gas Pipeline Across City-
Owned Property Located at 1701 Martin Luther King Freeway,Fort Worth,Texas,Also
Known as Trinity River Levee(COUNCIL DISTRICT 8)
RECOMMENDATION:
It is recommended that the City Council authorize execution of an Underground Pipeline License
Agreement with Texas Midstream Gas Services,LLC.,in the amount of$38,057.99 for a Natural Gas
Pipeline across City-owned property located at 1701 Martin Luther King Freeway, Fort Worth,Texas,
also known as Trinity River Levee,for a Term of 20 years.
DISCUSSION:
The City has been approached by representatives of Texas Midstream Gas Services,LLC.,
requesting an underground pipeline license agreement across a portion City-owned property located
at 1701 Martin Luther King Freeway, Fort Worth,Texas,also known as Trinity River Levee,for the
installation of a natural gas pipeline.The property is located southeast of Harmon Field Park and
west of Riverside Drive between Interstate 30 and West Fork Trinity River.The proposed alignment
will allow for a total of 805.46 linear feet of 20-inch diameter natural gas pipeline within a 20-foot wide
strip of land across the properties(0.058 acres more or less)for a term of 20 years. For initial
construction,a temporary construction workspace parallel,abutting,contiguous and along the license
tract(0.888 acres more or less)shall also be granted as part of the agreement.
In the interest of safety and as part of this agreement,Texas Midstream Gas Services,LLC,will
install a temporary pedestrian trail around the affected area according to the City specifications.The
temporary pedestrian trail will provide an alternate route for bike and pedestrian traffic during
construction of the pipeline and will be removed from the property after construction.
Texas Midstream Gas Services,LLC,has agreed to pay the City the standard fee of$47.25 per linear
foot of pipeline for the use of the property for a term of 20 years for a total cost of$38,057.99.
Revenues received from this project will be administered in accordance with the current Financial
Management Policy.
Texas Midstream Gas Services,LLC,will be responsible for repairing and restoring any damage to
the strip of land or surrounding property resulting from the construction of the pipeline.
The Property is located on COUNCIL DISTRICT 8,Mapsco 90,E.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that the Planning and Development
Department is responsible for the collection and deposit of funds due the City.
TO Fund/Account/Centers FROM Fund/Account/Centers
GC10 446300 006060001000 $19,029.00
http://www.fortworthgov.org/council_packet/mc_review.asp?1D=15252&councildate=5/... 05/25/2011
M&C Review Page 2 of 2
T127 446300 006127099901 $19,028.99
Submitted for City Manager's Office by: Fernando Costa(6122)
Oriainatina Department Head: Randle Harwood(6101)
Additional Information Contact: Jean Petr(8367)
DJ Harrell(8032)
ATTACHMENTS
062050 Martin Luther King Pipelinetrinitvriverlevee odf
http://www.fortworthgov.org/council_packet/mc review.asp?ID=15252&councildate=5/... 05/25/2011