HomeMy WebLinkAboutContract 45104-CO1 CITY TARY FORTWORTH., City of Fort Worth CONTRACT MO* Change Order, Request Breakdown Project Narnel 2011 Intersection Improvemients Phase 2 City sec# Client Project#(s)J 01856 Change Order Submittal# Date 2/20/ 014 0 -,.I.Niiiiiiimimi-I WON IN TPW Water Serer Contract e�CD� Totals Original Contract Amount $368,556.50 $3 8,556.50 180 Extras to Date Credits to Date Fending Change Orders In M&C Process) p�,��..�If r,, :, �f��,,.. ,,,� ml✓f ;,,( '"r!ry//!,rI%y���/ � ! ;1; ,�` r y-r,`�/�,'I 1�`frr'r�r'�fQr,�,/�e r ,r r✓f Contract Cost ate $3681556.50 JAmount of Proposed Change Order v m ar,o�"0 u� >rd,"/� $2,411595.7'5 oil Revised Contract Amount � ,) 11.""r�rti �„�i: $3931152.25 II'.,97 Original'FundsAvailable for Change Orders 1r��Mu ing Funds Available for this i Additional l Funding art necessary) 4 1;r $24,5951-75 i EIMIMI r CHANGE ORDERS o DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT M " LLO ABLE CONTRACT M UNT(ORIGINAL CON CT�COST 4,25 I This change order includes ornitted traffic signal hardware items including rll boxes and cable that are necessary for thetraffic signal to operate a er paverrient impirovements are completle.These items ere overlooked suring the plan r le ign phase and were discovered at the field pre,construction meeting, This change order also allows for the use oIf'a thicker pavement section V in,lieu of lime subgrade stabilization since,the pavement areas are relatively small. Aftested by: low woo if III I '���U Vi�� _ ➢ J � � u�u��UVIV�`J, K Cii ouu MMY CITY S E R F1 "IF" R"uir, NO M&C REQUIRED j -�d/dM`JWa,�mwuiwwu�mu�au�r�wnmuummw�mwwm�tlla'm�i�mru�Pmwu�rr�m�mim�imimor�wwiwmiomunwmw�mua�w.00n mrwummewwimrwwuwmm m�vorom auwwduuwwnarn� FoRT NVORTH City of Fort Worth Change Order Additions Project Name 2011, Intersection Improvements Phase 2 City Sec# 45104, ---__------- Client Project# Change Order Submittal# Date 2/2012: ADDITIONS I*EM DEMIRIPTIM DEPT Qty Unit Unit Cost Total 1-10 Unclassified ExcaVa7on TFW 25 $6 $1,500,001 1-13 Fine Grading,&Compaction TPW 445.00 SY $2.50 $1,112LO 1-15 11"Conc Pvrm TPW 371.00 SY $61.0O $22,631.00 11-12 Unclassified Excavation TPW 25,00 CY $59-00- $1 J450.001 1 1_1 51 Fine Grading&Compaction TPW 454,,001 SY $2.50 1 J 135,001 11-16 11" one Pvmt ;TPW 4071,00 SY $64.00 V6,048._00 1-35 14 AWG Loop Detect Cagle TPW 418.00 LF $1.50'0 $627.001 1-37 NO 8 Insulated Elec Condr TPW 21 HO LF $1.00 $216.00 ..--1-39 Ground Box,Large,w/Lid Apron TPWW 4.110 Ea $65H01 1-513 2"COiND,T PVC SCH 80(T) TPW 75.00 LF $9.00 $675.00 1-54 2"CONDT PVC MH 80,(T) TPW 224.00 LF $13.50 1-55 3"CONDT PW RH 80(T) TPWW 170,.00 LF $10.00 1,7001.001 1-56 3"'CONDT PVC SCH 80(B) TPW 630.00 LF $1E50 $ 765.00 .00 1-57 4/C 18 AWG Loop Lead-in Cable TPW 2,1180.00 LF $9, $4,360,0011 11-43 101014 AWG,Multi-Conductor Cable TPW 310.00 LF $4.251- $1,317,501 1148 Furnish/Install Alum Sign Mast Arm Mount TPW 2.00 EA $275.00 $550.00 1154 Install Elec Sery Pedestal TPA" 11.00 Ea $2,000.00 $2)0001.00 1155 2"'CONDT PVC SCH 80(T) TPW 295.00 LF $9.5011 $2,802,501 1_56 3"" NIT PVC SCH 80(T) TPW 50.00 LF $13.00 $6%00 11-57 3"" MDT P'V'C SCH 84(B) TP-W 70.00 LF $15.50 $1,085.00 1158 Audible Pedestrian Pushbutton Station TPW 3.00 Ea $2,000.0 6,000.001 11_59 Install Model 722 Preemption Detector 'TPW 2.0101 Ea, $1 X0.00 $2,000.00 Il_44 Furnish/Install Preemption Cable TPW 200.00.. LF 2,.5,0 I'l-61 41 C 19 TW_G Loop Lead-In Cable TPW 1,950.00 LF $2.00 $3,900.00 1162 51/C 14 TWG!] Multi-Conductor Cable TPW 565.00 LF $31-501 $1,977.50' 11­63 81C 14 AW�Multi-Conductor Cable TPW 260-00 LF $4.00 1,040,001 1 134 16/C 14 AWG Mulfi-CondUctor Cable TPW 265,010 LF 5.50 $1,457.50 ll-.,.65 NO 6 Insulated Elec Condr TPW 50.00 LF $2.00 100,010 1166 NO 6 Pare Elec Condr SL D or Stranded TPW 25-001 LF $2.00 $50.0 1157 11 11 NN,Bare Elec Condr TPW 1,230.00 LF $1.50 " 777 1158 Ground Box,Small,w/Lid Apron TPW 2.001 Ea $600.001 $1,21K 0-1 1169 Exploratory Excavation of Existing Utilities TPW 1.0'4 Ea $400.04 $400'001 l P 1170 Remove signal ploile foundation 2.00 Ea $1,0001.010 $2,001HO� Ill 711 Salvage Traffic Signal at Hulen&Grandberry T'PW 1.00 Ea $2,500.0 -$2,500,001 11-24 24"SLD Pvmt Marking HA,E(W), TPW 189M LF $5.50 $1,039. TPW $111,258.44 Water $0.00 Sewer $10.00 =Sub Total Additions $111,258.00 Cliange Order Additions Page.2 of 4 MI/S reakdown � this, Change, Order mol ag N/A Total Previous Change Orders if "w1me"! wu Total CFW Change Order Approval St-COAppO I Page 2 of 3 -1 C"ty of Fort Worth T RT H 1, 0,R W,0 Change Order Request Approval (Ch�a�nge, Order k Available li Links) For Change Order Submittal No. Change rder Igo. St,-COAppOl Cate Started: 3/13/2 City Sec. . 45104 Date Due 5/2/2014 Project Name: 11 Intersection Improvements Phase 01856 DOE Numbers: Project Numbers., Project Intersection revisions including additional traffic signal hard are items Description: that are needed blunt were not included in the original scope of the project. City Project 11gr..n Lissette Acevedo City Inspector.- Joseph Rogers, Key Brock Contractor: McClendon Construction COUNCIL ACTION If R uuired M&C Log N COST AND DAYS SUMMARY* e artrrue tw Cyst($) Fund Account Center Requested Days.* T'PW $ 24f595.75 C204-54,1200-20139018568,3 171 «..>d=,, ,P..... Aa w ,.may,m., _o_,,za.,..n„.•,__,P.r,f. . a.,.w ...,, _n.-w,, ,,... ,rna. — Total: $ 24,595.75 Tot!! Requested Days, 17 Approval: Stat is:: rri CFW Change Order Ap, r'ov al St-COAppOl Page 3 of 1 A " ro 'e . Yep Comments. user. Justin lair Date: 2014-03-13 4X-58 PM Approved!. des Comments: User. Lis,s,ette Acevedo Date. -03-1813.,145 P Approved'. Yes Comments., User: Martin Phillips ate 2014-03,-21 75-54 AM Approved� Yes Col e its User: Andy Anderson ate. 2014-03-,21 8*s04 AM Approved. Yd's. Comments: User,,, Doug Wiersig ai 2014-03-21, 10-106 Approved- Yes Comments.: seI`. Doug Black Date: 2014327 11.34 AM Approved. Yes Comments,, User.- Fernando Costa Date. 2014-03-27 6.50 PM Action Required. Fl eas app,rove