HomeMy WebLinkAboutContract 45513 CITY SECRETARVY
CONTRACT NO.
Developer and Project Information Cover Sheet:
Developer Company Name: D.R. Horton—Texas, Ltd.
Address, State,Zip Code: 6751 North Freeway,Fort Worth TX 76131
Phone, E-Mail: (817)230-0800, dallen @drhor-ton.com
Authorized Signatory/Title: Don E. Allen,Assistant Secretary
Project Name and Brief Description: Water, Paving, Storm Drain & Street Lighting Improvements to
serve Basswood Boulevard—Cloudcroft Lane to Sierra Pelada Drive
Project Location: Basswood Boulevard from Cloudcroft Lane to Sierra Pelada Drive
Plat Case No.: FP-013-042 Plat Name: Basswood Boulevard R-O-W
Mapsco: 34V Council District: 2 City Project No: 02219
CFA: 2014-009 DOE: 71.78
To be completed staff
Received by: �, L Date:
r
APR 1 2014
i
Combined CFA Agreement—Revised January 2014
[C I Ty 13 E C R E TA;RY
Ft Wn,
" µ
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Basswood Boulevard, from
Cloudcroft Lane to Sierra Pelada Dr. ("Project") within the City of Fort Worth, Texas
("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the
Project.
NOW,THEREFORE,For and in consideration of the covenants and
conditions contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section lI, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
2
acceptance process requires the Developer's contractor(s) to submit an
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof. Water (A) X ,
Sewer (A-1) ___, Paving (B) X, Storm Drain (B-1) X , Street Lights &
Signs (C)_A_.
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
i
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
Combined CFA Agreement—Revised January 2014
r
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 howl' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
4
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
Combined CFA Agreement—Revised January 2014
contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
6
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Combined CFA Agreement—Revised January 2014
Cost Summary Sheet
Project Name: Basswood Boulevard—Cloudcroft Lane to Sierra Pelada Drive
CFA No.: 2014-009 DOE No.: 7178
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 40,779.27
2.Sewer Construction
Water and Sewer Construction Total $ 40,779.27
B. TPW Construction
1.Street $ 592,993.67
2.Storm Drain $ 302,012.60
3.Street Lights Installed by Developer $ 62,329.05
TPW Construction Cost Total $ 957,335.32
Total Construction Cost(excluding the fees): $ 998,114.59
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 815.59
D. Water/Sewer Material Testing Fee(2%) $ 815.59
Sub-Total for Water Construction Fees $ 1,631.17
E. TPW Inspection Fee(4%) $ 35,800.25
F. TPW Material Testing(2%) $ 17,900.13
G. Street Light Inspsection Cost $ 2,493.16
H. Street Signs Installation Cost $ 245.00
Sub-Total for TPW Construction Fees $ 56,438.54
Total Construction Fees: $ 58,069.71
Choice
Financial Guarantee options,choose one Amount ck o e
Bond=100% $ 998,114.59
Completion Agreement=100%/Holds Plat $ 998,114.59
Cash Escrow Water/Sanitary Sewer=125% $ 50,974.09
Cash Escrow Paving/Storm Drain=125% $ 1,196,669.15
Letter of Credit=125%w/2 r expiration period $ 1,247,643.24
I
8
I
I
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instrument in quadruplicate, at Fort Worth, Texas this day of ..
20
CITY OF FORT WORTH-Recommmen(led by:
Water Department Transportation &Public Works Department
Wendy Chi- abulal, EMBA, P.E. Douglas . Wiersig, P.E.
Development Engineering Manager Director
Approved as to Form &Legality: Approved by City Manager's Office
Dou glas")W, Black Fernando C o
sta
Assistant City Attorney Assistant City Manager
M&C No. yjk
Date:
° N��
ATTEST: r w
G
aiyJ.
City Secre ary
ATTEST: DEVELOPER:
D.R. Horton—Texas, Ltd.,a Texas Limited Partnership
By: D.R.Horton, Inc., a Delaware corporation
Its authorized agent
Signature Signature
(Print)Name: Mark Allen Print Name: Don Allen
Title: Assistant Secretary
OFFICIAL RECORDI
W'E P'd�°I7d Y
ak
Combined CFA Agreement—Revised January 20 4 u RE
i
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
❑ Exhibit A-l: Sewer hnprovements
❑ Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
PELOTON LAND SOLUTIONS,LLC
5751 KROGER DR,SUITE 185,KELLER,TX 76244(817)562-3350
SANTA FE BASSWOOD BOULEVARD
Unit Pricing is Actual Bid Prices
3/20/2014
WATER IMPROVEMENTS
ITEM# DESCRIPTION UNIT CITY UNIT PRICE TOTAL
3311.0261 8"PVC Water Pipe LF 448 44.89 20,110.53
3312.3003 8"Gate Valve EA 1 1,290.58 1,290.58
3312.0001 Fire Hydrant EA 1 5,235.25 5,235.25
3311.0001 Ductile Iron Water Fittings w/Restraint TON 0.8 1,122.24 897.79
9999.0000 Concrete Blocking-Type B CY 2 123.45 246.89
3312.4112 16"x 8"Tapping Sleeve&Valve EA 1 5,678.53 5,678.53
3305.0107 Manhole Adjustment,Minor EA 2 981.96 1,963.92
3305.0114 Manhole Adjustment,Major w/Cover EA 1 5,330.64 5,330.64
3305.0109 Trench Safety LF 448 0.06 25.14
TOTAL WATER $40,779.27
STORM DRAIN IMPROVEMENTS
ITEM# DESCRIPTION UNIT CITY UNIT PRICE TOTAL
3341.0602 60"RCP,Class III LF 269 260.30 70,022.01
3341.0502 54"RCP,Class III LF 107 237.17 25,376.83
3341.0208 27"RCP,Class III LF 45 89.40 4,022.89
3341.0205 24"RCP,Class III LF 1,827 50.48 92,233.11
3341.0201 21"RCP,Class III LF 593 46.28 27,441.92
3349.3013 60"Straight Headwall,1 pipe EA 1 12,541.96 12,541.96
3349.3003 24"Straight Headwall,1 pipe EA 1 2,366.41 2,366.41
3349.6001 10'Recessed Curb Inlet EA 7 2,524.17 17,669.18
3349.6002 15'Recessed Curb Inlet EA 1 3,102.62 3,102.62
3349.0001 4'Storm Junction Box EA 2 2,734.52 5,469.03
3349.0003 6'Storm Junction Box EA 1 10,501.59 10,501.59
9999.0000 Modified 4'Drop Inlet EA 1 2,313.82 2,313.82
3349.7003 6'Drop Inlet EA 1 10,296.50 10,296.50
3137.0110 18"Thick Rock Rip Rap SY 238 68.36 16,270.37
3305.0116 Concrete Encasement for Utility Pipes CY 7.5 157.76 1,183.20
9999.0000 Connect to Ex.Storm Line EA 2 525.87 1,051.74
3305.0109 Trench Safety LF 2,841 0.05 149.40
TOTAL STORM DRAIN $302,012.60
20140226 SF Basswood_CFA_QTO.xlsx,Sheet 1 1 of 2 3/20/2014
PELOTON LAND SOLUTIONS,LLC
5751 KROGER DR,SUITE 185,KELLER,TX 76244(817)S62-3350
SANTA FE BASSWOOD BOULEVARD
Unit Pricing is Actual Bid Prices
3/20/2014
PAVING IMPROVEMENTS
ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL
3213.0105 10"Cone Pvmt SY 10,731 40.31 432,567.15
3213.0101 6"Cone Pvmt SY 263 27.52 7,237.74
3211.0502 8"Lime Treatment SY 11,472 2.31 26,456.04
3211.0501 6"Lime Treatment SY 279 2.05 571.92
3211.0400 Hydrated Lime TON 234 138.37 32,378.21
3213.0301 4'Wide,4"Cone Sidewalk SF 293 3.95 1,156.20
3213.0301 5'Wide,4"Cone Sidewalk SF 11,688 3.89 45,522.60
3213.0501 Barrier Free Ramp,Type R-1 EA 2 1,281.19 2,562.38
9999.0000 Street Header LF 97 8.20 795.36
9999.0000 Street Barricade LF 29 51.25 1,486.18
9999.0000 Remove Street Barricade EA 5 256.24 1,281.19
0241.0800 Remove Riprap SF 280 2.05 573.97
3217.0008 4"SLID Pvmt Marking Paint(Y) LF 3,584 1.33 4,775.45
3217.0007 4"SLID Pvmt Marking Paint(W) LF 2,284 1.33 3,043.29
3217.0203 8"SLID Pvmt Marking Paint(W) LF 186 3.07 571.92
3217.0503 24"SLID Pvmt Marking Paint(W) LF 60 20.50 1,229.94
3217.2102 REFL Raised Marker Type I-C EA 27 5.12 138.37
3217.2103 REFL Raised Marker Type II-A-A EA 91 5.12 466.35
9999.0000 Vertical Panels VP(F)-1 EA 22 201.25 4,427.50
3217.1002 Lane Legend Arrow EA 7 358.73 2,511.13
3217.1004 Lane Legend Only EA 1 358.73 358.73
3217.1006 Lane Legend Bike EA 6 358.73 2,152.40
3291.0100 Topsoil CY 300 25.62 7,687.13
3292.0400 Seeding,Hydromulch SY 2,700 1.79 4,842.89
9999.0000 Traffic Signs EA 16 512.48 1 8,199.61
TOTAL PAVING $592,993.67
STREET LIGHTING IMPROVEMENTS
DESCRIPTION UNIT QTY UNIT PRICE TOTAL
3441.3003 Rdwy Ilium Assmbly TY 18,18A,19,and D-40 EA 12 2,353.05 28,236.60
3441.3302 Rdwy Ilium Foundation TY 3,5,6,and 8 EA 12 984.90 11,818.80
9999.0000 2"Sch 80 PVC(includes Trenching&Backfill) LF 2,535 4.49 11,392.29
3441.3404 2-2-2-4 Quadplex Alum Elec Conductor LF 2,440 2.39 5,841.36
3441.1503 Ground Box,Large,w/Lid Apron EA 6 840.00 5,040.00
TOTAL STREET LIGHTS $62,329.05
STREET SIGNS
DESCRIPTION UNIT QTY I UNIT PRICE TOTAL
9999.0000 IStreet Name Blades I EA 1 245.00 245.00
TOTAL STREET SIGNS $245.00
20140226 SF Basswood_CFA_QTO.xlsx,Sheet 1 2 of 2 3/20/2014
---------- ------ ----------- ------------------------------------- ------ ----------------
Z � >
O F cq M
~ �00nxco
O °„ W-F
O W r
Zj W �~W
Q
U)-j iii
W0
w" L a
i
p
a
z — J
Q co co
}
rt
WC000
W W O
/ a co
> LAN
z -- W I _
oz
w LL
W � �
W
i Z O
W N
�✓ , I z p
I-
21 NdW36210H \ w
\L
11WI1 X110 HI2JOM ZIOA
I .-"''vim r IWII aNf1OW fl"18 Q
G�eeK I
I I F->
o r. W W
_ _ J Zp
11WI1 X110 MdNIOVS Q Q
0 F-p
LL
I F— ems/ 0 W
0 p�
O W <
a f' ,/ U) V Q
Q a
� m
J
�ZF �
F-
O
Z
--------------------------------------------- -------------- ----------------------------- ------------...-----------------
---EINIIHOiVN ---- Z o w a
V
N M
�00 � o
00 o� W
I
I
w < YCOww =
Q. J Y�JZ U)
Yo
LO 1 III I — a
N I I
a III I , � � •
1 I I I
III I I p
a��,.//l° � J
\ r I I 1 )mjvo w
w III o
7qC 00
¢Z \ III o W w w�M
�w II ( 1 r N W ~ _�
xa 1 11 ) 11 SOiNO I O p�ui
ww 1 I II I- Zoo
III I I M W w ��a
k�E: : 3:
III I I O= `ALL
I I I O
III I it � p
i
� 111 I IN �N
J_ a�
o-. W I 11 wQ°za I
r oW I
i� N 0
° I I I I M c
0 III I o Q
w W I 1 1 I I > Ow
0 w W U) 1 j 11 f-�
Og Q� mt III 11 W W
Lli�a w I I ww = J Q
�O I I Wz2 O Hp
0� I -w Q
1 m ��
Qd t ( 1 tl wow UJ
zo ONO
w
I > W Z Q X > OW =
I I N w >
I J w w U� Q
Lij I I Q Q - U
zw I 1 O W �" = Wo W Q a
Q 111 1 _ p 1- 0 W F--w 0 o
0, I II ( Z U Q U) Ef �O
uiiw I I I W O U` O u- oz
M w ap 0-
J
I I a w IL W 0= Q g J
QO CO
°—°
uiw
o
z = _
zD X a
W o
------------------------------ ---------- -------------
Z = > LO
0 ! CM') N
OD CO 0
0 « w-X1, N
' J n �FFr F-
LU ; W�WUj =
/
Y<� d
/`�\
P:
UJ
0azf,w �\ Q�o
woa \ W W W<m
F-OW
o ooww
i F- Zoo
�;II �--
�-` � I o =
elf
Na. WW LLL
a a ww I W
I I I I �ax Q � � 0
w w I .®
----� Q
0 O W
—__—_— — I j/ --- E37Vi®JNINMOa W I-
-
J Q
0 p
U-Q
�
w 1 III I \ ~ I III I 0�w
III 11( I I H C) a
zW IX I I ol� II ww W z O U
Ir W I zlWl _ > =00 p
oj. XQ JI ` I1 �IWI� Q p w O �/ N
e wwIi WIWII— — > W = QzQ Q �LIJ =
a o
(D 0 1 1 1 1 I--�- + FW- -j W Q w U
O 1 I 1 1 %4S. U' > U- _ W F
W
Luc
Q ¢
a III 11L— 1 I —t z w Q w QF Q CO Cl
m 1I1 I L —t W p C� oO ti Wz
�INIIHOiVIM a w 0- w a-= Q g J
-o mQU) —
w� o _U
Oz = �� _
IT -0i z::) X a
Lll o
----------- --------------------------------- ----------------- --------- --------------------
3NI-IHOiVVY Z = W
--�I - ---
0 . ? Cl)
f N M LL
1 �c
I —
F
o �� w
�ua a UJ < W w =
Y`n wo (1)
Ya
II
I I
I
yd I I I N N
1I I
I I I
,tIVldv®
LLI 1 co
2 I I ' N W ~ _�"�
ww I II I O Zoz
I 1- o
W
1 I I Z O wo
LL
I
�z �I I ( I I / 0?
ml 1 J Zw
ww i j I '.0 m Q Q
1 1 I W O ~Q
Z W m W J
OW
i O � ❑ w p �a
C-Z w J a.
IL 0
N N O❑ Z O O 'O = O
>
Lu W t0 w
Cl)I— t` ❑ O ❑ v Z
V Q
l - Z W4 p CO CO z Q Q
I !I 1 W J Y Y 0 \ m o
0� I I11 I -- C� �Q u1 Q JQ g
w I I 1 1 N M V >a W W
1 1 I I m} zo ❑ ❑ U 1
1 1 1 1 m~ U) m
ui
N Q
m
------------------------------------------------------- -------------- ------------ --------------------------
0
O '—� �M L
co 00 1'-
O
W = 0Dw•j w
\I
C/)-j z
Cl)
j \ \ � in d
\\\
ILU)w Ohw \ \ IBC)
F-°W \\\\\ : > �8
1— f
W N
I ' — �_'
0Of 6i
11
Z�0:zO
I I I I W Ira
o
N I\ i
�� � _
p
m
/x<
o°I I q
vi J4- -------- O W
---------- -
I� 1
I-Q
I I i w I�I Z w �
� W
ILI
"' I I O W ry
w I
: �lzI I S � �w O im -j O ❑
�u I�wl 1 I� 00 z w W 0 o�
WW Io�l I II�--- I �� > W O W }
X<I wl I I m H U ❑LU
3: } (/� U(A z
a I 0 --O O m m m z w
uj -t c� 5;
I J >FL W
� W � 0..
3NI-lHO17VW 0°�- U) cn = m o w
o J
N Q
i m U
\ — U
�_
a.
L---------------- -------------------------------------------------- .............. .........
----------------------------------------------------------------------------------------------------------------------------
3NI-lHOIVN Z = w g
M R
O °�ID T o
w r° u'
I 11N I — O „ w x -
(7 h r-
J Z
Id I I IW a N w O
i � i nom— "( a
I
_...
Z
FlYM-
I I a N
I l
ap Q� aco
� � = J X WU)o
< T ��6OX 3 N W W ww M
uj
�2 I,��` I N ! W F
w I
�� I I SOTTO I ..
ww I I N I m Z0z
i
I I I W ��x
I
I I~
-ELr Id I IJ � � I i f O Boa
Q I IU I O
w l I I 0
J I I
m I IN I
O 1 1 I I I i�ww i
I I I III
J A I I I I II W N
zQ i I I IZ r
om
! o > OW
I h>
I -
W W -j I� W Q J W
zo
ww IN I I w� O Q
>� I I I I ��ww _ W J Q
ww I I l kw�!� J Q W � O ~Q
I it ? 2 Q
m -
�
wow J
W Z Z Z 0
F11 Z 0 � L� 0 �� N
37- - I_!�
w _ 1 I�I�l O p 0 0 G vJ U to Z
p N 11 x�I _ fn 2 fn U) a a
I
I� 1 Ix O
�2 W I wlll� M W 0 W W a
w iZ I �I w O � O O ~ m °
I II
w I N v 0 W O a a
0 0
III m N w
I U
W
. o �
------------------------------------------------- ------------------------------ .............
Z w °
O � NM
Q o ��X� O
W
CN
N", LZ6w W y�W W=
>Q � n n.
w
\ J /
\ \ Z
ry
\ \
gD z \\ \ `� \ W J ch
lx w \ (n
Qn°
C2(w
HOUW \ \ W W W wx°m
L H N
O I W _
ICI dz _- O 0W6i
I z3z
I II I II� Ir 5y I I Z O °
fl-o n-
I LL
�IzIJ
hW
ToN W W 1, r� z
nw
�o J o IN I �u / x$ I
WWI
p �i�zl4 I
W Q DWI 1 /k _ -__---- > O w
------- m �I I/ /\IJCSNf�lN1®CJ J F->
r --
-------- - ^d I- /1 ` -- ---&-niasmi W -1 W w O�
-----� - Q -J z❑
I I I W I I I W Z 2 = Q m LL 1
0 `LEI I , Z \ ¢u I I z W z z Z Q Ow
I I I Irn �\ Z _ O U
W
Cl)
I I I_ I I —❑- ❑ Z ❑ ❑ O N
W I I I� I I �I O
w
a I IN 1 O ❑ O O U� a
f- Y i — Cf) U) U) Q W
I I IU I I J 7a I i_ ❑ W Q W w
z CO
I IN 1 0 d H d d
I I I _ r X � W
-- I- d W it d
3NI-lH3iVN m o w
N J
U)
I � U
eo =
I x �-
I w �
o �
----------------- ---------------------------------- ------------------------------------------------------
T3NIIHOlb'W Z w °
N
�cot-c p
j « O
J
W F
I I I , F w
II rya - C� Yo
I _ ( LO a
I I I I
I I I 110 M i
II
\\r I*I I I A yo W J
IZ I I I J j
O a°"'
p Woo
Zw I I i > W CLUN
! W
w I
a� I I I I II SOINO ! ❑ Z �F-
..
[lilt[ I I*I II Z0p
I I m >W �Fa
O mp
I I m01 ! LL
I II III � ❑
o I I IN �N
I
a ml
~� O I I I I M r
0 II r Q
I >
,mow � Ow I I I d W
$ ml I I I q LUG
Z❑
ww I I I I w D Q
I IIII � w OF-Q
I
w0vi m O J
N
0 �a
( s V
III T J �AA W a
w I i I N M , M �_......_ I 1 r� Q
V W W �/ v'
z I I I - c W Q w
w i III I -- F- LL m o
X u I III I I Z W Of co
j I I
T W CL F-
w U) U) I
LD 0
C ti V o w
° J
X N Q
a w C)
CO _U
CL
C,
2
O W
o 0
----------- ---------------------------------------- -----------
Z w o
OL ? 64 f7 LL
r w 00�c Q
\ ' O o W N
un
W F
\ LJJ ` Y��W v=i
LO CL
\ \ W J
Hui \ 0 a�
woQ \\\ \1 XX o
t-UW W w wo
_ > I— �FN
I _ : W 1 = n
0 o z
W ��o
a=
O °
LL
cG� l �\ I I O
❑
n W =1 76
s —
m
o
of
---
cn I
> O>---------m — --- lN EAIIJOS I
---------- -4-1-/i / - ----nom ��o W w�
_ —4 4-—I
(X CO
W I III
cn oW
I I I I �( � �W 0 w
z
All v°-
Z<I I � W _ O 0
X i i iii O o
( JOw a
2 U z
I I W C7 W (n a
nW/ W
U) W LL : m o
II I w
II I
W �
-- 1- - U O
3NI-lHOl`dW ,j 0 X V o w
N
a w v
� � U
2
O W
o (7
T3NIIHOiVN Z W o
OF NCO LPL
- F- °LOn� O
n w
W afZ)ww x
W z
LO a
a I it
I I I a N
I
—
\\ I I I O p
)mjvo : J
w M
co
w ammo
\ II Woo
z z I N W Q' M
II I ! W I _ �
II
w� I l III F- z°oz
I W O� LO
I I I I Z 0 �o
I I I r LL
I II III � p
o I I I I N �N �,
Q I I I I I T,
of Ii III Qom
p° I I I
II
0 I it r
ww NI I j III I o
OW
�� m! I III W ~�
� Ij I I � Z JZp
u I I I IA Q
I I � i � JQ
W O p
j I I I jl X L"< L
WOW CO J
z W C)
U) Q Op�
I I W z p� N
Q
!� I I I N M a Z W W �co V� Z
Lii
Cl) I I i — w 5 WN
I III I Z L.I.
W
�<
! III i -- U) W o
LLI
N M V Z W W i
I I I w C/) U) [�
I I j w 0- o w
0 U) N
X U
CL w m
�z U
w
o �
--------------------------------------------------------------- -------------------------------
Z W
00 2: NM R
LL
W 1--
w o
\ i O W L9
LV s K�W� W
wo
in d
\X�
o�
°,W O ago
�Zco WtQqOo
F-ow I I w w WW 90
I I 1 I — LU ~ F=
C) Z
�-
I d 1 OW
- F- Zoz
0
I j II III III-- i I Z O Boa
LL
Wj LLJ w \ \
N W
u+w �:�
o-� W L!-I L3J
o I I I ( mo=o
co
I I I Wye ��
°oi I U I w W
�I III I �� �� •
a _I I �� � -- —__---- > Ow
--------- - �_-- _---M---�0 -� Zp ww
/�- -- Z Q
I - I -I —1��- (D J Q
LLL<
W I I � � I III ( CO Ow
I I I wm I I I I Z W 0 �
w I I 1 ?N W L -1�L�L_ 0 C-)
a
g� I I zl�l = � 0 p
J U) I I I �I�I w Z N
Z
WW C7 O W
a I I u�lw I Z cA W
�— J— a
w V� Z
L
i I I III-- I Z Q
p w
II Z w
-- 1-1 --�- w CO I-
3NI-lHOiVIN
w D- U w
O J
N Q
X C)
CL w m cn
< 3: ez
w °
— ———-———-- ———— —————————----—— I
s
f