Loading...
HomeMy WebLinkAboutContract 43862-A4 AMENDMENT No. 4 Z�3'diz-jjd COWMCT TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group, PLLC. , (ENGINEER) made and entered into City Secretary Contract No. 43862, (the CONTRACT) which was authorized by M&C C- 25817 on the 11th day of September, 2012 in the amount of $131,291 .00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $28,369 .00 which was administratively authorized on August 23, 2013 and Amendment No. 2 in the amount of $13,068 . 00 which was administratively authorized on October 23, 2013 and Amendment No. 3 in the amount of $43,738 . 00 which was administratively authorized on February 7, 2014, and WHEREAS, the CONTRACT involves engineering' services for the following project: Sanitary Sewer Rehabilitation, Contract 86 . WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW 11BEREPORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter. into the following agreement, which amends the CONTRACT: 1 . I Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 20, 2014, a J copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by rn J Engineer totals $29, 625. 00 (Water: $20,456 .50; Sewer: $9,168 .50) . rn CD 2 . NO Article II of the CONTRACT is amended to provide for an _ increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the t 1 CITY SECRETARY 1 Page -1- T. WORTHw TX by the City for all work and services shall be an amount of $246,091 .00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED : ENGINEER City of Fort Worth Shield Engineering Group, PLLC Fernando Costa Crai Barnes, P.E. Assistant City Manager President DATE: DATE: APPRO RECOMMENDED: S . Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A —a�t Douglas W. Black Assistant City Attorney VOR ,,,syCgO¢m©pb �y ATTEST: 0 0 o ✓ `� ,�" .... � 00° 0 0p000 0FFICIAL Mary J. i4lys lr City Secretary CIS SECRETARY r. Page -2- I 1 i March 20, 2014 Soon Wong Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Sanitary Sewer Rehab Contract 86 -CPN 01964 Dear Soon, Shield Engineering Group (SEG) is pleased to submit the following as amended services to the original contract shown above: Waterline plans and coordination for Eastwood Avenue (approximately 2,419 LF). $1w(water) The COFW Water Dept (Tony Sholola) decided to replace the aging waterline ( ) to help reduce the chances of there being future trench failures in Eastwood Avenue. Effort includes design survey for existing meters, valves, and fire hydrant locations. • Revise plans and specs to separate the project into two construction phases. $ The first phase includes 4th and 5th street water and sewer, and the second phase (both) includes the remaining and 5thnstreet effort also includes revising the spec book,the limits of pavement repair g 4th Update preliminary opinion of probable cost to include Eastwood waterline and $1,32 pavement revisions along 4th and 5th street. Provide bid phase services for revised construction set and project phasing. $7,369 This effort includes reproduction for bidding and additional reproduction for both construction assuming the project is awarded to two separate contractors. sub markup 300 Total change/addendum to the contract $29,625 Original contract $131,291 Amendment 1 $28,369 Amendment 2 $13,068 Amendment 3 $43,738 Amendment 4 $29,625 Total contract $246,091 The new contract amount will be $246,091. Please feel free to contact me with any questions or comments. Sincerely, Jean-Marie Alexander,P.E. CEO Shield Engineering Group,PLLC Shield Engineering Group, PLLC k rri 1200 W. Freeway, suite 300, Fort woEmail: in o @segpllc'ccom$®7wwwosOh e9denginee8ingg$ou0p co7m | § ; §!®!;,#0 N E:J®��l:, §) 2 §)!k! ! w;!@ g eu.§\rkk k\ � ir m V |. ) § m k � y { mcL a; Luv © o � z � �° �U<j2o £2 � [! ;� °$ 1. k \ _ ° ■ ƒ\ " ) !! } / { ! ° m L !«] k ! _ \ \ \ -6_ m _ £5E - w ar. )/! ! ;§#$] Ej ! -a=. ) ) J \ - e I!)!ƒ\k)) z:" S.lE !E }