HomeMy WebLinkAboutContract 40121-A6 i8
CITV SEC Jvd
CONT
TO CITY SECRETARY CONTRACT
At 0.x
the City of or Worth CITY" ) and RJN Group, Inc. ,
made and entered into City Secretary Contract No 121, tie
CONTRACT) which s authorized by M&C C-24176 on the 13th day of ,
2010 In the amount of $432f396. 00; and
the CONTRACT was subsequently revise by: Amendment No. 1
in the amount of $92,009.00 which was authorized by M&C C-24999 on July
12, 2011, erg � No. 2 In the amount of 2'1,60 0 which was
administratively authorized on u s 30, 2011, Amendment No. 3 in the
amount ' $23,38,8 .50 which was admin.1stratively authorized on October 1
2011,11, erg n o. in the amount of $237, 678.510 which was authori,zed
M&C C-25433 on February r 2012, and Amendment No.5 in the amount, of
$45,750 .00 which was administratively authorized on it 8, 20 an
WHEREAS the CONT C � services for the
following prj ec
Clear Fork Drainage Basin -21 Sanitary Sewer Improvements; and
WHEREAS, it has become necessary to execute Amendment No. 6 to the
CONTRACT to include are increased s scope of work and revised fee.
NOW C , CITY and ENGINEERf acting herein y n through it
duly utho e representatives, enter into the following agreement,
which amends the CONTRACT:
M Article I of 1
the CONTRACT is amended to include the additional
engineering services specified in a proposal dated Apr3i.1 14 2014 a copy
CD of which is attached hereto and incorporated herein. The cost to City
for the additional es r� services � performed y � e,r totals
X42,� , �C .
Co
1
2 1
Axticle II of C amended o provide for an increase in
the fee: to be paid to Engineer for all work and services performed under
the Contract, en , so that the total fee paid by the City
work and services shall be an amount of $895,2 . C .
l
r" W �mu��anuolurroor�m�irrm
dflNUYU1Y0X96W1U'4'IIWNWNO'',
t,
OFFICIAL '%J E o .;fit,
t.
CITY , t u'� f IIII�^ me f,
ME,age �." M3,
r
xrrxrfirrru.;c;;,,y„ipp,„ arrrrc!arvtw„ucuuurrrrrvrr iei.mnm ircaarrauwuairrruaiwurrrrFrcawarr,err'rarurawrurreeeu ,urrrr-rrfrru
All other provisions of the Contract, which are not expressly
amended, herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth ENGINEER
R,JN roup Inc.
or�11 P.1
[l v 7
Wag
too I
Fernando Costa Peter La.1f P.E.
Assistant City Manager Vice, President
DATE: DATE:
APPROVAL RECOMMENDED: ,,
,41J"4
S. Frank Crumb, P.E.
Director,, Water Department
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
Date: N'/A
Douglas W. Black
Assistant City Attorney
ATTEST: 0,00000
b
ty Se
C/
OF''MIAL RECORD
Fw WORTH, TX
Page -2-
rj n.co wl
rJ n r 0 ,
Excellence through Ownership
April 14,2014
Mr. Robert Sauceda,P.E.
Project Manager
Fort Worth Water Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth,Texas 76102
RE: Contract Amendment No. 6
Clear Fork Drainage Basin—M-210 Sanitary Sewer Relocation
City Prof ect No. 010222, City Secretary No., 40121
RJN Group File No. 18242500
ATT. Mr. Sauceda:
Please find attached the Contract Amendment No. 6 request to the M-210: Sanitary Sewer
Relocation Project. This amendment request is seeking to recover labor and expenses associated
with the significant amount of additional design services on Part 3 and services during
construction (SDC) performed on Parts 2 and 3 from August through December 2013. Each of
these amendment cost centers will be discussed in greater detail in the amendment summaries
shown below.
M-210 PART 3—D :SIGN AND CONSTRUCTION PHASE SERVICES—EXTRA WORK
During the reporting periods noted above, RJN produced and issued new design drawings
associated with the construction of a realigned M-21 0 and Country Club service line to
accommodate the new Tennis Center. This also included the need to redesign the plans to
account for completely trenchless construction using tunneling and DD due to site
inaccessibility for traditional construction equipment. RJN was also asked by the City to design
the realignment of the 8-inch waterline in Country Club Circle (approximately 1,80�O LF) to the
western side of the street and across the southern Colonial Parkway intersection. The production
of these new designs required extensive site and technical coordination during the design and
during the construction of these improvements.,
More specifically,these amendment item efforts included:
L M- 10 and Colonial Clubhouse Service Re-route Preliminary Designs to
accommodate the new Tennis Center Building Improvements (Task 3.1F). RJN
closely coordinated with the Colonial staff on moving the existing public and private
sewer systems,to accommodate theffi new facilities while conforming to future system
improvement plans for the overall private system improvements plan for the Colonial
Country Club (CCC). Preliminary design plans were produced for these
improvements. RJN's staff hours, labor and expense costs incurred to perform this
item are shown in the summary cost table below.
ri-n in.com
Excellence through Ownership
2. M-210 and Colonial Clubhouse Service Re-route Final Designs, to accommodate
the new Tennis Center Building Improvements (Task 4.2G)# RJN closely
coordinated with the Colonial staff on final adjustments to the design plans that
moved the existing public and private sewer systems. Final design plans and a cost
estimate produced for these improvements. RJN also reviewed the Contractor's
submitted change order to Part 3 for, performing this additional work. RJN's staff
hours, labor and expense costs incurred to perform this item are shown in the
summary cost table below.
3. Redesign of the M-210 and Colonial Clubhouse Service Re-route Final Design
Plans to accommodate construction of the new Tennis Center Building
Improvements by trenchless means using tunneling and D. (Task 4.2H). Due
to construction equipment'inaccessibility to the site (none of their bridges could hold
the equipment's weight), the City directed RJN revised the design plans to be
constructed completely by trenchless means. RJN again closely coordinated with the
Colonial staff on the design plans and construction access. Final REVISED design
plans another cost estimate were produced for these improvements. RJN again
reviewed the Contractor's revised change order to Part 3 f or performing this
additional work. RJN's staff hours, labor and expense costs, incurred to perform this
item are shown in the summary cost table below.
4. City Staff requested redesign of the M-210 Part 3, Country Club Circle 8-inch
water line. (Task 4.21). Due local resident's concerns, City staff directed RJN to
realign the proposed water line by moving it to the western side of the street and
extending it beyond the Colonial Parkway intersection. RJN closely coordinated
with the Colonial staff on these revised design plans and its constructability with
limited adverse impacts to the neighborhood and country club activities. Final
REVISED design plans another;cost estimate were produced for these improvements.
RJN's staff hours, labor and expense costs incurred to perform this item are shown in
the summary cost table below.
5. M-210 Part 3 - Supplemental Site Visits, Technical Assistance and Additional
Record Drawings
gs Production for the new M-210,Re-route design on the Colonial
Country Club Property (Task 6-1G). Due to the M-210 and service re-route
design being added to the scope of work; the re-design to change to tunneling
construction on site; the realignment of the proposed 8-inch water line in Country
Club Circle; and traffic control&public event coordination activities along the Part 3
project area, a large number of unbludgeted site visits and coordination time was
required to be made. RJN"s staff hours, labor and expense costs incurred to perform
this item are shown in the summary cost table below.
M IM116MM -;I=, M
w"wrin.CoM
aroll D
X
Excellence through Ownership
A summary of RJN's anticipated staff our labor and expenses that are requested for the
work items noted above are shown in the table below:
Task Des tion Hours Labor Expenses F Total Costs
cnP
No
PRELIM17VA-RYDESIGNSER'VICES.-
3.1F M-210 and Colonial 97 $ 121670-00 $ 75.00 $ 12,345.00
Clubhouse Service Re-route—
P ELIM.PLANS
Subtotals: 97 $ 12.7670-001 $ 75.00 $ 12.5745.00,
FINAL DESIGN SER'VICES.-
4.2G M-210 and Colonial 46 $ 5)880.00 $ $ 5,955.00
Clubhouse Service Re-route— 75.00
FINAL PLANS
4.2H M-210 and Colonial 32 $ 4,500.00 $ $ 4,555.00
Clubhouse Service Re-route- 55.00
REDESIGNED FINAL
TRENCHLESS PLANS
4.21 M-2 10 Part 3 —Country Club 120 $ 14940.00 $ $ 14,995.00
Circle 8-inch Waterline 55.00
Realignment-REDESIGNED
FINAL PLANS
Subtotals: 1 198 1 $251320.00 11 $ 185.00 $25,505.00
CONSTRUCTION PHASE SEJ?VICES.-
.1 G Construction. Support — Extra 26 $ 4,120.00 $ 75.00 $ 41195.0O
S ite visits; Technical
Assistance & Public Events
Coordination
Subtotals,: 26 1 $ ............... 41120.00 $ 75.29 $ 431
TOTALS: 321 $ 429110.00 $ 335.010 $ 42 445.00
Therefore., we are requesting revised Contract Amendment No. 6 to the M-210 Sanitary Sewer
Relief Main Agreement in the amount of$42,445.00. There are no new services required to be
performed by certified M/'WBE firm associated with this amendment request. Contract
Amendment No. 6 represents approximately a five percent(4.98%) increase in the total contract
value.
N01(a I'm,
www.r n.co m
Excellence through Ownership
For your convenience, a summary of the total project fees are as follows:
Contract Item Fee
Original Contract Amount $ 432,396.00
Amendment N . 1 $ 92.7009.00
Amendment No. 2 $ 21)600.00
Amendment No. 3 $ 231388.50
Amendment No. 4 $ 237,678.50
Amendment No. 5R $ 45,750.00
Amendment No. 6 $ 42)445.00
Amended Contract Value $ 8959267.00
Please do not hesitate to contact us should you have questions or need any black ground
information concerning this matter. Thank you for your time and consideration.
Sincerely,
Chris Brooks,P,.E.,
Senior Project Manager
ATTACHMENTS
CC: Tony Sholola,P.E.,FWWD, City of Fort Worth