Loading...
HomeMy WebLinkAboutContract 45665 CITY SECRETAW CONTRACT NO.-L/11 I I Lull, Developer and Project Information Cover Sheet: Developer Company Name: Lackland Calmont, Ltd. Address, State,Zip Code: 3045 Lackland Rd. Fort Worth,TX 76116 Phone, E-Mail: (817)717-7136 Authorized Signatory/Title: Tim Fleet, General Manager Project Name and Brief Description: Water, Sewer,Paving,Drainage& Street Light Improvements to serve Deer Meadow Ph. 3 Project Location: 11500 Block of Oak Grove Rd.,Fort Worth TX Plat Case No.:FP-013-076 Plat Name: Deer Meadow Addition Council District: 6 City Project No: 02243 CFA: 2014-021 DOE: 7200 1 To be completed b staff Received by: Date: 1 (WICIAL RECORD t f r P t; l Combined CFA Agreement—Revised January 2014 RECEIVED J w 1210f 1i' t i COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Deer Meadow Ph. 3 ("Project")within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof. Water (A) �X , Sewer (A-1)_X==, Paving (B) X Storm Drain (B-1) X Street Lights & Signs (C)_X_. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section Il, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement—Revised January 2014 ' Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, bV the alle,-ed neWizence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alle,-ed ne,-Ii,ence of the City of Fort Worth, its officers, servants, or employees Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Combined CFA Agreement—Revised January 2014 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects,in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement—Revised January 2014 Cost Summary Sheet Project Name: Deer Meadow Ph. 3 CFA No.: 2014-021 DOE No.: 7200 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 197,130.00 2.Sewer Construction $ 243,528.00 Water and Sewer Construction Total $ 440,658.00 B. TPW Construction 1.Street $ 456,878.98 2.Storm Drain $ 201,234.50 3.Street Lights Installed by Developer $ 55,731.95 TPW Construction Cost Total $ 713,845.43 Total Construction Cost(excluding the fees): $ 1,154,503.43 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,813.16 D. Water/Sewer Material Testing Fee(2%) $ 8,813.16 Sub-Total for Water Construction Fees $ 17,626.32 E. TPW Inspection Fee(4%) $ 26,324.54 F. TPW Material Testing(2%) $ 13,162.27 G. Street Light Inspsection Cost $ 2,229.2.8 H. Street Signs Installation Cost $ 1,470.00 Sub-Total for TPW Construction Fees $ 43,186.09 Total Construction Fees: $ 60,812.41 Choice Financial Guarantee Options,choose one Amount ck one Bond=100% $ 1,154,503.43 Completion Agreement=100%/Holds Plat $ 1,154,503.43 ^ Cash Escrow Water/Sanitary Sewer=125% $ 550,822.50 i Cash Escrow Paving/Storm Drain=125% $ 892,306.79 Letter of Credit=125%w/2 r expiration period $ 1,443,129.29 j i 8 I IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has exec ted this instrument in quadruplicate, at Fort Worth,Texas this .., day o 20 4 CITY OF FORT WORTH-Recommended by: Water Department Transportation&Public Works Department Wendy Chi-B bulal,EMBA,P.E. Douglas W.Wiersig,P.E. Development Engineering Manager Director Approved as to Fornn &Legality: Approved by City Manager's Office e--:." . Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. 04 _ Date: ATTEST: ®o� ° o a J. r City Secre r AS ATTEST: DEVELOPER: Lackland Ca mo rtt, td. Signature Signature (Print)Name: Print Name: �� Title: OFFICIALRECORD CITY SEC"RE VOW Combined CFA Agreement—Revised January 2014 EVIL WRIII"149 TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 na �'"• o° R n0 p p Cp phqi ? O 5 Z Z �'� - � �� WTI § ti o o s„o y 3 �V o •L O v� y W ILL f FrcU "mow �F � r m _ r-, QW >-�7_� r uHt * uu0F0BW°WW l °`> ZU��z�'Q W t-' �2 AO GQ���u 2 - S W r l a C• 4�T Q F to 1— °=,E- g i s� M w aE g Hull K i 0l b d S9L 11 30135'Y EV' W I I30V MOOV-N 833C k �F�II II I II Ii III � 11A.GS 00 MR mOjvj 230 1 N LL c ,10'0ZT s'o.ez •TO'OZI -- _ .45'Z6 •M_t9f M90.00 ° 'm n\ pD°o r•f {t- N 0 w .00'OZI ! + AO'OZT .Db'ZZT €� O, o >3.SEO Nm c F �M.85.90°00 5 h9.B5.90 00 5_ 9.85.90°00 N A�N Q Z ti�c.�°`II'�� t o ° W C .00, E6 s OZI e __ . 44T 3 85� $ 0 90° k R. N NON t ° w Olt U3.85.90e00 N �y' y'.L7'Q.4�59:bi1 .e-da.lE-OZi.-.e J.- i ° I ,_7! . • P 000ZT o M.BS.90°005 °.00'OZI n V m . U° i 4 � � •N I Ili to � _� t CA . m - LL m �L FL p I� �•J V& _I • i 13 r��� m �� II• fq� =IM � (��_ qi 'I� ,v nd p �` as .tee �a tl� g V �1s pi ° L4 w E I n 0 E90B3r��-6 qS°J l D0.0�i 0.4 S�7•:���y m 1`0u`1b�I£�9.'g`t�G{>S�,n.OS r v 3'F.3-�8-5+.f z$ru 9��07°)0 n O d°o N�I`r of bI I -°gg EZ 0 O 9� .85.90.0 O N 9 b nn 5�!.l I b�• o>ddkF i t •I' O�,/e m�N_ 'K O-.3.'b1 ".. ma 15° 'OZT i z 3 8590 00 N � _ o •Le•58 H °�/.:C�/H � o .. a3.B£90°OOH .y O S£G 3'9 6£ e/^.�9ny m. 'N.H5.90 ^N 3 r N o-�^3.8'5'°E.9Z.0bI°E0'b0 E Ta m sri lo>�r N 1.GZ'6�LeZEi t N n., ° Z OL ON '81 t9 W W 3 n v o j 3J,7 y3S -ion ,1NY Oa 3-°, a 2nm 3.95190°00 � � EZN � �o � J� >fy1=i�3 syoi1���£�y ZTN.56'60IC b� IAN /� %/ y 1s55(�5 "u �j'sg$81sg$s a$ b `a °� _ y 11'3a':nb 1 'r.r1'1\\v33C �OUV-r •iB'6Gr l”/^ /� §R°� ..inn' S^ JNr SulS NOr1 Ji70 I i \".34 ° pngpoa siJ-+n Svinr lbanc bb.3�,�Jb_J3��, _�/� �ZLLGZLLdLZ . . Ndi•+3s ___ r11 �IO`� oN t�8 ``•� ? � r_.. _, _ ... jjj 3 3N^Ob 4Nbr'�IVdN 3i•1r1J�0 ^� gB LS ° �3�n 1 ,_`.. I i of -I A Ea 4 Z� 0 Z Z B, z < z 0 L'U LL. .0 in -�z Q 9 w ul z LU o< r HIM It LU 9 S, & nR E°l NU 4 s E,� -E 50 6 6.6 6 'EN"tT F rc-.9,.-g v —PH - E,f .�—q up� 5,,—p z, 2- �FE 9 E E2`0 Ups iD 0�? -E nA- zi zE- 19 y2, k 1 > E jj 2z E E7 t 2ewh 8 i F L — F I' COIN z O Lij U71 o McPHERSON CORD J m Y L � � O BLUE O ALSUE GARDEN ACRES Y PLAZA W OAK GROVE W � W W J Q TIMOTH STELLA MAE ° O SALE: 1 =2000' Ln 3 z cn Z�QRQCKETT TUCKERT O p 0 3 Oz N w �° Q m O p o 0 NICOLE WAY -3 PROJECT NELSON Lij LOCA TION o V r- SIER A BLANCA BROWNFORD I— Y N Deer w Ln z z 1 — a Creek z m OAK Ln F.M. 1187 GROVE OAK GROVE — RENDON o_ o FORT WORTH SPINKS ¢o AIRPORT E D.O.E. NO: 7200 WATER NO: P265-606150224383 LOCATION MAP SANITARY SEWER NO: P275-706130224383 STREET/STORM DRAIN NO: W-2305 "DEER MEADOW, PHASE 3" CITY PROJECT N0, 02243 X-22570 WELCH ENGINEEmNo, INC. CONSUL T/NG ENG INEERS i F FTTT F F -M SIERRA BLANCA DRIVE [ I ] � LrEt I LITF -H PROP 8"W N PROP 8•W 1 / LL- MEADOW SCAPE DRIVE PROP 8•W BROWNFORD DRIVE 5 / 'PROP 8'W I I 1 / _J / PROP 8"W j DOE MEADOW DRIVE ROP e•w `\ PROP 8•W L I O w FALLOW DEER DRIVE U I a w � z ° 100% DEVELOPER'S COST 8" WATER LINES, FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES SCALE: 1"=,300' EXHIBIT »A„ WATER NO: P265-606150224383 SANITARY SEWER NO: P275-706130224383 WATER IMPROVEMENTS STREET/STORM DRAIN NO: W-2305 "DEER MEADOW, PHASE 3" CITY PROJECT NO. 02243 X-22570 WELCH ENCA NEERIN0, INC. CONSULTING ENGINEERS i fi L t - r l SIERRA BLANCA DRIVEL 1 re�ss� __ 1_ I---1- f _ - - �- 1 I PROP 8'SS T i i 4� ' f I I I w l rPROP H ss f ' {r- - MEADOW SCAPE DRIVE PROP ass BROWNFORO DRIVE I ;off, PROP 8 S5 i \EX H SS ' i PROP g"SSHI ? r '� DOE MEADOW DRIVE I I } Ez 1-s ;s H'ss 0-If f i o l' 1 FALLOW DEE W_!' R DRIVE a z s i ..._z- I o -- Q�fi IIf , (� it 1 d 3 }7 3 LLJ Pi I 100% DEVELOPER'S COST ---�— 8" SANITARY SEWER LINES AND ASSOCIATED APPURTENANCES SCALE: 1"=300' i „ „ D.O.E. NO: 7200 EXHIBIT A— 1 WATER NO: P265-606150224383 SANITARY SEWER NO: P275-706130224383 SANITARY SEWER IMPROVEMENTS STREET/STORM DRAIN NO: W-2305 "DEER MEADOW, PHASE 3" CITY PROJECT N0. 02243 X-22570 WELCH ENGINEERING, INC. CONSUL TING ENGINEERS ----------------- ------------- SIERRA BLANCA DRIVE (50- RIGHT-OF-WAY) j i X-� T 291,9-13 _j j IMEADOW SCAPE DRIVE BROWNFORD DRIVE :zz cli (56'RIGHT-OF..... 1 (50' RIGHT-()F'-WAY) ry 91 DOE MEADOW DRIVE 1 i 10) 1 (50- RIGHT-OF-WAY) > uj FALLOW DEER DRIVE' < zd h 1 0 I Lli 100% DEVELOPER'S COST 6" PAVEMENT W/2% CROSS SLOPE AND 7" CURB ON 6" LIME SUBGRADE 100% DEVELOPER'S COST 2" TYPE "D" SURFACE COURSE ON 4" TYPE "B" BASE COURSE ON 6" LIME SUBGRADE SCALE: 1"=300' D.O.E. NO: 7200 EXHIBIT "B" WATER NO: P265-606150224383 SANITARY SEWER NO: P275-706130224383 PAVING IMPROVEMENTS STREET/STORM DRAIN NO: W-2305 "DEER MEADOW, PHASE 3CITY PROJECT NO, 02243 3" X-22570 WELCH ENCIRMERP40, I NC. CONSUL RNG ENGINEERS _ � 1 3' S�. GRATE IN�ET '.24•�CP.i _- -- ! 1 1 I I 1 21 RCP i l ( SIERRA BLANCA DRIVE `--i---I� —i i----2 i CP , �— N -. !I I i f i ( I 1 1 -j 16 RCP . �-- _ J 1 ! ! I I ! I ( I I ! 1 � ,• I l -- 1 MEADOW SCAPE DRIVE 10, BROWNFORD DRIVE 24-RCP .-- m— - 21"RCP RCP T l - I _ 1 _ �__ � . i 7 7 1 T I I _� � 1 _ ! 1 1 _ L t 121'RCP I 24"RC 1 1 i , 42"RCP DOE MEADOW DRIVE ..20� -_. _ f �- 1 ¢I s j l 24'RCP RCP 24-RCP 42'RCP W i 1 } TXOGT CH—FW—O I HEADWALL �I �, 1 FALLOW EE DRIV D E I r - ! ! I' w 1 �1 : 1- _ a� I u QfT r ' 1 _ I r t` K 5 I SCALE: 1"=300' i 3 10' OR 20' INLET-> 100% DEVELOPER'S COST STORM SEWER AND INLET AND ASSOCIATED APPURTENANCES 4 �� �� D.O.E. NO: 7200 EXHIBIT "B- 111 WATER NO: P265-606150224383 SANITARY SEWER NO: P275-706130224383 STORM DRAIN IMPROVEMENTS STREET/STORM DRAIN NO: W-2305 "DEER MEADOW, PHASE S' CITY PROJECT N0. 02243 X-22570 P WELCH ENGINEERING, INC. CONSUL TING ENGINEERS I f i e, SS t I r� Xi — ----- — -_-I SIERRA BLANCA DRIVE -7- t � A. � -r- - } I t ; MEADOW SCAPE DRIVE BROWNFORD DRIVE o! ul -_ - r m - -- - — ! { i I_. x MEADOW DRIVE - I DOE r I I I � I i � � � s uj W FALLOW DEER DRIVE i LLJ o � y t W{ 'ro Q CIO 't U + i * -- PROPOSED STREET LIGHT (100% DEVELOPER'S COST) p -- PROPOSED STREET SIGN (100% DEVELOPER'S COST) I ❑ -- PROPOSED GROUND BOX (100% DEVELOPER'S COST) r -- EXISTING STREET LIGHT I i P SCALE: 1"=300' �� �� D.O.E. NO: 7200 EXHIBIT C WATER NO: P265-606150224383 SANITARY SEWER NO: P275-706130224383 STREET LIGHTS STREET,/STORM DRAIN NO: W-2305 "DEER MEADOW, PHASE 3" CITY PROJECT N0. 02243 X-22570 WELCH ENGINEERING, I NC. CONSULTING ENGINEERS k I r i 00 42 43 SECTION 00 42 43 BID PROPOSAL PROPOSAL FORM Page 1 of 6 PROTECT: DEER MEADOWS-PHASE THREE DATE:03-31-14 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Q Specification Unit of Bid Quantity Unit Price Bid Value B idlut Item No. Description t3 Section No. Measure NO 3311.0261 �� 8 PVC Water Pipe 33 11 12 � F� 3,540 20.0� r � �$8,5000.00 a �� 0 3311.0141 6 PVC Water Pipe 33 1112 LF 10 $ 0 33123003 8"Gate Valve 33 1220 EA 10 $950.00 $9,500.00 33123002 6"Gate Valve 33 1220 EA 3 $800.00 $2,400.00 3312.0103 Connect.to Existing 8"Water Main 33 1225 EA 3 $250.00 $750.00 a 3312.0001 Fire Hydrant 33 1240 EA 3 $3,100.00 $9,300.00 3311,0001 Ductile Iron Water Fittings 33 11 11 TON 2 $3,600.00 $7,200.00 33050109 Trench Safety 3305 10 LF 3550 $1.50 $5,325.00 ------- 5 3312.2003 11"Water Service 1 33 12 10 1 EA 102 $725.00 $73,950.00 UNIT l: WATER IMPROVEMENTS BID SUMMARY $197,130.00 3 9 i k 7 S s 9 pk� 5 A i C h { d a 9 yi 3 CITY OF FORT WORTH DEER MEADOW,PHASE THREE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7200 Form Revised 20120120 City Project No.: 02243 00 42 43 SECTION 00 42 43 BID PROPOSAL PROPOSAL FORM Page 2 of 6 PROJECT: DEER MEADOWS-PHASE THREE DATE:03-31-14 i` UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Specification Unit of Bidlist Item No. Description Bid Quantity Unit Price Bid Value Section No. Measure �1 y i IIR �ARY-= E R:T1'YYP�O 'w .*=.5- 3331.4115 8"PVC Sewer Pipe 33 31 20 LF 3,119 $27.00 $84,213.00 3331.4116 8"PVC Sewer Pipe,CSS Backfill 33 11 10 LF 134 $70.00 $9,380.00 3305.3006 16"Steel Carrier Pipe 330524 LF 44 $80.00 $3,520.00 F 3339.1001 4'Manhole 33 39 20 EA 18 $2,700.00 $48,600.00 3339.1002 4'Drop Manhole 33 39 20 EA 2 $4,000.00 $8,000.00 3339.1003 4'Extra Depth Manhole 33 39 20 VF 87 $150.00 $13,050.00 3331.3101 4"Sewer Service,Two-way cleanout 33 31 50 EA 102 $375.00 $38,250.00 3301.0002 Post-CCTV Inspection 33 01 31 LF 3,253 $3.50 $11,385.50 3301.0101 Manhole Vacuum Testing 33 01 30 EA 20 $150.00 $3,000.00 a 3339.0001 Epoxy Manhole Liner 33 39 60 VF 205 $90.00 $18,450.00 3305.0201 Concrete Collars 33 05 13 EA 2 $150.00 $300.00 3305.0109 Trench Safety 3305 10 LF 3,253 $1.50 $4,879.50 3305.0113 Trench Water Stops(Clay Dams) 3305 10 EA 10 $50.00 $500.00 UNIT 2: SANITARY SEWER IMPROVEMENTS BID SUMMARY $243,528.00 a 4 3 3 k F M 1 CITY OF FORT WORTH DEER MEADOW,PHASE THREE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7200 Form Revised 20120120 Y 3 Cit Project No.: 02243 00 42 43 SECTION 00 42 43 BID PROPOSAL PROPOSAL FORM Page 3 of 6 PROJECT: DEER MEADOWS-PHASE THREE DATE:03-31-14 j 'a UNIT PRICE BID Bidder's Application M Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Unit of Section No. Measure Bid Quantity Unit Price Bid Value s`-+ , �" 3305.0109 Trench Safety 3305 10 LF 1,299 $1.50 $1,948.50 3341.0402 42"RCP,Class III 3341 10 LF 415 $92.00 $38,180.00 3341.0309 36"RCP,Class III 3341 10 LF 440 $75.00 $33,000.00 3341.0205 24"RCP,Class III 3341 10 LF 363 $47.00 $17,061.00 3341.0201 21"RCP,Class III 3341 10 LF 81 $45.00 $3,645.00 3349.0001 4'Storm Junction Box 33 49 40 EA 1 $4,400.00 $4,400.00 i 3349.0002 5'Storm Junction Box 33 49 40 EA 1 $6,000.00 $6,000.00 1 3349.5001 10'Curb Inlet 33 49 20 EA 4 $2,700.00 $10,800.00 a 3349.5003 20'Curb Inlet 33 49 20 EA 4 $5,800.001 $23,200.00 3349.7001 4'Drop Inlet 33 49 20 EA 1 $3,600.00 $3,600.00 s 3349.1009 42"Flared Headwall 33 49 40 EA 1 $3,400.00 $3,400.00 _ 3136.0102 Twisted Gabions 31 36 00 CY 70 $250.00 $17,500.00 3136.0104--,-----Twisted Gabions Mattresses 31 3600 CY 100 $250.00 $25,000.00 3137.0104 Medium Stone,Riprap,dry 31 3700 SY 190 $50.00 $9,500.00 9999.0001 Temporary Sediment Basin(See Detail) LS 1 $4,000.00 $4,000.00 UNIT 3: STORM DRAIN IMPROVEMENTS BID SUMMARY $201,234.50 s` s h 3 9 9 y� S 29 !i 3 7 Y i 7}f d r CITY OF FORT WORTH DEER MEADOW,PHASE THREE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7200 Form Revised 20120120 City Project No.: 02243 00 42 43 SECTION 00 42 43 BID PROPOSAL PROPOSAL FORM Page 4 of 6 PROJECT: DEER MEADOWS-PHASE THREE DATE:03-31-14 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Specification Unit of Bidlist Item No. Description Bid Quantity Unit Price Bid Value Section No. Measure N; sffl WE ga 3213.0101 6"Conc Pvmt 32 13 13 SY 11,345 $30.68 $348,064.60 3212.0302 2"Asphalt Type D 32 13 16 SY 759 $12.83 $9,737.97 3212.0501 4"Asphalt Type B 32 13 16 SY 759 $12.83 $9,737.97 3211.0501 6"Lime Treatment 32 11 29 SY 12,891 $2.00 $25,782.00 3211.0400 Lime(30#/SY) 32 11 29 TN 232 $155.00 $35,960.00 3213.0535 Barrier Free Ramp-Type R-1 32 1320 EA 8 $985.00 $7,880.00 3471.0003 Stop Signs 34 71 30 EA 4 $428.00 $1,712.00 3291,0100 Top Soil 3291 19 CY 870 $12.00 $10,440.00 3292.0400 Seeding,Hydromulch 3291 13 Sy 7833 $0.58 $4,543.14 -- 3217.0503 24"Solid White Stop Bar Paint(W) 32 17 23 LF 48 $13.10 $628.80 9999,0002 Street barricade(TXDOT) Sheet LF 87 $27.50 $2,392.50 UNIT 4: PAVING IMPROVEMENTS BID SUMMARY $456,878.98 CITY OF FORT WORTH DEER MEADOW,PHASE THREE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7200 Form Revised 20120120 City Project No.: 02243 00 42 43 SECTION 00 42 43 BID PROPOSAL t s PROPOSAL FORM Page 5 or'6 PROJECT: DEER MEADOWS-PHASE THREE DATE:03-31-14 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Unit of Bid Quantity Unit Price Bid Value Section No. Measure h UI � TR _ GFIN _ _ � . 3441.1502 Furnish/Install Ground Box,small, 3441 10 EA 4 $550.00 $2,200.00 w/lid w/apron Furnish/Install 10OW HPS PC Lighting 3441.3101 34 41 20 EA 16 $325.00 $5,200.00 Fixture a 3441.3301 Furnish/Install Rdwy Illum Foundation 34 41 20 EA 16 $815.00 $13,040.00 TY 1,2 and 4 2605.3015 Furnish/Install Conduit-Schedule 80 26 05 33 LF 569 $8.60 $4,893.40 PVC 2 inch Open Cut 1 3441.3004 #8 Alum Wire 34 41 20 CLF 569 $2.95 $1,678.55 Furnish/Install Rdway Illum TY D-25-6 3441.3004 344120 EA 16 $1,220.00 $19,520.00 Pole 3441.3004 Furnish/Install Type 25 Arm 34 41 20 EA 16 $575.00 $9,200.00 UNIT 5: STREET LIGHTING IMPROVEMENTS BID SUMMARY $55,731.95 t s 1 9 k CITY OF FORT WORTH DEER MEADOW,PHASE THREE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7200 3 Form Revised 20120120 City Project No.: 02243 1 00 42 43 SECTION 00 42 43 BID PROPOSAL. PROPOSAL FORM Page 6 of 6 PROJECT: DEER MEADOWS-PHASE THREE DATE:03-31-14 r UNIT PRICE BID Bidder's Application CONTRACTOR BASE BID UNIT 1:WATER IMPROVEMENTS BID SUMMARY $197,130.00 UNIT 2: SANITARY SEWER IMPROVEMENTS BID SUMMARY $243,528.00 UNIT 3: STORM DRAIN IMPROVEMENTS BID SUMMARY $201,234.50 UNIT 4: PAVING IMPROVEMENTS $456,878.98 UNIT 5: STREET LIGHTING IMPROVEMENTS $55,731.95 TOTAL BASE BID $1,154,503.43 a a ALTERNATE BID q TOTAL ALTERNATE BID 4 DEDUCTIVE ALTERNATE BID TOTAL DEDUCTIVE ALTERNATE BID ADDITIVE ALTERNATE BID TOTAL ADDITIVE ALTERNATE BID i TOTAL BID $1,154,503.43 4 B k f f g i i i 3 i t Y 4 5 c Y CITY OF FORT WORTH DEER MEADOW,PHASE THREE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7200 Form Revised 20120120 Y J Cit Project No.: 02243 i