Loading...
HomeMy WebLinkAboutOrdinance 6749 ORDINANCE NO. �-- AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF MISSISSIPPI AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT 1: MISSISSIPPI AVENUE From alley south of East Jessamine Street to East Arlington Avenue, known and designated as Unit 1, Project No. 061-21304-4553, Phase III Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by recon- structing existing defective curb and gutter with seven-inch high concrete curb and eight- een-inch wide concrete gutter so that the fin- ished roadway will be thirty feet wide. Four- foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 2: MISSISSIPPI AVENUE From East Arlington Avenue to East Baltimore Avenue, known and designated as Unit 2, Pro- ject No. 061-21304-4553, Phase III Echo, re- taining existing permanent pavement and by re- constructing existing defective concrete facil- ities with seven-inch high concrete curb and two- foot wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick con- crete driveways will be constructed where specified. together with concrete curbs, gutters, driveways and incide:ntals to such luipt,ovements on proper grade and line where same are not already so constructed,, together with storm sewers and drains and other necessary incidentals and appurtenances ; all of Said im- provements to be constructed as and where shown on the Plans and in strict, accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with AUff1JJLQAD Q.Mp and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NO1d, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, TH'Kra I. Such estimates be, and they are hereby adopted and approved, 11. It is hereby found and determined that the cost of improvements on ea,ch, portion of streets, avenues, and public places hereinafter described, with the amount or amouriLs per front foot proposed to be assessed for such improvements against abuttLng pro- perty and the owners thereof, are as follows, to-wit: UNIT 1: MISSISSIPPI AVENUE From alley south of E. Jessamine Street to E. Arlington Avenue, known and designated as Unit 1, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is the! estjmated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement. is the estimated amount per front foot to be assessed against abuttiing ,, property, and the owners thereof for wide concrete sidewalk is $_ the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $__J1. per square fool,- the total estimated amount per front foot to be as'sessed against abutting propert'y d11nd the owners thereof is $__1,R9 plus the cost incurred for concrete driveway construction where specified. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the _20th day of November .3, 19 72 , at 9:30 A.M._, in the Council Chamber in the City Hall in the City of Fort Wo-rt—h, Texas, and the City Secretary is hereby directed to give or-cause to be given notice of the time and place of such hearing and of, other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session.of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May- 12, 1967. Such notice, shall be.by advertisement -inserted at least three (3) times in a newspaper published in the --City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing.. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways,. streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United . States Mail at least fourteen (14) days before the , date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names bf such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do .not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be improved is listed as "unknown" on the then, current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rblls ,but no address for such owner is shown, no notice need be mailed. In those cases where the owner is shown to be in estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of thEF properties .to be assessed,, the names of those persons owning or claiming any interest in said. properties to whom the notice was mailed,.' together with the last known addresses determined as aforesaid of the respective owners and those peri sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy .of the notice of hearing and shall further certify the date or dates , on which said notice was mailed A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con- clusive evidence of the facts therein recited. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. P Passed and approved this �S r" day of 19 APPROVED AS TO FORM AND LEGALITY: 00 0 / City Attorney UNIT 2: MISSISSIPPI AVENUE Fr om E. Arlington Avenue to E. Baltimore Avenue, known and designated as Unit 2, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 2,811.76 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1,00 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot -- wide concrete sidewalk is $ ..99; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $.13 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $- 1_99 plus the cost incurred for concrete drivewav con- struction where specified. � UNIT 3: BEVERLY AVENUE From alley south of E. Jessamine Street to E. Jessamine Street, known and designated as Unit 3, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 3,344.07 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 - per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1 gg plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: BEVERLY AVENUE From E. Jessamine Street to E. Powell Avenue, known and designated as Unit 4, Project No. 061-21304-4553, Phase III Echo., The estimated cost of improvements is $ 7,500.66 -; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 footwide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33— per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 5: BEVERLY AVENUE From E. Powell Avenue to E. Harvey Avenue, known and designated as Unit 5, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 6,880 97 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ _9,0__; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ _Q_ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 font wide concrete sidewalk is $ .99 the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $_ 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 6: BEVERLY AVENUE From E. Harvey Avenue to E. Davis Avenue, known and designated as Unit 6, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 7_449_69_____; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot- wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33_ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 7: BEVERLY AVENUE From E. Davis Avenue to E. Arlington Avenue, known and designated as Unit 7, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 8,519.30 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1,89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 8: BEVERLY AVENUE From E. Arlington Avenue to E. Baltimore Avenue, known and designated as Unit 8, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 9,024.89 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .go ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is 8 -0- the estimated amount per front foot to be assessed against abutting -property and the owners thereof for 4 foot wide concrete sidewalk is $ 99 the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is .33 per square foot; the total estimated amount per front foot to be assessed against abuttint-, property and the owners thereof is $ 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 9: YUMA AVENUE From E. Davis Avenue to E. Powell Avenue, known and designated as Unit 9, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 6,722 54 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.00 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.99 plus the cost incurred for concrete driveway con- struction where specified. UNIT 10: YUMA AVENUE From E. Davis Avenue to E. Baltimore Avenue, known and designated as Unit 10, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 16,823.82 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for _4_foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $- 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 11: E. ARLINGTON AVENUE Vrom Mississippi Avenue to Yuma Avenue, known and designated as Unit 11, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 49_953_85 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $—.33 — per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 plus the cost incurred for concrete drivewa,v con- struction where specified . UNIT 12: E. ARLINGTON AVENUE From Yuma Avenue to 40' east of Lot 13, Block 13, Highland Park Addition, known and designated as Unit 12, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 5,019,08__ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1,00 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is 33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $_1,99 plus the cost incurred for concrete driveway con- struction where specified. UNIT 14: E. DAVIS AVENUE From Mississippi Avenue to Yuma Avenue, known and designated as Unit 14, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 44705.90 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ _oo _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $_ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $.33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 15: E. DAVIS AVENUE From Yuma Avenue to 245' east, known and designated as Unit 15, Project No. 061- 21304-4553, Phase III Echo. The estimated cost of improvements is $ 2,453.33 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.00 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners .thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.99 plus the cost incurred for concrete driveway con- struction where specified. UNIT 16: CUL-DE-SAC At Delaware and E. Davis Avenue, known and designated as Unit 16, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 52390.06 '; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 90 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot- wide concrete sidewalk is $. .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1,89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 17: E. HARVEY AVENUE From Mississippi Avenue to Yuma Avenue, known and designated as Unit 17, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 12,777.82 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $1.00 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4_fpot wide concrete sidewalk is $ 99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $__33 — per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.99 plus the cost incurred for concrete driveway con- struction where specified. __............................. UNIT *18: E. HARVEY AVENUE From Yuma Avenue to 145' east, kn6wh,and - designated as Unit 18, Project No. 061- 21304-4553, Phase III Echo. The estimated cost of improvements is $ 4-31,0,22 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is 9 -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot- wide concrete sidewalk is $ 99-; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 r plus the cost incurred for concrete drivewav con- struction where specified. UNIT 19: CUL-DE-SAC At E. Harvey Avenue and Delaware, known and designated as Unit 19, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 4471. 57 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 the estimated amount per front foot to be assessed against abutting property and-the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33— per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 20: E. POWELL AVENUE From Mississippi Avenue to Yuma Avenue, known and designated as Unit 20, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 14 2057.12 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.00 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1 -qq , plus the cost incurred for concrete driveway con- struction where specified. UNIT 2Z: E. JESSAMINE STREET From Mississippi Avenue to Beverly Avenue , known and designated as Unit 22, Project No. 061-21304-4553 Phase III Echo. The estimated cost of improvements is $15.359.57 __; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1,00 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is 8 -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $—..33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $_ 1.99 plus the cost incurred for concrete drivewav con- struction where specified. UNIT 23: E. JESSAMINE STREET From Beverly Avenue to 567.5' east, known and designated as Unit 23, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 6.424J9__ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.00.-. the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $_-O- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4-fm-o wide concrete sidewalk is $ 99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ _33 _ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $" 1 _c)g plus the cost incurred for concrete driveway con- struction where specified. UNIT 24: CUL-DE-SAC At E. Jessamine Street and Delaware Avenue, known and designated as Unit 24, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $ 4,301.62 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- ; the -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 25: BEVERLY AVENUE From E. Ramsey Street to alley south of E. Jessamine Street, known and designated as Unit 25, Project No. 061-21304-4553 The estimated cost of improvements is $ Phase III Echc�he estimated amount per front foot to be assessed against abut'ting property and the owners thereof for concrete curb and gutter is .90 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is 8 -()- ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -4 foot- wide concrete sidewalk is $ .99-_; the estimated amount per square foot to be assessed against abutting property andthe owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $-1.89 plus the cost incurred for concrete driveway con- struction where specified . UNIT 26: MISSISSIPPI AVENUE From E. Ramsey Street to alley south of E. Jessamine Street, known and designated as Unit 26, Project No. 061N21304-4553 Phase III Echo. The estimated cost of improvements is $_ 4P041.81 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 plus the cost incurred for concrete driveway con- struction where specified. UNIT 27: DELAWARE AVENUE From E. Arlington Avenue to E. Baltimore Avenue, known and designated as Unit 27, Project No. 061-21304-4553, Phase III Echo. The estimated cost of improvements is $_ 9,282.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .90 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $_ .99 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .33 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.89 plus the cost incurred for concrete driveway con- struction where specified. ..................­­'­............ ....... ..... ......... .... UNIT 3: BEVERLY AVENUE From alley south of Jessamine Street to Jessa- mine Street, known and designated as Unit 3, Project No. 061-21304-4553, Phase III Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven- inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide con- crete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 4: BEVERLY AVENUE From East Jessamine Street to East Powell Avenue, known and designated as Unit 4, Project No. 061-21304-4553, Phase III Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven- inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 5: BEVERLY AVENUE From East Powell Avenue to East Harvey Avenue, known and designated as Unit 5, Project No. 061- 21304-4553, Phase III Echo, a two-inch thick hot- mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide Concrete sidewalk and six-inch thick con- crete driveways will be constructed where speci- fied. UNIT 6: BEVERLY AVENUE From East Harvey Avenue to East Davis Avenue, known and designated as Unit 6, Project No. 061- 21304-4553, Phase III Echo, a two-inch thick hot- mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing ex isting defective curb and gutter with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick con- crete driveways will be constructed where speci- fied. UNIT 7: BEVERLY AVENUE From East Davis Avenue to East Arlington Avenue, known and designated as Unit 7, Project No. 061- 21304-4553, Phase III Echo, a two-inch thick hot- mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick con- crete driveways will be constructed where speci- fied. UNIT 8: BEVERLY AVENUE From East Arlington Avenue to East Baltimore Avenue, known and designated as Unit 8, Pro- ject No. 061-21304-4553,Phase III Echo, a two-inch thick hot-mix asphaltic concrete Sur- face course on a six-inch thick cement stabil- ized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 9: YUMA AVENUE From East Powell Avenue to East Davis Avenue, known and designated as Unit 9, Project No. 061-21304-4553, Phase III Echo, retaining exist- ing permanent pavement and by reconstructing existing defective concrete facilities with seven-inch high concrete curb and two-foot wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide con- crete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 10: YUMA AVENUE From East Davis Avenue to East Baltimore Avenue, known and designated as Unit 10, Project No. 061- 21304-4553, Phase III Echo, a two-inch thick hot- mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing defective existing curb and gutter with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four- foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 11: EAST ARLINGTON AVENUE From Mississippi Avenue to Yuma Avenue, known and designated as Unit 11, Project No. 061- 21304-4553, Phase III Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be twenty-six feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 12: EAST ARLINGTON AVENUE From Yuma Avenue to 40' east of Lot 13, Block 13, Highland Park Addition, known and designat- ed as Unit 12, Project No. 061-21304-4553, Phase III Echo, retaining existing permanent pavement and by reconstructing existing de- fective concrete facilities with seven-inch high concrete curb and two-foot wide concrete gutter so that the finished roadway will be twenty-six feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 13: DELETED UNIT 14: EAST DAVIS AVENUE From Mississippi Avenue to Yuma Avenue, known and designated as Unit 14, Project No. 061- 21304-4553, Phase III Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 15: EAST DAVIS AVENUE From Yuma Avenue to 245' east, known and des- ignated as Unit 15, Project No. 061-21304-4553, Phase III Echo, retaining existing permanent pavement and by reconstructing existing defective concrete facilities with seven-inch high concrete curb and two-foot wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 16: CUL-DE-SAC AT DELAWARE Known and designated as Unit 16, Project No. AND DAVIS AVENUE 061-21304-4553, Phase III Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the cul-de-sac will be eighty feet wide. Four-foot wide concrete sidewalk and six-inch thick con- crete driveways will be constructed where specified. UNIT 17: EAST HARVEY AVENUE From Mississippi Avenue to Yuma. Avenue, known and designated as Unit 17, Project No. 061- 21304-4553, Phase III Echo, retaining existing permanent pavement and by reconstructing exist- ing defective concrete facilities with seven- inch high concrete curb and two-foot wide con- crete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 18: EAST HARVEY AVENUE From Yuma Avenue to 145' east, known and des- ignated as Unit 18, Project No. 061-21304-4553, Phase III Echo, a two-inch thick hot-mix asphal- tic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstruct- ing existing defective curb and gutter with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished road- way will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 19: CUL-DE-SAC Ar HARVEY Known and designated as Unit 19, Project No. 061- AVENUE AND DELAWARE 21304-4553, Phase III Echo, a two-inch thick hot- AVENUE mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the cul-de-sac will be eighty feet wide. Four-foot wide con- crete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 20: EAST POWELL AVENUE From Mississippi Avenue to Yuma Avenue, known and designated as Unit 20, Project No. 061- 21304-4553, Phase III Echo,- retaining existing permanent pavement and by reconstructing exist- ing defective concrete facilities with seven- inch high concrete curb and two-foot wide con- crete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 21: DELETED UNIT 22: EAST JESSAMINE STREET From Mississippi Avenue to Beverly Avenue, known and designated as Unit 22, Project No. 061-21304-4553) Phase III Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and two-foot wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 23: EAST JESSAMINE STREET From Beverly Avenue to 567.5' east, known and designated as Unit 23, Project No. 061-21304- 4553, Phase III Echo, retaining existing per- manent pavement and by reconstructing existing defective concrete facilities with seven-inch high concrete curb and two-foot wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 24: CUL-DE-SAC AT EAST Known and designated as Unit 24, Project No. JESSAMINE STREET AND 061-21304-4553, Phase III Echo, a two-inch DELAWARE thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the cul-de-sac will eighty feet wide. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. UNIT 25: BEVERLY AVENUE From East Ramsey Street to alley south of East Jessamine Street, known and designated as Unit 25, Project No. 061-21304-4553, Phase III Echo, a two-inch thick hot-mix asphaltic concrete sur- face course on a six-inch thick cement stabilized gravel base and by reconstructing existing defect- ive curb and gutter with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six- inch thick concrete driveways will be constructed where specified. UNIT 26: MISSISSIPPI AVENUE From East Ramsey Street to allwy south of East Jessamine Street, known and designated as Unit 26, Project No. 061-21304-4553, Phase III Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by recon- structing existing defective curb and gutter with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide. Four-foot wide concrete sidewalk and six-inch thick con- crete driveways will be constructed where specified. UNIT 27: DELAWARE AVENUE From East Arlington Avenue to East Baltimore Avenue, known and designated as Unit 27, Pro- ject No. 061-21304-4553, Phase III, Echo, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing existing defective curb and gutter with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be twenty-two feet wide. Four- foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. Vim '11 hum"K citly qf Fort Worth, Texas maim& Adippr and-Council Comatunication ftA*KM 'r 0 MAE OATE REFERENCE SURUEOP Jontract - Assessment NUMSER 10/25/72 C-2363 Paving in Neighborhood lmprove-I I Council action is requested an the project described below: flojectQSsylletio Nature of Work: Street paving onN"eighborhoodImprovement Program (Echo Area - Phase III) as follows: ROADWAY R.O.W. TYPE OF UNIT STREET LIMITS WIDTH FRUT LELET IMPROVEMENTS 1. Mississippi N. Property line of 30 80 Reconstruct Alley S. of East Jessamine to E. Arlingtan 2, Mississippi E. Arlington to 30 80 Existing E. Baltimore Pavement to Remain 3. Beverly N. Property Line 30 60 Reconstruct of Alley S. of E. Jessamine to E. Jessamine 4. Beverly E. Jessamine to E. 30 60 Reconstruct Powell 5. Beverly E. Powell to E. 30 6o Reconstruct Harvey, V Beverly E. Harvey to E. Davis 30 60 Reconstruct 7. Beverly E. Davis to E. 30 60 Reconstruct Arlington 8. Beverly E. Arlington to 30 60 Reconstruct E. Baltimore 9. Yuma E. Powell to E. Davis 30 60 Existing Pavement to Remain 10. Yuma E. Davis to E. Baltimore 30 60 Reconstruct 11. & Arlington Mississippi to Yuma 26 60 Reconstruct: 12. E. Arlington Yuma to Delaware 26 60 Existing Pavement to Remain REKRENCE Award of Contract - Assessment mor NUMBER Paving in Neighbothood Improve- 10/25/72 C-2363 -A _1 111 ROADWAY R.O.W. TYPE OF UNIT STREET LIMITS WIDTH - FEET FEET 0Ptd:VEMENTS1 *13. Culv%-Sac E. Arlington at Deleted Delaware 14. EastDavis Mississippi to Yuma 30 60 Reconstruct 15, East Davis Yuvm to Delaware 30 60 Existing Pavement to Remain 16. Cul-De-Sac E. Davis at Delaware 80 106 Reconstruct 17. E. Harvey Mississippi to Yuma 30 60 Existing Pavement to Remain 10 East Harvey Yuma to Delaware 30 50 Reconstruct 19. Cul-De-Sac E. Harvey at Delaware 80 106 Reconstruct 2W E. Powell Mississippi to Yuma 30 60 Existing Pavement to *21. Cul-De-Sac E. Powell at Delaware Deleted 22, E. Jessamine Mississippi to Beverly 30 60 Reconstruct 23. E. Jessamine Beverly to Delaware 30 60 Existing Pavement to Remaii!!-t 24. Cul-De-Sac E. Jessamine at Delaware 80 106 Reconstruct 25, Beverly N. Property Line of 30 60 Reconstruct Alley S. of E. Jessamine to E. Ramsey, 26. Mississippi N. Property Line of 30 80 Reconstruct Alley S. of E. Jessamine to E. Ramsey 27. Delaware E. Arlington to E. 22 32 Reconstruct Baltimore *Deleted due to change in plans by adding Unit 27, to maintain better traffic facilities for normal and emergency vehicles. Changes have been approved by RX.D. DATE REFNOE SUOJECT: not of Contract - Assessment F%GE NUMBER Paving in Neighborhood Improve- 3 4, 10/25/72 C-2363 men _KKqho_Argj._Rhase_1!1J f ]ARrovements Streets to be "Reconstructed", will be improved by constructing a two-inch thick, hot�mix asphaltic concrete surface course on a six-inch thick cement s0bilized gravel base and by reconstrucing existing defective curb and guttel'', with seven-inch high concrete curb and eighteen-inch wide concrete gutter with six-inch thick concrete driveways where specified. Streets where existing pavement is to remain will be improved by retaining existing permanent pavement and by reconstructing existing defective concrete facilities withseven-inch high concrete curb and two-foot wide concrete gutter with six-inch thick concrete driveways where specified on the plans, All units will be provided with four-foot wide concrete sidewalks along with necessary storm sewer appurtenances. Submission of Bids The following bids have been received: Bidder Amount Austin to Company $275,943.77 Glade, Inc. 296,360.38 Texas Bitulithic Company 315,793.56 The following contractors obtained plans but did not bid on the project: L, Grimes and Company, Inc. S. R. 0. Asphalt, Inc. Walt Williams Construction Company Bids Received: October 5, 1972 Working Days Allotted: 88 Based on the low bid, approximately $29,803.39 will be assessed against abutting property owners to be provided for by a Band Fund Transfer from Revolving Fund Unspecified. Except for ineligible items of $18,854.61, two-thirds of the total project cost of approximately $303,53805 is re- imbursable by the Department of Housing and Urban Development. The proposed assessments are for one-third of the cost of cuxb, gutter, driveways and sidewalks, there none presently exist. Sufficient funds are available in Project Account No. 061-21304-4553, Neighborhood Improvement Area "ECHO", to finance the City's cost of construction, inspection engineering salaries and miscellaneous expenses. DATE REFERENCE SUWEVA Award of Contract - Assessment PAGE NUMSER Paving in Neighborhood Improve-, 4 _, 4 10/25/72 C-236Of __ 3 �Sbo Area., P qp ................ Recommendations It is recommended that: 1) The following Bond Fund Transfer be approved: Amount Froin To Reason, $29,80309 Unspecified N.I.P. Echo To provide for property Revolving Fund Revolving Fund ownerst share of con- 042-09724-901 042-10424-402 struction cost of N.I.P. Echo, Phase III 2) An, ordin,ance be adopted,: a) Declaring the necessity for ordering the improvements; b) Making the provisions for levying the assessments; c) Directing the Public Works Department to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Austin Road Company in. the amount of $275,943.77; e) Making appropriation to cover the indebtedness thereby incurred for improvements of the project named above. 3) An Ordinance be adopted: a) Approving the estimates of cost and amounts to be assessed; and, b) Setting November 20, 1972, as the data for the Benefit Hearing. Lam Attachments: "A" Location Map "B" Rewe 6 "C" Engineers' Preliminary Rolls SUBMITTED BY* WSPOWI;�W�Y COUNCOU A 4pp PPROVED L] OTHER (DESCRME) 'Y SF 7 DATE Ail aJ CITY MMAGER /47 4/l/