Loading...
HomeMy WebLinkAboutOrdinance 6949 Ole City of Fort Worth) Eexas Mayor and Council Communication mut A"ERDWE SuBjea: Award of Contract - Assessment ME UNWER Paving of Oak Grove Road and Construc- 2/4/74 C-2716 tion of Traffic Island at Morphy and Council action is requested on the projects described below. LescriLion ,1ro2,Qec;. DescripQ2 ,p Roadway R.O.W. Unit Street Limits Width 'Width I Oak Grave Road U. S. Highway 81 40 Feet 60 Feet Project No. to Felix Street 104-24000-241 2 Traffic Island Morpby Street and 60 Feet Long N/A Project No. South Main Street 104-35000-367 Unit 1 was initiated as a result of Conpuunity Facilities Contract No. 7754, X&C C-2699, on the south side of the street and a paving petition in conjuric- dote with a building permit for the property on the north side of the street. Uhit 2 is City initiated resulting from the recent entrance 'improvements a,t St. Joseph's Hospital for emergency vehicles and an traffic safety study by the Traffic Engineering Department. Unit 1, Oak Grove Road is a narrow gravel etreet which will be improved by construction of 7" thick hot mi asphaltic concrete pavement with 7" high, concrete curb and 18" wide concrete gutter on as 6" lime stabilized subgrade, along with 6" thick concrete driveways wbere specified onthe plans. Unit 2 will be the construction of an asphalt filled island with 6" stand-up curb at Nbrphy Street and South Main Street. Submission of Bids The following bids have been received: Amount of Bids Received Bidders Unit 1. Uhit 2 G,Iade, Inc,., $2q,966.50 $1,500.00 Texas Bitulithic Co. 31,648-50 1,890.00 Austin Road Co. 32,873.75 1,600.00 The following contractors took"lans and specifications but did not submit an proposal;