HomeMy WebLinkAboutContract 29007-A3 AMENDMENT NO.3
TO CITY SECRETARY CONTRACT NO.29007
STATE OF TEXAS §
§ CITY SECRETARY CONTRACT NO. dl b0"1—
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth ("City") and Transystems Corporation d/b/a
Transystems Corporation Consultants("Engineer")made and entered into City Secretary Contract
No. 29007 (the Contract")which was authorized by City Council via M&C C-19678 on .July
29, 2003; and
WHEREAS, the Contract involves engineering services for the following project:
Sanitary Sewer Main 253 Replacement
WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to
increase the scope of services and/or the maximum fee.
NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized
representatives, enter into the following agreement that amends the Contract:
1.
Article I, of the Contract is amended to include the additional engineering services
specified in the Engineer's proposal letter dated November 2, 2009 and attached hereto. The
cost to the City for the additional services to be performed by Engineer total$23,969.00.
-1-
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH=TX
2.
Article II of the Contract is amended to provide for an increase in the maximum fee to be
paid to Engineer for all work and services performed under the Contract, as amended, so that
the total fee paid by the City for all work and services shall not exceed the sum of$1,026,891.00.
3.
All other provisions of the Contract which are not expressly amended herein shall remain
in full force and effect.
EXECUTED on this the day of , 2009, in Fort Worth, Tarrant County,
Texas.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
-2-
ATTEST: CITY OF FOR WORTH
mne
Marty Hen Fernando t ,
City Secretary Assistant City Manager
Authorizatio ,� APPROVAL RECOMMENDED:
C' ImQUIR r*-S. Frank Crumb, P.E., Director
Water Department
APPROVED AS TO FORM
AND LEGALITY:
Amy J. sey
Assistant City Attorney
ENGINEER:
By:
NAME: Raul P na III
TITLE: SR. Vice President
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Breakout of Amendment 3 by Work Phase
Water Sewer Total
Survey
51 -Design Survey $ 0 $ 0 $ 0
Engineering
31 -Concept Design $ 17,929 $ 0 $ 17,929
32- Preliminary Design $0 $ 0 $ 0
33-Final Design 6,040 6,040
Engineering Totals $23,969 $ 0 $23,969
Total(Survey and Engineering) $23,969 $ 0 $23,969
Summary of the Contract and Amendments
Original Contract $ 890,335.00
Amendment 1 $ 35,243.00 Archeology Study
Amendment 2 $ 77,344.00 Reuse water line Layout,survey, other meetings
Amendment 3 $ 23,969.00 See this amendment
Contract Total $1,026,891.00
If you have any questions or require additional information please give me a call.
Sincerely,
TranSystems Corporation Consultants
-7
l
Kent Lunski, P.E.
Project Manager
Cc. Craig Schellbach P.E., Municipal Team Leader
Raul Pena III, P.E. Principal
2
G:\FW02\0155\Prooc"mt\Contracts\Amendment 3\M253 amendment 3 09-11-02.doc
tsystl��T�.�
November 2, 2009
Madelene Rafalko, P.E.
Water Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102-6311
RE: Amendment 3 of M-253 Replacement
City Project No. 29007, DOE 4027
Dear Madelene,
TranSystems (TSC) appreciates the opportunity to provide additional services with respect to the above
referenced project. We have prepared this amendment request for services regarding engineering, and
shop drawing review.
1. Pump Station Alternative Report $ 17,929
• General—Review costs of proposed pump station,force main and sewer lining
• Pump Station—TSC is to review predetermined site,develop schematic layout
for pump station,determine flows, review wet well material alternative, develop
plan/profile of pump station based on a typical submersible pump system at
proposed site.
• Force Main—Review to include sizing,general alignment(site visit)and easements
2. Construction Services
• Part 1 —Field site visits(2)and limited shop drawing assistance(20 hours) $ 3,272
• Part 2—Field site visits(2)and limited shop drawing assistance(5 hours) $ 1,384
• Part 3—Field site visits(2)and limited shop drawing assistance(5 hours) $ 1,384
Total Fee Amendment 3 $23,969
1
G:IFW021 01551ProjecNgmtlContraclslAmendment 31M253 amendment 3 09-11-02.doc
City of Fort Worth
M-253 Sewer Rehabilitation
Amendment 3
Breakout of Services
2-Nov-09
Rates
E4 E3 T4
170 125.86 103.45 Total
Design Services
Research 10 20 $ 3,327
Meetings(3) 1 6 0 $ 925
Cost Estimate 8 0 $ 1,007
Puma Station
Flow Values 3 0 $ 378
Sketch of PS Alternatives 2 4 $ 667
Developmeht Board Application 2 6 $ 872
Pumps 4 0 $ 503
Wet Well 6 0 $ 755
PS Layout 1 14 24 $ 4,415
Property Review 3 4 $ 791
Components 8 8 $ 1,834
Prefabricated Wet Well 4 0 $ 503
Forcemain
Site Visit 1 4 $ 540
Profile 1 8 $ 953
Desi n 2 2 $ 459
Subtotal $ 17,929
Construction Services
Part 1
Shop Drawings 20 0 $ 2,517
Site Visit 2 6 0 $ 755
Part 2
Shop drawings 5 0 $ 629
Site Visit 2 6 0 $ 755
Part 3
Shop Drawings 5 0 $ 629
Site Visit 2 6 0 $ 755
Subtotal $ 6,040
Total $ 23,969