HomeMy WebLinkAboutContract 29007-A2 AMENDMENT NO. 2
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.D QO'1—A,-�,
(M6C Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and TranSystems
Corporation d/b/a TranSystems Corporation Consultants, (Engineer)
made and entered into City Secretary Contract No. 29007, (the
Contract) which was authorized by the City Council by M6C C-19678
on the 29th day of July, 2003 and subsequently revised by one
amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Main 253 Replacement.
WHEREAS, it has become necessary to execute Amendment No. 2
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the
additional engineering services specified in M6C C-23685, adopted
by the City Council on the 28th day of July, 2009 and further
amplified in a proposal letter dated October 2, 2008, copies of
which are both attached hereto and incorporated herein. The cost
to City for the additional services to be performed by Engineer
total $77,344.00.
2.
Article II, of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $1,002,922 .00.
OFFICIAL RECOP`)
CITY SECRETA
-; - MWORTH,I
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on thi s the Z��I day of 2009,
in Fort Worth, Tarrant County, Texas.
ATTEST:
Y1 r_dntLt A.utthhorriizatiiOx
Marty Hendri �d�0
City Secretary
APPR RECOMb1ENDED: APPROVED: /��
�•w;ML--.-..
Frank Crumb, P.F/-'\ Fernando Costa
Director, Water Dep nt Assistant City Manager
TRANSYSTEMS CORPORATION d/b/a
TRANSYSTEMS C RATION CONSULTANTS
Engineer
By: Z64
Name:Rau Pena III, P.E. , Principal
500 W. 7 Street, Suite 600
Fort Worth, TX 76102
APPROVED AS TO FORM LEGALITY:
Assis ty Attorney
-2-
OFFICIAL RECORD ,
wATY SECR.ETAR"`
y i
M&C;Review Page 1 of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA F° "
COUNCIL ACTION: Approved on 7/28/2009 - Ord. No. 18730-07-2009
DATE: 7/28/2009 REFERENCE NO.: **C-23685 LOG NAME: 60M253A2
TRANS
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Amendment No. 2 in the Amount of$77,344.00 to City Secretary Contract No.
29007 with TranSystems Corporation, d/b/a TranSystems Corporation Consultants, for
Sanitary Sewer Main 253 Replacement from the Woodhaven Boulevard/Randol Mill Road
Intersection Easterly to the Village Creek Wastewater Treatment Plant and Adopt
Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of$77,344.00 from the Water and Sewer Operating Fund to the Sewer
Capital Projects Fund;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriation in the
Sewer Capital Projects Fund in the amount of$77,344.00; and
3. Authorize the City Manager to execute Amendment No. 2 in the amount of$77,344.00 to City
Secretary Contract No. 29007 with TranSystems Corporation, d/b/a TranSystems Corporation
Consultants, for Sanitary Sewer Main 253 Replacement thereby increasing the contract amount to
$1,002,922.00.
DISCUSSION:
On July 29, 2003, (M&C C-19678)the City Council authorized the City Manager to execute an
Engineering Agreement(Agreement) in the amount of$890,335.00 with TranSystems Corporation,
d/b/a TranSystems Corporation Consultants, for Sanitary Sewer Main 253 Replacement from the
Woodhaven Boulevard/Randol Mill Road intersection easterly to the Village Creek Wastewater
Treatment Plant.
The Agreement was subsequently revised by Amendment No. 1 (M&C C22534, November 27, 2007)
in the amount of$35,243.00 that provided for the additional services necessary to complete
Archeological Investigations required by the Texas Water Development Board.
Amendment No. 2 will provide compensation for additional survey, geotechnical engineering and
testing services to modify the alignment due to recent development activity previously approved
within the project area.
TranSystems Corporation, d/b/a TranSystems Corporation Consultants, proposes to perform the
necessary additional engineering services for a lump sum fee of$77,344.00. City staff considers this
fee to be fair and reasonable for the scope of services proposed.
TranSystems Corporation Consultants, d/b/a TranSystems Corporation Consultants, is in compliance
with the City's M/WBE Ordinance by achieving 15 percent M/WBE participation on this project. The
City's M/WBE goal is 11 percent.
This project is located in COUNCIL DISTRICTS 4 and 5.
ittp://apps.cfwnet.org/council_packet/mc—review.asp?ID=I 1813&councildate=7/28/2009 7/28/2009
M&C Review Page 2 of
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations and adoption of the attached appropriation ordinance, funds will be available in the
current capital budget, as appropriated, of the Sewer Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centem
$77.344.00 4P258 531200 705170109930 77 344.00
P258 476045 705170109930 1jPE45 538040 0709020 77 344.00
2) P258 531200 705170109930 $77,344.00
Submitted for Citv Manager's Office by: Fernando Costa (6122)
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: Madelene Rafalko (8215)
ATTACHMENTS
60M253A2 TRANS AO_doc
60M253A2 TRANS MAP.pdf
ttp:Happs.cfwnet.org/council_packet/mc—review.asp?ID=l 1813&councildate=7/28/2009 7/28/2009
October 2,2008
Madelene Rafalko, P.E.
Water Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102-6311
RE: Amendment 2 of M-253 Replacement
City Project No.29007, DOE 4027
Dear Madelene,
TranSystems (TSC) appreciates the opportunity to provide additional services with respect to the above
referenced project. We have prepared this amendment request for services regarding engineering,
surveying and coordination.
1. Reuse Water Line Layout $6,500
• TSC will develop a reuse water alignment along the proposed M-253
sewer alignment(32,000 If). TSC shall review the reuse water line location
within a proposed sewer/reuse water easement,and move the line to
street right-of-way where required. Task includes providing various sized
exhibits of the easement alignment, realignment of proposed sewer to
coincide with the proposed easement,easement realignment due to future
gas improvements through 2007, meetings(8),and City coordination.
This item does not include plans for the proposed reused water line.
2. Formal City Project Meetings $17,550
• Numbers of project meetings have exceeded the original projections in the 2002
Contract.There are currently two formal meetings a month with a detailed report.
This task anticipates 2 years of meeting starting February 2008.
3. Owner Meetings $ 1,610
• TSC was directed by the City to met with the owner of Rio De Caballos and
Wetland Partners.At the Rio De Cabellos meeting,TSC review previously
surveyed property,and explained design near ponds. At the Wetland Partners
meeting,TSC provided exhibits,explain project details, impacts and
advantages within the mitigation bank.
4. TWDB Meeting $3,080
• City directed TSC to meet with Texas Water Development Board and
Texas Historical Commission in Austin to discuss project progress. TSC
provided the preparation,coordination,and exhibits.
5. Easement Coordination $5,850
• Additional coordination of easements and condemnation due to delay in schedule
1
r;•lFW(191M.ri5lPmLgr AMmflr.nntraMclArmnd')%;krndmant 9(JR9.gnR Mr.
• Prepare condemnation exhibits for internal and landowner meetings(10)
• City directed TSC to prepare individual right-of-entry letter size exhibits(25)
for properties along the project to clarify the location of proposed sewer and
reuse water line.
6. TCP $1,450
• TSC will prepare a traffic control and detour sheets for Part 1
7. Surveying McGuffin, $6,980
• The approved alignment was impacted by a new development. A reroute
was required around the perimeter of the new platted property. TSC will
survey approximately 3650 linear feet. Survey includes topographic survey,
preparation of data,reestablishment of control,one call and staking for the
owner.
8. Survey verification $20,590
This proposed work would verify 22,000 linear feet(Part 2 and 3)of the
project since survey was performed in 2005. Work completed would include
verification of ownership,update topography, reestablishing control,walk
project and add improvement,and coordination with owners.
9. Survey and develop the drainage easement with Waterchase Estates $ 3,220
• Work includes right of entry, research property,establish control,field survey,
and developing description and exhibit.
10. Tree removal application $ 555
• TSC will prepare application for residential and City property. TSC will also
develop aerial exhibits.
Subtotal $67,383
Subconsultants
1. Center line staking of Waterchase Estates $ 3,500
• Provide centerline staking of 7 property owners. Original laves were staked years
ago.
2. Staking
• The City directed TSC to restake the Schaller property. The landowner had $ 456
been requesting that the City restake the proposed sewer easement.
3. Soil boring in McGuffins property and in Waterchase Estates $ 5,100
• Soil borings are needed at the McGuffin property(creek crossing)and
in the Waterchase Estates(50'deep bore).
Subtotal$ 9,056
Subconsultanf fee(10961) $905
Total Fee Amendment 2 $77,344
Does not include.
1. Tree mitigation
2. Surveying unplatted Waterchase Estates Drainage easements
2
r;•1FW(19V 11nri%Pmbr4MnmHr.nnfmrkl4mnnri 9%amonrlmanf 9 flfi .MA Mr.
Summary of the Contract and Amendments
Original Contract $ 890,335.00
Amendment 1 $ 35,243.00 Archeology Study
Amendment 2 $ 77,344.00 Reuse water line Layout,survey,other meetings
$1,002,922.00 Contract Total
TSC has performed some of the above work to expedite the project and keep the project moving toward
completion. If you have any questions or require additional information please give me a call.
Sincerely,
TranSystems Corporation Consultants
4 �
Kent Lunski,P.E.
Project Manager
Cc. Craig Schellbach,Municipal Team Leader
3