HomeMy WebLinkAboutContract 29007-A5 AMENDMENT No.5 CRY SECIMAW oo 7— CONTRACT N0. V TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation Consultants, (ENGINEER) made and entered into City Secretary Contract No. 29007, (the CONTRACT) which was authorized by M&C C-19678 on the 29th day of July, 2003 in the amount of $890, 335 . 00; and WHEREAS the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $35, 243 . 00 which was authorized by M&C C-22534 on November 27, 2007, Amendment Number 2 in the amount of $77, 344 . 00 which was authorized by M&C C-23685 on July 28, 2009, Amendment Number 3 in the amount of $23 , 969 . 00 which was administratively authorized on January 4, 2010, Amendment Number 4 in the amount of $7 , 415 . 10 which was administratively authorized on March 15, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project : Replacement of Sanitary Sewer Main 253, Parts 1, 2 and 3; and WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: OFFICIAL RECORD 1 . CITY SECRETARY FT. WORTH, TX Article I of the CONTRACT is amended to inclu al engineering services specified in a proposal dated May 11, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $78, 744. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1, 113, 050. 10. 3 . All other provisions of the Contract, which are not expressly 00-29-12 A11 : 36 IN Page -1- amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER TranSystems orpor ion Consultants Fernando Costa Raul Pena III, P.E. Assistant City Manager Principal DATE: z8 /Z DATE: GG �2t��z��� APPRO E NDED: S S. Frank Crumb, P. E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: Date : L�� 17, 2,01 'L Do Assistant City Attorney ATTEST: Di1 00000Ar aa�� p��o %0 ar J. Kayser ,c tekis dd City Secretary o%00 °0°0°*XY ova nnnoa�44 OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX Page -2- May 11, 2012 Madelene Rafalko, P.E. Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102-6311 RE: Amendment 5 of M-253 Replacement City Project No. 29007, DOE 4027 Dear Madelene, TranSystems (TSC) appreciates the opportunity to provide additional services with respect to the above referenced project. We have prepared this amendment request for services regarding engineering and surveying. Design Services 1. SSO1 Meetings and Reports $4,960 TSC is required to attend monthly and quarterly meetings and provide monthly reports. This item accounts for additional meetings from 6/2010 to10/2012. 2. Relocation of M-253 along Chesapeake Property in Part 3 $8,348 This items includes coordination meetings(6),coordinating deholes (exploratory excavations)of gas lines in City easement,alignment alternatives,cost estimates, and redesign of M-253 3. Sanitary Sewer Lateral Alternatives for Riverview Circle. $6,556 The area of the proposed alignment was developed after survey and plan development resulting in obstacles in the original design. This item includes the review of additional alternatives,site visits, exhibits and summary table. 4. Design of Sanitary Sewer Lateral Alternative for Riverview Circle. $5,640 This item will include the development of plans and related specifications for the final lateral alignment. 5. Design and Updates to M-253 Plans and Specifications $8,168 The plans and specifications will be updated from the 90%submittal in the old City standard formats to the current standard and restart the design process since Part 3 design was placed on hold. 6. TxDOT Utility Crossing permit $ 1,436 TSC will update and reprocess the expired TxDOTutility crossing permit application. 7. M-349 and L-12215 Sanitary Sewer Design $2,456 TranSystems will develop contract plans for 250 If of M-349 and 250 If of L-12215. 8. Sewer Alignment Alternatives for McGuffin Properties $4,184 This item includes attending meetings and the review of several alternative alignments along McGuffin properties and Randol Mill Rd. Deliverables include alternative summaries,cost estimate, exhibit,and modify plans and specification. 9. Traffic Control Plans $ 1,444 These plans were submitted to TPW prior to March 2010. Task includes resubmitting previously approved plans to the City and modifying sheets as necessary. 1 G:1FW02101551 ProjectMgmtlContractslAmendment 51M253 amendment 5 051012.doc 10. Easement Assistance $8,168 The Original Contract includes assistance for the acquisition and development of easement documents. TSC has been assisting with various new owners via new alignments and change of ownership. TSC provided extra assistance with the following properties(but not limited):Amendola,Chesapeake, Fort Worth Landfill,West Fork Partners,Woods and Square Top Partners. 11. Administration Services $6,512 Per the Original Contract,the project duration was anticipated to be approximately 1 year. This task requests additional fee for 8 years of escalation and administration services. Subtotal $57,872 Construction Services 1. Assistance During Part I Construction $3,628 This task includes TSC assistance with the transition from the initial Contractor that defaulted on the Part 1 construction contract to the insurity's Contractor. Subtotal $2,740 Survey Services 1. Old Randol Mill Rd. Easement $ 10,431 The proposed M-253 sewer alignment is proposed in Old Randol Mill Rd. right-of-way near the intersection of Woodhaven Blvd. and Randol Mill Rd. This task includes the development of a sanitary sewer reservation easement. Services include research, preparing a working sketch,field survey and preparation of easement description and plat. 2. M-349 and L-12215 Survey $2,795 This item includes the topographic survey on the above sewers. TSC will call One Call services, survey and develop computer aided design(CAD)files for the design of the sewers. 3. Riverbend Estates Riverview Dr. Survey $4,018 This item includes the topographic survey on the above sewers. TSC will call One Call services, survey and develop computer aided design(CAD)files for the design of the sewers. Subtotal $17,244 Total Fee Amendment 5 $78,744 The above fee is based on the following: 1. Part 3 construction services limited to shop drawings for pipe and tunnels 2 G:IFW021 01551 ProjectMgmtlContracts\Amendment 51M253 amendment 5 051012.doc Summary of the Contract and Amendments Original Contract $ 890,335.00 Amendment 1 $ 35,243.00 Archeology Study Amendment 2 $ 77,344.00 Reuse water line Layout,survey,other meetings Amendment 3 $ 23,969.00 Pump Station Alternative Report Amendment 4 $ 7,415.10 Hydraulic Report and PACSD Application Amendment 5 $ 78,744.00 This amendment $1,113,050.10 Contract Total TSC has performed some of the above work to expedite the project and keep the project moving toward completion. If you have any questions or require additional information please give me a call. Sincerely, TranSystems Corporation Consultants Rau Pena III, P.E. Principal Cc. Joseph C. Masterson, P.E. 3 G:IFW0210155 1ProjectMgmtlContractslAmendment 51M253 amendment 5 051012.doc City of Fort Worth M-253 Sewer Rehabilitation Amendment Breakout of Services 11-May-12 Rates E5 E4 E3 T4 T3 Admin2 $ 250.00 $ 190.00 $ 137.00 $ 112.00 $ 85.00 $ 72.00 Total No. Desl n Services 1 SSOI Meetings and Re 6/2010 to 10/2012 28 reports) 32 8 $ 4,960 Meetings(6),dehole coordination,site visits and redesign of M-253 in 2 Chesapeake property 2 32 32 $ 8,348 Sanitary Sewer Lateral Aternatives for Riverview Circle. Field visit.Create 3 exhibits and alternative 2 32 16 $ 6,556 4 Design sanitary sewer alternative for Riverview Circle 4 16 24 $ 5,640 5 Desi n and updates plans and specifications in new standards 40 24 $ 8,168 6 TxDOT utility crossing it 8 4 $ 1,436 7 Design of 250 If of M-349 and 250 If of L-12215 8 16 $ 2,456 8 Review design alternatives for McGuffin Properties.Summary alternatives,cost estimates exhibit modify plans and specifications 24 8 $ 4,184 9 ResubmitTraffic Control Plan for project bidding 4 8 $ 1,444 10 Easement asistance from 1 to 8 years(change owners,change in Real property staff extr a assistance for Chease ake Meyers,McGuffin Hall Woods 40 24 $ 8,168 11 Admin services increased from 1 to 9 ears 16 60 $ 6,512 Subtotal $ 57,872 No. Construction Services 1 Assistance with 2nd Part 1 Contractor 24 4 $ 3,628 Subtotal $ 3,628 Eng,Total $ 61,500 No. Survey Services Rates PM RPLS TECH CREW $135.00 $125.00 $85.00 $133.00 Total 1 Old Randol Mill Rd.Easement a.Job prep 2 2 $440 b.Recover establish control 1 4 6 $1,263 C.Rresearch Old Randol Mill 2 2 24 $2,560 d.Prepare working Sketch 8 8 $1,680 e.Field survey for easement 16 $2,128 f.Prepare easement description and plat 8 16 $2,360 Subtotal $10,431 2 M-349 and L-12215 Survey a.One call utility locate 2 2 $436 b.Topographic survey 2 8 $1,234 C.Data reduction/mapping 4 $340 d.QA/QC 4 1 $585 e.Ex enses 200 Subtotal $ Z795 3 Riverbend Estates Dr.Survey a.One call utility locate 4 4 $872 b.Topographic survey 3 12 $1,851 c.Data reduction/mapping 6 $510 d.QA/QC 4 1 $585 e.Ex enses 200 Subtotal $ 4,018 Survey Total $ 17,244 Total 1$ 78,744 M&C - Council Agenda Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 7/17/2012 DATE: Tuesday, July 17, 2012 REFERENCE NO.: **C-25739 LOG NAME: 60M253A5 - TRANS SUBJECT: Authorize Execution of Amendment No. 5 to City Secretary Contract No. 29007 with TranSystems Corporation Consultants in the Amount of$78,744.00 for a Total Contract Amount of$1,113,050.10 for Additional Engineering Services for the Replacement of Sanitary Sewer Main 253, Parts 1, 2 and 3 Along Randol Mill Road and the Banks of the Trinity River from Clay Court to Woodhaven Boulevard (COUNCIL DISTRICTS 4 and 5) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 5 with TranSystems Corporation Consultants in the amount of$78,744.00 to City Secretary Contract No. 29007 for a total contract amount of$1,113,050.10, for the Replacement of Sanitary Sewer Main 253, Parts 1, 2 and 3, along Randol Mill Road and the banks of the Trinity River from Woodhaven Boulevard to Clay Court. DISCUSSION: On July 29, 2003, (M&C C-19678) the City Council authorized execution of an engineering Agreement with TranSystems Corporation Consultants (TSC), in the amount of$890,335.00 for engineering and other related services to design the relocation of approximately 40,000 linear feet of Sanitary Sewer Main 253. The Agreement was subsequently revised by four Amendments totaling $143,971.10 that are further described as follows: Amendment No. 1 (M&C C-22534) approved by the City Council on November 27, 2007 in the amount of $35,243.00; Amendment No. 2 (M&C C-23685) approved by the City Council on July 28, 2009 in the amount of $77,344.00; Amendment No. 3 administratively approved by the City Manager on January 4, 2010 in the amount of $23,969.00; Amendment No. 4 administratively approved by the City Manager on March 15, 2011 in the amount of $7,415.10; and Amendment No. 5 will provide compensation for the additional services on the Project required for the following: • Additional coordination meetings, project reports and project administration due to changed City business processes and to coordinate with the Parks and Community Services Department; • Additional design services to avoid other utility conflicts which arose during the project, including survey and coordination for several properties impacted by the project; • Traffic control plans required by the City's changed business process; and http://apps.cfwnet.org/ecouncil/printmc.asp?id=17023&print=true&DocType=Print 7/30/2012 M&C - Council Agenda Page 2 of 2 ■ Additional construction support services. TranSystems Corporation Consultants agrees to maintain its initial M/WBE commitment of 28 percent that it made on the original Agreement and extend and maintain that same M/WBE commitment of 28 percent to all prior amendments up to and inclusive of this Amendment No. 5. Therefore, TranSystems Corporation Consultants remains in compliance with the City's M/WBE ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICTS 4 and 5. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P258 531200 705170109933 $78.744.00 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: M. Rafalko (8215) ATTACHMENTS 1. 60M253A5Tran FAR.pdf (CFW Internal) 2. 60M253A5-TRANS MAP.pdf (Public) 3. 60M253A5-TRANS MWBE.pdf (CFW Internal) 4. P258-476045-701139990100.doc (CFW Internal) http://apps.cfwnet.org/ecouncil/printmc.asp?id=17023&print=true&DocType=Print 7/30/2012