April 30, 2003
Mr. Tom Higgins
Economic Development Department
City of Fort Worth
900 Monroe, Suite 301
Fort Worth, TX 76102
Re: Implementation of Lancaster TIF- Phase II
Dear Mr. Higgins:
Thank you for asking Gideon Toal to submit a proposal to provide professional services
to evaluate and possibly put in place a South Downtown / Lancaster Corridor TIF. 1
have summarized the proposed professional services for Phase 11 below:
Phase 11: Expand and Update all Data to Make TIF Increment Projections
Task 1I.1 Develop and work with the City to attain consensus on the TIF
Boundary, provide database of existing TAD values for land and
improvements, ownership data, and current land use information. This
data base and maps, in essence, is the baseline data and potential TIF
base. From this data, we are able to generate the TIF projections and
expected increments.
Key Products: TIF database and accompanying maps in spreadsheet,
digital map, and PowerPoint summary formats.
Task I1.2 For each block in the proposed zone, develop projections for future land
uses, values, and timing/phasing of proposed developments. This task
will be the basis for developing a spreadsheet model of potential TIF
increments, given a reasonable range of development assumptions.
Key Products: Spreadsheet model on a block by block basis with low and
medium projections of the development potential of the proposed TIF.
Task II.3 Based on land uses and projections from above, develop draft financing
pro forma (and support spreadsheets) for a 20,30, and 40 year time
period. This model will allow the City, consultants and others to test
various scenarios and agree on the most likely scenario for the eventual
financing plan.
Key Products:This model will allow the City, consultants and others to
test various scenarios and agree on the most likely sc nario
eventual financing plan.
'
Architecture • Engineering • Planning • Interiors • Landscape Architectur �% „
500 West Seventh Street Suite 1400 Fort Worth, Texas 76102 Phone 817.335.499 8 i "V 7'rvp a;�g q
GldeonTbal
Mr. To Higgins
April 30, 2003
Page 2
Task 11.4 Develop probable list of TIF eligible projects. This will be based on
available project plans and projects deduced from the block by block
analysis.
Task ILS Work with City officials to determine how TIF can leverage selected
short term public/private investments (such as the T&P Building
Project). This effort will be in support of City Economic Development
staff should time sensitive prospects arise within the next few weeks and
months during the TIF formation period.
Professional Fee for Phase 11: $17,640 with $1,000 allowance for direct reimbursable
expenses
Key Staff: James Toal, David Pettit, Laurie Fleiner, Mary Swofford
This effort is estimated to take 126 professional hours over the next 6 months. Phase 11
will be finished in June with major products by May 20, 2003 if we are authorized to
proceed this week.
Thanks again for considering Gideon Toal. Our knowledge of Downtown, the Lancaster
corridor and the process of TIF formation should make us very qualified for this effort.
Sincerely,
w N -
vi,,wD AS'ffl FORM AND
J s Toal 9-0-
AGREED TO AND ACCEPTED BY:
C`003
...... ..........
Tom Higgins' Date f
Economic Development
City of Fort Worth
7
AMU By cozitract Authorization
/p 671
Date
Lancaster/South Downtown TIF Analysis and Implementation
Hours Fee 00
'Phase � N/ 5� O/c ��°✓
'Phase 11-Expand and Update Proposed TIF Projections
Develop and get Consensus on an expanded TIF Boundary and Update the MMMMM
11.1 Existing Values,Ownership,and Land Uses for the Expanded Area 24 $ 3,360
For each block in the proposed zone,develop projections for future land MMMMM
11.2 uses,values,and timing/phasing of proposed developments 48 $ 6,720
Based on land uses and projections from above,develop draft financing pro
forma(and support spreadsheets) for a 20,30,and 40 year time period MMMMM MMMMM
11.3 (note:this becomes the basis for the required financing plan) 40 $ 5,600
11.4 Develop Preliminary List of Possible TIF Eligible Projects 8 $ 1,120 MMMMM MMMMM
Work with City officials to determine how TIF can leverage selected short MMMMM MMMMM
11.5 term public/private investments(such as the T&P Building Project) 6 $ 840
Subtotal for Phase ll: 126 $ 17,640
Phase III-Complete the TIF Formation Process with City Officials
Develop Preliminary Finance Plan,Project Plans,and Detailed Description
of TIF Zone,and all other exhibits required for local government review and MMMMM MMMMM MMMMM
111.1 approval(except for legal documents) 162 $ 22,680
Provide support,attendance,phone call explanations,and PowerPoint
presentations,for staff meetings,stakeholder meetings,public hearings, MMMMM MMMMM MMMMM
111.2 and local jurisdiction meetings required to implement the TIF 64 $ 8,960
Subtotal for Phase 111: 226 $ 31,640
Total Professional Fee: 352 $ 49,280