HomeMy WebLinkAboutContract 45683 CITY SECRETARY
CONTRACT NO.
Developer and Project Information Cover Sheet:
Developer Company Name: Victory at North 'I'arrarit, LIC
Address, State,Zip Code: 825 W., Royal Lane, Suite 250 1 Irving,TX 75039
Phone, E-Mail: (972) 707-9555, ton realestategroupcom
y_@N�st—orx-,
Authorized Signatory/Title: Tony Ramji, Manager
......................-.— ..................... .........
Project Name and Brief Description: Water, Sewer,Paving, Drainage and Street Lights to serve a
portion of ViStLopL@ N. Tarrant Park-way Addition, Lot I &2,Block I
..........
............... ......... ....................
Project Location: West of Quail Valley Dr. and North of N.Tarrant Pkwy,
Flat Case No.: FS-1.3 158 Plat Name: Victory at N. Taffant Addition
..........................
Council District: 2 City Project No: 02254
..............
CFA: 2014-Okn DOE: 7202 A
To be compl ed by
Received by:
M
M
7<
M
r-J
rOFFICIAL RECORD
Combined CFA Agreement Revised January 2014 CITY"' SECRETARY
F 1� WOR,TH�TX
—---—-------..........................
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Victory at N. 'Tarrant Parkway
("Project.") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject tote availability
of City funds and approval, by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the
Project.
NOW,THEREFORE,For and in consideration of the covenants and
conditions contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy"') dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.,
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements
contemplated by this Agreement and that said construction shall be completed
in a good and workmanlike manner and in accordance with all City standards
and the City-approved construction plans, specifications and cost estimates
provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof. Water (A) x
Sewer(A-1) X , Paving (B) X, Storm Drain (B-1) X , Street Lights &
Signs (C) X .
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Combined CFA Agreement—Revised January 2014
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
1. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
4
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in Part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
Combined CFA Agreement—Revised January 2014
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
6
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Combined CFA Agreement—Revised January 2014
Cost Summary Sheet
Project Name: Victory at N. Tarrant Pkwy. Addition
CFA No.: 2014-017 DOE No.: 7202
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 70,148.50
2.Sewer Construction $ 23,037.50
Water and Sewer Construction Total $ 93,186.00
B. TPW Construction
1.Street $ 10,911.40
2.Storm Drain $ 210,364.00
3.Street Lights Installed by Developer $ 26,594.00
TPW Construction Cost Total $ 247,869.40
Total Construction Cost(excluding the fees): $ 341,055.40
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,863.72
D. Water/Sewer Material Testing Fee(2%) $ 1,863.72
Sub-Total for Water Construction Fees $ 3,727.44
E. TPW Inspection Fee(4%) $ 8,651.02
F. TPW Material Testing(2%) $ 4,425.51
G. Street Light Inspsection Cost $ 1,063.76
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 14,340.28
Total Construction Fees: $ 18,067.72
Choice
Financial Guarantee Options,choose one Amount ck one
Bond=100% $ 341,055.40
Com letion Acireement=100%/Holds Plat $ 341,055.40 X
Cash Escrow Water/Sanitary Sewer=125% $ 116,482.50
Cash Escrow Paving/Storm Drain=125% $ 309,836.75
Letter of Credit=125%w/2 r expiration period $ 426,319.25
8
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-l: Storm Drain Improvements
® Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instrument in quadruplicate, at Fort Worth, Texas this day of c,l FLt
1111-1-1 20--f4,
CITY OF FORT WORTf I-Recommended by:
Water Department f'ransportation& Public Works Department
�Wendy Chi-— b�ulal, EMBA, P.E. Do,4uglas , . Wiersig, P.E.
Development Engineering Manager Director
Aj)proved as to Form& Legality Approied��y City Managrer's Office
Douglas W. Black Fernando Costa
Assistant City Attorney Assistant City Manager
M&C No. V
Date-
........... F 0
0,
AT "
p GA
0
4 -...
9%60
Ma J. Kayser %0
City Secretary
ATTEST: DEVELOPER:
Victory at North arrant, L
Si. fi re Signature
Print)Name: &,>0t,,
Print Name:
Title:
OFFICIAL RECOR1)
Combined CFA Agreement—Revised Januaiy 2014 CITY SECRITARY
I
FT. WORTH,TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
Fountain Flat or
01 sapphwe Pool Trail
h vole"',
Mountain
rc Mcxglflo",r Ct Fran
$Nver Rd
E Jp
CL
C14
OAW�e St
to
Hoflnter Dr
ffidge lake Dr M
0
Alta j)r
SITE
Sta
(N V all ey Haven Way
Ru
IM Haven take Way
wry
delV
Ne
Cut
M,
j,
0
-j
CL 'r"
Colt
4 T
N Tarrant Pkw,y N T kwy N Tarrant Pkw)
40age Ot
Lake ChOvi Dr
ra
0 > iros Or ChanipWn Of %words E)r
0,eros% New Bursey Rd
Ide
Hynn Q Blackmon rt
Milford Df
plaw-we M
Not,
t -4 Tia,�
G
1000 500 0 1000 3000
0
mm-.77=
x
R
CX
11 inch l(1(1(,).1 t,
VICINITY MAP
0,
WATER, SEWEIA., PAVING AND
D I -""VEMENTS
RANAGE IMPRO
TO SERVE
A PORTION OF VICTORY @ N. TARRANTPARKWAY ADDITION
LOT I & 2, BLOCK 1
�IN GIRIAP1111C SCAIX
'o 50 0 10
fl 100 50 0 100 300
- - -- --------------------
uN FIEIET
I ioo rt,
0
II 4 LOT a k o(X 1
ACCI
E;. 242,156 ST,
fl
fl
0
N fl
fl
INSTALL:
1® " VALVE AND
...............
Lo
17--.7,T............................. _
_ . .fl. ...........................
..............
H -I
INSTALL
—7�
FIRE
................... .......... HYDRANT
NT ...........................................................................
r SA—EC"', .....................
FIRE LI ---........ INSTALL:
M5 Ac l-T— 1-2" WATER SERVICE�
971870 sr
u Ir.................. (DOM)
F�4 W. 14 61-1 1
r —,–i ............
"prillmiL 07,120 SR
%ws 000&r.
I TALL AT I Al
0
..........
L--J.......
.... .......
.............
INS ALL
tl FIRE NS"IAL
YDR
.............. H ANT 7 IRE HYDRANT WITH 6" FIRE
o. INSTALL: .. ........ 7ff— LINE TO BUILDING
1-2" WATER SERVICE -.-1-2" WATER SERVICE (DOM)
1-1" IRRIGATION .S R IC 1-1" WAER SERVICE (IRRG)
T- F.i -- --.. .......................
cf;
............... ................................. A#
..........__................ ....... ............ ...... ........... .............
...........
INSTALL 12" X 8" TEE, Noilli'nurant Varkwcky
0 to – -.1-...... ................. .............. .... ................ .......................................
CUT IN 12 VALVE
... ...................
.........--.-
........................
0
EXHIBIT "All
WATERIMPROVEMENTS
TO SIRE
r A PORTION OF VICTORY @ N. TARRANT PARKWAY ADDITION
LOT I & 2, BLOCK I
'RA]"HIC SC' E
100 50 0 300
100
............................. —-—----- ..........
--—----------
CONNECT TO
illwh N,
EXISTING MANHOLE
....................
5 s Ac
LOT 4, BUDCK
242,156, SY,
INSTALL 8"
SAN SWR MAIN
V 1
UA ............
..........
INSTALL 4' 1
MANHOLE
d=12.9'
_J
111T'l 1101* 1 INSTALL 4'
MANHOLE
§,, M.73 9-ft..
L RFIAt MANHOLE
YEJ"
3 P, 87,120 SF,
Ww"
L
------------------
4
x
0 ......
.....................
cl
Li
Ll
EXHIBIT "A—I "
SANITARY SEWER IMPROVEMEN TS
a:b TO SERVE
C) A PORTION OF VICTORY @ N. TARRANT PARKWAY ADDITION
LOT & 21, BLOCK. 1
V 100 I 50 0 100 .3
y I II fl Ili"I.e"7V i00 Ir1I:.. &N
B VV
ko LOT$ 1 5E8(
5.56
0 242,956&F.
� p
°C14, J 6 I
-9' I V
6 L_
LOT 9,6 0m 1
2.25 AC
97,1170 SF
r
aOMTObMas. ' 2.00 W-
87,120 SF.
vie
0
h V L--..L— --�
c C
CONSTRUCT 6' WIDE, V
ONSTRUCT 6
L _i_L �i CONC RIVE
CONSTRUCT 6 skr ,r
CON 7, DRIVE
M ' CM m Jr m u
l"2
CL
North Tarrant Parkway
91
EXHIBIT "B"
Lea
tz
PAVING IMPROVEMENTS
Gj TO SERVE
A PORTION OF VICTORY @ N. TARRANT PARKWAY ADDITION
LOT 1 & 2, BLOCS I
i
SS W
A
GRAPHIC S('ALE
1001 I 50 0 100 3
I
I i I
IN I'I I:'I' )
E I I I I inch 100 II. DNS.
M i II
Lr) I I I LOT 3.BLACK 1 58(
8.88 AC.
242,156&F. -
I II
I I I
N I I
M
W
I ll
`'.
o I I CONSTRUCT 9 X
F 5' HEADWALL &
° ° EGIN 9'X 5' RC {
o
0 / --
LOT 1.BLOCK,
22S AC ...
97,870 sF
3 i r LOT 2 BLOCK 1 I-..
200 Ar-
Wi
•>.
87,120 S.F. L
CONSTRUCT I I I I sKaK
,Q,,,u
0 30 RCP I I ( I ( -- `•
I L_
i CONSTRUCT
CONSTRUCT e %
9'X 5' RC �-
21" RCP �y J
0
I ~ dNSTR CT V 1 �I 1 II
I i "
' ONSTRUCT 24
. C
(, CONSTRUCT 7 CULVE
24" RCP 21" RCP 'f
r-
o _ —fi �.
N s-;k ail
K,� r J
"I '"
x •• v
0
CL
° REMOVE EX. m North Tarrant Parkway
N HEADWALL & CONSTRUCT
gam+ I (Called 200'R.o.w.
=�o
ND 9'X 5' RCB wU; 24" RCP
a EXHIBIT
Ln
STORM DRAINAGE IMPROVEMENTS
U-
TO SERVE
° A PORTION OF VICTORY @ N. TARRANT PARKWAY ADDITION
U
LOT 1 & 2, BLOCK 1
SSAIH
GRAPHIC S ryp /qy 1 ,r
100 I 50 0 100 3
tl r
Q100 r (NS
n G IP
L0 G P LOTS BLOCK 1 513(
AQ
MIN S.E
C P N
Li
F 4-
r
G P _CONSTRUCT 9 X r l
--5' HEADWALL & {�
EGIN 9'X 5' RC } °
-- - _
- - t 1
P
LOT 1,BLOCK 1
L25 Ac
. I r 2... LOT 7 P
{'I p0 AC,
I 4 �as I I G.0w I 87,120&F.
`e CONSTRUCT E P I ,a,ED aF. ( P
30 RCP
P P - 1
ca
r�rra
CONSTRUCT
9'X G p p 5' RC
rz
M
21" RCP G'
�1
P• bNS CT i ONSTRUCT 24"
p " i !� � � �� CULVE
N
e 24N RCP CT 21 RCP A� �
_ ® • p j
'. -a n. .m
REMOVE EX. �� North Tarrant Parkway
HEADWALL & z ® CONSTRUCT (c'ai°c`'Z°°'�.vW.
ND 9'X 5' RCB 24" RCP "
1�
EXHIBIT1
(1
STORM DRAINAGE IMPROVEMENTS
TO SERVE
PORTION OF VICTORY AR:. NT PARKWAY ADDITION
LOT I & 2, BLOCK I
SSW
(3R. .PHIC SCAI
F
r ~ C 1001 I 50 ...p>.;.
0 100 3
p o,
N ?
I u°u 1111'
k p I N . . .) ti.. INS
CL
00 p pp
LO LOT 3,BLOCK I M
5.511 AC.
g I I I 242,138 S.F.
8 ! I
M pl
II
I p
°B. I
A
1 LOT 1,BLOCK 1 6 p
L25 AC
97,670 SF
pr 1
`°Zooms '
87,120 S.F.p I I 4 as. I 14 I I I _
p ! L--J---L--J 1 :.
0
IN8 40
AND DAVIT POLE AND
� t DAVIT POLE n
......
MINA r- r UMI IRy
�.
CL
2 North Tarrant Parkway
a d18'I'1&„an Y,w'
0 1Ri":�g1Yre17
47Y
G
EXHIBIT
STREET LIGHT IMP RO� EMENTS
TO SERVE
PORTION OF VICTORY @, N. TAR NT PARKWAY .ADDITION
LOT I & 2, BLOCK I
wu
wu
004243
Bid Schedule Form
UNIT IA: WATER IMPROVEMENTS
(Funksh and install,including all appurtenate work,complete in place for the following:)
Item Specification&
Item Approximate unit Description
No. Quantity Measurement "D"Reference Unit Price Total Amount
3304.0101 "i"asrtgaoe Watt,t°Satwiot.a
Complete in place for die sum of per Lump Sum: $500.00 $5M.00
Doflars and
Cents
3305.0109 Trench Salety
2 557 Complete in place fax the sum of pear linear foot: $0-50 $278.50
Doflars and
Cents
..........
3305.0110 Utility Markers
3 Complete in place for die,sum of per ewh $100.00 $100.00
..................................PoHars and
Cents
.........................
3305.01'11 'Valve Box Adjustment
4 1 EA. Complete hi plam for the sum of goer esiclu $100.00 $100.00
................................-.-Dollars and
Cents
3311. I Ductile Iron Water Fiffings wl Restraint
5 i TON complete in gq".'for Or,sum of W.'r toil: $2,000.00 $2, .01D
J)ollars and
.......................... cc.ts
3311.0161 6"PVC Water Pipe
6 83 L.F. Complete,in place for the star of per linear foot: $29.00 $2,37A.(X)
I'milars and
.................--
..........I............................Cents
Ell ---
331 L(Y2,61 8"PVC Water Pipe
7 474 LY Complete in Place for the sum of TO.-F linear foM $29.00 $13,746 00
Dollar,,,,and
......... .....Cents
3312.(1001 Fire Hydratat
8 3 EA. Compicle in place for Cone sum of per ewh:: $3,200.M $9,6M.00
—Dollais and
Cents
3312.0117 Connection to Eximing 4'`12"Water Main
9 1 EA. Complete in place for the sum of per enicir $550S0 $550.00
—Dol laws and
.....--cents
___J
00 42 43
Bid Schedule Form
3312.2003 I"Water Service
10 2 EA. Complete in place for the sum of per each: $1,650.00 $3,300.00
Dollars and
Cents
3312.2203 2"Water Service
I( 3 EA. Complete in place for the sum of per each: $2,050.00 $6,150.00
Dollars and
_Cents
3312.3002 6"Gate Valve
12 3 EA. Complete in place for the sum of per each: $1,100.00 $3,300.00
Dollars and
Cents
3312.3003 8"Gate Valve
13 3 EA Complete in place for the sum of per each:
$1,400.00 $4,00.00
Dollars and
Cents
3312.3105 12"Cut-in Gate Valve
14 1 EA. Complete in place for the sum of per each:
$6,000.00 $6,000.00
Dollars and
Cents
3312.4106 12"x 6"Tapping Sleeve&Valve
15 2 EA. Complete in place for the sum of per each: $6,00000 $12,000.00
—Dollars and
Cents
3312.4107 12"x 8"Tapping Sleeve&Valve
16 1 EA. Complete in place for the sum of per each: $6,000.00 $6,000.00
Dollars and
Cents
Water&Sanitary Sewer
Unit IA-Water Improvements Sub-Total: $70,148.50
O0 47,43
Bid Schedule Form
UNIT 111: SANITARY SEWER IMPROVEMENTS
(,Punish and install,Including all appurtenate work,complete in place for the following.)
Item specification&
Item Approximate Unit Description
No. Quantity Measurement "D"Reference Unit Price Total Amount
3301.0002 Post-CCIN Inspection
1 375 L.F. Complete in place far ties sum of I=finear firm: $0.80 $300.00
................... -Dollars;and
Cents
33010 101 Manhole Vacuunt'resfing
2 2 Ek Complete in place Rw the sure of Per each: $3750 $7.5,00
Dollars and
....................................." Cents
3305.0109 Trench Safety
3 375 Complete in place fat the suers of iper fitwar foot: $0.50 $187.50
and
................... _--cents
333L3202 6"2-wayCleanout
4 2 EA. Complete in place for the surn(if p=eWu $800.00 $1,600.(X)
Dollars and
.................. _.-Cents
3331.3205 6"Sewer Service
5 1 EA. Complete in place for the sun of poor eack $1,2 ➢.N) $1,200.00
and
......... --Cents,
........ ...............__.......................................... .... .............
3331.5204 6"PVC Sewer Pilir,610 W(Misc OWy)
6 12.5 LF Complete tin,place for Elie surn of peer hiflear foot: $02,00 $775.00
Dollars and
....................... Cents
333153 10 all PVC Sewer Pipe,10'to 1.2'(Miss;Owdy)
7 350 Complete in p1we for the surn of peer Inieu foot: $134,00 $11,900-00
Doflats and
Cents
3339.1003 4!Lxu-&Depth Manhole
8 22 V.F. (.'omptete in pbce for the sum of 1per vertictil foot: $318.18 $71000.00
Dollars and
. ....... ................. Cents
..........
Water&Sanitary Sewer
Unit JB-Sanitary Sewer Improventenim Sub-Total: $23,037-50
Unit 1A&1B Subtotal: $93,186.00
00 42 43
Bid Schedule Forril
UNIT 1:PAVING IMPROVEMENTS
(Funish and install,including all appurtenate work,coT21ete in place for the following:)
Item Specification&
Item Approximate unit Description
No. Quantity Measurewnt "D"Reference Unit Price Total Amount
02410550 Remove Guardrail
1 226 LF. Complete in place for the sum Taff pram linear foot: $5.00 $1,130.00
.................................—Dollars and
Cents
3213.0301 4"CtxwSrdewWk
2 850 SY Complete in pJaLe fan the sum of jxr squm foot: $3.49 $2,966.5.)
..........................._Dollars and
Cents
3213.0402 7"Conewite L)riveway
3 1435 SF Complete in place for the surn of per square foot: $4.47 $6,418.00
I.............. .....__..............._Dollars and
........................................_Cents
3213.0500 Barrier tree Ramp,Type P 1
4 2 EA. Complete in place for die sum of lwo,ewh� $150S)o M.00
Dollars and
--cents
3292.0400 Seeding,Hydromulch
5 969 S.Y. Complete in place for the sum of per rquarewyard VIM $96.90
Dollars and
Cents
....................
f.v_W91 Storm Drain&Street lighting
Unit 1-Paving linprovernents Sub-Total: $10,911A0
UNIT 2: STORM DRAIN IMPROVEMENTS
(Funish and install,including all appurtenate work,complete in place for the following:)
Item Specification&
Item Approximate Unit Description
No. Quantity Measurement "D"Reference Unit Price Total Amount
0241,4401 Remove Headwall/SET
I EA. CryInplele al Jft&for file rum of per eadr $5,000.00 $5,000.00
Dollars and
.................---,-Cents
..........—nnn' —................................
3341.0201 21"RCRClass Ill
2 54 L.F. Complete in place for the sum of per linear foot: $50.00 $2,700.00
..................... .........-Dollar,;and
...............................Cents
3341.0205 2A"RCP,Class III
3 142 L.F Complete in pWx for the sum of parr linear I'm* $56.00 $7,952.00
-DoHms and
................ ............ Cents
---——--———-
00 42 43
Bid Schedule Forth
3341.1602 9x5 Box Culvert
4 408 L.F. Complete in place for the sum of per linear foot: $430.00 $175,440.00
Dollars and
Cents
3349.4104 21"SET,1 pipe
5 1 EA. Complete in place for the sum of per each: $1,000.00 $1,000.00
Dollars and
Cents
3349.4105 24"SET,1 pipe
6 3 EA. Complete in place for the sum of per each: $40000 $1,200.00
Dollars and
Cents
3137.0103 Large Stone Riprap,grouted
7 57 S.Y Complete in place for the sum of per square yard: $54.00 $3,078.00
Dollars and
Cents
3471.0001 Traffic Control
8 1 MONTH Complete in place for the sum of per month: $70000 $70000
Dollars and
Cents
3349.1000 Modified 9'x5' Headwall,Box Culvert
9 1 EA. Complete in place for each: $6,694.00 $6,694.00
Dollars and
Cents
3349.5001 10'Curb Inlet
10 2 EA. Complete in place for the sum of per each: $3,300.00 $6,600.00
Dollars and
Cents
Paving,Storm Drain&Street Lighting
Unit 2.Storm Drainage haprovements Sub-Total: $210,364.00
00 42 43
Bid Schedule Forth
UNIT 3: STREET LIGHT IMPROVEMENTS
(Funish and install,including all appurtenate work,complete in place for the following:)
Item Specification&
Item Approximate Unit Description
No. Quantity Measurement "D"Reference Unit Price Total Amount
3441.3312 Contact Enclosure,Pad Mount including all electric wiring and
electrrical equipment
I I EA. Complete in place for the sum of per each: $(0,5(8.00 $10,518.00
Dollars and
Cents
2605.0121 FumishlInstall Elec Sery Pole Mot
2 1 EA. Complete in place for the sum of per each: $3,500.00 $3,500.00
Dollars and
Cents
2605.2101 Conduit Box
3 2 EA. Complete in place for the sum of per each: $600,00 $1,200.00
Dollars and
Cents
3441.3003 Rdwy Ill um Assmbly TY 18,18A,19,and D40
4 2 EA. Complete in place for the sum of per each: $3,938.00 $7,876.00
Dollars and
Cents
344(.3302 Rdwy Ilium Foundation TY 3,5,6,and 8
5 2 EA. Complete in place for the sum of per each: $1,250.00 $2,500.00
Dollars and
Cents
3441.3102 200W IfPS PC Lighting Fixture
6 2 EA Complete in place for the sum of per each: $50000 $1,000.00
Dollars and
Cents
Paving,Storm Drain&Street Lighting
Unit 3-Street Light bnproventents Sub-Total: $26,594.00
00 42 43
Bid Schedule Form
Bid Summary:
Water&Sanitary Sewer
Unit IA-Water Improvements Sub-Total: $70,148.50
Unit 1B-Sanitary Sewer Improvements Sub-Total: $23,037.50
Unit 1A&1B Subtotal: $93,186.00
Paving,Storm Drain&Street Lighting
Unit 1-Paving Improvements Sub-Total: $10,911.40
Unit 2-Storm Drainage Improvements Sub-Total: $210,364.00
Unit 3-Street Light Improvements Sub-Total: $26,594.00
Unit 1,2&3 Subtotal: $247,869.40
Bid Grand Total: $341,055.40