Loading...
HomeMy WebLinkAboutContract 45697 CITY SECRETAW COMRACT MO,LL) Developer and Project Information Cover Sheet: Developer Company Name: VLMC, Inc. Address, State, Zip Code: 3045 Lackland Rd. I Fort Worth, TX 76116 Phone, E-Mail: (817) 717-7133, fleet(q.)lacklandholdings.com Authorized Signatory/Title: Timothy H. Fleet, President ................... ................... ................. ...... ...... Project Name and Brief Description: Water, Sewer, Paving, Drainage& Street Light Improvements to serve The Villages of Eagle Mountain, Phase I Project Location: East of Boat Club Road, South of WJ Boaz Road Plat Case No.: FP-13-077 Plat Name: The Villages of Eagle Mountain Council District: 2 City Project No: 02246 CFA: 2014-025 DOE: 7198 To be completed bY staff.- Received by: V Date: M C-) M M 110 05 ' (OFF"IC(AL, M1,`,','C()Rrj� Combined CFA Agreement—Revised January 2014 ........... COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TA ANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as The Villages of Eagle Mountain, Ph. I ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conforinance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A;)®? ., Sewer (A-1) Paving (B) X , Storm Drain (B-1) K , Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 1I, paragraph 7 of the Policy and the contracts shall be administered in confonnance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and perfonnance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the hmprovements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement— Revised January 2014 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACOD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the hnprovements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder, J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future irriproveinents provided for by this ►greenient, L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damagges are caused, in whole or in part, bE the allEged ngglikence of the CitV of Fort Worth, its oL Licrys, yervants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not sun-h injuries, death or damages are caused, in whole or in, Part, bv the alleged racy Ali gencenol"the CUE oLFort ► "orth its officers, servantv, or en Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Clombined CFA Agreement Revised Jamary 2014 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. M Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assig]-iftient of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 0. Inspection and material. testing fees are required as fbIlows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) f o r a total of 4% o f t he developer's share of the total construction cost as stated in the construction contract, ii. Developer shall pay in. cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the strectli O! its, inspection fees equal to four percent (4.%) of the developer's share of the streetlight construction cost as stated in the construction contract, iv. Developer shall pay in cash the total cost of street signs. R, COMPLETION WITHIN 2 YEARS L Developer shall complete the fniprovements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. H. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement—Revised January 2014 Cost Summaj-y Sheet Pro.iLd Name: The Villages of Eagle Mountain, Ph. I .... ..................... ................... ........... ...........- . .................. CFA No.: 2014-025 DOE No,: 7198 ...........­­ ........ . .......... . ........... ......... ................. An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is reqUired to support the following information•, Items E)eveloper's Cost A. Water and Sewer Construction 1 Water Construction $ 101,990.00 2.Sewer Construction $ 88,953..50 Water and Sewer Construction Total $ 190,943.50 B. TPW Construction 1,Street $ 228,950.75 2.Storm Drain $ 20,117.50 3. Street Lights Installed by Developer $ 14,300,00 TPW Construction Cost Total $ 263,36825 Total Construction Cost(excluding the fees): $ 454,311.75 .......................... Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 3,818.87 D. Water/Sewer Material Testing Fee(2%) $ 3,818,87 Sub-Total for Water Construction l=ees $ 7,637.74 E. -rpw Inspection Fee(4%) $ 9,962,73 F. TPW Material Teshiag(2%) $ 4,98137 G. Street Light Inspsection Cost $ 572.00 H. Street Signs Installation Cost $ 98000 Sub-Total for TPW Construction Fees $ 16,496.10 Total Construction Fees: $ 24,133.84 Choice Financial Guarantee Options,choose one Arnount (ck one Bond=100% $ 454,311.75 Completion Holds Plat $ 454,311.75 V/ Cash Escrow Water/Sanitary Sewer=125% $ 138,67938 Cash Escrow Paving/Storm Drain 1= 125% $ 329,210.31 Letter of Credit=125%w/2yr expiration 2eriod _J$ 567,889.69�� 8 IN TESTIMONY WHEREOF, the City offort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed, and said Deyg )per Baas exec 7this day of instrument inliadruplicate, at Fort Worth,Texas this .......... p 2 CITY OF FORT WORTH-Recommended by: Water Department Tranportation & Public Works Department ................. ........... ........................................... buj'�t Wendy Chi- abulat, EMBA, P.E, ersig, P.E. I 1� 2111C Development Engineering Manager +Dir - or Ap proved as to Form &,&!gafi�y' Appro I,ed by City anaa gers, Qffice ............................... o gugg I as W. Black t nando Costa Assistant City Attorney Assistant City Manager M&C No. Date: yaaaexraA ................. O� ATTESJ` 0 "TK 0C ry .ity S cr AT`1'EST: DEVELOPFR: 7,INC. ell ................ ......z................................ ............................................................... .......................... ......... signa re Signature .......... (Print)Name: Print Name: TIMOTHV H.FLEET 'fitleo PRESIDENT ] OFFICIAL RECO 0R RD Q$ CITI SECRETARV FT- W `11j, 'rX Combined CFA Agreement Revised January 2014 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 GOLF CLUB w w a T- W J BOAZ < z Nc S U-)tea PROJAECT ER 0 L O A T/ON w STARE 0 cn c ROBERTSON' Li z Li CID RA MA co O c SA TA 1 C RT UDI 5 T o ... LO NCH CRf� WE S. 220 CROM WELL MARINE ORES D.O.E. NO: 7998 LOCATION MAP WA : P268-602160224683 SANITARY SEWER : P275-702130224683 "THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM DRAIN N W-2307 ASE 1 f® CITY 2 RROJECT . 02246 H E N CY, I NC. COIV UL 77AIG ENGIAIE-ER - w Aft zg con L ................... 9L CL Ic -----------;7 W.TBOAZAD. Z c, fit. .j... awr:1...... ..157414i 0 Ar 3.66' �4 AF 04.53, RadKz 12SM' Cm Aag�e-Vr2440' 44,27 SW0241 MAT Opm 0 33 S p. lr� @ wp�v, xgrw s q AM, 3t.4 21 1� T ---L_ . ............ (D @ N.9 ............ fit 401 I v M w 1!111 ............. HOW 08 I 4 Mi, 05 M%1. ................... 09 as @ r W"w 43 @ —W 3 (E5) l a @3 mum d V ................................ (ID4 jftftgwx~"2=. 91— v fill .19 (LO .1mm..................................... @ 116101 Ol ma '0 .......... s® !L LUMFORD DRAT R 585"15 36E x58 YB t9 ........................................ ..... --------- @2 RLOCX 11 Ni 85"ls"m1w I AT N la. - sow 6& Wft—bO--*W Nxxv%wr�.,DM114MMTC F, ............ Z z Ln Jim ,0 �41 mod ......................... < ik Sol !I fit Olt A JI k1 wi at x 4, A I I I A z if lit l Ila 9 it it lit, fi 1.1 l lit l 1.11 1 i 1 0,1 fll skis It. It is lit I lit pill lilt, I fill I fig 091.1 1 , EX 8 i V APALACHEE DRIVE PROP W .................... ...................... ............ ................... ........... .............. PROP 8'W mo PROP 8`W PROP 12"4 EX 12-W 100% DEVELOPER'S COST 8" AND TT 12" WATER LINES, FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES EXISTING WATER LINES. FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES EXHIBIT 99A99 D.O.E. NO: 7198 WATER NO: P265-602150224683 WATER IMPROVEMENTS SANITARY SEWER NO: P275-702130224683 "THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM DRAIN NO: W-2307 CITY PROJECT NO. 02246 PHASE 1" X-22574 -WEIA,-H ]ENCHISMERD40. 11 NC. _ 004243 SEC'T'ION 00 42 43 BID PROPOSAt, 112091 OSA.1., FORM Page I of 6 PROJECT� VILLAGES OF EAGLE MOUNTAIN-Pit ASE ONE DATE:04-02-14 IJ ITT PRICE BID Bidder's Application Project Item Information Bidder's Propsai. eci1'imlion. Unit of Eit.#Nist:ltesn t��. Description � did t �,�a�t¢'i�ty Unit Price did Value Section No, Measure 3311.0461 12"PVC;Water Pipe 33 11 12 LF 1.07 $39.00 54,173.00 3311.0261 8"°PVC;Water Pipe 33 11 12 LF 1,244 $30.50 $37,942.00 3311 00101 6":PVC;Water Pie 33 '11 12 1.,F 5 $20.00 $100.00 .— _ _...... _ 3312.3005 12°"Crate Valve 33 1220 EA. 1 $'1,850.00 $1,850.00 33123003 8"Crate Valve 33 1220 EA. 4 $950.00 $3,800..00 3312,3002 6"Crate Valve 33 1220 E . 1 $800.00 $800.00 3312.0103 Connect.to Existing 8'" Water Main 33 1225 E.A. 1 $2,700.00 $2,700.00 331240105 Connect.to Existing 12"Water Main 33 1225 Eta. 1 $3,600.00 $3,600.00 ___... ............_,_.�._ — 3312.0001 Fire Hydrant 33 1240 EA 1 $3,100.00 53,100.00 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 1 $5,600.00 $5,600.00 _........ 3305.0109 Trench Safety 33 05 10 LF 1,356 $1.50 $2,034.00 331.2.2003 1"Water Service 33 1210 EA. 44 $825.00 $36,300,00 UNIT 1. WATER IMPROVEMENT'S BID SUMMARY $1.01,999.00 CITY OF FORT WORTH V9.fl.,1.,A.OT,S O.t^ OZ.E O `t'AIX„PRASE OA STANDARD CONS"T'RUC;I ION SPEC CATION OOC 1 'T a DOE: 719 muw• arm,®� a�na amu�am City Pm jest o..022d FF APALACHEE DRIVE EXIST 8"SS, EXIST 8"SS� EXIST 8"SS PROP 8"SS ai uj PROP 8"SS EXIST 8"SS MARINER WAY ,�PRO48�"JSSI 'i-EXIST SS HEREFORD DRIVE 100% DEVELOPER'S COST ASSOCIATED APPURTENANCES EXISTING 8* SANITARY SEWER APPURTENANCES is 99 WATER NO: P265-602150224683 SANITARY SEWER IMPROVEMENTS SANITARY SEWER NO: P275-702130224683 "THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM DRAIN NO: W-2307 CITY PROJECT NO. 02246 PHASE 1" X-22574 SECTION 0 3 u'rP Y?d 43 �Ik Fa.a`iunOSA.I. PROPOS AL FORM PaLe 2 of'6 PROJECT VILLAGI:I,S OF EAGLE MOUNT, FN-PHASE ONE 17A°l"1ia 04-02-14 UNIT PRICE BID Bidder's Application Project Item.Information Kidder's Proposal Bidl"sat Item No. Description Spedfication Unit of Bid Quantity I..Inh Price Bid"value Section No. Measure 3331„4115 8"PVC Serer pipe 33 11 20 I.F 1,191 $33.50 $39,898.50 3331.- Back fill._. 3339.1001 4°Manhole 33 39 20 EA 5 $4,000.00 $20,000.00 _. _...__ 3331.3102 4"Suer Service,Two-way cleanou�t 333150 EA. 44 $400.00 $17,600,00 _ .. _ 3301.0002 Post-CCTV Ins ectitan 33 01 31 LF 1,251 $3.50 $4„378.50 3301.0101 Manhole Vacuum Testing 33 01 30 IaA 5 $150.00 $750.00 3305x0113 F - Trench Water Stops(Clay Dams) 3305 10 EA 1 $250.00 $250.00 3305.0109 Trench Safety 3305 10 LF 1,251 $1.50 $1,876.50 I1' ® SA��77T SI:a R IMI'KO �dTS BID SUMMARY $88,953.50 CITY OF FORT WORT14 VILLAGES OF EAGLE MOUNTAIN,PHASE ON STANDARD CONSTRUCTION SP CII^ICA110N DOCUMFNTS DOE: 71% P.—R-"iRrrN Grp 70120 City Nojeca''Rqm:0224 .,..__ EX 24-RCP, : EX 30 RCP MAPA ACHE ...w �m.._..._._.... -E TRAI : ! I i ...... � .� it SCALE: 1"=200' MARINER WAY..... IL.__ _ _. �.. PROP 10°INLET ® EX RCP w 1 CHANNEL _ ._.. _._._ w/4:1 I SL ES PROP "RCP mm t HEREEFORD DRIVE . EX 24 RCP 1 ' CHANNEL 00X DEVELOPER'S COST w/4:1 SIDE SLOPES STORM SEWER AND INLET 100X DEVELOPER'S COST ROCK RIP RAP EXISTING STORM SEWER AND INLET EXHIBIT" "B-1 " D.O.E. O: 7198 STORM DRAIN IMPROVEMENTS WATER : P265-602150224683 SANITARY SEWER NO: P275-702130224683 "THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM DRAIN NO: W-2307 ASE 1" CITY PRR4OJECT NO. 02246 WELCH NO � . G, I NC. COAIS'UL 77AIG EAtGlAtElEIR S 00 42 4: SECTION 00 42 43 BID PROPOSAI PROPOSAL,FORM Page 3 of( PROJ1"CT: V tLLAGES OF EAGLE MOUN'[A.IN PHASE OlqE DA`n`.,:04-02-14 UNIT PRICE BID Bidder's Application Protect Item It brination Bidder's Proposal BidHst stein No. Description Specffication Unft of Bid Quamrity Unit Price Bid Value Section No. Measure 3341.0205 24"RCP,Class 111 3341 10 LF 183 $60.00 S10,980.00 3349,5001 10°Curb Wet 33 EA 1 $3,500.00 $3,5KOO 83 3305.0109 Trench Safety 33 05 10 LF 183 $150 $457.50 y 31330104 Medium Stone,Riprap,dry 3137700 y 74 $70-001 $5,180.00 ()o 7s I UNIT 3: STORM DRAIN IMPROVEMENTS BID SUMMARY $20,117.50 MY OF FORT WORTH VILLAGFS OF EAGI.,E MOWTAW,PHASE 01 STANDARD CONSTRUCTION SPECIFICATION rX)CUMENTS DOE: 71.9 Cily Prig o.:022 Mil APALACHEE DRIVE (W RICHT-OV WAY 29'B-0 SCALE: 1*'=200' z ?.5 ............ 0_ 2 6? - __ _ .-W, 09 j MARINER WAY (5w MGM V-ftr) F_ ........... HEREFORD DRIVE (fib" RldW-OF'-WAY) 100% DEVELOPER'S COST 6" PAVEMENT ON 6" LIME SUBGRADE 100% DEVELOPER'S COST 6" PAVEMENT REMOVAL AND REPLACEMENT 100% DEVELOPER'S COST 4" SIDEWALK REMOVAL AND REPLACEMENT ......EXHIBIT "1399 D.O.E. NO: 7198 PAVING IMPROVEMENTS WATER NO: P265-602150224683 SANITARY SEWER NO: P275-702130224683 "THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM 'DRAIN NO: W-2307 CITY PROJECT NO. 02246 PHASE 1 X-22574 WELCH ]ENOINEEM1*40, I INC. CONSUL r/NG E-NGINEERS W 42 C SECTION 00 42 43 BID PROPOSAI PROPOSAL FORM Page 4 of( PROJEC'I'. VILLAGES OF RAGLI-7,MOUNTAIN-PHASE ONE DAM:04 02 14 UNIT PRICE BID Blidder's .Application Project Itern Information Bidder's Proposai B'idfist Itern No. Description Specification (Jnit of Bid Quantity Unit Price Bid Value Section No. Measure -- 0241.0100 Remove Sidewalk 0241 13 SY 29 $15.50 "S449,50 0241,1000 Remove Concrete Pavernent 0241 15 SY 196 ----525.50 $4,998.00 .............. 3201.0611 6"Cone Pvmt Repair 32 01 29 SY 196 58500 $16,660M 1. 1" ................. 3211.0501 6"Lime Treatment 321129 SY 209 $100 $627.00 3211.0400 Time(36#/SY) 32 13 20 TN 180 $160.00 $608.00 3213.0301 4"Concrete Sidewalk 32 1320 SF 288 $515 $1,512.00 3211-0101 6"Conc Pvmt 3213 13 SY 4,300 $36.89 $158,627.00 3211.0501 6"Lime Tr — 5—eatment 32 1129 Sy �: 00 $3000 $13,500.00 11-- 1-1---1 ........... 3211 40400 Lime(36#/SY) 321129 TN 81.00 $160000 $12,%0.00 -__- ...... 32110530 Barrier Free Ramp-Type R-1 32 13 20 EA. 4 $1,250.00 $5,000.00 32910100 Top Sail 3291 19 CY 152 $31•50 $4,788.00 3292.0400 Seeding,Hydrornulch(ROW) 3291 13 SY 1375 $135 $2,406.25 ........... 3471 M03 Stop Signs 34 7130 EA 2 $475.00 5950.00 -- 32170503 24" Solid White Stop Bar(W) 72-1723 LF 28 $29a00 $812.00 347140001 Traffic Control 32 1713 LS —1 $3,023.00 $3,023.00 9999.0001 Street barricade(T3 D0'1) Detail Sheet LF =5 8 1 $35.00 $2,030.00 UNIT 4. PAVING IMPROVEMENTS BED SUMMARY $228,95V5� CITY OF FORT WOWITI VILLAGES OF I,;AGIJE MOUNTAIN,PHASE 01, STANDARD CONSTRUCTION SPE(AFICATION 1 0 UMFNTS DOE 719 70170111 City Project No,:0221 ................... M °== 4I ALACF4EE TRAIL. " � SCALE: 1"=200' F. .. I MARNNER � � ... ... _ ...E HEREFORD D VE .- * PROPOSED STREET LIGHT (100 DE'VELOPER'S COST) Q, - PROPOSED STREET SIGN (1 DEVEL0PER'S COST) PROP0SED GROUND BOX (too DEVEL,0PER'S COST) °- EXISTING STREET LIGHT —EXHIBIT "C" ,Oa , O: 71 STREET LIGHTS WATER : P265--602150224683 SANITARY SEWER N : P275-702130224683 "THE VILLAGES r®L MOUNTAIN, [ PROJE TAN DRAIN 246:- 2307 PHASE X-22574 E H NCB Cy, I NC. V)42 4.1 Si.f,CTION 00 42 43 1311)PROPOSAL PROPOSAL,FORM Phase 5 of C PROJECT: 'VILLAGES OF EA.GL.X MOUNTAIN..PHASE ONE DATT,.04.,02-14 UNIT PRICE :BID Bidder's Application Project Item Inforrnaticrn Bidder's Proposal Bidli,st Item No. Description Specification I..Init of 13id Quantity Unit Price Bid Value Section No. pleasure Furnish/Install Ground Brix. srnall 3441.1502 w/lidw/a ron p 3441 1.® FA 5 $475.00 92,375,00 34493101 Furnish/Install IOOW ITS PC Fighting 3441 20 EA 5 $250000 $1,250.00 Fixture 3441.3301 Furnish/Install.Rdwy Illum Foundation 34 41 20.._ EA 5 $850.00 $4,250.00 TY 1,2 and 4 26053015 Furnish/Install Conduit-Schedule 80 260533 I..,F 65 MOO $340.00 PVC 2 inch O en Cut 34413004 X18.Turn Wire 3441 20 CLF 65 $3.00 $195.00 ..._. 34413004 Furnish/Install Rdway Illurn TY -25-6 344120 F.A 5 $1,168.00 95,840.00 Pale 3441.3004 Furnish/Install Type 25 Arm 34 41 20 F,A 5 Included in Price UNIT : STREET LIGHTING IMPROVEMENTS BID SUMMARY $14,300.00 CITY OF Pt3RT WC U11 VILLAGES OF F LGLE MOUNTAIN PHASE ON STANDARD CONS UCTI()N SP"EC;IFICAnTIO.N DOCUMENTS TS Ee 719 uae or�awo�ea� 4d�?r1� C1 0ty Project No. 0224