HomeMy WebLinkAboutContract 45697 CITY SECRETAW
COMRACT MO,LL)
Developer and Project Information Cover Sheet:
Developer Company Name: VLMC, Inc.
Address, State, Zip Code: 3045 Lackland Rd. I Fort Worth, TX 76116
Phone, E-Mail: (817) 717-7133, fleet(q.)lacklandholdings.com
Authorized Signatory/Title: Timothy H. Fleet, President
................... ................... ................. ...... ......
Project Name and Brief Description: Water, Sewer, Paving, Drainage& Street Light Improvements to
serve The Villages of Eagle Mountain, Phase I
Project Location: East of Boat Club Road, South of WJ Boaz Road
Plat Case No.: FP-13-077 Plat Name: The Villages of Eagle Mountain
Council District: 2 City Project No: 02246
CFA: 2014-025 DOE: 7198
To be completed bY staff.-
Received by: V Date:
M
C-)
M
M
110
05
' (OFF"IC(AL, M1,`,','C()Rrj�
Combined CFA Agreement—Revised January 2014
...........
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TA ANT § Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as The Villages of Eagle
Mountain, Ph. I ("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Project.
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conforinance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A;)®? .,
Sewer (A-1) Paving (B) X , Storm Drain (B-1) K , Street Lights &
Signs (C) X .
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section 1I, paragraph 7 of the Policy and the
contracts shall be administered in confonnance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and perfonnance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the hmprovements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Combined CFA Agreement— Revised January 2014
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACOD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the hnprovements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
4
community facilities to be installed hereunder,
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future irriproveinents provided for by this
►greenient,
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such iniuries, death or damagges are caused, in
whole or in part, bE the allEged ngglikence of the CitV of Fort Worth, its
oL Licrys, yervants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims,, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not sun-h injuries, death or damages are caused, in
whole or in, Part, bv the alleged racy Ali gencenol"the CUE oLFort ► "orth its
officers, servantv, or en
Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
Clombined CFA Agreement Revised Jamary 2014
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
M Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assig]-iftient of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
0. Inspection and material. testing fees are required as fbIlows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) f o r a total of 4% o f t he
developer's share of the total construction cost as stated in the construction
contract,
ii. Developer shall pay in. cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the strectli O! its, inspection fees equal to four percent (4.%) of the
developer's share of the streetlight construction cost as stated in the
construction contract,
iv. Developer shall pay in cash the total cost of street signs.
R, COMPLETION WITHIN 2 YEARS
L Developer shall complete the fniprovements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
H. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
6
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Combined CFA Agreement—Revised January 2014
Cost Summaj-y Sheet
Pro.iLd Name: The Villages of Eagle Mountain, Ph. I
.... ..................... ................... ........... ...........- . ..................
CFA No.: 2014-025 DOE No,: 7198
........... ........ . .......... . ........... ......... .................
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is reqUired to support the
following information•,
Items E)eveloper's Cost
A. Water and Sewer Construction
1 Water Construction $ 101,990.00
2.Sewer Construction $ 88,953..50
Water and Sewer Construction Total $ 190,943.50
B. TPW Construction
1,Street $ 228,950.75
2.Storm Drain $ 20,117.50
3. Street Lights Installed by Developer $ 14,300,00
TPW Construction Cost Total $ 263,36825
Total Construction Cost(excluding the fees): $ 454,311.75
..........................
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 3,818.87
D. Water/Sewer Material Testing Fee(2%) $ 3,818,87
Sub-Total for Water Construction l=ees $ 7,637.74
E. -rpw Inspection Fee(4%) $ 9,962,73
F. TPW Material Teshiag(2%) $ 4,98137
G. Street Light Inspsection Cost $ 572.00
H. Street Signs Installation Cost $ 98000
Sub-Total for TPW Construction Fees $ 16,496.10
Total Construction Fees: $ 24,133.84
Choice
Financial Guarantee Options,choose one Arnount (ck one
Bond=100% $ 454,311.75
Completion Holds Plat $ 454,311.75 V/
Cash Escrow Water/Sanitary Sewer=125% $ 138,67938
Cash Escrow Paving/Storm Drain 1= 125% $ 329,210.31
Letter of Credit=125%w/2yr expiration 2eriod _J$ 567,889.69��
8
IN TESTIMONY WHEREOF, the City offort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary,with the corporate seal of the City affixed, and said Deyg )per Baas exec 7this
day of
instrument inliadruplicate, at Fort Worth,Texas this ..........
p
2
CITY OF FORT WORTH-Recommended by:
Water Department Tranportation & Public Works Department
................. ........... ...........................................
buj'�t
Wendy Chi- abulat, EMBA, P.E, ersig, P.E.
I 1� 2111C
Development Engineering Manager +Dir - or
Ap proved as to Form &,&!gafi�y' Appro I,ed by City anaa gers, Qffice
...............................
o gugg I as W. Black t nando Costa
Assistant City Attorney Assistant City Manager
M&C No.
Date:
yaaaexraA
.................
O�
ATTESJ`
0
"TK 0C
ry
.ity S cr
AT`1'EST: DEVELOPFR: 7,INC.
ell
................ ......z................................ ............................................................... .......................... .........
signa re Signature
..........
(Print)Name: Print Name: TIMOTHV H.FLEET
'fitleo PRESIDENT
]
OFFICIAL RECO
0R RD
Q$
CITI SECRETARV
FT- W `11j, 'rX
Combined CFA Agreement Revised January 2014
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
GOLF CLUB
w
w
a T-
W J BOAZ
< z
Nc S U-)tea
PROJAECT ER 0
L O A T/ON w STARE
0 cn c
ROBERTSON' Li z Li
CID RA MA
co O
c SA TA
1 C RT UDI
5 T o
... LO NCH CRf� WE S.
220
CROM WELL MARINE ORES
D.O.E. NO: 7998
LOCATION MAP WA : P268-602160224683
SANITARY SEWER : P275-702130224683
"THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM DRAIN N W-2307
ASE 1 f® CITY 2 RROJECT . 02246
H E N CY, I NC.
COIV UL 77AIG ENGIAIE-ER
-
w Aft
zg
con L
...................
9L
CL
Ic
-----------;7
W.TBOAZAD.
Z
c, fit.
.j...
awr:1...... ..157414i 0
Ar 3.66'
�4 AF
04.53,
RadKz 12SM'
Cm Aag�e-Vr2440'
44,27
SW0241 MAT
Opm
0 33
S
p.
lr�
@ wp�v, xgrw s q
AM,
3t.4
21 1� T
---L_
. ............ (D
@ N.9
............
fit
401
I v M w
1!111
.............
HOW
08 I 4 Mi,
05 M%1.
...................
09
as
@ r
W"w
43
@
—W 3
(E5)
l
a
@3
mum d
V ................................
(ID4
jftftgwx~"2=. 91— v
fill
.19
(LO
.1mm.....................................
@
116101
Ol
ma
'0
..........
s®
!L
LUMFORD DRAT
R 585"15 36E x58 YB
t9
........................................ ..... ---------
@2 RLOCX 11
Ni 85"ls"m1w I AT N
la.
- sow
6&
Wft—bO--*W Nxxv%wr�.,DM114MMTC F,
............ Z z
Ln
Jim
,0
�41
mod
.........................
<
ik
Sol
!I fit
Olt
A JI
k1
wi at x 4, A I I I A z
if
lit
l
Ila 9 it
it lit,
fi 1.1 l lit
l
1.11 1
i 1
0,1 fll
skis
It.
It
is
lit I lit
pill lilt,
I fill I fig 091.1 1
,
EX 8
i V
APALACHEE DRIVE
PROP W
.................... ......................
............
...................
...........
..............
PROP 8'W mo
PROP 8`W
PROP 12"4 EX 12-W
100% DEVELOPER'S COST 8" AND
TT
12" WATER LINES, FIRE
HYDRANTS, GATE VALVES AND
ASSOCIATED APPURTENANCES
EXISTING WATER LINES. FIRE
HYDRANTS, GATE VALVES AND
ASSOCIATED APPURTENANCES
EXHIBIT 99A99 D.O.E. NO: 7198
WATER NO: P265-602150224683
WATER IMPROVEMENTS SANITARY SEWER NO: P275-702130224683
"THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM DRAIN NO: W-2307
CITY PROJECT NO. 02246
PHASE 1" X-22574
-WEIA,-H ]ENCHISMERD40. 11 NC.
_
004243
SEC'T'ION 00 42 43 BID PROPOSAt,
112091 OSA.1., FORM Page I of 6
PROJECT� VILLAGES OF EAGLE MOUNTAIN-Pit ASE ONE DATE:04-02-14
IJ ITT PRICE BID Bidder's Application
Project Item Information Bidder's Propsai.
eci1'imlion. Unit of
Eit.#Nist:ltesn t��. Description � did t �,�a�t¢'i�ty Unit Price did Value
Section No, Measure
3311.0461 12"PVC;Water Pipe 33 11 12 LF 1.07 $39.00 54,173.00
3311.0261 8"°PVC;Water Pipe 33 11 12 LF 1,244 $30.50 $37,942.00
3311 00101 6":PVC;Water Pie 33 '11 12 1.,F 5 $20.00 $100.00
.— _ _...... _
3312.3005 12°"Crate Valve 33 1220 EA. 1 $'1,850.00 $1,850.00
33123003 8"Crate Valve 33 1220
EA. 4 $950.00 $3,800..00
3312,3002 6"Crate Valve 33 1220 E . 1 $800.00 $800.00
3312.0103 Connect.to Existing 8'" Water Main 33 1225 E.A. 1 $2,700.00 $2,700.00
331240105 Connect.to Existing 12"Water Main 33 1225 Eta. 1 $3,600.00 $3,600.00
___... ............_,_.�._ —
3312.0001 Fire Hydrant 33 1240 EA 1 $3,100.00 53,100.00
3311.0001 Ductile Iron Water Fittings 33 11 11 TON 1 $5,600.00 $5,600.00
_........
3305.0109 Trench Safety 33 05 10 LF 1,356 $1.50 $2,034.00
331.2.2003 1"Water Service 33 1210 EA. 44 $825.00 $36,300,00
UNIT 1. WATER IMPROVEMENT'S BID SUMMARY $1.01,999.00
CITY OF FORT WORTH V9.fl.,1.,A.OT,S O.t^ OZ.E O `t'AIX„PRASE OA
STANDARD CONS"T'RUC;I ION SPEC CATION OOC 1 'T a DOE: 719
muw• arm,®� a�na amu�am City Pm jest o..022d
FF
APALACHEE DRIVE
EXIST 8"SS,
EXIST 8"SS�
EXIST 8"SS
PROP 8"SS
ai
uj
PROP 8"SS
EXIST 8"SS
MARINER WAY
,�PRO48�"JSSI
'i-EXIST SS
HEREFORD DRIVE
100% DEVELOPER'S COST
ASSOCIATED APPURTENANCES
EXISTING 8* SANITARY SEWER
APPURTENANCES
is 99
WATER NO: P265-602150224683
SANITARY SEWER IMPROVEMENTS SANITARY SEWER NO: P275-702130224683
"THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM DRAIN NO: W-2307
CITY PROJECT NO. 02246
PHASE 1" X-22574
SECTION 0 3 u'rP Y?d 43
�Ik Fa.a`iunOSA.I.
PROPOS AL FORM PaLe 2 of'6
PROJECT VILLAGI:I,S OF EAGLE MOUNT, FN-PHASE ONE
17A°l"1ia 04-02-14
UNIT PRICE BID Bidder's Application
Project Item.Information Kidder's Proposal
Bidl"sat Item No. Description Spedfication Unit of Bid Quantity I..Inh Price Bid"value
Section No. Measure
3331„4115 8"PVC Serer pipe 33 11 20 I.F 1,191 $33.50 $39,898.50
3331.- Back fill._.
3339.1001 4°Manhole 33 39 20 EA 5 $4,000.00 $20,000.00
_. _...__
3331.3102 4"Suer Service,Two-way cleanou�t 333150 EA. 44 $400.00 $17,600,00
_ .. _
3301.0002 Post-CCTV Ins ectitan 33 01 31 LF 1,251 $3.50 $4„378.50
3301.0101 Manhole Vacuum Testing 33 01 30 IaA 5 $150.00 $750.00
3305x0113 F - Trench Water Stops(Clay Dams) 3305 10 EA 1 $250.00 $250.00
3305.0109 Trench Safety 3305 10 LF 1,251 $1.50 $1,876.50
I1' ® SA��77T SI:a R IMI'KO �dTS BID SUMMARY $88,953.50
CITY OF FORT WORT14 VILLAGES OF EAGLE MOUNTAIN,PHASE ON
STANDARD CONSTRUCTION SP CII^ICA110N DOCUMFNTS DOE: 71%
P.—R-"iRrrN Grp 70120 City Nojeca''Rqm:0224
.,..__ EX 24-RCP,
:
EX 30 RCP
MAPA ACHE
...w �m.._..._._.... -E TRAI
:
! I
i ......
� .� it SCALE: 1"=200'
MARINER WAY.....
IL.__
_ _. �.. PROP 10°INLET
® EX RCP w
1 CHANNEL _ ._.. _._._
w/4:1 I SL ES PROP "RCP mm t
HEREEFORD DRIVE
. EX 24 RCP
1 ' CHANNEL
00X DEVELOPER'S COST w/4:1 SIDE SLOPES
STORM SEWER AND INLET
100X DEVELOPER'S COST
ROCK RIP RAP
EXISTING STORM SEWER
AND INLET
EXHIBIT" "B-1 " D.O.E. O: 7198
STORM DRAIN IMPROVEMENTS WATER : P265-602150224683
SANITARY SEWER NO: P275-702130224683
"THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM DRAIN NO: W-2307
ASE 1" CITY PRR4OJECT NO. 02246
WELCH NO � . G, I NC.
COAIS'UL 77AIG EAtGlAtElEIR S
00 42 4:
SECTION 00 42 43 BID PROPOSAI
PROPOSAL,FORM Page 3 of(
PROJ1"CT: V tLLAGES OF EAGLE MOUN'[A.IN PHASE OlqE DA`n`.,:04-02-14
UNIT PRICE BID Bidder's Application
Protect Item It brination Bidder's Proposal
BidHst stein No. Description Specffication Unft of Bid Quamrity Unit Price Bid Value
Section No. Measure
3341.0205 24"RCP,Class 111 3341 10 LF 183 $60.00 S10,980.00
3349,5001 10°Curb Wet 33 EA 1 $3,500.00 $3,5KOO
83
3305.0109 Trench Safety 33 05 10 LF 183 $150 $457.50
y
31330104 Medium Stone,Riprap,dry 3137700 y 74 $70-001 $5,180.00
()o 7s I
UNIT 3: STORM DRAIN IMPROVEMENTS BID SUMMARY $20,117.50
MY OF FORT WORTH VILLAGFS OF EAGI.,E MOWTAW,PHASE 01
STANDARD CONSTRUCTION SPECIFICATION rX)CUMENTS DOE: 71.9
Cily Prig o.:022
Mil
APALACHEE DRIVE
(W RICHT-OV WAY
29'B-0
SCALE: 1*'=200'
z ?.5
............
0_
2 6?
- __ _ .-W,
09
j
MARINER WAY
(5w MGM V-ftr) F_
...........
HEREFORD DRIVE
(fib" RldW-OF'-WAY)
100% DEVELOPER'S COST
6" PAVEMENT ON 6" LIME
SUBGRADE
100% DEVELOPER'S COST
6" PAVEMENT REMOVAL
AND REPLACEMENT
100% DEVELOPER'S COST
4" SIDEWALK REMOVAL
AND REPLACEMENT
......EXHIBIT "1399 D.O.E. NO: 7198
PAVING IMPROVEMENTS WATER NO: P265-602150224683
SANITARY SEWER NO: P275-702130224683
"THE VILLAGES OF EAGLE MOUNTAIN, STREET/STORM 'DRAIN NO: W-2307
CITY PROJECT NO. 02246
PHASE 1 X-22574
WELCH ]ENOINEEM1*40, I INC.
CONSUL r/NG E-NGINEERS
W 42 C
SECTION 00 42 43 BID PROPOSAI
PROPOSAL FORM Page 4 of(
PROJEC'I'. VILLAGES OF RAGLI-7,MOUNTAIN-PHASE ONE DAM:04 02 14
UNIT PRICE BID Blidder's .Application
Project Itern Information Bidder's Proposai
B'idfist Itern No. Description Specification (Jnit of Bid Quantity Unit Price Bid Value
Section No. Measure
--
0241.0100 Remove Sidewalk 0241 13 SY 29 $15.50 "S449,50
0241,1000 Remove Concrete Pavernent 0241 15 SY 196 ----525.50 $4,998.00
..............
3201.0611 6"Cone Pvmt Repair 32 01 29 SY 196 58500 $16,660M
1. 1" .................
3211.0501 6"Lime Treatment 321129 SY 209 $100 $627.00
3211.0400 Time(36#/SY) 32 13 20 TN 180 $160.00 $608.00
3213.0301 4"Concrete Sidewalk 32 1320 SF 288 $515 $1,512.00
3211-0101 6"Conc Pvmt 3213 13 SY 4,300 $36.89 $158,627.00
3211.0501 6"Lime Tr — 5—eatment 32 1129 Sy �: 00 $3000 $13,500.00
11-- 1-1---1 ...........
3211 40400 Lime(36#/SY) 321129 TN 81.00 $160000 $12,%0.00
-__- ......
32110530 Barrier Free Ramp-Type R-1 32 13 20 EA. 4 $1,250.00 $5,000.00
32910100 Top Sail 3291 19 CY 152 $31•50 $4,788.00
3292.0400 Seeding,Hydrornulch(ROW) 3291 13 SY 1375 $135 $2,406.25
...........
3471 M03 Stop Signs 34 7130 EA 2 $475.00 5950.00
--
32170503 24" Solid White Stop Bar(W) 72-1723 LF 28 $29a00 $812.00
347140001 Traffic Control 32 1713 LS —1 $3,023.00 $3,023.00
9999.0001 Street barricade(T3 D0'1) Detail Sheet LF =5 8 1 $35.00 $2,030.00
UNIT 4. PAVING IMPROVEMENTS BED SUMMARY $228,95V5�
CITY OF FORT WOWITI VILLAGES OF I,;AGIJE MOUNTAIN,PHASE 01,
STANDARD CONSTRUCTION SPE(AFICATION 1 0 UMFNTS DOE 719
70170111 City Project No,:0221
...................
M
°== 4I ALACF4EE TRAIL. "
�
SCALE: 1"=200'
F. ..
I
MARNNER � � ... ...
_ ...E
HEREFORD D VE .-
* PROPOSED STREET LIGHT (100 DE'VELOPER'S COST)
Q, - PROPOSED STREET SIGN (1 DEVEL0PER'S COST)
PROP0SED GROUND BOX (too DEVEL,0PER'S COST)
°- EXISTING STREET LIGHT
—EXHIBIT "C" ,Oa , O: 71
STREET LIGHTS WATER : P265--602150224683
SANITARY SEWER N : P275-702130224683
"THE VILLAGES r®L MOUNTAIN, [ PROJE TAN DRAIN 246:- 2307
PHASE X-22574
E H NCB Cy, I NC.
V)42 4.1
Si.f,CTION 00 42 43 1311)PROPOSAL
PROPOSAL,FORM
Phase 5 of C
PROJECT: 'VILLAGES OF EA.GL.X MOUNTAIN..PHASE ONE DATT,.04.,02-14
UNIT PRICE :BID Bidder's Application
Project Item Inforrnaticrn Bidder's Proposal
Bidli,st Item No. Description Specification I..Init of 13id Quantity Unit Price Bid Value
Section No. pleasure
Furnish/Install Ground Brix. srnall
3441.1502 w/lidw/a ron p 3441 1.® FA 5 $475.00 92,375,00
34493101 Furnish/Install IOOW ITS PC Fighting 3441 20 EA 5 $250000 $1,250.00
Fixture
3441.3301 Furnish/Install.Rdwy Illum Foundation 34 41 20.._ EA 5 $850.00 $4,250.00
TY 1,2 and 4
26053015 Furnish/Install Conduit-Schedule 80 260533 I..,F 65 MOO $340.00
PVC 2 inch O en Cut
34413004 X18.Turn Wire 3441 20 CLF 65 $3.00 $195.00
..._.
34413004 Furnish/Install Rdway Illurn TY -25-6 344120 F.A 5 $1,168.00 95,840.00
Pale
3441.3004 Furnish/Install Type 25 Arm 34 41 20 F,A 5 Included in Price
UNIT : STREET LIGHTING IMPROVEMENTS BID SUMMARY $14,300.00
CITY OF Pt3RT WC U11 VILLAGES OF F LGLE MOUNTAIN PHASE ON
STANDARD CONS UCTI()N SP"EC;IFICAnTIO.N DOCUMENTS TS Ee 719
uae or�awo�ea� 4d�?r1� C1 0ty Project No. 0224