Loading...
HomeMy WebLinkAboutContract 42145 CITY SECRETARY CONTRACT NO... TRANSPORTATION IMPACT FEE CREDIT AGREEMENT THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the "Agreement") is made and entered into effective as of the Effective Date (as defined below), by and among THE CITY OF FORT WORTH, TEXAS (the "City"), a home rule municipal corporation situated in Tarrant, Denton, Parker, Johnson, and Wise Counties, Texas, and A-S 104 TIMBERLAND TOWN CENTER, L.P., a Texas limited partnership, and KROGER TEXAS,L.P.,AN Ohio limited partnership (collectively the"Owner") (the City and the Owner a "Party", and collectively, the "Parties"). RECITALS WHEREAS, the City is a home rule municipal corporation duly organized and validly existing under the laws and statutes of the State of Texas and is located within Tarrant, Denton, Parker,Johnson, and Wise Counties, Texas; and WHEREAS,the Owner is the owner of approximately 25.90 acres in Tarrant County, Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the corporate boundaries of the City. A map of the Property showing its location is attached hereto as Exhibit "B"; and WHEREAS, the Owner desires to proceed with development of the Property as described or illustrated on the Development plan, attached hereto as Exhibit"C",which Development Plan identifies the intended land uses in relation to the lay-out of on-site and off-site transportation facilities necessary for serving full development of the Property;and WHEREAS,the City has adopted a Transportation Impact Fee program pursuant to Tex. Loc. Gov't Code chapter 395, Ordinance No. 18083, under which charges ("impact fees") are imposed on new development for transportation facilities serving the development and which are identified within the City's adopted transportation improvements plan; and WHEREAS, transportation impact fees must be collected and spent within the service area(s) in which the new development is located; and WHEREAS, the Property is located within service area A; and WHEREAS, the transportation facilities shown on the Development Plan are identified within the City's adopted transportation improvements plan; and WHEREAS,Ordinance No. 18083 Section 1-15 provides for credits against impact fees for dedication or construction of transportation improvements shown on the adopted transportation improvements plan; and OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX r WHEREAS, Owner agrees to dedicate and construct the transportation improvements shown on the Development Plan in exchange for credits against future transportation impact fees; and WHEREAS, Owner has submitted a final plat to the City for approval, subject to dedication and construction of the transportation improvements shown on the Development Plan; and WHEREAS,based on the anticipated traffic impacts from the development,the City, and Owner contemplate the necessity for the construction of system facilities,which must be credited against transportation impact fees otherwise due; and WHEREAS,the City,in accordance with Chapter 395,has determined the maximum transportation impact fees to be charged against new development within service area A to be $989 per service unit; and WHEREAS, Owner has received the following preliminary plat approval: The Shops at Timberland Crossing, Lots 1-6, Block 1 WHEREAS, Owner has received approval for construction plans and executed Community Facilities Agreements for the following: Timberland Blvd. and N. Beach St., DOE No. 6502 NOW,THEREFORE,for and in consideration of the mutual agreements,covenants, and conditions contained herein,and other good and valuable consideration,the City and the Owner hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Transportation Improvements. Owner agrees to dedicate the rights-of-way for and construct the system facilities identified in Exhibit "D", which is attached hereto and incorporated herein by reference. For any transportation improvement which has been dedicated or constructed by Owner on the Property and accepted by the City prior to execution of this Agreement,the improvement shall be identified as completed on Exhibit 3. Credits. The Parties agree that the estimated value of the credits for each transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee associated with any lot for which a building permit has previously been issued,and the net value of credits shown on Exhibit"E"shall be considered as exact. 2 Schedule 2 impact fee associated with any lot for which a building permit has previously been issued,and the net value of credits shown on Exhibit"E"shall be considered as exact. 4. Phasing,. The Parties acknowledge that, where it is anticipated that the project shall be developed in phases, the anticipated construction of improvements by phase shall be as depicted in Exhibit"D", which is attached hereto and incorporated herein by reference. 5. Allocation of Credits by Phase. The general allocation of credits to each phase of the development shall be as shown on Exhibit "F",which is attached hereto and incorporated herein by reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have been created until the system facility for which credit is given shall either be guaranteed through an executed Community Facilities Agreement or approved and accepted by the City. The Parties further agree that, prior to the application of a credit against transportation impact fees otherwise due for any unit of development; the following events shall take place: (a) The Parties have entered into a Community Facilities Agreement for the dedication or construction of the system facility; (b) The number of credits resulting from such improvement has been valued; and (c) Concurrent with final plat approval, a credit allocation shall be provided by the Developer for the phase of development to which the credit is to be applied, which allocation may either assign the credit, expressed in dollars,to each finally platted lot or may create a credit-pool to be utilized by that phase of development. (d) To the extent that any credit balance remains after allocation of credits this Agreement may be amended to allocate such unused credits to subsequent phases of the development. 6. Proportionality. Owner agrees that the obligation to dedicate and construct improvements to serve the development shown on the Concept Plan, as provided in section 2 of this Agreement,and the credits against transportation impact fees attributed to such contributions and generally allocated to phases of the development herein, are roughly proportionate to the nature and extent of the development shown on the Concept flan. 7. Term and Effective Date The initial term of this Agreement shall be ten (10) Years from its Effective Date, in accordance with Ordinance No. 18083, which shall be the date on which the last party executes the Agreement. 8. Agreement to Run with the Land. Owner shall have the right to assign this Agreement to any person or entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is in writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement by reference and binds the Owner's Assignee to perform (to the extent of the obligations assigned) in accordance with this Agreement. Each Owner's Assignee shall become a Party to this Agreement upon the execution of such assignment. In no event may this Agreement be construed to authorize assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for use outside the boundaries of the Property. 9. Amendment. This Agreement shall not be modified or amended except as follows: (a) Any amendment or modification to this Agreement or any Exhibit or schedule hereto shall be in writing and signed by the Parties. (b) Any revision, amendment, or modification to this Agreement, the Development Plan, or any Exhibit or schedule thereto,shall become effective on the date executed by the Parties or, as applicable, upon the date of approval by the City Council or designated city official. 10. Exhibits. The exhibits attached to this Agreement are incorporated as part of this Agreement for all purposes as if set forth in full in the body of this Agreement. _1 IN WITNESS WHEREOK,the undersigned parties have executed this Agreement as of the d-9-day of S 2011. CITY OF FORT WORTH,TEXAS: OWNER: A-S 104 TIMBERLAND TOWN CENTER, L.P., a Texas limited partnership By: A-S 104, L.C., a Texas limited liability comp e 1 P Fernando Costa N even D. Alvis Assistant City Manager Title: Manager Recommended By: KROGER TEXAS L.P., an Ohio limited partnership By: KRGP Inc., an Ohio corporation, General Partner andle H lood By: . Z � � � Director, Planning and Development Name: Patricia T. Ash Title: Vice President Approved as to Form and Legality: *J* v't4* ATTEST: Marty Hendrix rY oft r City SecretaryrcoJ� 5 OFFICIAL RECORD CITY SECRETARY �o i � FT. WORTH, TX EXHIBIT LIST "A" Description of the Property "B" Map of Property "C" Development Plan Map "D" Transportation Improvements "E" Credits Against Transportation Impact Fees "F" Allocation of Credits 6 EXHIBIT A Property Description Being a tract of land situated in the Jose Chirino Survey, Abstract No. 265 in the City of Fort Worth, Tarrant County, Texas, and being a portion of Tract II conveyed to North Tarrant 226 Joint Venture by deed recorded in Volume 15468, Page 164, Deed Records, Tarrant County, Texas, described in the Deed to Minta Loren McPhereson recorded in Volume 12764, Page 636, Deed Records, Tarrant County, Texas, and being more particularly described by metes and bounds as follows.- Commencing ollows:Commencing at a PK nail found,in the North right-of-way line (proposed centerline) of Timberland Boulevard (a variable width right-of-way), said point being South 25 degrees 09 minutes 14 seconds East, a distance of 60.00 feet from the South corner of Lot 1, Block 3, MCPHERSON RANCH, PHASE II, an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Cabinet A, Slide 8910, Plat Records, Tarrant County, Texas; Thence North 25 Degrees 09 Minutes 14 Seconds West, a distance of 60.00 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299) in the proposed North right-of-way line of said Timberland Boulevard; Thence South 64 degrees 50 minutes 46 seconds West, along the proposed North right-of-way line of said Timberland Boulevard, a distance of 125.36 feet to a 1/2 inch iron rod found, said point being in a tangent curve to the right having a radius of 976.00 feet, a delta of 05 degrees 12 minutes 36 seconds, and a chord that bears South 67 degrees 27 minutes 04 seconds West, a distance of 88.72 feet; Thence continuing along the proposed North right-of-way line of said Timberland Boulevard and along said curve to the right, an arc length of 88.75 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299), said point being the Southeast corner and the Point of Beginning of herein described tract, same being the beginning of a tangent curve to the right, having a delta of 13 Degrees 05 Minutes 30 Seconds, a radius of 976.00 feet and a chord bearing of South 76 Degrees 36 Minutes 07 Seconds West, a distance of 222.52 feet,- Thence eet;Thence continuing along the proposed North right-of-way line of said Timberland Boulevard and along said curve to the right, an arc length of 223.01 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299); Thence North 00 degrees 31 minutes 07 seconds West, a distance of 251.29 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299), said point being the beginning of a non-tangent curve to the right, having a delta of 05 degrees 58 minutes 55 seconds, a radius of 941.96 feet and a chord bearing of South 84 degrees 18 minutes 45 seconds West, a distance of 98.30 feet; Thence, along said curve to the right, an arc length of 98.35 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299); Thence, North 89 degrees 29 minutes 06 seconds West, a distance of 276.43 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299) in the proposed East right-of-way line of North Beach Street (a variable width right-of-way), said point being the beginning of a non-tangent curve to the left, having a delta of 16 Degrees 08 Minutes 34 Seconds, a radius of 1265.00 feet and a chord bearing of North 09 Degrees 40 Minutes 45 Seconds West, a distance of 355.23 feet; Thence, in a northerly direction, along said curve to the left, an arc length of 356.41 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299), said point being the South corner of Lot 1, Block 1, SARATOGA CENTER ADDITION, an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Cabinet A, Slide 12369, Plat Records, Tarrant County, Texas; Thence North 00 degrees 31 minutes 07 seconds East, along the East line of said Lot 1, Block 1, SARATOGA CENTER ADDITION, a distance of 541.26 feet to a 1/2 inch iron rod found for corner, and being the Southwest corner of Lot 39 (open space), Block 3, MCPHERSON RANCH, PHASE I, an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Cabinet A, Slide 8266, Plat Records, Tarrant County, Texas, Thence South 89 degrees 29 minutes 01 second East, along the South line of said Lot 39 (open space) and along the South line of Lot 40 (open space) of said MCPHERSON RANCH, PHASE I, a distance of 780.94 feet to a 1/2 inch iron rod found for corner, and being in the West line of Lot 19 (open space) of said MCPHERSON RANCH, PHASE II; Thence South 00 degrees 43 minutes 54 seconds West, along the West line of Block 3 of said MCPHERSON RANCH, PHASE II, a distance of 373.46 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299); Thence North 89 degrees 28 minutes 53 seconds West, a distance of 160.89 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299); Thence South 00 degrees 31 minutes 07 seconds West, a distance of 92.00 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299); Thence North 89 degrees 28 minutes 53 seconds West, a distance of 95.36 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299); Thence South 00 degrees 31 minutes 07 seconds West, a distance of 367.40 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299)1- Thence 299);Thence South 18 degrees 23 minutes 32 seconds East, a distance of 28.37 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299), said point being the beginning of a non-tangent curve to the left, having a delta of 02 degrees14 minute 23 seconds, a radius of 941.96 feet and a chord bearing of North 74 degrees 16 minutes 37 seconds East, a distance of 36.82 feet; Thence, along said curve to the left, an arc length of 36.82 feet to a 1/2 inch iron rod set with a yellow cap stamped (TXHS RPLS 5299); Thence South 19 degrees 55 minutes 05 seconds East, a distance of 244.02 feet to the Point of Beginning and containing 599,162 square feet or 13.46 acres of land. 1 0 aF'-] KELLER-HASLET a J do SITE ti ti TIMBERLAND z o -- z ! SUNSET CAYLUR J TIMBERLAND_.- SUNSET x a z w � U J q r � U H N W 3 MAPSCO 22-B & C N.T.S. CFA VICINITY MAP TIMBERLAND BLVD . & N . BEACH ST. FROM ALTA VISTA (N. BEACH ST. ) TO THE EAST DOE #6502, CITY PROJECT NO. 01547 J. CHIRINO SURVEY, ABSTRACT NO. 265 FORT WORTH, TEXAS EXHIBIT B EXHIBIT U d� T E- a € a� i t :31• {� stili ad 41 ff di � f1i c Asx 1 I � -8 c'. _1 y l � 1 °dam � 1 1 a t ° § FURLONP°WR § 9 S= :1 f EXHIBIT D Shopes at Timberland Credit Agreement DEVELOPER BUILT ROADS Status Accepted Anticipated *Eligible for Credit Against Transportation Impact Fees FoRTWORTH z X o y rye, } y M' ' 14 ' h Y EXHIBIT E Credits Against Transportation Impact Fees Net Credit Value of Capacity Provided $ 631,625.45 Value of Existing Demand $ - Net Credit Available $ 631,625.45 The Shops at Timberland Crossing City Project No. 1547 Prepared: April 5, 2011 D.O.E. No.6502 EXHIBIT E Credits Against Transportation Impact Fees Capacity Provided by Timberland Blvd Paving Item No. Description 'Unit Unit Price Quantity Amount 1 Unclassified Street Excavation CY $ 11.00 3145.92 $ 34,605.12 2 Pavement-Asphalt-Remove SY $ 4.56 1772 $ 8,080.32 3 Pavement-Concrete Driveway-Remove SF $ 0.54 0 $ - 4 Pavement-Concrete-Remove SF $ 0.54 0 $ - 5 Pavement-Gravel-Remove SY $ 2.26 607 $ 1,371.82 6 Pavement Marking-Remove LF $ 0.66 0 $ - 7 Walk-Remove SF $ 0.54 0 $ - 8 Sawcut-Curb&Gutter-Remove LF $ 3.46 372 $ 1,287.12 9 Sign-Remove&Salvage EA $ 350.00 0 $ - 10 Trees-Permitted-Remove EA $ 650.00 0 $ - 11 Trees-Permitted-Relocate EA $ 390.00 0 $ - 12 Topsoil-6 Inch-Medians&Parkway-Install SY $ 1.95 4629.52 $ 9,027.56 13 Grass-Hydromulch Seeding-Medians&Parkway^ Install SY $ 0.83 4962.85 $ 4,119.17 14 Subgrade-6 Inch-Lime Stabilized-30 lbs/sy-Install SY $ 2.70 6855.11 $ 18,508.80 15 Subgrade-Lime for Stabilization-Install TN $ 150.00 102.83 $ 15,424.50 16 Pavement-2 Inch-Surface Course-Type D-Install SY $ 12.00 0 $ - 17 Pavement-4 Inch-Base Course-Type B-Install SY $ 21.00 0 $ - 18 Pavement-9.5 Inch Concrete-Install SY $ 34.57 6382.34 $ 220,637.49 19 Pavement-Silicone Joint Sealant Install LF $ 0.85 3816 $ 3,243.60 20 Pavement-Header-Install LF $ 8.50 0 $ - 21 Curb-Install LF $ 1.00 2682 $ 2,682.00 22 Driveway-6 Inch-Install SF $ 8.00 0 $ - 23 Walk-4 Ft-Install SF $ 3.00 4467 $ 13,401.00 24 Walk-5 Ft-Install SF $ 3.00 0 $ - 25 Walk-Variable Width-Install SF $ 3.00 0 $ - 26 Retaining Wall-Install LF $ 35.60 0 $ - 27 Sidewalk Ramp-Type B-Install EA $ 475.00 0 $ - 28 Sidewalk Ramp-Type F-Install EA $ 770.00 0 $ - 29 Sidewalk Ramp-Type G-Install EA $ 670.00 0 $ - 30 Sidewalk Ramp-Type H-Install EA $ 1,590.00 1 $ 1,590.00 31 Concrete Island&Ramp-Type J Install EA $ 1,170.00 0 $ - 32 Concrete Island& Ramp-Type K^ Install EA $ 1,730.00 1.67 $ 2,889.10 33 Pavement Marking-Crosswallk Bar-18 Inch Install LF $ 6.60 18.5 $ 122.10 34 Pavement Marking-Stop Bar-18 Inch-Install LF $ 4.40 52 $ 228.80 35 Pavement Marking-4 Inch Yellow-Install LF $ 1.40 38 $ 53.20 36 Pavement Marking-Turn Arrows-Install EA $ 130.00 2 $ 260.00 37 Pavement Marking-Words-Install EA $ 140.00 2 $ 280.00 38 Pavement Marking-Bike Lane-8 Inch-Install LF $ 1.40 2136 $ 2,990.40 39 Pavement Marking-Bike Lane-8 Inch Dotted-Install LF $ 1.40 1384 $ 1,937.60 40 Pavement Marking-Bicycle Symbol&Arrow-Install EA $ 500.00 8 $ 4,000.00 41 Pavement Marking-Lane Markers Type II-CR-4-Install EA $ 3.05 142 $ 433.10 42 Pavement Marking-Lane Markers Type W-4-Install EA $ 2.75 527 $ 1,449.25 43 Sign-Small-Ground Mount-Furnish and Install-Install EA $ 470.00 10 $ 4,700.00 44 Sign-Street Dead End Barricade-Install EA $ 1,500.00 0 $ - 45 Pipe-4 Inch PVC Irrigation Sleeves-Install LF $ 10.50 0 $ - 46 Temporary Erosion Control-Install LS $ 9,050.00 0.5 $ 4,525.00 47 Traffic Control-Install LS $ 19,000.00 0.5 $ 9,500.00 48 Pre-Bid Item Sign-Project Des ination-Install EA $ 300.00 0.5 $ 150.00 Paving Subtotal $ 367,497.05 The Shops at Timberland Crossing City Project No.1547 D.O.E.No.6502 Prepared: April 5,2011 Page 2 of 3 EXHIBIT E Credits Against Transportation Impact Fees Capacity Provided by Timberland Blvd Storm Drain Item No. Description Unit Unit Price Quantity Amount 1 Pipe-21 Inch CL III-Install LF $ 48.26 41 $ 1,978.66 2 Pipe-24 Inch CL III-Install LF $ 47.42 17 $ 806.14 3 Pipe-30 Inch CL III-Install LF $ 51.45 0 $ - 4 Pipe-36 Inch CL IV-Install LF $ 75.35 266 $ 20,043.10 5 Pipe-42 Inch CL III-Install LF $ 97.96 0 $ - 6 Box Culvert-4 Ft X 3 Ft-Install LF $ 110.79 71.2 $ 7,888.25 7 Box Culvert-5 Ft X 3 Ft-Install LF $ 158.22 162.81 $ 25,759.80 8 Box Culvert-7 Ft X 3 Ft-Install LF $ 230.18 72 $ 16,572.96 9 Box Culvert-8 Ft X 3 Ft-Install LF $ 244.83 220 $ 53,862.60 10 Inlet-Recessed-10 Ft-Install EA $ 2,695.00 1 $ 2,695.00 11 Manhole Ty M-4 Ft X 4 Ft-Install EA $ 3,410.00 0 $ - 12 Manhole Ty M-5 Ft X 4 Ft-Install EA $ 3,410.00 0.28 $ 954.80 13 Manhole Ty M-6 Ft X 4 Ft-Install EA $ 3,740.00 0.28 $ 1,047.20 14 Concrete Collar at 36 inch pipe-Install EA $ 250.00 1 $ 250.00 15 Large Junction Box-Install EA $ 6,050.00 1 $ 6,050.00 16 Headwall/Drop Structure/Grouted Riprap" Remove LS $ 900.00 1 $ 900.00 17 Wingwall-Type FW-0-Install EA $ 2,970.00 1 $ 2,970.00 18 Headwall-5 Ft X 3 Ft Sloped With Concrete Apron^ Install EA $ 4,290.00 0.28 $ 1,201.20 19 Riprap-12 Inch Rock-Install CY $ 165.00 25.41 $ 4,192.65 20 Trench Safety" Install LF $ 1.00 850.01 $ 850.01 Storm Drain Subtotal $ 148,022.37 Street Lights iterrr'No D'escri tion Unit Unit Price Quantity Amount �, 1 Light-Illumination Assembly^ Relocate EA $ 950.00 0 $ - 2 Light-D-40 Single Head Luminaire-Install EA $ 620.00 0 $ - 3 Light-Illumination Assembly-D-40 Street Lights^ Install EA $ 1,300.00 2 $ 2,600.00 4 Light-Concrete Foundation Type 3,5,6&8^ Install EA $ 1,050.00 2 $ 2,100.00 5 Electrical Pull Box-Small-Install EA $ 500.00 2 $ 1,000.00 6 Electrical Ground Box-Large-Install EA $ 550.00 0 $ - 7 Cable-Num 4-Install LF $ 2.15 1803 $ 3,876.45 8 Cable-Num 8-Install LF $ 1.05 601 $ 631.05 9 Conduit-2 Inch-Open Cut-Sch 40-Install LF $ 4.65 601 $ 2,794.65 10 Conduit-3 Inch-Open Cut-Sch 40-Install LF $ 6.60 0 $ - Street Light Subtotal $ 13,002.15 Paving Subtotal $ 367,497.05 Storm Drain Subtotal $ 148,022.37 Street Lights Subtotal $ 13,002.15 CONSTRUCTION SUBTOTAL $ 528,521.57 Other Eligible Items Descri tion Unit Unit Price Amount [Engineering,Surveying and Material Testing 20% of Paving&Storm Drain $ 103 103.88 Total Value of Capacity Provided $ 631,625.45 The Shops at Timberland Crossing City Project No.1547 D.O.E.No.6502 Prepared: April 5,2011 Page 3 of 3 QXVA37309 aNd721.79,WII ao c CLI x O � h W. q � �' oo Q z -- h Chakrathouk, Manivanh From: Westerman, Julie Sent: Monday, August 22, 2011 9:28 AM To: Chakrathouk, Manivanh Subject: RE: Contract: Shops at Timberland Crossing Transportation Impact Fee Credit Agreement Monni, Transportation Impact Fee Credit Agreements do not require an M&C. Thanks, Julie Julie Westerman City of Fort Worth I Planning and Development l000 Throckmorton Street, Fort Worth,TX 76102 Ph: 817.392.2677 Fax: 81.7.392.7985 Julie.Westerman(a)fortworthgov.org Transportation Impact Fees How am I doing? Please contact my supervisor at Julia.McCleeary(Vortworth ov.org. NOTE: The City of Fort Worth will have a new web address starting Oct. 1, 2011: www.FortWorthTexas.gov From: Chakrathouk, Manivanh Sent: Monday, August 22, 20119:26 AM To: Westerman, Julie Subject: Contract: Shops at Timberland Crossing Transportation Impact Fee Credit Agreement Hello Julie, Please advise if this contract requires an M&C? If so, please provide a printed hard copy of one to City Secretary's Office. Thank you, Mani vanh.Chakrathouk(u>fortwortli ro�v org 1