Loading...
HomeMy WebLinkAboutContract 42162-A1 r CITY SECRETARY CONTRACT NO. e4 1I, — AMENDMENT NUMBER 1 STATE OF TEXAS 8 (No M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. (ENGINEER) made and entered into City Secretary Contract No. 42162, (the CONTRACT) in the amount of $587,076.00 which was authorized by the City Council by M&C C-25080 on the 2nd day of August, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: Old Denton Road from Golden Triangle Boulevard to Heritage Trace Parkway, Project Number 01724; and WHEREAS, it has become necessary to execute Amendment No. 1 to said CONTRACT to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: Article I Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal letter dated February 9, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $17,122.00. Article II Article II of the CONTRACT is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be the amount of$604,198.00. OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX city of Fort Worth_ I exas - Amendment to Engineering Agreement PMO Official Release Date- 1 1/29/201 1 Page I of 2 Article III All other provisions of the CONTRACT, which are not expressly amended herein, shall remain in full force and effect. Executed and effective this the ��ay of PrP t 1 , 2012. ATTEST: CITY OF FORT WORTH: �0000000oo0 -- d BY Mary J. ser/-" oft v5 o z d Fernando Costa City Secretary d 00 0-KFyd Assistant City Manager 00* 0000000000 00 flanl APPROVED AS TO FORM AND LEGALITY APPROVAL RECOMMENDED: By: By. �� t Douglas W. Black Dougl W. Wiersig, P.E. Assistant City Attorney Director, Transportation/ Public Works Department No M&C Required TEAGUE NALL AND PERKINS, INC. Mark R. Berry, P.E. CEO OFFICIAL RECORD cite of Fart Worth_ Texas CITY SECRETARY Amendment to Fngineering Agreement FT. WORTH, TX PMO Official Release Date_ 11/29/2011 Page 2 of 2 � r M!b TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning February 9, 2012 Mr. Michael R. Weiss P.E. City of Fort Worth Transportation and Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 Re: Old Denton Road(Golden Triangle Boulevard to Heritage Trace Parkway) Fee Proposal for Contract Amendment No. 1 Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services to providea signal at the intersection of Old Denton Road and Crawford Farms. As requested, a signal design at the intersection of Old Denton Road and Crawford Farms will be provided. • Additional Engineering Services o Signal design for Old Denton Road and Crawford Farms Intersection $ 15,565 o Administration fee (10%) on Sub consultants 1,557 Total Contract Amendment No.1: $ 17,122 Summary of Contract Fee: Original Contract Amount: $ 587,076 Amendment No. 1: $ 17,122 Revised Contract Amount $ 604,198 Thank you for consideration of this contract amendment request. If you have any questions,please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Scott A. Gibson, P.E. Copy: Mr. Tom Rutledge—TNP 0 W"ec19VtWM1Wee MIX"\coMhad amend 05 doc 1100 Macon Street•Fort Worth, Texas 76102•817.336.5773 phone•817.336.2813 fax www.tnp-onlirw.com