AMENDMENT NUMBER 1
STATE OF TEXAS 8
(No M&C Needed)
COUNTY OF TARRANT 8
WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. (ENGINEER)
made and entered into City Secretary Contract No. 42162, (the CONTRACT) in the amount of
$587,076.00 which was authorized by the City Council by M&C C-25080 on the 2nd day of August,
2011; and
WHEREAS, the CONTRACT involves engineering services for the following project: Old Denton
Road from Golden Triangle Boulevard to Heritage Trace Parkway, Project Number 01724; and
WHEREAS, it has become necessary to execute Amendment No. 1 to said CONTRACT to
include an increased scope of work and revised maximum fee;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized
representatives, enter into the following agreement, which amends the CONTRACT:
Article I
Article I of the CONTRACT is amended to include the additional engineering services specified
in the proposal letter dated February 9, 2012, a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be performed by Engineer totals
$17,122.00.
Article II
Article II of the CONTRACT is amended to provide for an increase in the maximum fee to be
paid to Engineer for all work and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be the amount of$604,198.00.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
city of Fort Worth_ I exas -
Amendment to Engineering Agreement
PMO Official Release Date- 1 1/29/201 1
Page I of 2
Article III
All other provisions of the CONTRACT, which are not expressly amended herein, shall remain
in full force and effect.
Executed and effective this the ��ay of PrP t 1 , 2012.
ATTEST: CITY OF FORT WORTH:
�0000000oo0 --
d BY
Mary J. ser/-" oft v5 o z d Fernando Costa
City Secretary d 00 0-KFyd Assistant City Manager
00* 0000000000 00
flanl
APPROVED AS TO FORM AND LEGALITY APPROVAL RECOMMENDED:
By: By. �� t
Douglas W. Black Dougl W. Wiersig, P.E.
Assistant City Attorney Director, Transportation/
Public Works Department
No M&C Required TEAGUE NALL AND PERKINS, INC.
Mark R. Berry, P.E.
CEO
OFFICIAL RECORD
cite of Fart Worth_ Texas CITY SECRETARY
Amendment to Fngineering Agreement FT. WORTH, TX
PMO Official Release Date_ 11/29/2011
Page 2 of 2
� r
M!b TEAGUE NALL AND PERKINS
Civil Engineering Surveying Landscape Architecture Planning
February 9, 2012
Mr. Michael R. Weiss P.E.
City of Fort Worth
Transportation and Public Works Department
1000 Throckmorton
Fort Worth, Texas 76102
Re: Old Denton Road(Golden Triangle Boulevard to Heritage Trace Parkway)
Fee Proposal for Contract Amendment No. 1
Dear Mr. Weiss:
Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract
based on additional services requested. The following is a brief description and cost for the
additional services provided on this project:
Additional Services to providea signal at the intersection of Old Denton Road and
Crawford Farms.
As requested, a signal design at the intersection of Old Denton Road and Crawford Farms will be
provided.
• Additional Engineering Services
o Signal design for Old Denton Road and Crawford Farms Intersection $ 15,565
o Administration fee (10%) on Sub consultants 1,557
Total Contract Amendment No.1: $ 17,122
Summary of Contract Fee:
Original Contract Amount: $ 587,076
Amendment No. 1: $ 17,122
Revised Contract Amount $ 604,198
Thank you for consideration of this contract amendment request. If you have any questions,please
do not hesitate to call me.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
Scott A. Gibson, P.E.
Copy: Mr. Tom Rutledge—TNP
0 W"ec19VtWM1Wee MIX"\coMhad amend 05 doc
1100 Macon Street•Fort Worth, Texas 76102•817.336.5773 phone•817.336.2813 fax
www.tnp-onlirw.com