Loading...
HomeMy WebLinkAboutContract 45832 MY SECRETAW CORMCT fjo. Developer and Project Information Cover Sheet: beveloper Company Name: WM-Maft Real Estite Business Tmst ..............1-111­­11................. ....................... Address, State, Zip Code:200 1 SE 10"'Sh-eet BentonAlle,AR.72 716 .....—-----_­........... ..............-1.111.­...........................___............. ...... P...h........o.......n........e, E-Mail:K.athQr EL ...o.......479)277-2605 ................... ........................................... .......... Authorized Signatoryffitle: Brian Hooper, Vice President,Real Estate .......... ....................... ....... ............ Project Name and Brief Description: Water, Sewer,Paving,and Drainage Improvements to serve Walmart Market#3043-02 ........... ........................ ................... ................._­..._......_'__.­............... Project Location: 4536 Heritage Trace Park ................................ way .................. Plat Case No.:FS-13-078 Plat Narne: Heritage Addition . ............. ....................... ............. ......................................... Council District: 4 City F'roject No: 022312. j................................. ..... ....................... ......................... CFA� 2014-016 ,OE: 7187 .........._..__.o.. To be complet I b I f Date Received by OFFICIAAL RECORD Y Combined CFA Agreement Revised January 2014 CITYSECRETARY �J 'WX RECEIVED AUG I I Z014 rFt. WoRrm, yx .................................................... ............................. COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Walmart Market #3043-02 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Proj ect. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developera rees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike era in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. Oe following checked exhibits are made a part hereof. Water (A)_ Sewer (A-1)_X_,, Paving (B) X _Storm Drain(B-1) X Street Lights & Signs (C)_. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalifi ed, insured, licensed and bonded to do work in public streets and/or to perform water/waste to construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the it and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the Improvements valid fora period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the to of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement-Revised January 2014 Page 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with. any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless fora inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servantv, or enw1opees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, its or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries,...death or danigges are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its of Licers, servants, or gfflplo le es. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Combined CFA Agreement--Revised Jane ry 2014 Page 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 1 YEARS i. Developer shall complete the Improvements within one(1) year, provided, however, if construction of the Improvements has started within the one year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of one (1) year from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of one (1) year if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement—Revised January 2014 Page 7 Cost Summary Sheet Project Name: Walmart Market#3043-02 CFA No.: 2014-016 DOE No.: 7187 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following informatior> Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $50,462.47 2. Sewer Construction $88,957.03 Water and Sewer Construction Total $ 139,419.49 B. TPW Construction 1. Street $22,690.95 2. Storm Drain $549,102.20 TPW Construction Cost Total $ 571,793.15 Total Construction Cost(excluding the fees): $ 711,212.64 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 2,788.39 D. Water/Sewer Material Testing Fee (2%) $ 2,788.39 Sub-Total for Water Construction Fees $ 5,576.78 E. TPW Inspection Fee (4%) $ 22,871.73 F. TPW Material Testing (2%) $ 11,435.86 Sub-Total for TPW Construction Fees $ 34,307.59 Total Construction Fees: $ 39,884.37 Choice Financial Guarantee Options, choose one Amount (cn one) Bond = 1000 $ 711,212.64 Completion Agreement= 100%/ Holds Plat $ 711,212.64 Cash Escrow Water/Sanitary Sewer= 125% $ 174 274.37 Cash Escrow Paving/Storm Drain = 125% $ 714,741.44 Letter of Credit= 125%w/2 r expiration period $ 889,015.80 r 7' 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City Secretary,with the corporate seal of the City affixed,and.said Developer has execut, this instrument in quadruplicate,at Fort Worth,Texas this, �,�1 , day of' 2014. CITY OF FORT WORTH-Recommended °y® Water Department Transportation&Public Works Department .......... .3 �JB It Wendy Chi-B-bulal, EMBA,P.E. Douglas Wiersig,P.E. Development _'ngineering Manager Director Approved as to For &Legafity Approved by City.Alanager's (Yftce Fernando Costa Assistant City Attorney Assistant City Manager M&C No.1,11k I-------...... Date:—,.................... ATTEST: 0 ,I' ary J. r City Secre PEVELOPER: 7W. 11-rsje;r�s., Wal-Mart Real Esta Business Trust pature Sig t e (Print Name.- Print Name: r) Title: IV �;I, fj i k A. c-occ OFFICIAL RECORD #mMW*Wdwy CITY SECRETARY FT WORTH,TX n- Combined CFA Agree ment-. Revised January 2014 j 9 ........... Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-l: Storm Drain Improvements ® Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 I ' --- I _ _ " Ld eP _ ? r PROJECT SITE rA1VVl.,1 ROAD � � i WALMART NEIGHBORHOOD MARKET #3043 ._ SITE LOCATION MAP NOT TO SCALE" rm DUNAWAV DOE: 7187 AW 5501 Bailey Avenue•Suite 400•Fart Wor h,Texas 76w07 CITY PROJECT NO.:02232 9 Tod,R17.335.1121•Fax 817.335.7437 FILE NO.:W-2302 a QTX REG,IF'•'11 141 J m i o 4 v roams J 0 ao f� qo g �aI ' tl Ln ft LLJ Z 0 �o Q z� r- -- m 3 COX 1�j Xui 2 Q�i'ca + go C4T4NPa ems ' � III19 W ox 16 110 lo . z � N zj t" ua 0 ��Q��� -4 00NN N as c� w� 0 c3 X cr 1 CL F h LU (D 0 w 0 . w . . 1 0 0 0 0 egg C4 j 62�' I :.z o. � w�� :j 62 fix,xg J tot.O'Q% " 0 0 0 1 133UIS H3V39•N • 's-qucs rauY�er(r�;e,X11"Ni�d l°J1W04 3�'*�cagroada0 fiarga«:aaugFru3Yi0SI"B..P.'.QQp610r\O(M' lrauq.aasb adl".B Fliddgl[d WV,..,-.,,!,�.�§Y'll6Z`�6�.ABapQ"` B'��h:NO bd` pJ=A9 q O°Id .......... O OCT AI ui bd + so N N N k) 00 00;D 43 Wm co x MLLJ (D LLI z + '4' go N N N W) to z z cr u A 'm UWJ LWU ;i� F- Z) w L, 0 ss 0 cm LEL L2U:� U-i 1 0 Ln Ge LLJ C) o > C) C) > z m m 0. uj m CL. w C) o C) o C) W w W R R < R 00+0 LU (D Llot U Fvo6f jynLn-, m 36'p E%.36*V&–L'–.-...--.— K M. Ex.12"WL--- 02 wod autuni i33UIS '-7rn 3 9'N .......... tMew'Alew:Ag(IgUOld �IV4�":!:=V4�:)\,qiqlW4xMg\sfiuW�OM\F)UIJBBU16ug\TOO°l..LOOOOU\000000\UO�PrlrK)Ad\:E)��UWMIJ WV LS�vi 0Z'!0e"Aj.r!=!10!:!!! ....................-.................. " z LLJ LU z uj cn vii A LO w r- En UJ w z 0 -j axa 3: 0 cn an Gn uJjl LL to r� 0 uj �- (n LM w ui UJ LIJ z � LU r 0 0 0 < cn CL a- CL 0 Ln z 0 0 0 < U w cc cr cc 0 U3 a- m M RE iN Ck UN ism z -i < LLJ d m � (D LLJ uj Cl CD 0 CL kk . .......... .................................. m x Lu ......... ui JFP w r, W JUR, i IQQ Q: _j U UJ W Fo < U- -J U- -i QQ: lQt Rt z ......... ....... ........................................................... f F z Lo 0 0 CrIl Rk Ji:zS uj w a Uj C) 10 3:: W < U- C/) < Ui Z 4 uj I�Q IOU Qk 118 UJ tau C=) C) ICY CD A ti Lij avw Ami IT ...... 133UiS H :)V313 'N ....................................--.—Ex.12'WL Ex,112-WL Wb ............ BW'LPPB9-q. UaW,3AOjdwl JawaS Ajegue a\f)upaaulr)ua�100,L/G()009\000"\Uolpnpojd\�9:k�lVdg Ij WV No—tmew *w:Ae aaUOld .5\V:D\--4q�t�x3\SbUW.J V�,IOZ 0EAln�lAepsmpaM: P' < CJ d Ln fJ C? �w.e 0 0 K ej a. ra IV •�!` ® M LU wLLI U ®m uj LAJ m U ao Z Er V" uw It F. Q "K 0 J t onto Irk o ¢� ENG Isuk N�� " fog to mow. �, fe„ ❑QI,. I.A...01P.H m.�. lcu d \' �,� i ¢1'1111` I ... � u � y ..-.m^ A .. _"";_, ,�. ...... ......E:x 5E'i"^ ...mmy„e ...,._,._......_.... .["rs,'�Gw .._.....„ .... .___.. • rw��p�p � 120. ... -------- ...., ..... OW MUM- .. . _ _..... __...._..... ......... _..._ E "NV1 d Nih dd.�fi:SO�W 9 4 c:' �4ffivagr s:&\CSrb�rya a��Rl as iV6 J"�� � t 8 .orc�ro��N:�r�gsc e«�Y\:± UJILW 31Va9 Wd OF 4V 710 LU C) CD— r4 0 < 0 LU CD CL m Z 0 0 0 C) In In LU C) LU ui al C) 01 a- ° 9 K ra M� U- %( ol z N Xx uj ui k .3 cm on LU P� LU t Q to U- j Cl CO to '_K§� 0 th a C> x -CM3 IL 'K ul LLA r-0 �r. L) WIJ UJ > U. .....i gpzl 'C' U- -j L LU �H uj z L Lu d CD co on % wa, 6Aq)*kpoG,g S4U+'.)UH)AojdwB upwj 4 w04S\Vj' )njpo�jVO�HlVdglH Wd'W 11 U19'fFt(Z'()C eunr L,o U00009WXY)GOVAN, Aopuow��qo mo44oW,AjoW�Ag G1. -11d CFA PROJECT QUANTITY MATRIX, DOE Prqjed#3403, City,Pro act#02232 SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO.1 BID ITEM UNIT 5T 9 19 015,016 024 WATERIMPROVEMENTS I --33111.02418^Water Pip. LF :721 - 721 $28.40 $20,476.40 2 3311.01416"water l?ip€ 5 LIE 50 50 $24.50 $1,225.00 -3 331L0001 Ductile Im.WSW,Fftfi.ge w/Restraint TON 1.8V2 1.82 $3,73075 $6,789.97 4 3312 3002 6- EACH 5 5 $802.80 $4,014.00 5 3312.3006 8"Gate Valve EACH 1 1 $1,126.30 $1,126.30 3312.0001 Fine Hydrant EACH 2 2 $2,780.30 $5,560.60 7 33112203 2"Water Service 17-A(-'-Ul= 4 4 $2,133.00 $8,532.00 e 3305.01(Y)TrerrchSety LF 771 771 $1.50 $1,156.50 EACH 1 1 $1,581.70 $1,581.70 1 SUBTOTAL $50,462.47 �EWERIMPROVEMENTS 1 3331,4115 8"Se-Pip, 2- 690 690 $29.00 $20,010.00 2 3331,4115 6"Sc-r rips LF 148 $26.50 $3,922.00 3 3331.4109 6"Sewer Pif.,CSSB.&fiI1 11F 40 40 $50.00 $2,000.00 4 33313201 6-Seve,Service EACH 1 1 $1,452.40 $1,452.40 5 3339.1001 4'Nbd,.Ic EACH $1,68713 $8,435.65 6 3339 1002 4'Dop M.I.Ic 1 1 $2,295.04 $2,295.04 7 3339.0001 Ej-y M.nh.lc L VIE 62 62 $184.00 $11,408M 8 13339.1 NO 4'Extra Deed,Manhole VF 26 26 $146.80 $3,816.80 9 330.5.0112 C...mle Collar--- -- EACH 6 6 $120.75 $724.50 10 3331.3401 D ION 0.05 005 $3,730.75 $186.54 IT 1 3305 -40 40 $113.10 $4,524O A002 16^casing kv Otten Cut 2 $4,524.00 12 330.1.1102 16"Casing ByOfltc1 Than Open Celt LF 95 95 $232.70 $22,106.50 13 33053002 8"k-Carrier Pipe LF 135 135 $29.00 $3,915.00 14 -3.301.0101 manhole V-um'f 6 -�caiag F.A(JI 6 $125.00 $750.00 15 3301,0002 Pmc-CCTV 1.veum I.F 1013 1013 $110 $1,215.60 16 13305.0109 Trench Safety LF 878 878 $2.50 $2,195.00 1 1 SUBTOTAL $88,957.03 ^IMPROVEMENTS I I 1 0241.130(1 Run.e Corierew Crab&Cluma LF 410 410 $12.00 $4,920.00 2 3213.0401 6"Concrete Driveway SF 1447 3447 $3.851 $13,270.95 3 3471.001 Traffic Cow,ol m() 1 1 $2,500.00 $2,500.00 4 3471.0003 Traffic Central Details EACH 1 1 $2,000.00 $2,000M SUBTOTAL $22,690.95 DRAINAGE IMPROVEMENTS 1 0241.4101 Rene-10'Recessed Inlet EACH 1 1 $690.00 $690.00 2 0241 4102 R......IS'Recessed Inlet EACH 1 1 $690.00 $690.00. 3 3341)6001 10'Recessed Inlet L!2-1 1 1 $2,68560 $2,685.60 4 3349,6rY12 15°Recessed Into EACH 1 1 $4,071.00 $4,071.00 5 33410201 2l-'RCP,CI-H1 LF 133 + 133 $47.10 $6,264.30 6 33411403 7z5 Be,C.I,,,,t LF 500 500 $1,045.20 $522,600.00 7 3137 0105 Medimi Stone Rilmp.grouted SY 73 73 $75.60 $5,518.80 a 3125.0101 SWPPP,I- I's 1 1 $5,000.00 $5,000.00 9 3305.01(y)•rrachsakty LF _6.33 633 $2.50 $1,582.50 ISUBTOTAL $549,102.20 TOTAL $711,212.64