HomeMy WebLinkAboutContract 45832 MY SECRETAW
CORMCT fjo.
Developer and Project Information Cover Sheet:
beveloper Company Name: WM-Maft Real Estite Business Tmst
..............1-11111................. .......................
Address, State, Zip Code:200 1 SE 10"'Sh-eet BentonAlle,AR.72 716
.....—-----_........... ..............-1.111............................___............. ......
P...h........o.......n........e, E-Mail:K.athQr EL ...o.......479)277-2605
................... ........................................... ..........
Authorized Signatoryffitle: Brian Hooper, Vice President,Real Estate
.......... ....................... ....... ............
Project Name and Brief Description: Water, Sewer,Paving,and Drainage Improvements to serve
Walmart Market#3043-02
........... ........................
................... ................._..._......_'__................
Project Location: 4536 Heritage Trace Park
................................ way ..................
Plat Case No.:FS-13-078 Plat Narne: Heritage Addition
. ............. ....................... ............. .........................................
Council District: 4 City F'roject No: 022312. j................................. ..... .......................
.........................
CFA� 2014-016 ,OE: 7187
.........._..__.o..
To be complet I b I f
Date
Received by
OFFICIAAL RECORD
Y
Combined CFA Agreement Revised January 2014 CITYSECRETARY
�J 'WX
RECEIVED AUG I I Z014 rFt. WoRrm, yx
.................................................... .............................
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Walmart Market #3043-02
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Proj ect.
NOW,THEREFORE,For and in consideration of the covenants and
conditions contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developera rees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike era in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. Oe following checked exhibits are made a part hereof. Water (A)_
Sewer (A-1)_X_,, Paving (B) X _Storm Drain(B-1) X
Street Lights &
Signs (C)_.
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section 11, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalifi ed, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste to construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the it and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent(100%) of the contract price
of the Improvements valid fora period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the to of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Combined CFA Agreement-Revised January 2014 Page 3
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with. any of the
4
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless fora inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servantv, or enw1opees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, its or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such iniuries,...death or danigges are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
of Licers, servants, or gfflplo le es. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
Combined CFA Agreement--Revised Jane ry 2014 Page 5
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 1 YEARS
i. Developer shall complete the Improvements within one(1) year, provided,
however, if construction of the Improvements has started within the one
year period, the developer may request that the CFA be extended for one
additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
6
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of one (1) year from the date of this Agreement (and any
extension period)the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of one (1) year if the
Developer breaches this Agreement, becomes insolvent or fails to pay costs
of construction and the financial guarantee is not a Completion Agreement.
If the financial guarantee is a Completion Agreement and the Developer's
contractors and/or suppliers are not paid for the costs of supplies and/or
construction, the contractors and/or suppliers may put a lien upon the
property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Combined CFA Agreement—Revised January 2014 Page 7
Cost Summary Sheet
Project Name: Walmart Market#3043-02
CFA No.: 2014-016 DOE No.: 7187
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following informatior>
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $50,462.47
2. Sewer Construction $88,957.03
Water and Sewer Construction Total $ 139,419.49
B. TPW Construction
1. Street $22,690.95
2. Storm Drain $549,102.20
TPW Construction Cost Total $ 571,793.15
Total Construction Cost(excluding the fees): $ 711,212.64
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 2,788.39
D. Water/Sewer Material Testing Fee (2%) $ 2,788.39
Sub-Total for Water Construction Fees $ 5,576.78
E. TPW Inspection Fee (4%) $ 22,871.73
F. TPW Material Testing (2%) $ 11,435.86
Sub-Total for TPW Construction Fees $ 34,307.59
Total Construction Fees: $ 39,884.37
Choice
Financial Guarantee Options, choose one Amount (cn one)
Bond = 1000 $ 711,212.64
Completion Agreement= 100%/ Holds Plat $ 711,212.64
Cash Escrow Water/Sanitary Sewer= 125% $ 174 274.37
Cash Escrow Paving/Storm Drain = 125% $ 714,741.44
Letter of Credit= 125%w/2 r expiration period $ 889,015.80 r 7'
8
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City
Secretary,with the corporate seal of the City affixed,and.said Developer has execut, this
instrument in quadruplicate,at Fort Worth,Texas this, �,�1 ,
day of'
2014.
CITY OF FORT WORTH-Recommended °y®
Water Department Transportation&Public Works Department
..........
.3
�JB
It
Wendy Chi-B-bulal, EMBA,P.E. Douglas Wiersig,P.E.
Development _'ngineering Manager Director
Approved as to For &Legafity Approved by City.Alanager's (Yftce
Fernando Costa
Assistant City Attorney Assistant City Manager
M&C No.1,11k I-------......
Date:—,....................
ATTEST:
0
,I'
ary J. r
City Secre
PEVELOPER:
7W. 11-rsje;r�s.,
Wal-Mart Real Esta Business Trust
pature Sig t e
(Print Name.- Print Name:
r)
Title: IV �;I,
fj i k
A. c-occ
OFFICIAL RECORD
#mMW*Wdwy CITY SECRETARY
FT WORTH,TX
n-
Combined CFA Agree ment-. Revised January 2014 j 9
...........
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-l: Storm Drain Improvements
® Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
I '
---
I _ _
"
Ld
eP
_ ? r
PROJECT SITE
rA1VVl.,1 ROAD � � i
WALMART NEIGHBORHOOD MARKET #3043
._
SITE LOCATION MAP
NOT TO SCALE"
rm
DUNAWAV DOE: 7187
AW
5501 Bailey Avenue•Suite 400•Fart Wor h,Texas 76w07 CITY PROJECT NO.:02232
9 Tod,R17.335.1121•Fax 817.335.7437 FILE NO.:W-2302
a QTX REG,IF'•'11 141
J
m
i
o
4
v
roams J 0
ao f� qo g
�aI ' tl Ln
ft
LLJ
Z
0
�o
Q
z�
r- -- m
3 COX 1�j
Xui
2 Q�i'ca + go C4T4NPa
ems ' � III19 W
ox
16 110 lo .
z
� N
zj
t" ua
0 ��Q���
-4 00NN N as
c� w� 0
c3
X cr 1 CL F
h
LU
(D 0
w 0 .
w
. .
1 0 0 0 0 egg C4 j 62�' I :.z o.
� w�� :j 62 fix,xg
J tot.O'Q%
" 0 0 0 1
133UIS H3V39•N
• 's-qucs rauY�er(r�;e,X11"Ni�d l°J1W04 3�'*�cagroada0 fiarga«:aaugFru3Yi0SI"B..P.'.QQp610r\O(M' lrauq.aasb adl".B Fliddgl[d WV,..,-.,,!,�.�§Y'll6Z`�6�.ABapQ"` B'��h:NO bd` pJ=A9 q O°Id
..........
O
OCT
AI
ui
bd
+ so N N N k) 00
00;D 43
Wm
co x
MLLJ
(D
LLI
z
+
'4' go N N N W)
to
z
z cr u
A 'm
UWJ LWU ;i�
F- Z) w L,
0 ss
0
cm LEL L2U:�
U-i 1 0
Ln Ge
LLJ C) o > C) C) > z
m m 0. uj m CL. w
C) o C) o C)
W w W R R < R 00+0
LU
(D
Llot
U
Fvo6f jynLn-,
m
36'p E%.36*V&–L'–.-...--.—
K M.
Ex.12"WL---
02
wod autuni
i33UIS
'-7rn 3 9'N
..........
tMew'Alew:Ag(IgUOld
�IV4�":!:=V4�:)\,qiqlW4xMg\sfiuW�OM\F)UIJBBU16ug\TOO°l..LOOOOU\000000\UO�PrlrK)Ad\:E)��UWMIJ WV LS�vi 0Z'!0e"Aj.r!=!10!:!!!
....................-.................. "
z
LLJ LU
z
uj
cn vii A LO
w r- En
UJ w
z 0 -j
axa 3: 0 cn an Gn uJjl
LL
to r� 0 uj
�- (n LM w ui UJ LIJ z �
LU
r 0 0 0 < cn
CL a- CL
0 Ln z
0 0 0 < U w
cc cr cc 0
U3 a- m M RE iN Ck UN ism
z -i <
LLJ d m �
(D
LLJ
uj
Cl
CD
0
CL
kk
. ..........
..................................
m x
Lu
......... ui
JFP
w r, W JUR, i IQQ Q:
_j U UJ W
Fo < U- -J
U- -i QQ: lQt Rt z
......... ....... ...........................................................
f F
z
Lo
0
0
CrIl
Rk Ji:zS
uj
w a
Uj C) 10
3:: W
< U-
C/) <
Ui Z
4 uj
I�Q IOU Qk 118 UJ tau C=)
C)
ICY CD
A
ti
Lij
avw Ami IT
...... 133UiS H :)V313 'N
....................................--.—Ex.12'WL Ex,112-WL Wb
............
BW'LPPB9-q. UaW,3AOjdwl JawaS Ajegue a\f)upaaulr)ua�100,L/G()009\000"\Uolpnpojd\�9:k�lVdg Ij WV No—tmew *w:Ae aaUOld
.5\V:D\--4q�t�x3\SbUW.J V�,IOZ 0EAln�lAepsmpaM:
P' <
CJ d Ln
fJ C?
�w.e 0 0
K ej a. ra
IV •�!` ® M
LU
wLLI
U
®m uj
LAJ
m
U ao Z
Er
V"
uw It F.
Q
"K
0
J
t onto
Irk
o ¢� ENG
Isuk N��
"
fog to mow.
�, fe„ ❑QI,. I.A...01P.H m.�.
lcu d \' �,�
i ¢1'1111` I ...
� u
� y
..-.m^ A .. _"";_, ,�. ...... ......E:x 5E'i"^ ...mmy„e ...,._,._......_.... .["rs,'�Gw .._.....„ .... .___.. • rw��p�p
�
120.
... -------- ...., .....
OW MUM-
.. .
_ _..... __...._..... ......... _..._
E "NV1 d Nih dd.�fi:SO�W 9 4 c:' �4ffivagr s:&\CSrb�rya a��Rl as iV6 J"�� � t 8 .orc�ro��N:�r�gsc e«�Y\:± UJILW 31Va9 Wd OF 4V 710
LU
C)
CD—
r4
0 <
0
LU
CD CL m
Z 0 0 0
C)
In In
LU
C)
LU
ui
al
C)
01
a-
° 9
K ra
M�
U- %(
ol
z
N Xx
uj
ui
k
.3 cm on
LU P�
LU t Q
to U- j Cl CO
to
'_K§�
0 th
a
C> x
-CM3 IL
'K
ul
LLA r-0
�r.
L) WIJ UJ >
U. .....i gpzl
'C'
U- -j L
LU
�H
uj
z L Lu
d
CD co
on
% wa,
6Aq)*kpoG,g S4U+'.)UH)AojdwB upwj 4 w04S\Vj'
)njpo�jVO�HlVdglH Wd'W 11 U19'fFt(Z'()C eunr L,o
U00009WXY)GOVAN, Aopuow��qo mo44oW,AjoW�Ag G1. -11d
CFA PROJECT QUANTITY MATRIX, DOE Prqjed#3403, City,Pro act#02232
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO.1 BID ITEM UNIT 5T 9 19 015,016 024
WATERIMPROVEMENTS
I --33111.02418^Water Pip. LF :721 - 721 $28.40 $20,476.40
2 3311.01416"water l?ip€ 5
LIE 50 50 $24.50 $1,225.00
-3 331L0001 Ductile Im.WSW,Fftfi.ge w/Restraint TON 1.8V2 1.82 $3,73075 $6,789.97
4 3312 3002 6- EACH 5 5 $802.80 $4,014.00
5 3312.3006 8"Gate Valve EACH 1 1 $1,126.30 $1,126.30
3312.0001 Fine Hydrant EACH 2 2 $2,780.30 $5,560.60
7 33112203 2"Water Service 17-A(-'-Ul= 4 4 $2,133.00 $8,532.00
e 3305.01(Y)TrerrchSety LF 771 771 $1.50 $1,156.50
EACH 1 1 $1,581.70 $1,581.70
1 SUBTOTAL $50,462.47
�EWERIMPROVEMENTS
1 3331,4115 8"Se-Pip, 2- 690 690 $29.00 $20,010.00
2 3331,4115 6"Sc-r rips LF 148 $26.50 $3,922.00
3 3331.4109 6"Sewer Pif.,CSSB.&fiI1 11F 40 40 $50.00 $2,000.00
4 33313201 6-Seve,Service EACH 1 1 $1,452.40 $1,452.40
5 3339.1001 4'Nbd,.Ic EACH $1,68713 $8,435.65
6 3339 1002 4'Dop M.I.Ic 1 1 $2,295.04 $2,295.04
7 3339.0001 Ej-y M.nh.lc L VIE 62 62 $184.00 $11,408M
8 13339.1 NO 4'Extra Deed,Manhole VF 26 26 $146.80 $3,816.80
9 330.5.0112 C...mle Collar--- -- EACH 6 6 $120.75 $724.50
10 3331.3401 D ION 0.05 005 $3,730.75 $186.54 IT 1 3305 -40 40 $113.10 $4,524O
A002 16^casing kv Otten Cut 2 $4,524.00
12 330.1.1102 16"Casing ByOfltc1 Than Open Celt LF 95 95 $232.70 $22,106.50
13 33053002 8"k-Carrier Pipe LF 135 135 $29.00 $3,915.00
14 -3.301.0101 manhole V-um'f 6
-�caiag F.A(JI 6 $125.00 $750.00
15 3301,0002 Pmc-CCTV 1.veum I.F 1013 1013 $110 $1,215.60
16 13305.0109 Trench Safety LF 878 878 $2.50 $2,195.00
1 1 SUBTOTAL $88,957.03
^IMPROVEMENTS I I
1 0241.130(1 Run.e Corierew Crab&Cluma LF 410 410 $12.00 $4,920.00
2 3213.0401 6"Concrete Driveway SF 1447 3447 $3.851 $13,270.95
3 3471.001 Traffic Cow,ol m() 1 1 $2,500.00 $2,500.00
4 3471.0003 Traffic Central Details EACH 1 1 $2,000.00 $2,000M
SUBTOTAL $22,690.95
DRAINAGE IMPROVEMENTS
1 0241.4101 Rene-10'Recessed Inlet EACH 1 1 $690.00 $690.00
2 0241 4102 R......IS'Recessed Inlet EACH 1 1 $690.00 $690.00.
3 3341)6001 10'Recessed Inlet L!2-1 1 1 $2,68560 $2,685.60
4 3349,6rY12 15°Recessed Into EACH 1 1 $4,071.00 $4,071.00
5 33410201 2l-'RCP,CI-H1 LF 133 + 133 $47.10 $6,264.30
6 33411403 7z5 Be,C.I,,,,t LF 500 500 $1,045.20 $522,600.00
7 3137 0105 Medimi Stone Rilmp.grouted SY 73 73 $75.60 $5,518.80
a 3125.0101 SWPPP,I- I's 1 1 $5,000.00 $5,000.00
9 3305.01(y)•rrachsakty LF
_6.33 633 $2.50 $1,582.50
ISUBTOTAL $549,102.20
TOTAL $711,212.64