HomeMy WebLinkAboutContract 42183-A1 AMENDMENT NO. 1 TO
COMMUNITY FACILITIES AGREEMENT
STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 42-
���_p,
COUNTY OF TARRANT § AUTHORIZING M&C NO. _.
WHEREAS, the City of Fort Worth (City) and Lancaster Properties, LLC (Developer)
entered into a Community Facilities Agreement, City Secretary Contract No. 42183 ("CFA"); and
WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA to add City
participation in an amount not to exceed $26,170.59 for the City's portion of costs associated with
the installation of a 12-inch sewer main contemplated by the CFA; and
WHEREAS, the City Council authorized execution of Amendment No. 1 to the CFA on the
day ofd , 2011 via M&C e
NOW THEREFORE, City and Developer, acting herein by and through their duly authorized
representatives, enter into the following agreement, which amends the CFA:
1.
Cost Summary Table is amended to be and read:
Dev. Cost City's Cost Total Cost
A. Construction
1. Water $ 71,550.00 $ - $ 71,550.00
2. Sewer $157,868.78 $ 20,131.22 $178,000.00
Construction Cost Sub-Total $229,418.78 $ 20,131.22 $249,550.00
Contingency 25% $ - $ 5,032.81 $ 5,032.81
Plus Contingency $229,418.78 $ 25,164.03 $254,582.81
Construction Fees:
B. Inspection Fee 2% $ 4,588.38 $ 503.28 $ 5,091.66
C. Material Testing Fee 2% $ 4,588.38 $ 503.28 $ 5,091.66
Construction Fees Sub-Total $ 9,176.76 $ 1,006.56 $ 10,183.32
Total Project Cost $238,595.54 $ 26,170.59 $264,766.13
The costs stated herein are based upon construction estimates. The City's participation estimate
shall be based upon unit prices contained in City of Fort Worth Ordinance No. 19192 approved on
6/22/2010 (or by public bid). The City's cost participation shall be in an amount not to exceed
$26,170.59 ("Participation"), but the reimbursement of the Participation (excluding inspection and
material testing fees) is not a lump sum amount and may be less than stated above depending upon
actual quantities from the Notice of Final Completion package (`Green sheet') and unit prices from the
construction contract document and Green sheet but not to exceed the unit prices contained in the City
of Fort Worth Ordinance No. 19192;
OFFICIAL. R CCiR01
AMENDMENT NO 1 `,
The Lancaster CITY SECRETARY,
Nage 1 of 3 FT, WORTH, TX
Sewer Cost Break Down (City pays for 8" PVC sewer pipe and 8/12 (67%)for other
items)
Item
# Description Qty Unit Unit Price Percentage Total
1 8" PVC Sewer 400 LF $40.00 $40.00 $16,000.00
2 4' Standard Manhole 2 EA $2,340.00 $1,567.80 $3,135.60
3 Concrete Collar 2 EA $39.00 $26.13 $52.26
4 Vacuum Test 2 EA $104.00 $69.68 $139.36
5 Post Constr. TV 400 LF $2.00 $1.34 $536.00
6 Trench safety 400 LF $1.00 $0.67 $268.00
Total $20,131.22
2.
All other provisions of the CFA, which are not expressly amended herein, shall remain in
full force and effect.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
AMENDMENT NO 1
The Lancaster
Page 2 of 3
y,
EXECUTED on this the ` ` day of V&V)*AA[" , 2011, in Fort
Worth, Tarrant County,Texas.
ATTEST: acp, �O�'r as CITY OF FORT WORTH:
ICV.�°°°° °°°
o
MarFernando Costa
i�. d o d
City Secreta 00, °° o° ,yd Assistant City Manager
0
000 °°°°°°° a
����ntlZlAS 4 -§'
WATER DEPARTMENT APP VAL RECOMMENDED:
1 & z
Wendy C -Babulal,EMBA,P.E. Frank Crumb,Director
Development Engineering Manager Water Department
APPRO TO FORM
A ALI
t
Douglas Black
Assistant City Attorney
14A c C- 2- 7306
r2. .e. IA
DEVELOPER
LANCASTER PROPERTIES, LLC
BY ITS MANAGER,LANG PARTNERS,LLC
By:
Kyle Fredrik Oudt
Member
OFFICIAL RECORD'
AMENDMENT NO t CITY SECRETARY
The Lancaster
Page 3 of 3 FT. WORTH, TX
M5THST
L�
6TH ST
7TH ST
O �E PJ
CROCKErT ST
ORTON-0
GP P S- —
� o ~
z O L,
n z L) PROJECT SITE
N
NORTH
U
VICINITY MAP
N.T.S.
THE LANCASTER
N VAN ZANDT PARK ADDITION
FORT WORTH, TEXAS
m
HUITTZOLARS
Huitt-Zollors, Inc. Fngineerinq / Architecture
'8 500 W. 7th St, Ste. 300 Fort worth, Texas 78102
Phone (817)335-3000 Fox (817)335-1025
px
F-----_---R - '
_r p
� INORWOOD STREET N
7777
MNi
�v o?o (-
p m:w
�_ z�
� � 0 0 Q•,I�T1 � � X � 3
cn
cn D a
-iL m¢ i y 0 o X
TT
2. ",— Qom. n
7 i
fi
ni
r
Y
° Q y
Za N o
c- §. s, •, a m w� x
ta
3 r Y! kk ? rnT1 7 Q' sy�'.,
y 9i a r a ��f
�'fie
Z X17 J
LIT
3
thY
Dx o �
r n
C > NW o '
Vis ; x -3r
N _; CURRIE STREET
PART B—PROPOSAL
DEVELOPER AWARDED CONTRACTS
UNIT 1: SEWER
CPMS
RECORD
NUMBER Approx. Unit CPMS Name(Bid Item Unit Total
id Item) Quantity Measurement Description) Price Amount
Pipe-Sewer-12 Inch-Ductile
Iron Pipe(All Depths)—Install
BID-00247 840 LFy _TWe-1,r Dollars (0� 100,ft
& Mu
Cents Per Unit Measurement $ $
Junction Box Sanitary Sewer
Storm Drain Crossing—Install
BID-00203 1 EA SVA 11tave) `_iiM t�, Dollars 60l 7!
& n!.
Cents Per Unit Measurement $ $
_ Manhole-Shallow Std 4 Ft Diam-
(Shallow Cone)w/Collar&
Watertight Insert—Install
BID-00212 6 EA 4,a00 " a5, a00
F-or_R,m -J Dollars
Cents Per Unit Measurement $ $
Manhole-Vacuum Test—
Services
BID-00217 6 EAI `co — Loo(�h� ,��rrd —Dollars
do a
Cents Per Unit Measurement $ $
—' Sewer Service4 Inch-2 Way —^
Clean Out--Install Q
BID-00356 1 EA �, { lw,41 ni _Dollars
&
Cents Per Unit Measurement $ $
Sewer Service4 Inch-SDR26—
Installll
BID-00358 10 LF �t Uoliars 30 y 300
Cents Per Unit Measurement $ $
Sewer Service-6 Inch-2 Way
Clean Out--Install
i
BID-00362 3 EA C., f�u«�r� 1 l,l Dollars 450'
&-O
Cents Per Unit Measurement $ $
Updatcd 8/30/2010
PART B—PROPOSAL
DEVELOPER AWARDED CONTRACTS
UNIT 1: SEWER
CPMS
RECORD
NUMBER Approx. Unit CPMS Name(Bid Item Unit Total
id ItemQuantity Measurement Description) Price Amount
Sewer-Service-6 Inch-SDR26—
Install
BID-00363 135 LF �'Y 16— 06a—
'91ti�i Dollars
& A/�:
_ Cents Per Unit Measurement $ $
Sewer-Service-8 Inch-2 Way
Clean Out—Install
BID-00364 1 EA Ctzt4. ��e E .1�y1o1,100- 11100"
Dllars
-
Cents Per Unit Measurement $ $
Sewer-Service-8 Inch-SDR26—
Install , r
BID-00365 35 LF rrtY rk. Dollars `TS 15 7 S
&, ri
Cents Per Unit Measurement $ $
Trench Safety System 5 Foot
Depth—Install `
BID-00372 1,020 LF Che, Dollars
�-
_ Cents Per Unit Measurement $ $
Concrete-Encasement—Install
BID-00841 155 LF V 6" Dollars
AA
Cents Per Unit Measurement $ $
_ Asphalt Trench Pavement Repair
1 LS VA., Asa„4 Dollars 15aV 15,E
Cents Per Unit Measurement $ $
8"Sanitary Sewer—Remove,
550 LF
Cut&Plug at Manhole
�� ["L-
T e- .v�. Dollars
& 442
Cents Per Unit Measurement $ $
Connect to Existing 8"Sanitary 1
Sewer 5 t a 5 0
1 EA C , !j II,4' lars
&
Cents Per Unit Measurement $ $;
Upaatoa-U30/2010
PART B—PROPOSAL
DEVELOPER AWARDED CONTRACTS
UNIT 1: SEWER
CPMS
RECORD
NUMBER Approx. Unit CPMS Name(Bid Item Unit Total
Bid ItemQuantity Measurement Description) Price Amount
Connect to Existing 12"Sanitary
Sewer
1 EA
&
Cents Per Unit Measurement $
TOTAL AMOUNT BID-SEWER 00c $
pdrtrd R.;U 201;1
M&C Review Page 1 of 2
Off'i,.lal site of the City of FoiI,Worth,Texas
CITY COUNCIL AGENDA FORT TI+
COUNCIL ACTION: Approved on 12/6/2011
DATE: 12/6/2011 REFERENCE ."C-25306 LOG NAME:06TH ELAN CASTE RAPARTMENTS
NO..
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of an Amendment to Community Facilities Agreement, City Secretary
Contract No. 42183, with Lancaster Properties LLC, and Authorizing City Participation in an
Amount Not to Exceed $26,170.59 for Construction of Twelve-Inch Sewer Main to Serve
The Lancaster Apartments (COUNCIL DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council authorize an amendment to the Community Facilities Agreement
with Lancaster Properties LLC, for the City to participate in an amount not to exceed $26,170.59 for the
construction of the twelve-inch sewer main to serve The Lancaster Apartments.
DISCUSSION:
Lancaster Properties LLC, the developer of The Lancaster Apartments (The Apartments) has executed
a contract for community facilities to serve a development located in Fort Worth (see attached map).
There will be City participation for the construction of a twelve-inch sewer main that will provide service to
The Apartments and surrounding area. The Developer's estimated costs for water and sewer improvements
are subject to construction inspection and material testing fees.
Cost-summary table:
Developer Cost City Cost Total Cost
A. Construction
1. Water $ 71,550.00 $ - $ 71,550.00
2. Sewer $ 157,868.78 $ 20,131.22 $ 178,000.00
Construction Cost Sub-Total $ 229,418.78 $ 20,131.22 $ 249,550.00
Contingency 25 percent $ - $ 5,032.81 $ 5,032.81
Plus Contingency $ 229,418.78 $ 25,164.03 $254,582.81
Construction Fees:
B. Inspection Fee (two
percent) $ 4,588.38 $ 503.28 $ 5,091.66
C. Material Testing Fee (two
percent) $ 4,588.38 $ 503.28 $ 5,091.66
Construction Fees Sub-Total $ 9,176.76 $ 1,006.56 $ 10,183.32
Total Project Cost $ 238,595.54 $ 26,170.59 $ 264,766.13
The cost stated is based on the engineer's estimates. The City participation reimbursement shall be based
upon maximum not to exceed unit prices contained in City of Fort Worth Ordinance No. 19192 approved on
June 22, 2010. The City's cost participation shall be in an amount not to exceed $26,170.59 (Participation),
but the reimbursement of the Participation (excluding inspection and material testing fees) is not a lump
sum amount and may be less than stated above depending upon actual quantities from the Notice of
Final Completion package (Green Sheet) and unit prices from the construction contract document and
Green Sheet, but not to exceed the unit prices contained in the City of Fort Worth Ordinance No. 19192.
This project is located in COUNCIL DISTRICT 9.
littp://apps.cfwnet.org/council_packet/mc_review.asp?ID=16048&councildate=12/6/2011 01/23/2012
M&C Review Page 2 of 2
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital budget,
as appropriated, of the Sewer Capital Project Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
P275 539140 709130172983 $25,164.03
P275 531350 709130172985 $503.28
P275 531200 709130172984 $503.28
Submitted for City Manager's Office bv: Fernando Costa (6122)
Originating Department Head: Randle Harwood (6101)
Additional Information Contact: Jana Knight(2025)
ATTACHMENTS
Lancaster Apartments CFA Exhibit.pdf
llttp://apps.cfwnet.org/council_packet/mc_review.asp?ID=16048&councildate=l 2/6/2011 01/23/2012