Loading...
HomeMy WebLinkAboutContract 42183-A1 AMENDMENT NO. 1 TO COMMUNITY FACILITIES AGREEMENT STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 42- ���_p, COUNTY OF TARRANT § AUTHORIZING M&C NO. _. WHEREAS, the City of Fort Worth (City) and Lancaster Properties, LLC (Developer) entered into a Community Facilities Agreement, City Secretary Contract No. 42183 ("CFA"); and WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA to add City participation in an amount not to exceed $26,170.59 for the City's portion of costs associated with the installation of a 12-inch sewer main contemplated by the CFA; and WHEREAS, the City Council authorized execution of Amendment No. 1 to the CFA on the day ofd , 2011 via M&C e NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CFA: 1. Cost Summary Table is amended to be and read: Dev. Cost City's Cost Total Cost A. Construction 1. Water $ 71,550.00 $ - $ 71,550.00 2. Sewer $157,868.78 $ 20,131.22 $178,000.00 Construction Cost Sub-Total $229,418.78 $ 20,131.22 $249,550.00 Contingency 25% $ - $ 5,032.81 $ 5,032.81 Plus Contingency $229,418.78 $ 25,164.03 $254,582.81 Construction Fees: B. Inspection Fee 2% $ 4,588.38 $ 503.28 $ 5,091.66 C. Material Testing Fee 2% $ 4,588.38 $ 503.28 $ 5,091.66 Construction Fees Sub-Total $ 9,176.76 $ 1,006.56 $ 10,183.32 Total Project Cost $238,595.54 $ 26,170.59 $264,766.13 The costs stated herein are based upon construction estimates. The City's participation estimate shall be based upon unit prices contained in City of Fort Worth Ordinance No. 19192 approved on 6/22/2010 (or by public bid). The City's cost participation shall be in an amount not to exceed $26,170.59 ("Participation"), but the reimbursement of the Participation (excluding inspection and material testing fees) is not a lump sum amount and may be less than stated above depending upon actual quantities from the Notice of Final Completion package (`Green sheet') and unit prices from the construction contract document and Green sheet but not to exceed the unit prices contained in the City of Fort Worth Ordinance No. 19192; OFFICIAL. R CCiR01 AMENDMENT NO 1 `, The Lancaster CITY SECRETARY, Nage 1 of 3 FT, WORTH, TX Sewer Cost Break Down (City pays for 8" PVC sewer pipe and 8/12 (67%)for other items) Item # Description Qty Unit Unit Price Percentage Total 1 8" PVC Sewer 400 LF $40.00 $40.00 $16,000.00 2 4' Standard Manhole 2 EA $2,340.00 $1,567.80 $3,135.60 3 Concrete Collar 2 EA $39.00 $26.13 $52.26 4 Vacuum Test 2 EA $104.00 $69.68 $139.36 5 Post Constr. TV 400 LF $2.00 $1.34 $536.00 6 Trench safety 400 LF $1.00 $0.67 $268.00 Total $20,131.22 2. All other provisions of the CFA, which are not expressly amended herein, shall remain in full force and effect. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) AMENDMENT NO 1 The Lancaster Page 2 of 3 y, EXECUTED on this the ` ` day of V&V)*AA[" , 2011, in Fort Worth, Tarrant County,Texas. ATTEST: acp, �O�'r as CITY OF FORT WORTH: ICV.�°°°° °°° o MarFernando Costa i�. d o d City Secreta 00, °° o° ,yd Assistant City Manager 0 000 °°°°°°° a ����ntlZlAS 4 -§' WATER DEPARTMENT APP VAL RECOMMENDED: 1 & z Wendy C -Babulal,EMBA,P.E. Frank Crumb,Director Development Engineering Manager Water Department APPRO TO FORM A ALI t Douglas Black Assistant City Attorney 14A c C- 2- 7306 r2. .e. IA DEVELOPER LANCASTER PROPERTIES, LLC BY ITS MANAGER,LANG PARTNERS,LLC By: Kyle Fredrik Oudt Member OFFICIAL RECORD' AMENDMENT NO t CITY SECRETARY The Lancaster Page 3 of 3 FT. WORTH, TX M5THST L� 6TH ST 7TH ST O �E PJ CROCKErT ST ORTON-0 GP P S- — � o ~ z O L, n z L) PROJECT SITE N NORTH U VICINITY MAP N.T.S. THE LANCASTER N VAN ZANDT PARK ADDITION FORT WORTH, TEXAS m HUITTZOLARS Huitt-Zollors, Inc. Fngineerinq / Architecture '8 500 W. 7th St, Ste. 300 Fort worth, Texas 78102 Phone (817)335-3000 Fox (817)335-1025 px F-----_---R - ' _r p � INORWOOD STREET N 7777 MNi �v o?o (- p m:w �_ z� � � 0 0 Q•,I�T1 � � X � 3 cn cn D a -iL m¢ i y 0 o X TT 2. ",— Qom. n 7 i fi ni r Y ° Q y Za N o c- §. s, •, a m w� x ta 3 r Y! kk ? rnT1 7 Q' sy�'., y 9i a r a ��f �'fie Z X17 J LIT 3 thY Dx o � r n C > NW o ' Vis ; x -3r N _; CURRIE STREET PART B—PROPOSAL DEVELOPER AWARDED CONTRACTS UNIT 1: SEWER CPMS RECORD NUMBER Approx. Unit CPMS Name(Bid Item Unit Total id Item) Quantity Measurement Description) Price Amount Pipe-Sewer-12 Inch-Ductile Iron Pipe(All Depths)—Install BID-00247 840 LFy _TWe-1,r Dollars (0� 100,ft & Mu Cents Per Unit Measurement $ $ Junction Box Sanitary Sewer Storm Drain Crossing—Install BID-00203 1 EA SVA 11tave) `_iiM t�, Dollars 60l 7! & n!. Cents Per Unit Measurement $ $ _ Manhole-Shallow Std 4 Ft Diam- (Shallow Cone)w/Collar& Watertight Insert—Install BID-00212 6 EA 4,a00 " a5, a00 F-or_R,m -J Dollars Cents Per Unit Measurement $ $ Manhole-Vacuum Test— Services BID-00217 6 EAI `co — Loo(�h� ,��rrd —Dollars do a Cents Per Unit Measurement $ $ —' Sewer Service4 Inch-2 Way —^ Clean Out--Install Q BID-00356 1 EA �, { lw,41 ni _Dollars & Cents Per Unit Measurement $ $ Sewer Service4 Inch-SDR26— Installll BID-00358 10 LF �t Uoliars 30 y 300 Cents Per Unit Measurement $ $ Sewer Service-6 Inch-2 Way Clean Out--Install i BID-00362 3 EA C., f�u«�r� 1 l,l Dollars 450' &-O Cents Per Unit Measurement $ $ Updatcd 8/30/2010 PART B—PROPOSAL DEVELOPER AWARDED CONTRACTS UNIT 1: SEWER CPMS RECORD NUMBER Approx. Unit CPMS Name(Bid Item Unit Total id ItemQuantity Measurement Description) Price Amount Sewer-Service-6 Inch-SDR26— Install BID-00363 135 LF �'Y 16— 06a— '91ti�i Dollars & A/�: _ Cents Per Unit Measurement $ $ Sewer-Service-8 Inch-2 Way Clean Out—Install BID-00364 1 EA Ctzt4. ��e E .1�y1o1,100- 11100" Dllars - Cents Per Unit Measurement $ $ Sewer-Service-8 Inch-SDR26— Install , r BID-00365 35 LF rrtY rk. Dollars `TS 15 7 S &, ri Cents Per Unit Measurement $ $ Trench Safety System 5 Foot Depth—Install ` BID-00372 1,020 LF Che, Dollars �- _ Cents Per Unit Measurement $ $ Concrete-Encasement—Install BID-00841 155 LF V 6" Dollars AA Cents Per Unit Measurement $ $ _ Asphalt Trench Pavement Repair 1 LS VA., Asa„4 Dollars 15aV 15,E Cents Per Unit Measurement $ $ 8"Sanitary Sewer—Remove, 550 LF Cut&Plug at Manhole �� ["L- T e- .v�. Dollars & 442 Cents Per Unit Measurement $ $ Connect to Existing 8"Sanitary 1 Sewer 5 t a 5 0 1 EA C , !j II,4' lars & Cents Per Unit Measurement $ $; Upaatoa-U30/2010 PART B—PROPOSAL DEVELOPER AWARDED CONTRACTS UNIT 1: SEWER CPMS RECORD NUMBER Approx. Unit CPMS Name(Bid Item Unit Total Bid ItemQuantity Measurement Description) Price Amount Connect to Existing 12"Sanitary Sewer 1 EA & Cents Per Unit Measurement $ TOTAL AMOUNT BID-SEWER 00c $ pdrtrd R.;U 201;1 M&C Review Page 1 of 2 Off'i,.lal site of the City of FoiI,Worth,Texas CITY COUNCIL AGENDA FORT TI+ COUNCIL ACTION: Approved on 12/6/2011 DATE: 12/6/2011 REFERENCE ."C-25306 LOG NAME:06TH ELAN CASTE RAPARTMENTS NO.. CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of an Amendment to Community Facilities Agreement, City Secretary Contract No. 42183, with Lancaster Properties LLC, and Authorizing City Participation in an Amount Not to Exceed $26,170.59 for Construction of Twelve-Inch Sewer Main to Serve The Lancaster Apartments (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize an amendment to the Community Facilities Agreement with Lancaster Properties LLC, for the City to participate in an amount not to exceed $26,170.59 for the construction of the twelve-inch sewer main to serve The Lancaster Apartments. DISCUSSION: Lancaster Properties LLC, the developer of The Lancaster Apartments (The Apartments) has executed a contract for community facilities to serve a development located in Fort Worth (see attached map). There will be City participation for the construction of a twelve-inch sewer main that will provide service to The Apartments and surrounding area. The Developer's estimated costs for water and sewer improvements are subject to construction inspection and material testing fees. Cost-summary table: Developer Cost City Cost Total Cost A. Construction 1. Water $ 71,550.00 $ - $ 71,550.00 2. Sewer $ 157,868.78 $ 20,131.22 $ 178,000.00 Construction Cost Sub-Total $ 229,418.78 $ 20,131.22 $ 249,550.00 Contingency 25 percent $ - $ 5,032.81 $ 5,032.81 Plus Contingency $ 229,418.78 $ 25,164.03 $254,582.81 Construction Fees: B. Inspection Fee (two percent) $ 4,588.38 $ 503.28 $ 5,091.66 C. Material Testing Fee (two percent) $ 4,588.38 $ 503.28 $ 5,091.66 Construction Fees Sub-Total $ 9,176.76 $ 1,006.56 $ 10,183.32 Total Project Cost $ 238,595.54 $ 26,170.59 $ 264,766.13 The cost stated is based on the engineer's estimates. The City participation reimbursement shall be based upon maximum not to exceed unit prices contained in City of Fort Worth Ordinance No. 19192 approved on June 22, 2010. The City's cost participation shall be in an amount not to exceed $26,170.59 (Participation), but the reimbursement of the Participation (excluding inspection and material testing fees) is not a lump sum amount and may be less than stated above depending upon actual quantities from the Notice of Final Completion package (Green Sheet) and unit prices from the construction contract document and Green Sheet, but not to exceed the unit prices contained in the City of Fort Worth Ordinance No. 19192. This project is located in COUNCIL DISTRICT 9. littp://apps.cfwnet.org/council_packet/mc_review.asp?ID=16048&councildate=12/6/2011 01/23/2012 M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Project Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P275 539140 709130172983 $25,164.03 P275 531350 709130172985 $503.28 P275 531200 709130172984 $503.28 Submitted for City Manager's Office bv: Fernando Costa (6122) Originating Department Head: Randle Harwood (6101) Additional Information Contact: Jana Knight(2025) ATTACHMENTS Lancaster Apartments CFA Exhibit.pdf llttp://apps.cfwnet.org/council_packet/mc_review.asp?ID=16048&councildate=l 2/6/2011 01/23/2012