Loading...
HomeMy WebLinkAboutContract 42205-CO1 DISTRIBUTION: CITY SECRETARY WHITE-FILE CITY OF FORT WORTH CANARY-CONSTRUCTION FILE CONTRACT NO. 4220S_C PINK-PROJECT MANAGER CHANGE ORDER REQUEST GOLDENROD-CONTRACTOR CHANGE ORDER NO. 1 DATE: 11/21/11 D.O.E.NO. PROJECT NO. WTR-2010-200051 PROJECT DESCRIPTION: Riverside Wastewater Treatment Plant Digester Sludge Treatment,Removal,and Disposal Project CITY SECRETARY CONTRACT NO. 42205 ORIGINAL CONTRACT AMOUNT..............................................................$ $5255,040.00 EXTRAS TO DATE..............................................................$ $0.00 CREDITS TO DATE.............................................................S $0.00 CONTRACTCOST TO DATE......................................................................................................................................................................................................$ $5255.040.00 AMOUNTOF PROPOSED CHANGE ORDER............................................................................................................................................................................5 -$762.00 REVISEDCONTRACT AMOUNT...............................................................................................................................................................................................5 $5.254.278.00 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS......................................................................................................................................................$ $0.00 ADDITIONALFUNDING(IF NECESSARY)..............................................................................................................................................................................$ -0- REMAINING FUNDS AVAILABLE FOR CHANGE ORDER....................................................................................................................................................$ $0.00 IN ACCORDANCE Wn H THIS CHANGE ORDER,THE CONTRACTOR SHALL: As described in proposal and supporting documenting submitted to City by AUI on November 9-10,2011(see Attachment 1),implement the use of belt press technology to remove, handle,and process sludge for disposal for the purpose of removing moisture from sludge which will reduce both actual sludge quantity and the amount of fly ash required to stabilize sludge. Contractor shall be responsible for ensuring that contaminated solid or aqueous-phase sludge does not contaminate work areas during operation of belt press equipment. Contractor shall also be responsible for decontaminating/disposing of belt press and associated equipment at the conclusion of the project.All liquids generated by belt press operations shall be processed through Liquids Treatment Processing Facility per Specification 02218. Processed sludge must meet requirements for classification as a TSCA-regulated nonhazardous waste. If belt press process results in sludge that has difficulty meeting nonhazardous waste classification requirements, Contractor shall revert to original sludge handling and processing methods described in Specification Section 02218 at no additional cost to City. Contract quantities and unit costs are revised per this change order as shown in Table 1(attached). M/WBE participation goal for the project remains unchanged at 13.00%. �. . . . . . .ER .i R,anald 80158 P. (3onzsl � �� 4 ,j • '9k13 _gyp ��� ,o•�(��Q°000� as NALE� o °000, te....�! �a o�d }�o0 0d TOTAL COST FOR CHANGE ORDER NUMBER ° - $ 762.00 This project is complete. �a 000 00 �� aa�fxAs It is understood gad greed that the acceptance of this Change Order by the contractor coerti[atn en aewrd and satisfaction 1,IU,a.��p. and represents paymeot in full(both n ung and money)for all costs arising out of,or incidental to,the Change Order. �•l ORIGINAL CONTRACT TIME ADDMONAL APPROVED TIME TO DATE APPROVED CONTRACT TIME TO DAIS 7DMONAL TIME FOR THIS CHANGE ORDER 180 days 0 days 0 days 30 days CONTRACTOR DATE FIELD ENGINEER DATE AUI Contractors,LLC I 11121111 Tony Bosecker,P.E.,Freese and Nichols,Inc. MANAGER/CONST SER. DATE DIRECMR/MANAGniG DEPT. DATE Richard S.Tall ect MWAger aR>scTrHt coNnb� D OA <rry Air7ORNEYWATO ——---- S. Frank ta or `� Christa ReyrloW Senior Assistant City orrery CrrY MANAGER L /'� DATE COUNCIL ACTION IIF REQUIRED► - ant C`�`— /1Z�L // 3 APPROVED o I �"�ECRETAR Fernando Costa Assistant City anagen FTW11231\C:\Documents and Settings\rWlel\My Documents\Digester l 2geRemoya{C"� qr I Innovative approaches FREESE Practical results • t 4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 fax 817-735-7491 • www.freese.com November 17, 2011 Mr. Richard Talley Regulatory/Environmental Coordinator City of Fort Worth Water Department P. O. Box 870 Fort Worth, Texas 76101-0870 Re: City of Fort Worth Riverside Wastewater Treatment Plan Digester Sludge Treatment, Removal, and Disposal Project FNI Project No. FTW 11231 Change Order Request No. 1(CO-01) Dear Mr. Talley: Enclosed please find a copy of Change Order No. 1 for work to be performed by AU1 Contractors, Inc. on the above referenced project. This change order reduces the overall contract value by$762.00 to$5,254,278.00. The purpose of this change order is to implement the use of belt press equipment into the sludge handling process in order to significantly reduce the quantity of fly ash required to stabilize sludge and the total volume of stabilized sludge that will require transportation and disposal. Use of this method could potentially result in significant cost savings for the project that would be realized if the revised contract quantities are below budget at the end of the project. Sincerely, AkKl'� e/� Robert W. Chambers, P.G. Principal Enclosure cc: File FTW 11231\C:\Usm\drnhV4 pOat•1Loc&N4Cro*WWWxkm \Temporary Int~Film Contem.Ou*)ok\FL11915PU1Charge Order No 1 Submittal Letter.doc 8 N M MM \ N y M N n N N ' N Vpf Vf N 0 0 0 0 o 0 0 pO o o n �mp U1 O �N NN aD t9 anD t00 N O � O �p O V! •► N O H E H O • h o 0 o h m � N O O O N C7 N Oa O N co N A O a H H 01 N � H O H � _LM 0 0 p aD O000 OlO CO a a N N N mp O O O O in O O O O O o O Q O C C O a o o h N Vl Q C O l7 O n c N co N N H C H Lo p O O O N Z N O aO N m O V H H O N E H d rl O _� • C C C Q C im H H F d £ W d o co o 0 o a ` O o 0 0 ct oo �2 H o m cq d m Op C 3 u H v, to 'c S a 0 o a N 2 etl o O � ra- N B � ^' Id �v `�7Nb u Attachment 1 AUI Proposal for Change Order No. 1 Robert Chambers From: Philip Bennett<pbennett@auigc.com> Sent: Thursday, November 10, 2011 1:45 PM To: Robert Chambers Subject: RE: Press Option for Sludge Removal Attachments: Process Description (11-10-1 1).xlsx Robert, See the attached spreadsheet that provides the City of Fort Worth a description of our expected production rate, process overview and cost estimation for utilizing the press method at Riverside WWTP. Thank you, Philip Bennett AUI Contractors -----Original Message----- From:Robert Chambers[mailto:RWC@freese.com] Sent:Thursday, November 10, 20118:57 AM To: Philip Bennett Cc: Barbara Nickerson; Larry Eckersley Subject: Re: Press Option for Sludge Removal Thanks Sent from my iPhone On Nov 10,2011,at 8:49 AM, "Philip Bennett"<pbennett@auigc.com>wrote: >Robert, >I hope to have something written up by this afternoon. >Thank you, >Philip >----Original Message---- •From: Robert Chambers[mailto:RWC@freese.com] >Sent:Thursday, November 10,20118:32 AM >To: Philip Bennett >Cc: Larry Eckersley;Barbara Nickerson >Subject: Re: Press Option for Sludge Removal >Per my voice mail,we need a detailed breakdown of your cost proposal with a written description of how the process would work in letter format, including anticipated production rates,schedule,etc. It needs to be at a level of detail that can be understood by multiple people in the City that might be seeing/hearing about this method for the first time. >Sent from my iPhone 1 >On Nov 9,2011,at 1:13 PM, "Philip Bennett" <pbennett@auigc.com<mailto:pbennett@auigc.com>>wrote: > Robert&Katie, >Please see the attached spreadsheet regarding the use of a belt press in lieu of the contract method of handling and treating the digester sludge at Riverside WWTP. >As we discussed in our meeting on October 19, 2011,we have assembled the overall cost savings to the City of Fort Worth with the reduction in solid sludge handling due to the belt press method. I have included the potential savings for a 25%,30%and 35%reduction of solids. We have based our cost ideas on achieving the 30%reduction in solid sludge. We do not see the need to introduce additional water to process the solids. We believe that this process can be achieved with the water currently available inside the digesters. >In addition, I have included a separate tab for the minority participation,and estimate that we will still achieve the contract goals with the reduction of solid sludge processed. >As we also discussed,we have estimated the overall cost to the City of Fort Worth to be$919,363 to utilize the belt press method. This includes rental,operation,clean up and replacement parts for this equipment. However,while this cost is significant,the attached matrix projects an overall substantial savings for the City of Fort Worth on the Riverside project beyond the belt press cost. I also believe that our estimation of fly ash could be conservative,and that additional savings could be recognized on this unit price item, beyond the attached spreadsheet. >Our hope is to receive a swift decision from the City and Freese and Nichols, in order for us to begin the sludge processing on digesters 6,7&8 immediately. Please send us a written approval to proceed as soon as the City has reviewed and accepted this method and cost. >Sincerely, >Philip Bennett >Project Manager ><image001.png> >Superior Services with an Exceptional Team >4775 North Freeway, Fort Worth,TX 76106 >Office: 817-926-4377 Fax: 817-926-4387 >www.auigc.com<http://www.auigc.com/> >Think Green, Live Green -Please consider the environment before printing this email. >NOTICE:The information contained in this communication is CONFIDENTIAL. It is intended solely for the person(s)to whom it is addressed. If the reader of this message is not the intended recipient, nor the employee or agent responsible to deliver it to the intended recipient,you are hereby notified that any dissemination,distribution, or copying of this communication is strictly prohibited. If you receive this message in error, please delete and contact the sender.Thank you. >Any views expressed in this message are those of the individual sender, except where the message states otherwise and the sender is authorized to state them to be the views of any such entity. > Please consider the environment before printing this message. ><Belt Press Submittal (11-09-11).xlsx> 2 >This electronic mail message is intended exclusively for the individual or entity to which it is addressed.This message, together with any attachment, may contain the sender's organization's confidential and privileged information.The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization.Any unauthorized review, printing, retention,copying, disclosure,distribution, retransmission,dissemination or other use of,or taking of any action in reliance upon,this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer.Thank you for your cooperation. 3 RIVERSIDE WWTP SLUDGE REMOVAL PROCESS 16000 TONS 888.89 HRS 19 TONS/HR 22.22 WKS 5.13 MO's PHASE 1- 1 Remove upper layer of solid sludge using a air mover(vacuum truck) a)alternate method would be to use a trackhoe to remove this layer 2 Upper layer of solid sludge would be transferred to a roll-off box for treatment with fly ash via vacuum truck PHASE'2 1 Remaining liquideous sludge and suspended solids will be pumped from the digester through a sludge pump and run through a press to separate the solids from the liquids. 2 Pressed solids will be transferred directly from the press into a roll-off box for mixing with fly ash(as needed). 3 Liquid will be pumped from press into first FRAC tank for processing through on-site facility (similar to the Digester#9 project). PHASE 3= 1 Process water throughLiquids Treatment Tank,filter and remaining FRAC tanks for disposal into Sanitary Sewer Manhole. 2 Complete mixing of fly ash in solid sludge,test and transfer to TSCA disposal site. dsssu K `ti ,t 'i: KIVERS DE otR X vti' z zt .; 3 _ g n qO t - 4 >; 2596 REDUCED SOLIDS SCENARIOk , ...-:n;. fA7rr..r ESTIMATEDPOTENTIAL TOTAL BID UNIT BID BELT PRESS ORES COST WITH POTENTIAL REM 11 DESCRIPTION OF BID ITEMS PRKE QUANTITIES UOM QUANTITIES COST BELT PRESS SAVINGS 21 Class"F"Ash vg - 70%Reduttlon $ 49.00 7000 TON 21m $ 343,000 1 900. v f 22 Transportation of Stabilized• $ 27.00 23000 TON -•17250•, •$ 621,000 750 �i Y Solid 51 Conteminated Debris to Disposal Site- 25%Reduction Added Fly Ash pordondsolids $ 27.00 7000 TON : 2100 $ 189,000 S 700 " Y,2319M Total Tran w/ Ash 300M TON SteblilxedSlu Contaminated $ 80.25 23000 TON :k72949- Z31,845750 DebrisDis I Regulated, Non-hazardous waste with PCB's> 50 - 20%Reduction Added F Ash rtlon d solids 90.25 7000 1 TON .2100 $ 561,750 1 2S Total ObPosel wl Fly Ash 30000 TON 2 _ •-s,,"..z.,,.; TOTAL POTENTIAL SAVINGS s �� {? 3 REDEICEpSQUDS K tw ESTIMATED'.- POTENTIAL TOTAL. BID UNIT BID BELT PRESS ORIGINAL COST WITH POTENTIAL REM M DESCRIPTION OF BID ITEMS PRICE QUANTITIES UOM QUANTITIES COST BELT PRESS SAVINGS 21 Dass"F"Ash- 70%ReduRbn $ 49.00 7000 TON - 2100,:: $ 343,000 $, 1 O Z 900.' .-.t,. _cr*• '•'•E�a�"4..s�. '`:d .ki�'< ,'°.z+�, Ott` ,4, ,tr�,?i'x�s�,, ..*•` 7 .h 22 Tnm rptiond5tebilized $ 27.00 23000 TON 16100 $ 621,000 4!4,700 Solid 61ud Contemimted Debris •;, to Dls I Sfte- 30%Reduction Added F Ash on d solids $ 27.00 7000 TON 210*+'> $ 189,000 700 Top!Inn w Ash 30000 TON 23 stebillzed Slud ,/Cmt.minaW $' 80.25 230011 TON •161001. $ 1,845,750 , -282,02y Debris Disposal Regulated, ,_ ,•y.-.., Non-hazardous waste with KB's> 50 309ARedwtion Added Ash portion of solids $ 80.25 7000 TON 2100x.- $ 561,750 s :...1 52S Total Disposalw Ash 30000 TON �::;,., -�,,�, _=; TOTAL POTENTIAL SAVINGS r s 35%aEDUCED WUDRff,�NARIa ,,< ESTIMATED POTENTIAL TOTAL BID UNIT BID ESTI ESS ORIGINAL COST WITH POTENTIAL ITEM N DESCRIPTION OF BID ITEMS PRR:E QUANTITIES UOM QUANTITIES COST BELT PRESS SAVINGS 21 Class"P Ash- 70%Reduction $ 49.00 7000 TON 2100"-.:: $ 343,000 10 900 _ 5 22 Transportatkm of Stabilized $ 27.00 23000 'TON 14950 $ ;,._. 621,000 650 :a" 227 Solid SI Contaminated Debris to Disposal Site- 3S%Reduction Added Ash ofsolids $ 27.00 7000 TON 2100 189,000 700 gAidded Tran w Ash 30000 TON urinated 80.25 23000 TON $ BUS 750 Rw wasp with PCB's> 5%Reductionh of solids $ 80.25 7000 TON $ x61750 1 Tod Dimposell w Art 30008 TON TOTAL POTENTIAL SAVWM NOTES: 1 The Mew IWWW dJall aesoeat for tit eat of tae beM arm~we be a.bwaaM in"mm to*a aaow ter tit dr4s nsfer aM mawwAg ] 40 Irl Omma a eb grits of Of MI erarwaleele awl bellum there a"be a sale.t+l of additional waw in aea area, 3 TMe dire Neeea+a nam are bele Of of 00&%%W wwp.Mm Mew 60 d*00w aM plumed Mroup./lea RIVERSIDE WWTP- BELT PRESS COST ITEM TIME UOM UNIT$ EXTENSION Belt Press-2M Unit(5ea x 5mo) 25 MO $ 15,100 $ 377,S00 Belt Press Mobilization(1 in/1 out) 5 EA $ 3,750 $ 18,750 Replace Hoses&Belt on Press incl labor 5 EA $ 33,475 $ 167,375 5000W Generator(5 ea x 5mo) 25 MO $ 1,650 $ 41,2S0 Fuel for Generator(50gal/day)x 5ea 27062 GAL $ 3.95 $ 106,89S Belt Press Certified Operators 5 MO $ 15,588 $ 77,940 (4m x 40hrs/wk @ $22.50/hr) 3 Trash Pumps 3 EA $ 1,775 $ S,32S Misc. Piping& Hoses 1 LS $ 4,411 $ 4,411 GRAND TOTAL COST �;,TW,446' MARKUP(1596)-Per NTCOG $ 119,917 TOTAL w/MARKUP RIVERSIDE WIA" DIGESTER SLUDGETREATMENr, REMOVAL,and DISPOSAL M)' BE UTILIZATION COMPANY DBE WORK DETAIL SUPPLIES DOLLAR INFORMATION CERTIFICATION DESCRIPTION PURCHASED AMOUNT 1 Shea Services NCTRCA Roof Debris Hauling $ 162,752 PO Box 2263 Denton,TX 76207 o.940-243-8528 F.940-243-8531 2 Ram Tool &Supply NCTRCA Containment $ 99,265 1432 Mac Arthur Dr Materials Carrollton,TX 75007 O. 214-358-2363 F.214-358-3768 3 Environmental Standards NCTRCA Erosion Control $ 12,735 PO Box 800667 Balch Springs,TX 75180 O.972-913-9006 F. 214-231-9060 4 JM Materials NCTRCA Sludge Hauling $ 310,610 PO Box 199 Alvord,TX 76255 O.940-427-3645 F.940-427-2789 Total Dollar Amount of M/WBE Subcontractor/Suppliers $ 585,362 Total Revised Value of Work Utilizing Belt Press $ 4,499,390 (Based on reducing sludge solids 30%&adding belt press cost) City's M/WBE Project Goal 13.00% Prime's M/WBE PROJECT UTILIZATION 13.01%