HomeMy WebLinkAboutContract 30600 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARR-ANT § Contract
WHEREAS, Wildwood Development Company 1, Ltd., hereinafter called
"Developer", desires to make certain improvements to Edgewood Addition, Phase 1, an
addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Tom Gaubert, its duly
authorized General Partner, and the City, acting herein by and through Marc Ott, its
duly authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section H, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section H, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section H, of the Policy.
CFA with Revised 4%
Edgewood Phase I
September 2,2004
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in PuM by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234),
I Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof
CFA with Revised 4% 2
Edgewood Phase I
September 2,2004
Water (A)None; Sewer (A-1)None; Paving (B) attached; Storm Drain (B-
1) attached; Street Lights and Signs (C) attached.
H. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, Bl, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, Bl,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $867,453.56.
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ 501,905.20 $ 501,905.20
2. Storm Drainage $322,363.00 $ 322,363.00
3. Street Lights $ 6,500.00 $ 19,500.00 $ 26,000.00
4. Street Name Signs $ 700.00 $ 700.00
B. Engineering Design $ -
C. Construction Engineering $ -
and Management by DOE (2%) $ 16,485.36 $ 16,485.36
TOTALS $ 847,253.56 $ 20,200.00 $ 867,453.56
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent ()�-%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA with Revised 4%
3
Edgewood Phase I
September 2, 2004
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the 2 day of September,
2004,
Approval Recommended:
Transportation and Public Works
Department
C
ATTEST: Robert Goode, P. E.
Director
ity Fo W
_MARTY H NDRIX
CITY SECRETARY
Marc Ott
Assistant City Manager
Approved as to Form:9
,� :ontract nuthorizatiox
Assistant City Attorney Date
ATTEST: DEVELyC�P `
Corp rate Secretary Thomas M. Gaubert
Jack R. Gaubert Chairman
wildwood Development Company wildwood Development Company
CFA with Revised 4% 4
Edgewood Phase I.
-
September 2,2004 t
FT. WORTH
PROJECrSIrE
0 1000 UK m 4040
SCALE 1 M FEET
0 CROWLEY
F.M. 1187 W. RE DON-CROWLEY R
C CL
CROWLEY FT. WORTH 3K <
L 1141 TS
Q
BURLESON
LOCATION MAP
EDGEWOOD
PHASE I
Located In
Fort Worth, Texas
OWNER: ENGINEER/SURVEYOR:
WEATHERFORD VENTURE
P.O. Box $89
DeSoLo,Texas 75123-0689 5tarne5 Consulting Incorporated
(972)274-0001 FAX 19721 274-1004 4025 Woodland Park Blvd.Suite 230
Arlington.Texas 76013
(81'n 265-2881 Fax (817)265-4347
DEVELOPER:
WILDWOOD DEVELOPMENT COMPANY
P.O. Box 889
DeSoLo,Texas 75123-0689 JULY, 2003
19721274-0001 FAX 19721274-1004
cl
o 0
,Qm 1332LJ S Ifom
00 c)
at CD
C v a C,
0 q OX —
LU co
0040
CA
U
1 0 A
LU 0
Wtf 3 SIRE ON 19,IWO:f sl
X
Ipw
I A
ui
0 § -03
03
-erO Lij
CY
i I A
IAO 0 I�r A
A
ELF
z
:3
ku
ci
ci
20
z
0
uj
U.
CV
Maw DOL Uq 'ON,MM LVI-:o avow xamoun w)aK3w Isw
70
zu
G r Ci
.133'd.LS 00 aWom
CD
>
x
r TJ
C,)
qw)
5e
3Ard 3 S.LH E 13H IT MOA # q
z
0
o ry
3Nn3MLL
x
Lli 31,
3N 3AO 01S3 03
—W
uj "d'31d ZO dOWd
"U.
E- F E- E
-
pat w <
t7u
uj 0 0 0
C4 x
w
<
o
MOIAM, aVOW A3VAOUO NOCW:rd IS wt
AUG-11-2804 04 :24 PM $TARNESCONSULTIN 8172654347
P'. 03
ENGINTER'S OPINION OF PROBABLE COST
Date: 7/15/03 Project; Edge,,yood Phase I Client: Wildwood Development
Job No: SC100101 Location: Fort Worth, Texas
Item Ur1 t Total
No, Description Unit Quantity Price Cost
Paving Facilities
I CIcAring&Grubbing Acre 19.7 $2,000.00 $39,400.00
2. Unclassified Excavation C.Y. 25,784 $1.50 $38,676.00
3. Compacted F111(density Control) C.Y. 22,221 $1.00 $22,221.00
4. 6"Subgrade Lime Stabilized S.Y. 112,;74 $1.55 S20,10%70
5. Hydrated Lime Ton 195 $92-00 $17.940.00
6. 6"Concrete Pavement(Streets) S.Y. 12577 pp $20.50 S257,939.390
7. 4-Conci e Pavement(Wa&s) L.F. 6:936 9.6& sie.00 cgt*46,99101
8. Access Ramp-Comer Ea. 7 $650-00 $4,550.00
9. Access Ramp-Mid-block Ea. 26 $600,00 $15,6()0.00
10. Sawcut&Remove Asphalt L.F. 121 $12.00 $1,452.00,
11. Street Header L.F. 70 56040 54,200.00
12. Barricade L.F. 28 $50.00 $1,400,00
13. HMAC Transitiou S,Y, 10 523.00 $230.00
14. Emsion&Sediment Control-Paving Lot 1 $11,700.00 $11,700.00
is. Adjust Manhole E& 10 5300.00 53.000.1.10
Stut Nme Sign Ea, a $100.00 5800.00
t7-.- Street Light Foundation Ela, 13 S650,00 S8,450.D0
17
2"Schedule 80 PVC Conduit L.F. 2,928 S6.00 517,568.00
Pa Box F. 4 $-Z75.00 $1,100.
20. Trafric,saf*ry Lot 1 $3,500.00 53.500.00
21. Signage,A Pavement Marking Lot I S4,600,00 $4,600.00
Paving Subtotal 4~9,20
This engineer's opinion of probable cost is Wed an the cogineer's expericnoe and haw judtrncnt as a Proftn"n1k, Engineer,
MY evaluation of work to be performed to this contract Is spoculadve in nature undl the d%WW "p is W-platul-
OdWoAally,the engineer has no control over the cost of labor, material or services to be tUrniAed by others, or over market
0041d"M Acrjw oosu may vary &orn the values wntalned heraln. This opinion has been prop" in accordance with
generally accepted ensinet:rinj practices and neither expresses nor Implies any ruarUtu or warranty.
Mage 3 ors
ENGINEER'S OPINION OF PROBABLE COST
Date: 7/15/03 Project: Edgewood Phase I Client: Wildwood Development
Job No: SCI00101 Location: Fort Worth, Texas
Item Unit Total
No. Description Unit Quantity Price Cost
Storm Drain Facilities
1 21" R.C.P. Class III with Trench L.F. 214 $30,00 $6,420.00
2. 24"R.C.P. Class III with Trench L,F. 57 $34.00 $1,938.00
3. 27"R.C.P. Class III with Trench L.F. 48 $39.00 $1,872.00
4. 30" R.C.P. Class III with Trench L.F. 78 $45.00 $3,510.00
5. 54"R.C.P. Class III with Trench L.F. 68 $129.00 $8,772.00
6. 60"R.C.P. Class III with Trench L.F. 1,049 $146.00 $153,154.00
7. 60" R.C.P. (13-2 Radius)Class III with Trench L.F. 183 $159,00 $29,097.00
8. 66"R.C.P. Class III with Trench L.F. 86 $172.00 $14,792.00
9. 10' Curb Inlet Ea. 11 $2,350.00 $25,850.00
10. 5' Square Drop Inlet with Apron Ea. 1 $3,300.00 $3,300.00
11. 6' Square Manhole Ea. 3 $3,600.00 $10,800.00
12. Headwall Ea. 1 $4,300.00 $4,300.00
13. 12"Gabion S.Y. 637 $75.00 $47,775.00
14. Trench Safety L.F. 1,783 $1.00 $1,783.00
15. Erosion & Sediment Control-Utility Lot 1 $9,000.00 $9,000.00
Storm Drain Subtotal $322,363.00
This engineer's opinion of probable cost is based on the engineer's experience and best judgment as a Professional Engineer.
Any evaluation of work to be performed to this contract is speculative in nature until the detailed design is completed.
Additionally, the engineer has no control over the cost of labor, material or services to be furnished by others, or over market
conditions. Actual costs may vary from the values contained herein. This opinion has been prepared in accordance with
generally accepted engineering practices and neither expresses nor implies,any guarantee or warranty.
Page 4 of 5
C'l
U
Q
0 un
C
133NIS 00 'domWO fz
x
fX CL
cj
F- CO
0
o o
C9
O
3ANIH 3 S.LHC 3H 190A
UA
tu
43
3NV I 3AO 0 Isa OJ
LU
O
:3O
ku
CJ
Zd z
7
WE— E—
uj uj r,3
C> LLJ
LLJ
0
h"Ob 00t USLL'ON"tpm'ri'd) CYOU A3'WODWO NOCN34 1S3�A
III. STREET LIGHTS:
1. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 5 EA $ 2, 000 $10, 000 . 00
MID-BLOCK RESIDENTIAL 5 EA $ 2 , 000 $10 , 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 3 EA $ 2 , 000 $6, 000 . 00,
MID-BLOCK COLLECTOR 0 EA $ 2 , 000 $0 , 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2 , 500 $0 , 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $26, 000 . 00
City' s Cost $19, 500 - 00
Developer' s Subtotal $0, 000 . 00
10% Contingencies $0, 000 . 00
Project Total $26, 000 . 00
Adjacent Developer' s Cost $0 , 000 . 00
Developer' s Cost $0, 000. 00
2% Inspection Fee $0, 00 . 00
Developer' s Responsibility See PG
III-1, "Line 7"
EDGEWOOD, PHASE I
August 6, 2003
Fort Worth, Texas
August 6, 2003
PAGE 1 OF Exhibit C
2 . STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C" , immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department .
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
4 . The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit at a depth not less than 30 inches and at
least 18-inch behind the curb, "clear from all other utilities" .
S . The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit between streetlights proposed for
installation and the power source to become operational .
6 . A 3-inch schedule 80 PVC conduit is required when crossing streets
at a depth not less than 30 inches, unless indicated otherwise on
the plans concrete pull boxes shall be provided at the crossing
points .
7 . Street light conduit and footings shall be installed by the
developer' s contractor as part of and at the time of street
construction. The city will obtain electric service and complete the
street light construction in accordance with approved plans.
B . The developer or their contractor shall contact City' s street light
division 48 hours prior to starting any installation of conduit
and/or streetlights at (817) 871-8100 to insure proper inspection of
work.
9 .The procedure for installing conduit and footings will be with the
inspector on the job site or you can request a copy by calling 817-
871-6596 .
EDGEWOOD, PHASE I
August 6, 2003
Page 2 of Exhibit C
"STREET LIGHTS"
INTERSECTIONS
W. RENDON CROWLEY RD & TREELIKE DR 1
FOREST HEIGHTS DR & WORTHWOOD RD 1
FOREST GROVE DR & TREELINE DR 1
RIDGE TREE RD & TREELIKE DR 1
TREELIKE DR & TREELIKE DR 1
MID - BLOCK
FOREST HEIGHTS DR 1
FOREST GROVE LN 1
TREELIKE DR 3
CHANGE OF DIRECTIONS
RIDGE TREE RD 2
WORTHWOOD ST 1
EDGEWOOD, PHASE I
Page 3 of Exhibit C
IV
STREET NAME SIGNS
1 . The City will install the street name signs upon final approval
of the street construction. The street name signs will remain
the property of, and will be maintained by, the City.
2 . The City will pay for the street name sign installations required
for this development to the extent of $100 . 00 per intersection.
This unit cost will be revised annually by the Department of
Transportation and Public Works to reflect prevailing costs of
materials and labor.
3 . This development creates the following seven (7) intersections at
a cost to the City of $700 .00 :
Treeline Drive and Forest Grove Lane
Treeline Drive and Worthwood Street
Worthwood Street and Forest Heights Drive
Worthwood Street and Worthwood Street
Ridge Tree Road and Forest Grove Lane
Ridge Tree Road and Treeline Drive
Ridge Tree Road and Forest Heights Drive
Edgewood
Phase I
Fort Worth, Texas Date: August 6, ' 00-3
IV-1